    Measure O BondAlternative Education Facility

    District Office FacilityMarch 7, 2013

    SAN MATEO UNION HIGH SCHOOL DISTRICT

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    2/56

    1

    Agenda Alternative Education Facility

    District Office Facility

    Recommendation

    Next Steps

    1

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    3/56

    2

    Alternative Education Facility

    2

    Background Information

    Facility Programming

    Location Options

    Community Input and Timeline

    Enrollment Projections

    Facility MatrixMeasure O Project List

    Facility Thumbnail Schematics

    Land Preferences

    CDE Guidelines

    CEQA

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    4/56

    33

    Background Information

    Peninsula High School has resided at various locations within the District

    boundaries in the past decades The program is currently housed at the Crestmoorschool site

    The Crestmoor facility was constructed in 1960 and occupied in 1962 making it51years old

    Studies have found that older buildings present obstacles to teaching and learningand cause the loss of instructional time

    68% of the students reside in Burlingame, Foster City or San Mateo

    The current site is located 12 miles from the heart of San Mateo

    86% of the students take the bus to attend school

    The District bus takes 60 minutes each way

    The Samtransbus takes 90 minutes each way

    The Caltrainto San Bruno connection to Samtrans takes100 minutes each way The last bus leaves Peninsula High School at 2:40 p.m.

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    5/56

    4

    Profile of Typical Peninsula High School Student

    Credit deficient at risk of not graduating

    Desire for alternative program to comprehensive high school

    Need for greater counseling support

    50% are from homes with a single parent

    20% of the students received discipline at previous school

    60% categorized as economically disadvantaged

    86% get to school without family help or support

    71% of students engaged in after school in non-school relatedactivities including work, babysitting, volunteering, communityservice

    67% male 40% do not attend school regularly due to its remote location

    80% attend post-secondary schools after graduation (communitycollege, trade schools, private schools, etc.)

    4

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    6/56

    5

    Alternative High School Students City of Residence

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    7/56

    6

    Alternative High School-Student City of Residence

    Number

    City Students PercentageSouth San Francisco 1 0.4%

    Daly City 1 0.4%

    San Bruno 55 24.7%

    Millbrae 13 4.5%

    Burlingame 29 13.0%

    Hillsborough 2 0.9%

    San Mateo 111 49.8%Foster City 10 4.5%

    Total 223 100%

    *Burlingame, San Mateo and Foster City students compose 68.2% of studentpopulation

    6

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    8/56

    7

    What Alternative School Students Want?

    Desire to graduate and prepare for post secondary educational

    options

    Career Technical Education course opportunities

    Co-curricular sport programs

    Extracurricular activities Access to work study programs, internships, and job shadowing

    Counseling services

    Social services Accessible facilities

    Opportunities to use educational technology

    A site that facilitates a sense of belonging and community An environment that validates their worth as learners

    7

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    9/56

    88

    Facility Characteristics

    Desired Characteristics for Facility:

    State-of-the-art teaching facility

    Flexible teaching spaces

    Technology options

    Career Technical Education classrooms

    Accessibility to sports programs and extracurricular activities

    Accessibility to social services

    Accessibility to after school employment

    Near transportation options

    Childcare center

    Readily accessible to students residenceReliable and energy-efficient buildings and facilities

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    10/56

    9

    Architect Program Alternative High SchoolDraft Program for a 350 student Alternative Education facility with classrooms loaded

    at 1:27 and assume a classroom is vacant for one period in sevenfor prep periodUnit Subtotal Total

    Administration Quantity Area Area Area NotesReception lobby 1.0 250 250 At main campus entry

    Principal 1.0 180 180 Office with desk and table for 4

    Asst Principal 1.0 150 150 Private Office

    Secretary 1.0 80 80 Open off lobby

    Office Asst. 1.0 80 80 Open off lobby

    Health Attendance 1.0 180 180 Office nurse room

    Counselor 2.0 120 240 Private Offices

    Counselor Secretary 1.0 80 80 Adjacent to Counselors

    School Safety Advocate 1.0 120 120 Private Office

    Campus Supervisor 1.0 120 120

    Conference Room 1.0 200 200 Accommodate 8

    Cum File Storage Room 1.0 60 60 Fire resistant storage room

    Admin Storage 1.0 50 50Staff Work Room 1.0 200 200 Convenient for staff and teachers

    Staff Lounge 1.0 250 250 Convenient for staff and teachers

    Staff Toilet Rooms 2.0 200 400

    Circulation (20% of above) 1.0 528 528

    Subtotal 3,168 Sq. Ft.

    9

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    11/56

    10

    Architect Program Alternative High SchoolUnit Subtotal Total

    Facilities Quantity Area Area Area NotesClassroomsClassrooms 9.0 960 8,640 Loaded at 27:1

    Science Labs 2.0 1,500 3,000 Loaded at 27:1

    Digital Arts 1.0 1,200 1,200 Co-locate with library

    Pathway-Hospital 1.0 2,500 2,500 Incldsarea for kitchen

    Pathway-Health 1.0 1,500 1,500Pathway-Construction 1.0 2,000 2,000

    Subtotal 18,840 Sq. Ft.

    Library, Cafeteria and Other Spaces

    Library, College and Career Center 1.0 3,500 3,500

    Large Group Area and Cafeteria 1.0 6,400 6,400 Located with rethermkitchenChild Care-three years and younger 1.0 1,800 1,800 18 students and outdoor area

    Subtotal 11,700 Sq. Ft

    Support Spaces

    Student Toilet Rooms 2.0 400 800

    Custodians 1.0 120 120

    Mechanical spaces 1.0 100 100

    Electrical and TelcomSpaces 1.0 200 200

    Subtotal 1,220 Sq. Ft

    Total Alternative Education Facility 34,928 Sq. Ft.

    Property 2-5 Acres

    10

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    12/56

    1111

    Location Options

    On February 24, 2011 District Administration presentedoptions for the possible locations for the Alternative HighSchool.

    The options included placing a modernized facility at:Crestmoor High School

    Hillsdale High School

    San Mateo High School

    OR

    Purchasing land and/or a facility that is centrally located and easily

    accessible to students and families

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    13/56

    12

    Community Input and TimelineConsiderations State of the art facility Centrally located Program identity Cost to maintain Crestmoor site until new facility is available Construction escalation (schedule) Development and construction cost Trade off of Measure O monies if land is purchased other projects will not be funded

    Property Acquisition California Environmental Quality Act

    Detailed technical review Political

    Detailed California Department of Education review Department of Toxic Substance Control clearance Total land cost Schedule

    Existing Property California Environmental Quality Act

    Negative Declaration or Categorical Exemption

    Total project Cost

    Schedule

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    14/56

    13

    Aragon High School Moderate Enrollment

    13

    Aragon H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 408 369 341 394 395 428 415 437 467 483 486 494 489 489

    10th Grade 468 385 372 339 397 398 427 413 436 466 482 484 493 488

    11th Grade 424 436 369 362 325 379 377 403 394 415 444 459 461 469

    12th Grade 341 401 419 360 353 317 369 366 391 381 402 430 444 447

    Total 1,641 1,591 1,501 1,455 1,470 1,522 1,588 1,619 1,688 1,745 1,814 1,867 1,887 1,893

    Difference (50) (90) (46) 15 52 66 31 69 57 69 53 20 6

    Cum Difference (50) (140) (186) (171) (119) (53) (22) 47 104 173 226 246 252

    Facility Capacity 2,125

    Available Capacity 232

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    15/56

    14

    Burlingame High School Moderate Enrollment

    14

    Burlingame HS 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 333 355 311 340 365 410 397 424 427 431 453 440 418 418

    10th Grade 335 343 357 323 339 363 408 395 423 425 429 452 439 416

    11th Grade 322 312 335 353 310 324 348 390 381 408 410 414 436 423

    12th Grade 353 344 321 351 344 302 315 338 382 372 399 401 405 426

    Total 1,343 1,354 1,324 1,367 1,358 1,399 1,468 1,547 1,613 1,636 1,691 1,707 1,698 1,683

    Difference 11 (30) 43 (9) 41 69 79 66 23 55 16 (9) (15)

    Cum Difference 11 (19) 24 15 56 125 204 270 293 348 364 355 340

    Facility Capacity 1,890

    Available Capacity 207

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    16/56

    15

    CapuchinoHigh School Moderate Enrollment

    15

    Capuchino H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 322 301 292 292 301 347 303 335 307 295 310 335 314 331

    10th Grade 312 301 307 288 283 291 335 292 330 302 291 305 329 308

    11th Grade 272 269 271 280 264 258 266 306 269 303 278 267 281 303

    12th Grade 254 254 269 266 274 259 253 261 298 262 295 271 260 273

    Total 1,160 1,125 1,139 1,126 1,122 1,155 1,157 1,194 1,204 1,162 1,174 1,178 1,184 1,215

    Difference (35) 14 (13) (4) 33 2 37 10 (42) 12 4 6 31

    Cum Difference (35) (21) (34) (38) (5) (3) 34 44 2 14 18 24 55

    Facility Capacity 1,795

    Available Capacity 580

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    17/56

    16

    Hillsdale High School Moderate Enrollment

    16

    Hillsdale H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

    9th Grade 368 359 349 358 373 384 396 410 443 456 462 472 469 471

    10th Grade 337 363 352 350 362 377 386 397 411 444 455 460 470 467

    11th Grade 291 312 333 335 344 355 368 376 386 400 430 441 446 455

    12th Grade 280 283 305 343 328 337 347 360 365 375 387 416 427 432

    Total 1,276 1,317 1,339 1,386 1,407 1,453 1,497 1,543 1,605 1,675 1,734 1,789 1,812 1,825

    Difference 41 22 47 21 46 44 46 62 70 59 55 23 13

    Cum Difference 41 63 110 131 177 221 267 329 399 458 513 536 549

    Facility Capacity 1,807

    Available Capacity (18)

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    18/56

    17

    Mills High School Moderate Enrollment

    17

    Mills H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 340 353 319 301 297 314 306 288 273 260 282 302 271 273

    10th Grade 381 342 341 323 300 296 313 305 287 272 260 281 301 271

    11th Grade 378 354 333 340 310 288 284 300 296 279 265 253 273 293

    12th Grade 377 376 342 340 334 304 282 279 294 291 274 260 248 268

    Total 1,476 1,425 1,335 1,304 1,241 1,202 1,185 1,172 1,150 1,102 1,081 1,096 1,093 1,105Difference (51) (90) (31) (63) (39) (17) (13) (22) (48) (21) 15 (3) 12

    Cum Difference (51) (141) (172) (235) (274) (291) (304) (326) (374) (395) (380) (383) (371)

    Facility Capacity 1,725

    Available Capacity 620

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    19/56

    18

    San Mateo High School Moderate Enrollment

    18

    San Mateo H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 418 384 392 382 392 419 409 426 456 470 472 480 474 474

    10th Grade 334 393 359 383 378 388 412 402 423 452 466 468 476 470

    11th Grade 333 286 333 328 343 339 346 368 367 385 412 424 426 433

    12th Grade 276 288 282 328 305 319 315 322 343 341 358 383 395 397

    Total 1,361 1,351 1,366 1,421 1,418 1,465 1,482 1,518 1,589 1,648 1,708 1,755 1,771 1,774Difference -10 15 55 -3 47 17 36 71 59 60 47 16 3

    Cum Difference -10 5 60 57 104 121 157 228 287 347 394 410 413

    Facility Capacity 1,970

    Available Capacity 196

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    20/56

    19

    District Moderate Enrollment

    19

    Totals 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 2,190 2,123 2,004 2,070 2,126 2,306 2,229 2,324 2,376 2,398 2,469 2,527 2,438 2,460

    10th Grade 2,174 2,127 2,096 2,016 2,062 2,116 2,285 2,207 2,314 2,364 2,386 2,453 2,512 2,423

    11th Grade 2,111 2,074 2,069 2,086 1,991 2,033 2,081 2,244 2,189 2,292 2,343 2,363 2,431 2,487

    12th Grade 2,026 2,086 2,083 2,138 2,096 2,001 2,040 2,089 2,249 2,192 2,295 2,346 2,366 2,434Total 8,501 8,410 8,252 8,310 8,275 8,456 8,635 8,864 9,128 9,246 9,493 9,689 9,747 9,804

    Difference (91) (158) 58 (35) 181 179 229 264 118 247 196 58 57

    Cum Difference (91) (249) (191) (226) (45) 134 363 627 745 992 1,188 1,246 1,303

    F ilit M t i

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    21/56

    20

    Facility Matrix

    20

    M O A d P j t Li t

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    22/56

    21

    Measure O Approved Project List

    21

    Site Project 2011 2012 2013 2014 2015 2016 2017 Total

    Approved Projects :

    BHS StadiumBleacher Upgrades $0 $0 $1,762,189 $0 $0 $0 $0 $1,762,189

    BHS Replace Home Economics Bld $0 $0 $10,572,519 $0 $0 $0 $0 $10,572,519

    SMHSStadiumBleacher Upgrades $0 $0 $1,861,458 $0 $0 $0 $0 $1,861,458

    DW Technology $481,350 $454,739 $500,000 $500,000 $500,000 $500,000 $2,063,911 $5,000,000DW COP Payment $80,655,261 $0 $0 $0 $0 $0 $0 $80,655,261

    DW Radios $0 $140,000 $0 $0 $0 $0 $0 $140,000

    SMHSRepair / Upgrade Brick Building $0 $0 $7,320,813 $0 $0 $0 $0 $7,320,813

    DW Furniture, Fixtures, Equipment $0 $0 $0 $100,000 $150,000 $150,000 $150,000 $550,000

    DW Topside Contingency $0 $0 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000

    DW Administrative Overhead $0 $0 $0 $750,000 $750,000 $750,000 $750,000 $3,000,000Total $81,136,611 $594,739 $23,016,979 $2,350,000 $2,400,000 $2,400,000 $3,963,911 $115,862,240

    M O P di P j t Li t

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    23/56

    22

    Measure O Pending Project List

    22

    Site Project 2011 2012 2013 2014 2015 2016 2017

    DW Land Acquisition Alt. Education $15,000,000 $15,000,000 $15,000,000 $15,000,000

    DW Alt Education Center SMHS/HHS $28,678,182 $30,685,655 $32,833,651 $35,132,006

    DW Alt Education Center Crestmoor $27,552,119 $28,929,725 $30,954,806 $33,121,642

    DW Land Acquisition Dist.Office $5,000,000 $5,000,000 $5,000,000 $5,000,000

    DW Administrative Office $18,528,318 $19,825,300 $21,213,071 $22,697,986

    DW Maintenace, Ops, Transportation $12,875,611 $13,776,904 $14,741,287 $15,773,177

    HHS HHS 4th Classroom Building (21 Classrooms) $18,304,869 $19,586,210 $20,957,245 $22,424,252

    Construction Escalation Projected at 7%

    M O P j t Li t

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    24/56

    23

    Measure O Project List

    23

    Energy Savings and Deferred Mainten 2011 2012 2013 2014 2015 2016 2017AHS Transite Panel Replacement $7,830,000 $8,378,100 $8,964,567 $9,592,087

    HHS Transite Panel Replacement $6,771,000 $7,244,970 $7,752,118 $8,294,766

    MHS Transite Panel Replacement $7,244,970 $7,752,118 $8,294,766 $8,875,400

    DW Solar Thermal Pool Heaters $5,270,400 $5,639,328 $6,034,081 $6,456,467

    AHS New HVAC Controls / Ventilation $1,220,000 $1,305,400 $1,396,778 $1,494,552BHS Air Condition South Wing $762,500 $815,875 $872,986 $934,095

    CHS Air Condition "D" Wing" $610,000 $652,700 $698,389 $747,276

    CHS Fence Stadium Field $305,000 $4,291,350 $4,591,745 $4,913,167

    CHS Fence Entire Site $533,750 $571,113 $611,090 $653,867

    CHS Repave All Roads $1,756,800 $1,879,776 $2,011,360 $2,152,156HHS Replace Fencing $1,275,144 $1,364,404 $1,459,912 $1,562,106

    New Buildings:

    MHS New 5-Classroom Building $4,003,125 $4,283,344 $4,583,178 $4,904,000

    MeasureO Project List

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    25/56

    24

    Measure O Project List

    24

    Athletic Fields & Court: 2011 2012 2013 2014 2015 2016 2017

    AHS Artificial Turf Baseball Field $1,982,500 $2,121,275 $2,269,764 $2,428,648

    CHS Artificial Turf Baseball / Softball Fields $2,635,200 $2,819,664 $3,017,040 $3,228,233CHS Artificial Turf Soccer Field $3,050,000 $3,263,500 $3,491,945 $3,736,381

    HHS Artificial Turf Baseball Field $1,372,500 $1,468,575 $1,571,375 $1,681,372

    HHS Artificial Turf Soccer Field $1,830,000 $1,958,100 $2,095,167 $2,241,829

    MHS Artificial Turf Baseball Field $1,903,200 $2,036,424 $2,178,974 $2,331,502

    MHS Artificial Turf Soccer Field $3,263,500 $3,491,945 $3,736,381 $3,997,928

    MHS Resurface Lower Basketball Courts $228,750 $244,763 $261,896 $280,229SMHS Artificial Turf Baseball / Softball Fields $1,903,200 $2,036,424 $2,178,974 $2,331,502

    AHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276

    CHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276

    HHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276

    MHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276

    SMHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276

    Facility Requests:

    CHS Improve Bus Loop $610,000 $652,700 $698,389 $747,276

    CHS Bleachers for Tennis Courts $62,500 $66,875 $71,556 $76,565

    CHS Hand Dryers in All Bathrooms $156,250 $167,188 $178,891 $191,413

    CHS Storage Building by Tennis Courts $114,375 $122,381 $130,948 $140,114

    DW Security Upgrades $1,525,000 $1,631,750 $1,745,973 $1,868,191

    DO Pave Bus Yard Parking Lot $937,500 $1,003,125 $1,073,344 $1,148,478

    HHS Restructure science labs for class of 35

    MHS Multi-purpose Building behind Gyms $2,592,500 $2,773,975 $2,968,153 $3,175,924

    SMHS Transform E115 & E116 into Classrooms $750,000 $802,500 $858,675 $918,782

    SMHS Install Bike Lockers $38,125 $40,794 $43,649 $46,705SMHS Concrete Emergency Ops Building $106,750 $114,223 $122,218 $130,773

    Location Options San MateoHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    26/56

    2525

    Location Options San Mateo High School

    Location Options San MateoHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    27/56

    26

    Location Options San Mateo High School

    26

    Location Options San MateoHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    28/56

    27

    Location Options San Mateo High School

    27

    Location Options San MateoHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    29/56

    28

    Location Options San Mateo High School

    28

    Location Options HillsdaleHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    30/56

    2929

    Location Options Hillsdale High School

    Location Option HillsdaleHigh School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    31/56

    30

    Location Option Hillsdale High School

    30

    Location Options Remain at PeninsulaSite

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    32/56

    31

    Location Options Remain at Peninsula Site

    Location Options Remain at PeninsulaSite

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    33/56

    32

    Location Options Remain at Peninsula Site

    Land AcquisitionProperty Development

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    34/56

    3333

    Land Acquisition Property Development

    The District assembled a specialized team and established a

    process to assess viable properties that were either owned orcould be accessed through acquisitions

    Team consists of:

    Benson Lee, CEQA (California Environmental Quality Act) Consultant

    Westgate Ventures, Asset Managers

    QKA Architects

    GreystoneWest, Construction Management

    Land AcquisitionPreferences

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    35/56

    3434

    Parcel size of 2 to 5 acres or more that is relatively level ideally with two streetfrontages

    Direct access to arterial or similar sized street avoid sites with small streets,particularly if they run through residential neighborhoods

    Property that has water, sewer, power, natural gas, phone, cableTV, utilities andstorm drains on or directly adjacent in order to avoid excessiveoff-site costs or

    entitlements by local jurisdictionsProperty that is easily accessible from public transportation

    Property with a fire hydrant of at least 1,500 gallons per minute (more may berequired depending on design) or if no hydrant, immediate accessto fire water to addhydrants. It is possible two fire hydrants may be required for this size of a school. Fireflow is becoming a bigger issue with DSA which accentuates this preference

    Property in a commercial or business area to reduce controversy

    Land AcquisitionCDE Guidelines

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    36/56

    3535

    q

    CDE Guidelines: In the California Department of Educations (CDE) School SiteSelection & Approval Guide, CDE establishes a number of criteriafor selectingnew school properties. Below are a summary of the issues. Seehttp://www.cde.ca.gov/ls/fa/sf/schoolsiteguide.aspfor the complete document: Proximity to Airports: From the CDE Guide:

    If the site is within two nautical miles of an existing airport runway or a potential runway included in anairport master plan, as measured by direct air line from the part of the runway that is nearest to the schoolsite, the following procedures must be followed before the site can be approved.

    Proximity to High Voltage Power Lines: From the CDE Guide. See guide for further descriptions and exceptions.

    In consultation with the State Department of Health Services (DHS) and electric power companies, theDepartment has established the following limits for locating anypart of a school site property line near the

    edge of easements for high-voltage power transmission lines: 100 feet from the edge of an easement for a 50-133kV (kilo volts) line

    150 feet from the edge of an easement for a 220-230kV line

    350 feet from the edge of an easement for a 500-550kV line

    These figures represent kV strengths of transmission lines used by

    Presence of Toxic & Hazardous Substances: While the Guide goes into greater detail, sites should be pass a PhaseOne Environmental Site Assessment and not be near landfills, former dumps, chemical plants, fuel storagefacilities or contain naturally occurring materials such as asbestos, oil and gas.

    Hazardous Air Emissions and Facilities Within a Quarter Mile: As the title implies, properties that are adjacent orwithin a quarter of a mile of hazardous air emissions (includingmajor freeways) should be avoided.

    Land AcquisitionCDE Guidelines

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    37/56

    3636

    q

    CDE Guidelines Continued::

    Proximity to Railroads: From the Guide (see Guide for complete description). It is highly advisable to select aproperty that is at least 1,500 feet from a railroad track easement.

    If the proposed site is within 1,500 feet of a railroad track easement, a safety study shall be done by acompetent professional trained in assessing cargo manifests, frequency, speed, and schedule of railroadtraffic, grade, curves, type and condition of track, need for sound or safety barriers, need for pedestrian and

    vehicle safeguards at railroad crossing, presence of high pressure gas lines near the tracks that couldrupture in the event of a derailment, preparation of an evacuation plan. In addition to the analysis, possibleand reasonable mitigation measures must be identified.

    Proximity to Pressurized Gas, Gasoline or Sewer Pipeline: The distances from these pressurized pipes aredetermined by the pipe size and pressure. A consultant is required to evaluate blast potential and other hazards ifthe property is near such pressurized pipelines. It is best if the property is not near pressurized gas, gasoline orsewer pipelines.

    Proximity to Propane Tanks: Like pressurized pipes, it is best to avoid sites that are adjacent to propane tanks.

    Noise: CDE is concerned with adjacent noise including industrial andlight industrial uses. Properties that havemore than 50 decibels at the property line should be avoided, asmitigation measures may be required.

    Proximity to Major Roadways: While from above we want streets capable of handling the schools traffic, theCDE Guide does indicate "The site shall not be adjacent to a road or freeway that any site-related traffic and sound

    level studies have determined will have safety problems or soundlevels which adversely affect the educationalprogram."

    Geological Studies and Soils Analysis: Because the SMUHSD is adjacent to the San Francisco Bay, specialattention should be paid to soil characteristics to avoid soft bay mud or liquefiable soils. Mitigations for thesecan cost hundreds of thousands of dollars. A preliminary geotechnical report can easily access a propertys soilcharacteristics. Likewise careful consideration must be made for distances from known earthquake faults.

    Safe Route to Schools: Sites without established and safe pedestrian paths of travel should be avoided.

    CEQA Environmental Documentation

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    38/56

    37

    Given the limited information about the proposed project at any of the sites, the

    scope of the environmental review under CEQA and the associated timeframes forpreparation of documentation cannot be determined at this time. Greater projectdetails, along with input from responsible public agencies and the public at-large,would be required to adequately ascertain the level of analysis,which could rangefrom a relatively simple categorical exemption to an Environmental Impact Report

    (typically triggered when there are potentially significant and unmitigatedenvironmental effects resulting from a project). In addition, anumber of CDEGuideline topics (e.g., hazmat; geologic hazards; safe routes toschool) overlapissues that must be addressed as part of the CEQA evaluation.

    Based upon the very preliminary drawings that have been provided, the followingscope of environmental review and approximate timeframes have been providedfor each option location:

    Crestmoor High School San Mateo High School

    Hillsdale High School

    Purchasing land or facility

    CEQA-Crestmoor High School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    39/56

    38

    If a primary intent for the project is replacement/reconstruction of existing facilities

    to provide earthquake-resistant structures, and no potentially significantenvironmental impacts would result from the development, a categoricalexemption may meet CEQA requirements. A categorical exemption could beprepared within two to three days, followed by a 30-day public comment period.

    Concerns associated with soil displacement were discussed as possible issues.Traffic and parking do not appear to be major concerns since many students woulduse public transit and traffic volumes appear to be low along local roadways. Inthe event that the project needs to address issues, CEQA documentation may

    require at least a Negative Declaration, supported by an Initial Study, along withpossible geologic and biological studies and possible permits within the area of thewatercourse. Document preparation and processing could range from two monthsto a year or more.

    CEQA-San Mateo High School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    40/56

    39

    Either of the two location options would probably require at least a Negative

    Declaration, supported by an Initial Study. A parking lot with a new entry,requiring a curb cut, on Humboldt Street would be developed, which wouldpreclude the applicability of a categorical exemption. According to previouscontinuation school information, a total of 45 spaces for staff and 50 for studentswould be provided. As the responsible agency for local roadways, the City of San

    Mateo would need to be contacted to discuss the scope of a possible traffic/parkingstudy and possible offsets, resulting from the removal of the existing bus parkingfacility, and an encroachment permit for the curb cut. Other issues may includenoise and visual effects depending upon the chosen layout alternative.

    In the past, residents at the condominium development along the northernperimeter of the high school have been vocal about proposed development at thehigh school. The level of public concerns and involvement may have a bearing

    upon the level of environmental review and documentation preparation andprocessing. The timeframe for completion of CEQA review could range from twoto three months to perhaps five to six months.

    CEQA-Hillsdale High School

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    41/56

    40

    Either of the two location options would probably require at least a Negative

    Declaration, supported by an Initial Study. The two-story building wing, shown inboth layouts, may pose a possible visual effect upon nearby residents. Sinceexisting parking areas already exist and streets appear to carry low volumes ofvehicles, a traffic study may not be required although the City of San Mateo shouldbe contacted to clarify this issue. Assuming that neither visual impacts or an

    increase in traffic will pose significant issues, the CEQA document preparation andprocess could range from three to four months. The level of public concerns andinvolvement may have a bearing upon the level of environmental review anddocumentation preparation and processing.This could extend the CEQA timeline.

    CEQA-Purchasing Land or Other Facility

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    42/56

    41

    Assuming that a suitable parcel of land or facility is acquired,either a Negative

    Declaration, supported by an Initial Study, or an Environmental Impact Reportwould likely be needed to meet CEQA review requirements. However, the extentof issues that must be evaluated will vary with the specific site conditions andsurrounding land uses, which are currently unavailable. As stated in the LandAcquisitionPreferences, zoning will have to be considered. In addition, an

    amendment to the local general plan may also be needed. Under state law, onlyfour amendments per year to a general plan are permitted.

    Currently, lacking project location and design specifics, a timeestimate for the

    completion of CEQA documentation and processing cannot be determined. ANegative Declaration, supported by an Initial Study could take as little as threemonths while an Environmental Impact Report would require seven months ormore.

    Alternative High School Facility

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    43/56

    42

    Site Options CEQA

    Level

    CEQA

    Timeline

    GeneralPlanChang

    es

    CDEA

    pproval

    Design

    Allocation

    DSAT

    imeAllocation

    ProjectSchedule

    TotalT

    imeline

    ProjectCost

    Centra

    llyLocated

    Access

    ibletoPublicTransportatio

    n

    SchoolI

    dentity

    AthleticFacilities

    Childcare

    FacilityFitOnSite

    Parkin

    g

    Crestmoor High school

    Hillsdale High School

    San Mateo High School

    New Site

    *Matrix for Board to utilize as they consider options

    District Office

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    44/56

    43

    District Office Programming

    CEQA Field Act

    Architect Program District Office

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    45/56

    44

    Draft Program for District OfficeUnit Subtotal Total

    Administration Quantity Area Area Area NotesAttendance and Welfare

    Reception 1.0 300 300

    Work stations 4.0 62.5 250

    Computer workstations 1.0 150 150

    Offices 2.0 150 300

    Private Investigator 1.0 80 80

    Storage 2.0 50 50

    Subtotal 1,130

    Bond Accounting

    Office 1.0 150 150Reception 1.0 50 50

    Open office space 1.0 100 100

    Subtotal 300

    Technology

    Reception 1.0 100 100Office 2.0 150 150

    Open Office 4.0 62.5 250

    Workshop 1.0 100 100

    Storage 1.0 50 50

    Subtotal 650

    44

    Architect Program District Office

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    46/56

    45

    Draft Program for District OfficeUnit Subtotal Total

    Administration Quantity Area Area Area NotesBusiness Office

    Reception 1.0 100 100

    Deputy office 1.0 249 249

    Private offices 4.0 150 600

    Open office space 7.0 50 350

    Storage 1.0 100 100

    Cash counting room 1.0 120 120

    Subtotal 1,519

    Human Resources

    Reception 1.0 100 100Private offices 4.0 175 700

    Open office space 6.0 50 300

    Conference room 1.0 150 150

    Storage 1.0 100 100

    Nurse workstation 1.0 50 50Subtotal 1,400

    Other

    Mech, Elec, Misc 1.0 2,306 2,306

    Circulations 1.0 5,765 5,765Subtotal 8,071

    45

    Architect Program District Office

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    47/56

    46

    Draft Program for District OfficeUnit Subtotal Total

    Administration Quantity Area Area Area NotesInstructional Services

    Reception 1.0 100 100

    Work stations 6.0 100 600

    Collaborative Room 1.0 500 500

    Offices 5.0 170 850

    Storage 1.0 100 100

    Subtotal 2,150

    Special Education

    Office 2.0 150 300

    Reception 1.0 150 150Open office space 3.0 100 300

    Storage 1.0 250 250

    Subtotal 1,000

    Superintendent

    Reception 1.0 100 100

    Office 1.0 250 250

    Admin. Asst 1.0 80 80

    Storage 1.0 50 50

    Subtotal 480

    46

    Architect Program District Office

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    48/56

    47

    Draft Program for District OfficeUnit Subtotal Total

    Administration Quantity Area Area Area NotesBoard

    Board Asst. 1.0 80 80

    Conference Room 1.0 500 500

    Board Room 1.0 3,000 3,000

    Technology 1.0 50 50

    Storage 2.0 50 100

    Subtotal 3,730

    Shared Space

    Lobby and Reception 1.0 1,500 1,500

    Large Conference (20+) 3.0 750 2,250Medium Conference (12) 4.0 500 2,000

    Small Conference(10) 4.0 250 1,000

    Central File Storage 1.0 500 500

    Toilet Rooms 1.0 1,500 1,500

    Copy Room 2.0 250 500Custodial/Janitorial 1.0 250 250

    Staff Break Room 1.0 1,200 1,200

    Subtotal 10,700

    Total 31,130

    47

    Architect Program Maintenance, Operations, Transportation

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    49/56

    48

    Draft Program for Maintenance and Operations FacilityUnit Subtotal Total

    Administration Quantity Area Area Area NotesMaintenance

    Painter 1.0 300 300

    Painters Storage 1.0 500 500

    Painters changing room 1.0 100 100

    Conference Room 1.0 500 500

    Carpenters Shop 1.0 960 960

    Tool Storage 1.0 800 800

    Mechanical Shop 1.0 960 960

    Electrical Shop 1.0 960 960

    Electrical Storage 1.0 960 960Testing Materials 1.0 500 500

    Subtotal 6,540

    Facilities Use

    Storage 1.0 50 50

    Office 2.0 150 300Reception 1.0 200 200

    Subtotal 550

    Print Shop 1.0 500 500 500

    Server Room 1.0 500 500 500

    Emergency Services 1.0 500 500 500

    48

    Architect Program Maintenance, Operations, Transportation

    f f i i d i

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    50/56

    49

    Draft Program for Maintenance, Operations and TransportationUnit Subtotal Total

    Administration Quantity Area Area Area NotesShipping Receiving 1.0 500 500 500

    Grounds

    Equipment Shed 1.0 2,000 2,000

    Seed Fertilizer Storage 1.0 400 400

    Subtotal 2,400

    Food Service Office

    Storage 1.0 1,000 1,000

    Office 1.0 120 120

    Subtotal 1,120Locksmith 1.0 300 300 300

    Shared Facilities

    Staff Break Room 1.0 500 500

    Electrical Storage 1.0 500 500

    Subtotal 1,000

    49

    Architect Program Maintenance, Operations, Transportation

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    51/56

    50

    Draft Program for Maintenance, Operations and TransportationUnit Subtotal Total

    Administration Quantity Area Area Area NotesTransportation

    Offices 4.0 150 600

    Open Office Space 6.0 100 600

    Mechanics Bay 1.0 4,000 4,000

    Tool Room 1.0 200 200

    Lunch room 1.0 500 500

    Storage 1.0 300 300

    Subtotal 6,200

    Mech., Elec., Circulation 1.0 3017 3,017 3,017

    Total Maintenance and Operations 23,127

    Total 54,257

    Acres 7-10

    50

    CEQA-District Office

    Thescopeof CEQA documentationrequiredfor relocationof theDistrictOfficeandInformation

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    52/56

    51

    The scope of CEQA documentation required for relocation of the District Office and InformationTechnology facilities to an existing commercial business park, in which four acres would be

    needed, would depend on the site characteristics and surroundingsetting. On the one hand, if theexisting use characteristics (e.g., staffing levels, business hours; parking) of a site were similar tothe District Office functions and no potentially significant environmental issues or concerns (e.g.,hazmat, higher traffic volumes, cultural resources) are identified, a minimal evaluation may beneeded. On the other hand, issues such as increased traffic, greater parking needs, and potentialhazmat issues (especially if state funds were involved) would require more extensive review.

    Another factor in determining the extent of the evaluation is also the baseline or existing conditionsat the time the CEQA review is initiated. If the proposed relocation site has been vacant, the analysiswill likely differ from a site that is currently occupied (e.g., new traffic would be added to localroadways under a vacant scenario vs. the likelihood of little difference under an existing usescenario).

    Since relocation of District Office does not qualify under any of the categorical exemptions underCEQA, a Negative Declaration, supported by an Initial Study, would likely be the applicable andappropriate level of required documentation. Upon receipt of thebackground materials (e.g., design,operational parameters), the entire CEQA environmental review process would rangefrom about two and one-half to three months, including the 30-day review period, for an

    environmental document in which less than significant effects are identified. In the event that anexpanded traffic analysis or other issues need to be addressed under a Negative Declaration, the timerequired could increase by 30 to 60 days. An Environmental Impact Report (EIR), whichwould take at least six to seven months to complete, is unlikely to be needed for location within anexisting commercial business park.

    CEQA-Maintenance, Operations, Transportation

    M i t dO ti

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    53/56

    52

    Maintenance and Operations

    The scope of CEQA documentation required for relocation of the current Maintenance and

    Operations facilities, which would include a Loading Dock, woulddepend on the sitecharacteristics and surrounding setting for an approximately two-acre property. Given thefunctions of current M,O&T facilities, a suitable location couldinclude an area with already

    existing industrial uses. Resulting impacts associated with CEQA review could include, butmay not be limited to, potentially increased traffic (e.g., staffing and loading activities),possibly greater parking needs, presence of existing hazmat issues and the need to addressmanagement of hazmat at the new facilities, and possibly noise if sensitive land uses occurnear the property.

    Unless the M,O&T is situated in proximity to such sensitive landuses or nearby roadintersections in which intersection thresholds of operation are exceeded during the a.m.traffic peak, the level of CEQA documentation would likely be a Negative Declaration,supported by an Initial Study, in which the timeframe for the review process would besimilar to the District Office facility.

    CEQA- Maintenance, Operations, Transportation

    Transportation

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    54/56

    53

    Transportation

    The extent of CEQA documentation for relocation of the Bus Barn, to an approximately

    one-acre site would again depend upon the site characteristics and surrounding settingalong with operational parameters (i.e., number of buses; do buses move in and out of thefacilities during the peak a.m. and p.m. traffic hours?). CEQA-related issues of concern

    could include, but not be limited to, traffic, parking adequacy and noise if sensitive landuses occur nearby along with management of on-site fuels.

    Like the M,O&T facilities, unless the Bus Barn is located in proximity to sensitive land

    uses or road intersections in which intersection thresholds of operation are exceeded duringthe a.m. or p.m. traffic peak, the level of CEQA documentation would likely be a NegativeDeclaration, supported by an Initial Study, in which the timeframe for the review processwould be similar to the M,O&T facilities, discussed above.

    Recommendation

    Option Eliminated

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    55/56

    5454

    Option Eliminated:

    Due to projected enrollment growth with Bay Meadows development coming on line,Hillsdale High School will be the southern school able to accommodate futureenrollment increase

    Most Comprehensive Solution:Alternative SchoolPurchase property that is centrally located, easily accessible to public transportationfor the Alternative Education Facility

    Allocate six months to identify and begin due diligence for potential propertypurchase for Alternative School

    District Office

    Purchase property that is centrally located, easily accessible for constituents

    Alternative:If a viable property is not identified and secured, the Board of Trustees should reconsider anddiscuss if the Alternative High School should be built at San Mateo High School.

    Crestmoor High School should be considered as a last resort

    Next Steps

  • 7/29/2019 Smuhsd 3-7-13 Phs Study Session

    56/56

    5555

    District Administration will identify properties closelymeeting specific criteria

    All property sites will be analyzed by team to determine

    viabilityRecommendation will be brought forth to the Board of

    Trustees for consideration

    If a roadblock is encountered, the Board of Trustees will bereconvened for further discussion