spate engineering gash river - sudan

48
SPATE ENGINEERING GASH RIVER - SUDAN Lesson 4 [email protected]

Upload: tale

Post on 23-Feb-2016

88 views

Category:

Documents


0 download

DESCRIPTION

SPATE ENGINEERING GASH RIVER - SUDAN . Lesson 4. [email protected]. Gash River in north west Sudan. The Gash River. Known in the past to be fearsome with sharp uncontrollable floods. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SPATE ENGINEERING  GASH RIVER - SUDAN

SPATE ENGINEERING GASH RIVER - SUDAN

Lesson 4

[email protected]

Page 2: SPATE ENGINEERING  GASH RIVER - SUDAN

Gash River in north west Sudan

Page 3: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 4: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 5: SPATE ENGINEERING  GASH RIVER - SUDAN

The Gash River

Known in the past to be fearsome with sharp uncontrollable floods. Historically the river flowed further to the west with the original Delta

area close to what is now the New Halfa irrigation scheme. It rises in Eritrea, some 15 miles south of Asmara, and as the river

Mareb, it flows through a relatively narrow valley until it reaches Haykota, where it gradually widens into a sandy-clayey plain, the Tesseney-Omhajer plain. From there it flows in a westerly direction to Tesseney where the river turns northwards into Sudan.

The Gash/Mareb is dry for much of the year, but is subject to sudden floods during the rainy season (July to September).

The river transports considerable amounts of sediment (fine sand and silt) and has been estimated to transport about 5.5 millions tons of sediment annually at Kassala Bridge.

Page 6: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 7: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 8: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 9: SPATE ENGINEERING  GASH RIVER - SUDAN

The Gash River

The river continual deposits and picks up material from the river bed and the neighbouring banks to stay in regime.

When the river crosses the border, its slope reduces remarkably and the river gradually deposits the sediment load in its course and the lower Delta.

This gives rise to a very unstable river that that has changed direction many times and that undergoes continuous morphological changes.

The sediment deposits have led to a gradual build up in river channel level (sometimes 1-2 m), especially where irrigation offtakes are located.

In Kassala City, the existing river bed is now some two meters above much of the ground level in the City and thus when breaches occur, considerable flood damage results

Page 10: SPATE ENGINEERING  GASH RIVER - SUDAN

The irrigation system in the Gash Agricultural Scheme (GAS)

Command area comprises main, link and some branch canals fed from the Gash River by means of gravity offtakes fitted with stop logs.

The flows in these gravity canals are divided into a number of Misga or distributary canals that directly supply the agricultural land through breaches in the canal banks.

Unit flows are high and these flow across the Misga blocks (of about 3000 feddans) as a wetting front following the line of least resistance and guided by Misga water workers who are instructed by the Sheikh al Misga or water master

The main factors affecting its progress are slope, nature/texture of soil, surface characteristics & its covering.

Page 11: SPATE ENGINEERING  GASH RIVER - SUDAN

The design of these systems was first developed in the 1930s and improved upon in the late 1950s.

They were originally developed for the cultivation of cotton using flush irrigation techniques (this is a variation on spate irrigation that utilise fluctuating run-off in the seasonal Gash River) and the design details are reported by C.H. Swan (1959) in the Recorded Behaviour of the River Gash in Sudan.

The considerable amount of sediment that is transported by this river[5% by Volume] is deposited within the canal systems and gives rise to increased annual maintenance costs necessary to provide the design slopes and flows within each of the six blocks that utilise the river water

Page 12: SPATE ENGINEERING  GASH RIVER - SUDAN

Design considerations

Maintain velocity Minimise annual O&M Do not provide blockages Use limited available water as efficiently as

possible Adapt application of water to new cropping

patterns

Page 13: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 14: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 15: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 16: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 17: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 18: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 19: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 20: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 21: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 22: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 23: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 24: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 25: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 26: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 27: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 28: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 29: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 30: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 31: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 32: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 33: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 34: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 35: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 36: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 37: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 38: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 39: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 40: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 41: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 42: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 43: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 44: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 45: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 46: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 47: SPATE ENGINEERING  GASH RIVER - SUDAN
Page 48: SPATE ENGINEERING  GASH RIVER - SUDAN