signature: date: bexleyheath bellway homes south ......case study bexleyheath albion road,...

1
CASE STUDY BEXLEYHEATH ALBION ROAD, BEXLEYHEATH, LONDON DA6 7LB New brownfield development of 518 apartments, 9 commercial units and under croft parking in a six no reinforced concrete frames up to 12 stories. Work commenced November 2018 > Pile caps ground beam and lift shafts. > Storm and foul water drainage installation > Formation of under croft parking > Construction of 6 no reinforced concrete frames up to 12 stories in height CLIENT: Bellway Homes South East CONTRACT VALUE: £11,600,000 SCOPE OF WORKS GROUNDWORK AND CONCRETE FRAME SPECIALISTS www.coinford.co.uk

Upload: others

Post on 26-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Signature: Date: BEXLEYHEATH Bellway Homes South ......CASE STUDY BEXLEYHEATH ALBION ROAD, BEXLEYHEATH, LONDON DA6 7LB New brownfield development of 518 apartments, 9 commercial units

CASE STUDY

BEXLEYHEATHALBION ROAD, BEXLEYHEATH, LONDON DA6 7LB

New brownfield development of 518 apartments, 9 commercial units and under croft parking in a six no reinforced concrete frames up to 12 stories. Work commenced November 2018

> Pile caps ground beam and lift shafts.

> Storm and foul water drainage installation

> Formation of under croft parking

> Construction of 6 no reinforced concrete frames up to 12 stories in height

CLIENT:Bellway Homes South East

CONTRACT VALUE:£11,600,000

SCOPE OF WORKS

GROUNDWORK AND CONCRETE FRAME SPECIALISTS www.coinford.co.uk

Images

p1diqb32gsk3ud0c1n2b11en7g47.doc Page 2 of 2

Paul confirmed yes

Paul confirmed yes

Images

p1diqb32gsk3ud0c1n2b11en7g47.doc Page 2 of 2

Paul confirmed yes

Paul confirmed yes

CASE STUDY

p1diqb32gsk3ud0c1n2b11en7g47.doc Page 1 of 2

Site Name: Bexleyheath Job No: 724

Site Address: Albion Road, Bexleyheath, London DA6 7LB

Description: (Max 50 Words)

New brownfield development of 518 apartments, 9 commercial units and under croft parking in a six no reinforced concrete frames up to 12 stories. Work commenced November 2018

Client: Bellway Homes South East

Contract Value: £11,600,000

Scope of works:(Max 16 lines) Pile caps ground beam and lift shafts.

Storm and foul water drainage installationFormation of under croft parking.Construction of 6 no reinforced concrete frames up to 12 stories in height

Approved By: Position:

Signature: Date:

IMAGES: Paul confirmed yes