SPECTRAP - GSIprogress report and status

overview

Page 2: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Initial problemsInitial problems

=> The best option was to disassemble the whole system piece by piece

• View ports were not in line• No vacuum could be established• We had no idea how the whole system looked inside• The trap had to be changed anyhow

Page 3: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Stage I – dismantlingStage I – dismantling

Liquid nitrogen dewar

Liquid helium dewar

Outer (70K) shield

Inner (4K) shield

Mounting “can”

SC magnet coils

trap

4K elec.

ions

Page 4: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Removing the outer shieldRemoving the outer shield

Supported by a small crane

Positioning spokes

Page 5: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Removing the LN dewarRemoving the LN dewar

Page 6: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Broken bellows on the LN dewarBroken bellows on the LN dewar

Page 7: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

LN dewar and inner shield overviewLN dewar and inner shield overview

Page 8: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Removing the inner shieldRemoving the inner shield

Some broken electronics parts

Broken support disc of the inner shield

+ other smaller damages

Page 9: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

The “old” trap & 4K electronicsThe “old” trap & 4K electronics

a hyperbolic trap with two “pre-traps”

amplifier and (broken) coil

Page 10: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Removing the LHe dewarRemoving the LHe dewar

Page 11: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Intermezzo I – the HITRAP platformIntermezzo I – the HITRAP platform

... and the SPECTRAP setup on it

future beam line

Page 12: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Stage II – repaired?Stage II – repaired?

No, still vacuum problems~ 6·10-2 mbar

Page 13: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Leak (hole) searchLeak (hole) search

• pumping test of the dewars• found a bad weld on the LN dewar• no further (big) leaks detected

Page 14: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Intermezzo II – the “new” trapIntermezzo II – the “new” trap

Trap design modified for purposes of SPECTRAP

Page 15: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Further modificationsFurther modifications

new electronics development with help of Stahl electronics

additional mirror & lens pair

Page 16: SPECTRAP - GSI progress report and status overview

Zoran Anđelković

Next stepsNext steps

• Put the system (again) back together and check the vacuum• Add the electronics and optics to the trap• If the vacuum should be OK – cool down (LN + LHe) and energize the SC magnet• Think of installing a Faraday cup under the trap• Shoot some (any) ions through• Make simulations of ions inside the trap• Be optimistic!