TRANSCRIPT
-
FLOW CHART OF SOD FACING1. Before execute sod facing work, Contractor shall be trimming location with 2:1, as shown on construction drawing which approved by Engineer.2. After Trimming have been executed, sod facing install with chess board method which size 20cm x 20cm per segment, this method will be shown on attached picture .3. After install sod facing, it will be maintenance by spraying water on location.
-
1. Trimming Location by Excavator 2. Install Sod Facing by Manually
-
3. Method of Sod Facing4. Water SprayingArea of Install sod facing