  • 8/9/2019 S.M. Wright PPT

    1/19Page 1

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Proposed SM Wright Project

    IH 45/SM WRIGHT

    Proposed SM Wright Project

    IH 45/SM WRIGHT

    March 30, 2010 March 30, 2010 March 30, 2010

    Texas Department of TransportationTexas Department of TransportationTexas Department of Transportation

    Halff AssociatesBaker Consulting Associates

    Halff AssociatesHalff AssociatesBaker Consulting AssociatesBaker Consulting Associates

    Texas Department

    of Transportation

    Dallas District

    Agenda

    Why is this project needed? What is the process? How has the community been involved? What is being studied? Next Steps

    Why is this project needed? What is the process? How has the community been involved? What is being studied? Next Steps

  • 8/9/2019 S.M. Wright PPT

    2/19Page 2

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Project Need& Overview

    Project Need& Overview

    SM Wright Project Scope

    To developTo developconcepts for theconcepts for theSM Wright ProjectSM Wright Projectwith a focus onwith a focus onincreased safetyincreased safetythrough removingthrough removingthe CF Hawn tothe CF Hawn toSM Wright bend,SM Wright bend,improved mobilityimproved mobilityand efficiency,and efficiency,

    while enhancingwhile enhancingcommunitycommunityconnectivity andconnectivity andaesthetics.aesthetics.

    ProposedTrinity Parkway

    (by others)

    Project Study Area

    45

    45

    175

    30

  • 8/9/2019 S.M. Wright PPT

    3/19Page 3

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    SM Wright Fundamentals

    H a t c h e r S t H a t c h e r S t

    45

    C ol oni al A v

    e

    C ol oni al A v

    e

    S.M. Wright FreewayS.M. Wright Freeway

    Current 6-Lane freeway & frontage roads serve over110,000 vehicles per day (vpd).

    Diversion to I-45 and Trinity

    Parkway reduces SM Wrighttraffic to about 40,000 vpd.

    raffic reduction no longer needsfreeway or bridges on SM Wright.

    Remaining local & through trafficvolume requires only 6-lanesignalized arterial.

    No added (new) right-of-way isanticipated for SM Wright.ROW is anticipated for US 175connection to IH 45.

    Design of SM Wright interchangeat SH 310 is part of this project.

    Current 6-Lane freeway & frontage roads serve over110,000 vehicles per day (vpd).

    Diversion to I-45 and Trinity

    Parkway reduces SM Wrighttraffic to about 40,000 vpd.

    Traffic reduction no longer needsfreeway or bridges on SM Wright.

    Remaining local & through trafficvolume requires only 6-lanesignalized arterial.

    No added (new) right-of-way isanticipated for SM Wright.ROW is anticipated for US 175connection to IH 45.

    Design of SM Wright interchangeat SH 310 is part of this project.

    This Projects Traffic Flow

    I H 4 5

    S M W r i g h t

    F r e e w a y

    U S 1 7 5 Ideal NeighborhoodRochester Park

    N

    45

    L a m a

    r

    T o d a y T o d a y s s

    C o m m u t e r F

    l o w

    C o m m u t e r F

    l o w

    P r o p

    o s e d

    P r o p

    o s e d

    C o m m

    u t e r F

    l o w o n

    C o m m

    u t e r F

    l o w o n

    D i r e c

    t C o n

    n e c t i

    n g R a

    m p s

    D i r e c

    t C o n

    n e c t i

    n g R a

    m p s

    Proposed Project Concept Add direct connecting ramps between US 175 CF Hawn Freeway & IH 45 Improve IH 45 capacity to facilitate new direct connecting CF Hawn ramps Provide access between CF Hawn & SM Wright through a grade separated interchange Convert SM Wright to a low speed, signalized, pedestrian-friendly, landscaped arterial Spacing provided to allow proposed Trinity Parkway connection and extension

    P r o p

    o s e d

    T r i n i

    t y P a

    r k w a

    y

  • 8/9/2019 S.M. Wright PPT

    4/19Page 4

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    This Projects Traffic Volumes

    I H 4 5

    S M W r i g h t

    F r e e w a y

    U S 1 7 5 H a t c h e r S t r e e t N

    45

    L a m a

    r

    T o d a y T o d a y s s

    C o m m

    u t e r F l o w

    C o m m

    u t e r F l o w

    P r o p o s e

    d

    P r o p o s e

    d

    C o m m

    u t e r F l o

    w

    C o m m

    u t e r F l o

    w

    20092030 No Build2030 Alternative 12030 Alternative 2

    Note: Daily Traffic Volumes areApproximate, NCTCOG

    96,500125,000189,700212,100

    100,800124,700122,700122,800

    00

    74,30097,200

    116,200133,100

    48,00039,800

    107,900126,500117,600128,800

    8,20021,80021,80021,900

    S H 3 1 0

    F u t u r e

    T r i n i t y

    P a r k w

    a y

    Project ProcessProject Process

  • 8/9/2019 S.M. Wright PPT

    5/19Page 5

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Project Process

    1. DEVELOP CONCEPT1. DEVELOP CONCEPTALTERNATIVESALTERNATIVES

    2. EVALUATE CONCEPT2. EVALUATE CONCEPTALTERNATIVESALTERNATIVES

    3. SELECT PREFERRED3. SELECT PREFERREDALTERNATIVEALTERNATIVE

    4. REQUIRED FHWA APPROVALPREPARE DRAFT SCHEMATIC &

    DRAFT ENVIRONMENTAL DOCUMENT

    4. REQUIRED FHWA APPROVAL4. REQUIRED FHWA APPROVALPREPARE DRAFT SCHEMATIC &PREPARE DRAFT SCHEMATIC &

    DRAFT ENVIRONMENTAL DOCUMENTDRAFT ENVIRONMENTAL DOCUMENT

    P u

    b l i c

    P a r t

    i c i p a

    t i o n a n d

    P u

    b l i c

    P a r t

    i c i p a

    t i o n a n

    d

    A g e n c y

    C o o r d

    i n a

    t i o n

    A g e n c y

    C o o r d

    i n a

    t i o n

    5. REQUIRED FHWA APPROVALPREPARE FINAL SCHEMATIC &

    FINAL ENVIRONMENTAL DOCUMENT

    5. REQUIRED FHWA APPROVAL5. REQUIRED FHWA APPROVALPREPARE FINAL SCHEMATIC &PREPARE FINAL SCHEMATIC &

    FINAL ENVIRONMENTAL DOCUMENTFINAL ENVIRONMENTAL DOCUMENT

    WE AREHERE

    Community InvolvementCommunity Involvement

  • 8/9/2019 S.M. Wright PPT

    6/19Page 6

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Invited Community Participants

    H.S. Thompson Elementary School (DISD)NCTCOGMLK, Jr. Elementary School (DISD)TxDOT

    DHA Rhoades TerraceCity of Dallas (PW & T, PARD, DPD)DHA Turner CourtsDARTDHA Park ManorNTTA

    Public Agencies

    Major commercial property ownersSouth Dallas Nursing HomeSt. Philips School and Community CenterSouth Dallas Baptist ChurchGrace & Mercy Missionary Baptist ChurchPeoples Missionary Baptist ChurchGreater New Zion Baptist ChurchNew Hope Baptist Church

    Other Key Stakeholders

    T. R. Hoover CDCInnercity Community Development Corp.Dallas Black Chamber of CommerceClean South DallasForest Heights Neighborhood Development Corp.SouthFair Community Development Corporation

    Nonprofit Organizations

    Ideal Neighborhood AssociationForest Heights Neighborhood AssociationWendelkin/Driscoll Neighborhood AssociationQueen City Neighborhood AssociationSouth Boulevard/Park Row Historic District

    Adjacent Neighborhood Associations

    Community Involvement

    Dallas Council Trinity River Committee Briefing - February 5, 2008

    SM Wright 1 st Stakeholder Work Group Meeting Mar. 31, 2008

    SM Wright 2 nd Stakeholder Work Group Meeting Sept. 9, 2008

    City of Dallas Public Meeting hosted by Councilmember Davis Oct. 14, 2008

    SM Wright 3 rd Stakeholder Work Group Meeting Dec 9, 2008

    SM Wright 4 th Stakeholder Work Group Meeting Jan. 13, 2009

    Dallas Council Trinity River Committee Briefing - April 21, 2009

    SM Wright TxDOT Public Meeting April 28, 2009

    Trinity Pkwy NTTA Public Hearing May 5, 2009

    SM Wright Project Elected Officials Briefing March 8, 2010

    SM Wright Project TxDOT Public Meeting March 30, 2010Topic: SM Wright Final Design, US 175 and IH 45 Alternatives Analysis

  • 8/9/2019 S.M. Wright PPT

    7/19Page 7

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    What is Being Studied?What is Being Studied?

    Study Segments

    ProposedTrinity Parkway

    (by others)

    Project Study Area45

    175

    30

    SM WrightRedevelopment

    IH 45Improvements

    US 175 to IH 45Connection

  • 8/9/2019 S.M. Wright PPT

    8/19Page 8

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    US 175 to IH 45 Connection

    45

    175

    30

    US 175 to IH 45Connection

    Project Study Area

    175

    45

    45

    S M W

    r i g h t F w y .

    CF Hawn FRWY

    US 175 to IH 45 Connection

    Goal Increase safety by removing the freeway curve atCF Hawn and SM Wright.This Project Build new freeway to freeway ramps fromCF Hawn to IH 45 with widening of IH 45. Design toprovide room to connect and extend proposed TrinityParkway. The ramp connection impacts (south of IH 45)include approx. 34 acres of right of way need (no impacts toexisting historical district) on 42 parcels with 8 potentiallydisplaced commercial buildings and 9 potentially displacedresidential buildings (includes 3 garage/shed structures).

  • 8/9/2019 S.M. Wright PPT

    9/19Page 9

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    IH 45 Improvements

    Project Study Area45

    175

    30

    IH 45Improvements

    IH 45 Alternative #1

    IH 45 Alternative #1 Design

    Provide two-lane direct connecting ramps between CF Hawn and IH 45.

    Widen IH 45 from a total of six main lanes to eight main lanes.

    To minimize ROW impacts, the main lanes utilize 11 lanes and 2 inside shoulders. Thesewidths do not meet TxDOT and FHWA design standards, which requires a design exception.

    Minimal ROW is needed along IH 45. ROW is required for the CF Hawn ramp connections.

    Based on NCTCOG 2030 traffic projections, Alternative #1 experiences significantly morecongestion than Alternatives 2A & 2B. Inadequate capacity for Alternative #1 forces abreakdown in traffic (congestion) along IH 45, CF Hawn, and SM Wright within the project limits.

    24 4 @ 11 4@11 241010 2 2

    ROW VARIES 220 TO 500

    NorthboundSouthbound

  • 8/9/2019 S.M. Wright PPT

    10/19Page 10

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    IH 45 Alternative #2A

    IH 45 Alternative #2A Design

    Provide three-lane direct connecting ramps between CF Hawn and IH 45.

    Widen IH 45 from a total of six main lanes to ten main lanes.

    To minimize ROW impacts, the main lanes utilize 11 lanes and 4 inside shoulders. Thesewidths do not meet TxDOT and FHWA design standards, which requires a design exception.

    Right Of Way (ROW) is needed along IH 45 and for the CF Hawn ramp connections.

    24 5 @ 11 5@11 241010 4 4

    ROW VARIES 220 TO 500

    NorthboundSouthbound

    IH 45 Alternative #2B

    IH 45 Alternative #2B Fact Sheet

    Provide three-lane direct connecting ramps between CF Hawn and IH 45.

    Widen IH 45 from a total of six main lanes to ten main lanes.

    The main lanes utilize 12 lanes and 10 shoulders. These widths meet TxDOT and FHWA design standards and do not require a design exception.

    Right Of Way (ROW) is needed along IH 45 and for the CF Hawn ramp connections.

    24 5 @ 12 5@12 241010 10 10

    ROW VARIES 220 TO 500

    NorthboundSouthbound

  • 8/9/2019 S.M. Wright PPT

    11/19Page 11

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Comparison of Alternatives

    No impact15 residential bldgs(includes 7 garages)5 commercial bldgs

    39 parcels4.1 acres2B

    No impact2 residential bldgs(includes 1 garage)4 commercial bldgs

    31 parcels2.6 acres2A

    No impact0 displacements4 - parcels0.6 acres1

    HistoricalDistrictImpacts

    PotentiallyDisplaced Buildings

    # of ParcelsImpacted

    ROW Needalong IH 45

    (acres)

    IH 45 Alt. #

    The Right of Way (ROW) impacts for the ramp connections between IH 45 and CF Hawnare the same for all IH 45 alternatives. The ramp connection impacts include:

    Approx. 34 acres of ROW need (no impacts to existing historical districts)42 parcels impacted8 potentially displaced commercial buildings9 potentially displaced residential buildings (includes 3 garage/shed structures)

    IH 45 ALTERNATIVES ROW IMPACT COMPARISON

    SM Wright Redevelopment

    Project Study Area45

    175

    30

    SM WrightRedevelopment

  • 8/9/2019 S.M. Wright PPT

    12/19Page 12

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Concept Development

    SM WRIGHT REDEVELOPMENT OPTIONSPREVIOUSLY DISCUSSED:

    Roadway Alignment Split Alignment Single Alignment one side Single Alignment meandering

    Connections & Access Through Streets Cul-de-Sacs Tee Intersections

    Residual Land Use Recreation/Park or Green Space Parking Redevelopment

    No new right of way

    SM WRIGHT REDEVELOPMENT OPTIONSPREVIOUSLY DISCUSSED:

    Roadway Alignment Split Alignment Single Alignment one side Single Alignment meandering

    Connections & Access Through Streets Cul-de-Sacs Tee Intersections

    Residual Land Use Recreation/Park or Green Space Parking Redevelopment

    No new right of way

    Residential AreasResidential Areas Commercial Areas Civic Areas Park Areas Undeveloped Areas

    Major Linkages & Nodes

    S e c

    t i o n

    B r e a

    k

    S e c

    t i o n

    B r e a

    k

    Existing Land Use and CrossingsSM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

  • 8/9/2019 S.M. Wright PPT

    13/19Page 13

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Preferred Concept

    Turtle Creek Boulevard

    Meandering Alignment

    SM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

    Concept Access/Residual LandSM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

  • 8/9/2019 S.M. Wright PPT

    14/19Page 14

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    SM Wright Freeway Enhancements & Revitalization StudyConcept Enhancement PlanSM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

    SM Wright FreewayConvert to Low-speed Arterial

    Existing Proposed

    Concept AestheticsNorth at PennsylvaniaSM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

  • 8/9/2019 S.M. Wright PPT

    15/19Page 15

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Existing Proposed

    Concept AestheticsSouth at Metropolitan

    SM Wright FreewayConvert to Low-speed Arterial

    SM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

    SM Wright Freeway Enhancements & Revitalization StudyConcept Enhancement PlanSM WRIGHT REDEVELOPMENTSM WRIGHT REDEVELOPMENT

  • 8/9/2019 S.M. Wright PPT

    16/19Page 16

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    SM Wright / CF Hawn Intersection

    Option 1 Design Elements A) Enhanced Vehicular Paving

    B) Gateway ArchC) Major/Minor Decorative Gateway Monuments

    A AA ABBBB

    C CC C

    D DD D

    E EE E

    D) Vegetative Greenwall

    E) Potential Commercial Development

    SM Wright / CF Hawn Intersection

    Option 2 Design Elements A) Enhanced Vehicular PavingB) Iconic Gateway Entry MonumentsC) Decorative Gateway Monuments

    D) Form Line ConcreteE) Ornamental Grass PlantingsF) Potential Commercial Development

    A AA A

    BBBB

    C CC C

    D DD D

    E EE E

    F FF F

  • 8/9/2019 S.M. Wright PPT

    17/19Page 17

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Monuments and Gateways

    Neighborhood Gateways

  • 8/9/2019 S.M. Wright PPT

    18/19Page 18

    . M. Wright Project March 30, 2010 Public Meeting

    Texas

    of Transportation Department Halff Associates, Inc.

    Greenwalls

    Enhanced Walls & Paving

  • 8/9/2019 S.M. Wright PPT

    19/19

    . M. Wright Project March 30, 2010 Public Meeting

    Next Steps

    S.M. Wright Project Schematic & EnvironmentalDevelopment 4-6 month process

    S.M. Wright Project Schematic & Environmental

    Review & Approval 10-12 month process S.M. Wright Public Hearing Summer 2011 FHWA Approval (anticipated) Fall 2011 S.M. Wright Project Construction 2012-2014

    (Dependent on Funding) Adjacent Corridor

    Redevelopment(City of Dallas)- Ongoing

    Tim Nesbitt, P.E.TxDOT Project Manager

    Texas Department of TransportationP.O. Box 133067Dallas, Texas 75313-3067Phone: 214-320-6245Fax: 214-320-4470

    Or visit the project web site at:www. smwright project.org

    For More Information