Dismantling

TRANSCRIPT

  • 5/28/2018 Site Clearance and Demolition

    1/2

    Site Clearance and Demolition

    Objective

    To define standard procedures and arrangements for site clearance and demolition works

    Scope

    This methodology covers demolition of existing structures and clearance of construction site in

    accordance with Construction drawings and Specifications and to the satisfaction of the Engineer.

    Procedure

    Prior to start of demolishing activities all structures that are to be demolished will be thoroughlyexamined to ascertain their type, construction details and appropriate method of demolition to be

    used.

    Method statement for demolishing of structures compromising of sequence and method of workingwill be submitted for the approval of Engineer before the commencement of demolishing and

    breaking out of each type of structure.

    Demolishing will be carried out in controlled manner using suitable equipment such as cranes,excavators, Jack hammers and chisels or pneumatic or electric breakers etc as per site requirements

    with the approval of Engineer without causing any damage to the adjacent structures.

    Demolition and breaking out will be carried out by taking all the necessary measures such asproviding protective barriers, safety barriers etc to ensure safe working.

    Redundant services such as electrical cables, transformers, pipe work, ducts etc will be disconnectedand removed in the area to be demolished as per consultation with the relevant statutory

    authorities. Services which are to remain in use will be protected from damage and kept clear of

    debris at all times.

    All redundant foundations, manholes, drains and buried items will be completely broken out, andremoved accordingly as per Engineers instructions.

    The demolished material will be sorted and disposed-off accordingly as per Engineers includingmaterial to be deposited at clients store, debris and by-products.

    All demolishing activities will be properly supervised to ensure the performance as per specificationsand given details on drawings to the satisfaction of Engineer.