SPECTRAP - GSI progress report and status overview. Initial problems. View ports were not in line No vacuum could be established We had no idea how the whole system looked inside The trap had to be changed anyhow. => The best option was to disassemble the whole system piece by piece. - PowerPoint PPT PresentationTRANSCRIPT
SPECTRAP - GSIprogress report and status
overview
Zoran Anđelković
Initial problemsInitial problems
=> The best option was to disassemble the whole system piece by piece
• View ports were not in line• No vacuum could be established• We had no idea how the whole system looked inside• The trap had to be changed anyhow
Zoran Anđelković
Stage I – dismantlingStage I – dismantling
Liquid nitrogen dewar
Liquid helium dewar
Outer (70K) shield
Inner (4K) shield
Mounting “can”
SC magnet coils
trap
4K elec.
ions
Zoran Anđelković
Removing the outer shieldRemoving the outer shield
Supported by a small crane
Positioning spokes
Zoran Anđelković
Removing the LN dewarRemoving the LN dewar
Zoran Anđelković
Broken bellows on the LN dewarBroken bellows on the LN dewar
Zoran Anđelković
LN dewar and inner shield overviewLN dewar and inner shield overview
Zoran Anđelković
Removing the inner shieldRemoving the inner shield
Some broken electronics parts
Broken support disc of the inner shield
+ other smaller damages
Zoran Anđelković
The “old” trap & 4K electronicsThe “old” trap & 4K electronics
a hyperbolic trap with two “pre-traps”
amplifier and (broken) coil
Zoran Anđelković
Removing the LHe dewarRemoving the LHe dewar
Zoran Anđelković
Intermezzo I – the HITRAP platformIntermezzo I – the HITRAP platform
... and the SPECTRAP setup on it
future beam line
Zoran Anđelković
Stage II – repaired?Stage II – repaired?
No, still vacuum problems~ 6·10-2 mbar
Zoran Anđelković
Leak (hole) searchLeak (hole) search
• pumping test of the dewars• found a bad weld on the LN dewar• no further (big) leaks detected
Zoran Anđelković
Intermezzo II – the “new” trapIntermezzo II – the “new” trap
Trap design modified for purposes of SPECTRAP
Zoran Anđelković
Further modificationsFurther modifications
new electronics development with help of Stahl electronics
additional mirror & lens pair
Zoran Anđelković
Next stepsNext steps
• Put the system (again) back together and check the vacuum• Add the electronics and optics to the trap• If the vacuum should be OK – cool down (LN + LHe) and energize the SC magnet• Think of installing a Faraday cup under the trap• Shoot some (any) ions through• Make simulations of ions inside the trap• Be optimistic!