Page 1: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 1/19

 

1

MW Site CompletionReport

Site ID (Near end): 0078

Site ID (Opposite end): 0390

Site Name: Kamran chowrangi

Region: Karachi

Project: MW South

Submission Date: 26-09-2013

Page 2: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 2/19

 

2

About This cument:

This document is intended to regulate the site installation documents at each step of a microwave project

specify the quantity and format of output documents at each phase and provide guide lines on the integrity

and specification of output documents.

Page 3: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 3/19

 

3

Table of Contents

Link Budget.......................................................................................................................... 4

Board Plan ........................................................................................................................... 5

Media Plan .......................................................................................................................... 5

SW Commissioning ............................................................................................................. 6

HW Installation Pictures ................................................................................................... 08

MW Installation Check list ................................................................................................ 11

Confirmation Check List …………………………………………………………………………………………..….15

1- Link Budget

Designed RSL: -39.24(dBm) Tx Power: 20.0(dBm)

Achieved RSL: -41.2(dBm) Tx Frequency:15047.0/ 14557.0(MHz)

Page 4: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 4/19

 

4

S-KHI-0078  S-KHI-0390 

Elevation (m)  63.67  46.31 Latitude  24 55 39.10 N  24 56 32.30 N 

Longitude  067 07 50.40 E  067 11 57.30 E True azimuth (°)  76.69  256.72 Vertical angle (°)  -0.16  0.12 

 Antenna model   A15D12HS   A15D12HS  Antenna height (m)  25.00  25.00  Antenna gain (dBi)  42.60  42.60 

Circ. branching loss (dB)  3.60  3.60 

Frequency (MHz)  15000.00 Polarization  Vertical 

Path length (km)  7.12 

Free space loss (dB)  133.04  Atmospheric absorption loss (dB)   0.20 Field margin (dB)  1.00 

Net path loss (dB)  56.24  56.24 

Radio model  15G_HP_128Q_28M_159M  15G_HP_128Q_28M_159M TX power (watts)  0.10  0.10 TX power (dBm)  20.00  20.00 

EIRP (dBm)  59.00  59.00 Emission designator   28M0D7W  28M0D7W 

TX Channels  24B28H 15047.0000H  24B28L 14557.0000H 24B28H 15047.0000V  24B28L 14557.0000V 

RX threshold criteria  BER 10-6  BER 10-6 RX threshold level (dBm)  -70.00  -70.00 

RX signal (dBm)  -39.24  -39.24 Thermal fade margin (dB)  33.76  33.76 XPD fade margin - multipath (dB)  29.07  29.07 Flat fade margin - multipath (dB)  27.80  27.80 

Geoclimatic factor   1.53E-03 Path inclination (mr)  2.44 

Fade occurrence factor (Po)  6.49E-03  Average annual temperature (°C)   26.00 

Worst month - multipath (%)  99.99892  99.99892 (sec)  28.35  28.35 

 Annual - multipath (%)   99.99960  99.99960 (sec)  127.58  127.58 

(% - sec)  99.99919 - 255.16 

Rain region  ITU Region K 0.01% rain rate (mm/hr)  42.00 

XPD fade margin - rain (dB)  41.10  41.10 Flat fade margin - rain (dB)  33.03 

Rain rate (mm/hr)  128.25 Rain attenuation (dB)  33.03  Annual rain (%-sec)  99.99964 - 112.06 

 Annual multipath + rain (%-sec)  99.99884 - 367.22 

Tue, Jun 04 2013 S-KHI-0078-S-KHI-0390.pl4  Reliability Method - ITU-R P.530-12 Ran - ITU-R P530-7 

Page 5: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 5/19

 

5

2- Board Plan 

Site ID: 0078

PIU-

10FAN-

11

7 CSH 8

5—IFX2->0390-V 6—IFX2->0390-H

PIU-

9

3—IFX2->0390-V 4—IFX2->0390-H

1- 2—SL1D

3- Media Plan 

Route

Site ID Rout Site-1 Rout Site-2 Rout Site-3 Warid Tie

E1

4. SW Commissioning pictures

After completion of Hardware installation and Software commissioning following pictures will be required.

1.  Software Commissioning (Pictures).

Main Window

(Select NE from NE Explorer >> Click Slot Layout

from main Window)

TX Frequency

(Select ODU from NE Explorer >> Click ODU

Interface>> Radio Frequency Attribute)

Page 6: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 6/19

 

6

IF Attributes

(Select IF1A from NE Explorer >> Click IF

Attribute>> Radio Working Mode)

TX Power & RSL

(Select ODU from NE Explorer >> Click ODU

Interface>> Power Attribute)

N/A

Node Name & Node ID

Page 7: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 7/19

 

7

(Select NE from NE Explorer >> Expend NE Configuration >> Click NE Attribute)

Cross Connections

(Please capture after expanding cross connections)

Protection (If applicable)

(Select NE from NE Explorer >>ExpendNE Configuration >> Click Cross connect Configuration)

N/A

Page 8: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 8/19

 

8

5. MW Installation pictures

Antenna Fixing

(Must Cover antenna assembly while capturing) 

ODU Fixing and waterproof

(Must cover both IF Connectors in case of 1+0) 

ODU Grounding

(Show Grounding termination)

IF Cable grounding

(Show IF End)

Page 9: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 9/19

 

9

IF Cable Grounding

(Show Bus Bar end)

IF Cable Grounding

(If Bus Bar installed)

Page 10: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 10/19

 

10

MW Rack& DDF& DCDB

(Cover all Three in one frame) IF cableloop

(Near to ODU)

Page 11: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 11/19

 

11

Cable Routing on Vertical Ladder

(Identify Recently Installed cable) IDU Grounding

(Cover termination end)

Near to tower brases use the mounting bracket bolts

in revarce path Use Of the labels for DC power breakers

Page 12: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 12/19

 

12

DDF

(Identify Recently Installed cable with proper

labeling)

DCDB

(Cover your Cable connection at Breaker in right

sequence)

N/A N/A

Page 13: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 13/19

 

13

Grounding cable should be routed & printed labeled Power cable should be routed & printed labeled

IF connector of ODU should be waterproofed and

face downward.

Mention the Faceing ID at both end

Page 14: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 14/19

 

14

6- Microwave Installation Check List 

Site Supervisor Name: Adnan Cell Number:03003672767

Signature: ____________________________ Date:_________26-09-2013___________________

mation

e ID (A) 0078 Site ID (B) 0390 Subcon Symbia

MW Design Detail Checklist

nk Type (PDH/SDH) PDH

Indoor Installations OK Not OK Remarks

19 inch Rack Installation N/A

ability of 19" Rack mounting and alignment as per drawing. N/A

oper Leveling and Drilling works N/A

oper tightening of all nuts and bolts and No nuts and bolts missing N/A

ounding Bus Bar Mounting & DCDB installation. N/A

IDU Check List

Page 15: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 15/19

 

15

mly installed (Best suitable place) OK

ftware Check (using WEB LCT) OK

L Check & Snapshots (using WEB LCT) OK

tenuation Values & TX Power Check & Snapshots as per Link Budget OK

eck Far end Visibility (NMS) OK

oper IF Cable Connector & tightness OK

cuit Breakers of proper rating installed OK

Grounding

oper thimbles used at Grounding Bus Bar OK

rge Arrestors properly installed & grounded (If applicable) N/A

st OK Not OK Remarks

U properly grounded OK

'' rack properly grounded N/A

DF properly grounded N/A

Cable Laying/ Labeling

cables properly cut, laced and terminated OK

oper Routing of IF Cables, PCM Cables and Power Cables OK

Cables and Power Cables laid separately OK

Us properly labeled OK

e Tags used at IDU end for labeling OK

B and Circuit Breakers labeled OK

/ PCM/ Power Cables labeled OK

beling of E1 terminations done on DDFs N/A

utdoor Installations

Page 16: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 16/19

 

16

Antenna/Mounting Works  OK NOK Remarks

crowave Dish and Mounting Bracket installed properly OK

tra IF cable should be twisted to 2 or 3 circles near ODU/Antenna OK

oper weather proof taping at ODU/ Antenna side OK

tenna Water drain hole detaches rubber cap and drain hole must be at bottom OK

tenna height as per the link budget OK

Nuts and Bolts properly tightened OK

W Antenna Side Support properly mounted OK

tenna Pole Fixed Properly OK

tenna Bracket Fixed in Pole Properly OK

nnectors properly made and securely tightened OK

stec properly sealed N/A

Grounding OK NOK Remarks

oper thimbles used OK

DU properly grounded with scratched paint tower OK

Cables grounded with all outdoor bus bars available OK

ot more than one grounding termination on a single point on bus bars OK

Cable Laying/ Labeling

oper Routing of IF Cables OK

uminum tags used for labeling at ODU side for IF Cables N/A

grounding wires/ cables in downward direction from ODU/ IF Cables on tower OK

cables properly tied on tower OK

aveguide/IF cable termination (antenna to ODU/equipment side) OK

beling for each PCM cable and for each E1 N/A

Page 17: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 17/19

 

17

Tests Performed

witch over function success N/A

/ Rx Mute function success OK

oopback success OK

ear-End loop back success OK

r-End loop back success OK

OW function success N/A

arm Generation and Reporting success OK

op visible on NMS OK

hours BERT Test N/A

tching of all E1s checked N/A

Items to be attached with Pre-PAT document  OK NOK Remarks

Hours BERT Test Report N/A

nk Performance Report OK

ommissioning Documents OK

stallation Pictures (Indoor/Outdoor) OK

L & Configuration Snapshots (tx power, attenuation etc.) OK

ard Inventory Information OK

0- House Keeping

e properly cleaned OK

Page 18: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 18/19

 

18

quipment Serial #

IDU ODU HYBRID DISHite A

ite B

REMARKS

TP done

7. Confirmation Check List 

Item Description Yes No Remarks

Combine PR Received (BTS+MW) NO

Site RFI checked and confirmed to Project Team for

equipment delivery, NO

DN received before equipment delivery, Yes

Page 19: Site Compeletion Report 0078

8/13/2019 Site Compeletion Report 0078

http://slidepdf.com/reader/full/site-compeletion-report-0078 19/19

 

19

Combine Equipment received at site (BTS+MW), YES

Link Budget, Board plan & Media plan was shared before

team movement,  YES

Missing Equipment reported timely YES