s.no item details 1. name of the mining lease site road metal, … · 2018-11-08 · 1 m/s anjani...

19
1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry “B2” Category Mine 2.20 Ha. Form -1M APPENDIX - VIII FORM – IM (1) Basic Information S.No Item Details 1. Name of the Mining lease site Road Metal, Buliding Stone & Gravel Mine – 2.20 Hect. M/s Anjani Stone Crushers , Mg Ptr: Sri. M. Singa Reddy. 2. Location /site (GPS Coordinates) B.P. LATITUDE LONGITUDE 1. 17°43'51.13"N 82°59'53.03"E 2. 17°43'52.75"N 82°59'54.40"E 3. 17°43'44.17"N 83°00'02.00"E 4. 17°43'45.09"N 82°59'55.12"E 5. 17°43'50.91"N 82°59'55.64"E Sy.No. 220 M/s Anjani Stone Crusher, Mg Ptr Sri M.Singa Reddy, Marturu Village, Anakapalli Mandal, Visakhapatnam District . 3. Size of the Mining Lease 2.20 Ha. 4. Capacity of Mining lease (cu.m) Five Years Road Metal & Buildiing Stone: 2,78,820 M 3 . Gravel 1,39,410 M 3 . 5. Period of mining lease 15 Years 6. Expected Cost of the Project Rs.15 lakhs. 7. Contact Information M/s Anjani Stone Crusher, Mg Ptr: Sri M. Singa Reddy, H. No: 1-108-18, MIG-76, MVP Colony, Sector-8, Visakhapatnam - 530017, Andhra Pradesh State. Ph No:9959912667. II) Environmental Sensitivity S.No Areas Distance in Kilometers Details 1. Distance of Project site from nearest Rail or road bridge over the concerned River, Rivulet, Nallah etc. Anakapalli is the nearest railway station about to 5 Km from the applied area 2. Distance from the infrastructural Facilities 1.National Highway 2.State Highway 3.Major District Road 4.Any other Road 5.Electrical Transmission line pole or tower 6.Canal of check dams or reservoirs or lake or ponds State Transport Bus Services from Marturu Village to Visakhapatnam. Private Auto Transport also available on this Road network Venkannapalem to Chodavaram Road. Electricity is available in the village and also using Electricity for all Agricultural lands. Sharada River – 2 Km.

Upload: others

Post on 21-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

1

M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry “B2” Category Mine – 2.20 Ha. Form -1M

APPENDIX - VIII FORM – IM

(1) Basic InformationS.No Item Details

1. Name of the Mining lease site Road Metal, Buliding Stone & Gravel Mine – 2.20 Hect. M/s Anjani Stone Crushers , Mg Ptr: Sri. M. Singa Reddy.

2. Location /site (GPS Coordinates) B.P. LATITUDE LONGITUDE

1. 17°43'51.13"N 82°59'53.03"E

2. 17°43'52.75"N 82°59'54.40"E

3. 17°43'44.17"N 83°00'02.00"E

4. 17°43'45.09"N

82°59'55.12"E

5. 17°43'50.91"N 82°59'55.64"E

Sy.No. 220 M/s Anjani Stone Crusher, Mg Ptr Sri M.Singa Reddy,

Marturu Village, Anakapalli Mandal, Visakhapatnam District .

3. Size of the Mining Lease 2.20 Ha.

4. Capacity of Mining lease (cu.m) Five Years

Road Metal & Buildiing Stone: 2,78,820 M3.

Gravel 1,39,410 M3.

5. Period of mining lease 15 Years

6. Expected Cost of the Project Rs.15 lakhs.

7. Contact Information M/s Anjani Stone Crusher, Mg Ptr: Sri M. Singa Reddy, H. No: 1-108-18, MIG-76,

MVP Colony, Sector-8,Visakhapatnam - 530017,

Andhra Pradesh State. Ph No:9959912667.

II) Environmental Sensitivity

S.No Areas Distance in Kilometers Details 1. Distance of Project site from nearest

Rail or road bridge over the concerned River, Rivulet, Nallah etc.

Anakapalli is the nearest railway station about to 5 Km from the applied area

2. Distance from the infrastructural Facilities 1.National Highway2.State Highway3.Major District Road4.Any other Road

5.Electrical Transmission line pole or tower

6.Canal of check dams or reservoirs or lakeor ponds

State Transport Bus Services from Marturu Village to Visakhapatnam. Private Auto Transport also available on this Road network

Venkannapalem to Chodavaram Road.

Electricity is available in the village and also using Electricity for all Agricultural lands.

Sharada River – 2 Km.

Page 2: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

2

M/s Anjani Stone Crushers, Mg Ptr: Sri. M.Singa Reddy, Road Metal , Building Stone & Gravel “B2” Category Mine – 2.20 Ha. Form -1M

6. Intake for drinking water pump House 7. Intake for irrigation canal pumps

Drinking water is available from bore well in the nearby area or source from the Agriculture Fields. Nearby Bore wells from Surrounding Agricultural Lands.

3 Areas Protected under international Conventions, national or local legislation for their ecological, landscape, cultural or other related value

Neither Ecological Landscape nor any cultural Related activity is present near by the mine lease area.

4 Areas used by protected , important Or sensitive for ecological reasons – Wetlands, watercourses or other Water bodies, coastal Zone, biospheres, mountains, forests

N/A

5 Areas used by protected , important Or sensitive species of flora or Fauna for breeding , nesting foraging, Resting, over wintering, migration

There are no such important sensitive locations are present in the nearby the quarry applied area.

6 Inland, Costal, marine or underground waters

There are no such important features are present in the nearby the quarry lease applied area.

7 State National boundaries

There is no state/ National boundaries are near By the Applied Area.

8 Routes for facilities used by the public for access to recreation or other tourist, pilgrim areas

N/A

9 Defense Installations The Mine area is not located close to any of the Defense installation.

10 Densely populated or built –up area, Distance from nearest human habitation

The nearest densely Populated area is Marturu Village (3023) as 2011 Census Anakapalli Mandal, it is about to 1km

11 Area occupied by sensitive man - made land uses (hospitals, community facilities)

The health facilities are occurred nearby the Marturu is near emergency conditions, Visakhapatnam Town is well placed for Doctors, Nursing Homes & Hospitals.

12 Area containing important , high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries , tourism , minerals)

No River/ Nala is flowing through the applied area, Hence no impact is anticipated.

13 Areas already subjected to pollution Or environmental damage. ( those where existing legal environmental

None

Page 3: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

3

16 Whether the proposal involves Approval / clearance under: if yes, Details of the same and their status, to be given. i. The Forest (Conservation) Act, 1980 ii. The wildlife (Protection) Act, 1972 iii. The C.R.Z Notification, 1991.

Act Name Approval Required (Yes/No)

Status

I) The Forest (Conservation) Act, 980

No

No Forest land is involved

ii) The Wildlife (Protection) Act, 1972

No

No wildlife sanctuary is coming Within the study area

iii) The C.R.Z Notification, 1991

No The mine lease area Is not coming under CRZ

17 Forest land involved No

18 Whether there is any litigation Pending against project and / or Land which the project is propose To be set up

a) Name of the Court b) Case No c) orders/directions of the

Court, if any and its relevance with the proposed Project.

There is no litigation pending against the project.

Signature of Proponent

M/s Anjani StoneCrushers,

Mg Ptr Sri. M. Singa Reddy,

S/o M.Konda Reddy,

Door No:1-108-18, MIG-76

MVP Colony, Sector-8,

Visakhapatnam - 530017,

Andhra Pradesh State.

standards are exceeded) 14 Area susceptible to natural hazard

which could cause the project to present environmental problems (earthquakes, subsidence landsides, erosion, flooding climatic conditions)

Seismic Zone –III, (Moderate)

15 Is proposed mining site located over Or near fissure / fracture for ground Water recharge

None

Page 4: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

4

Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2” Category Mine – 2.20 Ha.

Prefeasibility Report

1.0 Executive Summary of the Project

The Proposed Applied area of M/s Anjani Stone Crushers Mg Ptr: M.Singa Reddy, Road metal Buliding Stone & Gravel , over an extent of 2.20 Ha. Which is located at Sy. No.220, of Marturu Village, Anakapalli Mandal, Visakhapatnam District.

1.1 Introduction

Dy.Director of Mines & Geology , Visakhapatnam approved M/s Anjani Stone Crushers, Mg Ptr Sri M. Singa Reddy Mining Plan on letter No: 3349/SM-AKP/2018, Dated:15-10-2018.

Salient features of the Project are given in Table .1.0 & 2.0

Table .1.0 Project location and quarry details

Project Name Road Metal Building Stone & Gravel Quarry Applied area

M/s Anjani Stone Crusher Mg Ptr: Sri.M. SingaReddy.

Area 2.20 Ha.

Location of Quarry Sy.No. 220 , Marturu Village , Anakapalli Mandal, Visakhapatnam District , Andhra Pradesh.

Project Cost Rs.20 lakhs

Mineral of mine Road Metal,Buliding Stone & Gravel.

Proposed Production Road Metal & Buildiing Stone: 2,78,820 M3. Gravel 1,39,410 M3.

Method of Mining Open cast method

No. of Working days 250

Water requirement 4.0 KLD

Source of water Tankers from outside

Man Power 28

Table 2.0 Salient features of the Project

Details Measurement

Nearest Village & Habitation Pappaya Santa Palem – 1Km – N. Marturu is the nearest Village which is located 1.7 km towards West Side and Marturu is situated 23 km distance from Visakhapatanam From Applied area.

Road access Marturu to Anakapalli to Visakhapatnam.

Nearest Major Road Visakhapatnam to Anakapalli Highway.

Nearest Town Anakapalli and Visakhapatnam is Major Towns.

Page 5: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

5

M/s Anjani Stone Crusher, Mg Ptr: Sri M. Singa Reddy Road Metal , Building Stone & Gravel “B2”

Category Mine – 2.20 Hect. Prefeasibility Report

2.0 Introduction of the Project/ Background Information

2.1 Identification of Project and Project Proponent

The present project area is found Geological deposits of Road Metal, Building Stone & Gravel Quarry in Sy.No.220 at Marturu Village , Anakapalli Mandal, Visakhapatnam District, Andhra Pradesh. 2.2 Brief description of nature of the project The Mining Applied area of 2.20 Ha, It is Located at Marturu Govt.Land Sy.no. 220, Marturu Village, Anakapalli Mandal, Visakhapatnam District, Andhra Pradesh. Mining Run by Open Cast Method using with small machinery Mining is followed and it has been proposed to produce Road Metal and Building Stone is 59,910 M3 /Annum and For Gravel is 29,955 M3/Annum. M/s Anjani stone crushers, Mg Ptr: Sri. M. Singa Reddy , is applicant of the Mine area, He is a Businessman dealing in various activities in and around Visakhapatnam District, Andhra Pradesh. Assistant Director of Mines & Geology , Anakapalli has recommended for Grant of Applied area to Dy.Director of Mines & Geology ,Visakhapatnam, over an extent of 2.20 Ha. Sy. No. 220 Requested the Applicant to submit the approved Mining Plan and EC & Pollution for Resume the Mining activity above said area. The Mining Plan was Approved by Dy.Director of Mines & Geology, Visakhapatnam an Letter No: 3349/SM-AKP/2018, Dated: 15– 10 -2018. The Mining Applied area is below 5 Ha. which is considered as "B2" category as per DEIAA notification , Hence it is comes under Jurisdiction of District Level Environment Impact Assessment Authority (DEIAA) Visakhapatnam, Visakhapatnam District for obtaining the Environment Clearance.

2.3 Need for the project and its importance to the country and or region

The demand for Road Metal and Building Stone & Gravel good growth in Visakhapatanam ,

Andhra Pradesh and the adjoining Places, Hence Road Metal, Building Stone & Gravel

Production is rapidly increasing in Visakhapatnam and surrounding areas. Based on the demand

of Mineral, the lessee intends to Produces the Required Quantity of Mineral for Various Markets

for Civil construction / High Way, Works Filling Leveling Purpose.

Rail network The Nearest Railway Station is Anakapalli with 5 Km.

Nearest water sources Drinking Water is Available from Bore Well in the nearby Agriculture Field of surrounding areas.

River /Stream Saradha River - 2Km From Applied Area.

Forest boundary There are no Reserved and Protected forests Area observed in 10km radius

Interstate Boundary There is no Interstate Boundary Available.

Nearest mines if any Within the 500 M radius Road Metal and Building Stone and Gravel Quarries working Since long.

Page 6: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

6

M/s Anjani Stone Crusher,Mg Ptr Sri. M. Singa Reddy Road Metal,Building Stone & Gravel “B2”

Category Mine – 2.20 Hect. Prefeasibility Report

As Per DEIAA notification 2006 the project falls under Category – "B2" the proponent is

Submitting the proposal to get clearance for production capacity of Gravel 1,39,410 M3 and

Road Metal & Buildiing Stone: 2,78,820 M3 from DEAC & DEIAA, Visakhapatnam District for

the Purpose of Grant of Environment Clearance of the Applied Area.

2.4 Demand – Supply

The Demand and supply for the Road Metal and Building Stone, Gravel is growing which makes a

lot of scope for Revenue Generation especially in Civil works, Highway Works Etc.,

2.5 Important vs. Indigenous production: N/A

2.6 Domestic / Export markets.

Road Metal, Building Stone & Gravel is a Minor, it is major contributor in regular domestic market

for Civil works.

2.7 Employment Generation (Direct and Indirect) due to the project.

Proposed Mining is open Cast Mining it will be provide direct employment of 28

indirect employment will also be provided like machinery operators, drivers & helpers Etc.,

3.0 Project Description

3.1 Type of project including interlinked and interdependent project, if any. N/A

3.2 Location (Map showing general location, specific location, and project

Boundary & project site layout) with coordinates.

Page 7: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

7

M/s Anjani Stone crushers,Sri. M. Singa Reddy Road Metal, Building Stone & Gravel “B2” Category

Mine – 2.20 Ha. Prefeasibility Report

Location details of the Project area :- TOPO SHEET NO: 65 K/14,65 O/2&3

Geo Coordinates of the applied area

B.P. LATITUDE LONGITUDE

A. 17°43'51.13"N 82°59'53.03"E

B. 17°43'52.75"N 82°59'54.40"E

C. 17°43'44.17"N 83°00'02.00"E

D. 17°43'45.09"N 82°59'55.12"E

E. 17°43'50.91"N 82°59'55.64"E

Page 8: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

8

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. Prefeasibility Report

3.3 Details of alternative sites, considered and the basis of selecting the Proposed

site particularly the environment considerations gone into Should be highlighted.

N/A

3.4 Size & Magnitude of operation

The proposed project envisages producing of Road Metal and Building Stone is 59,910 M3

Production Per annum And Gravel is 29,955 M3/ Annum.

Table .3.0 Year Wise Production Details of Road Metal and Building Stone & Gravel

3.4.1 Topography

Physiographically the applied area forms a part of hill slope Towards North West. The Hillock is

Aligned the NW-SE Direction. The Maximum Elevation is 99 M towards NW and Minimum

Elevation is 55 M towards South East.

3.4.2 Regional Geology

The Eastern Ghats Mobile (EGMB) is more than 600km in length from Srikakulam in the

Northern to Ongole in the South. This belt is more than 100 km in width in Northern part

and appears down to less than 20km in the south, it has broad actuated trend with west

ward convexity. The NNE -SSW trend in the southern part of the belt changes NE-SW in the

North, EGMB is divided into 3 longitudinal Zone viz.

Page 9: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

9

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. Prefeasibility Report

1 Western Charnockite Zone

2 Central - Khondalite Zone

3 Eastern - Migmatite Zone

while in the Northern parts in Srikakulam, Vizianagaram & Visakhapatnam District the

central Khondalite Zone occupies major part of the area, whereas western Charnockite Zone

occurs in the Southern part. The rocks in this belt and represented High Grade Granulite

facies of Metamorphism and suffered by complex deformation.

The Chamockite group consists of acid, intermediate, and basic varieties. The migmatite

group consists various rock types including Leptynite, porphyroblastic granitoid gneiss ,

garnet –biotite- hypersthene gneiss , quartzo felspathic mobilisates and other associated

hybrid rocks. Bauxitic laterite occupies several flat topped and gently sloping hills at

elevation of 1000 m and above. Laterites are mostly developed on khondalites and rarely on

chamockites.

This Mine When commences it is Planned about Nearly Road Metal and Building Stone and

Gravel is 4,18,230 M3 this rate of production the Proved reserves of Road Metal and Building

Stone and Gravel is 83,646 M3 Per annum, shall provide a 10 years period approximately.

Life of the Mine: 10 Years.

3.5 Project description with process details

The Road metal and Building Stone and Gravel Applied area is exposed on the Hill. It is proposed to mine the by Open Cast using Mechanized methods, by developing the 2 Benches 6M Height. The development of Benches will be maintained @ 40-600 safety slopes as per the safety requirement. The Road Metal and Building Stone & Gravel excavation is using small machinery of JCB, Proclains, Small Trucks / Tractors for Transportation.

Table 5.0 Extent of Mechanization

S.No Machinery No.s

1 Compressor 4

2 JCB 2

3 Brakers 1

4 Tipper/Tractors 10

Page 10: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

10

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. Prefeasibility Report

3.6 Raw material required along with estimated quantity, likely source, marketing area of final

products, mode of transport of raw material and finished products.

No raw material will be required in the proposed project.

3.7 Resource optimization / Recycling and reuse envisaged in the project, if any, should be

briefly outlined.

N/A

3.8 Availability of water its source, Energy/ power requirement and sources should be given. Water required for drinking, Green belt, Development Dust suppression will be maintained by the applicant .This water will be supplied from tankers / bore wells of nearby area.

Table 6.0 Water Requirement

S.no Water Usage Quantity (KLD)

1 Water sprinkling on haul roads 2.0

2 Domestic 1.4

3 Green Belt 0.6

Total 4.0

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/

disposal

3.9.1 Solid waste

There is 100% Recoverable Mineral from the Quarry. Finally the Applicant can make Quarrying till

Road Level/ Ground Level.

3.9.2 Liquid effluent

No Liquid effluent will be generated at the Mine site. The domestic waste water generated will be

sent to septic tanks followed by soak pits if came from the Quarry.

4.0 Site Analysis

4.1 Connectivity

4.1.1 Nearest Railway Station is Anakapalli with 5 Km.

4.1.2 Nearest Airport Visakhapatnam Airport is 34 km far away from the Mine Applied area. 4.1.3 Landform, Land use and Land ownership : Govt.Land .

Page 11: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

11

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. Prefeasibility Report

Table 7.0 Land use pattern

4.4 Topography Physiographically the applied area forms a part of hill slope Towards North West. The Hillock is

Aligned the NW-SE Direction. The Maximum Elevation is 99 M towards NW and Minimum

Elevation is 55 M towards South East.

5.0 Planning Brief

5.1 Planning Concept

It is proposed to produce Gravel is 1,39,410 M3 and Road Metal & Buildiing Stone: 2,78,820 M3of

Mineral from the Applied area.

5.2 Population Projection

The project will use employees mostly from nearby villages. There is no any increase in population due to this project.

5.3 Land use planning

The project Is 2.20Ha. The Applied area is consent holder of Govt. The Recovery Factor is Road Metal & Building Stone and Gravel is 100%. Reserves can be absolutely Recoverable.

Page 12: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

12

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. Prefeasibility Report

5.4 Assessment of Infrastructure Demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the villages was assessed on the basis of need and priority. The assessment will be made in the socio economic survey & will be submitted at the time of final presentation regarding EC.

5.5 Amenities / Facilities

Office, Rest shelter, first Aid room, workshop will be constructed by the applicant

6.0 Proposed Infrastructure

6.1 Industrial area (Processing area) No infrastructure is proposed.

6.2 Residential Area (Non – Processing Area) As the local persons will be getting employment, no residential area / housing is proposed within the mining lease area. 6.3 Green Belt

6.4 Sewerage System

The waste water generated will be sent to septic tanks followed by soak pits.

6.5 Industrial waste management: N/A

6.6 Solid waste management

There is 100% Recoverable from the proposed quarry.

7.0 Rehabilitation and Resettlement (R&R) Plan

There will be no displacement of houses. Hence rehabilitation and resettlement is not envisaged.

8.0 Analysis of Proposal (FINAL RECOMMENDATIONS)

8.1 Financial and Social Benefits with special Emphasis on the Benefit to the local people including tribal population, If Any, in the area.

This project will also provide employment to local people helping them earn livelihood and improve their socio economical status.

Page 13: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

13

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

Environmental Management Plan

9.0 Anticipated impacts & Mitigation Measures due to proposed project: The Environmental Management Plan is prepared with a view to facilities effective Environmental management of the project in general and implementation of the mitigation measures in particular The EMP provides a delivery mechanism to address potential adverse impacts and to introduce standards of good practice to be adopted for all project works. The anticipated impacts due to Mining and allied activates are air, noise land, water and socio – economic along with the mitigations to the extent possible are described in the following paragraphs.

9.1 Sources of Pollution and Control measures

The major sources for pollution are air and noise and Dust due to proposed mine from loading

operation and transportation of material to the places. However, as the quarrying area is very

limited hence dust generated is very little though the applicant is taking all the precautionary

steps for protecting the air pollution by greater extent of water sprinkling system out the mine

lease area.

9.1.1 Air Pollution and its Mitigation

Anticipated Sources of Air Pollution

Digging & Excavation (Dust, Non – fugitive) Loading & unloading and Transportation by vehicles (fugitive and line sources)

Air Quality Management Road – Regular repair (every 6 months) and Grading

Regular water sprinkling on haulage roads during dry conditions

Trucks - Avoid overloading of trucks and Unnecessary idling of vehicles. Movement – Trucks to be covered with tarpaulin / plastic Enforcing for dust limit (<25 kmph) Plantations – Green belt development and avenue plantation Precautionary measures by providing the protective nose mask for dust. 9.1.2 Noise Pollution and its mitigation Sources of Noise The Road Metal and Building Stone and Gravel rock breaking, haulage may be generating noise, however, the probable noise level will be within permissible limits. The noise produced due to the machinery operations and transport vehicles. However, all the vehicles are regularly repaired and checking the maintenance.

1. Loaded trucks movement generates 80-84 dB (A) (2-3 trucks short time stay at mine area) 2. Digging and excavation activities -70 dB(A) (Only during day time) 3. (if required Blasting operation only for few minutes) 4. Normal values when mining is not in operation (40-45dB(A))

Page 14: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

14

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

Control Measures

The protective noise reducing gear like earmuffs, the company will provide

earplugs. All the machines are used acoustic enclosures to avoid the noise.

Mining operations will be carried out during day time only and avoid

inconvenience to the nearby habitations.

The noise propagation values found to be less than the prescribed noise limits

Ear plugs will be provided to the noise prone areas

Vehicular maintenance will ensure less noise.

9.1.3 Water Quality

The Mine lease area is Elevated Hill Gravel with Stone type Deposition. It usable Gravel and Road

Metal and Building Stone Quarry operations not extent Below Ground Level Maximum. There is a

possibility of accumulation of rain water in the Mine pits during Monsoon. There is no Continuous

Mining operations in the Monsoon Period. Whatever were Accumulated water in the Mine during

Monsoon will be seeps the below some level. Therefore, there is no ground water contamination.

9.1.4 Occupational Safety and Health

Safety precautions as per Metalliferrous Mines Regulations and Govt. Mine Rules and Act

shall be taken.

Minimum distance of 7.5 m will be left all along the Mine lease boundary. The mined out

area will be kept out of bounds for public by providing fencing.

Occupational Safety and Health to Control Exposure to Noise

o Reducing the exposure time of workers to the higher noise levels

o Smooth blasting techniques, special explosive and silent non – explosive

demolishing agent will be used.

10.0 House keeping

Proper housekeeping and cleanliness will be maintained in the infrastructure facilities. Wet mopping will be adopted to conserve water. Sign boards will be provided in the work areas and the road and building highlighting the safety and occupational aspects.

11.0 Transport Systems

The Finished product is transported by road using through trucks. The applicant will deploy Proclains and Tippers to Transport the Road Metal and Building Stone & Gravel Mineral, unfinished (waste) material to the destination area. The materials while transporting do not pose

Page 15: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

15

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

any hazard Sufficient parking facilities will be provided for vehicles loading and unloading of

material. Safety sign will be displayed inside and outside the mine to avoid road accidents.

12.0 Afforestation Programme and Flora – Fauna

Flora and Fauna

Due to water stress conditions and Edaphic factor the biomass cover is less. Tree coverage is less and mostly herbs and shrubs are dominating.

The vegetation is very scarce. No valuable plant species are found that is ecologically Important (Rare, endangered threatened etc.) restricted to the area.

The loss of biomass cab be compensated by providing ideal conditions (proper supervision, water, fertilizer etc.)for the proposed Green Belt.

Other than domestic animals no ecologically important animals are reported in this area

13.1 Proposed Afforestation

The Soil scraped from the surface will be stored temporarily along the edges of the mine till the complete extraction. This ensures proper preservation and utilization of the soil.

13.2 Proposal for reclamation of land affected by Mining

The proposed mining will result in reducing the height of the area and exposing the parent rock. To the ground level, the applicant may be Reutilize for Agriculture purpose after completion of the Quarrying.

13.3 Environmental Greening Program

Environmental greening program is an important component of the Environment Management Plan and is an imperative requirement for any major industrial activity, as per the guidelines issued by the ministry of Environment and forests, Govt. of Indian Conceptualization, design and implementation of the proposed activity and the site conditions area presented. Each year some of the part of the barrier zone will be subjected to Afforestation and care will be taken to protect the saplings. Fruit growing trees are proposed to be planted.

13.4 Plantation programme

The Quarry lease applied area is not suitable for plantation as entire area is hillock area. There are absolutely chances of any tree can growing in the quarry area. However it is proposed to plant a few trees in the same place or nearby village. The details are proposed plantation. Viz, Neem and Sarugudu etc which is envisaged of good survival rate.

Page 16: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

16

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

13.0 Socio – Economic Environment For the functioning of the mine approx. 28 manpower will be utilized and it will not have

any significant impact on economy of the local people It will have indirect benefit to the people of Andhra Pradesh in the form of collection of

tax. Land allocated for road will be laid with avenue plantation along with lights which will be

useful for the local people No impact due to influx of population / labour because the mine is very small.

14.0 Disaster Planning:

The Mining operation shall be carried out under the management control and direction of a qualified mines manager holding a second class managers certificate of competency to manage a Metalliferous Mine granted by director general of Mines safety DGMS, DGMS have been issuing a number of standing orders and circulars to be followed by the mine management in case of disaster, if any. Moreover Mining staff would be sent to refresher courses from time to keep them abreast of the regulations. However following Natural / Industrial Hazards may occur during normal operation.

Slope failure at the faces. Accident due to explosives. Accident due to heavy Equipment / Machinery. Sabotage in case of magazine Accident due to try Rocks and Boulder

In order to take care of above Hazards / Disasters, the following control shall be adopted.

All safety precautions and provisions of Metalliferous Mine Regulation 1961 are strictly followed during all mining operations

Checking and regular maintenance of garland drains and earthen bunds to avoid any inflow of surface water into mining area

Entry of Unauthorized persons shall be prohibited Fire fighting and first aid provisions in the mines office and mining Area. Provision of all the safety appliances such as safety boots, helmets, goggles etc.

Would be made available to the employees and regular check to ensure the use Training and refreshed courses for all employees working in the hazards premises Working of mine as per approved plan, related amendments and other regulatory

Provisions Cleaning of mine faces shall be done regularly.

Provision of magazine at safe place with fencing and necessary security arrangement

Suppression of dust on the haulage roads by providing water sprinkling.

Page 17: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

17

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

15.0 Environment Management Cell

A cell for Environmental Management within Mine lease area at the project level, will take the

overall responsibility for co-ordination of the actions required for environment management and

mitigation, and for monitoring the progress of the proposed management plans and actions to be

taken for the project. The cell will be under the overall supervision of the mine Manager, and

responsible for monitoring of the implementation of the various actions which are to be executed

by the agencies specified in the EMP. The cell will be headed by Mine Manager and the other

members of the cell that will include a Horticulturist and 1 no. of supervisor or Foreman may be

appointed.

The EMC will prepare a formal report on Environmental Management and mitigation for the

Environmental Engineer at the Mine, at six – monthly intervals. Reports on any urgent or

significant issues may be prepared at shorter intervals. Apart from responsibilities listed above,

the EMC will be the have the responsibility of the following

Collection of water and air samples within and outside the work zone

Analyzing the water and air samples

Implementation of the control and protective measures

Land reclamation and vegetation

Co-ordination of the environment related activities

Collection of the statistics of health of workers

Green belt development

Awareness and implement safety programmes

Monitor the progress of implementation of EMP

16.0 Post Project Monitoring

The survey of air pollution comprises of the following monitoring aspects.

a. Ambient air quality Monitoring b. Noise Level Monitoring

Ambient air quality and noise level Monitoring will be carried out at minimum three stations, one

station within mine site and two stations nearby residential areas outside the mine Parameters

like suspended particulate matter, sulphur dioxide, oxides of nitrogen carbon monoxide and lead

will be monitored. The frequency of monitoring is preferably once in three months on 24 hour

basis. The samples will be collected in accordance with the procedures given by CPCB.

Page 18: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

18

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

17.0 Other Management Aspects

Records will be maintained for the analysis of ambient air quality and noise levels. These records

are not only required for the perusal of the pollution control Board authorities. The management

will maintain the records as per the hazardous waste regulations and EPA regulations and for the

annual consents for air and water, and renewal of authorization for the storage of hazardous

waste as per the Hazardous waste (Handling & Management ) Rules,1989 .The records of

hazardous waste manifest will be maintained. The format of the same is enclosed in appendix.

The Mine shall obtain the consent for operation (CFO) as required under section 25/26 of the

water act, 1974 and under section 21/22 of Air Act, 1981 before trail production and commission

from the state pollution control Board .The CFO will be renewed each year by the management.

The Mine will submit environmental statement every year before September 30.

The management ensure that it will comply with all the direction and regulations issued by the

Ministry of Environment Forests and Climate, New Delhi and Central Pollution Control Boards.

The Consent for Establishment, consent for operation will be displayed in a conspicuous location for the information of the inspecting authorities of different departments.

Page 19: S.No Item Details 1. Name of the Mining lease site Road Metal, … · 2018-11-08 · 1 M/s Anjani Stone Crusher , Mg Ptr: Sri M. Singa Reddy Road Metal, Building Stone & Gravel Quarry

19

M/s Anjani Stone Crushers,Mg Ptr :Sri.M. Singa Reddy Road Metal, Building Stone & Gravel “B2”

Category Mine – 2.20 Ha. EMP

18.0 Cost proposed for Environment Management Plan

Total Cost for the Proposed Project is 20.00 Lakhs. Budget allocated for EMP is 3.80 Lakhs as Capital Cost and 2.31 Lakhs for Recurring Cost Per Annum.

S.No Work Name Unit Cost RS

Total Fixed Cost Rs

Recurring Cost

1 Safety Shoes 500 - 14,000

2 Helmet 100 - 11,200

3 Hand Gloves 30 - 2,250

4 Ear Plugs 10 - 2,800

5 Cloth for Protection from

Dust 20 - 5,600

6 Gunny Bags for Drill Hole

Coverage Lump Sum - 10,000

7 Dust Masks 300 - 25,200

8 Construction of Retaining

Wall 80,000 -

9 Construction of Garland

Drain 20,000 5,000

10 Check Dam 20,000 5,000

11 Water Sprinkling 2,50,000 50,000

12 Green Belt Establishment 10,000 10,000

13 Medical Examination - 5,600

14 Environmental Monitoring - 40,000

15 Social Welfare Measures - 50,000

TOTAL (RUPEES) 3,80,000 2,31,000