Page 1: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Simon KirbyDirector, Infrastructure Investment

Page 2: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Our inheritance

• Network Rail took over the railway Network Rail took over the railway infrastructure in 2002infrastructure in 2002

• A maintenance contract structure with little A maintenance contract structure with little incentive for efficiency incentive for efficiency

• 4,000 mile backlog in renewals4,000 mile backlog in renewals

• Regional structure, no central controlRegional structure, no central control

• An explosion in costs from £3.3bn per year in An explosion in costs from £3.3bn per year in 1999 to £6bn a year in 20021999 to £6bn a year in 2002

Page 3: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Track replacement volumesTrack replacement volumes (miles) (miles)

Page 4: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Key challenges

• SafetySafety– Reduce incidents of broken rails, SPADs, Accidents, etc…Reduce incidents of broken rails, SPADs, Accidents, etc…

• Performance Performance – Reduce delays by around 33% over next 5 yearsReduce delays by around 33% over next 5 years

• CostCost– Improve efficiency by around 31% over next 5 yearsImprove efficiency by around 31% over next 5 years

• Work volumesWork volumes– Massively increase volume of work being deliveredMassively increase volume of work being delivered

Page 5: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

And on a growing railway…

2000/01 2001/02 2002/03 2003/04 2004/05 2005/06

Pas

sen

ger

Jo

urn

eys

(m)

940

980

1020

1060

1100

1140

Passenger Journeys

Page 6: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Growth in Renewals – 07/08Growth in Renewals – 07/08

£m

0

500

1,000

1,500

2,000

2,500

04/05 actual 05/06 actual 06/07 actual

+23%

+22%

Page 7: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

0

100

200

300

400

500

600

700

800

Track Civils Signalling Estates E&P Telecoms

£m

05/06 actual

06/07 actual

+5%

+17%

+54%+30%

+59% +55%

Increased spend by asset in 06/07Increased spend by asset in 06/07

Page 8: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Growth in Renewals – 07/08Growth in Renewals – 07/08

£m

0

500

1,000

1,500

2,000

2,500

04/05 actual 05/06 actual 06/07 actual

+23%

+22%

07/08 budget

+10%

Page 9: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Enhancement spend

202 170 182280

388

642

806748 770 821

473567

1031

1411

100

300

500

700

900

1100

1300

1500

95/6 96/7 97/8 98/9 99/0 00/1 01/2 02/3 03/4 04/5 05/6 06/7 07/8 08/9

Mil

lio

ns

(£)

past spend future spend

Page 10: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Track renewals

Page 11: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Improvement in efficiencies

26%24%

10%

20%

0%

5%

10%

15%

20%

25%

30%

Controllable Opex Maintenance Plain Line S&C

22%

Projects

Page 12: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Our response

• National functional structureNational functional structure

• Maintenance in-houseMaintenance in-house

• GRIP GRIP

• Reorganising Track Renewals internally Reorganising Track Renewals internally

• Focus on costs, quality and timelinessFocus on costs, quality and timeliness

• Improving programme managementImproving programme management

Page 13: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Track renewals: current position

• Consistent improvement Track Quality Consistent improvement Track Quality

• Delay minutes reduced year on yearDelay minutes reduced year on year

• Good S&C performanceGood S&C performance

• Improving Plain Line DeliveryImproving Plain Line Delivery

• Plain Line costs improving but still not fast Plain Line costs improving but still not fast enoughenough

Page 14: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Track renewals: 2007 activities

• Fundamentally overhaul the whole renewals Fundamentally overhaul the whole renewals end to end process end to end process

• Reward best 4 of 6 performing contractors Reward best 4 of 6 performing contractors through competitionthrough competition

• Create efficient delivery methods for short Create efficient delivery methods for short duration possessionsduration possessions

Page 15: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Supplier rationalisation

• By the autumn we plan to down select the best 4 contractors (from 6)

• 4 Territory based renewals Contractors and 1 National high output contractor

• We will review the allocation of work to optimise delivery method and agent

• We will manage against key indicators and drive for collaborative and integrated working

Page 16: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

End-to-end process improvement

• Accelerating engineering specifications

• Plan is to create a 3 year rolling renewal programme

• Whole process from maintenance through track engineering, planning and track renewals is being mapped & optimised

• Behavioural change and training programme being developed

Page 17: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Target Improvement

5%

10%

15%

20%

25%

30%

35%

2004/ 05 2005/ 06 2006/ 07 2007/ 08 2008/ 09

Circa 22% to 25%

31%

TargetCurrent positionPost-changes

Page 18: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Conventional Renewals

Page 19: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Conventional renewals

• Structured reviews of:– engineering specifications to deliver optimised

worksite packaging

– resource planning to increase efficiency

– mapping resource availability to demand

• Greater involvement in contractor management using performance indicators

• Higher-level cross industry cooperation

Page 20: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

High Output MachineryHigh Output Machinery

Page 21: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

High Output MachineryHigh Output Machinery

• Continued development of High Output systems (e.g. SLW)

• Potential acquisitions of additional plant

• Deployment of medium output solutions being progressed (e.g. MOBCs and Slinger)

Page 22: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Modular turnoutsModular turnouts

Page 23: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Modular turnouts

• Developing a systems solution to delivering S&C

• Standard products, factory built and modular delivered on bespoke wagons

• Lean manufacturing techniques in manufacturing and installation

• Through life benefits – quality, reduced maintenance, installed monitoring

• Will progressively replace conventional techniques – up to 75%

Page 24: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Modular turnouts

Controlled build

Delivered in-gauge

Modular installation

(on flat bed)

Page 25: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Conventional Renewals

54 hours Today!

37 hours Basic process changes & disciplines: incentivised, templated, site presence

27 hoursBearer Splice – road delivery / out of gauge

21 hours, or 2 x 12 hours Modular assembly, tilting wagon delivery,

improved excavation, ballast laying

8 hoursConsistent mid-week possessions

7 Day Railway

6 Day Railway

Page 26: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Conventional Renewals

Money / time

27 hrs

54hrs

12 hrs

8 hrs

37 hrs

Core possession time

Pro

cess

Spl

ice

Wag

ons

& A

ssem

bly

Man

ufac

ture

+?

£477k/ point end

£443k

£406k

Sub £350k

Best ‘UK’ Class

Equivalent Best European Class (today)

World Leader

GB (today)

Page 27: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

8 hour plain line

Page 28: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

8 hour plain line

• Concept study completed to explore principles and prove and clarify the remit

• Key objectives include:– Standard unit of delivery– Installation less than 8 hrs– Single line working– High line speed opening (85mph+)

• Full programme by mid-2007• Progressive introduction from 2009 anticipated• Will moderate, or reverse, efficiency aspirations

Page 29: Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway

Simon KirbyDirector, Infrastructure Investment