sr-710 environmental study

26
SR-710 Environmental Study All Communities Convening – March 1 and 3, 2012

Upload: metrolosangeles

Post on 17-Feb-2017

471 views

Category:

Business


0 download

TRANSCRIPT

SR-710 Environmental StudyAll Communities Convening – March 1 and 3, 2012

Presentation Agenda

> Welcome/Introductions and Purpose

> Overview of Process/Opportunitiesfor Public Participation

> Environmental Review Process

> Open House Stations Review

> Adjourn to Open House

> Welcome/Introductions and Purpose

> Overview of Process/Opportunitiesfor Public Participation

> Environmental Review Process

> Open House Stations Review

> Adjourn to Open House

All Communities Convening> Convenes study area communities together

> Open House Purpose> Share information

> Learn about the process

> Gather comments

> Open House Process

> Convenes study area communities together

> Open House Purpose> Share information

> Learn about the process

> Gather comments

> Open House Process

Notification Activities

> E-Blasts

> Mailing

> Drop off in El Sereno Community

> Announcements at meetings

> Facebook Posts and Online Ads

> Media coverage (print and blogs)

> Libraries

> E-Blasts

> Mailing

> Drop off in El Sereno Community

> Announcements at meetings

> Facebook Posts and Online Ads

> Media coverage (print and blogs)

> Libraries

Multiple venues for participation

> All Communities Convening

> Community Liaison Councils

> Stakeholder Outreach Advisory Committee

> Variety of participation opportunities:

> All Communities Convening

> Community Liaison Councils

> Stakeholder Outreach Advisory Committee

> Variety of participation opportunities:> Roundtables> Focus Groups> Open Houses

> Workshops> Virtual meetings

Public Participation –Environmental Review Process

We arehere

Project Background

> Two-thirds of LA County votersapprove using Measure R funds toaddress congestion

> Unresolved SR-710 option contributesto growing congestion on nearbyfreeways and streets

> Two-thirds of LA County votersapprove using Measure R funds toaddress congestion

> Unresolved SR-710 option contributesto growing congestion on nearbyfreeways and streets

Environmental Review ProcessOverview

Robust project scoping completed

> March 2011 – Notice of Intent andNotice of Preparation were published

> March 2011 – Agency scoping meetingwas held

> March/April, 2011 – Eight (8) publicscoping meetings were held at variouslocations within the project study area

> March 2011 – A virtual scoping meetingwas held

> September 2011 – Scoping SummaryReport completed

> March 2011 – Notice of Intent andNotice of Preparation were published

> March 2011 – Agency scoping meetingwas held

> March/April, 2011 – Eight (8) publicscoping meetings were held at variouslocations within the project study area

> March 2011 – A virtual scoping meetingwas held

> September 2011 – Scoping SummaryReport completed

What we heard during Scoping

> Keep all modal options on thetable:

> Traffic Systems Management/Traffic DemandManagement low build

> Surface, subsurface and elevated structures

> Transit (bus and rail options)

> Street improvements

> Freight management systems

> Supporting advanced technologies

> No build

> Keep all modal options on thetable:

> Traffic Systems Management/Traffic DemandManagement low build

> Surface, subsurface and elevated structures

> Transit (bus and rail options)

> Street improvements

> Freight management systems

> Supporting advanced technologies

> No build

More on what we heard

> Consider the following issues:

> Traffic> Engineering> Social> Aesthetic> Economic> Cultural

> Natural> Archeological> Health> Air Quality> Noise> Environmental Justice

> Traffic> Engineering> Social> Aesthetic> Economic> Cultural

> Natural> Archeological> Health> Air Quality> Noise> Environmental Justice

More on what we heard

> Define project need and study area

> Consider local and regional planning impacts

> Conduct cost/benefit analyses

> Continue public participation

> Define project need and study area

> Consider local and regional planning impacts

> Conduct cost/benefit analyses

> Continue public participation

Post Scoping - Initial Study Area

Alternatives Analysis (AA)

> Next step in the environmental review process

> Evaluate a full range of multi-modal alternativesto address the problem

> Collect data and conduct engineering and otherenvironmental and technical assessments

> Consider public comments

> Next step in the environmental review process

> Evaluate a full range of multi-modal alternativesto address the problem

> Collect data and conduct engineering and otherenvironmental and technical assessments

> Consider public comments

Alternatives Analysis Process

Study Decision-Making

Study Team Stakeholders

Metro,Caltrans &

FederalAgencies

Metro,Caltrans &

FederalAgencies

Study &Recommend

Study &Recommend

Inform &Advise

Inform &Advise

InputInput DecideDecide

Four Elements of Need

Area of Influence

Regional transportationsystem

(north-south mobility)

Freeway system efficiency

Study Area

Freeway system efficiency

Congestion on localstreets

Transit system efficiency

Regional Transportation System

> Regional travel speeds are low> Delay is high> Travel times are unpredictable

> Regional travel speeds are low> Delay is high> Travel times are unpredictable

Freeway System

> Over-capacity north-southtravel demands affectsmobility

> High delays andunpredictable travel timeson study area freeways

> High accident rates onfreeways

> Over-capacity north-southtravel demands affectsmobility

> High delays andunpredictable travel timeson study area freeways

> High accident rates onfreeways

Local Street System

> Affected by excess freewaytraffic

> Operates at low speeds> Out-of-place freeway trips

cause high levels ofcongestion

> Affected by excess freewaytraffic

> Operates at low speeds> Out-of-place freeway trips

cause high levels ofcongestion

Transit System

> Operational deficiencies> Low travel speeds for buses> North-south transit network is

constrained

> Operational deficiencies> Low travel speeds for buses> North-south transit network is

constrained

Next Steps

> Develop, analyze and screen initial alternatives

> Continue conceptual engineering and technicalanalyses

> Recommend final set of alternatives – Fall 2012

> Continue public participation

> Develop, analyze and screen initial alternatives

> Continue conceptual engineering and technicalanalyses

> Recommend final set of alternatives – Fall 2012

> Continue public participation

Participate Online

facebook.com/sr710study

@SR710Study

metro.net/sr710study

(855) 4-SR-710-0 / (855) 477-7100 - toll free

[email protected]

facebook.com/sr710study

@SR710Study

metro.net/sr710study

(855) 4-SR-710-0 / (855) 477-7100 - toll free

[email protected]

Open House Stations

Sign-In1Project

Overview2

CommunityOutreach4

5Community

Liaison CouncilsProject

Overview2

3 EnvironmentalProcess

5

6

CommunityLiaison Councils

Comments