single phase protodune detector installation plans and constraints jack fowler duke university...

Download Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016

If you can't read please download the document

Upload: paul-bartholomew-lawrence

Post on 20-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Installation and integration scope Review all activities with CERN HSE DSO for proper training, access and PPE requirements. Also develop work packages. Set up receiving and testing area for components at CERN.  From each subsystems QA plan, develop the test areas required at CERN. Organize effort for integrated testing at CERN before, during and after installation. Organize infrastructure required in EHN1. Organize detector survey during construction. Set up tooling required for installation in EHN1. Coordinate detector installation with cryogenic installation. Install and test the detector components. Commission detector. 23-Feb-2016Jack Fowler | SP PD Installation discussion3