ERGON ENERGY CORPORATION LIMITED

SPECIFICATION

FOR

DISTRIBUTION DESIGN DRAFTING STANDARD

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. i Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Table of Contents

PURPOSE AND SCOPE.............................................................................................1

RESPONSIBILITIES ...................................................................................................1

1. TYPES OF DISTRIBUTION & SUBTRANSMISSION DESIGNS.......................1

2. CONSTRUCTION PLAN....................................................................................1

3. EXPLANATION..................................................................................................2 3.1. Project Numbers.................................................................................................... 2 3.2. Standard Title Block .............................................................................................. 2 3.3. Revised Construction Plan .................................................................................... 2 3.4. Standard Notes...................................................................................................... 3 3.5. Work Specific Notes .............................................................................................. 3 3.6. Conduit Schematic Diagrams (where applicable).................................................. 3 3.7. Location Map......................................................................................................... 4 3.8. Standard Drawing Sheets...................................................................................... 4 3.9. Smallworld Footprint.............................................................................................. 4 3.10. Standard Scales .................................................................................................... 4 3.11. North Sign Standard Symbol ................................................................................. 4 3.12. Design Approval Check ......................................................................................... 4 3.13. Design Approval Matrix ......................................................................................... 5

4. CONDUIT CONSTRUCTION PLAN ..................................................................5 4.1. Standard Format.................................................................................................... 5 4.2. Sample Construction Plan ..................................................................................... 6

5. UNDERGROUND CONSTRUCTION PLAN ......................................................6 5.1. Standard Format.................................................................................................... 6 5.2. Sample Construction Plan ..................................................................................... 6

6. OVERHEAD CONSTRUCTION PLAN...............................................................7 6.1. Standard Format.................................................................................................... 7 6.2. Sample Construction Plan ..................................................................................... 7

7. STREET LIGHT CONSTRUCTION PLAN .........................................................7 7.1. Standard Format.................................................................................................... 7 7.2. Sample Construction Plan ..................................................................................... 8

8. SCHEDULES.....................................................................................................8 8.1. Sample Construction Plan ..................................................................................... 8 8.2. Construction Schedule ........................................................................................ 10

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. ii Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose............................................................................................................................. 11 8.3. Overhead Conductor Schedule ........................................................................... 13 Purpose............................................................................................................................. 14 8.4. Public Lighting Schedule ..................................................................................... 15 Purpose............................................................................................................................. 16 8.5. Underground Cable Schedule ............................................................................. 17 Purpose............................................................................................................................. 18 8.6. Conduit Ducting Schedule ................................................................................... 19 Purpose............................................................................................................................. 20

APPENDIX A – TITLE BLOCK..................................................................................21

APPENDIX B – SYSTEM DESIGNER – FIELD MEASUREMENT GUIDELINES.....22

APPENDIX C – SYMBOLOGY..................................................................................22

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 1 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

PURPOSE AND SCOPE To describe a minimum set of standards to be adhered to by Ergon Energy Line Design staff and External Designers for the production of a construction plan associated with the development and or maintenance of the distribution network. The standard format included in this standard has been developed for use on distribution construction plans and agreed to by the Mapping & Design Operational Forum. All future amendments to this standard are to be presented to the Forum for consideration. The need for standardisation is driven by the following business requirements:

A standard format is necessary for training purposes; A standard format can be understood by all Ergon Energy Line Design and

Construction staff who may be required to work across all regions; A standard format is required by Contractors and Consultants who may work across all

regions. This document details the required standard format for construction plan presentation to Constructors, both internal and external. It does not attempt to stipulate standard design or construction processes or practices.

RESPONSIBILITIES Manager Line Standards is the Approver listed in MI000403R100. Process Owners & Sub-Process Managers List (Reference). Design & Connection Services Manager shall maintain this Specification document.

Design Standards Coordinator is the Subject Matter Expert (SME) for this Specification document.

1. TYPES OF DISTRIBUTION & SUBTRANSMISSION DESIGNS This standard applies to the presentation of the following designs:

• All overhead network distribution designs up to and including 66kV; • All underground network distribution designs up to and including 66kV; • All public lighting designs for the lighting layout design.

2. CONSTRUCTION PLAN A ‘construction plan’ is prepared for all additions and alterations to the Distribution & Sub Transmission Network. A construction plan provides a structured and consistent presentation of information required for estimating, construction, statutory approvals and asset identification for updating of the GIS and subsequently Ellipse – Asset Management Program. The following construction plans are detailed:

• Overhead electrical reticulation • Underground electrical reticulation • Conduit Plan required for the installation of underground conduit and associated works • Street Lighting.

Hard copies are to be printed in colour for clarity.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 2 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

3. EXPLANATION

3.1. Project Numbers The Ellipse Work Request Number for each project is to be used to register a construction plan and the following format is to be used - 12345.

3.2. Standard Title Block The title block of a construction plan provides information for identification of the proposed works and status of the construction plan. The title block should be placed at the bottom of the construction plan and the format depicted in Appendix A is recommended. Mandatory information to be included by Designer:

• Project Number • Sheet size • Scale • Issue • Description standard format:

• Location of project • Description of work – and type of plan e.g. ‘Conduit Construction Plan’ • Customer’s details

• Reference drawings • Construction plan revisions • ‘As Constructed’ Stamp (refer below for example of stamp)

ON COMPLETION, MARK UP THIS PRINT CLEARLY WITH ALL FINAL

CHANGES AND RETURN TO NETWORKDATA GROUP FOR REGION

CHANGES Yes/No

COMPLETION DATE……………………….

PRINT NAME………………………………

POSITION……………………………………

SIGNATURE…………………………………

DATE…………………………………………

3.3. Revised Construction Plan For Energy Services, the Designer must be consulted about all required changes to the construction plan. The Designer will perform a design check to determine if the requested change will alter either of the structural/civil, technical design or lighting design. If it does, this will be a major change; however, if it doesn’t alter the design, it is a minor change.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 3 of 22 Specification RSD04 Ver 2

For a major change a new revision of the construction plan is to be issued but for a minor change a verbal approval will be followed up with an email confirmation.

NB. All approved changes to the Construction Plan are to be marked up in RED, in a neat and legible manner allowing the amendments to be clearly understood.

3.4. Standard Notes The Mapping and Design Forum have approved a standard set of notes to be included on construction plans. They are located on the shared drive \\ecasd01\smallworld\Standardnotes - these are to be copied and pasted to the construction plan.

Requests for additional notes or modification to existing notes are to be approved by the Mapping and Design forum, the Design Support Co-ordinator and the Senior Design Support Officer shall have administration rights to this folder.

3.5. Work Specific Notes Work Specific Notes are notes/instructions that are necessary to highlight particular high risk features within the construction plan. These are to be large enough to be clearly visible and easily attract the attention of construction staff. The boxes should be located as close as practical, and with an arrow pointing to the affected site.

Example: Caution and Warning flags indicating possible conflict with other utilities’ major assets – to be in a RED text box with a pointer and with black text.

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

WARNING Telstra Optic Fibre Cable

on 4.0m alignment – Contact Joe Bloggs for physical location phone

46532187

3.6. Conduit Schematic Diagrams (where applicable) Conduit Schematic Diagrams are to be geographical and include the following objects:

• Ducts• Station numbers• Padmount transformer (if allocated)• HV Isolating Devices (if required)• Termination pole or existing asset• Pillars• Pits (if required)• Street Lights

Cadastre information is not required.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 4 of 22 Specification RSD04 Ver 2

3.7. Location Map If required, a Location Map can be included as a separate sheet or as an inset on the construction plan.

3.8. Standard Drawing Sheets The Drawing Sheets are limited to the following sizes:

• A1 Landscape • A2 Landscape • A2 Portrait • A3 Landscape • A4 Landscape • A4 Portrait

3.9. Smallworld Footprint All footprints should be reviewed and updated to encompass only the work area required with a suggested additional 50m buffer for rural and 10m buffer for urban.

3.10. Standard Scales The Standard Scales are:

• 1:500 • 1:750 • 1:1000 • 1:1250 • 1:1500 • 1:2000 • 1:2500 • 1:3000 for large OH, UG or Comms works plan • 1:4000 for large OH, UG or Comms works plan • 1:5000 for large OH, UG or Comms works plan • 1:10000 for large OH, UG or Comms works plan • 1:20000 • 1:25000

3.11. North Sign Standard Symbol

3.12. Design Approval Check The approver of all Smallworld designs must check the design against this document for compliance to the standard.

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 5 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

3.13. Design Approval Matrix

Internal Design Approval External Design Acceptance

Using all Standard Assemblies

Peer Check Design Approver (Checked)

Peer Check Design Approver (Checked)

Using any Non-Standard

Assemblies

Peer Check Designer Approver (Checked) Design Engineer / Principal Engineer Line Standards

Peer Check Designer Approver (Checked) Design Engineer / Principal Engineer Line Standards

If the design is using all standard assemblies, the authorised design approver can approve the design. However, if it is of a complex nature, the authorised design approver can request for a Design Engineer / Principal Engineer Line Standards to approve it.

If the design is using any non-standard assemblies, the design is to be approved by a Design Engineer / Principal Engineer Line Standards.

4. CONDUIT CONSTRUCTION PLAN A conduit construction plan is required to allow civil construction to be performed. It will indicate the route, number and size of conduits to be installed to allow for the underground reticulation for new residential/rural subdivisions.

4.1. Standard Format The standard format is to include:

• DCDB Plan (Digital Cadastre Data Base) – street and roads (if available) – allotment boundaries and numbers - easements

• Station numbers • Pillar locations • Padmount transformer location • Free standing HV switch location • Trench cross sections indicators • Conduit schedule • Street Light schedule (with footing identification in remarks) • Standard notes to include street light column alignment • Work specific notes if required • Conduit schematic – when required to clearly identify the individual conduit runs • Scale • North sign • Title block (standard) • Proposed cable easements where required • ‘As constructed’ stamp • Development stage boundary if required • Pits (if required) • All station numbers are to be sequential

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 6

Ergon Energy Corporation LimErgon Energy Queensland Pt

4.2. Sample Construction Plan The following sample construction plan is included to illustrate as closely as possible the correct completion of schedules and construction plan format: If the link to the embedded document is broken please request a copy of the sample construction plan.

5. UNDERGROUND CONSTRUCTION

5.1. Standard Format The standard format is to include:

• DCDB Plan (Digital Cadastre Data Base) – boundaries and numbers - easements

• Station numbers • Pillar locations • Padmount transformer location (if required) • Free standing HV switch location (if required• Schedules (as per Section 8)

• Construction Schedule • Underground Cable Schedule • Public Lighting Schedule • Conduit Ducting Schedule

• Standard notes as required • Work specific notes as required • Scale • North sign • Title block (standard) • Proposed cable easements • ‘As constructed’ stamp • Development stage boundary • Zone substation number • Feeder number • Indicate relevant phase for each lot – R, W • Location map as required • Cable Joints • All station numbers are to be sequential

5.2. Sample Construction Plan The following sample construction plan is includedcompletion of schedules and construction plans for

of 22 Specification RSD04 Ver 2

ited ABN 50 087 646 062 y Ltd ABN 11 121 177 802

PLAN

street and roads (if available) allotment

)

or B

to illustrate as closely as possible the correct mat:

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 7 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

If the link to the embedded document is broken please request a copy of the sample construction plan.

6. OVERHEAD CONSTRUCTION PLAN An Overhead construction plan is prepared for the erection of overhead electrical reticulation.

6.1. Standard Format The standard format is to include:

• DCDB Plan (Digital Cadastre Data Base) – street and roads (if available) – allotment boundaries and numbers - easements

• Station numbers • Pole Locations • Schedules (as per Section 8)

• Construction Schedule • Overhead Conductor Schedule • Public Lighting Schedule

• Standard notes as required • Work specific notes as required • Scale • North sign • Title block (standard) • Zone substation number • Feeder number • Location map if required • Span lengths – (Note: span lengths shown in Smallworld may not be true due to

cadastre shift) • All station numbers are to be sequential

6.2. Sample Construction Plan The following sample construction plans are included to illustrate as closely as possible the correct completion of schedules and construction plan format: If the link to the embedded document is broken please request a copy of the sample construction plan.

7. STREET LIGHT CONSTRUCTION PLAN A Streetlight Construction Plan is prepared for erection/ installation of public lighting.

7.1. Standard Format The standard format is to include:

• DCDB Plan (Digital Cadastre Data Base) – street and roads (if available) – allotment boundaries and numbers - easements

• Station numbers • Pole Locations

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 8 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

• Schedules (as per Section 8) • Construction Schedule • Overhead Conductor Schedule • Public Lighting Schedule

• Standard notes as required • Work specific notes as required • Scale • North sign • Title block (standard) • Zone substation number • Feeder number • Location map if required • ‘As Constructed’ stamp • A statement of Compliance with the requirements of AS/NZ 1158 (in accordance with

AS/NZS 158.1.1:2005 Clause 2.11 and Appendix D) • All station numbers are to be sequential

7.2. Sample Construction Plan The following sample construction plan is included to illustrate as closely as possible the correct completion of schedules and construction plan format: If the link to the embedded document is broken please request a copy of the sample construction plan.

8. SCHEDULES

8.1. Sample Construction Plan Schedules provide an ordered layout of information relevant to any modification to the Energy Services network. Schedules are to accompany all construction plans. It is preferable that the construction plan and its associated schedules be presented on the same sheet. If this is not practical, then schedules may be grouped on a separate sheet. Data entered onto schedules to be limited to one item per line, for each column. Modification of the schedules is permitted but limited to turning off columns that do not contain data, from being displayed within the drawing. This is the default setting. Schedule font size is free text, default settings:

• Schedule data text 2mm; • Schedule column heading text 1.8mm; • Schedule title 137% of column heading text.

The schedule headings word-wrap as standard default. The following schedules are detailed, including definitions for column entries:

• Construction Schedule – applicable to OH and UG works including distribution substations. • Overhead Conductor Schedule – applicable to OH conductor works, including LV Services. • Public Lighting Schedule – applicable to all public lighting works, excluding watchman

lighting. • Underground Cable Schedule – applicable to all underground cabling activities.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 9 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

• Conduit Ducting Schedule – applicable for all runs of underground conduits, including bends where required.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 10 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

8.2. Construction Schedule

CONSTRUCTION SCHEDULE STN NO

SITE LABEL

POLE ALIGNMENT

POLE SETTING DEPTH

ACTION CONSTRUCTION CLASS

CONSTRUCTION CODE

DRAWING NUMBER

POSITION ON POLE

REMARKS

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 11 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose This schedule contains all information relevant to the construction of overhead, underground, street light and substation structures associated with the design construction plan. This schedule must be used where overhead, underground, street light or substation works are affected.

COLUMN DESCRIPTION AND USAGE

STATION (STN) The station number is the reference for the asset on the works plan

SITE LABEL Ergon Energy’s official site identifier for the site at which an asset is located – e.g. pole, service pillar, etc.

POLE ALIGNMENT This identifies the distance the pole centre line is offset from the nearest property boundary. It is to be used for showing offsets to gain Statutory approvals.

POLE SETTING DEPTH Pole setting depth is the depth the pole is to be set in the ground.

ACTION Description of the action to be performed i.e. Install – Recover – Upgrade – Relocate, on that asset, on that line in the schedule.

CONSTRUCTION CLASS

The class of the nominated construction as listed in Ergon Energy’s Standard Overhead, Underground, and Public Lighting Construction manuals for the construction to be actioned. This field lists the folder of the construction manual the construction can be found.

CONSTRUCTION CODE

A coded description of the assembly to be actioned. Codes used to describe constructions to be in accordance with the overhead, underground, and public lighting standard construction manuals.

Pole mounted constructions, are to be listed from the top of the pole down.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 12 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

COLUMN DESCRIPTION AND USAGE

DRAWING NUMBER

This is the drawing number in the overhead, underground and lighting standard construction manuals for the nominated construction.

POSITION ON POLE

This is the order in which the nominated constructions are added to the pole. The position 1 is at the head of the pole and subsequent numbers move the constructions down the pole.

REMARKS

To be utilised for construction notes only. Details of all constructions to be worked on are to be detailed in the construction column. These remarks are being stored against each object and auto populated into the schedule.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 13 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

8.3. Overhead Conductor Schedule

OVERHEAD CONDUCTOR SCHEDULE STN

FROM STN TO ACTION VOLTAGE CONDUCTOR

CODE NUMBER OF

CONDUCTORSROUTE

LENGTH (m)

MES (M) %NBL WIND

PRESSURE (pa)

REMARKS

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 14 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose This schedule contains all information relevant to the design, construction and recording of work on overhead conductors associated with the works plan. This schedule must be used when overhead conductors are affected by the works.

COLUMN DESCRIPTION AND USAGE

STN FROM The works plan station numbers at which a particular strain section commences. A separate line is to be used for each strain section as indicated on the works plan.

STN TO The works plan station numbers at which a particular strain section terminates. A separate line is to be used for each strain section as indicated on the works plan.

ACTION Description of the action to be performed on the conductors on the same line in the schedule.

VOLTAGE The nominal voltage type of the conductors. e.g. 11 kV, LV.

CONDUCTOR CODE

A description of the conductors or cables to be worked on. The conductor code is listed. Refer to the Energy Services Design manual – Standard Conductor Applications Dwg 3053 sheet 2.

ROUTE LENGTH The sum of the span lengths between station numbers in metres.

NUMBER OF CONDUCTORS

This is the number of individual conductors that make up the each run of mains between the nominated station numbers.

MES Mean effective span in metres as calculated in accordance with the Design Manual, for the spans in a single strain section between the nominated station numbers.

%NBL Percentage Nominal Breaking Load. The design tension limit which is not to be exceeded under the specified loading conditions.

WIND PRESSURE This is the wind pressure in Pascals to which the conductor stringing calculations were performed.

REMARKS To be utilised for construction notes only. Details of all conductors to be worked on are to be detailed in the conductor column.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 15 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

8.4. Public Lighting Schedule

PUBLIC LIGHTING SCHEDULE STN NO.

SITE LABEL ACTION CONSTRUCTION

CODE RATE OWNER MOUNTING HEIGHT ORIENTATION REMARKS

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 16 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose

This schedule contains all information relevant to the construction of street lighting works associated with the construction plan. This schedule must be used where any streetlights are affected by the works.

COLUMN DESCRIPTION AND USAGE

STN NO The station numbers that are the reference for the plan site ID.

SITE LABEL Ergon Energy’s official site identifier for the site. e.g. pole number.

ACTION Description of the action to be performed on the construction on the same line in the schedule.

CONSTRUCTION CODE

A coded description of the street lighting asset to be actioned. Codes used to describe street lighting constructions to be in accordance with the Ergon Energy Public Lighting Construction manual.

RATE The street lighting tariff (rate) associated with the luminare. 1, 2, or 3.

OWNER This is the name of the customer who is responsible for payment of the lighting tariff

MOUNTING HEIGHT

Nominal mounting height of luminare as defined in the Ergon Energy Public Lighting Manual.

ORIENTATION Magnetic Bearing from Smallworld

REMARKS To be utilised for construction notes only, and to identify the required footing for street light columns i.e. Major or Minor. Details of all public lighting works are to be detailed in the schedule columns.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 17 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

8.5. Underground Cable Schedule

UNDERGROUND CABLE SCHEDULE STN

FROM STN TO ACTION VOLTAGE CONSTRUCTION

CODE ROUTE

LENGTH CABLE

LENGTH REMARKS

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 18 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose This schedule contains all information relevant to the design, construction and recording works on underground cabling associated with the construction plan. This schedule must be used where any underground cabling is affected.

COLUMN DESCRIPTION AND USAGE

STN FROM The works plan station number at which the cable run is to commence.

STN TO The works plan station number at which the cable run is to terminate.

ACTION Description of the action to be performed on the construction on the same line in the schedule

VOLTAGE The nominal voltage type of the cables, e.g. 11 kV, LV.

CONSTRUCTION CODE A description of the cable size and type.

ROUTE LENGTH The total length of cable as measured off the plan between terminations , etc.

CABLE LENGTH The total length of cable required including allowance for end lengths (terminations, joints) etc.

REMARKS To be utilised for construction notes only, including proposed HV joint locations. Details of all underground cabling works are to be detailed in the schedule columns.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 19 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

8.6. Conduit Ducting Schedule

CONDUIT DUCTING SCHEDULE

STN FROM

STN TO ACTION

CONSTRUCTION CODE

LENGTH (m)

BENDS

REMARKS

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 20 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Purpose This schedule contains all information relevant to the laying of conduit ducts in trenches for underground works. This schedule shall be used for all underground construction plans. The station numbers are the sites the conduits run between. These sites include, • Poles • Pillars • Distribution Cabinets • Joints/end cap • Pits • Ground Mounted Switches (GMS) • Towers

COLUMN DESCRIPTION AND USAGE

STN FROM The works plan station number at which the conduit run is to commence.

STN TO The works plan station number at which the conduit run is to terminate.

ACTION Description of the action to be performed i.e. Install - Recover – Upgrade – Relocate, on the asset, on the same line in the schedule.

CONSTRUCTION CODE

A coded description of the assembly to be actioned. Codes used to describe constructions to be in accordance with the overhead, underground, and public lighting standard construction manuals.

LENGTH The length of the duct run between the nominated station numbers

BENDS This is a text field and information to be inserted manually, where required.

REMARKS To be utilised for construction notes only. Details of all civil works are to be detailed in the schedule columns.

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 21 of 22 Specification RSD04 Ver 2

APPENDIX A – TITLE BLOCK The title block provides information on the identification of the proposed works, the Designer, the drawings status, the drawings approval information and the plan type. This style of title block is recommended. The project number itself must be located in a position where its identification maybe ascertained without unfolding the works plan, preferably at the bottom right hand corner. A title block is to be used on all works plans. The title block displayed has been reproduced from Ergon Energy’s standard drawing sheet template. Join A

AMEN

DM

ENTS

OA

OR

IGIN

AL

ISSU

E

Rev

B –

Stn

3 M

oved

2

met

re n

orth

7/9

/05

Works Plan revisions are to be noted here. Legend will be included in this section automatically by Smallworld

Join A

REFERENCE DRAWINGS Project Number: Drawing State:

ERGON ENERGY CORPORATION LTD Contract / Quote Number: Business Approved Date: Name:

Created Dat /Time: eCreated By: Check d Date: eName:

A1 SD01254

NEXT SHEET

11kV Windemere Feeder EB-D Innes Park Town Map Sheet 1 HV Schematic 9348/D-1

Approved Date: Approved By:

Perseverance Dam Road – Innes Park URD Subdivision – Electrical Plan Garrisha Pty Ltd Walker Family Trust SCALE: 1:2500

ISSUE

B

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

Specification for Distribution Design Drafting Standard

Check this is the latest Process Zone version before use. Page 22 of 22 Specification RSD04 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802

APPENDIX B – SYSTEM DESIGNER – FIELD MEASUREMENT GUIDELINES The Designer responsible for the design and pegging of projects shall use a measuring instrument with a precision to enable all linear and angular measurements to be read with an accuracy that will ensure that the design will comply with all applicable Ergon Energy standards, policies and procedures. The accuracy of the selected instrument will be reflected by the complexities/ risk of the project.

APPENDIX C – SYMBOLOGY

FB

EA

AB

EA

FB

AA

FC

AA

BC

BC

AA

FC

AB

BB

GCGC

EA

FB

HB

GC

AA

FBEA

FB

AA

FB

FB

BB

AA

FB

BB

FB

AA

FA

FB

FB

AA

FB

BB BB

EA

AA

AA

AA

EA

EA

AB

EA

AB

EA

EA

ABEAAA

SUNNYRIDGE RO

AD

BOLE

S ST

REET

7

89

1011

5

4

3

62627

25

2829

24

23

14

2221

1213

1516

2019

18

17

2

139

3837

36

3031

3233

3435

4.00 m

12.4

3 m

3.21

m

8.47 m

25.5m 5.7m

7.54 m

12.13 m

33

32

34

31

30

61

62

27

5017

52

5164

28

76

5329

35

54

8

3

5

109

11

46

63

36

13

12

47

37

59

48

14

60

49

15

16

18

58 45

39

56

2

19

38

40

67

66

1

Unknown

4

65

20

21

42

41

26

2522

43

44

2324

57

SC200545

4032387

403531040349794035381

4034978 4034977

4034976

4034975

4034972

4034971

4034973

4034969

33

32

34

31

30

61

62

27

5017

52

5164

28

76 5329

35

54

8

35

109

11

4663

36

13

1247

37

59

48

14

60

49

15

16

18

58 45

39

56

2

19

38

40

67

66

1

465

20

2142

41

26

2522

43

44

2324

57

AB

GC

GC

EA

1 RP608950

2627

5164

28

7

65329

SC200545

BB

FB

HB

GC

AA

FB

FB

28

29

24

8

3

5

109

46

45

N

S

W E

1 2 3 4 5 6 7 8 9 10 11 12

H

G

F

E

D

C

A

B

A

B

C

D

E

F

G

H

COPYRIGHT This drawing must not be reproduced in part or whole without written permission from ERGON ENERGY CORPORATION Ltd.

A1

841 X 594UNLESS OTHERWISE STATEDALL DIMENSIONS IN MILLIMETRES

Contract / Quote Number Business Approved Date

Name:

Checked Date:

1 2 3 4 5 6 7 8 9 10 11 12

A1

ISSUE

ERGON ENERGY CORPORATION LTD

0m 20m 40m 60m

Name:

Project Number:

ABN 50 087 646 062

REFERENCE DRAWINGS

DRAWING REFERENCE No.B1 - 14G - 317/8

ZONE SUB/STN No. 07FEEDER No. GS-102

ELLIPSE FEEDER No. FD-1365 WET

PADMOUNT TRANSFORMER3.0m X 3.0m EASEMENT

CONDUIT SCHEMATIC

UNDERGROUND CONSTRUCTION NOTES

1. CONDUIT DEPTHS, ALIGNMENTS & TRENCHING detail refer Underground Construction Manual TRENCHING DWG5165. Provide Polymeric Cable Protection Cover in accordance with CONSTRUCTION PRACTICES DWG 5124.

2. Developer to supply and install conduits, lighti ng foundations, padmount foundation and site finish. Required Foundationconstruction for Padmount Transformer is code PMF11US. At si te 6, Lot 26 use the standard Padmount Uniculvert with baseslab as required in Ergon's specifications, CSR Humes P roduct No. 1 X Uniculvert, BC1200.9500 or Equiv., 2 X End Walls,BC1200.9510 or Equiv., & 1 X Base Sl ab, BC1200.0188 or Eqiuv.

Developer to provide a 3.0m X 3.0m Padmount Transformer easem ent in Lot 26, at site 6, & a 3.0m X 3.0m RMU easementin Lot 28, at site 5, as s hown on the drawing.

At site 5, a stand alone RMU culvert foundation will be required which is not shown in Ergon's URD Specifi cations, but detailswill be shown in Drawing No. 913095-01 to be supplied by the Designer & copies should be in the construc tion folders. The culvert foundation can be obtained from CS R Humes Rockham pton, Bryan Dobby 0419 476 132, Product No. 5104612is the 900 X 900 X 900 deep stormwater pit plus a specially m anufactured 100tk reinforced concrete lid for a 4 switch unit, isProduct No.5107632, to be provided wi th a 600 X 800 hole.Developer to install c able 35mm2 19/1.53 insulated copper to be direct buried in the trench with conduits between stations 5& 10 with enough length for connection at both ends. Cable to be suppli ed by Ergon.The cable should be connected to the common earth bar in the bottom of the RMU cabinet and to the LV MEN system whichwill generally be at the nearest pillar site.

3. Developer to contact Ergon Energy for site audits in acc ordance with RSC07.

4. Local council to accept streetlights and positions.

SPECIFICATIONS

This works plan is to be read in conjunction with the following ERGON ENERGY manuals and specifications.* RSC06 URD Main Specification* RSC07 URD Civil Works* Underground Construction Manual* Lighting Construction ManualConsumer's installation shall comply with AS3000: 1991 - SAA Wiring Rules.

RMU 3.0m X 3.0m EASEMENT

0m 5m 10m 15m 20m

0m 5m 10m 15m 20m 25m

CONDUIT SCHEMATIC PLAN

SHEET1 of 103/12/2007 10:01:20

ncrosbie

03/12/2007 13:00:54

jhope

ON COMPLETION, MARK UP THISPRINT CLEARLY WITH ALL FINALCHANGES AND RETURN TO NETWORKDATA GROUP FOR REGIONCHANGES Yes/No ………………COMPLETION DATE……………………….NAME…………………………………………POSITION……………………………………SIGNATURE…………………………………DATE…………………………………………

OR

IGIN

AL

ISS

UE

AM

EN

DM

EN

TS

OA

.

SCALE - 1:1000

SCALE 1:1000

Approved By:

Approved Date:

Created By: wwilson

Drawing Status: Investigate

E

Boles Street - Gladstone - URD Subdivis ion - The Glen Precinct stage 1 - URD Construction Plan - Foreman, OF TB No.1 Pty Ltd

Created Date/Time: 26/07/2007 16:38:06

CPMCY02580

LEGEND

DCDBLand Parcel - STATE LANDLand Parcel - FREEHOLDLand Parcel - RESERVE

Unregistered PropertyURP CloakURP KerbsURP LotsURP Roundabouts

ElectricityAerial Stay - as constructed

Connection Poi nt - Unknown PlannedDuct - planned

Earth - as constructedEarth - planned

Earth Cable - plannedEarth CableGMS Site

Pillar - Cross Road Pillar PlannedPillar - Normal Pillar Planned

Pole - HV/LVPole - Unknown PlannedPole - SL PlannedPole - HVPole - BollardPole - LVPole - LV Future HVPole - HV/LV Planned

Pole - LV Future HV ( To Be Removed)Pole - LV ( To Be Removed)Pole - Unknown ( To Be Removed)Pole - HV ( To Be Removed)

Pole - SL ( To Be Removed)Pole - HV/LV ( To Be Removed)Pole - Bollard ( To Be Removed)

Stay - as constructedStay - removed

Stay ( To Be Removed)

Streetlight - Column / Pole MountedStreetlight - Column / Pole Mounted PlannedStreetlight - PlannedStreetlight - Unknown

Substation - PlannedSubstation - Pole

Substation ( To Be Removed)

Low VoltageLV Cable - planned ( 240v)LV Cable - planned ( 415v)LV Cable Termination - planned ( 415v)

LV Line - as constructed ( 240v)LV Line - removed ( 240v)

LV Line - planned ( 240v)

LV Line - as constructed ( 415v)LV Line - removed ( 415v)LV Line - planned ( 415v)

LV Line - as constructed ( Streetlight)LV Line - removed ( Streetlight)LV Line - planned ( Streetlight)

LV Line ( To Be Removed)

LV Isolating Device - planned ( 240v)

LV Isolating Device - OpenBridge_planned ( 240v)

LV Isolating Device - planned ( 415v)LV Isolating Device - OpenBridge_planned ( 415v)

High VoltageHV Cable - planned ( 11kv)HV Cable Termination - planned ( 11Kv)

HV Line - as constructed ( 11kv)HV Line - removed ( 11kv)HV Line - planned ( 11kv)

HV Line ( To Be Removed)

Hv Isolating Device - removed ( 11Kv)Hv Isolating Device - planned ( 11Kv)

Hv Isolating Device - removed ( 22Kv)Hv Isolating Device - planned ( 22Kv)

Hv Isolating Device ( To Be Removed)

DraftingRedline Line (Path)

Conduit Schematic Legend

ElectricityDuct - 100mm/110mmDuct - 125mmDuct - 40mm

GMS Site

Streetlight - Column / Pole MountedStreetlight - Column / Pole Mounted PlannedStreetlight - PlannedStreetlight - Unknown

Pillar - Cross Road Pillar PlannedPillar - Normal Pillar Planned

Pole - HV/LVPole - Unknown Planned

Pole - SL PlannedPole - HVPole - BollardPole - LVPole - LV Future HVPole - HV/LV Planned

Pole - LV Future HV ( To Be Removed)Pole - LV ( To Be Removed)Pole - Unknown ( To Be Removed)Pole - HV ( To Be Removed)Pole - SL ( To Be Removed)Pole - HV/LV ( To Be Removed)Pole - Bollard ( To Be Removed)

Substation ( To Be Removed)

Conduit Ducting ScheduleSTN

FROMSTNTO

ACTION CONSTRUCTIONCODE

LENGTH(m)

REMARKS

4 9 Install C125L 139 m HV Conduit ends 1.5m f rom Pole 4 19 Install C100L 48 m LV Conduit 4 65 Install C40H 16 m Earth wire conduit to provide 15.0m

clearance from Telstra pit 7 8 Install C100L 59 m LV Conduit 7 9 Install C125L 78 m HV Conduit 7 17 Install C100L 74 m LV Conduit 7 27 Install C100L 21 m LV Conduit 8 10 Install C100L 22 m LV Conduit 9 33 Install C125L 177 m HV Conduit

10 11 Install C100L 40 m LV Conduit 10 16 Install C125L 161 m HV Conduit 10 46 Install C40H 3 m S/L Conduit 11 12 Install C100L 8 m LV Conduit 12 13 Install C100L 29 m LV Conduit 12 47 Install C40H 3 m S/L Conduit 13 14 Install C100L 42 m LV Conduit 13 48 Install C40H 25 m S/L Conduit 14 15 Install C100L 40 m LV Conduit 14 49 Install C40H 23 m S/L Conduit 17 18 Install C100L 25 m LV Conduit 17 45 Install C40H 3 m S/L Conduit 18 19 Install C100L 30 m LV Conduit 19 20 Install C100L 27 m LV Conduit 19 38 Install C40H 29 m S/L Conduit 19 39 Install C40H 8 m S/L Conduit 20 21 Install C100L 36 m LV Conduit 20 40 Install C40H 11 m S/L Conduit 20 41 Install C40H 12 m S/L Conduit 21 22 Install C100L 42 m LV Conduit 21 26 Install C100L 13 m LV Conduit 21 42 Install C40H 3 m S/L Conduit 22 23 Install C100L 45 m LV Conduit 22 25 Install C100L 13 m LV Conduit 22 43 Install C40H 4 m S/L Conduit 23 24 Install C100L 24 m LV Conduit 23 44 Install C40H 16 m S/L Conduit 27 50 Install C40H 3 m S/L Conduit 28 29 Install C100L 15 m LV Conduit 28 37 Install C100L 168 m LV Conduit X-press for futur e use to

Lots 13 & 14 28 37 Install C125L 168 m HV Conduit for futur e use to lots 49,

51, boundary of subdiv 29 30 Install C100L 23 m HV Conduit 30 31 Install C100L 38 m LV Conduit 30 35 Install C100L 42 m LV Conduit 30 51 Install C40H 9 m S/L Conduit 31 32 Install C100L 16 m LV Conduit 31 33 Install C100L 19 m LV Conduit 31 34 Install C100L 36 m LV Conduit 32 52 Install C40H 3 m S/L Conduit 35 36 Install C100L 41 m LV Conduit 35 53 Install C40H 16 m S/L Conduit 35 54 Install C40H 22 m S/L Conduit

Construction ScheduleSTNNO

SITELABEL

POLEALIGNMENT

POLESETTINGDEPTH

ACTION CONSTRUCTIONCLASS

CONSTRUCTIONCODE

DRAWINGNUMBER

POSITIONON POLE

REMARKS

1 Recover Pole Equipment 22FP3/5/MOO/U 1037 1 1 Recover Pole Equipment LVP3/50/000 1017 2 Conductor 4 X 7/.134AAC FLY 1 X19044 Recover Hv Isolating Device 11kV (DO) Unknown 3 20k EDO S/D markup L. Baker 2804/06 1 4034976 1.800 Recover Pole A51-23 Page 51 2 Recover Pole Equipment POLEEQUIPMENT Unknown 1 Post Processed 2 4201445 1.800 Recover Pole WP11/8D/NE 1091 3 Recover Pole Equipment POLEEQUIPMENT Unknown 1 Post Processed 3 Recover Stay STAY Unknown 2 3 152163 Recover Substation 50kVA 11kV/LV (SP) Unknown 3 3 118270.T1 Recover Transformer TRANSFORMER Unknown 4 3 4262117 2.000 Recover Pole WP12/8D/NE 1091 4 4034976 Install Pole WP14/8S/SB 1091 4 4034976 Install Pole Equipment 22TRS/MOO 1082 1 4 X019579 Install Hv Isolating Device CTP11TR185LPG3 1369 2 4 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 3 4 4034976 Install Pole Equipment LVP3/50/000 1017 4 Conductor 4 X 7/.134AAC FLY 4 4034976 Install Pole Equipment SOHN/225/AL 1045 5 4 4034976 Install Pole Equipment SOHA/225/AL 1048 5 4 Install LV Cable Termination LVCTP/240/M/AL 5056 6 4 Install LV Isolating Device LVSWP/4/OW 5056 6 LV OPEN POINT 4 Install Earth EHVEMGMEN/SEP/AL 1446 7 5 X019580 Install Hv Isolating Device SPEC_HV_ISOL_DEV_UG Unknown RMU 4 X Feeder Switches (SafeLink

CCCC) B in No. 0105005 5 Install Earth EPM11/COM 5013 5 Install Earth EADDCU 5013 5 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 5 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 6 SC200545 Install Substation PM11/500/ASL2S1F 5191 6 Install Earth EADDCU 5013 6 Install Earth EPM11/COM 5013 6 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 6 Install LV Cable Termination LVCTPM11/240 5087 6 Install LV Cable Termination LVCTPM11/240 5087 6 Install LV Cable Termination LVCTPM11/240 5087 7 Install Pillar LVPN2/6/240 5026 7 Install Earth EMEN/PIL 5085 8 Install Pillar LVPN2/6/240 5026 8 Install Earth EMEN/PIL 5085

10 Install Pillar LVPN2/6S/240 5026 10 Install Earth EMEN/PIL 5085 11 Install Pillar LVPN2/6/240 5026 11 Install Earth EMEN/PIL 5085 12 Install Pillar LVPN2/6S/240 5026 12 Install Earth EMEN/PIL 5085 13 Install Pillar LVPN2/6S/240 5026 13 Install Earth EMEN/PIL 5085 14 Install Pillar LVPN2/6S/240 5026 14 Install Earth EMEN/PIL 5085 15 Install Pillar LVPN1/6S/240 5025 15 Install Earth EMEN/PIL 5085 17 Install Pillar LVPN2/6S/240 5026 17 Install Earth EMEN/PIL 5085 18 Install Pillar LVPN2/6/240 5026 18 Install Earth EMEN/PIL 5085 19 Install Pillar LVPN3/6S/240 5027 Install additional S/L fuse A506-4 19 Install Earth EMEN/PIL 5085 20 Install Pillar LVPN2/6S/240 5026 Install additional S/L fuse A506-4 20 Install Earth EMEN/PIL 5085 21 Install Pillar LVPN2/6S/240 5026 21 Install Earth EMEN/PIL 5085 22 Install Pillar LVPN2/6S/240 5026 22 Install Earth EMEN/PIL 5085 23 Install Pillar LVPN2/6S/240 5026 23 Install Earth EMEN/PIL 5085 24 Install Pillar LVPN1/6/240 5025 24 Install Earth EMEN/PIL 5085 25 Install Pillar LVPX/6/16CU 5041 26 Install Pillar LVPX/6/16CU 5041 27 Install Pillar LVPX/6S/16CU 5041 29 Install Pillar LVPN2/6/240 5026 29 Install Earth EMEN/PIL 5085 30 Install Pillar LVPN3/6S/240 5027 30 Install Earth EMEN/PIL 5085 31 Install Pillar LVPN1/6S/240 5025 31 Install Earth EMEN/PIL 5085 32 Install Pillar LVPX/6S/16CU 5041 35 Install Pillar LVPN1/6S/240 5025 Install additional S/L fuse A506-4 35 Install Earth EMEN/PIL 5085 36 Install Pillar LVPX/6/16CU 5041 38 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 39 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 40 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 41 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 42 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 43 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 44 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 45 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 46 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 47 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 48 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 49 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 50 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 51 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 52 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 53 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 54 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb

SCALE 1:500

SCALE 1:500

FB

EA

AB

EA

FB

AA

FC

AA

BC

BC

AA

FC

AB

BB

GCGC

EA

FB

HB

GC

AA

FBEA

FB

AA

FB

FB

BB

AA

FB

BB

FB

AA

FA

FB

FB

AA

FB

BB BB

EA

AA

AA

AA

EA

EA

AB

EA

AB

EA

EA

ABEAAA

SUNNYRIDGE RO

AD

BO

LES

STR

EET

7

89

1011

5

4

3

62627

25

2829

24

23

14

2221

1213

1516

2019

18

17

2

139

3837

36

3031

3233

3435

33

32

34

31

30

61

62

27

5017

52

5164

28

76

5329

35

54

8

35

109

11

4663

36

13

1247

37

59

48

14

60

49

15

16

18

58 45

39

56

2

19

38

40

67

66

1Unknown

465

20

2142

41

26

2522

43

44

2324

57

SC200545

4032387

403531040349794035381

4034978 4034977

4034976

4034975

4034972

4034971

4034973

4034969

N

S

W E

1 2 3 4 5 6 7 8 9 10 11 12

H

G

F

E

D

C

A

B

A

B

C

D

E

F

G

H

COPYRIGHT This drawing must not be reproduced in part or whole without written permission from ERGON ENERGY CORPORATION Ltd.

A1

841 X 594UNLESS OTHERWISE STATEDALL DIMENSIONS IN MILLIMETRES

Contract / Quote Number Business Approved Date

Name:

Checked Date:

1 2 3 4 5 6 7 8 9 10 11 12

A1

ISSUE

ERGON ENERGY CORPORATION LTD

0m 20m 40m 60m

Name:

Project Number:

ABN 50 087 646 062

REFERENCE DRAWINGS

4

38

19

40

20

LV OPEN POINT

39

41

42

2621

22

25

43

23

24

44

18

17

45

46

47

48

13

14

49

15

36

27

50

728

30

51

3252

31

3334

3554

53

29

37LV SWITCH GEARTHE GLEN PRECINCTSC20054511/500/3

4034987

LEGENDOverhead LV LineU/G Conduit C100L + Cable LV- 240C4/673U/G Conduit C100L + Cable LV- 16CUC4/614U/G Conduit C40H+ Cable LV-6CUC2/507U/G Conduit C40H+ Cable LV- 16CUC2/603Conduit for future use

Street Light

Pillar Normal

Pillar Cross Road

LV SCHEMATIC

LOT 41RP610715

No. 71

No. 77

6

12

11

10

8

No. 75

No. 73 A

B

A

B

CA

C

B

C

A

B

C

BC

A

A

B

C

A

B

A

B

C

C

A

A

C

B

B

C

A

B

C

A

STAGE 1UNDERGROUND CONSTRUCTION NOTES

1. CONDUIT DEPTHS, ALIGNMENTS & TRENCHING detail refer Underground Construction Manua l TRENCHING DWG 5165. Provide Polymeri cCable Protection Cover in accordance with CONSTRUCTION PRACTICES DW G 5124.

2. Developer to supply and install conduits, lighti ng foundations, padmount foundation and site finish. Required Foundation construction forPadmount Transformer is code PM F11US. At site 6, Lot 26 use the standard Padmount Uniculvert with base slab as required in Ergon'sspecifications, CSR Humes P roduct No. 1 X Uniculvert, BC1200.9500 or Equiv., 2 X End Walls, BC1200.9510 or Equiv., & 1 X Base Slab,BC1200.0188 or Eqiuv. Developer to provide a 3.0m X 3.0m Padmount Transform er easement in Lot 26, at site 6, & a 3.0m X 3.0m RMU easem ent in Lot 28, at site 5, asshown on the drawing.At site 5, a stand alone RMU culvert foundation will be required which is not shown in Ergon's URD Specifications, but details wil l be shown inDrawing No. 913095-01 to be supplied by the Designer & copies should be in the constructi on folders. The culvert foundation can be obtained from CSR Humes Rock hampton, Bryan Dobby 0419 476 132, Product No. 5104612 is the 900 X 900 X900 deep stormwater pit plus a specially manufactured 100tk reinforced concrete lid for a 4 switc h unit, is Product No.5107632, to be provided witha 600 X 800 hole.Ergon to install cable 35mm2 19/1.53 insulated copper to be direct buri ed in the trench with conduits between stations 5 & 10 with enough length forconnection at both ends. The cable should be connected to the common earth bar in the bottom of the RMU cabinet and to the LV MEN system whic h will generally be at thenearest pillar site.

3. DBYD information to be provided in the construction folder. Physical l ocations for Council, Telstra, & Gas to be obtained where applicable.

4. Ergon Energy Civil Contractor to install conduits in road reserve accross Bol es Street, sites 4 to 56 as shown on plan. A C40H conduit is to beinstalled on the footpath from site 4, to a distance of 15.0m from the adjacent Telstra pit to provide cl earance & insulation for the HV equipmentearth as shown on the plan. Contractor Robert S haw mobile 0409783243.

5.Developer to contact Ergon Energy for site audits in acc ordance with RSC07.

6. Local council to accept streetlights and positions.

Asset Identification numbers to be glued or attached as required to all NEW HV & LV equipment & the numbers recorded against each relevant asset in the Construction Schedule includingPadmount Transformers. U/G Construction Manual - Assemblies - Dwg 568. O/H Construction Manual - Assemblies - Dwg 64.

X019579 TO X019580

X101 FOR FUTURE USE

X102 TO SC200545

X103 TO X019580

WARNINGHV Equipment Earth to be installed

in conduit from the pole to a distanceof 15.0m from the Telstra pit. The

Civil Contractor to install C40Hconduit to provide insulation for theearth wire to the position shown on

the plan.

X104 FOR FUTURE USE

X103 TO X019579

X102 FOR FUTURE USE

X101 TO SC200545

X019580

X104

X102

X103

X101

SC200545

X101

X102

X103

4034976

X019579

SITE LABELS

SITE 4 -

SITE 5 -

SITE 6 -

ON COMPLETION, MARK UP THISPRINT CLEARLY WITH ALL FINALCHANGES AND RETURN TO NETWORKDATA GROUP FOR REGIONCHANGES Yes/No ………………COMPLETION DATE……………………….NAME…………………………………………POSITION……………………………………SIGNATURE…………………………………DATE…………………………………………

03/12/2007 10:01:20

ncrosbie

03/12/2007 13:00:54

jhope

UNDERGROUND CONSTRUCTION PLAN

UNDERGROUND CONSTRUCTION

SPECIFICATIONS

This works plan is to be read in conjunction with thefollowing ERGON ENERGY manuals andspecifications.* RSC06 URD Main Specification* RSC07 URD Civil Works* Underground Construction Manual* Lighting Construction ManualConsumer's installation shall comply with AS3000:1991 - SAA Wiring Rules.

OVERHEAD CONSTRUCTION

SPECIFICATIONS

This works plan is to be read in conjunction with thefollowing ERGON ENERGY manuals andspecifications.* Distribution Field Manual* Overhead Construction Manual* Lighting Construction ManualConsumer’s installation shall comply with AS3000:1991 – SAA Wiring Rules.

SHEET1 of 1

SYSTEM DIAGRAM No.17 - A1 - 314/10

DRAWING REFERENCE No.B1 - 14G - 317/8

ZONE SUB/STN No. 07FEEDER No. GS-102

ELLIPSE FEEDER No. FD-1365 WET

BOLE

S S

TREE

T

4 X

7/.13

4AAC

FLY

OR

IGIN

AL

ISS

UE

AM

EN

DM

EN

TS

OA

.

SCALE - 1:1000

SCALE 1:1000

Approved By:

Approved Date:

Created By: wwilson

Drawing Status: Investigate

E

Boles Street - Gladstone - URD Subdivis ion - The Glen Precinct stage 1 - URD Construction Plan - Foreman, OF TB No.1 Pty Ltd

Created Date/Time: 26/07/2007 16:38:06

CPMCY02580

LEGEND

DCDBLand Parcel - STATE LANDLand Parcel - FREEHOLDLand Parcel - RESERVE

Unregistered PropertyURP CloakURP KerbsURP LotsURP Roundabouts

ElectricityAerial Stay - as constructed

Connection Poi nt - Unknown PlannedDuct - planned

Earth - as constructedEarth - planned

Earth Cable - plannedEarth CableGMS Site

Pillar - Cross Road Pillar PlannedPillar - Normal Pillar Planned

Pole - HV/LVPole - Unknown PlannedPole - SL PlannedPole - HVPole - BollardPole - LVPole - LV Future HVPole - HV/LV Planned

Pole - LV Future HV ( To Be Removed)Pole - LV ( To Be Removed)Pole - Unknown ( To Be Removed)Pole - HV ( To Be Removed)

Pole - SL ( To Be Removed)Pole - HV/LV ( To Be Removed)Pole - Bollard ( To Be Removed)

Stay - as constructedStay - removed

Stay ( To Be Removed)

Streetlight - Column / Pole MountedStreetlight - Column / Pole Mounted PlannedStreetlight - PlannedStreetlight - Unknown

Substation - Planned

Low VoltageLV Cable - planned ( 240v)LV Cable - planned ( 415v)LV Cable Termination - planned ( 415v)

LV Line - as constructed ( 240v)LV Line - removed ( 240v)LV Line - planned ( 240v)

LV Line - as constructed ( 415v)

LV Line - removed ( 415v)LV Line - planned ( 415v)

LV Line - as constructed ( Streetlight)LV Line - removed ( Streetlight)LV Line - planned ( Streetlight)

LV Line ( To Be Removed)

LV Isolating Device - planned ( 240v)LV Isolating Device - OpenBridge_planned ( 240v)

LV Isolating Device - planned ( 415v)

LV Isolating Device - OpenBridge_planned ( 415v)

High VoltageHV Cable - planned ( 11kv)HV Cable Termination - planned ( 11Kv)

HV Line - as constructed ( 11kv)HV Line - removed ( 11kv)HV Line - planned ( 11kv)

HV Line ( To Be Removed)

Hv Isolating Device - as constructed ( 11Kv)

Hv Isolating Device - removed ( 11Kv)Hv Isolating Device - planned ( 11Kv)

Hv Isolating Device - as constructed ( 22Kv)Hv Isolating Device - removed ( 22Kv)Hv Isolating Device - planned ( 22Kv)

Hv Isolating Device ( To Be Removed)

DraftingRedline Line (Path)

Conduit Ducting ScheduleSTN

FROMSTNTO

ACTION CONSTRUCTIONCODE

LENGTH(m)

REMARKS

4 9 Install C125L 139 m HV Conduit ends 1.5m f rom Pole 4 19 Install C100L 48 m LV Conduit 4 65 Install C40H 16 m Earth wire conduit to provide 15.0m

clearance from Telstra pit 7 8 Install C100L 59 m LV Conduit 7 9 Install C125L 78 m HV Conduit 7 17 Install C100L 74 m LV Conduit 7 27 Install C100L 21 m LV Conduit 8 10 Install C100L 22 m LV Conduit 9 33 Install C125L 177 m HV Conduit

10 11 Install C100L 40 m LV Conduit 10 16 Install C125L 161 m HV Conduit 10 46 Install C40H 3 m S/L Conduit 11 12 Install C100L 8 m LV Conduit 12 13 Install C100L 29 m LV Conduit 12 47 Install C40H 3 m S/L Conduit 13 14 Install C100L 42 m LV Conduit 13 48 Install C40H 25 m S/L Conduit 14 15 Install C100L 40 m LV Conduit 14 49 Install C40H 23 m S/L Conduit 17 18 Install C100L 25 m LV Conduit 17 45 Install C40H 3 m S/L Conduit 18 19 Install C100L 30 m LV Conduit 19 20 Install C100L 27 m LV Conduit 19 38 Install C40H 29 m S/L Conduit 19 39 Install C40H 8 m S/L Conduit 20 21 Install C100L 36 m LV Conduit 20 40 Install C40H 11 m S/L Conduit 20 41 Install C40H 12 m S/L Conduit 21 22 Install C100L 42 m LV Conduit 21 26 Install C100L 13 m LV Conduit 21 42 Install C40H 3 m S/L Conduit 22 23 Install C100L 45 m LV Conduit 22 25 Install C100L 13 m LV Conduit 22 43 Install C40H 4 m S/L Conduit 23 24 Install C100L 24 m LV Conduit 23 44 Install C40H 16 m S/L Conduit 27 50 Install C40H 3 m S/L Conduit 28 29 Install C100L 15 m LV Conduit 28 37 Install C100L 168 m LV Conduit X-press for futur e use to

Lots 13 & 14 28 37 Install C125L 168 m HV Conduit for futur e use to lots 49,

51, boundary of subdiv 29 30 Install C100L 23 m HV Conduit 30 31 Install C100L 38 m LV Conduit 30 35 Install C100L 42 m LV Conduit 30 51 Install C40H 9 m S/L Conduit 31 32 Install C100L 16 m LV Conduit 31 33 Install C100L 19 m LV Conduit 31 34 Install C100L 36 m LV Conduit 32 52 Install C40H 3 m S/L Conduit 35 36 Install C100L 41 m LV Conduit 35 53 Install C40H 16 m S/L Conduit 35 54 Install C40H 22 m S/L Conduit

Construction ScheduleSTNNO

SITELABEL

POLEALIGNMENT

POLESETTINGDEPTH

ACTION CONSTRUCTIONCLASS

CONSTRUCTIONCODE

DRAWINGNUMBER

POSITIONON POLE

REMARKS

1 Recover Pole Equipment 22FP3/5/MOO/U 1037 1 1 Recover Pole Equipment LVP3/50/000 1017 2 Conductor 4 X 7/.134AAC FLY 1 X19044 Recover Hv Isolating Device 11kV (DO) Unknown 3 20k EDO S/D markup L. Baker 2804/06 1 4034976 1.800 Recover Pole A51-23 Page 51 2 Recover Pole Equipment POLEEQUIPMENT Unknown 1 Post Processed 2 4201445 1.800 Recover Pole WP11/8D/NE 1091 3 Recover Pole Equipment POLEEQUIPMENT Unknown 1 Post Processed 3 Recover Stay STAY Unknown 2 3 152163 Recover Substation 50kVA 11kV/LV (SP) Unknown 3 3 118270.T1 Recover Transformer TRANSFORMER Unknown 4 3 4262117 2.000 Recover Pole WP12/8D/NE 1091 4 4034976 Install Pole WP14/8S/SB 1091 4 4034976 Install Pole Equipment 22TRS/MOO 1082 1 4 X019579 Install Hv Isolating Device CTP11TR185LPG3 1369 2 4 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 3 4 4034976 Install Pole Equipment LVP3/50/000 1017 4 Conductor 4 X 7/.134AAC FLY 4 4034976 Install Pole Equipment SOHN/225/AL 1045 5 4 4034976 Install Pole Equipment SOHA/225/AL 1048 5 4 Install LV Cable Termination LVCTP/240/M/AL 5056 6 4 Install LV Isolating Device LVSWP/4/OW 5056 6 LV OPEN POINT 4 Install Earth EHVEMGMEN/SEP/AL 1446 7 5 X019580 Install Hv Isolating Device SPEC_HV_ISOL_DEV_UG Unknown RMU 4 X Feeder Switches (SafeLink

CCCC) B in No. 0105005 5 Install Earth EPM11/COM 5013 5 Install Earth EADDCU 5013 5 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 5 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 6 SC200545 Install Substation PM11/500/ASL2S1F 5191 6 Install Earth EADDCU 5013 6 Install Earth EPM11/COM 5013 6 Install HV Cable Termination 11PM/CTC/ASL/185T 5206 6 Install LV Cable Termination LVCTPM11/240 5087 6 Install LV Cable Termination LVCTPM11/240 5087 6 Install LV Cable Termination LVCTPM11/240 5087 7 Install Pillar LVPN2/6/240 5026 7 Install Earth EMEN/PIL 5085 8 Install Pillar LVPN2/6/240 5026 8 Install Earth EMEN/PIL 5085

10 Install Pillar LVPN2/6S/240 5026 10 Install Earth EMEN/PIL 5085 11 Install Pillar LVPN2/6/240 5026 11 Install Earth EMEN/PIL 5085 12 Install Pillar LVPN2/6S/240 5026 12 Install Earth EMEN/PIL 5085 13 Install Pillar LVPN2/6S/240 5026 13 Install Earth EMEN/PIL 5085 14 Install Pillar LVPN2/6S/240 5026 14 Install Earth EMEN/PIL 5085 15 Install Pillar LVPN1/6S/240 5025 15 Install Earth EMEN/PIL 5085 17 Install Pillar LVPN2/6S/240 5026 17 Install Earth EMEN/PIL 5085 18 Install Pillar LVPN2/6/240 5026 18 Install Earth EMEN/PIL 5085 19 Install Pillar LVPN3/6S/240 5027 Install additional S/L fuse A506-4 19 Install Earth EMEN/PIL 5085 20 Install Pillar LVPN2/6S/240 5026 Install additional S/L fuse A506-4 20 Install Earth EMEN/PIL 5085 21 Install Pillar LVPN2/6S/240 5026 21 Install Earth EMEN/PIL 5085 22 Install Pillar LVPN2/6S/240 5026 22 Install Earth EMEN/PIL 5085 23 Install Pillar LVPN2/6S/240 5026 23 Install Earth EMEN/PIL 5085 24 Install Pillar LVPN1/6/240 5025 24 Install Earth EMEN/PIL 5085 25 Install Pillar LVPX/6/16CU 5041 26 Install Pillar LVPX/6/16CU 5041 27 Install Pillar LVPX/6S/16CU 5041 29 Install Pillar LVPN2/6/240 5026 29 Install Earth EMEN/PIL 5085 30 Install Pillar LVPN3/6S/240 5027 30 Install Earth EMEN/PIL 5085 31 Install Pillar LVPN1/6S/240 5025 31 Install Earth EMEN/PIL 5085 32 Install Pillar LVPX/6S/16CU 5041 35 Install Pillar LVPN1/6S/240 5025 Install additional S/L fuse A506-4 35 Install Earth EMEN/PIL 5085 36 Install Pillar LVPX/6/16CU 5041 38 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 39 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 40 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 41 0.5600 Install Pole SLBPM/90/115/UGCI2 8038 Alignment from rear of kerb 42 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 43 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 44 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 45 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 46 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 47 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 48 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 49 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 50 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 51 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 52 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 53 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 54 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb

Underground Cable ScheduleSTN

FROMSTNTO

ACTION VOLTAGE CONSTRUCTIONCODE

ROUTELENGTH

CABLELENGTH

REMARKS

4 5 Install 11kV 11-185T/1716 143 m 157 m 4 19 Install 415V LV-240C4/673 48 m 52 m 5 6 Install 11kV 11-185T/1716 85 m 91 m 5 10 Install SPEC_EARTH_CABLE 3 m 3 m Earth Cable 35mm2, 19/1.53 insulated

copper Bin No.1543109 connect earth bar in RMU to MEN in pillar

6 8 Install 415V LV-240C4/673 63 m 67 m 6 17 Install 415V LV-240C4/673 77 m 82 m 6 29 Install 415V LV-240C4/673 19 m 23 m 7 27 Install 415V LV-16CUC4/614 21 m 25 m 8 10 Install 415V LV-240C4/673 22 m 26 m

10 11 Install 415V LV-240C4/673 40 m 44 m 10 46 Install 240V LV-6CUC2/507 3 m 8 m 11 12 Install 415V LV-240C4/673 8 m 12 m 12 13 Install 415V LV-240C4/673 29 m 33 m 12 47 Install 240V LV-6CUC2/507 3 m 8 m 13 14 Install 415V LV-240C4/673 42 m 46 m 13 48 Install 240V LV-6CUC2/507 25 m 30 m 14 15 Install 415V LV-240C4/673 40 m 44 m 14 49 Install 240V LV-6CUC2/507 23 m 28 m 17 18 Install 415V LV-240C4/673 25 m 29 m 17 45 Install 240V LV-6CUC2/507 3 m 8 m 18 19 Install 415V LV-240C4/673 30 m 34 m 19 20 Install 415V LV-240C4/673 27 m 31 m 19 38 Install 240V LV-16CUC2/603 29 m 34 m 19 39 Install 240V LV-16CUC2/603 8 m 13 m 20 21 Install 415V LV-240C4/673 36 m 40 m 20 40 Install 240V LV-16CUC2/603 11 m 16 m 20 41 Install 240V LV-16CUC2/603 12 m 17 m 21 22 Install 415V LV-240C4/673 42 m 46 m 21 26 Install 415V LV-16CUC4/614 13 m 17 m 21 42 Install 240V LV-6CUC2/507 3 m 8 m 22 23 Install 415V LV-240C4/673 45 m 49 m 22 25 Install 415V LV-16CUC4/614 13 m 17 m 22 43 Install 240V LV-6CUC2/507 4 m 9 m 23 24 Install 415V LV-240C4/673 24 m 28 m 23 44 Install 240V LV-6CUC2/507 16 m 21 m 27 50 Install 240V LV-6CUC2/507 3 m 8 m 29 30 Install 415V LV-240C4/673 23 m 27 m 30 31 Install 415V LV-240C4/673 38 m 42 m 30 35 Install 415V LV-240C4/673 42 m 46 m 30 51 Install 240V LV-6CUC2/507 9 m 14 m 31 32 Install 415V LV-16CUC4/614 16 m 20 m 32 52 Install 240V LV-6CUC2/507 3 m 8 m 35 36 Install 415V LV-16CUC4/614 41 m 45 m 35 53 Install 240V LV-6CUC2/507 16 m 21 m 35 54 Install 240V LV-6CUC2/507 22 m 27 m

Public Light ScheduleSTNNO.

SITELABEL

ACTION CONSTRUCTIONCODE

RATE OWNER MOUNTINGHEIGHT

REMARKS

38 Install SLM125D Rate2 Gladstone 9.000 Requires Adaptor Bracket Bin No.001104732

39 Install SLM125D Rate2 Gladstone 9.000 Fit with Adaptor Bracket Bin No.001104732

40 Install SLM125D Rate2 Gladstone 9.000 Fit with Adaptor Bracket Bin No.001104732

41 Install SLM125D Rate2 Gladstone 9.000 Fit with Adaptor Bracket Bin No.001104732

42 Install SLM80DA Rate2 Gladstone 7.500 43 Install SLM80DA Rate2 Gladstone 7.500 44 Install SLM80DA Rate2 Gladstone 7.500 45 Install SLM80DA Rate2 Gladstone 7.500 46 Install SLM80DA Rate2 Gladstone 7.500 47 Install SLM80DA Rate2 Gladstone 7.500 48 Install SLM80DA Rate2 Gladstone 7.500 49 Install SLM80DA Rate2 Gladstone 7.500 50 Install SLM80DA Rate2 Gladstone 7.500 51 Install SLM80DA Rate2 Gladstone 7.500 52 Install SLM80DA Rate2 Gladstone 7.500 53 Install SLM80DA Rate2 Gladstone 7.500 54 Install SLM80DA Rate2 Gladstone 7.500

nholmes
Text Box
5.2 Sample UG Construction Plan

105

FN50

7

1

AP4332

103 FN507

104 FN507

9.3

72º

75.86º

Unknown

3

64

5

1

2

250580Y

SP79777

250035

4161424

4258146

4258146A

4258145

4258144

4263257

4258143

MOURA

SHEAN STREET

DAWSON HIGHWAY

KING STREET

SHEAN STREET

DAWSON HIGHW

AY

DAWSON HIGHWAY

GILCHRIST STREET

LANE

SHIRLEY STREET

ROGER STREET

MARSHALL STREETSHIRLEY STREET

BELL STREET

BELL STREET

NICKLIN STREET

KING STREETLANELANE

DAWSON HIGHWAYDAVEY STREET

DAVEY STREET

YOUNG STREETSHIRLEY STREETKNAGGS STREET

MCARTHUR STREET

NOTT STREET

NOTT STREET

NOTT STREET

MISFELD STREET

HAMILTON STREET

FARMER STREET

MCDOWELL STREETWID

T STR

EETNOBBS STREET

WIDT STREET

NOBBS STREETWIDDERICK STREETHERTZOG STREETHERTZOG STREET

DAWSON HIGHWAY

ROGERS STREET

DAW

SON

HIG

HWAY

NICKLIN STREET

HEWITT STREETDAVEY STREET

DAVEY STREET

JULE

S ST

REE

T

ROAD

SCENIC STREETBELL STREET

KNAGGS STREETNOTT STREET

SCENIC STREET

KNAGGS STREET

MCARTHUR STREET

LUHRS STREETDAVEY STREET

DAVEY STREET

DAVEY STREETBURNHAM STREET

BURNHAM STREETROG

ERS

STRE

ET

DAVEY STREET

ROGERS STREETHICKS STREET

BURNHAM STREETBECKER STREET

STEPHENSON STREETENGEL STREET

LEDERHOSE STREETENGEL STREET

ELLE

M S

TREE

T

BECKER STREET

STEPHENSON STREET

BECKER STREET

PATH

WA

Y

DAVEY STREET

ENGEL STREETENGEL STREETNOBBS STREET

NOBBS STREET

NOBBS STREETNOBBS STREET

NOBBS STREET

NOBBS STREET

DAW

SON

HIG

HWAY

DAWSON HIGHWAY

DAWSON HIGHWAY

DAWSON HIGHWAY

SALEYARDS R

OAD

DAWSON HIGHWAY

SAXELBYS ROAD

RIVER ROAD

TEMPORARILY CLOSED ROAD TOM

ASZU

KS R

OAD

RIVER ROAD

RIVER ROAD

RIVER ROAD

RIVER ROAD

RIVE

R RO

AD

DRAIN

DRAINDRAIN

DRAIN

CHANNEL

CHANNEL

3 64

51

2

250040

79774250537

250166250018

250116250039

250017

250051

250038

250578

250631

250192

250009

250019250046

250189

250636

250045

250014

250605

250566

250211

79801D

250668

250669

250007

250010

250580Y 25057079803D

SP79777250042

250609

250512

250035

250020250401

250050

250585

250013

N

S

W E

1 2 3 4 5 6 7 8

A

B

C

D

E

FProject Number

Contract / Quote Number

UNLESS OTHERWISE STATEDALL DIMENSIONS IN MILLIMETRES

Checked Date:

Name:

Name:

Business Approved Date

COPYRIGHT This drawing must not be reproduced in part or whole without written permission from ERGON ENERGY CORPORATION Ltd.

A

B

C

D

E

F

A2ISSUE

ERGON ENERGY CORPORATION LTD

594 X 420

1 2 3 4 5 6 7 8

A2

ABN 50 087 646 062

REFERENCE DRAWINGS

LOT 103FN507

LOT 104FN507

Proposed ResidenceA. Hutchinson

Proposed ResidenceM. Hutchinson

0m 30m 60m 90m 120m 150m

WARNINGU/G Irrigation Main

approx. locationRefer to

Construction Notes

WORKSITE

MOURATOWNSHIP

OVERHEAD CONSTRUCTION NOTES

1.Locate underground irrigation mains before work commences, contact Matt Hutchinsonmobile 0409269399.

2. Customers to provide suitable points of attachment for Ergon overhead services.

SPECIFICATIONS

This works plan is to be read in conjunction with the following ERGON ENERGY manualsand specifications.* Distribution Field Manual* Overhead Construction Manual* Lighting Construction ManualConsumer’s installation shall comply with AS 3000: 1991 – SAA Wiri ng Rules.

Asset Identification numbers to be attached to all NEW wood & concrete Poles & the numbers recorded against each relevant asset in the Construction Schedule. O/H Construction Manual - Assemblies - Dwg 64.

OVERHEAD RURAL CONSTRUCTION PLAN

ON COMPLETION, MARK UP THISPRINT CLEARLY WITH ALL FINALCHANGES AND RETURN TO NETWORKDATA GROUP FOR REGIONCHANGES Yes/No ………………COMPLETION DATE……………………….NAME…………………………………………POSITION……………………………………SIGNATURE…………………………………DATE…………………………………………

SHEET1 of 107/12/2007 14:20:36

ncrosbie

07/12/2007 15:17:46

wwilson

LOCATION PLAN

ZONE SUB/STN No. MRBS 10FEEDER NO. MR-202

ELLIPSE FEEDER No. FD-2144SYSTEM DIAGRAM No.

17 - A2 - 277/2REFERENCE DRAWING No.

C11B - 133/2

DAWSON RIVER

84

20

50

ACCESS TRACK

SALE

YARD

S R

OAD

50

20

ACCESS TRACK

RIVER ROAD

DAWSON RIVER

AM

EN

DM

EN

TS

OR

IGIN

AL IS

SU

EO

A.

SCALE - 1:2000

SCALE 1:2000

Approved By:

Created Date/Time: 16/03/2007 15:33:26

Created By: jhope

Approved Date:

Saleyards Rd - Moura - 22kV extension to 63kVA Transformer plus LV ext ension -OH Construction Plan - M. & A. Hutchinson

Drawing Status: Design

CY02518F

LEGEND

DCDBLand Parcel - LANDS LEASELand Parcel - FREEHOLD

Strata Parcel - LANDS LEASEWatercourse

ElectricityConnection Point - Customer ConnectionConnection Point - Customer Connection Planned

Earth - as constructedEarth - planned

Pole - HV/LVPole - Unknown PlannedPole - HVPole - LV PlannedPole - LVPole - HV/LV Planned

Pole - LV ( To Be Removed)

Pole - Unknown ( To Be Removed)Pole - HV/LV ( To Be Removed)Pole - HV ( To Be Removed)

Stay - as constructedStay - removedStay - planned

Stay ( To Be Removed)

Substation - Planned

Substation - Pole

Low VoltageLV Line - as constructed ( 415v)LV Line - planned ( 415v)

High VoltageHV Line - as constructed ( 22kv)HV Line - planned ( 22kv)

Hv Isolating Device - as constructed ( 22Kv)

Construction ScheduleSTNNO

SITELABEL

POLEALIGNMENT

POLESETTINGDEPTH

ACTION CONSTRUCTIONCLASS

CONSTRUCTIONCODE

DRAWINGNUMBER

POSITIONON POLE

REMARKS

1 4258145 Upgrade Pole Equipment 22S3/7/B/MAR/R 1077 2 Change X-Arm To Opposite Side Of Pole 1 4258145 Install Stay PS22GS2/45CB 1097 3 2 2.200 Install Pole WP14/12S/SB 1091 2 Install Pole Equipment 22T3/7/B/MAR/R 1041 1 2 Install Stay PS22GS2/45CB 1097 2 Offset 1.5m 2 Install Stay PS22GS1/45CB 1097 2 Offset 1.5m 2 Install Pole Equipment SOHS/495 1215 3 2 Install Pole Equipment SOHS/425 1053 4 2 SP79777 Install Substation SS22/3/63ABC 1407 5 2 SP79777 Install Transformer PT22/3/63NF Unknown 6 2 Install Earth EPT/SEP 1241 7 2 Install Earth EA Unknown 7 2 Install Earth EAR Unknown 7 3 1.850 Install Pole WP11/5S/SB 1091 3 Install Pole Equipment LVBI/495 1012 1 4 1.850 Install Pole WP11/8S/SB 1091 4 Install Pole Equipment LVBT/495 1014 1 4 Install Stay PS22GS1/45CB 1097 2 4 Install Pole Equipment SOHN/425/ABC 1044 3 4 Install Earth EMEN/ABC 1296 3

Overhead Conductor ScheduleSTN

FROMSTNTO

ACTION VOLTAGE CONDUCTORCODE

NUMBER OFCONDUCTORS

ROUTELENGTH

(m)

MES %NBL WINDPRESSURE

(Pa)

REMARKS

1 2 Install 22kV MAR 3 84 m 84 20 900 Pa 2 4 Install 415V B495 1 99 m 50 10 900 Pa 2 5 Install 415V B425 1 30 m 20 Service 1200 Pa Service Stringing Table Dwg 1049 4 6 Install 415V B425 1 30 m 20 Service 1200 Pa Service Stringing Table Dwg 1049

KATHERINE COURT

COCKATOO DRIVE

LORI

KEET

AVE

NUE

KENN

ETH

COUR

T

PATH

WAY

BEA

K ST

REET

8 7

WB

13

913

4

R

2

5

B

1514

W R

171211

1

3

R

10

RWB

SP200559

4076535

4200430

4076541

4076542

4072979

4072961

4072960

40729624013961

4072981

4082519

4082518

4082517

40729834072984

4155940

4072982

4082372

4082371

EA

EAEB

LUSCOMBE COURT

SANDPIPER AVENUE

GOSHAWK S

TREET

LUSC

OM

BE

CO

UR

T

NO

RM

A S

TREE

T

SANDPIPER AVENUE

LOR

IKEE

T A

VEN

UE

NORMA STREET

NORMA STREET

SANDPIPER AVENUE

HER

ON

CO

UR

T

GANNET STREETBR

OLG

A A

VEN

UE

COCKATOO DRIVE

BR

OLG

A A

VEN

UE

HARRIER AVENUE

KATHERINE COURT

COCKATOO DRIVE

LORI

KEET

AVE

NUE

COCKATOO DRIVE

HARRIER AVENUE

SKU

A S

TREE

T CURLEW DRIVE

CLARANCE

DRIVEROAD

ROAD

IRO

NB

AR

K A

VEN

UE

JACARANDA COURT

OREGON COURT

RADIATA STREET

LUSCOMBE COURT

TEAK STREETTEAK STREET

WATTLE STREET

WATT

LE S

TRE

ET

OREGON COURT

BEA

K S

TREE

T

BEAK

STR

EET

WA

TTLE

STR

EET

KENN

ETH

COUR

T

PATH

WAY

WATTLE STREET

BEA

K S

TREE

T

BEAK STREET

538

539

537

536

540535534533

541542

532 543544

556555

552553

551

550

549548

547546

505

595596

597

554

575594

593 526525524516

545

517506

504503502 522523

518520519 521

512

513

515514510

511

501500

507508

509

499498

497

488489

527

528529

531530

OPEN SPACE

482 496495

494

592598

599591

590

487486

484

600601

602

485603

463

464462

461

483

465466

6

8 7

13

913 4

2

515 14

171211

13

10

UNKNOWN

152689

152331

SP200559

152443

152732

152180

152429

U199600

ZC1039974

ZC1039975

ZC1039983ZC1039976

U199704ZC1039978ZC1039977

ZC1039984U196829U196828

U196826U196825

U196820U196821

N

S

W E

1 2 3 4 5 6 7 8

A

B

C

D

E

FProject Number

Contract / Quote Number

UNLESS OTHERWISE STATEDALL DIMENSIONS IN MILLIMETRES

Checked Date:

Name:

Name:

Business Approved Date

COPYRIGHT This drawing must not be reproduced in part or whole without written permission from ERGON ENERGY CORPORATION Ltd.

A

B

C

D

E

F

A2ISSUE

ERGON ENERGY CORPORATION LTD

594 X 420

1 2 3 4 5 6 7 8

A2

ABN 50 087 646 062

REFERENCE DRAWINGS

0m 20m 40m 60m

COCKATOO DVESP20055911/315/3

LV OPEN POINT

LV OPEN POINTLV OPEN

POINT

SUKA STREETSP15244311/315/3

4072979

4072977

OVERHEAD CONSTRUCTION NOTES

1. Customer to supply & install suitable Service Pole insideproperty boundary.

2. DBYD locations have been obtained. Physical locations willbe required for Council, Telstra & Gas.

SPECIFICATIONS

This works plan is to be read in conjunction with the followingERGON ENERGY manuals and specifications.* Distribution Field Manual* Overhead Construction Manual* Lighting Construction ManualConsumer’s installation shall compl y with AS3000: 1991 –SAA Wiring Rules.

Asset Identification numbers to be attached to all NEW wood & concrete Poles & the numbers recorded against each relevant asset in the Construction Schedule. O/H Construction Manual - Assemblies - Dwg 64.

LEGEND

Overhead LV Lines New

Overhead LV Lines Existing

LV SCHEMATIC

ON COMPLETION, MARK UP THISPRINT CLEARLY WITH ALL FINALCHANGES AND RETURN TO NETWORKDATA GROUP FOR REGIONCHANGES Yes/No ………………COMPLETION DATE……………………….NAME…………………………………………POSITION……………………………………SIGNATURE…………………………………DATE…………………………………………

Lot 401RP901621

Unit Development

LOCATION PLAN

06/12/2007 08:30:17

seccles

07/12/2007 07:21:47

wwilson

OVERHEAD URBAN CONSTRUCTION PLAN

LV OPEN POINT

SHEET1 of 1

ZONE SUB/STN No. GSBS 07FEEDER No. GS-108

ELLIPSE FEEDER No. FD-1368SYSTEM DIAGRAM No.

17 - A1 - 314/12DRAWING REFERENCE No.

B1 - 14G - 317/11&12

LV OPEN POINT

BROL

GA A

VENU

E

BWNR

BWNR

RNWB

BEAK

ST

REE

T

FLY 7/.134AAC

LORI

KEET

AV

ENUE

BWNR

FLY 7/.134AAC

4072

981

4072

982

MOON 7/4.75AAC

RNW

B

SKUA

ST

REET

45.0m

38.0m

31.0m

AM

EN

DM

EN

TS

OR

IGIN

AL IS

SU

EO

A.

SCALE - 1:1000

SCALE 1:1000

Approved By:

Created Date/Time: 22/10/2007 13:52:33

Created By: ncrosbie

Approved Date:

Cockatoo Drive, New Auckland - Gladstone - 11kV Extension to 315kVATransformer for 12 Unit Development - OH Construction Plan - Bill Robertson

Drawing Status: Investigate

68962E

LEGEND

DCDBEasementsLand Parcel - FREEHOLD

Unregistered PropertyURP Lots

ElectricityConnection Point - Customer Connection PlannedConnection Point - Unknown

Connection Point - Unknown ( To Be Removed)Connection Point - Custom er Connection ( To Be Removed)

Earth - as constructedEarth - removed

Earth - planned

Earth ( To Be Removed)

Pole - HV/LV PlannedPole - LV PlannedPole - LV Future HVPole - HV/LVPole - LV

Pole - LV ( To Be Removed)Pole - LV Future HV ( To Be Removed)Pole - HV/LV ( To Be Removed)

Stay - as constructedStay - removed

Stay - planned

Stay ( To Be Removed)

Streetlight - Column / Pole Mounted PlannedStreetlight - UnknownStreetlight -

Streetlight - Unknown ( To Be Removed)Streetlight - Column / P ole Mounted ( To Be Removed)

Substation - Planned

Low VoltageLV Line - as construct ed ( 240v)LV Line - removed ( 240v)

LV Line - planned ( 240v)

LV Line - as construct ed ( 415v)LV Line - removed ( 415v)LV Line - planned ( 415v)

LV Line ( To Be Removed)

High VoltageHV Line - as constructed ( 11kv)HV Line - removed ( 11kv)HV Line - planned ( 11kv)

HV Line ( To Be Removed)

Construction ScheduleSTNNO

SITELABEL

POLEALIGNMENT

POLESETTINGDEPTH

ACTION CONSTRUCTIONCLASS

CONSTRUCTIONCODE

DRAWINGNUMBER

POSITIONON POLE

REMARKS

1 4072981 0.5600 2.150 Install Pole WP14/8S/SB 1091 Alignment from rear of kerb 1 4072981 Install Pole Equipment 22S3/7/B/000 1077 1 FLY 7/.134 AAC to MARS 7/3.75 AAC 1 4072981 Install Pole Equipment LVS3/51/000 1020 2 FLY 7/.134 AAC to MOON 7/4.75 AAC LV

OPEN POINT 1 4072981 Install Pole Equipment SOHN/225/AL 1045 3 1 4072981 Install Pole Equipment SOHN/225/AL 1045 3 1 Install Earth EMEN/AL 1296 5 2 0.5600 2.150 Install Pole WP14/12S/SB 1091 Alignment from rear of kerb 2 Install Pole Equipment 22DP3/5/MAR/U 1039 1 2 Install Pole Equipment LVP3/50/MOO 1017 2 2 Install Pole Equipment SOHC/425/AL 1070 3 2 Install Pole Equipment SOHN/225/AL 1045 3 2 Install Pole Equipment SOHA/225/AL 1048 3 2 SP200559 Install Substation SS11/3/315OW 1409 4 2 200559 Install Transformer PT11/3/315NF Unknown 4 2 Install Earth EPT/SEP/DD 1311 5 3 4072982 0.5600 2.150 Install Pole WP14/8S/SB 1091 Alignment from rear of kerb 3 4072982 Install Pole Equipment 22T3/7/B/MAR/U 1041 1 3 4072982 Install Stay PS22GS2/60CP 1097 2 3 4072982 Install Pole Equipment LVS3/51/000 1020 3 FLY 7/.134 AAC to MOON 7/4.75 AAC 3 4072982 Install Pole Equipment SOHC/425/AL 1070 4 3 4072982 Install Pole Equipment SOHN/450/ABC 1050 4 Fuse Links 100A 4 0.5600 1.850 Install Pole WP11/5S/NE 1091 Alignment from rear of kerb 4 Install Pole Equipment SOHP2/225/ABC 1110 1

13 Recover Pole Equipment POLEEQUIPMENT Unknown 1 13 Recover Stay STAY Unknown 2 13 Recover Pole Equipment POLEEQUIPMENT Unknown 3 13 Recover Pole Equipment POLEEQUIPMENT Unknown 4 13 Recover Earth EARTH Unknown 5 13 4072981 2.000 Recover Pole A51-23 Page 51 Relocate Asset N umber to new pole 14 Recover Pole Equipment POLEEQUIPMENT Unknown 1 14 Recover Pole Equipment LVBT/250 1014 2 14 Recover Pole Equipment POLEEQUIPMENT Unknown 3 14 4072980 2.000 Recover Pole WP12/5D/NE 1091 15 Recover Pole Equipment POLEEQUIPMENT Unknown 1 15 Recover Pole Equipment POLEEQUIPMENT Unknown 2 15 4072982 2.000 Recover Pole WP12/5D/NE 1091 Relocate Asset N umber to new pole

Overhead Conductor ScheduleSTN

FROMSTNTO

ACTION VOLTAGE CONDUCTORCODE

NUMBER OFCONDUCTORS

ROUTELENGTH

(m)

MES %NBL WINDPRESSURE

(Pa)

REMARKS

1 3 Install 11kV MAR 3 68 m 35 6 1200 Pa 1 3 Upgrade 415V MOO 4 68 m 36 6 1200 Pa 1 3 Relocate 415V MOO 4 68 m 36 6 1200 Pa 1 5 Relocate 415V 163 4 52 m 45 6 1200 Pa 7/.134 AAC Fly 1 6 Relocate 11kV 163 3 128 m 45 6 1200 Pa 7/.134 AAC Fly 1 7 Install 240V B225 1 23 m Service 1200 Pa Service Stringing Table Dwg 1049 1 17 Install 240V B225 1 21 m Service 1200 Pa Service Stringing Table Dwg 1049 2 4 Install 415V B425 1 17 m Service 1200 Pa Service Stringing Table Dwg 1049 2 11 Install 240V B225 1 19 m Service 1200 Pa Service Stringing Table Dwg 1049 2 12 Install 240V B225 1 23 m Service 1200 Pa Service Stringing Table Dwg 1049 3 10 Install 415V B450 1 20 m Service 1200 Pa Service Stringing Table Dwg 1049 3 13 Install 415V B425 1 22 m Service 1200 Pa Service Stringing Table Dwg 1049 4 8 Install 240V B225 1 12 m Service 1200 Pa Service Stringing Table Dwg 1049 4 9 Install 240V B225 1 12 m Service 1200 Pa Service Stringing Table Dwg 1049 7 13 Recover 240V B225 1 23 m Service 8 14 Recover 240V 417 1 23 m Service 9 14 Recover 240V 417 1 24 m Service

11 15 Recover 240V B225 1 24 m Service 12 14 Recover 240V B225 1 20 m Service 13 15 Recover 240V B250 2 20 m Service 13 17 Recover 240V B225 1 20 m Service

Public Light ScheduleSTNNO.

SITELABEL

ACTION CONSTRUCTIONCODE

RATE OWNER MOUNTINGHEIGHT

REMARKS

1 4072981 Install SLWPB/MA3AL Ergon 1 4072981 Install SLS250CA Rate2 Gladstone 9.000 3 4072982 Install SLS250CA Rate2 Gladstone 9.000 3 4072982 Install SLWPB/MA3AL Ergon

13 Recover SLWPB/MA3AL Ergon 13 Recover SPEC_STREETLIGHT_SL Rate2 Gladstone 9.000 15 Recover STREETLIGHT Unknown Gladstone 9.000 50W MV

CBGB

FB

BB

AA

GBFB

BB

EA

AA

AA

EA

ABEA

EA

EBEA ACAA

EA

FBAB

AA

FB

EA

AB

HAMPTO

N DRIVE

CREMORNE DRIVE

ROAD

CREMORNE DRIVE

HAMPTON DRIVE

TIMB

ERTO

P CO

UR

T

PRYDE STREET

PATH

WA

Y

4 5

6

3

12

11

7 10

98

2

1

141316

15

4027

5241

Unknown

Unknown

Unknown

Unknown

Unknown

R

Unknown

Unknown

BB

R

2322

BB

UnknownWW Unknown

B

Unknown

UnknownW

2

3013

14

21

15

11

1029

3

24

49

20

12

19

17

62627

16

25

5

28

Unknown

Unknown

Unknown

Unknown

Unknown

UnknownUnknown

UnknownUnknown

Unknown

RR

8

18

7

152998

P169826

P188549

P188548

P169827

P169828

ZC1039561

ZC1039763 ZC1039560

P169829

4141623

4141624

4141643

4141644

ZC1039769P187284

P187285 4141645

ZC1039768

CBGB

FB

BB

AA

GBFB

BB

EA

AA

AA

EA

ABEA

EA

EBEAAC

AA

EA

FBAB

AA

FB

EA

AB

103

RP836494 30 4

SP

130 5

73 305 SP130573

106

RP836494

107

RP836494

ROAD

PATH

WA

Y

4 5

6

3

12

11

7 10

98

2

1

1413

1615

1.00 m

2.00 m

21.42

m

14.00 m

2322

2

3013

14

21

15

11

1029

3

24

49

20

12

19

17

626

27

16

25

5

28

8

18

7

2322

2

3013

14

21

15

11

1029

3

24

49

20

12

19

17

626

27

16

25

5

28

8

18

7

N

S

W E

1 2 3 4 5 6 7 8 9 10 11 12

H

G

F

E

D

C

A

B

A

B

C

D

E

F

G

H

COPYRIGHT This drawing must not be reproduced in part or whole without written permission from ERGON ENERGY CORPORATION Ltd.

A1

841 X 594UNLESS OTHERWISE STATEDALL DIMENSIONS IN MILLIMETRES

Contract / Quote Number Business Approved Date

Name:

Checked Date:

1 2 3 4 5 6 7 8 9 10 11 12

A1

ISSUE

ERGON ENERGY CORPORATION LTD

0m 20m 40m 60m

Name:

Project Number:

ABN 50 087 646 062

REFERENCE DRAWINGS

ZONE SUB/STN No. 45FEEDER No. BR-107ELLIPSE FEEDER No

FD-1416 WET

SYSTEM DIAGRAM 17-A1-313/5REFERENCE DWG No. 8 - 345

0m 10m 20m 30m 40m 50m

CONDUIT SCHEMATIC

STREET LIGHTING LOCATIONSDimensioned

STREET LIGHTING CONSTRUCTION PLAN

LOCATION PLAN

ON COMPLETION, MARK UP THISPRINT CLEARLY WITH ALL FINALCHANGES AND RETURN TO NETWORKDATA GROUP FOR REGIONCHANGES Yes/No ………………COMPLETION DATE……………………….NAME…………………………………………POSITION……………………………………SIGNATURE…………………………………DATE…………………………………………

UNDERGROUND CONSTRUCTION NOTES

1. CONDUIT DEPTHS, ALIGNMENTS & TRENCHING detail refer Underground Construction Manual TRENCHING DWG5165. Provide Polymeric Cable Protection Cover in accordance with CONSTRUCTION PRACTICES DWG 5124.

2. Developer/Civil Contractor to SUPPLY & INSTALL CONDUIT, PLUS LIGHTING FOUNDATIONS.

3. Developer/Civil Contractor to obtain DBYD Locations, plus obtain physical l ocations where required.

4. Developer to contact Ergon Energy for site audits in acc ordance with RSC07.

5. Local council to accept streetlights and positions.

SPECIFICATIONS

This works plan is to be read in conjunction with the following ERGON ENERGY manuals and specifications.* RSC06 URD Main Specification* RSC07 URD Civil Works* Underground Construction Manual* Lighting Construction ManualConsumer's installation shall comply with AS3000: 1991 - SAA Wiring Rules.

05/12/2007 09:17:28

12/12/2007 10:30:15

ncrosbie

jhope

SHEET1 of 1

KEATING STREET

OR

IGIN

AL

ISS

UE

AM

EN

DM

EN

TS

OA

.

SCALE - 1:1000

SCALE 1:1000

Approved By:

Approved Date:

Created By: wwilson

Drawing Status: Investigate

A

Pryde Street - Tannum Sands - Street Lighting - URD Subdivision Civi l Precinctstage 1 - Lighting Plan - Calliope Shire Council Development

Created Date/Time: 14/11/2007 13:55:25

WR125511

LEGEND

DCDBEasementsLand Parcel - FREEHOLD

Unregistered PropertyURP CloakURP FeaturesURP KerbsURP Kerbs

URP LotsURP Lots

ElectricityConnection Po int - Unknown

Duct - as constructedDuct - planned

Earth - as constructedGMS Site

Pillar - Cross Ro ad Pillar PlannedPillar - UnknownPillar - Normal P illar PlannedPillar - Link Pillar Planned

Pit - as constructed

Po le - Unknown PlannedPole - SLPole - SL P lannedPole - LV

Streetlight - Column / Pole Mo unted PlannedStreetlight - Unknown

Substation - Ground

Low VoltageLV Cable - as constructed ( 240v)LV Cable - planned ( 240v)

LV Cable - as constructed ( 415v)LV Cable - planned ( 415v)

LV Cable - as co nstructed ( Streetlight)LV Cable - planned ( Streetlight)

LV Line - as constructed ( 415v)LV Isolating Device - as co nstructed ( 415v)

High VoltageHV Cable - as co nstructed ( 11kv)

SCALE 1:750

LEGEND

ElectricityDuct - 100mm/110mmDuct - 125mmDuct - 40mmDuct - Unknown

Duct ( To Be Removed)Streetlight - Colum n / Pole Mounted Planned

Pillar - Cross Road Pillar PlannedPillar - Normal Pillar PlannedPillar - Link Pillar Planned

Pole - Unknown PlannedPole - SL Planned

Conduit Ducting ScheduleSTN

FROMSTNTO

ACTION CONSTRUCTIONCODE

LENGTH(m)

REMARKS

2 3 Install C100L 43 m LV Conduit 2 13 Install C40H 16 m S/L Conduit 3 4 Install C100L 41 m LV Conduit 3 14 Install C40H 24 m S/L Conduit 4 5 Install C100L 36 m LV Conduit 4 15 Install C40H 22 m S/L Conduit 4 21 Install C100L 17 m LV Conduit 4 21 Install C125L 17 m HV Conduit 4 21 Install C125L 17 m HV Conduit 5 6 Install C100L 60 m LV Conduit 5 16 Install C40H 34 m S/L Conduit 5 28 Install C100L 26 m LV Conduit 6 7 Install C100L 58 m LV Conduit 6 9 Install C100L 59 m LV Conduit 6 17 Install C40H 17 m S/L Conduit 7 8 Install C100L 16 m LV Conduit 7 18 Install C40H 3 m S/L Conduit 9 10 Install C100L 38 m LV Conduit 9 12 Install C100L 15 m LV Conduit 9 19 Install C40H 4 m S/L Conduit

10 11 Install C100L 25 m LV Conduit 11 20 Install C40H 3 m S/L Conduit 22 28 Install C125L 130 m HV Conduit 29 30 Install C125L 17 m HV Conduit 29 30 Install C125L 17 m HV Conduit

Public Light ScheduleSTNNO.

SITELABEL

ACTION CONSTRUCTIONCODE

RATE OWNER MOUNTINGHEIGHT

REMARKS

13 Install SLM80DA Rate2 Calliope 7.500 14 Install SLM80DA Rate2 Calliope 7.500 15 Install SLM80DA Rate2 Calliope 7.500 16 Install SLM80DA Rate2 Calliope 7.500 17 Install SLM80DA Rate2 Calliope 7.500 18 Install SLM80DA Rate2 Calliope 7.500 19 Install SLM80DA Rate2 Calliope 7.500 20 Install SLM80DA Rate2 Calliope 7.500

Underground Cable ScheduleSTN

FROMSTNTO

ACTION VOLTAGE CONSTRUCTIONCODE

ROUTELENGTH

CABLELENGTH

REMARKS

2 3 Install 415V LV-240C4/673 43 m 47 m 2 13 Install 240V LV-6CUC2/507 16 m 21 m 3 4 Install 415V LV-240C4/673 41 m 45 m 3 14 Install 240V LV-6CUC2/507 24 m 29 m 4 5 Install 415V LV-240C4/673 36 m 40 m 4 15 Install 240V LV-6CUC2/507 22 m 27 m 5 6 Install 415V LV-240C4/673 60 m 64 m 5 16 Install 240V LV-6CUC2/507 34 m 39 m 6 7 Install 415V LV-240C4/673 58 m 62 m 6 9 Install 415V LV-240C4/673 59 m 63 m 6 17 Install 240V LV-6CUC2/507 17 m 22 m 7 18 Install 240V LV-6CUC2/507 3 m 8 m 9 10 Install 415V LV-240C4/673 38 m 42 m 9 19 Install 240V LV-6CUC2/507 4 m 9 m

10 11 Install 415V LV-240C4/673 25 m 29 m 11 20 Install 240V LV-6CUC2/507 3 m 8 m

Construction ScheduleSTNNO

SITELABEL

POLEALIGNMENT

POLESETTINGDEPTH

ACTION CONSTRUCTIONCLASS

CONSTRUCTIONCODE

DRAWINGNUMBER

POSITIONON POLE

REMARKS

2 Install Pillar LVPN2/6/240 5026 3 Install Pillar LVPN2/6S/240 5026 4 Install Pillar LVPN2/6S/240 5026 5 Install Pillar LVPN2/6S/240 5026 6 Install Pillar LVPN3/6S/240 5027 7 Install Pillar LVPL2/6S/240 5042 9 Install Pillar LVPN2/6S/240 5026

10 Install Pillar LVPN2/6/240 5026 11 Install Pillar LVPN1/6S/240 5025 12 Install Pillar LVPX/6/16CU 5041 13 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 14 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 15 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 16 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 17 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 18 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 19 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb 20 0.5600 Install Pole SLBPM/75/115CI 8042 Alignment from rear of kerb