spe distinguished lecturer series spe foundation · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377...
TRANSCRIPT
![Page 1: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/1.jpg)
SPE DISTINGUISHED LECTURER SERIESis funded principally
through a grant of the
SPE FOUNDATIONThe Society gratefully acknowledges
those companies that support the programby allowing their professionals
to participate as Lecturers.
And special thanks to The American Institute of Mining, Metallurgical,and Petroleum Engineers (AIME) for their contribution to the program.
![Page 2: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/2.jpg)
A new Generation of Wells for Developing Tight Reservoir Facies
A new Generation of Wells for Developing Tight Reservoir Facies
by:Salam P. Salamy-Saudi Aramco
SPE Distinguished Lecturer Series Program2004 - 2005
![Page 3: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/3.jpg)
Outline
Evolution of MRC Well ConceptImplementation: Expanding the Learning Curve
MRC Objectives and DesignsResults
Impact on Unit Development CostSummary Future Focus Areas- Way Forward!
![Page 4: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/4.jpg)
World Growth of Horizontal Wells
0
1000
2000
3000
4000
5000
1985 1986 1988 1990 1992 1994 1996 1998 2000 20020
10000
20000
30000
40000
50000
Annual Well Count Cumulative
Ann
ual W
ell C
ount
Cum
Wel
ls
![Page 5: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/5.jpg)
Growth Of Horizontal Wells in Saudi Aramco
Growth of Horizontal Wells
0
20
40
60
80
100
120
140
1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Year
No. o
f Wel
ls
0
100
200
300
400
500
600
700
800
900
Cum
ulat
ive
![Page 6: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/6.jpg)
SHAYBAH FIELDSHAYBAH FIELD
Size: 60 Km. X 15 Km.Size: 60 Km. X 15 Km.
Shaybah Field Located in Rub’ al-Khali Desert, Saudi ArabiaDeveloped with Single-Lateral one Km Horizontal Wells in 1996.
Put on Stream July 1998.
Producing Formation the Shu’aibaLow Permeability (Avg. 13 mD)
![Page 7: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/7.jpg)
40% 27% 33%
Heel ToeMiddleTD
1Km horizontal wellAverage Production Profile
Shaybah Horizontal Well Flow Profile
85% of the Logged Section Showed Flow Contribution
![Page 8: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/8.jpg)
0
5000
10000
15000
20000
25000
30000
35000
40000
1998 2000 2002 2004 2006 2008 2010 2012 20140
4000
8000
12000
16000
20000
24000
28000
32000
Case Study: GOR OptimizationHorizontal Length Assessment
CUM OIL
GOR
3 Km
2 Km
1 Km
1 Km3 Km
2 Km
Cum
Oil,
MST
B
GO
R, S
CF/
STB
![Page 9: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/9.jpg)
Horizontal Wells PI as Function of Reservoir Contact – Shaybah Field
0
10
20
30
40
50
1 Km 2 Km 3 Km
Horizontal Well Length
1Km +2Km +3Km
PI, S
TBD
/Psi
![Page 10: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/10.jpg)
600
700
800
900
1000
1100
1200
1300
1400
0 1 2 3 4 5 6 7 8 9
2 Km3 Km
1 Km
1 Km Delay Gas BreakthroughImprove Oil Recovery
Shaybah Field Well PerformanceCum GOR Vs. Cum Oil as Function of Length
GO
R, S
CF/
STB
Cum Oil , MMSTB
![Page 11: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/11.jpg)
0
1
2
3
4
5
6
7
8
9
10
11
12
84 82 83 85 466
752
727
737
430
174
324
325
326
327
219
218
217
216
182
183
185
296
431
432
377
379
381
Res
ervo
ir C
onta
ct, K
m
0
1
2
3
4
5
6
7
8
9
10
11
12
84 82 83 85 466
752
727
737
430
174
324
325
326
327
219
218
217
216
182
183
185
296
431
432
377
379
381
Res
ervo
ir C
onta
ct, K
m
1999 MP Wells 2000 MP Wells 2001 MP Wells
1 Km Contact 2 Km Contact 3 Km Contact
Evolution of Horizontal Drilling in Shaybah
![Page 12: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/12.jpg)
Maximum Reservoir Contact (MRC):Maximum Reservoir Contact (MRC):
A well with an aggregate reservoir contact in excess of 5 kilometers via a single or multi-lateral configuration.
A well with an aggregate reservoir contact in excess of 5 kilometers via a single or multi-lateral configuration.
![Page 13: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/13.jpg)
Drivers / Desired Results
– Unit Development Costs– Unit Operating Costs– Draw down at a given flow rate– Water and Gas breakthroughs
Minimize
– Long term performance– Production rate / PI– Sweep efficiency / Reserves
Maximize
![Page 14: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/14.jpg)
ChallengesChallenges
![Page 15: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/15.jpg)
The New Architecture: Larger Foot PrintThe New Architecture: Larger Foot Print
SHYB-753 (Fork)7.9 Km
SHYB-220 (Hybrid)12.3 Km
Offshore Carbonate (Fishbone)
7.8 Km
7” liner
![Page 16: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/16.jpg)
-4600
-4400
343
368
367 376
378
38079
81
80
82 83
7571
76377
381
217
10
15
366
369253379
1058.5380
673381
39
82
25
PIB/D/PSI
3Avg.3-Km
5.8378
3377
ReservoirContact, Km
WellNo.
MRC Performance (South Shaybah)
3
10
6.5
4.0
8
3
RateMBOD
SHYB-380:
2.5 Fold Increase In PI Compared to Average 3-Km Well
381
379
377
380
378
![Page 17: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/17.jpg)
Fork and Fishbone Type Sidetracked in Open Hole
The total depth : 16,026’Contact : 40,384’ ( 12.3 km)12 MBOD
L- 8
L- 7
L- 6
L- 5
L- 4
L- 3
L-2
L-1
MOTHERBORE
7” Shoe9-5/8” shoe
76.94,882L-859.02,537L-761.53,597L-649.42,964L-556.42,255L-449.63,052L-339.75,951L-239.15,350L-146.69,796MB
ROP(ft/hr)
Length (ft)
Laterals
![Page 18: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/18.jpg)
-4600
-440
0
207
2
7372
77
379211
216
217218
219220
323
2209�
236�237239
17
26
126
PIB/D/PSI
1207
2219
12.3220
ReservoirContact, Km
WellNo.
SHYB-220:6 Fold Increase In PI and
Rate Compared to 1- Km Well
MRC Performance (South Shaybah)
2
3
12
RateMBOD 220
207
219
![Page 19: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/19.jpg)
Reservoir Contact, Km
PI,
bbl/d
ay/P
siPI /Rate Vs. Reservoir Contact
020406080
100120140
1.0 2.0 3.0 5.8 8.5 12.302468101214
PI, STBD/PsiRate, MBOD
Rat
e, M
BO
D
![Page 20: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/20.jpg)
Shaybah Horizontal Well PerformanceCumulative Production vs. Time
0.0
2.0
4.0
6.0
0 6 12 18 24 30 36 42 48
`
1 Km (8/1998)
3.7 Km (6/2000)
1 Km (8/1998)
8.5 Km (8/2002)12.3 Km (11/2002)
5.8 Km (8/2002)
Cum
ulat
ive
Prod
uctio
n , M
MST
B
Time, Months
![Page 21: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/21.jpg)
Other Field Examples-MRC Wells
Onshore Carbonate ReservoirOffshore Carbonate Reservoir
![Page 22: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/22.jpg)
MRC ApplicationOnshore/Carbonate ReservoirOnshore/Carbonate Reservoir
428
412
![Page 23: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/23.jpg)
MRC Well Results- PI and Rate Test
0
2
4
6
8
10
12
14
Offset Horizontal MRC Well
Onshore MRC Well Performance
0
2
4
6
8
10
12
14
Offset Horizontal MRC Well
Onshore MRC Well Performance
PI=40 b/d/psi
PI=85 b/d/psi
Prod
uctio
n R
ate,
MB
OD
![Page 24: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/24.jpg)
Offshore/Carbonate ReservoirOffshore/Carbonate Reservoir
MRCMRC
![Page 25: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/25.jpg)
0046
-10
112
1314
2426
282.
0 km
0.8
km
1.3
km1.75 km
1.0 km
1.25
km
142
Tested: 14.0 MBOD
Production Rate:MRC: 10 MBODOff-set 1 Km: 3 MBOD
![Page 26: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/26.jpg)
Outline
Evolution of MRC ConceptImplementation: Expanding the Learning Curve
DesignsResults
Impact on Unit Development CostSummary Future Focus Areas - Way Forward!
![Page 27: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/27.jpg)
71%
29%
1-KmSHYB- 257
1-KmSHYB- 257
74%
26%
MRC 8.5 KmSHYB- 380
MRC 8.5 KmSHYB- 380
IntraReservoir
IntraReservoir
ExtraReservoir
ExtraReservoir
Extra versus Intra Reservoir Drilling Time
![Page 28: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/28.jpg)
68%
32%
62%
38%
1-KmSHYB- 257
MRC 8.5 KmSHYB- 380
IntraReservoir
IntraReservoir
ExtraReservoir
ExtraReservoir
Extra versus Intra ReservoirUnit Cost
![Page 29: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/29.jpg)
Unit Development Cost vs. Reservoir ContactShaybah FieldUnit Development Cost vs. Reservoir ContactShaybah Field
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1 2 3 4 5 6 7 8 9 10 11 12 13
Reservoir Contact, KmReservoir Contact, Km
Nor
mal
ized
Uni
t Cos
tN
orm
aliz
ed U
nit C
ost
$/bb
l/day
of I
nitia
l Pro
duct
ion
$/bb
l/day
of I
nitia
l Pro
duct
ion
1998 1999 2002 2002 2002
![Page 30: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/30.jpg)
SummaryMRC Wells mark the beginning of a new era.
The experience to date is limited but promising. Over 25 MRC wells have been drilled to-date.
Primary Beneficiaries: Tight-facies.
Opportunities: Medium & High Quality Reservoirs.
MRCs combined with Intelligent Well Technologies will reduce costs.
Drill bit: Tool for modifying Reservoir architecture-Knowledge Management Tool.
Guidelines and Best Practices to Ensure Proper Implementation.
![Page 31: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/31.jpg)
Future Focus Areas- Way Forward
Formation Damage:Prevention over Remediation
Reducing Cost Smart/Intelligent Wells
Appropriate Integration of New Technologies:Solution Oriented vs. Application
![Page 32: SPE DISTINGUISHED LECTURER SERIES SPE FOUNDATION · 2020. 6. 17. · 79 81 80 82 83 75 71 76 377 381 217 10 15 366 379 3 25 369 380 8.5 105 381 3 67 39 82 25 PI B/D/PSI 3 Avg. 3-Km](https://reader036.vdocument.in/reader036/viewer/2022062609/60fc2bb00443e671fd67399f/html5/thumbnails/32.jpg)
THANK YOU