smartsite - charles county, md | home · industry productivity 200% production increase by others...

11
SmartSite the right waythe right toolsthe right reasons

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

SmartSitethe right way—the right tools—the right reasons

Page 2: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

Status QuoImpact= Waste + Consumption

• BIM (CIVIL)Model with IPD & GPS Implementation

• Wood Model

• Sand & Gravel Model

• Recycling Model

New Equation:Impact= (Waste + Less Consumption)-(Recycling +

Extraction)

Page 3: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

Industry Productivity200% Production Increase by others

30% Production Decrease by Construction Industry

230% 35 Year GAP

Page 4: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

4 Categories of Stakeholders

Project

Stakeholders

Page 5: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

ACPT’s IPD / Virtual Construction Mgt Team

Page 6: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

10+ Years

New Equation:Impact= (Waste + Less Consumption)-(Recycling + Extraction)

Page 7: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

10+ Years

Dual Certification Forest Mgt

•3,604 Acres (2,579 Dual Cert., additional 900 Acres SFI only) •Currently Offsets more than 25% of the wood used for new home construction•Waste is minimized but used for energy/paper•Sequesters up to 50,000 tons CO2 p/year•Leads to other Accreditations (LEED, NHAB)

Page 8: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

10+ Years

Produces20x

Consumption

Sand & Gravel Recovery•New Development generates 960,000 tons (320K tons p/year) •New Development uses only 50,500 tons total (10,100 tons p/yr)•100 Acres of productive development saves 100 Acres elsewhere •Improves Water Retention•Leads to other Accreditations (LEED, NHAB)

Page 9: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

10+ Years

Recycled Materials

•Reduce Use of Aggregates via remediated soils•Reduce Asphalt Paving Thickness with Stronger Base Course•NAHB Green Approved Products•Use Glass Cullet in place of Blue Stone•Leads to other Accreditations (LEED, NHAB)

PeoplePlanetProfitPeople: HTP

Human Toxicity Potential (cancer -non cancer)

Planet: CO2 Global Warming Potential Equiv. (GWP).

Profit: Cost Embodied kilowatt hours from (MJ).

*Statistics generated from the Pavement Life-cycle Assessment Tool for Environmental and Economic Effects; Consortium on Green Design and Manufacturing University of California, Berkley

Page 10: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP

“BIM Gets It’s Hands Dirty”Coming Soon June 2011 Edition

www.SitePrepMag.com“How a 3D model and an

integrated project delivery process are saving money at a

master-planned community in

Maryland.” By Daniel C. Brown

Pat HobbsPartner- SmartSite

Page 11: SmartSite - Charles County, MD | Home · Industry Productivity 200% Production Increase by others 30% Production Decrease by Construction Industry 230% 35 Year GAP