OWNER PMC LSTK ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITED B 25/11/11 Approval PA PP MD REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 1 of 11 SIZING OF CABLE TRAY LPG - I UNIT FOR NEW PROPANE GAS COMPRESSOR ONGC CONTRACT NO. MR/MM/LSTK/AB/OTP/PGC(R)/2009/Y15BC09001/PC-6039 OF OIL AND NATURAL GAS CORPORATION LIMITED MUMBAI, INDIA CONSULTANT ENGINEERS INDIA LIMITED, VADODARA

Upload: alvin-smith

Post on 29-Nov-2015

274 views

Category:

Documents


10 download

DESCRIPTION

cable tray

TRANSCRIPT

Page 1: Sizing of cable tray rev. D.pdf

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/11 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 1 of 11

SIZING OF CABLE TRAY

LPG - I UNIT

FOR

NEW PROPANE GAS COMPRESSOR

ONGC CONTRACT NO.

MR/MM/LSTK/AB/OTP/PGC(R)/2009/Y15BC09001/PC-6039

OF

OIL AND NATURAL GAS CORPORATION LIMITED

MUMBAI, INDIA

CONSULTANT

ENGINEERS INDIA LIMITED, VADODARA

Page 2: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 2 of 11

CONTENTS

1. SCOPE

2. BASIS & ASSUMPTIONS

3. CABLE TRAY /LADDER SPECIFICATION

4. TRAY SIZING CALCULATION

5. TRAY SIZING VERIFICATION

Page 3: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 3 of 11

1. SCOPEThis calculation covers the Sizing of Cable Tray with respect to Cable Data consideration required for allequipment of “New Propane gas compressor” project at LPG-1 plant, Uran complex of Oil &Natural Gas Corporation limited (ONGCL). The panels for all the equipment are considered to belocated in existing LPG-1 substation. Power supply will be from new PMCC to be located in the LPG-1substation.

2. BASIS & ASSUMPTIONS2.1 Electrical Design Basis for New Propane Compressor (Doc. No. section C2.8 of 6867-00-50-50-

DB-01 rev. B, clause no.7.2 & 14.2 “Cable laying philosophy”).

2.2 Cable Data as per Cable Schedule doc. no. 6972-010-50-50-CSH-0021.

2.3 Cables are considered to be laid in single layer.

2.4 Spare capacity of 10 % is considered for cable trays (as per ‘Design Philosophy for ElectricalFacilities’ clause no. 7.2.5 of cabling system).

2.5 Refer ‘Design Philosophy for Electrical Facilities’ Cl.no: 7.2.8 of cabling system – for cable traydesign related to loading.

2.6 Cable data for sizing of cable trays have been selected based on the Standard chart of “Polycab”make Copper & aluminium conductor, XLPE insulated, armoured cable conforming to IS 7098part-1/1988.

3. CABLE TRAY /LADDER SPECIFICATION3.1 Refer Standard Specification no. 6-51-0082 rev. 2, Clause no.3.1 & 4.1 of “Cable Trays & Laying”.

3.2 Cable ladders are recommended for sizes above 300mm.

3.3 Cable trays shall comply with the requirements specified in EIL installation standard (7-51-0333).

3.4 HT Power, LT Power and control cables shall be laid in separate trays wherever trays are used.

3.5 Refer to NEC table 318-9 for the maximum fill area for multicore cables.

Page 4: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 4 of 11

4. TRAY SIZING CALCULATION:

4.1 CABLES FROM LPG-1 S/S TO NEW PROPANE GAS COMPRESSOR

4.1.1 Cable tray from LPG-I to New Propane gas compressor shed (New Propane gas Compressor)

(Copper conductor up-to 16 mm2).

Sum of total Diameter for LT Power cables = 468 mm.

With spare capacity of 10%, size required = 516 mm

Recommended tray size for single layer of LT cables:

Select from the Standard Cable tray sizes available = 1no. X 600 mm.

Cables are touching to each other.

For cable tray drawing refer annexure II (b)

LT Cable size No. Overall Dia. (mm) Total length of Tray required(mm)

3c x 4 mm² 7 15.0 7 x 15 = 105.0

4c x 6 mm² 5 18.0 5 x 18 = 90.0

3c x 70 mm² 1 30.0 1 x 30 = 30.0

3c x 95mm² 3 33.0 3 x 33 = 99

3c x 185 mm² 2 45.0 2 x 45 = 90

3.5c x 35 mm² 1 26.0 1 x 26 = 26

3.5c x 50 mm² 1 29.0 1 x 29 = 28

Total: 468 mm

Page 5: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 5 of 11

4.1.2 Cable tray from LPG-I to New Propane gas compressor shed (New Propane gas Compressor)

(Copper conductor up to 16 mm2).

Sum of total Diameter for LT Power cables = 436.2 mm.

With spare capacity of 10%, size required = 480 mm

Recommended tray size for single layer of LT cables:

Select from the Standard Cable tray sizes available = 2no. X 300 mm.

Cables are touching to each other.

For cable tray drawing refer annexure II (c)

LT Cable size No. Overall Dia. (mm) Total length of Trayrequired (mm)

12P x 1.5mm2 2 29.7 2 x 29.7 = 59.4

6P x 1.5 mm2 8 21.6 8 x 21.6 = 172.8

10C x 2.5mm2 3 21 3 x 21 = 63

6C x 2.5mm2 4 15 4 x 15 =60

3C x 2.5mm2 4 14 4 x 14 = 56

3C x 4 mm2 1 15 1 x 15 = 15

2C x 2.5mm2 2 12 2 x 12 =24

Total: 436.2 mm

Page 6: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 6 of 11

4.1.3 Cable tray from Panel no. 19 in LPG-I to New Propane compressor 6.6kV HT motor

Sum of total Diameter for HT Power cables = 80 mm.

With spare capacity of 10%, size required = 88 mm

Select from the Standard Cable tray sizes available = 1no. X 300 mm.

For cable tray drawing refer annexure II (a)

HT Cable size No. Overall Dia. (mm) Total Diameter (mm)

3c x300mm² 1 80.0 1 x 80 = 80.0

Total: 80 mm

Page 7: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 7 of 11

4.2 CABLE TRAY FROM LPG-1 S/S TO LPG-2 S/S

4.2.1 Single core cable

Sum of total Diameter for HT Power cables = 492 mm.

With spare capacity of 10%, size required = 542 mm

Select from the Standard Cable tray sizes available = 1no. X 600 mm.

Spacing between cables is 80 mm after trefoil connection

For cable tray drawing refer annexure I (a)

LT Cable size No. Overall Dia. (mm) Total length of Trayrequired (mm)

1C X 300 mm2 12 41 12 x 41 =492

Total: 492 mm

Page 8: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 8 of 11

4.2.2 Control cable (run through 4’’ GI conduit)

Sum of total diameter for control cables = 42 mm. Sum of total diameter for HT Cables =160 mm.Total diameter of control and power cables is 202 mm (42 + 160).With spare capacity of 10%, size required = 223 mm.Select from the Standard Cable tray sizes available = 1no. X 300 mm

For cable tray drawing refer annexure I (b)

LT Cable size No. Overall Dia. (mm) Total length of Trayrequired (mm)

10C X 2.5 mm2 2 21 2 x 21= 42

Total: 42 mm

LT Cable size No. Overall Dia. (mm) Total length of Trayrequired (mm)

3C X 300 mm2 2 80 2 x 80= 160

Total: 160 mm

Page 9: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 9 of 11

5. TRAY SIZING VERIFICATION:

5.1 CABLES FROM LPG-1 S/S TO NEW PROPANE GAS COMPRESSOR

5.1.1 Cable tray from New PMCC to Field Equipment (New Propane gas Compressor)

5.1.1.1 LT Cables laid on 600mm tray are as follows:Run Core Size - mm2 Overall Diameter (mm) Weight of Cable -

kg/km7 3 4 15 545 X 2.455 4 6 16.5 740 X 1.451 3 70 30 1350 X 0.353 3 95 33 1655 X 1.052 3 185 45 2835 X 0.71 3.5 35 25 910 X 0.351 3.5 50 28 1125 X 0.35

TOTAL 7316

5.1.1.2 LT Cables laid on 2 NOS. 300 mm tray are as follows

Run Core Size - mm2 Overall Diameter (mm) Weight of Cable -kg/km

2 12P 1.5 29.7 945 X 0.78 6P 1.5 21.6 740 X 0.783 10 2.5 21 665 X 1.05

4 6 2.5 15 620 X 1.134 3 2.5 14 435 X 1.071 3 4 15 545 X 0.352 2 2.5 12 385 X 1.25

TOTAL 3775

Page 10: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 10 of 11

5.1.2 Cable tray from Panel no. 19 to New Propane compressor 6.6kV HT motor

HT Cables laid on 1no. 300 mm tray are as follows:

Run Core Size - mm2 Overall Diameter (mm) Weight of Cable -kg/km

1 3 300 80 7140 X 0.35TOTAL 2499

5.2 CABLE TRAY FROM LPG-1 S/S TO LPG-2 S/S

5.2.1 HT Cables laid on 600 mm tray are as follows:

Run Core Size - mm2 Overall Diameter (mm) Weight of Cable -kg/km

12 1 300 41 1840 X 3

TOTAL 5520

5.2.2 Control Cables along with HT Cables laid on 300 mm tray are as follows:

Run Core Size - mm2 Overall Diameter (mm) Weight of Cable -kg/km

2 3 300 80 7140 X 0.52 10 2.5 21 665 X 0.5

TOTAL 3903

Page 11: Sizing of cable tray rev. D.pdf

SIZING OF CABLE TRAY

OWNER PMC LSTK

ONGC LIMITED ENGINEERS INDIA LIMITED SAVAIR ENERGY LIMITEDB 25/11/2011 Approval PA PP MD

REV. NO. DATE PURPOSE PREPARED REVIEWED BY APPROVED BY

DOCUMENT NO: 6972-010-50-50-CAL-0020 Page 11 of 11

Conclusion:

Thus the Cable tray size selection meets all the requirements of:-

a) Spare Capacity (10%)

b) Allowable fill area (as per NEC table)

c) Cable load (as per Design Philosophy for Electrical Facilities – Cl. no: 7.2.8