site location list of drawings neil building no. name … · 19-12-2017 · demo wall new wall...
TRANSCRIPT
UP
UP
DW
LI L S
ON II
R
I C
E
A
EPP
001-015516REGISTERED
LICENSEDARCHITECT
OF
* *
DESIGN FIRM #: IL 184-002172
DATE OF SIGNATURE:
THE ARCHITECT IS NOT RESPONSIBLE FOR THEWORKMANSHIP OF THE CONTRACTOR. ALLLIABILITY OF THE ARCHITECT IS WAIVED WHENTHE CONTRACTOR OR OWNER DEVIATES FROMTHESE DOCUMENTS WITHOUT WRITTENAPPROVAL FROM THE ARCHITECT
DO NOT SCALE THE PLANS. ALL DIMENSIONSSHALL BE CONFIRMED BY THE CONTRACTORPRIOR TO ASSEMBLY.
THESE PLANS ARE THE SOLE PROPERTY OFALLEN+PEPA ARCHITECTS ELGIN STUDIO, INC.OF GENEVA, ILLINOIS- COPYRIGHT 2017. ANYUNAUTHORIZED USE OF THESE PLANS, INWHOLE OR IN PART IS STRICTLY PROHIBITED.
PLAS LAM PLASTIC LAMINATEPSP POUNDS PER SQUARE FOOTPT PAINTPTD PAINTEDREQ'D REQUIREDSC SOLID COREST/ST STAINLESS STEELSECT SECTIONSF SQUARE FOOTSY SQUARE YARDSHT SHEETSTD STANDARDSTL STEELT&B TOP AND BOTTOMT&G TONGUE AND GROOVETHK THICK, THICKNESST/O TOP OFTYP TYPICALUNO UNLESS NOTED OTHERWISEVCT VINYL COMPOSITION TILEVIF VERIFY IN FIELDW/ WITHW/O WITHOUTW/C WATERCLOSETYD YARD
FD FLOOR DRAINFL FLOORFT FOOTGL GLASSGYP BD GYPSUM WALLBOARDHC HOLLOW COREHCA HANDICAP ACCESSIBLEHT HEIGHTHM HOLLOW METALINSUL INSULATIONJB JUNCTION BOXLA LANDSCAPE ARCHITECTLAM LAMINATE OR LAMINATEDLAV LAVATORYMAX MAXIMUMMECH MECHANICALMO MASONRY OPENINGMTL METALMFG MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSNIC NOT IN CONTRACTNO NUMBERNTS NOT TO SCALEOC ON CENTEROD OUTSIDE DIAMETER
@ AT (THE RATE OF)& AND# NUMBER OR POUNDACT ACOUSTIC CEILING TILEAFF ABOVE FINISHED FLOORALUM ALUMINUMBLDG BUILDINGB/O BOTTOM OFCL CENTER LINECLG CEILINGCOL COLUMNCONC CONCRETECONST CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTORCPT CARPETDET DETAILDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDWGS DRAWINGSELECT ELECTRICALEL ELEVATIONEQ EQUALEXT EXTERIOREXIST EXISTINGEXP JT EXPANSION JOINT
ABBREVIATION LEGEND
DOOR NUMBERDOOR NUMBERDOOR NUMBERDOOR NUMBER
WINDOW/ TYPEWINDOW/ TYPEWINDOW/ TYPEWINDOW/ TYPE
DETAILDETAILDETAILDETAIL
ELEVATION LEVELELEVATION LEVELELEVATION LEVELELEVATION LEVEL
101
A101
1-
1t
BRICKBRICKBRICKBRICK
CONCRETE BLOCKCONCRETE BLOCKCONCRETE BLOCKCONCRETE BLOCK
STONESTONESTONESTONE
RIGID INSULATIONRIGID INSULATIONRIGID INSULATIONRIGID INSULATION
CONCRETECONCRETECONCRETECONCRETE
SANDSANDSANDSAND
WOOD STUD PARTITIONWOOD STUD PARTITIONWOOD STUD PARTITIONWOOD STUD PARTITION
SHEET OF ACTUAL ENLARGEMENTSHEET OF ACTUAL ENLARGEMENTSHEET OF ACTUAL ENLARGEMENTSHEET OF ACTUAL ENLARGEMENT
REVISION INDICATORREVISION INDICATORREVISION INDICATORREVISION INDICATOR1
1i COLUMN TYPECOLUMN TYPECOLUMN TYPECOLUMN TYPE
EXISTING TO REMAINEXISTING TO REMAINEXISTING TO REMAINEXISTING TO REMAIN
DEMO WALLDEMO WALLDEMO WALLDEMO WALL
NEW WALLNEW WALLNEW WALLNEW WALL
DETAILDETAILDETAILDETAIL
SHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUAL
ENLARGEMENTENLARGEMENTENLARGEMENTENLARGEMENT
AREAAREAAREAAREA
SECTIONSECTIONSECTIONSECTION
NUMBERNUMBERNUMBERNUMBER
SHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUAL
SECTIONSECTIONSECTIONSECTION
INTERIORINTERIORINTERIORINTERIOR
ELEVATIONELEVATIONELEVATIONELEVATION
NUMBERNUMBERNUMBERNUMBERSHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUALSHEET OF ACTUAL
ENLARGEMENTENLARGEMENTENLARGEMENTENLARGEMENT
PLAYGROUNDPLAYGROUNDPLAYGROUNDPLAYGROUND
PROJECT NO.
DRAWN
CHECKED
DESCRIPTION DATE
SHT.
POST BID/PERMIT REVISIONS:
12/19/2017 9:04:14 AM
G1-1
NE
IL B
UIL
DIN
G
17-009
AK
EP
EL
GIN
MA
TH
& S
CIE
NC
E
12/19/17
OF 5
GENERAL BUILDINGINFORMATION
1
SYMBOLS LEGEND ARCHITECT'S SEAL & STATEMENTLIST OF ABBREVIATIONS
LIST OF DRAWINGSSITE LOCATION
1" = 30'-0"1 SITE PLAN
NEIL BUILDINGELGIN MATH & SCIENCE
NO. NAME DESCRIPTION
1 G1-1 GENERAL BUILDING INFORMATION
2 A1-1 FIRST FLOOR PLAN
3 A1-2 SECOND FLOOR PLAN
4 A1-3 REFLECTED CEILING PLAN
5 A2-1 EXTERIOR ELEVATIONS
CODE STUDY
PROJECT NEIL BUILDING
1600 DUNDEE AVE.
ELGIN, IL 60120
OWNER OWNER NAME
PHONE #
ARCHITECT ALLEN + PEPA ARCHITECTS
215 FULTON AVE.
GENEVA, IL 60134
(630) 578-1105
CONTRACTOR TBD
ADDRESS 1
CITY, ST. ZIP
PHONE #
BUILDING CODES 2012 INTERNATIONAL BUILDING CODE
2012 INTERNATIONAL FIRE CODE
2011 NATIONAL ELECTRIC CODE
2006/9 INTERNATIONAL FUEL GAS CODE
2012 INTERNATIONAL MECHANICAL CODE
2014 ILLINOIS STATE PLUMBING CODE
1997 ILLINOIS ACCESSIBILITY CODE, 2003 ICC/ANSI ACCESSIBILITY CODE
2015 STATE OF ILLINOIS ENERGY CONSERVATION CODE
2012 LIFE SAFETY - NFPA 101
** NOTE: ALL CODES MAY BE SUBJECT TO MUNICIPAL AMENDMENTS
ZONING CF - COMMUNITY FACILITY
USE GROUP B- BUSINESS
CONSTRUCTION TYPE 5B
FIRE PROTECTION FULLY SPRINKLERED
AREA OF WORK ?? SF, NET OR GROSS OR APPROXIMATE
REVISION DATE
EA DCB
6
5
3
4
2
1
825 SF
CLASSROOM161
887 SF
CLASSROOM162
1,008 SF
CLASSROOM160151 SF
BOYSTOILET
151
150 SF
GIRLSTOILET
152
905 SF
CLASSROOM124
818 SF
CLASSROOM123
851 SF
CLASSROOM122
820 SF
CLASSROOM121
853 SF
CLASSROOM120
909 SF
CLASSROOM102
972 SF
CLASSROOM100
861 SF
CLASSROOM103
117 SF
TOILET101
39 SF
CLO.100B
155 SF
STORAGE106
173 SF
OFFICE112
209 SF
CONFERENCE113
80 SF
TOILET107
67 SF
TOILET120B
887 SF
CLASSROOM130
847 SF
CLASSROOM132
110 SF
TOILET131
61 SF
STORAGE133
47 SF
TOILET134
133 SF
VESTIBULE141
994 SF
HEARTHROOM
142
158 SF
VESTIBULE144
3,930 SF
COMMONS140
48 SF
JANITOR150
92 SF
TOILET104
193 SF
VESTIBULE110
45 SF
CLO.103B
65 SF
STAIR145
55 SF
STAIR146
EXIST. VCTEXIST. VCTEXIST. VCTEXIST. VCT
REPLACEREPLACEREPLACEREPLACE
CRACKED VCTCRACKED VCTCRACKED VCTCRACKED VCT
EXIST.EXIST.EXIST.EXIST.
VCTVCTVCTVCT
EXIST.EXIST.EXIST.EXIST.
CARPETCARPETCARPETCARPET
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
EXIST. VCTEXIST. VCTEXIST. VCTEXIST. VCT
EXIST.EXIST.EXIST.EXIST.
VCTVCTVCTVCT
EXIST.EXIST.EXIST.EXIST.
VCTVCTVCTVCT
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST.EXIST.EXIST.EXIST.
CARPETCARPETCARPETCARPET
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST.EXIST.EXIST.EXIST.
CARPETCARPETCARPETCARPET
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. VCTEXIST. VCTEXIST. VCTEXIST. VCT
EXIST. VCTEXIST. VCTEXIST. VCTEXIST. VCT
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
EXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIESEXIST. CUBBIES
REPAIR ANDREPAIR ANDREPAIR ANDREPAIR AND
PAINT DRYWALLPAINT DRYWALLPAINT DRYWALLPAINT DRYWALL
REPAIR ANDREPAIR ANDREPAIR ANDREPAIR AND
PAINT DRYWALLPAINT DRYWALLPAINT DRYWALLPAINT DRYWALL
REPLACE VBREPLACE VBREPLACE VBREPLACE VB
REPLACEREPLACEREPLACEREPLACE
BASEBOARDSBASEBOARDSBASEBOARDSBASEBOARDS
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
1'-6"
2'-7"
1'-6"
2' - 0"2' - 0"2' - 0"2' - 0"
2'-0"
5' - 3 1/2"5' - 3 1/2"5' - 3 1/2"5' - 3 1/2"
7' - 9 7/8"
7' - 9 7/8"
7' - 9 7/8"
7' - 9 7/8"
5' - 11"
5' - 11"
5' - 11"
5' - 11"
4' - 2"
4' - 2"
4' - 2"
4' - 2"
3'-7"17'-1"
4'-1"
4' - 3"4' - 3"4' - 3"4' - 3" 13' - 8"13' - 8"13' - 8"13' - 8" 6' - 5"6' - 5"6' - 5"6' - 5"
EXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-IN
SEATINGSEATINGSEATINGSEATING
EXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-IN
SEATINGSEATINGSEATINGSEATING
GRAYBOXGRAYBOXGRAYBOXGRAYBOX
EXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARD
W/ PROJECTORW/ PROJECTORW/ PROJECTORW/ PROJECTOR
SCREEN ABOVESCREEN ABOVESCREEN ABOVESCREEN ABOVE
EXIST. TACK BOARDEXIST. TACK BOARDEXIST. TACK BOARDEXIST. TACK BOARD
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
EXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARD
W/ PROJECTORW/ PROJECTORW/ PROJECTORW/ PROJECTOR
SCREEN ABOVESCREEN ABOVESCREEN ABOVESCREEN ABOVE
EXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARDEXIST. WHITE BOARD
W/ PROJECTORW/ PROJECTORW/ PROJECTORW/ PROJECTOR
SCREEN ABOVESCREEN ABOVESCREEN ABOVESCREEN ABOVE
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
REPLACE VB
REPLACE VB
REPLACE VB
REPLACE VB
REPLACE VBREPLACE VBREPLACE VBREPLACE VB
REPLACE VBREPLACE VBREPLACE VBREPLACE VB
REPLACE WINDOWREPLACE WINDOWREPLACE WINDOWREPLACE WINDOW
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
EXIST. CARPETEXIST. CARPETEXIST. CARPETEXIST. CARPET
(STAINED)(STAINED)(STAINED)(STAINED)
REPLACE VBREPLACE VBREPLACE VBREPLACE VB
REPLACE VBREPLACE VBREPLACE VBREPLACE VBREPLACE VBREPLACE VBREPLACE VBREPLACE VB
REPLACE VBREPLACE VBREPLACE VBREPLACE VB
4' - 1 3/8"4' - 1 3/8"4' - 1 3/8"4' - 1 3/8"
REPLACEREPLACEREPLACEREPLACE
DOORDOORDOORDOOR
REPLACEREPLACEREPLACEREPLACE
DOORDOORDOORDOOR
LEAK, REPAIRLEAK, REPAIRLEAK, REPAIRLEAK, REPAIR
DRYWALLDRYWALLDRYWALLDRYWALL
TIGHTENTIGHTENTIGHTENTIGHTEN
DOOR HINGEDOOR HINGEDOOR HINGEDOOR HINGE
TIGHTEN/REPAIRTIGHTEN/REPAIRTIGHTEN/REPAIRTIGHTEN/REPAIR
HINGESHINGESHINGESHINGES
FIREFIREFIREFIRE
EXTINGUISHEREXTINGUISHEREXTINGUISHEREXTINGUISHER
EXISTINGEXISTINGEXISTINGEXISTING
SWINGSETSWINGSETSWINGSETSWINGSET
EXISTINGEXISTINGEXISTINGEXISTING
PLAYGROUNDPLAYGROUNDPLAYGROUNDPLAYGROUND
EXISTINGEXISTINGEXISTINGEXISTING
ASPHALTASPHALTASPHALTASPHALT
396 SF
PRESCHOOL105
360 SF
ENTRY111
546 SF
ADMIN116
EXIST. CARPETEDEXIST. CARPETEDEXIST. CARPETEDEXIST. CARPETED
STAGESTAGESTAGESTAGE
EXIST.EXIST.EXIST.EXIST.
BOOKCASESBOOKCASESBOOKCASESBOOKCASES
EXIST.EXIST.EXIST.EXIST.
CUBBIESCUBBIESCUBBIESCUBBIESCUBBIESCUBBIESCUBBIESCUBBIES
EXIST. WHITEEXIST. WHITEEXIST. WHITEEXIST. WHITE
BOARDBOARDBOARDBOARD
EXIST. TACKEXIST. TACKEXIST. TACKEXIST. TACK
BOARDBOARDBOARDBOARD
WHITE LAMINATEWHITE LAMINATEWHITE LAMINATEWHITE LAMINATE
COUNTERTOPSCOUNTERTOPSCOUNTERTOPSCOUNTERTOPS
AND CABINETSAND CABINETSAND CABINETSAND CABINETS
WHITE LAMINATEWHITE LAMINATEWHITE LAMINATEWHITE LAMINATE
COUNTERTOPSCOUNTERTOPSCOUNTERTOPSCOUNTERTOPS
AND CABINETSAND CABINETSAND CABINETSAND CABINETS
EXIST.EXIST.EXIST.EXIST.
CUBBIESCUBBIESCUBBIESCUBBIES
WHITE LAMINATEWHITE LAMINATEWHITE LAMINATEWHITE LAMINATE
COUNTERTOPSCOUNTERTOPSCOUNTERTOPSCOUNTERTOPS
AND CABINETSAND CABINETSAND CABINETSAND CABINETS
C
PROJECT NO.
DRAWN
CHECKED
DESCRIPTION DATE
SHT.
POST BID/PERMIT REVISIONS:
12/19/2017 9:03:56 AM
A1-1
NE
IL B
UIL
DIN
G
17-009
AK
EP
EL
GIN
MA
TH
& S
CIE
NC
E
12/19/17
OF 5
FIRST FLOOR PLAN
2
1/8" = 1'-0"1 FIRST FLOOR PLAN
REVISION DATE
NEW WALL
EXISTING WALL TO REMAIN
DEMO WALL
RATED WALL
INSULATED WALL
EA DCB
6
5
EXIST.EXIST.EXIST.EXIST.
CARPETCARPETCARPETCARPET
OPENOPENOPENOPEN
TOTOTOTO
BELOWBELOWBELOWBELOW
2'-8"
8'-11"
6'-6 1/2"
EXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-INEXIST. BUILT-IN
SEATINGSEATINGSEATINGSEATING
REPLACEREPLACEREPLACEREPLACE
WINDOWWINDOWWINDOWWINDOW
REPLACEREPLACEREPLACEREPLACE
WINDOWWINDOWWINDOWWINDOW
SECURE CUBBYSECURE CUBBYSECURE CUBBYSECURE CUBBY
TO WALLTO WALLTO WALLTO WALL
A1-2
2
B A
D
02 SECOND FLOOR9' - 1 5/8"
03 TOP OF CMU BEARING15' - 8"
04 ROOF DECK16' - 2 1/2"
D C B
REPLACE WINDOWREPLACE WINDOWREPLACE WINDOWREPLACE WINDOW
A
B
01 FIRST FLOOR0"
02 SECOND FLOOR9' - 1 5/8"
WATER LEAK, REPAIRWATER LEAK, REPAIRWATER LEAK, REPAIRWATER LEAK, REPAIR
CEILING / DRYWALLCEILING / DRYWALLCEILING / DRYWALLCEILING / DRYWALL
THIS AREATHIS AREATHIS AREATHIS AREA
PROJECT NO.
DRAWN
CHECKED
DESCRIPTION DATE
SHT.
POST BID/PERMIT REVISIONS:
12/19/2017 9:03:58 AM
A1-2
NE
IL B
UIL
DIN
G
17-009
AK
EP
EL
GIN
MA
TH
& S
CIE
NC
E
12/19/17
OF 5
SECOND FLOOR PLAN
3
REVISION DATE
1/8" = 1'-0"1 SECOND FLOOR PLAN
ROOM SCHEDULE
ROOM
AREA FLOOR FINISH BASEBOARD
WALL FINISH CEILING LIGHT FIXTURE
LOCKERSWHITE
BOARDSTACK
BOARDSPROJECTOR
SCREEN COMMENTSNO. NAME NORTH EAST SOUTH WEST MATERIAL HEIGHT SOFFIT TYPE NO.
100 CLASSROOM 972 SF CARPET / VCT VB GYP. BD 4' SUSPENDED FLUORESCENT 18 20 2
100B CLO. 39 SF VCT VB GYP. BD. 4' CEILING MTD. FLUORESCENT 1
101 TOILET 117 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 2
102 CLASSROOM 909 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 18 20 1 2
103 CLASSROOM 861 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 17 19 1 1
103B CLO. 45 SF VCT VB GYP. BD. 4' CEILING MTD. FLUORESCENT 1
104 TOILET 92 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 2
105 PRESCHOOL 396 SF CARPET VB GYP. BD. 9' - 6" PENDANT MTD. FLUORESCENT DOWNLIGHT, RECESSED CAN LIGHT 3, 2
106 STORAGE 155 SF VCT VB ACT 9' - 0" 2x4 FLUORESCENT 2
107 TOILET 80 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 1
110 VESTIBULE 193 SF TILE TILE GYP. BD. PENDANT MTD. FLUORESCENT DOWNLIGHT 2
111 ENTRY 360 SF CARPET WD GYP. BD. PENDANT MTD. FLUORESCENT DOWNLIGHT 3
112 OFFICE 173 SF CARPET VB ACT 9' - 0" 2x4 FLUORESCENT 2
113 CONFERENCE 209 SF CARPET VB ACT 9' - 0" 2x4 FLUORESCENT 2 1
116 ADMIN 546 SF CARPET WD GYP. BD PENDANT MTD. FLUORESCENT DOWNLIGHT, 6" FLUORESCENT LOW-PROFILE DOWNLIGHT 2, 3
120 CLASSROOM 853 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 18 19 1 2
120B TOILET 67 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT
121 CLASSROOM 820 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 14 20 1 1
122 CLASSROOM 851 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 14 20 1 1
123 CLASSROOM 818 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 18 19 1 2
124 CLASSROOM 905 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 20 1 3
130 CLASSROOM 887 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 20 1 1
131 TOILET 110 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 2
132 CLASSROOM 847 SF CARPET / VCT VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 18 1 1
133 STORAGE 61 SF 4' CEILING MTD. FLUORESCENT
134 TOILET 47 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 1
140 COMMONS 3,930 SF CARPET WD GYP. BD. PENDANT MTD. METAL HALIDE, PENDANT MTD. FLUORESCENT DOWNLIGHT, 6"FLUORESCENT LOW-PROFILE DOWNLIGHT
6, 12, 6
141 VESTIBULE 133 SF TILE TILE GYP. BD. PENDANT MTD. FLUORESCENT DOWNLIGHT 2
142 HEARTH ROOM 994 SF CARPET / VCT WD GYP. BD. 8' - 0" 6" FLUORESCENT LOW-PROFILE DOWNLIGHT, 1x4 FLANGE FLUORESCENT TROFFER 10, 6
144 VESTIBULE 158 SF TILE TILE GYP. BD. PENDANT MTD. FLUORESCENT DOWNLIGHT 2
145 STAIR 65 SF VCT VB
146 STAIR 55 SF CARPET WD GYP. BD.
146B STAIR 40 SF
150 JANITOR 48 SF TILE TILE GYP. BD. 8' - 6" 6" FLUORESCENT LOW-PROFILE DOWNLIGHT 1
151 BOYS TOILET 151 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 2
152 GIRLS TOILET 150 SF TILE TILE ACT 8' - 6" 2x4 FLUORESCENT 3
160 CLASSROOM 1,008 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 20 1 4 1
161 CLASSROOM 825 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 18 1 2 1
162 CLASSROOM 887 SF CARPET VB GYP. BD. 4' SUSPENDED FLUORESCENT 16 22 1 3 1
01 FIRST FLOOR: 39 255 15 23 3
200 OVERLOOK 151 SF CARPET WD GYP. BD. 6" FLUORESCENT LOW-PROFILE DOWNLIGHT 2
201 LIBRARY 502 SF CARPET WD GYP. BD. PENDANT MTD. FLUORESCENT LINEAR 4
202 OVERLOOK 124 SF CARPET WD GYP. BD. 6" FLUORESCENT LOW-PROFILE DOWNLIGHT 2
02 SECOND FLOOR: 3 0 0 0 0
1/4" = 1'-0"2 LIBRARY ELEV. LKG. NORTH
1/4" = 1'-0"3 ADMIN /ENTRY ELEV. LKG. NORTH
Baseboard Schedule
ROOM BASEBOARD
NO. NAME LENGTH MATERIAL
100 CLASSROOM 44' - 9 1/8" Plastic - Vinyl Cove Base
102 CLASSROOM 53' - 4 7/8" Plastic - Vinyl Cove Base
120 CLASSROOM 74' - 10 5/8" Plastic - Vinyl Cove Base
121 CLASSROOM 72' - 11" Plastic - Vinyl Cove Base
122 CLASSROOM 57' - 11 7/8" Plastic - Vinyl Cove Base
130 CLASSROOM 78' - 4 1/8" Plastic - Vinyl Cove Base
132 CLASSROOM 81' - 5 1/8" Plastic - Vinyl Cove Base
A+P WINDOW SCHEDULE
Type Mark Type Operation
Rough Opening
Head Height Finish Comments EgressWidth Height
A 2'-0" X 2'-4" CASEMENT 2' - 0" 2' - 4" 5' - 4" REPLACE WINDOW, FRAME IS OKAY
B 2'-0" X 5'-4" PICTURE 2' - 0" 5' - 4" 5' - 4" REPLACE WINDOW, FRAME IS OKAY
C 3'-0" X 5'-10" PICTURE 3' - 0" 5' - 10" 7' - 10" REPLACE WINDOW, FRAME IS OKAY
D 1'-11" X 4'-0" PICTURE 1' - 11" 4' - 0" 6' - 8" REPLACE WINDOW, FRAME IS OKAY
EA DCB
6
5
3
4
2
1
FIX WATERFIX WATERFIX WATERFIX WATER
LEAKLEAKLEAKLEAK
FIX WATERFIX WATERFIX WATERFIX WATER
LEAKLEAKLEAKLEAK
REPLACE CEILINGREPLACE CEILINGREPLACE CEILINGREPLACE CEILING
TILESTILESTILESTILES
CLASSROOM161
CLASSROOM162
CLASSROOM160
BOYSTOILET
151
GIRLSTOILET
152
CLASSROOM124
CLASSROOM123
CLASSROOM122
CLASSROOM121
CLASSROOM120
CLASSROOM102
CLASSROOM100
CLASSROOM103
TOILET101
CLO.100B
STORAGE106
OFFICE112
CONFERENCE113 TOILET
107
TOILET120B
CLASSROOM130
CLASSROOM132
TOILET131
STORAGE133
TOILET134
VESTIBULE141
HEARTHROOM
142
VESTIBULE144
STAIR146B
COMMONS140
JANITOR150
TOILET104
VESTIBULE110
CLO.103B
STAIR145
STAIR146
PRESCHOOL105
NEW WALL
EXISTING WALL TO REMAIN
DEMO WALL
RATED WALL
INSULATED WALL
EA DCB
6
OVERLOOK200 OVERLOOK
202
LIBRARY201
PROJECT NO.
DRAWN
CHECKED
DESCRIPTION DATE
SHT.
POST BID/PERMIT REVISIONS:
12/19/2017 9:04:02 AM
A1-3
NE
IL B
UIL
DIN
G
17-009
AK
EP
EL
GIN
MA
TH
& S
CIE
NC
E
12/19/17
OF 5
REFLECTED CEILING PLAN
4
1/8" = 1'-0"1 REFLECTED CEILING PLAN
REVISION DATE
1/8" = 1'-0"2 02 SECOND FLOOR
01 FIRST FLOOR0"
B/ FOOTING-11' - 8"
02 SECOND FLOOR9' - 1 5/8"
03 TOP OF CMU BEARING15' - 8"
04 ROOF DECK16' - 2 1/2"
E AD C B
01 FIRST FLOOR0"
02 SECOND FLOOR9' - 1 5/8"
03 TOP OF CMU BEARING15' - 8"
04 ROOF DECK16' - 2 1/2"
653 421
REPAIRREPAIRREPAIRREPAIR
FASCIAFASCIAFASCIAFASCIA
01 FIRST FLOOR0"
02 SECOND FLOOR9' - 1 5/8"
03 TOP OF CMU BEARING15' - 8"
04 ROOF DECK16' - 2 1/2"
EA DCB
18' - 7 1/8"
27' - 9 7/8"
9' - 5 3/8"
01 FIRST FLOOR0"
02 SECOND FLOOR9' - 1 5/8"
03 TOP OF CMU BEARING15' - 8"
04 ROOF DECK16' - 2 1/2"
6 5 34 2 1
REPAIRREPAIRREPAIRREPAIR
FASCIAFASCIAFASCIAFASCIA
PROJECT NO.
DRAWN
CHECKED
DESCRIPTION DATE
SHT.
POST BID/PERMIT REVISIONS:
12/19/2017 9:04:10 AM
A2-1
NE
IL B
UIL
DIN
G
17-009
AK
EP
EL
GIN
MA
TH
& S
CIE
NC
E
12/19/17
OF 5
EXTERIOR ELEVATIONS
5
1/8" = 1'-0"3 SOUTH ELEVATION
1/8" = 1'-0"2 EAST ELEVATION
1/8" = 1'-0"1 NORTH ELEVATION
1/8" = 1'-0"4 WEST ELEVATION
REVISION DATE