sinus representative office 53 le ngoc han str., hai ba trung …sinus.internetdsl.pl/sinus.pdf ·...

67
SINUS LTD. Przemyslowa 2 83-000 Pruszcz Gdański Poland TEL: +48 58 6823011 FAX: +48 58 6823015 e-mail: [email protected] Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District, Hanoi, Vietnam TEL: +84 4 976 5228/9 FAX: +84 4 976 5227 e-mail: [email protected]

Upload: others

Post on 12-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

SINUS LTD.Przemysłowa 2

83-000 Pruszcz Gdański

PolandTEL: +48 58 6823011FAX: +48 58 6823015e-mail: [email protected]

Sinus Representative Office53 Le Ngoc Han Str.,Hai Ba Trung District,

Hanoi, VietnamTEL: +84 4 976 5228/9FAX: +84 4 976 5227e-mail: [email protected]

Page 2: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT

As informed by The Hanoi Timeson 15 January, 2009 – „A floating storage and offloading unit (FSO) which has a capacity of 150,000 tonnes, the FSO5, was successfully launched today by the Nam TrieuShipbuilding Industrial Corporation. This is the biggest vessel built by Vietnamese shipbuilders so far.

FSO5, built for the PetrovietnamTechnical Services Corporation (PTSC), is over 258 meters long, 46 meters wide.”

The FSO-5 was designed by SINUS Ltd. Co., (Poland) and examined by the GL/ABS andthe Vietnam Register of Shipping. The vessel is 276.14 meters long, 46.4 meters wide, and 24 meters high and will be equipped with three engines with a capacity of 800-1,200 KW. FSO5 can store and supply crude oil to refinery with an output of 3,500-5,000 cubicmetres an hour.

Page 3: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ARTICLES ABOUT BALTECOLOGICALSHIP

EUREKA - E! 2772

www.bg.pg.gda.pl/pmr.html

Page 4: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ARTICLES ABOUT ECOLOGICAL DOCK

EUREKA - E! 2968

www.bg.pg.gda.pl/pmr.html

Page 5: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ARTICLES ABOUT INCOWATRANS

EUREKA - E! 3065

www.bg.pg.gda.pl/pmr.html

Page 6: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ARTICLES ABOUT STEEL SANDWICH PANELSEUREKA - E! 3074

Page 7: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ARTICLES ABOUT CORET

EUREKA - E! 3614

www.bg.pg.gda.pl/pmr.html

Page 8: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

NAVAL ARCHITECTURE / MARINE ENGINEERING / MARINE CONSULTING

Page 9: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

SINUS Ltd was set up in 24.04.1989 to provide high class technical service for the vessels of different types. It was headed by TomaszLacki, assisted by a team of highly qualified Naval Architects / Marine Engineers who had came from former ship design and construction office of Gdansk Shipyard Ltd. All of them are licensed engineer. The team of designers, headed by Wlodzimierz Lacki —formerly senior Naval Architect of Gdansk Shipyard Design-Office, brought to the company their experience gained during years of practice based on hundreds of vessels delivered to different owners all over the world.

Page 10: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Since June 2001 SINUS has completed ISO 9001 requirements confirmed by CERTIFICATE.Now the company is in the process renewal the ISO 9001:2000 CERTIFICATE (in three Authority: DnV, GL and PRS) and the new ISO 14001 CERTIFICATE implementation.

Since 2001 SINUS has managed the co-operation with Faculty of Ocean Engineering & Ship Technology in Gdansk University of Technology.

Page 11: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ORGANISATIONAL DIAGRAM:

Chairman

T. Łącki

Vice Chairman

M. Łącka

Quality Manager

Cz. Szpanowski

General Designer

W. Łącki

Naval Architect

K. Sroka

Project Manager

L. Milewicz

ARCHIVE

Safety supervisorCz. Janczała

ChairmanassistantJ. Kozieł

IT DepartamentS. Ryba

R .Ostapkowicz

SecretaryB. Rams

English languageconsultant

J.Jankowska

Leader ofhull

structure

J. Cetnarski

Leader of

engine

R. Tyszkiewicz

Leader of

electricity

A. Łukiewski

Leader ofmachineryand piping

M. Tarczyński

Leader ofdeck

equipment

J. Kort

Leader ofarchite-cture

K. Nowacka

28 persons

7 persons

3 persons

10 persons

4 persons

2 persons

Page 12: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Engineering Manpower:

Activity No. of engineerspermanent

General Design- senior project managers 3Hull and structural design, Theoretical calculations 28Eng. room and machinery and Piping Systems 17Accommodation arrangements 2Electric, Navigation, Automation Systems 3Deck machinery 5Surveys and inspections 2

Number of persons that presently work in other companies: - 9 persons in NORWAY; - 3 persons in Stralsund Shipyard, GERMANY - 6 persons working for GL Engineering Service, GERMANY

VIETNAM OFFICE,

MARINE TECHNIC Ltd.

Page 13: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

“TRIBON” engineers for detail design

Department Number ofTRIBON Users

Remarks

Hull 16 Hull modelling, structure, nestingand production information

Eng. room and machinery and Piping Systems 13 Structure for machinery, piping

Accommodation arrangements 1 Accommodation, structure andinsulation

Electric, Navigation, Automation Systems 3 Cabling, structure for electricalequipment

Deck machinery 4 Structure and piping for deckequipment

General Design 2 Lines fairing – NAPA forTRIBON

Total of Project values Number of Projects Maximum Engineering - hours

DEPENDS ON THE PROJECT 1 TO 4 15000 hours per month

SINUS Sp. z o.o. is possible to increase the number of designers up to 100 persons.

Page 14: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Additional possibilities :

• Electric balance calculations

• Principal and detail diagrams

• Inclining tests

• Lofting and cutting information on data files

• Surveys and inspections

• Certified welders and Ship Mechanics

ENGINEERING SERVICE

Structural engineering

Machinery and propulsion systems

Detail design drawings

Deck equipment

Stability Calculations according to IMO codes

Class drawings with approval

Piping systems

Electric, automation and navigation systems

FEM Analysis

Arrangements and layout

Fire control and safety plans

Page 15: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

ENGINEERING TOOLS

AUTOCAD 2000

TRIBON M3

Class programs PRS, DnV, LR, BV, ABS, GL

AUTOSHIP

AUTOHYDRO

AUTOPOWER

Cutting Information in ESSI Code with possibility to read AutoCad

ANSYS

Page 16: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

1 08.1996 –12.1996

820 TEUContainerCarrier

Class drawings hull,partly hull systemsand deck equipmentincluding classapproval.

Preussag Noell / Sheller

2 12.1996 –05.1997

1300 TEUContainerCarrier

Class drawings hull,partly hull systemsand deck equipmentincluding classapproval.

Preussag Noell / LeonardBlumberg

3 1997 1700 TEUContainerCarrier

Whole class designincluding approval

Preussag Noell / ChristianAhrenkiel

4 08 – 11 1997 Gas carrier3750 cbm

Hull systems, classand productiondrawings

Preussag Noell / Ferrostaal

5 1998 Car carrier Workshop drawingsand cuttinginformation for 6blocks

MARITECH German Owner

SINUS Reference List

Page 17: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

6 1998 Offshoresupportvessel

Workshop drawings MARITECH Norwegian Owner

7 11.1997 –06.1998

ConversionM/T ARTICA

Design package fornew part from front ERbulkhead.

FKAB / Naval Yard Gdynia

8 05 – 07 1998 Cargo Ship13000 TDWSine 101

Contract andclassification projectwit approval in GL

ERKA SHIPPING – HamburgGermany

9 06 – 08 1998 Conversionof M/V TEGEfromheavylift tocontainervessel

Main contractor forturn-key projectincluding finance,management for sub-contractor (YantarShipyard), supervisingand engineering.

CHRISHIP AS J Christiansen,Norway

SINUS Reference List

Page 18: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... Project Name

Major buisness Client or project number

10 02.1998 – 05.1999

Conversion of six bulk carrier

MS “DUOBULK”, “TRIOBULK”, “QUATROBULK”, “CINCOBULK”, “SEISBULK” and SP507. Main contractor for turnkey project including finance, management for sub-contractor (Yantar-Shipyard), supervising and engineering. Lengthening 15,4 m with new hatch coamings and covers plus general R&M work. Additionally in “QUATROBULK”, “CINCOBULK”, “SEISBULK” and SP507 rebuilding E.R. and new main engine.

Vang Shipmanagement AS FB Invest AS, Norway

SINUS Reference List

Page 19: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

11 1998 Localassistanceat Hull Dept

Classification andworkshop drawings onNB 498, cruise vesselfor COSTA.

Kvaerner Masa Yards

12 1998 Bulkdischargingbin

General layout of bulkdischarging bin

Malmo Hamn AB

13 07 – 11 1998 Containercarrier2500TEU,NB 8184

Workshop drawingswith cutting files forcargo hold sections.

Gdynia Shipyard Poland

14 07 – 09 1998 Car carrierfor 6000mobiles, NB8168

Drawings of bottom,sides and deckssections, and NCdocumentation

Gdynia Shipyard Poland

15 1998 Conversionof “MANSALOFF-SHORE”

General engineering,strength calculations,class approval andworkshop drawings.

Malta drydock

SINUS Reference List

Page 20: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

16 1998 MalmoHamn AB

Project for design andmeasures to improveinternal and externalenvironment includingreduction of dustlevels spread by wind.Project plan andspecification forlandscaping.

Malmo Hamn AB

17 1998 ROROconversion

Conversionspecification for rorovessel

Tor Line AB

18 1998 Fishingvesseldesign

Feasibility study onfishing vessel designfor Namibia Industryinvestments.

A&P Inc. Switzerland

SINUS Reference List

Page 21: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

19 1998 NB 68,Ropax2000+

Local assistance atYard for checking andcorrections of classand workshopdrawings on steel andinterior. NB 68, Ropax2000+ for COTUNAV

FOSEN MEK Norway

20 02 –07 1999 Multipurpose vessel m/v“HARJUMAA”

Finalising of buildingand taking over toEstonian Owner

ESCO Shipping - Estonia

21 1999 Tankervessel -105.000 T,NB 8183

NC documentation. Gdynia Shipyard - Poland

22 01 – 05 1999 CableLayingVessel430/431 TEU

Whole class design. VWS Yard, Stralsund - Germany

SINUS Reference List

Page 22: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

23 08 – 11 1999 Product/chemical carrier78500 m3,NB 8185

Hull workshopdrawings and NCdocumentation.

Gdynia Shipyard- Poland

24 1999 Hull fairing Preparation andsupervising of hullfairing technology.

Clipper Star

25 07 – 08 1999 Product/chemical carrierNB 8221

Contract design. Gdynia Shipyard- Poland

26 1999 Product/chemical carrier

Hull workshopdrawings and NCdocumentation.

Gdynia Shipyard- Poland

27 11 – 12 1999 Passengerferry NB 69

Hull workshop drawing– 4 sections.NC – 25 sections

F.K.A.B – Sweden

SINUS Reference List

Page 23: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

28 02.2000 –01.2001

RO-LO14800tNB 8222

Workshop drawings,NC documentation, 3DMachinery Modellingand detail engineering

Gdynia Shipyard- Poland

29 06 – 11 2000 ContainerCarrier 2000TEU, NB8200

Hull workshopdrawings and NCdocumentation.

Gdynia Shipyard- Poland

30 01 – 03 2001 ISIS FPSO Conversion of Tankerto Floating ProductStorage and Offloadingvessel in Malta.

Malta Drydocks - Malta

31 2001 1200 TEUContainerCarrier

Hull Class drawings. Christian Ahrenkiel - Germany

32 2001 3000 TEUContainerCarrier -Panamaxsize

Hull Class drawings -working andclassification drawingin TRIBON.

MAERSK - Germany

SINUS Reference List

Page 24: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

33 2002 BARGE AG4131

Workshop drawingsand NC documentation- 10 blocks

FKAB - SWEDEN

34 2002 AsphaltTanker 4950DWT

Technical drawings,strength and thermalcalculation, approvalin GL.

SDM - Germany

35 2002 - 2004 ENVIRON-MENTFRIEN-DLYSHIPS FORBALTICAREA –RESEA-RCH.PROJECTEUREKA -E!2772

Preliminary project,technical drawingsand approval in GL 4new “CLEAN DESIGN”vessels:SINE 202 - Containercarrier 950TEU,SINE 203 - Tankervessel,SINE 204 - RO-ROvessel, and ESINE 205 - River/Seavessel

TECHNICAL UNIVER-SITY INGDANSK AND SZCZECIN

SINUS Reference List

Page 25: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

36 2003 - 2005 ENVIRONMENT FRIEN-DLY FLOA-TING DOCK– RESE-ARCHPROJECTEUREKA -E!2968

Preparation oftechnical require-ments, estimation ofbuilding costs and lifetime cost prediction,preliminary design ofreconstruction andmodification ofexisting floatingdocks, materialmanagement andmarketing activities inrelation toenvironment friendlyfloating dock.

TECHNICAL UNIVER-SITY INGDANSK AND WARSAW

37 2003 CONTAI-NERVESSEL4100TEU -SINE 211TD

Preparation oftechnicaldocumentation withapproval inGermanischer Lloyd

RADEREI PATJENS e.K. -Germany

SINUS Reference List

Page 26: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

38 2004 - 2006 RESE-ARCHPROJECTEUREKA -E!3065‘INCOWATRANS’

Preparing of technicalrequirement for designof inland and coastalships environmentallyfriendly.Planned projects of 4types of vessels:SINE 207 - INLANDGENERALCARGO/CONTAINER18/36TEU.SINE 208 - INLANDRORO VESSELSINE 209 - INLANDBULKCARRIER /CHEMICAL CARRIERSINE 210 - INLANDRESEARCH VESSEL

TECHNICAL UNIVER-SITY INGDANSK

SINUS Reference List

Page 27: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

39 2004 - 2007 RESE-ARCHPROJECTEUREKA -E!3074‘ASPIS’

Application of multi-layers steel panels inships construction.Analysis ofconstruction andtechnological solutionin existing ships fromthe double-layerstructure applicationpoint of view.Strength analysis ofnew constructionsolutions with panelsapplication.

TECHNICAL UNIVER-SITY INGDANSK

40 2005 UMBILICALLAYINGVESSEL

TechnicalDocumentation

S 282 - SAW 2017

41 2005 UMBILICALLAYINGVESSEL

TechnicalDocumentation

S 336 - SAW 2019

SINUS Reference List

Page 28: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... ProjectName

Major buisness Client or project number

42 2005 TimberCarrier

Technical design Herman Buss - Germany

43 2006 FJELLSTRAND AS -AHTS

Conversion S 360

44 2006 Drilling Rig I Workshop hulldrawings for part ofplatform

Energomontarz Gdynia /AkerKvarner

45 2006 GEOMSTER- AHTS

Conversion S 330

46 2006-2007 Drilling Rig I Workshop hulldrawings for part ofplatform

Energomontarz Gdynia /AkerKvarner

SINUS Reference List

Page 29: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... Project Name

Major buisness Client or project number

47 2007 FSO 150 000 DWT

Class design and workshop documentation

Monobuoy / Vinashin Offshore / PTSC

48 2006 POLAR VENTURER - AHTS

Conversion S 265

49 2007-05 to 2007-10

FPSO Documentation for conversion of vessel (class and workshop) and model

TEEKAY PETROJARL (Norway

50 2007 M/V GOESEA - AHTS

Conversion S 079

51 2007 CGG DUKE - AHTS

Conversion S 008

SINUS Reference List

Page 30: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

53Order

From...to... Project Name

Major buisness Client or project number

52 2007

1250 TEU Container

Ship – SINE 214

PT Documentation Raderei Patjens e. K. - Germany

53 2007 H602 Platform

Technical Documentation Elektromontaz

54 2007 FPSO SIRI

Technical Documentation of Container Ship tp FPSO conversion

Petrojarl Production AS

SINUS Reference List

Page 31: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Order From...to... Project Name

Major buisness Client or project number

55 2008 ST.

BARBARA - AHTS

Conversion and modernisation of hull

construction and onboard equipment

and systems, in order to use modified drill rig

and moonpool to perform sea bottom

examination.

MILIANA SHIPPING COMPANY / PETROBALTIC

56 2008 BN 162 - - AHTS

Workshop piping documentation

BERGEN GROUP NEWBUILDING AS

57 2008

3200 TEU Container

Ship – SINE 215

PT Documentation Raderei Patjens e. K. - Germany

58 2008 FSO-5 Working Documentation

Vinashin Offshore / PTSC Vietnam

SINUS Reference List

Page 32: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT - E!2772 BALTECOLOGICALSHIP - SINE 202 -Container Vessel 950 TEU

Page 33: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT – E!2772BALTECOLOGICALSHIP - SINE 203 -Oil Product Tanker Ship

Page 34: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT – E!2772 BALTECOLOGICALSHIP - SINE 204-RO-RO Vessel 7400 TDW

Page 35: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT – E!2772 BALTECOLOGICALSHIP - SINE 205 -RIVER-SEA Vessel 2900 TDW

Page 36: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT - E!3065 INCOWATRANS - SINE 207 -Inland General Cargo / Container 18 /36 TEU

Page 37: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT – E!3065 INCOWATRANS - SINE 208 -Tug and Barge

Page 38: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

EUREKA PROJECT –E!2969 ECOLOGICAL DOCK - SINE 212 -Ecological Dock

Page 39: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No SINE 0012 – 1700 TEU Container Carrier

Owner: Preussag Noell

Scope of work: complete class documentation.

Page 40: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No 430/431 – Cable LayingVessel

Client: VWS Yard Stralsund.

Scope of work: complete classdocumentation.

Page 41: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No NB 8221 – Product/ Chemical Carrier

Client: Gdynia Shipyard

Scope of work: contract documentation.

Page 42: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No SINE 210 Oil Tanker 4500 DWT

Scope of work: complete technical documentation.

Page 43: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT Asphalt Tanker 4950 DWT

Client: SDM Germany

Scope of work: complete technical documentation.

Page 44: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No SINE 211-TD –Container Vessel 4100 TEU

Client: Raderei Patjens

Scope of work: complete technical documentation.

Page 45: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT No SINE 201-III-TD –Container Vessel 950 TEU

Client: Raderei Patjens

Scope of work: complete technical documentation

Page 46: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT OSTSEE-TD/0110-1–

Multi-Purpose Dry Cargo Vessel

Client: HERMANN BUSS GmbH & Cie

Scope of work: complete technical documentation

Page 47: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion

Client: Malta Drydocks

Scope of work: documentation for conversion of Tanker to Floating ProductStorage and Offloading vassel in Malta

Page 48: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of hull drawings - NEW SEA CHEST CONSTRUCTION.

Page 49: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion.

Client: Malta Drydocks

Example of hull drawing - HELICOPTER DECK-SUPPORT CONSTRUCTION

Page 50: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of piping drawing - HYDRAULIC CONTROL LINES ARRANGEMENT

Page 51: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of piping drawing - DECK PURGE LINE ARRANGEMENT (ON DECK)

Page 52: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - PROCESS DISCHARGE LINE ARRANGEMENT ON DECK INCLUDING TYPICAL SUPPORT

Page 53: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - FLARE PIPING ARRANGEMENT

Page 54: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - PRODUCED WATER PIPING ARRANGEMENT ON DECK

Page 55: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion Client: Malta Drydocks

Example of electrical drawing -CABLES ROUTING

Page 56: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of electrical drawing -CARGO HIGH HIGH ALARMS ARRANGEMENT ON DECK

Page 57: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FPSO SIRI – Conversion

Client: Teekay Petrojarl

3D model in TRIBON

Page 58: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FPSO SIRI – Conversion

Client: Teekay Petrojarl

Page 59: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Drilling Platform H-600

workshop and welding documentation

Page 60: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Drilling Platform H-600

workshop and welding dokumentation

Example of piping and cable tray laying

Page 61: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

Drilling Platform H-600

workshop and welding documentation

Page 62: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico

Page 63: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico

TURRET

Page 64: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico

Page 65: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico

Page 66: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico

Example of piping co-ordination

Page 67: Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung …sinus.internetdsl.pl/sinus.pdf · 2009-02-23 · Sinus Representative Office 53 Le Ngoc Han Str., Hai Ba Trung District,

FSO-5 PROJECT Client: PTSC

Shipyard: Vinashin - Nasico