soP
REGARDING MATERIAL RECEIPT & ISSUANCE TO SUB- CONTRACTOR
o Sub-Contractor will formally serve a request for the material to Site Office one month before the
requirement , specifying in the request the particulars of the approved material from
Consultant & Client, its required quantity, its purpose of use as per drawing according to the
specified format (as attached).
. Request will be approved by the DGM/PD. Rest of the procedure will be followed by the store
department of TELENOR SITE as per the company policy.
INSPECTION REPORT will be made by Purchase Officer at the time of receiving of material from
vendor, which will be dully signed by Sub-Contractor showing the approval of the Sub -
Contractor i.e. it is according to the specification and according to the brand (Specimen of
Report is attached).
Materialwill be issued by the store and store will keep the MATERIAL ISSUE SLIP for its record.
MATERIAL RECEIVING REPORT will be made by Purchase Officer (as attached), which will be
Approved by the Departmental Head of PCL and finally signed by the Receiver/Sub-Contractor.
By the 15th of every month bill of Sub-Contractor will be reconciled with the store record.
\"%fPrepared By:
lnternalAuditor DGM/PD
MATERIAL REQUSITION
By
Dated:
Equipment OtherMaterial
NO BOQ NO. ITEM DESCRIPT!ON UNIT
QTY
RECEIVED
QTY
CONSUMED
QTY
BAIANCE
QTY
DEMANDED TO BE USED IN
*n_,,,Requested By:Sub- Contractor Autorized By:DePartment Head
MATERIAL ISSUANCE REPORTMpffiKffim;$Dated:
OtherMaterial Equipment
CL>r---Received By:Sub- Contractor
NO ITEM CODE ITEM DESCRIPTION UNIT QTY TO BE USED IN
Authorized By:Department Head Approved By: DGM / PD
q*fi P.T MATERIAL INSPECTION REPORTffiwffiff#ffijww Bv
$r%&1js*e{tlr} Lre
Material Equipment Other
Signature
Sub- Contractor,Date & Stamp
NO ITEM CODE ITEM DESCRIPTION
According To
Brand Specification
Signature
Purchase Officer