SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For Proposed Synthetic Acrylic Polymer Emulsions, Industrial Synthetic Adhesives, Glues, Thermosetting Acrylic Resins, Polymer of Vinyl Acetate and Vinyl Copolymers, Ethylene Vinyl Acetate EmulsionEC OBTAINED Vide Letter No J-11011/409/2014-IA II (I) Dt: 17.02.2016 by M/s Jesons Industries Limited at SF No.32/2 & 33/2(a), Plot No.A-4/2 (Part B) , SIPCOT Industrial Complex, Village : Thervoykandigai , Taluk Gummidipoondi , District Thiruvallur, Tamil Nadu Submitted to Ministry of Environment and Forests Regional Office, I and II Floor, Handloom Export Promotion Council, 34, Cathedral Garden Road Nungambakkam, Chennai 600 034 Prepared by ENVIRONMENTAL CONSULTANT HUBERT ENVIRO CARE SYSTEMS (P) LTD CHENNAI June 2017

Upload: others

Post on 30-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

SIX MONTHLY ENVIRONMENTALCLEARANCE COMPLIANCE REPORT

For“Proposed Synthetic Acrylic Polymer Emulsions, Industrial Synthetic Adhesives, Glues,

Thermosetting Acrylic Resins, Polymer of Vinyl Acetate and Vinyl Copolymers,Ethylene Vinyl Acetate Emulsion”

EC OBTAINED Vide Letter No J-11011/409/2014-IA II (I) Dt: 17.02.2016

byM/s Jesons Industries Limited

atSF No.32/2 & 33/2(a), Plot No.A-4/2 (Part B) , SIPCOT Industrial Complex, Village :

Thervoykandigai , Taluk Gummidipoondi , District Thiruvallur, Tamil Nadu

Submitted to

Ministry of Environment and ForestsRegional Office, I and II Floor,

Handloom Export Promotion Council,34, Cathedral Garden Road

Nungambakkam, Chennai 600 034

Prepared by

ENVIRONMENTAL CONSULTANTHUBERT ENVIRO CARE SYSTEMS (P) LTD

CHENNAIJune 2017

Page 2: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Table of Contents

1.0 PROJECT DETAILS ........................................................................................................ 3

2.0 LOCATION MAP................................................................................................................... 4

3.0 SITE PHOTOGRAPH............................................................................................................ 5

4.0 SIX MONTH ENVIRONMENTAL CLEARANCE COMPLIANCE STATEMENT... 6

5.0 ENVIRONMENT CLEARANCE SIX MONTHLY REPORT........................................ 16

5.1 Ambient air quality monitoring...................................................................................................16

5.2 Ambient Noise level monitoring .................................................................................................16

5.3 Soil quality monitoring................................................................................................................16

6.0 CONCLUSION ..................................................................................................................... 17

LIST OF ANNEXURE

Annexure 1 : Copy of Environmental ClearanceAnnexure 2 : Environmental Monitoring ReportAnnexure 3 : Water bill from SIPCOTAnnexure 4 : STP & ETP flow diagramAnnexure 5 : Site photographs

Annexure 6 : Fire NOC

Annexure 7 : CSR Receipts.

Annexure 8 : EMP Cell DetailsAnnexure 9: Newspaper advertisement copy

Annexure 10: Site Layout

Annexure 11: TNPCB LetterAnnexure 12: HWM Authorization.

Page 3: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

1.0PROJECT DETAILS

Name of the project “Synthetic Acrylic Polymer Emulsions, Industrial Synthetic Adhesives,Glues, Thermosetting Acrylic Resins, Polymer of Vinyl Acetate andVinyl Copolymers, Ethylene Vinyl Acetate Emulsion”

Project Location M/s Jesons Industries Limited

SF No.32/2 & 33/2(a), Plot No.A-4/2 (Part B) , SIPCOT IndustrialComplex, Village : Thervoykandigai , Taluk Gummidipoondi ,District Thiruvallur , Tamil Nadu.

File No J-11011/409/2014-IA II (I) Dt: 17.02.2016 Annexure 1

TOR issued date 31/ 03/2015

Proposed capacity 41400 MTPA

Project proponent M/s. Jesons Industries Limited

Total land area 7.75 Acres (31363.14 Sq.m)

Project cost 14 Crore

Power Requirement 250 KVA

Stand by DG-250KVA

Water Requirement 108 KLD (100 KLD From SIPCOT 8 KLD from recycling sewage/effluent)

No. of employees 100 during operation

Page 4: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

2.0 LOCATION MAP2.0 LOCATION MAP2.0 LOCATION MAP

Page 5: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

3.0 SITE PHOTOGRAPH

Front view of the site

Infrastructure view of the site

Page 6: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

4.0 SIX MONTH ENVIRONMENTAL CLEARANCE

COMPLIANCE STATEMENT

A. Specific Conditions

S.No Conditions Status of compliance

1 Wet scrubber along with stack of

adequate height shall be provided to

furnace oil fired thermo pack heater to

control particulate emission

Wet scrubber is Provided with stack height

of 15m to control particulate emission from

thermo pack heater.

2. AAQ data shall be collected as per

NAAQS standards notified by the

ministry vide GSR No. 826 (E) dated

16th sep 2009 the levels of PM10, PM2.5,

SO2 NOx CO, VOC and HC (methane

and non methane) shall be monitored in

the ambient air and emission from the

stacks and displayed at a convenient

location near the main gate of the

company and at important public places.

The company shall upload the results of

monitored data on its website and shall

update the same periodically. It shall

simultaneously be sent to the RO of

MoEF, the respective ZO of CPCB and

TNPCB

AAQ datas are collected as per NAAQS

standards notified by the ministry vide GSR

No. 826 (E) dated 16th sep 2009 the levels of

PM10, PM2.5, SO2 NOx CO, VOC and HC

(methane and non methane) are monitored in

the ambient air and emission from the stacks.

Monitoring results are enclosed in the

Annexure 2. M/s Jesons Industries Limited

will upload the results of monitored data on

Jesons website and will be update the same

periodically and simultaneously sent to the

RO of MoEF, the respective ZO of CPCB

and TNPCB.

Page 7: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

3. In plant control measures for checking

fugitive emission from all the vulnerable

sources shall be provided. Fugitive

emission shall be controlled by providing

closed storage, closed handling and

conveyance of chemicals/materials, multi

Cyclone separator and water sprinkling

system. Dust suppression system

including water sprinkling system shall

be provided at loading and unloading

areas to control dust emissions. Fugitive

emission in the work zone environment,

product, Raw material, storage area etc.

shall be regularly monitored. All

necessary steps should be taken for

monitoring of chlorine as well as VOCs

in the proposed plant

To control fugitive emissions from

vulnerable sources the following measured

are taken.

1.Closed storage

2.Closed handling of chemicals

3.Water sprinkler system in storage area

are provided.

The fugitive emissions will be regularly

monitored by providing Gas Vapor Detector

of chlorine as well as VOCs in the plant

4. The gaseous emission from DG sets shall

be dispersed through adequate stack

height as per CPCB standards. Acoustic

enclosure shall be provided to the DG

sets to mitigate the noise pollution.

The gaseous emission from DG sets will be

dispersed through stack of 11m height as per

CPCB. Acoustic enclosure is Provided with

250KVA –DG Set.

5. Total fresh water requirement from

SIPCOT water supply should not Exceed

100 M3/day

The total usage of fresh water per day is

below the limit 100 M3/day. The latest bill

on 05th April, 2017 from SIPCOT is enclosed

in the Annexure 3.

Page 8: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

6. Total industrial effluent generation shall

not exceed 7m3/day. Effluent will be

treated in the ETP followed by RO to

achieve Zero discharge. RO Rejects shall

be evaporated in the MEE. RO permeates

shall be recycled/ reused in the process.

No effluent will be discharged outside

the plant premises. Domestic sewage

shall be treated in STP. Water Quality of

treated effluent shall meet the norms

prescribed by CPCB/SPCB

The total effluent generation is not exceeding

7m3/day and therefore the condition is

complied. An Effluent Treatment Plant with

capacity 8 m3/day followed by RO is

provided. The plant produces zero discharge

(ZLD) and the RO Permeate is reused in the

cleaning activity. The norms of CPCB and

TNPCB are also met by providing STP for

domestic sewage treatment.

7. Continuous online monitoring system

(24X7) to be installed and data to be

provided to company’s website and

respective RO MoEF&CC, and

concerned CPCB

The letter attached to TNPCB for waiving of

the condition is enclosed as an Annexure 11.

As DG is for back up only & capacity is

250KVA and thermo pack 850 Kg/hr.

8. Process Effluent/any wastewater shall not

be allowed to mix with storm water.

Storm Water drain shall be passed

through guard pond.

A Separate Piping system is provided for

ETP inlet and STP inlet and so the storm

water will not be allowed to mix with ETP

and STP, therefore the condition is complied.

Plan and photograph are enclosed in

Annexure 4 and 5

Page 9: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

9. The company shall obtain authorization

for collection, storage and disposal of

hazardous waste under the hazardous

waste (Management, Handling and Tran

boundary Movement) Rules, 2008 and

amended as on date for management of

Hazardous wastes and prior permission

from TNPCB shall be obtained for

disposal of solid/ hazardous waste in the

TSDF. Measures shall be taken for

firefighting facilities in case of

emergency.

Hazardous waste (Management, Handling

and Tran boundary Movement) Rules, 2008

and amended as on date for management of

Hazardous wastes and prior permission from

TNPCB has been obtained for disposal of

solid/ hazardous waste in the TSDF. HWM

authorization is enclosed an Annexure 12

10. The company strictly comply with the

rules and guidelines under manufacture

storage and import of hazardous

chemicals (MSIHC) Rules, 1989 as

amended time to time. All transportation

of hazardous chemicals shall be as per

Motor Vehicle Act (MVA), 1989

M/s Jesons Industries Limited agrees upon

and strictly complies with the rules and

guidelines under manufacture storage and

import of hazardous chemicals (MSIHC)

Rules, 1989 as amended time to time. All

transportation of hazardous chemicals shall

be as per Motor vehicle Act (MVA), 1989

11. The unit shall make the arrangement for

protection of possible fire hazardous

during manufacturing process in material

handling. Fire fighting system shall be as

per the norms. Fire hydrant system shall

be provided along with fire monitor and

flame detection system in the process as

well as storage areas.

The NOC from Fire Department and Fire

Fighting system is provided as per the norms

along with the fire monitor and flame

detection system in the process as well as in

the storage areas. Annexure 6

12. Occupational health surveillance of the

workers shall be done on a regular basis

and records maintained as per the

factories Act

Occupational health surveillance of the

workers is being done regularly and records

are being kept as per the factories Act.

Photographs are enclosed in Annexure 5.

Page 10: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

13. Green belt over 10632 m2 area should be

developed within plant premises with

atleast 10 m wide green belt on all side

along the periphery of the project area, in

downward direction, and along road side

etc. Selection of plant species shall be as

per the CPCB Guidelines in consultation

with the DFO.

The Greenbelt Area has been developed in

the project site around 10700 Sq.m (34.11%).

(Near warehouse and production block 1170

Sq.m) and also the plant species are selected

as per CPCB guidelines with consultation of

DFO. Greenbelt photographs and site plan

marked with greenbelt are enclosed in

Annexure 5 & 10

14. At least 2.5% of the total cost of the

project should be earmarked towards the

corporate social responsibility and item-

wise details along with time bound action

plan should be prepared and submitted to

the ministry’s RO at Chennai

implementation of such program should

be ensured accordingly in a time bound

manner.

The following payment has been made under

CSR.

1. Rs.490000/-in Prime Minister Relief Fund

vide Receipt No.1521/2016 dt.23.02.2016.

2. Rs.1250000/- to Shreeyash Prastishthan

dt.29.02.2016 vides Receipt No.1292

3. Rs.10000/- in Prime Minister National

Relief Fund vide receipt No.6805987

dt.30.12.2015.

4. Rs.1000000/- - Vedanta Cultural

Foundation vide Receipt No.2015-16/958

dt.25.01.2016.

5. Rs.400,000/- in Prime Minister National

Relief Fund vide receipt No.6805987

dt.31.0.3.2017.

6. Rs.10,00,000/- to Shreeyash Prastishthan

dt.01.03.2017 vides Receipt No.626.

Further payment will be made in Prime

Minister Relief Fund.

All Receipts mention above is enclosed in

Annexure 7

Page 11: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

B. General condition

S.No Conditions Status of compliance

1. The project authorities shall strictly adhere to

the stipulations made by the state

government and TNPCB

M/s Jesons Industries Limited strictly

adheres to the stipulations made by state

Government and TNPCB.

2. No further expansion or modifications in the

plan shall be carried out without prior

approval of the MoEF. In case of deviations

or alternation in the project proposal from

those submitted to this ministry for

Clearance, a fresh reference shall be made to

the ministry to assess the adequacy of

conditions imposed and to add additional

environmental protection measures required,

if any.

There is no modification in the plan. In

case of any change(s) in the scope of the

project, a fresh appraisal by the MoEF

shall be obtained.

3. The location of AAQ monitoring stations

shall be decided in consultant with the SPCB

and it shall be ensured that at least one

station is installed in the upwind and

downwind direction as well as where

maximum ground level concentration are

anticipated

The location of AAQ monitoring

stations are decided as per SPCB

conditions. Photograph of the

Monitoring station is enclosed in the

Annexure 5

4. The overall noise levels in and around the

plant area shall be kept well within the

standards providing noise control measures

including acoustic hoods, silencers,

enclosure etc. on all sources of noise

generation. The ambient noise levels shall

conform to the standards

The Noise levels in and around the plant

premises is within the standards. Noise

generation levels are enclosed in the

monitoring report. Annexure 2

Page 12: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

5. The company shall harvest rainwater from

the roof tops of the buildings and storm

water drains to recharge the ground water

and use the same water for the process

activities of the project to conserve fresh

water.

The required condition has been

complied and the photographs of rain

water harvesting, ditch and storm water

drains are all enclosed in Annexure 5

6. Training shall be imparted to all employees

on safety and health aspects of chemicals

handling. Pre-employment and routine

periodical medical examinations for all

employees on handling of chemicals shall be

imparted.

M/s Jesons Industries Limited is

imparting training to all employees on

safety and health aspects of chemical

handling regularly. Routine medical

checkup and pre-employment medical

checkup are carried out regularly and the

photos are enclosed in Annexure 5

7. Usage of Personnel Protection Equipments

(PPEs) by all employees/workers shall be

ensured

All PPEs will be provided to workers.

Also, adequate training and information

on safety and health aspects will be

given to workers. In-site safety signage

is also provided. Photographs are

enclosed in Annexure 5

8. The company shall also comply with all the

environmental protection measures and

safeguards proposed in the documents

submitted to the ministry. All the

recommendation made in EMP/EIA in

respect of environmental management, risk

mitigation measures and public hearing

relating to the project shall be implemented.

M/s Jesons Industries Limited will

comply with all environmental

protection measures and safeguards

proposed in the documents submitted to

the ministry.

Page 13: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

9. The company shall undertake all relavent

measures for improving the socio-economic

conditions of the surrounding area.. CSR

activities shall be undertaken by involving

local villages and administration.

M/s Jesons Industries Limited will

undertake all the relevant measures for

improving the socio-economic

conditions of the surrounding area. CSR

activities will be undertaken by

involving local villages and

administration.

10. The company shall undertake eco

developmental measures including

community welfare measures in the project

area for the overall improvement of the

environment.

M/s Jesons Industries Limited will

undertake eco developmental measures

including community welfare measures

in the project area for the overall

improvement of the environment.

11. A separate Environment Management Cell

equipped with full fledged laboratory

facilities shall be set up carry out the

environmental management and monitoring

functions.

We are setting up a laboratory for

Environment management with all the

required equipments. List of EMP cell

responsibility is enclosed as Annexure

8.

12. The company shall earmark sufficient funds

towards capital cost and recurring cost/

annum to implementation the conditions

stipulated by the MoEF as well as the state

government along with the implementation

schedule for all the conditions stipulated

herein. The funds so Earmarked for

environment management/ pollution control

measures shall not be diverted for any other

purpose.

M/s Jesons Industries Limited adheres to

the condition and will not divert

environment management fund for any

other purpose.

Page 14: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

13. A copy of the clearance letter shall be sent

by the project proponent to concerned

panchayat, zilla parised /municipal

corporation, urban local body and the local

NGO, if any from whom suggestions /

representations if any, were received while

processing the proposal.

Condition Compiled

14. The project proponent shall also upload the

status of compliance of the stipulated EC

conditions, including results of monitored

data (both in hard copies as well as by e-

mail) to the respective Regional Office of

MoEF, the respective Zonal Office of CPCB,

and TNPCB. A copy of EC and status of EC

report shall be posted on the website of the

company

M/s Jesons Industries Limited will

upload the status of compliance of the

stipulated EC conditions, including

results of monitored data to the

respective Regional Office of MoEF, the

respective Zonal Office of CPCB, and

TNPCB.

15. The environmental statement for each

financial year ending 31st March in Form V

as is mandated to be submitted by the project

proponent to the concerned state pollution

Control Board as prescribed under the

Environmental (P) Rules 1986, as amended

subsequently, shall also be put on the website

of the company along with the status of

compliance of EC conditions and shall also

be sent to the respective Regional Office of

MoEF by e-mail.

The condition is agreed upon.

Page 15: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

S.No Conditions Status of compliance

16 The project proponent should advertise in at

least two local News papers widely

circulated in the region, one of which shall

be in the vernacular language informing that

the project has been accorded Environment

Clearance and copies of clearance letters are

available with the Tamil Nadu Pollution

Control /Board and may also be seen on the

website of the MoEF at

http://www.envfor.nic.in. the advertisement

should be made within 10 days from the date

of receipt of the clearance letter and a copy

of the same should be forwarded to the

Regional Office of this Ministry

M/s Jesons Industries Limited has

advertised in the newspaper as per the

regulation and the copy is attached in

Annexure 9

17. The project authorities shall inform the RO

as well as the ministry, the date of financial

closure and final approval of the project by

the concerned authorities and the date of start

of project.

The condition is agreed upon.

M/s Jesons Industries Limited has

informed RO and will also inform the

Ministry.

Page 16: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

5.0 ENVIRONMENT CLEARANCE SIX MONTHLY REPORT

It is mandatory to submit six month compliance report to MoEF Regional Office by the

proponent. For the purpose of obtaining six month compliance certificate the environmental

monitoring was carried out at site by M/s. Hubert Enviro Care Systems Pvt. Ltd for the period of

June – November 2016.

5.1 Ambient air quality monitoring

During operation phase particulate matter and gaseous emissions are likely to arise from

the site movement of vehicles, operation of DG sets etc., the ambient air quality

parameters such as suspended Particulate matter (PM10), Respirable Particulate matter

(PM 2.5), Sulphur dioxide, Oxides of Nitrogen (NOx), VOC, Hydro carbons and Carbon

monoxide were monitored at 2 location. The test report of ambient air quality for the

period of October 2016 – March 2017 is enclosed as Annexure-2.

5.2 Ambient Noise level monitoring

During operation phase the ambient noise level likely to be generated due to machinery

operations and movement of vehicles. 1 location was selected for monitoring the noise

level. The test report of ambient noise recorded during period of October 2016 – March

2017 is enclosed in Annexure-2.

5.3 Soil quality monitoring

During operation phase soil contamination may occur due to oil spills from machinery,

during maintenance and operation of DG sets on site. 1 location was selected for

monitoring the soil quality. The Soil samples were collected and analyzed for nutrients

and heavy metals. The test report of soil samples collected and analyzed during October

2016 – March 2017 is enclosed as Annexure2.

Page 17: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

6.0 CONCLUSION

1. The environmental monitoring was carried out at site during the period of October

2016 – March 2017.

2. All the conditions stipulated in Environmental Clearance are being complied.

Page 18: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

List of Annexure

Annexure 1 : Copy of Environmental Clearance

Annexure 2 : Environmental Monitoring Report

Annexure 3 : Water bill from SIPCOT

Annexure 4 : STP & ETP flow diagram

Annexure 5 : Site photographs

Annexure 6 : Fire NOC

Annexure 7 : CSR Receipts.

Annexure 8 : EMP Cell Details

Annexure 9: Newspaper advertisement copy

Annexure 10: Site layout

Annexure 11: TNPCB waiver

Annexure 12: HWM Authorization.

Page 19: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
HECS
Typewritten text
Annexure 1
Page 20: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 21: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 22: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 23: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 24: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 25: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
HECS
Typewritten text
Annexure 3
Page 26: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

MH

600

600

COLLECTION TANK3.0 X 3.0 X 3 (1.8) M

SB-101A SB-101B

RAW EFFLUENTTRANSFER PUMP

SLUDGE PUMP

RO FEED PUMP FILTER FEED PUMP

UF FEED PUMP UF BACKWASH PUMP

HIGH PRESSUREPUMP

RO PRESSURE VESSEL -1NOS

DT-103 DT-102 DT-101

DOSING SYSTEM

Ø1030

SB-101A SB-101B

SB-101C

SB-101D

HECS(P)Ltd APPROVED/DATE

ENGINEERING CHECKED/DATE

DRAFTING CHECKED/DATEDESIGNED

NAME DATE

CHECKED

CHENGAL

CEO

IMO No.CLASS I.D SCALE REV

2

TITLE:

DRAWN SURIYA.M

DWG No:DD-HECS - JI - Overall Layout - 001

M/s. Jesons Industries Ltd., Gummidipoondi

CLIENT:

OVERALL LAYOUT

09.07.15

FOR SOLAR POND, 350 Sq.M AREA IS REQUIRED.CLIENT TO SUGGEST AREA FOR THE SAME

NOTE:-

09.07.15

09.07.15

TAG.NO DESCRIPTION SIZET-101T-102T-103T-104T-105T-106

COLLECTION TANK BAR SCREEN CHAMBER FLASH MIXER TANK

PRI-CLARIFIER TANK

OXIDATION TANK

3.0 X 3.0X 3.0M (1.8)0.5 X 0.5 X 0.5M

0.7 X 1.25 X 3.0M

2.3 X 1.25 X 3.0M

S.NO123456

MOC

RCCMS

MS

MS

MS

QTY111

1

1

ETP TANK DETAILS

T-107 SEC-CLARIFIER TANK 0.8 X 1.25 X 3.0M7

MS 1T-108 CLARIFIED WATER TANK 0.5 X 1.25 X 3.0M8

MS 1T-109 UF FEED TANK 1.0 X 1.25 X 3.0M9

MS 1T-110 UF PERMEATE TANK10

MS 1T-111 RO PERMEATE TANK11

T-112 RO-I REJECTS TANK12

2.0 X 1.25 X 3.0M

ANAEROBIC DIGESTER 4.2 X 1.25 X 3.0M

MS 1

MS 1

0.5 X 0.5 X 1.2M

1.5 X 1.25 X 3.0M

MS 11.5 X 1.25 X 3.0M

SB-101 SLUDGE DRYING BED13 BRICK 21.5 X 1.5 X 1.2M

PR PUMP ROOM13 RCC 213.5 X 3.5 X 3.5M

TAG.NO DESCRIPTION SIZE ( L X W X H )T-101T-102T-103T-104T-105

BAR SCREEN CHAMBERCOLLECTION TANK

AERATION TANKCLARISETTLER TANKCLARIFIED WATER TANK

1.5 x 1.5 x 3.0M (1.5)

1.2 x 1.25 X 2.5M0.5 X 0.5 X 0.5M

0.7 X 0.75 X 2.5M

QTY0101

010.7 X 0.5 X 2.5M 01

01

MOCRCCMSMSMSMS

SB-A/B SLUDGE DRYING BED 1.5 X 1.5 X 1.2M 02BRICK WORK

HECS
Typewritten text
Annexure 4
Page 27: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 28: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

MBBR

SEWAGE

T-103T-104

T-105

SEWAGE 6.0KLD

F-101

P-101W/S

P-102W/S

P-103W/S

B-101W/S

COLLECTION TANK

F-102

SLUDGE DRYING BED

T-101

TO PROCESSFM

TAG.NO DESCRIPTION SPECIFICATION MOC MAKEP-101 RAW SEWAGE TRANSFER PUMP

P-102

FILTER FEED PUMP

0.25M3/HR 12M HEAD,1.0HP

0.5M3/HR 10M HEAD,1.0HP

QTYCI

CI

KIRLOSKAR SP 'O'

SP 'O'P-103

SLUDGE PUMP

CI KDS225++

02

0202

F-101 PRESSURE SAND FILTER 0.5M3/HR 400Ø 1250HOSF-102 ACTIVATED CARBON FILTER

DT-101 HYPO DOSING TANK 50LTS,410Ø X 480H HDPE SINTEX/RENO

MODEL

EQUIPMENT LIST

B-101 AIR BLOWER 30M3/HR, 3.0HP CI KAY 42AC 01

0.5M3/HR 25MHEAD,2.0HP

0.5M3/HR 400Ø 1250HOS01

KIRLOSKARKIRLOSKAR

---

0101

FRPFRP

DP-01

DT-01

T-102

TAG.NO DESCRIPTION TYPEV01&04 RAW SEWAGE PUMP SUCTIONV02&05 RAW SEWAGE PUMP DELIVERYV03&06 RAW SEWAGE PUMP DELIVERY

V11&14 SLUDGE PUMP SUCTIONV12&15 SLUDGE PUMP DELIVERY

V13&16

V23&29 PSF&ACF INLETV24&30 PSF&ACF OUTLETV25&31 PSF&ACF BACKWASH INLETV26&32 PSF&ACF BACKWASH OUTLETV27&33 PSF&ACF DOWN RINSEV28&34 PSF&ACF AIR VENT

VALVE LIST

PG01&08 PRESSURE GAUGE(0-7KG/CM2)NV01&08 NEEDLE VALVE

V07 AIR BLOWER DELIVERYV08

AIR BLOWER DELIVERY

SLUDGE PUMP DELIVERYFILRTER FEED PUMP SUCTIONFILRTER FEED PUMP DELIVERYFILTER FEED PUMP DELIVERY

V17&20V18&21V19&22

BALL VALVE

BUTTERFLY VALVE

BALL VALVE

BALL VALVEBALL VALVE

BALL VALVENON RETURN VALVE

NON RETURN VALVE

NON RETURN VALVE

NON RETURN VALVE

BALL VALVE

BUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVE

FM

V09 AIR BLOWER LINE TO AERATION TANK BUTTERFLY VALVEV10 RE-CIRCULATION LINE FROM SLUDGE BALL VALVE

PG

HECS(P)LtdAPPROVED/DATE

ENGINEEING CHECKED/DATE

DRAFTING CHECKED/DATEDESIGNED

NAME DATE

CHECKED

CR

CEO

IMO No.CLASS I.D SCALE REV

0

DWG No: DD - HECS - JI - STP - P&ID - 002

TITLE: CLIENT:REVISION

SURIYA

REV BY DATE DESCRIPTIONS EDIT

ISSUED FOR EXECUTION25.08.150

M/S. JESONS INDUSTRIES LTD,GUMMIDIPOONDI

SEWAGE TREATMENT PLANT - 6.0 KLDPROCESS & INSTRUMENTATION DIAGRAM

DRAWN SURIYA 25.08.15

THIS DRAWING DOES NOT RELEVE THE CONTRACTOR THE RESPONSIPLITY OF ENSURING THE CORRECTNESSOF DIMENSIONS CONTAINED THERE IN

25.08.15

25.08.15

Page 29: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Site photographs June 2017Site photographs June 2017Site photographs June 2017

HECS
Typewritten text
Annexure 5
Page 30: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Site photographs June 2017Medical Camp Photos

Page 31: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
HECS
Typewritten text
Annexure 6
Page 32: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 33: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

TrSTT. + F\ f\ \

x.lrqqtrT {iqTq {l€d 6iqqRIME fifiNlsrEp.s ruArro NAl,RELIEF FttND

PAN: AACTP4637Q

Receivedwilh thanksrrom M/s JESoNS INDUSTRIES LIMIreo(PAN-AAACJ765gp)9O4, gTH FLOOR, PENINSULA TOWER 1.PENINSULA COFPORATE PARK. LOWERPAREL

Rercipt*"- 1-56435 1564ss Dated 31 -Ma r- zo1 7

dt. 23/03/2O171 jjL. a.:,i:.: :: i.: . ., Ii:l: :iir";l.: .:: ri;:r.r:r:jl I \il.

WEST MUMBAI 4OOO1 3

FOUR LAKH ONLY

(

(

HECS
Typewritten text
Annexure 7
Page 34: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

c

F, K" I**afiUnden" fiecref*ryTele:23fi13683FAX : 23015655

1s6435M/S J ESONS rN D U STRIES LIMITED(PAN.AAA C J,7 6 5gp)904,9TH FLOOR, PENINSULA TOWER 1,PENINSULA CORPORATE PARK, LOWERPARELWEST MUMBAI4OOOl3

qqmq-4t c|-dFq' Rrde q?l q

Frirne Minister's National Re[ief' *j.r.*:r;!

uffq{d} orqfdq+$ fcA - 110 orl

PRIME MINTSTER'S OFFICENew Delhi-110 011

3l-Mar-2017

[r)n's{-(P. K. Bali)

No. 82(103)/2017-PMF

Dear srR / MADAM

We acknowledge with thanks the generous contribution to the PrimeMinister's National Relief Fund.

The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.

A formal receipt is enclosed.

With regards.

Your sincerely,

c

Page 35: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

:.PRIME M: PAN : AACT"P4037Q

REL]EF F.UND

ReceiPt No' 15 3 5 51 1 53551

Received withthanksfrom M/s JESoNS INDUSTRIES LIMTTED, PAN-AAACJ765gp9O4, PENINSULA TOWER NO.1, CORPORATEPARK, GANPATRAO KADAM MARG,LOWERPAREL WEST MUMBAI 4OOO1 3

tbesum of Rupees' NINE LAC NINETY THOUSAND OMLY

Dated3O-Dec-2O1 6

i.rr: ::,;l1i :irr:.r

HCPN5001 31 5620

DIRECT

ff c4uU.glg;s]Cr"rd'aed.f i{afJorf .

P"r.irnerAdr?t&fddtilYdtid.dat"lfetf€ffiiBdu]':',','

(

Rs,

: !r:";ir :i :'i:1,iijr.l-- .j,.r rjrl i , il,ji:i.\: r: : !- rl li i,ii ::

'' ; pHtNE' iltrir3il,rfr iidF}lcfr : i,.i l

,,.l 'i, l,; ; : rl.,i tVEI4?DEti;il;i :j]1, ;: ;l.,i :: l;,,

,r:\ :. _" .1

-rt

(

Page 36: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

F. K. Balidlnden Secretary'EeIe :330136S3FhX;23015655

No. -8?-<1096)/2016-PMF

Dear StR / MADAM

nsJrqff {Nftq {rFd idsPrime Minister's National Relicf l-unrl

q'qntrJf orqff,qT{ fetfr - 110 011

PR"I}IE MINISTf, R'S OFFICf,New Delhi-ll0 0ll

30-Dec-2016

C

(,,

Minister's National Relief Fund.

The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.

A formal receipt is enclosed.

With regards.

153551M/S JESONS INDUSTRIES LIMITED, PAN-AAACJ7659P904, PENINSULA TOWER NO.I, CORPORATEPARK, CANPATRAO KADAM MARG,LOWERPAREL WEST MUMBAI 4OOOI 3

Your sincerely,

(P. K.Bali)

We acknowledge with thanks the generous contribution to the Prime

[r]''s{-

giq*if 3-rra

Page 37: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

'a

!iia

i:)?a

*l,

1lli'

i:"Ni"

t:

kL:.,

'il;l:f

::i

t:

iiii

:,:,l

::. ,l,:i ::l

:"' ,"

.. ..:

,'::

. ':., t,

t

.:..ir ::, ::

'1. ;- 2

,.' il 'L:

t: .: :;,: ,:: i:

ii: i,t. i.:

:.i:!::, '.i :i:::..t

..1- i.l .-i

...".,:.:

i: .(

.. .;) .,' ,:

-,t--'i I

';a :: i:

i: ) ".i

i, .!, ...i: ...!

"::.

f

Page 38: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

c

P. K. BaliUnder SecretaryTele;23013683FAX:23015655

I

1s3268M/S. JESONS INDUSTRIES LIMITED904,9TH ITLOOR, PENINSULA TOWER 1,CORPORATE PARK, LOWERPAREL WEST MUMBAI 4OOO13(PAN-AAACJ7659P)

sqrn{* {r€q rrrd atqPrime Mlnister's National Relief Fund

sqrflf* orqrdqT{ f6il - tlo oti

PRIME MINISTER'S OFFICE

New Delhl-ff0 0ll

Your sincerely,

19-Dec-2016

No' Bz(ros6)/20r6-pMF

DearSIR / MADAM

We acknowledge with thanks the generous contribution to the PrimeMinister's National Relief Fund.

The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.

A formal receipt is enclosed.

With regards.(i

Page 39: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

O1

sss.I

l>

^1I

s)

sa

-+

d<t

1grnFt

-

s3p

a

ei

s

v7

tsbsd\)s

l'-i

i

E

a

\A(\J-)

e\_>

\(€t({\.{\

I(

x\ss

((5

sI

$c

,{bd

5'))iq

J

c

r-\(

cl\J\

o;;(oo

=ro6st6Frc;zco

CL

stcp

c;z

psfiEEF?Ex att

,E€i

Es p gE,f gT5E i H

EfgEiFi iRs'gi fr*g

Esat{slt !E Ec tr

E# s;;{d HEEEnleeEE E22F,E 9s e-

EE*TE=

E =F

F

EE;5 5E<&cc

tr(uer-

llrt?r-tft

TErts,GLo-Fr-a(tr

oot-F

-o

E$h\f-hdq,tq'

a.J

)d

zts

z

7.

Page 40: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Shreeyash PratishthanCLttNo258(P)Satara'fanda,'I'q.&DisL.ALrrangabad-43 l005Ph.No.(0240)660tj70 l-35 lolcl:ur(0240) 2344748.

WWW.svpqe,Ut B rnai | : [email protected]

Date: 10.02.2011

(

'fo,

.lesor-rs Inclustlies l.td.,904. Peninsula 'l'ower l.Ganpatrao Kadan-r Marg.Lowcr Parel (West).Munrbai 400 01 3.

SUB:

With respect

.Appcal for Donation,

to above subiect. wc introduce ourselves as lbllorvs:

Ilrief Backerou nd:

r ShreeyashPratishthan located at Aurangabad is catering ncecls in 1he fleld of Engineering.Pol1,1gg5.i. and MBA progranlmes. Il sharpens stLrclcnt's 1-rclsorralitl,with Gurukr-rl culture.ShrecyaslrPratishthan is pLrtting uritiliitg c1'1ults to crrrcrsc' ris rr ccntrc of excellencc lirr'clcvclopir-rg el'f'ectivc pe rsoualitics. Shrecl,ashPlutishtlrirn 1'e rsi.-,tcntlv sccks & adopls

introvtttive urcthocls to inr;lrovc thc clLralitv of highcl cclucrrliorr on rr consistcnr lrasrs, ltplovides the pcrlcct anrtrience lirr higher educalion. Slrr',.:r'.i irshPratishthern has ntetde

landmark conlribLrtictns trt thc clcr,'eloprnent ol'cLrtlitrgr etlq.' tce ltnologr,' irr r,iu'ior,rs lields.ShreeyashPlatishthan cndcavors to bring out cullulirl ancJ nutional integration among the

sludent comnrunity and to foster the leeling ol'orrcncss lnrons thenr by striving and

imparting the lofty ideals of honesty and integlit;,. v\rl11lc Plopaling them to acquireanalytical, rational & logical turn ol'mind.

Campus:

ShreeyashPratishthan is one of the BIIST technical institutes hLrb irr Nltrlrarashtra state in the un-

aidcd sector,'l'hc canrpns is spread c:ver 27 acres which provicies an idcal cnvironnrent [br

technical cducation. It has beautilulll'lanclscapcd and czrrcfirlll ten.lurl srldens. provides an iclcal

environnlcnt lbr a congcnial lcalning cxpclierrcc. bcaLrtilirl niltru'ill lrirtl lrrillrrtion licc atnrosphclc.ltis a most lively plircc on tlrc camllr,rs proviclilrg a sali:. conrliri'tlrblc rrnii ll'icncllv onv'ronrlent thert

enables learning and advanccrlent of lrnou,lcdgc and l)fc)nt()lcs rlir;ct,'ir,r'\'ilnd scirolarship.'l'hc

dcdicated faculty arrcl thc suppolting sta1l'ar.c the pillals o1'stlcnlttir- cr)nrbincd lvith i,ibrarrt and

talented student commr-rnity wilh human verlues certainly nralic Shr-cctirsh as thc Instilute o1'global

r rnportance.

ln order to carry out valious pl'()Blarrs, we nccd a lo1 of luncls [o affiln!ic" fior the same we wouldlil<e to bring to your notice that as per section 135 of tlrc Conrpanics Act,20l3 specified

conrpanies have to spend mininium 2oh of their average ne1 plolit in prcvior-rs three years in CSR

activities. Under scheclule VII o1'the Corr-rpanies Act, 201i a list o1'noLivilies eligible lbr CSR

activities has been spccified one of which being promoting educatiLrr].

Page 41: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Any generous monetary help would be appreciated, it will deflnitely hetp to camy out our task.

You could also send a demand draft/Cheque or transfer thq anrount b,v I{T'GS as per the followingdetails:

AccountName: SHREEYASFIPRATISHTHAN

Bank name:

Branch:

Union Bank of India.

Aurangabad (Main).

NEFT/IFSC Code: UBINO534455.

Account no: 34450r0100s0s44.

Please accord a favorable consideration ofour appeal and oblige,

Thanking You,

Your's faithfully,

l'or Shreeyash Pratishthan.

Page 42: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

Shreeyash Prati shrhanGut No 258 (P) Satara l'ancja.'lq,& Dist, ALrrangabad- 4l i(j0\, jui l irr No. (02210) 6(10870l-j5

C

'l'o,

Jesons Industries Ltd,

904, Peninsula'l'ower l,

Ganpatrao l(adarl Marg,

l.ow'cr Ilarel (West).

Murnbai " 400 013.

Respected Sir,

We are extlet'nely thar-rkful to you fbr consiclcling oLrl appeal

donating Rs.10,00,000/- (Rupees Ten I,akh only) fo uur"l-r'ust,

We assure you that the u,,-tounf shall be Lrtilizecl onl-r, lrl'theStudents and other expansion work of our infrastrLrcturc.

We hope our rclationshi;l will be everlasting.

'l'hanl<ins You,

Date: 06.03.2017

lbl donation &

beneflt of our

YoLlr's f aith1lIly.

lioi' 5h i'r:cyash Pratishthan,

,,/f(l/i/r/,-r ^g'

r\ utliorized Si gn atory

Page 43: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

EMP CELL

The following members are appointed as Members of EMP CELL for “Jesons Industries Limited”

Name Designation Role in Safety Committee

Priyang Desai Manager – Operation Team Leader

Nandakumar Sr. Executive- HR Team Member

Subramaniyan Manager Commercial Team Member

Baskar S. QC/QA Manager Team Member

Arockiraj A. Dispatch Executive Team Member

Kiran Panwal Production Operator Team Member

Kalakar Malik Office Boy Team Member

Nagendra Production Helper Team Member

Jayprakash Production Helper Team Member

Sathish Dispatch Helper Team Member

HECS
Typewritten text
Annexure 8
Page 44: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
HECS
Typewritten text
Annexure 9
Page 45: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 46: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,

2" (50MM) OR 3" (75MM) THK.

(1:20 SLOPE)

PEBBLE STONE

CONCRETE PAVING

R.C. COVER SLAB

PERFERATED

1'-0" [0.30]

PERCOLATION PIT

SECTION - CC

SOLAR ENERGY

ACTIVATOR

FORMED GROUND LEVEL

GROUND FLOOR LEVEL

PARAPET LEVEL

SLAB LEVEL

W

W

W

W

W

W1

D1

WEIGH BRIDGECABIN

TERRACE

FORMED GROUND LEVEL

GROUND FLOOR LEVEL

PARAPET LEVEL

SLAB LEVEL

1 1

GROUND FLOOR PLANTERRACE FLOOR PLAN

SECTION - 1-1

1 1

WEIGH BRIDGE CABIN1:400

TYPEDESCRIPTION

OPENING SIZE

S C H E D U L E O F J O I N E R Y

Length Width

DOORS

D1 1000 2100

W1 2100 1500ALU. FRAMED SLIDING WINDOW TO DETAIL

ROLLING SHUTTER

RS 2400 2400 ROLLING SHUTTER TO DETAIL

V1 2400 900LOUVERED WINDOW

SECURITY BLOCK, WEIGH BRIDGE CABIN AND UTILITY BLOCK

FLUSH SHUTTER TO DETAIL

TEAK WOOD FRAMED DOOR WITH

WINDOWS & VENTILATORS

W 1200 1500ALU. FRAMED SLIDING WINDOW TO DETAIL

V 600 600LOUVERED WINDOW

L1 2400 2100 LOUVERED WINDOW

LAYOUT WAS APPROVED BY DEPUTY DIRECTOR OF TOWN &

COUNTRY PLANNING,CHENGALPET VIDE 65/2013

SECURITY BLOCK

TOILET V

W

W

WW

W

W1

D1

TERRACE LEVEL

FORMED GROUND LEVEL

GROUND FLOOR LEVEL

PARAPET LEVEL

SLAB LEVEL

2 2

FORMED GROUND LEVEL

GROUND FLOOR LEVEL

PARAPET LEVEL

SLAB LEVEL

GROUND FLOOR PLAN

TERRACE FLOOR PLAN

ELEVATION

SECTION - 2-2

SECURITY BLOCK1:100

NAME OF BUILDINGSQ.FTSQ.MS.NO

email : [email protected] : www.paparchitect.com

14, COLLEGE ROAD, CHENNAI - 600 006Phone : +91 (0) 44 2827 8361, 2827 3958/59

P I T H A V A D I A N A N D P A R T N E R SChennai ▪ Bengaluru ▪ Kochi ▪ Hyderabad

Fax : +91 (0) 44 2827 1053

ARCHITECT & LICENCE SURVEYOR SIGNATURE:

OCCUPIER / LEASE HOLDER SIGNATURE

KANDIGAI VILLAGE, GUMMIDIPOONDI TALUK,

NAME:PLAN SHOWING THE PROPOSED FACTORY BUILDING FOR

INDUSTRIAL PARK IN SURVEY NOS 32/2(PART) THERVOY

M/s JESONS INDUSTRIES LTD,PLOT NO.A-4/2 PART-B) SIPCOT

MATERIAL STORE CUM PRODUCTION BLOCK

1.

GROUND FLOOR

MATERIAL STORE - 1472.00 SQ.M

370.00 3982.50

SECOND FLOOR(PRODUCTION BLOCK)

65.00 700.00

STAIRCASE HEAD ROOM

UTILITY BLOCKS

3.

THERMOPACK ROOM -100.00 SQ.M

4.

27.00 290.00WEIGH BRIDGE CABIN

54.00 582.00SECURITY BLOCK

TOTAL F.S.I AREA3218.00 34638.25

F.S.I. ACHIEVED - 0.102

ACHIEVED PLOT COVERAGE - 9.787%

TOTAL FSI AREA - 3218.00 SQ.M

TOTAL PLOT EXTENT AS PER LEASE DEED - 7.75 ACRES(31363.087 SQ.M)

THIRUVALLUR DISTRICT - 601 202 .

OFFICE & CONFERANCE ROOM-115.00 SQ.M

PRODUCTION BLOCK -370.00 SQ.M

1957.00 21065.00TOTAL GROUND FLOOR AREA

FIRST FLOOR

2877.00 30968.00

TOTAL AREA FOR M.STORE CUM PRODUCTION BLOCK

DG SET / MAINTAINANCE -100.00 SQ.M

ELECTRICAL PANEL ROOM -60.00 SQ.M

TOTAL AREA FOR UTILITY BLOCK260.00 2798.61

5.484.00 5210.00

UNDER GROUND TANK (ETP)

AREA STATEMENT(F.S.I AREA)

NAME OF BUILDINGSQ.FTSQ.MS.NO

AREA STATEMENT(NON F.S.I AREA)

6.37.50 403.50

SEWAGE TREATMENT PLANT(STP)

7.90.00 968.75

UNDER GROUND TREATED WATER

8.60.00 646.00

EFFLUENT TREATMENT PLANT(ETP)

TOTAL NON F.S.I AREA 771.50 8304.35

TOTAL GREEN AREA PROVIDED - 7850 Sq.m(25.20%)

LORRY PARKING(2907.00 SQ.M)

NO. OF WORKERS / OFFICE STAFF : 65 NOS (MALE - 60 NOS,FEMALE : 05 NOS)

MANUFACTURE OF : INDUSTRIAL ADHESIVES & SYNTHETIC ACRYLIC

POLYMER EMULSIONS

Plot No.A-4/1PART-A

VACANT LAND

SITE PLAN

PROPOSED

COLOR INDEX

BOUNDARY

ROAD

reproduced or altered either in full or in part by anyone without consent

4. Dimensions to be followed as indicated and not to be scaled3. All dimensions in millimeters and levels in meters.

N O T E S

attention of the Architect2. Any discrepancy in the drawing should be brought to the immediate

from us or be passed to any individual or company not authorised by us.

1.This drawing is sole property of 'Pithavadian and Partners' and must not be

ADDITIONAL NOTES1.ALL DOORS & WINDOWS OPEN OUTWARDS

2.SILL LEVEL OF WINDOWS IS BELOW 1.00M

3.DISTANCE BETWEEN MACHINERY AND JOINERY IS 0.60M

4. ALL DIMENSIONS IN MILLIMETERS AND LEVELS IN METERS.

LEASE DEED DOCUMENTS REGISTERED VIDE DOC NO:3833/2014AT SRO GUMMIDIPOONDI

9.

100.00 1076.40OPEN TRANSFORMER YARD

LIST OF MACHINERY

MACHINERY NAME

BLOCK

NO

QTY

SS 25mt Jacketed Reactor With Condenser With 1.00 (SET)

1.

Propellor Blade & Gear Box & Elec.Motor with

Emulsion Tank (located one level above)

2.

SS 10 mt. Jacketed Reactor, Condenser With

blade With Gear Box and Electr.Motor With

EACH HP TOTAL HP

70 70

Emulsion Tank (located one level above)

2.00 (SET) 35 70

Thermopack with Accessories (850 KG/hour Capacity)

1.00 19.00 19.00

4.

250 KVA DG SET (Stand By)

1.00 - -

5.

Cooling Tower (300 TR)

1.00 42.50 42.50

6.

SS Raw Material Storage tanks (35 M.T)

5.00 3.00 9.00

7.

SS Finished Goods tanks (30 M.T)

4.00 32.50

8.

DM Plant (100 M.T)

1.00 15.00 15.00

9.

Effluent Treatment Plant (ETP- 5 M.T)

1.00 5.00 5.00

10.

Sewage Treatment Plant (STP- 5 M.T)

1.00 5.00 5.00

3.

NH3/ Catalyst Storage Tanks (1 M.T)

4.00 3.00 9.00

11.

QUALITY & LAB ROOM -115.00 SQ.M

PRODUCTION BLOCK - 370.00 SQ.M

485.00 5220.50

TOTAL FIRST FLOOR AREA

A0-AS SHOWN

1:400

2.

PARKING SLOT DETAILS

REQUIRED PROVIDED

6 NOS 7 NOS

CAR PARKING(2907.00 SQ.M)

3 NOS 5 NOS

PURPOSECOMMUNITY

(No Motor for NH3 Tank)

and Compressor

(3 Motor For 5 Tanks)

TOTAL HP

277.00

1 2 3 4 5 6 7

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

SLOPEDN

600MM WIDE DAYLIGHT PANEL

RIDGE LINE

600MM WIDE DAYLIGHT PANEL

RIDGE LINE

1000

1000

1

0

1

5

1

5

9

0

1

5

9

0

1

0

1

0

1165

1015

UP

HECS
Typewritten text
Annexure 10
Page 47: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
HECS
Typewritten text
Annexure 12
Page 48: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 49: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 50: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 51: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,
Page 52: SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE … · 2017. 10. 16. · SIX MONTHLY ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT For “Proposed Synthetic Acrylic Polymer Emulsions,