THE NATURAL CHOICE for Workmanship & Material Warranty 01379 788166 www.speeddeck.com PROTECTING YOUR INVESTMENT FOR UP TO QUARTER OF A CENTURY SpeedZip ® SpeedRoof ® SpeedDeck ® Structural Decks Dynamic Insulation Protector Warranty The most comprehensive single source envelope warranty with regular on-site independent auditing of workmanship eliminating the weak link between material and workmanship guarantees for up 25 years. “Get it right, first time!” ost comprehensive single source envelope warranty with regular on site independent aud PROTECTOR WARRANTY

Upload: elecosoft-plc

Post on 26-Mar-2016

249 views

Category:

Documents


0 download

DESCRIPTION

The Protector Warranty the final piece of the Jigsaw for all of our Roofing & Cladding Systems. 25 Year Material and Workmanship Warranty.

TRANSCRIPT

Page 1: SpeedDeck Building Systems Limited Protector Warranty

THE NATURAL CHOICEfor Workmanship & Material Warranty

01379 788166www.speeddeck.com

PROTECTING YOUR INVESTMENTFOR UP TO QUARTER OF A CENTURY

SpeedZip® SpeedRoof ® SpeedDeck® Structural DecksDynamic Insulation Protector Warranty

The most comprehensive single source envelope warranty with regular on-site independent auditing of

workmanship eliminating the weak link between material and workmanship guarantees for up 25 years.

“Get it right, first time!”

ost comprehensive single source envelope warranty with regular on site independent aud

PROTECTOR WARRANTY

Page 2: SpeedDeck Building Systems Limited Protector Warranty

Quality does not cost, but failure does!

Why do you need a Protector Warranty?Control of quality of materials and workmanship makes the biggest difference in the life expectancy and environmental impact on any building. Traditionally manufacturers of systems offer a material/system guarantee and the ‘approved’ contractor, who undertakes the installation of the system offers up to 12 year workmanship guarantee.

In the main, ‘approved’ contractors self-check their own installation to ensure accurate and robust details are constructed, guaranteeing their own work and exposing themselves to growing liabilities for up to 12 years.

At the point of failure, after the installation has been completed, the weak link in the construction supply chain can be exposed between the small print in the material/system and installation guarantees resulting in difficulties in apportioning responsibilities, voiding guarantees.

Many guarantees are promoted throughout the construction industry with material / system guarantees providing the headline i.e. ‘25 Year System Guarantee’ and workmanship guarantees being substantially less i.e. up to 12 Years.

‘Approved’ contractors can have failures of envelope solutions whether it is a system or workman-ship defect!

If there is a failure during the work-manship guarantee period and the ‘approved’ contractor has ceased from trading, is the guarantee void?

What is the cost of putting it right after the workmanship guarantee has expired?

Who is responsible for the guarantee where differing materials and systems interface?

2 www.speeddeck.com THE NATURAL CHOICE

Page 3: SpeedDeck Building Systems Limited Protector Warranty

The best protection for your investment

What is Protector Warranty?SpeedDeck’s partnership with AWM’s Protector Warranty provides the final piece of the jigsaw linking seamlessly material/system guarantees WITH a workmanship warranty up to 25 Years providing long-term assurance in your investment.

With all SpeedDeck’s roofing & cladding systems, AWM’s Protector Warranty can be applied ensuring the best value for any client’s investment in their building during its construction and throughout its operational life.

The Protector Warranty is a single source, transferrable warranty incorporating independent regular specialist inspections conducted throughout the project build ensuring the highest quality in both overall construction and detail thereby underpinning life expectancy, reducing liabilities and therefore benefiting the whole life costs.

SpeedDeck and it’s partnered supply chain offers a diverse portfolio of systems to enable the specifier to design total envelope solutions with Protector, a Single Source Warranty, including the interfaces between the various materials, systems and details throughout the the whole envelope.

Regular in-depth independent specialist auditing of the design through to installation on-site is essential to minimise any unlikely envelope failure. All such advice and audits are covered by a £5 million professional indemnity cover.

3www.speeddeck.comTHE NATURAL CHOICE

Page 4: SpeedDeck Building Systems Limited Protector Warranty

The devil is in the detail!

How SpeedDeck ensures design integrity?Introducing SpeedDeck’s unrivalled product range, technical support and Protector Warranty at the earliest opportunity on any project enables the client to gain the experience and knowledge of our comprehensive supply chain. This reduces risk, ensures performance and compliance from project feasibility, construction and throughout its operational life.

The extensive range of SpeedDeck’s sustainable roofing and cladding systems ensures that we have a choice of versatile systems to achieve your performance brief, aesthetic desire and budget, providing bespoke solutions to differing challenges.

Market leading commercial & technical support offering advice on:- • System selection • Material Guidance • Component application • Project Specific NBS Based Specifications • Robust Perimeter Detailing • Thermal & Acoustic performance

• CAD Details• Breeam Ratings• Structural design & wind uplift requirements• Building Regulations and best practice technical advice• Budget Costings• Nationwide Experienced Specialist Roofing Contractors

4 www.speeddeck.com THE NATURAL CHOICE

Page 5: SpeedDeck Building Systems Limited Protector Warranty

SpeedDeck Systemswith a single source warranty

Where can Protector Warranty be used?The Protector Warranty is offered on all of SpeedDeck’s full product range ensuring that the quality control of the manufacturing of the products and components are continued through the installation of the systems.Standing Seam Systems:

All components within the above systems including sealants, tapes, fillers, fixings, specialist fabrications, flashings, support systems, rooflights and fall arrest systems...

THE METAL CLADDING &ROOFING MANUFACTURERS ASSOCIATION

Standing Seam Systems: • SpeedZip • SpeedDeck • SpeedRoof

Environmental Solutions: • Green Roof • Dynamic Insulation • Photovoltaic

Trapezoidal Systems: • Profiled Sheeting • Sinusoidal Sheeting • Structural Decking • Structural Trays • Composite Panels

Liner Profiles: • WalkLiner • Stramliner

System Accessories: • Flashings • Specialist Fabrications • Rainscreen Systems • IsoBar Support Systems • Fixings

Associated Systems: • Single Ply Membrane

®

®

®

®

®

5www.speeddeck.comTHE NATURAL CHOICE

Page 6: SpeedDeck Building Systems Limited Protector Warranty

Constructed to perform

How Protector Warranty ensures construction compliance?Involving SpeedDeck Building Systems Limited and AWM’s Protector Warranty at the early stage ensures that the right roofing and cladding system and the very highest standards of workmanship are adhered to from design & specification through installation meeting all the necessary building regulations and that all the vital interacting details are not neglected providing high performance and peace of mind throughout the build-ings operational life.

Protector Warranty records include detailed on-site digital photography used to support easy to check AWM auditing forms completed by Specialist AWM Auditors. The in-depth completed reports are submit-ted to the sub-contractor, main contractor and client to manage a project’s weekly progress and detail any corrections required until after the very last snagging.

Protector Warranty inspection includes the following:

Independent Drawing / Design Review.

Weekly Site Inspections to Audit Workmanship.

Airtightness Audit.

Perimeter Detailing Check.

Audit of constructed Robust Details.

Compliance with Current Building Regulations,

Good Working Practice & BBA.

Full and clear reporting system.

Single Source Independent Warranty up to 25

years including workmanship.

6 www.speeddeck.com THE NATURAL CHOICE

Page 7: SpeedDeck Building Systems Limited Protector Warranty

Experience where it counts

Pioneer Protector Inspection Leak Detection Investigation

Auditing Workmanship & Materials Ltd Express Group Building · College Business Park · Kearsley Road

Ripon · North Yorkshire · HG4 2RN T: +44 (0) 1765 603975 · F: +44 (0) 5602 092898 E: [email protected] W: www.qaplus.org

Document Ref: 28 Issue no: 2 Date of Issue: 01/01/10 RESTRICTED

x

Inspection Worksheet

Roofing / Cladding Contractor Details Company: XXX Address: XXX Address: XXX Town: XXX County: XXX Post Code: XXX Office Contact: XXX Tel: XXX Site Contact: XXX Contact Tel: XXX

Main Contractor: XXX Contact: XXX Site Office Tel: XXX

Roofing / Cladding Sub-Contract Start: 01/02/11

INSTRUCTION CONTACT DETAILS Instructing Company: SpeedDeck Instructing Contact: Michael Mann Instructing Contact No: 01379788166 Instructing Contact Email: [email protected]

Amount of Visits: 1st Visit

PPE Hard toed boots, high-Viz jacket, safety helmet, goggles, gloves and safety harness (if required) and suitably clothed.

AWM Approved Manufacturer: SpeedDeck Standard Roof Liner Sheet: 0.7mm Walkliner 31mm deep x 1000mm wide Fastener Type / Grade: BM-LS25-S16 / BM-LS22-S16 (side laps) Liner Sheet Sealing: 50x1mm tape (side laps) 9x3mm butyl (end laps) Vapour Control Layer Type / Grade: Stramcheck – PowerLon VCL 250 Insulation Type / Thickness: Mineral wool 220mm (0.04W/mk) with Rigid insulation under walkway areas. Spacer System Type / Centres: Isobar Support Rail System: 765mm centres with 220mm high brackets and 81mm halters Breather Membrane: SpeedDeck SD 100 Outer Sheet Covering: 0.9mm thick SpeedZip Natural Stucco Embossed Aluminium Standing Seam Outer Fastener Type / Grade: Not Applicable Please attach roofing specification and construction drawings. See XXX Drg No. 731 / GA01 Rev `A`

Copies: Client / Live File / Archive / Broker

Approved Auditor: Trevor Downs FIoR

AWM Approved Manufacturer: SpeedDeck High Humidity Roof Liner Sheet: Wide Trough Perforated Aluminium Stramliner 0.9mm thick secured via 3mm thk `top-hat` spacer brackets Fastener Type / Grade: BM-LS25-S16 / BM-LS22-S16 (Side laps) Liner Sheet Sealing: 50x1mm tape (side laps) 9x3mm butyl (end laps) Vapour Control Layer Type / Grade: Stramcheck AL foil encapsulated vapour control layer Insulation Type / Thickness: Mineral wool 220mm (0.04W/mk) with Rigid insulation under walkway areas. Spacer System Type / Centres: Isobar Support Rail System: 765mm centres with 220mm high brackets and 81mm halters Breather Membrane: Yes Outer Sheet Covering: 0.9mm Speedzip Stucco Outer Fastener Type / Grade: Please attach roofing specification and construction drawings. See XXX Drg No. 731 / GA02 Rev `A`

Roofing System Square Metres: 1057m2 Roofing System Square Metres:

Approved Auditor Assigned: Trevor Downs FIoR

Anticipated Program: 8 Weeks TBA

Project Reference: AWM / I -011-XXX Project Title: XXX Project Location: XXX

AWM AUDITOR INSTRUCTION : Protector Warranty - The auditor is to conduct an inspection of the roofing material installation as specified above, for the provision of a 25 year protector warranty. The auditor is to look at the quality of the product installation and comment on any items which may have an adverse effect on theinstallation of the specified material.

Additional Information: XXX̀ Working Drawings` obtained from site (Photostat copies)

901m2

AMPLE

AMAMAm t of Vis

AMPAMPt, go es, g es and safPPLEM App

ner Sh Tr0.9m cured vi

aste pe / G : BMr Sh et Se ling

ps)ontro

d v

SAMSSmann@eSMPMPMPLMPLfing

AASAMON ecto

year p otec ranty. Tn th stallation of th

ve / Bro

s FFIoR

k HHigh HminniummS

` sspaceLS222-22 S16pps) 9xx3

mccheckk A

2220mmmallkwkk aypoort RRats and 8

tuucocc

onstructv `̀A`

aaa ttion asommmennt

Pioneer Protector Inspection Leak Detection Investigation

Auditing Workmanship & Materials Ltd Express Group Building · College Business Park · Kearsley Road

Ripon · North Yorkshire · HG4 2RN T: +44 (0) 1765 603975 · F: +44 (0) 5602 092898 E: [email protected] W: www.qaplus.org

Document Ref: 28 Issue no: 2 Date of Issue: 01/01/10 RESTRICTED

x

Inspection Worksheet

QA+ Inspection Date: 3rd March 2011

Weather: 0.0° C Frosty, sunny and no wind

Purpose of Visit: 1st Visit to inspect roofing to date

General Installation Summary : [Normal Comment] [ADVISORY] [BOLD CRITICAL] Item No. / Visit No . AWM (T B Downs) arrived on site and signed XXXvisitors book and was then given a Site Induction and then allowed to access the roof area to be inspected with XXXin attendance. On arrival it was noted that there was good access to the roof via scaffold tower and ladders with edge protection was around the perimeter of the roof area - with this in mind all due care and attention was made to Health and Safety using the appropriate PPE equipment during the inspection. 1/1 It was quite evident that work on the `non-acoustic` roof area had not long started although approximately 90% of the steel liner sheets had been installed along with the insulated gutter – the gutter at present had not had any of the joint positions `heat-welded .̀ Roof Areas Referenced- D7 / D19+ to R7 / R19+ and lower level R7 / R19+ to Tx7 / Tx19+. (see photographs Nos. 1, 2, 3 and 4) 2/1 The steel liner sheets had been secured to the substructure (i.e. galv. steel purlins) with FixFast fasteners at the centres as Shown and specified on drawing No. 731 / GA02 Rev `A` and the side laps stitched at 450mm centres. The side laps were sealed with 50mm x 1mm thick Polyband tape and end laps sealed with 9mm x 3mm thick butyl sealant. (see photographs Nos. 5 and 6) 3/1 At the eaves and ridge positions the profile of the liner sheets have been sealed-off with rigid foam fillers bedded on a translucent silicone sealant all as per detail drawings Nos. 731 / D09 Rev `A` and D16 Rev `a` also in accordance with the manufacturer’s recommendations. (see photographs Nos. 7 and 8) 4/1 No work had been carried out on the `High Humidity Roof` over the swimming pool area, however, the wide trough perforated aluminium liner sheets had been `loaded out` in positions. (see photographs Nos. 9 and 10) 5/1 Work was currently `ongoing` on the installation of steel liner sheets to lower roof area B7 / B18 and D7 / D18 along with the installation of the membrane gutter. (see photograph No. 11)

Material Storage: All liner sheets, fasteners, vapour control layer and Isobar components stored at roof level.

Time Arrive On Site: 08.00am

Time Depart From Site: 10.00am

Safety Site Induction: Yes (15mins) by MS

Client Instruction: AWM was instructed to carry out independent inspections of the roofing system for the provision of a protector warranty.

SSAMPLE

S[No mal C

signedX XvX isinda e On ar was

pe er of thE eq pmetendur

stic roof area h ninsul d gut the gut

R7 / 9+ an we

teel pde la at

h 9m hick buty

n sea wi` and

SS

Pioneer Protector Inspection Leak Detection Investigation

Auditing Workmanship & Materials Ltd Express Group Building · College Business Park · Kearsley Road

Ripon · North Yorkshire · HG4 2RN T: +44 (0) 1765 603975 · F: +44 (0) 5602 092898 E: [email protected] W: www.qaplus.org

Document Ref: 28 Issue no: 2 Date of Issue: 01/01/10 RESTRICTED

x

Inspection Worksheet

Photograph No. 7

Photograph No. 9

Photograph No. 11

Photograph No. 8

Photograph No. 10

Photograph No. 12

Photograph Sheet No 2

Eph N

SAMPLE

SASASAMSAAMMPMPMPLEEMP

EE

sssthe rroweer anddmaade too

e ssteeltiions

saasree sealle

the

errfoff ratte

witth the

Pioneer Protector Inspection Leak Detection Investigation

Auditing Workmanship & Materials Ltd Express Group Building · College Business Park · Kearsley Road

Ripon · North Yorkshire · HG4 2RN T: +44 (0) 1765 603975 · F: +44 (0) 5602 092898 E: [email protected] W: www.qaplus.org

Document Ref: 28 Issue no: 2 Date of Issue: 01/01/10 RESTRICTED

x

Inspection Worksheet

Report Date: 3rd March 2011 Report Writer: Trevor Downs FIoR Copies: Live File / Instructing Company

Continuation report

General Installation Comments: [Normal Comment] [ADVISORY] [BOLD CRITICAL] Item No. / Visit No . 6/1 IT WAS NOTED ON BOTH DRAWINGS NOS. 731 / GA01 REV `A` AND GA02 THAT THE ISOBAR AND BRACKETRY IS SPECIFIED AS BEING `POWDER COATED` FOR BOTH THE STANDARD ROOF SPECIFICATION AND THE HIGH HUMIDITY SPECIFICATION, WHEREAS ON SITE THERE IS ONLY `GALVANIZED` ISOBAR AND BRACKETS - THIS NEEDS CLARIFICATION PRIOR TO THE ISOBAR SUPPORT RAIL SYSTEM BEING INSTALLED. (SEE PHOTOGRAPH NO. 11) 7/1 BOTH DRAWINGS NOS. 731 / GA01 REV `A` AND GA02 SHOW THE INSULATION DEPTH AS BEING 220MM IN THE SPECIFICATION BUT THE VOID IS SHOWN ON THE DRAWING AS BEING 236MM AND UP TO THE UNDERSIDE OF THE OUTER SHEET – AGAIN THIS SHOULD BE CHECKED OUT PRIOR TO INSTALLATION OF THE INSULATION.

Summary of Inspection Carried Out

The above inspection was carried out by AWM with XXX in attendance and in general the workmanship was found to be of a reasonably high standard and during the inspection any points of concern were noted and are contained within this report purely in an advisory capacity only.

AWM would wish to point out that these findings are in a particular `window of time` and do not constitute a `snagging list` but we will revisit these points during our next inspection.

Non-Compliance Notice

Date Issued: Non Compliance No: Non Compliance Rectified:

Project Reference: AWM / I -011-XXX Project Title: XXX Project Location: XXX

SAMPLE

ONLY `GAEM NG

S. 7 GA0 ANE VOID IS OWN ON TH

BE CHECK D OUAMrried Ou

h XXX atte anceaso bly hig nda

elyin advisory apac

ular ` tn.

Pioneer Protector Inspection Leak Detection Investigation

Auditing Workmanship & Materials Ltd Express Group Building · College Business Park · Kearsley Road

Ripon · North Yorkshire · HG4 2RN T: +44 (0) 1765 603975 · F: +44 (0) 5602 092898 E: [email protected] W: www.qaplus.org

Document Ref: 28 Issue no: 2 Date of Issue: 01/01/10 RESTRICTED

x

Inspection Worksheet

Photograph No. 4

Photograph No. 2 Photograph No. 1

Photograph No. 6

Photograph No. 3

Photograph No. 5

Photograph Sheet No 1

EEph N

MPLEMPLEEMP

EE

SASASASAMSAAMMPMP

7www.speeddeck.comTHE NATURAL CHOICE

Page 8: SpeedDeck Building Systems Limited Protector Warranty

Investing in your future

SpeedDeck Building Systems Limited with the Protector Warranty offers the whole Project Team BenefitsThe Building Owner

The Specifier

The Contractor

• Single Source Warranty for the WHOLE SpeedDeck Building Systems Limited Envelope System.• Protection of your investment in the building’s value and during its operational life.• Low energy usage not just for the time of the air tightness test but for the life of the warranty.• Transferable single point of contact warranty straight to the team who are responsible for your envelope for up to 25 years.

• Single source specification route for the whole envelope solution.• Suppliers accountability of the system.• Minimal environmental impact based on correct envelope solution, less deliveries to site, and accurate construction of robust details.• Reduced risk of litigation.

• Independent review of details at design and construction stage.• Reduction of liabilities after construction.• Additional specialist site supervision.• Warranty up to 25 Years including Workmanship.

8 www.speeddeck.com THE NATURAL CHOICE

Page 9: SpeedDeck Building Systems Limited Protector Warranty

25 year comprehensive protection

Who are AWM?Auditing, Workmanship & Materials are a specialist independent auditing company trading in the construction industry experienced in all manner of roofing & cladding systems.

Specialist services include: • Detailed Roof & cladding condition surveys. • Maintenance of roofing & cladding systems. • On-site System Testing. • Flat roofing leak detection. • Thermographic Surveys • Rope Accessing. • Other leak detection and exploration services.

AWM’s wealth of knowledge and experience means that working with the manufacturer and the installation contractor ensures that any defects are identified and corrected during the design / or through the installation process.

History will show that quality does not cost….. BUT FAILURE DOES!!

Get it right, first time!

www.qaplus.org

Where a client requires some ‘peace of mind’ but does not want a fully insured system, then the Protector Warranty is a valuable addition to the project and provides some reassurance that the products specified will be the products installed and will perform to expectations.

The Pioneer Warranty is administered by Building and Land Guarantees Ltd and is ultimately insured by Amtrust Europe Ltd (AM Best security rating "A Excellent"). The security of Amtrust Europe Ltd is rated by Standard and Poors at A+, by A M Best at A and by Fitch at A+*. With a long term policy such as the Pioneer Warranty it isimportant that the Insurer is rated highly by the standard insurer rating agencies

Developed specifically for Local AuthoritiesFor buildings such as schools, it is paramount to get the construction exactly right first time. AWM has developed a specialist service for local authorities to achieve this seamlessly within a contract for the weatherproofing with the right design, materials and quality of workmanship

Where building owners want long term assurance in excess of the Pioneer Warranty period, AWM can provide the owner with an added warranty, which will come into force after that warranty period. In general terms the warranty will give assurance to the owner for a further 15 years.

9www.speeddeck.comTHE NATURAL CHOICE

OTHER PRODUCTSOTHER PRODUCTS

*25 year protection is for Protector Warranty and is not provided with all the AWM products listed above.

*

Page 10: SpeedDeck Building Systems Limited Protector Warranty

August 2011

SpeedDeck Building Systems Limited, Oaksmere Business Park, Yaxley, Eye, Suffolk IP23 8BWSpeedDeck Building Systems Limited reserves the right to make substitutions and modifications to the specifications of any of its products without prior notice. It is the customer’s responsibility to ensure that the Company’s products are correctly installed and that they are suitable for the customer’s particular requirements and application. The Company undertakes business only upon its standard terms and conditions.

SpeedDeck Building Systems Limited is an Eleco plc Company. SpeedDeck, Vitesse, PP32, IsoBar, Elan WalkLiner, SpeedRoof and SpeedZip are registered trademarks of SpeedDeck Building Systems Limited.

® ®® ® ®

tel: +44(0)1379 788166fax: +44(0) 1379 788161