SIX MONTHLY ENVIRONMENTALCLEARANCE COMPLIANCE REPORT
For“Proposed Synthetic Acrylic Polymer Emulsions, Industrial Synthetic Adhesives, Glues,
Thermosetting Acrylic Resins, Polymer of Vinyl Acetate and Vinyl Copolymers,Ethylene Vinyl Acetate Emulsion”
EC OBTAINED Vide Letter No J-11011/409/2014-IA II (I) Dt: 17.02.2016
byM/s Jesons Industries Limited
atSF No.32/2 & 33/2(a), Plot No.A-4/2 (Part B) , SIPCOT Industrial Complex, Village :
Thervoykandigai , Taluk Gummidipoondi , District Thiruvallur, Tamil Nadu
Submitted to
Ministry of Environment and ForestsRegional Office, I and II Floor,
Handloom Export Promotion Council,34, Cathedral Garden Road
Nungambakkam, Chennai 600 034
Prepared by
ENVIRONMENTAL CONSULTANTHUBERT ENVIRO CARE SYSTEMS (P) LTD
CHENNAIJune 2017
Table of Contents
1.0 PROJECT DETAILS ........................................................................................................ 3
2.0 LOCATION MAP................................................................................................................... 4
3.0 SITE PHOTOGRAPH............................................................................................................ 5
4.0 SIX MONTH ENVIRONMENTAL CLEARANCE COMPLIANCE STATEMENT... 6
5.0 ENVIRONMENT CLEARANCE SIX MONTHLY REPORT........................................ 16
5.1 Ambient air quality monitoring...................................................................................................16
5.2 Ambient Noise level monitoring .................................................................................................16
5.3 Soil quality monitoring................................................................................................................16
6.0 CONCLUSION ..................................................................................................................... 17
LIST OF ANNEXURE
Annexure 1 : Copy of Environmental ClearanceAnnexure 2 : Environmental Monitoring ReportAnnexure 3 : Water bill from SIPCOTAnnexure 4 : STP & ETP flow diagramAnnexure 5 : Site photographs
Annexure 6 : Fire NOC
Annexure 7 : CSR Receipts.
Annexure 8 : EMP Cell DetailsAnnexure 9: Newspaper advertisement copy
Annexure 10: Site Layout
Annexure 11: TNPCB LetterAnnexure 12: HWM Authorization.
1.0PROJECT DETAILS
Name of the project “Synthetic Acrylic Polymer Emulsions, Industrial Synthetic Adhesives,Glues, Thermosetting Acrylic Resins, Polymer of Vinyl Acetate andVinyl Copolymers, Ethylene Vinyl Acetate Emulsion”
Project Location M/s Jesons Industries Limited
SF No.32/2 & 33/2(a), Plot No.A-4/2 (Part B) , SIPCOT IndustrialComplex, Village : Thervoykandigai , Taluk Gummidipoondi ,District Thiruvallur , Tamil Nadu.
File No J-11011/409/2014-IA II (I) Dt: 17.02.2016 Annexure 1
TOR issued date 31/ 03/2015
Proposed capacity 41400 MTPA
Project proponent M/s. Jesons Industries Limited
Total land area 7.75 Acres (31363.14 Sq.m)
Project cost 14 Crore
Power Requirement 250 KVA
Stand by DG-250KVA
Water Requirement 108 KLD (100 KLD From SIPCOT 8 KLD from recycling sewage/effluent)
No. of employees 100 during operation
2.0 LOCATION MAP2.0 LOCATION MAP2.0 LOCATION MAP
3.0 SITE PHOTOGRAPH
Front view of the site
Infrastructure view of the site
4.0 SIX MONTH ENVIRONMENTAL CLEARANCE
COMPLIANCE STATEMENT
A. Specific Conditions
S.No Conditions Status of compliance
1 Wet scrubber along with stack of
adequate height shall be provided to
furnace oil fired thermo pack heater to
control particulate emission
Wet scrubber is Provided with stack height
of 15m to control particulate emission from
thermo pack heater.
2. AAQ data shall be collected as per
NAAQS standards notified by the
ministry vide GSR No. 826 (E) dated
16th sep 2009 the levels of PM10, PM2.5,
SO2 NOx CO, VOC and HC (methane
and non methane) shall be monitored in
the ambient air and emission from the
stacks and displayed at a convenient
location near the main gate of the
company and at important public places.
The company shall upload the results of
monitored data on its website and shall
update the same periodically. It shall
simultaneously be sent to the RO of
MoEF, the respective ZO of CPCB and
TNPCB
AAQ datas are collected as per NAAQS
standards notified by the ministry vide GSR
No. 826 (E) dated 16th sep 2009 the levels of
PM10, PM2.5, SO2 NOx CO, VOC and HC
(methane and non methane) are monitored in
the ambient air and emission from the stacks.
Monitoring results are enclosed in the
Annexure 2. M/s Jesons Industries Limited
will upload the results of monitored data on
Jesons website and will be update the same
periodically and simultaneously sent to the
RO of MoEF, the respective ZO of CPCB
and TNPCB.
S.No Conditions Status of compliance
3. In plant control measures for checking
fugitive emission from all the vulnerable
sources shall be provided. Fugitive
emission shall be controlled by providing
closed storage, closed handling and
conveyance of chemicals/materials, multi
Cyclone separator and water sprinkling
system. Dust suppression system
including water sprinkling system shall
be provided at loading and unloading
areas to control dust emissions. Fugitive
emission in the work zone environment,
product, Raw material, storage area etc.
shall be regularly monitored. All
necessary steps should be taken for
monitoring of chlorine as well as VOCs
in the proposed plant
To control fugitive emissions from
vulnerable sources the following measured
are taken.
1.Closed storage
2.Closed handling of chemicals
3.Water sprinkler system in storage area
are provided.
The fugitive emissions will be regularly
monitored by providing Gas Vapor Detector
of chlorine as well as VOCs in the plant
4. The gaseous emission from DG sets shall
be dispersed through adequate stack
height as per CPCB standards. Acoustic
enclosure shall be provided to the DG
sets to mitigate the noise pollution.
The gaseous emission from DG sets will be
dispersed through stack of 11m height as per
CPCB. Acoustic enclosure is Provided with
250KVA –DG Set.
5. Total fresh water requirement from
SIPCOT water supply should not Exceed
100 M3/day
The total usage of fresh water per day is
below the limit 100 M3/day. The latest bill
on 05th April, 2017 from SIPCOT is enclosed
in the Annexure 3.
S.No Conditions Status of compliance
6. Total industrial effluent generation shall
not exceed 7m3/day. Effluent will be
treated in the ETP followed by RO to
achieve Zero discharge. RO Rejects shall
be evaporated in the MEE. RO permeates
shall be recycled/ reused in the process.
No effluent will be discharged outside
the plant premises. Domestic sewage
shall be treated in STP. Water Quality of
treated effluent shall meet the norms
prescribed by CPCB/SPCB
The total effluent generation is not exceeding
7m3/day and therefore the condition is
complied. An Effluent Treatment Plant with
capacity 8 m3/day followed by RO is
provided. The plant produces zero discharge
(ZLD) and the RO Permeate is reused in the
cleaning activity. The norms of CPCB and
TNPCB are also met by providing STP for
domestic sewage treatment.
7. Continuous online monitoring system
(24X7) to be installed and data to be
provided to company’s website and
respective RO MoEF&CC, and
concerned CPCB
The letter attached to TNPCB for waiving of
the condition is enclosed as an Annexure 11.
As DG is for back up only & capacity is
250KVA and thermo pack 850 Kg/hr.
8. Process Effluent/any wastewater shall not
be allowed to mix with storm water.
Storm Water drain shall be passed
through guard pond.
A Separate Piping system is provided for
ETP inlet and STP inlet and so the storm
water will not be allowed to mix with ETP
and STP, therefore the condition is complied.
Plan and photograph are enclosed in
Annexure 4 and 5
S.No Conditions Status of compliance
9. The company shall obtain authorization
for collection, storage and disposal of
hazardous waste under the hazardous
waste (Management, Handling and Tran
boundary Movement) Rules, 2008 and
amended as on date for management of
Hazardous wastes and prior permission
from TNPCB shall be obtained for
disposal of solid/ hazardous waste in the
TSDF. Measures shall be taken for
firefighting facilities in case of
emergency.
Hazardous waste (Management, Handling
and Tran boundary Movement) Rules, 2008
and amended as on date for management of
Hazardous wastes and prior permission from
TNPCB has been obtained for disposal of
solid/ hazardous waste in the TSDF. HWM
authorization is enclosed an Annexure 12
10. The company strictly comply with the
rules and guidelines under manufacture
storage and import of hazardous
chemicals (MSIHC) Rules, 1989 as
amended time to time. All transportation
of hazardous chemicals shall be as per
Motor Vehicle Act (MVA), 1989
M/s Jesons Industries Limited agrees upon
and strictly complies with the rules and
guidelines under manufacture storage and
import of hazardous chemicals (MSIHC)
Rules, 1989 as amended time to time. All
transportation of hazardous chemicals shall
be as per Motor vehicle Act (MVA), 1989
11. The unit shall make the arrangement for
protection of possible fire hazardous
during manufacturing process in material
handling. Fire fighting system shall be as
per the norms. Fire hydrant system shall
be provided along with fire monitor and
flame detection system in the process as
well as storage areas.
The NOC from Fire Department and Fire
Fighting system is provided as per the norms
along with the fire monitor and flame
detection system in the process as well as in
the storage areas. Annexure 6
12. Occupational health surveillance of the
workers shall be done on a regular basis
and records maintained as per the
factories Act
Occupational health surveillance of the
workers is being done regularly and records
are being kept as per the factories Act.
Photographs are enclosed in Annexure 5.
S.No Conditions Status of compliance
13. Green belt over 10632 m2 area should be
developed within plant premises with
atleast 10 m wide green belt on all side
along the periphery of the project area, in
downward direction, and along road side
etc. Selection of plant species shall be as
per the CPCB Guidelines in consultation
with the DFO.
The Greenbelt Area has been developed in
the project site around 10700 Sq.m (34.11%).
(Near warehouse and production block 1170
Sq.m) and also the plant species are selected
as per CPCB guidelines with consultation of
DFO. Greenbelt photographs and site plan
marked with greenbelt are enclosed in
Annexure 5 & 10
14. At least 2.5% of the total cost of the
project should be earmarked towards the
corporate social responsibility and item-
wise details along with time bound action
plan should be prepared and submitted to
the ministry’s RO at Chennai
implementation of such program should
be ensured accordingly in a time bound
manner.
The following payment has been made under
CSR.
1. Rs.490000/-in Prime Minister Relief Fund
vide Receipt No.1521/2016 dt.23.02.2016.
2. Rs.1250000/- to Shreeyash Prastishthan
dt.29.02.2016 vides Receipt No.1292
3. Rs.10000/- in Prime Minister National
Relief Fund vide receipt No.6805987
dt.30.12.2015.
4. Rs.1000000/- - Vedanta Cultural
Foundation vide Receipt No.2015-16/958
dt.25.01.2016.
5. Rs.400,000/- in Prime Minister National
Relief Fund vide receipt No.6805987
dt.31.0.3.2017.
6. Rs.10,00,000/- to Shreeyash Prastishthan
dt.01.03.2017 vides Receipt No.626.
Further payment will be made in Prime
Minister Relief Fund.
All Receipts mention above is enclosed in
Annexure 7
B. General condition
S.No Conditions Status of compliance
1. The project authorities shall strictly adhere to
the stipulations made by the state
government and TNPCB
M/s Jesons Industries Limited strictly
adheres to the stipulations made by state
Government and TNPCB.
2. No further expansion or modifications in the
plan shall be carried out without prior
approval of the MoEF. In case of deviations
or alternation in the project proposal from
those submitted to this ministry for
Clearance, a fresh reference shall be made to
the ministry to assess the adequacy of
conditions imposed and to add additional
environmental protection measures required,
if any.
There is no modification in the plan. In
case of any change(s) in the scope of the
project, a fresh appraisal by the MoEF
shall be obtained.
3. The location of AAQ monitoring stations
shall be decided in consultant with the SPCB
and it shall be ensured that at least one
station is installed in the upwind and
downwind direction as well as where
maximum ground level concentration are
anticipated
The location of AAQ monitoring
stations are decided as per SPCB
conditions. Photograph of the
Monitoring station is enclosed in the
Annexure 5
4. The overall noise levels in and around the
plant area shall be kept well within the
standards providing noise control measures
including acoustic hoods, silencers,
enclosure etc. on all sources of noise
generation. The ambient noise levels shall
conform to the standards
The Noise levels in and around the plant
premises is within the standards. Noise
generation levels are enclosed in the
monitoring report. Annexure 2
S.No Conditions Status of compliance
5. The company shall harvest rainwater from
the roof tops of the buildings and storm
water drains to recharge the ground water
and use the same water for the process
activities of the project to conserve fresh
water.
The required condition has been
complied and the photographs of rain
water harvesting, ditch and storm water
drains are all enclosed in Annexure 5
6. Training shall be imparted to all employees
on safety and health aspects of chemicals
handling. Pre-employment and routine
periodical medical examinations for all
employees on handling of chemicals shall be
imparted.
M/s Jesons Industries Limited is
imparting training to all employees on
safety and health aspects of chemical
handling regularly. Routine medical
checkup and pre-employment medical
checkup are carried out regularly and the
photos are enclosed in Annexure 5
7. Usage of Personnel Protection Equipments
(PPEs) by all employees/workers shall be
ensured
All PPEs will be provided to workers.
Also, adequate training and information
on safety and health aspects will be
given to workers. In-site safety signage
is also provided. Photographs are
enclosed in Annexure 5
8. The company shall also comply with all the
environmental protection measures and
safeguards proposed in the documents
submitted to the ministry. All the
recommendation made in EMP/EIA in
respect of environmental management, risk
mitigation measures and public hearing
relating to the project shall be implemented.
M/s Jesons Industries Limited will
comply with all environmental
protection measures and safeguards
proposed in the documents submitted to
the ministry.
S.No Conditions Status of compliance
9. The company shall undertake all relavent
measures for improving the socio-economic
conditions of the surrounding area.. CSR
activities shall be undertaken by involving
local villages and administration.
M/s Jesons Industries Limited will
undertake all the relevant measures for
improving the socio-economic
conditions of the surrounding area. CSR
activities will be undertaken by
involving local villages and
administration.
10. The company shall undertake eco
developmental measures including
community welfare measures in the project
area for the overall improvement of the
environment.
M/s Jesons Industries Limited will
undertake eco developmental measures
including community welfare measures
in the project area for the overall
improvement of the environment.
11. A separate Environment Management Cell
equipped with full fledged laboratory
facilities shall be set up carry out the
environmental management and monitoring
functions.
We are setting up a laboratory for
Environment management with all the
required equipments. List of EMP cell
responsibility is enclosed as Annexure
8.
12. The company shall earmark sufficient funds
towards capital cost and recurring cost/
annum to implementation the conditions
stipulated by the MoEF as well as the state
government along with the implementation
schedule for all the conditions stipulated
herein. The funds so Earmarked for
environment management/ pollution control
measures shall not be diverted for any other
purpose.
M/s Jesons Industries Limited adheres to
the condition and will not divert
environment management fund for any
other purpose.
S.No Conditions Status of compliance
13. A copy of the clearance letter shall be sent
by the project proponent to concerned
panchayat, zilla parised /municipal
corporation, urban local body and the local
NGO, if any from whom suggestions /
representations if any, were received while
processing the proposal.
Condition Compiled
14. The project proponent shall also upload the
status of compliance of the stipulated EC
conditions, including results of monitored
data (both in hard copies as well as by e-
mail) to the respective Regional Office of
MoEF, the respective Zonal Office of CPCB,
and TNPCB. A copy of EC and status of EC
report shall be posted on the website of the
company
M/s Jesons Industries Limited will
upload the status of compliance of the
stipulated EC conditions, including
results of monitored data to the
respective Regional Office of MoEF, the
respective Zonal Office of CPCB, and
TNPCB.
15. The environmental statement for each
financial year ending 31st March in Form V
as is mandated to be submitted by the project
proponent to the concerned state pollution
Control Board as prescribed under the
Environmental (P) Rules 1986, as amended
subsequently, shall also be put on the website
of the company along with the status of
compliance of EC conditions and shall also
be sent to the respective Regional Office of
MoEF by e-mail.
The condition is agreed upon.
S.No Conditions Status of compliance
16 The project proponent should advertise in at
least two local News papers widely
circulated in the region, one of which shall
be in the vernacular language informing that
the project has been accorded Environment
Clearance and copies of clearance letters are
available with the Tamil Nadu Pollution
Control /Board and may also be seen on the
website of the MoEF at
http://www.envfor.nic.in. the advertisement
should be made within 10 days from the date
of receipt of the clearance letter and a copy
of the same should be forwarded to the
Regional Office of this Ministry
M/s Jesons Industries Limited has
advertised in the newspaper as per the
regulation and the copy is attached in
Annexure 9
17. The project authorities shall inform the RO
as well as the ministry, the date of financial
closure and final approval of the project by
the concerned authorities and the date of start
of project.
The condition is agreed upon.
M/s Jesons Industries Limited has
informed RO and will also inform the
Ministry.
5.0 ENVIRONMENT CLEARANCE SIX MONTHLY REPORT
It is mandatory to submit six month compliance report to MoEF Regional Office by the
proponent. For the purpose of obtaining six month compliance certificate the environmental
monitoring was carried out at site by M/s. Hubert Enviro Care Systems Pvt. Ltd for the period of
June – November 2016.
5.1 Ambient air quality monitoring
During operation phase particulate matter and gaseous emissions are likely to arise from
the site movement of vehicles, operation of DG sets etc., the ambient air quality
parameters such as suspended Particulate matter (PM10), Respirable Particulate matter
(PM 2.5), Sulphur dioxide, Oxides of Nitrogen (NOx), VOC, Hydro carbons and Carbon
monoxide were monitored at 2 location. The test report of ambient air quality for the
period of October 2016 – March 2017 is enclosed as Annexure-2.
5.2 Ambient Noise level monitoring
During operation phase the ambient noise level likely to be generated due to machinery
operations and movement of vehicles. 1 location was selected for monitoring the noise
level. The test report of ambient noise recorded during period of October 2016 – March
2017 is enclosed in Annexure-2.
5.3 Soil quality monitoring
During operation phase soil contamination may occur due to oil spills from machinery,
during maintenance and operation of DG sets on site. 1 location was selected for
monitoring the soil quality. The Soil samples were collected and analyzed for nutrients
and heavy metals. The test report of soil samples collected and analyzed during October
2016 – March 2017 is enclosed as Annexure2.
6.0 CONCLUSION
1. The environmental monitoring was carried out at site during the period of October
2016 – March 2017.
2. All the conditions stipulated in Environmental Clearance are being complied.
List of Annexure
Annexure 1 : Copy of Environmental Clearance
Annexure 2 : Environmental Monitoring Report
Annexure 3 : Water bill from SIPCOT
Annexure 4 : STP & ETP flow diagram
Annexure 5 : Site photographs
Annexure 6 : Fire NOC
Annexure 7 : CSR Receipts.
Annexure 8 : EMP Cell Details
Annexure 9: Newspaper advertisement copy
Annexure 10: Site layout
Annexure 11: TNPCB waiver
Annexure 12: HWM Authorization.
MH
600
600
COLLECTION TANK3.0 X 3.0 X 3 (1.8) M
SB-101A SB-101B
RAW EFFLUENTTRANSFER PUMP
SLUDGE PUMP
RO FEED PUMP FILTER FEED PUMP
UF FEED PUMP UF BACKWASH PUMP
HIGH PRESSUREPUMP
RO PRESSURE VESSEL -1NOS
DT-103 DT-102 DT-101
DOSING SYSTEM
Ø1030
SB-101A SB-101B
SB-101C
SB-101D
HECS(P)Ltd APPROVED/DATE
ENGINEERING CHECKED/DATE
DRAFTING CHECKED/DATEDESIGNED
NAME DATE
CHECKED
CHENGAL
CEO
IMO No.CLASS I.D SCALE REV
2
TITLE:
DRAWN SURIYA.M
DWG No:DD-HECS - JI - Overall Layout - 001
M/s. Jesons Industries Ltd., Gummidipoondi
CLIENT:
OVERALL LAYOUT
09.07.15
FOR SOLAR POND, 350 Sq.M AREA IS REQUIRED.CLIENT TO SUGGEST AREA FOR THE SAME
NOTE:-
09.07.15
09.07.15
TAG.NO DESCRIPTION SIZET-101T-102T-103T-104T-105T-106
COLLECTION TANK BAR SCREEN CHAMBER FLASH MIXER TANK
PRI-CLARIFIER TANK
OXIDATION TANK
3.0 X 3.0X 3.0M (1.8)0.5 X 0.5 X 0.5M
0.7 X 1.25 X 3.0M
2.3 X 1.25 X 3.0M
S.NO123456
MOC
RCCMS
MS
MS
MS
QTY111
1
1
ETP TANK DETAILS
T-107 SEC-CLARIFIER TANK 0.8 X 1.25 X 3.0M7
MS 1T-108 CLARIFIED WATER TANK 0.5 X 1.25 X 3.0M8
MS 1T-109 UF FEED TANK 1.0 X 1.25 X 3.0M9
MS 1T-110 UF PERMEATE TANK10
MS 1T-111 RO PERMEATE TANK11
T-112 RO-I REJECTS TANK12
2.0 X 1.25 X 3.0M
ANAEROBIC DIGESTER 4.2 X 1.25 X 3.0M
MS 1
MS 1
0.5 X 0.5 X 1.2M
1.5 X 1.25 X 3.0M
MS 11.5 X 1.25 X 3.0M
SB-101 SLUDGE DRYING BED13 BRICK 21.5 X 1.5 X 1.2M
PR PUMP ROOM13 RCC 213.5 X 3.5 X 3.5M
TAG.NO DESCRIPTION SIZE ( L X W X H )T-101T-102T-103T-104T-105
BAR SCREEN CHAMBERCOLLECTION TANK
AERATION TANKCLARISETTLER TANKCLARIFIED WATER TANK
1.5 x 1.5 x 3.0M (1.5)
1.2 x 1.25 X 2.5M0.5 X 0.5 X 0.5M
0.7 X 0.75 X 2.5M
QTY0101
010.7 X 0.5 X 2.5M 01
01
MOCRCCMSMSMSMS
SB-A/B SLUDGE DRYING BED 1.5 X 1.5 X 1.2M 02BRICK WORK
MBBR
SEWAGE
T-103T-104
T-105
SEWAGE 6.0KLD
F-101
P-101W/S
P-102W/S
P-103W/S
B-101W/S
COLLECTION TANK
F-102
SLUDGE DRYING BED
T-101
TO PROCESSFM
TAG.NO DESCRIPTION SPECIFICATION MOC MAKEP-101 RAW SEWAGE TRANSFER PUMP
P-102
FILTER FEED PUMP
0.25M3/HR 12M HEAD,1.0HP
0.5M3/HR 10M HEAD,1.0HP
QTYCI
CI
KIRLOSKAR SP 'O'
SP 'O'P-103
SLUDGE PUMP
CI KDS225++
02
0202
F-101 PRESSURE SAND FILTER 0.5M3/HR 400Ø 1250HOSF-102 ACTIVATED CARBON FILTER
DT-101 HYPO DOSING TANK 50LTS,410Ø X 480H HDPE SINTEX/RENO
MODEL
EQUIPMENT LIST
B-101 AIR BLOWER 30M3/HR, 3.0HP CI KAY 42AC 01
0.5M3/HR 25MHEAD,2.0HP
0.5M3/HR 400Ø 1250HOS01
KIRLOSKARKIRLOSKAR
---
0101
FRPFRP
DP-01
DT-01
T-102
TAG.NO DESCRIPTION TYPEV01&04 RAW SEWAGE PUMP SUCTIONV02&05 RAW SEWAGE PUMP DELIVERYV03&06 RAW SEWAGE PUMP DELIVERY
V11&14 SLUDGE PUMP SUCTIONV12&15 SLUDGE PUMP DELIVERY
V13&16
V23&29 PSF&ACF INLETV24&30 PSF&ACF OUTLETV25&31 PSF&ACF BACKWASH INLETV26&32 PSF&ACF BACKWASH OUTLETV27&33 PSF&ACF DOWN RINSEV28&34 PSF&ACF AIR VENT
VALVE LIST
PG01&08 PRESSURE GAUGE(0-7KG/CM2)NV01&08 NEEDLE VALVE
V07 AIR BLOWER DELIVERYV08
AIR BLOWER DELIVERY
SLUDGE PUMP DELIVERYFILRTER FEED PUMP SUCTIONFILRTER FEED PUMP DELIVERYFILTER FEED PUMP DELIVERY
V17&20V18&21V19&22
BALL VALVE
BUTTERFLY VALVE
BALL VALVE
BALL VALVEBALL VALVE
BALL VALVENON RETURN VALVE
NON RETURN VALVE
NON RETURN VALVE
NON RETURN VALVE
BALL VALVE
BUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVEBUTTERFLY VALVE
FM
V09 AIR BLOWER LINE TO AERATION TANK BUTTERFLY VALVEV10 RE-CIRCULATION LINE FROM SLUDGE BALL VALVE
PG
HECS(P)LtdAPPROVED/DATE
ENGINEEING CHECKED/DATE
DRAFTING CHECKED/DATEDESIGNED
NAME DATE
CHECKED
CR
CEO
IMO No.CLASS I.D SCALE REV
0
DWG No: DD - HECS - JI - STP - P&ID - 002
TITLE: CLIENT:REVISION
SURIYA
REV BY DATE DESCRIPTIONS EDIT
ISSUED FOR EXECUTION25.08.150
M/S. JESONS INDUSTRIES LTD,GUMMIDIPOONDI
SEWAGE TREATMENT PLANT - 6.0 KLDPROCESS & INSTRUMENTATION DIAGRAM
DRAWN SURIYA 25.08.15
THIS DRAWING DOES NOT RELEVE THE CONTRACTOR THE RESPONSIPLITY OF ENSURING THE CORRECTNESSOF DIMENSIONS CONTAINED THERE IN
25.08.15
25.08.15
Site photographs June 2017Site photographs June 2017Site photographs June 2017
Site photographs June 2017Medical Camp Photos
TrSTT. + F\ f\ \
x.lrqqtrT {iqTq {l€d 6iqqRIME fifiNlsrEp.s ruArro NAl,RELIEF FttND
PAN: AACTP4637Q
Receivedwilh thanksrrom M/s JESoNS INDUSTRIES LIMIreo(PAN-AAACJ765gp)9O4, gTH FLOOR, PENINSULA TOWER 1.PENINSULA COFPORATE PARK. LOWERPAREL
Rercipt*"- 1-56435 1564ss Dated 31 -Ma r- zo1 7
dt. 23/03/2O171 jjL. a.:,i:.: :: i.: . ., Ii:l: :iir";l.: .:: ri;:r.r:r:jl I \il.
WEST MUMBAI 4OOO1 3
FOUR LAKH ONLY
(
(
c
F, K" I**afiUnden" fiecref*ryTele:23fi13683FAX : 23015655
1s6435M/S J ESONS rN D U STRIES LIMITED(PAN.AAA C J,7 6 5gp)904,9TH FLOOR, PENINSULA TOWER 1,PENINSULA CORPORATE PARK, LOWERPARELWEST MUMBAI4OOOl3
qqmq-4t c|-dFq' Rrde q?l q
Frirne Minister's National Re[ief' *j.r.*:r;!
uffq{d} orqfdq+$ fcA - 110 orl
PRIME MINTSTER'S OFFICENew Delhi-110 011
3l-Mar-2017
[r)n's{-(P. K. Bali)
No. 82(103)/2017-PMF
Dear srR / MADAM
We acknowledge with thanks the generous contribution to the PrimeMinister's National Relief Fund.
The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.
A formal receipt is enclosed.
With regards.
Your sincerely,
c
:.PRIME M: PAN : AACT"P4037Q
REL]EF F.UND
ReceiPt No' 15 3 5 51 1 53551
Received withthanksfrom M/s JESoNS INDUSTRIES LIMTTED, PAN-AAACJ765gp9O4, PENINSULA TOWER NO.1, CORPORATEPARK, GANPATRAO KADAM MARG,LOWERPAREL WEST MUMBAI 4OOO1 3
tbesum of Rupees' NINE LAC NINETY THOUSAND OMLY
Dated3O-Dec-2O1 6
i.rr: ::,;l1i :irr:.r
HCPN5001 31 5620
DIRECT
ff c4uU.glg;s]Cr"rd'aed.f i{afJorf .
P"r.irnerAdr?t&fddtilYdtid.dat"lfetf€ffiiBdu]':',','
(
Rs,
: !r:";ir :i :'i:1,iijr.l-- .j,.r rjrl i , il,ji:i.\: r: : !- rl li i,ii ::
'' ; pHtNE' iltrir3il,rfr iidF}lcfr : i,.i l
,,.l 'i, l,; ; : rl.,i tVEI4?DEti;il;i :j]1, ;: ;l.,i :: l;,,
,r:\ :. _" .1
-rt
(
F. K. Balidlnden Secretary'EeIe :330136S3FhX;23015655
No. -8?-<1096)/2016-PMF
Dear StR / MADAM
nsJrqff {Nftq {rFd idsPrime Minister's National Relicf l-unrl
q'qntrJf orqff,qT{ fetfr - 110 011
PR"I}IE MINISTf, R'S OFFICf,New Delhi-ll0 0ll
30-Dec-2016
C
(,,
Minister's National Relief Fund.
The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.
A formal receipt is enclosed.
With regards.
153551M/S JESONS INDUSTRIES LIMITED, PAN-AAACJ7659P904, PENINSULA TOWER NO.I, CORPORATEPARK, CANPATRAO KADAM MARG,LOWERPAREL WEST MUMBAI 4OOOI 3
Your sincerely,
(P. K.Bali)
We acknowledge with thanks the generous contribution to the Prime
[r]''s{-
giq*if 3-rra
'a
!iia
i:)?a
*l,
1lli'
i:"Ni"
t:
kL:.,
'il;l:f
::i
t:
iiii
:,:,l
::. ,l,:i ::l
:"' ,"
.. ..:
,'::
. ':., t,
t
.:..ir ::, ::
'1. ;- 2
,.' il 'L:
t: .: :;,: ,:: i:
ii: i,t. i.:
:.i:!::, '.i :i:::..t
..1- i.l .-i
...".,:.:
i: .(
.. .;) .,' ,:
-,t--'i I
';a :: i:
i: ) ".i
i, .!, ...i: ...!
"::.
f
c
P. K. BaliUnder SecretaryTele;23013683FAX:23015655
I
1s3268M/S. JESONS INDUSTRIES LIMITED904,9TH ITLOOR, PENINSULA TOWER 1,CORPORATE PARK, LOWERPAREL WEST MUMBAI 4OOO13(PAN-AAACJ7659P)
sqrn{* {r€q rrrd atqPrime Mlnister's National Relief Fund
sqrflf* orqrdqT{ f6il - tlo oti
PRIME MINISTER'S OFFICE
New Delhl-ff0 0ll
Your sincerely,
19-Dec-2016
No' Bz(ros6)/20r6-pMF
DearSIR / MADAM
We acknowledge with thanks the generous contribution to the PrimeMinister's National Relief Fund.
The Prime Minister appreciates the thoughtful gesture and conveys hisgratitude. The amount will be of immense help in rehabilitating those affectedby the disaster.
A formal receipt is enclosed.
With regards.(i
O1
sss.I
l>
^1I
s)
sa
-+
d<t
1grnFt
-
s3p
a
ei
s
v7
tsbsd\)s
l'-i
i
E
a
\A(\J-)
e\_>
\(€t({\.{\
I(
x\ss
((5
sI
$c
,{bd
5'))iq
J
c
r-\(
cl\J\
o;;(oo
=ro6st6Frc;zco
CL
stcp
c;z
psfiEEF?Ex att
,E€i
Es p gE,f gT5E i H
EfgEiFi iRs'gi fr*g
Esat{slt !E Ec tr
E# s;;{d HEEEnleeEE E22F,E 9s e-
EE*TE=
E =F
F
EE;5 5E<&cc
tr(uer-
llrt?r-tft
TErts,GLo-Fr-a(tr
oot-F
-o
E$h\f-hdq,tq'
a.J
)d
zts
z
7.
Shreeyash PratishthanCLttNo258(P)Satara'fanda,'I'q.&DisL.ALrrangabad-43 l005Ph.No.(0240)660tj70 l-35 lolcl:ur(0240) 2344748.
WWW.svpqe,Ut B rnai | : [email protected]
Date: 10.02.2011
(
'fo,
.lesor-rs Inclustlies l.td.,904. Peninsula 'l'ower l.Ganpatrao Kadan-r Marg.Lowcr Parel (West).Munrbai 400 01 3.
SUB:
With respect
.Appcal for Donation,
to above subiect. wc introduce ourselves as lbllorvs:
Ilrief Backerou nd:
r ShreeyashPratishthan located at Aurangabad is catering ncecls in 1he fleld of Engineering.Pol1,1gg5.i. and MBA progranlmes. Il sharpens stLrclcnt's 1-rclsorralitl,with Gurukr-rl culture.ShrecyaslrPratishthan is pLrtting uritiliitg c1'1ults to crrrcrsc' ris rr ccntrc of excellencc lirr'clcvclopir-rg el'f'ectivc pe rsoualitics. Shrecl,ashPlutishtlrirn 1'e rsi.-,tcntlv sccks & adopls
introvtttive urcthocls to inr;lrovc thc clLralitv of highcl cclucrrliorr on rr consistcnr lrasrs, ltplovides the pcrlcct anrtrience lirr higher educalion. Slrr',.:r'.i irshPratishthern has ntetde
landmark conlribLrtictns trt thc clcr,'eloprnent ol'cLrtlitrgr etlq.' tce ltnologr,' irr r,iu'ior,rs lields.ShreeyashPlatishthan cndcavors to bring out cullulirl ancJ nutional integration among the
sludent comnrunity and to foster the leeling ol'orrcncss lnrons thenr by striving and
imparting the lofty ideals of honesty and integlit;,. v\rl11lc Plopaling them to acquireanalytical, rational & logical turn ol'mind.
Campus:
ShreeyashPratishthan is one of the BIIST technical institutes hLrb irr Nltrlrarashtra state in the un-
aidcd sector,'l'hc canrpns is spread c:ver 27 acres which provicies an idcal cnvironnrent [br
technical cducation. It has beautilulll'lanclscapcd and czrrcfirlll ten.lurl srldens. provides an iclcal
environnlcnt lbr a congcnial lcalning cxpclierrcc. bcaLrtilirl niltru'ill lrirtl lrrillrrtion licc atnrosphclc.ltis a most lively plircc on tlrc camllr,rs proviclilrg a sali:. conrliri'tlrblc rrnii ll'icncllv onv'ronrlent thert
enables learning and advanccrlent of lrnou,lcdgc and l)fc)nt()lcs rlir;ct,'ir,r'\'ilnd scirolarship.'l'hc
dcdicated faculty arrcl thc suppolting sta1l'ar.c the pillals o1'stlcnlttir- cr)nrbincd lvith i,ibrarrt and
talented student commr-rnity wilh human verlues certainly nralic Shr-cctirsh as thc Instilute o1'global
r rnportance.
ln order to carry out valious pl'()Blarrs, we nccd a lo1 of luncls [o affiln!ic" fior the same we wouldlil<e to bring to your notice that as per section 135 of tlrc Conrpanics Act,20l3 specified
conrpanies have to spend mininium 2oh of their average ne1 plolit in prcvior-rs three years in CSR
activities. Under scheclule VII o1'the Corr-rpanies Act, 201i a list o1'noLivilies eligible lbr CSR
activities has been spccified one of which being promoting educatiLrr].
Any generous monetary help would be appreciated, it will deflnitely hetp to camy out our task.
You could also send a demand draft/Cheque or transfer thq anrount b,v I{T'GS as per the followingdetails:
AccountName: SHREEYASFIPRATISHTHAN
Bank name:
Branch:
Union Bank of India.
Aurangabad (Main).
NEFT/IFSC Code: UBINO534455.
Account no: 34450r0100s0s44.
Please accord a favorable consideration ofour appeal and oblige,
Thanking You,
Your's faithfully,
l'or Shreeyash Pratishthan.
Shreeyash Prati shrhanGut No 258 (P) Satara l'ancja.'lq,& Dist, ALrrangabad- 4l i(j0\, jui l irr No. (02210) 6(10870l-j5
C
'l'o,
Jesons Industries Ltd,
904, Peninsula'l'ower l,
Ganpatrao l(adarl Marg,
l.ow'cr Ilarel (West).
Murnbai " 400 013.
Respected Sir,
We are extlet'nely thar-rkful to you fbr consiclcling oLrl appeal
donating Rs.10,00,000/- (Rupees Ten I,akh only) fo uur"l-r'ust,
We assure you that the u,,-tounf shall be Lrtilizecl onl-r, lrl'theStudents and other expansion work of our infrastrLrcturc.
We hope our rclationshi;l will be everlasting.
'l'hanl<ins You,
Date: 06.03.2017
lbl donation &
beneflt of our
YoLlr's f aith1lIly.
lioi' 5h i'r:cyash Pratishthan,
,,/f(l/i/r/,-r ^g'
r\ utliorized Si gn atory
EMP CELL
The following members are appointed as Members of EMP CELL for “Jesons Industries Limited”
Name Designation Role in Safety Committee
Priyang Desai Manager – Operation Team Leader
Nandakumar Sr. Executive- HR Team Member
Subramaniyan Manager Commercial Team Member
Baskar S. QC/QA Manager Team Member
Arockiraj A. Dispatch Executive Team Member
Kiran Panwal Production Operator Team Member
Kalakar Malik Office Boy Team Member
Nagendra Production Helper Team Member
Jayprakash Production Helper Team Member
Sathish Dispatch Helper Team Member
2" (50MM) OR 3" (75MM) THK.
(1:20 SLOPE)
PEBBLE STONE
CONCRETE PAVING
R.C. COVER SLAB
PERFERATED
1'-0" [0.30]
PERCOLATION PIT
SECTION - CC
SOLAR ENERGY
ACTIVATOR
FORMED GROUND LEVEL
GROUND FLOOR LEVEL
PARAPET LEVEL
SLAB LEVEL
W
W
W
W
W
W1
D1
WEIGH BRIDGECABIN
TERRACE
FORMED GROUND LEVEL
GROUND FLOOR LEVEL
PARAPET LEVEL
SLAB LEVEL
1 1
GROUND FLOOR PLANTERRACE FLOOR PLAN
SECTION - 1-1
1 1
WEIGH BRIDGE CABIN1:400
TYPEDESCRIPTION
OPENING SIZE
S C H E D U L E O F J O I N E R Y
Length Width
DOORS
D1 1000 2100
W1 2100 1500ALU. FRAMED SLIDING WINDOW TO DETAIL
ROLLING SHUTTER
RS 2400 2400 ROLLING SHUTTER TO DETAIL
V1 2400 900LOUVERED WINDOW
SECURITY BLOCK, WEIGH BRIDGE CABIN AND UTILITY BLOCK
FLUSH SHUTTER TO DETAIL
TEAK WOOD FRAMED DOOR WITH
WINDOWS & VENTILATORS
W 1200 1500ALU. FRAMED SLIDING WINDOW TO DETAIL
V 600 600LOUVERED WINDOW
L1 2400 2100 LOUVERED WINDOW
LAYOUT WAS APPROVED BY DEPUTY DIRECTOR OF TOWN &
COUNTRY PLANNING,CHENGALPET VIDE 65/2013
SECURITY BLOCK
TOILET V
W
W
WW
W
W1
D1
TERRACE LEVEL
FORMED GROUND LEVEL
GROUND FLOOR LEVEL
PARAPET LEVEL
SLAB LEVEL
2 2
FORMED GROUND LEVEL
GROUND FLOOR LEVEL
PARAPET LEVEL
SLAB LEVEL
GROUND FLOOR PLAN
TERRACE FLOOR PLAN
ELEVATION
SECTION - 2-2
SECURITY BLOCK1:100
NAME OF BUILDINGSQ.FTSQ.MS.NO
email : [email protected] : www.paparchitect.com
14, COLLEGE ROAD, CHENNAI - 600 006Phone : +91 (0) 44 2827 8361, 2827 3958/59
P I T H A V A D I A N A N D P A R T N E R SChennai ▪ Bengaluru ▪ Kochi ▪ Hyderabad
Fax : +91 (0) 44 2827 1053
ARCHITECT & LICENCE SURVEYOR SIGNATURE:
OCCUPIER / LEASE HOLDER SIGNATURE
KANDIGAI VILLAGE, GUMMIDIPOONDI TALUK,
NAME:PLAN SHOWING THE PROPOSED FACTORY BUILDING FOR
INDUSTRIAL PARK IN SURVEY NOS 32/2(PART) THERVOY
M/s JESONS INDUSTRIES LTD,PLOT NO.A-4/2 PART-B) SIPCOT
MATERIAL STORE CUM PRODUCTION BLOCK
1.
GROUND FLOOR
MATERIAL STORE - 1472.00 SQ.M
370.00 3982.50
SECOND FLOOR(PRODUCTION BLOCK)
65.00 700.00
STAIRCASE HEAD ROOM
UTILITY BLOCKS
3.
THERMOPACK ROOM -100.00 SQ.M
4.
27.00 290.00WEIGH BRIDGE CABIN
54.00 582.00SECURITY BLOCK
TOTAL F.S.I AREA3218.00 34638.25
F.S.I. ACHIEVED - 0.102
ACHIEVED PLOT COVERAGE - 9.787%
TOTAL FSI AREA - 3218.00 SQ.M
TOTAL PLOT EXTENT AS PER LEASE DEED - 7.75 ACRES(31363.087 SQ.M)
THIRUVALLUR DISTRICT - 601 202 .
OFFICE & CONFERANCE ROOM-115.00 SQ.M
PRODUCTION BLOCK -370.00 SQ.M
1957.00 21065.00TOTAL GROUND FLOOR AREA
FIRST FLOOR
2877.00 30968.00
TOTAL AREA FOR M.STORE CUM PRODUCTION BLOCK
DG SET / MAINTAINANCE -100.00 SQ.M
ELECTRICAL PANEL ROOM -60.00 SQ.M
TOTAL AREA FOR UTILITY BLOCK260.00 2798.61
5.484.00 5210.00
UNDER GROUND TANK (ETP)
AREA STATEMENT(F.S.I AREA)
NAME OF BUILDINGSQ.FTSQ.MS.NO
AREA STATEMENT(NON F.S.I AREA)
6.37.50 403.50
SEWAGE TREATMENT PLANT(STP)
7.90.00 968.75
UNDER GROUND TREATED WATER
8.60.00 646.00
EFFLUENT TREATMENT PLANT(ETP)
TOTAL NON F.S.I AREA 771.50 8304.35
TOTAL GREEN AREA PROVIDED - 7850 Sq.m(25.20%)
LORRY PARKING(2907.00 SQ.M)
NO. OF WORKERS / OFFICE STAFF : 65 NOS (MALE - 60 NOS,FEMALE : 05 NOS)
MANUFACTURE OF : INDUSTRIAL ADHESIVES & SYNTHETIC ACRYLIC
POLYMER EMULSIONS
Plot No.A-4/1PART-A
VACANT LAND
SITE PLAN
PROPOSED
COLOR INDEX
BOUNDARY
ROAD
reproduced or altered either in full or in part by anyone without consent
4. Dimensions to be followed as indicated and not to be scaled3. All dimensions in millimeters and levels in meters.
N O T E S
attention of the Architect2. Any discrepancy in the drawing should be brought to the immediate
from us or be passed to any individual or company not authorised by us.
1.This drawing is sole property of 'Pithavadian and Partners' and must not be
ADDITIONAL NOTES1.ALL DOORS & WINDOWS OPEN OUTWARDS
2.SILL LEVEL OF WINDOWS IS BELOW 1.00M
3.DISTANCE BETWEEN MACHINERY AND JOINERY IS 0.60M
4. ALL DIMENSIONS IN MILLIMETERS AND LEVELS IN METERS.
LEASE DEED DOCUMENTS REGISTERED VIDE DOC NO:3833/2014AT SRO GUMMIDIPOONDI
9.
100.00 1076.40OPEN TRANSFORMER YARD
LIST OF MACHINERY
MACHINERY NAME
BLOCK
NO
QTY
SS 25mt Jacketed Reactor With Condenser With 1.00 (SET)
1.
Propellor Blade & Gear Box & Elec.Motor with
Emulsion Tank (located one level above)
2.
SS 10 mt. Jacketed Reactor, Condenser With
blade With Gear Box and Electr.Motor With
EACH HP TOTAL HP
70 70
Emulsion Tank (located one level above)
2.00 (SET) 35 70
Thermopack with Accessories (850 KG/hour Capacity)
1.00 19.00 19.00
4.
250 KVA DG SET (Stand By)
1.00 - -
5.
Cooling Tower (300 TR)
1.00 42.50 42.50
6.
SS Raw Material Storage tanks (35 M.T)
5.00 3.00 9.00
7.
SS Finished Goods tanks (30 M.T)
4.00 32.50
8.
DM Plant (100 M.T)
1.00 15.00 15.00
9.
Effluent Treatment Plant (ETP- 5 M.T)
1.00 5.00 5.00
10.
Sewage Treatment Plant (STP- 5 M.T)
1.00 5.00 5.00
3.
NH3/ Catalyst Storage Tanks (1 M.T)
4.00 3.00 9.00
11.
QUALITY & LAB ROOM -115.00 SQ.M
PRODUCTION BLOCK - 370.00 SQ.M
485.00 5220.50
TOTAL FIRST FLOOR AREA
A0-AS SHOWN
1:400
2.
PARKING SLOT DETAILS
REQUIRED PROVIDED
6 NOS 7 NOS
CAR PARKING(2907.00 SQ.M)
3 NOS 5 NOS
PURPOSECOMMUNITY
(No Motor for NH3 Tank)
and Compressor
(3 Motor For 5 Tanks)
TOTAL HP
277.00
1 2 3 4 5 6 7
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
SLOPEDN
600MM WIDE DAYLIGHT PANEL
RIDGE LINE
600MM WIDE DAYLIGHT PANEL
RIDGE LINE
1000
1000
1
0
1
5
1
5
9
0
1
5
9
0
1
0
1
0
1165
1015
UP