standard industri pembinaan - · pdf file5.1 legal 7 5.2 production ... this malaysian...

32
READY-MIXED CONCRETE: PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS © Copyright LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA Standard Writing Organisation Lembaga Pembangunan Industri Pembinaan Malaysia CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA Ibu Pejabat CIDB, Lot 10, Menara Dato’ Onn, Pusat Dagangan Dunia Putra No 45, Jalan Tun Ismail, 50480 Kuala Lumpur. Tel : 603-4047 7000 Fax : 603-4047 7070 http://www.cidb.gov.my CIS 21: 2016 STANDARD INDUSTRI PEMBINAAN (CONSTRUCTION INDUSTRY STANDARD)

Upload: doanbao

Post on 22-Feb-2018

225 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

READY-MIXED CONCRETE:PRODUCTION, CONFORMITY,TRANSPORTATION AND DELIVERYCRITERIA FOR PRODUCERS

© Copyright

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA Standard Writing Organisation

Lembaga Pembangunan Industri Pembinaan Malaysia CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA Ibu Pejabat CIDB, Lot 10, M enara Dato’ Onn, Pusat Dagangan Dunia PutraNo 45, Jalan Tun Ismail, 50480 Kuala Lumpur.Tel : 603-4047 7000 Fax : 603-4047 7070http://www.cidb.gov.my

CIS 21: 2016

STANDARD INDUSTRIPEMBINAAN(CONSTRUCTION INDUSTRY STANDARD)

Page 2: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

i

READY-MIXED CONCRETE: PRODUCTION, CONFORMITY,

TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS

Page 3: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

ii

© Construction Industry Development Board Malaysia 2016

All enquiries regarding this book should be forwarded to: Chief Executive Construction Industry Development Board Malaysia Level 35, Menara Dato’ Onn Pusat Dagangan Dunia Putra No 45, Jalan Tun Ismail 50480 Kuala Lumpur Malaysia Tel : 603-4047 7000 Fax : 603-4047 7070 Email : [email protected] Website : www.cidb.gov.my

Completed in 2016 First edition 2016 No part of this publication may be reproduced or transmitted in any form or by any means, whether mechanical or electronic including photocopying and recording without the written consent of CIDB.

Perpustakaan Negara Malaysia Data Pengkatalogan-dalam-Penerbitan

Page 4: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

iii

Table of Contents

Committee Representation iv

Foreword v

1. Introduction 1

2. Scope 3

3. Normative References 4

4. Definitions and Abbreviations 4

5. General Requirements

5.1 Legal 7

5.2 Production control 7

5.3 Technical personnel 8

5.4 Batching plant, silos, stock piles, mixer and testing 8

5.5 Constituent materials and concrete 9

5.6 Conformity control and conformity criteria 10

5.6.1 Designed concrete 10

5.6.2 Prescribed and standardised concrete 12

5.6.3 Designated concrete 12

5.6.4 Proprietary concrete 13

5.6.5 Action in the case of non-conformity of the product 13

5.7 Transportation and delivery of concrete 13

6. Exchange of Information 14

7. Quality Management Requirements 14

8. Certification 19

9. Identification of Ready-mixed Concrete Plant and Signage 20

Appendix A - Figure 1. A typical schematic diagram of wet and 22

dry batching plant

Acknowledgment 23

Page 5: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

iv

Committee Representation

The Construction Industry Standard 21 publication was managed and developed by the

Construction Industry Development Board Malaysia, with the assistance of the Working Group

on Ready Mixed Concrete. The representatives comprise from the following organisations:

Construction Industry Development Board Malaysia

National Ready-mixed Concrete Association Malaysia

Master Builders Association Malaysia

Construction Research Institute of Malaysia

Association of Consulting Engineers Malaysia

Institution of Engineers Malaysia

American Concrete Institute (KL Chapter)

SIRIM QAS International Sdn Bhd

Jabatan Kerja Raya Malaysia

Cement & Concrete Association Malaysia

Concrete Society Malaysia

Industrial Concrete Product Sdn Bhd

Iqramxpert Sdn Bhd

Page 6: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

v

FOREWORD

This Malaysian Construction Industry Standard No. 21 (hereinafter referred to as CIS 21), which

is the standard for ready-mixed concrete certification, was developed by the working group on

ready-mixed concrete, with the assistance of Construction Industry Development Board

Malaysia (CIDB). CIDB acted in the capacity of moderator and facilitator for the Working Group

throughout the development process of this standard.

This CIS, mainly based on MS 523: Part 1:2005, was developed specifically for ready-mixed

concrete as a basis for ready-mixed concrete producers in ensuring that their ready-mixed

concrete plant, production and production control, transportation and delivery are certified

independently by a certification body recognised by CIDB.

Compliance with the content of this document does not in itself confer immunity from legal

obligations.

Page 7: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

1

1. Introduction

1.1 MS 523: Part 1:2005, which is a full adoption of EN 206-1:20001, provides a

platform for upgrading and enhancing the quality of ready-mixed concrete to a higher

level through a product-conformity approach by providing a mechanism for the product

to be independently certified by a recognised certification body. MS 523: Part 1:2005

placed greater responsibility to the producer who shall be responsible for the conformity

of ready-mixed concrete according to the concrete specification.

Note 1: EN 206-1:2000 has been superseded by EN 206:2013. However, MS 523: Part 1: 2005 still refers

to EN 206-1:2000 as MS 523: Part 1: 2005 and it is yet to be amended.

1.2 MS 523: Part 1: 2005 is supported by two complimentary Malaysian Standards -

MS 523-2:2011: the method of specifying and as a guidance for the specifier and MS

523-3:2010: a specification for constituent materials and concrete. These two

complimentary standards, which include the Malaysian experience, provide a good link

for specifiers and users to the MS 523: Part1: 2005.

1.3 MS 523: Part 1:2005 covers both site-mixed concrete and ready-mixed concrete.

The quality of site-mixed concrete is very much dependent on the contractor and the

project supervisor while ready-mixed concrete, on the producer. However, to date, there

is no specific Malaysian Standard for ready-mixed concrete that addresses and assists

Malaysian producers to readily understand and adopt MS 523: Part 1:2005. Thus, CIS

21 was put together to provide a clear direction for ready-mixed concrete producers in

complying with the requirements of MS 523: Part 1:2005. Additional requirements are

included, which takes into consideration the knowledge and experience gained by the

Malaysian concrete industry.

1.4 In general, Annex C of MS 523: Part 1:2005 have made provisions for

assessment, surveillance and certification for concrete and they are applicable for

ready-mixed concrete.

1.5 CIS 21, which is specifically titled as “Ready-Mixed Concrete:Production, Conformity, Transportation And Delivery Criteria For Producers” is dedicated to ready-mixed concrete only. It is to be used for product certification with new and redefined terms that are highlighted in 1.5.1. Additional requirements are also provided in 1.5.2 as to supplement the provision in MS 523: Part 1:2005.

Page 8: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

2

1.5.1 New and redefined terms Several existing terms are redefined1 and new2 definitions, in comparison with the

definitions in Clause 3, MS 523: Part 1:2005, have been established in CIS 21, befitting

its application base on the information in MS 523 and other information available from

other sources. These terms may assists producers better, in order to comply with the

applicable requirements of MS 523: Part 1 :2005. They are as follows:

i. Ready-mixed concrete (redefined, see 4.1.1),

ii. Ready-mixed concrete plant (new, see 4.1.2),

iii. Production control (new, see 4.1.6),

iv. Production control system (new, see 4.1.7),

v. Wet batching (new, see 4.1.8),

vi. Dry batching (new, see 4.1.9),

vii. Plant mixer (new, see 4.1.10),

viii. Initial production (new, see 4.1.12),

ix. Continuous production (new, see 4.1.13),

x. Initial assessment (new, see 4.1.14),

xi. Product certification (new, 4.1.10)

Note 1: These terms are already in use and have been defined in MS 523: Part 1:2005.

Note 2: These terms are already in use in MS 523: Part 1:2005, but not distinctly defined.

1.5.2 Additional requirements

Additional requirements have been included in CIS 21, in comparison to MS 523. These are as follows:

i. Introduction of Type 1 and Type 2 batching plant (see 2.1)

ii. Legal requirement for the producer (see 5.1)

iii. Technical personnel (see 5.3)

iv. Quality management system (see 7.0)

v. Certification by CIDB recognised CB (see 8.1)

vi. Certificate (see 8.5)

vii. Identification (see 9.1) and Signage (see 9.2)

Page 9: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

3

2. Scope

2.1 The scope of CIS 21 is for ready-mixed concrete produced by any ready-mixed

concrete plants (i.e., plants may be located on the construction site or off-site),

producing concrete for structural and non-structural use, including those used in casting

of precast concrete products. CIS 21 covers two types of batching plants1, which are:

Type 1 - Wet batching plant2 (W)

Type 2 - Dry batching Plant3 (D)

Note 1: A typical schematic diagram of wet and dry batching plant is highlighted in Appendix A.

Note 2: In wet batching, the primary mixing of the concrete is performed in a plant mixer, and the

secondary mixing is done in the truck mixer for maintaining the concrete in homogenous state before the

concrete is discharged from the truck mixer.

Note 3: In dry batching, the primary mixing of the concrete is performed in a truck mixer, and the

secondary mixing is done in the truck mixer for maintaining the concrete in homogenous state before the

concrete is discharged from the truck mixer.

2.2 This publication includes production and production control, conformity,

transportation of concrete to the point of delivery, and delivery.

2.3 CIS 21 is published for producers, specifiers, users, inspection bodies,

certification bodies, regulating authorities and other interested parties as the basis for

compliance on ways ready-mixed concrete is produced, transported to the point of

delivery, delivered under a documented production control system and production

control procedures.

2.4 The producer shall be responsible for the evaluation of conformity of concrete to

specified requirements.

2.5 The ready-mixed concrete shall comply with applicable specified requirements of

MS 523: Part 1:2005, MS 523-2:2011 and MS 523-3:2010.

Page 10: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

4

3. Normative References The following normative references are indispensible for the application of this standard.

For dated references, only the edition cited applies. For undated references, the latest

edition of the normative references (including amendments) applies.

i. MS 523: Part 1:2005: Concrete- Part 1: Specification, performance, production

and conformity (second revision)

ii. MS 523-2:2011: Method of specifying and guidance for the specifier (second revision)

iii. MS 523-3:2010: Concrete - Part 3: Specification for constituent materials and

concrete (second revision) iv. MS 26-1-1:2009: Testing of concrete - Part 1: Fresh Concrete - Section 1:

Sampling (second revision)

v. ISO 9001: Quality Management System - Requirements 4. Definitions and Abbreviations

4.1 Definition

Generally, the definitions in MS 523: Part 1:2005, MS 523-2:2011 and MS 523-3:2010

apply. In CIS 21, the applicable definitions are as follows:

4.1.1 Ready-mixed concrete

Concrete manufactured in any ready-mixed concrete plant situated at any location for

delivery in a fresh state.

4.1.2 Ready-mixed concrete plant

The buildings, structures and batching facilities, including but not limited to the testing,

silos, mixers, aggregate storage facilities for production control, batching, production,

and supply of ready-mixed concrete.

4.1.3 Producer

Person or body producing fresh concrete.

Page 11: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

5

4.1.4 Specifier

Person or body establishing the specification for fresh and hardened concrete.

4.1.5 User

Person or body using fresh concrete in the execution of a construction or a component.

4.1.6 Production control

Production control comprises all relevant measures necessary to maintain the

properties of concrete in conformity to specified requirements.

4.1.7 Production control system

A documented production control manual, which defines the responsibility, authority and

the interrelation of all personnel who manage, perform and verify work affecting quality

of concrete and contains documented procedures and instructions for production

control.

4.1.8 Wet batching

The constituent materials are batched directly into a plant mixer.

4.1.9 Dry batching

The constituent materials are batched directly into a truck mixer.

4.1.10 Plant mixer

Concrete mixer installed at the ready-mixed concrete plant that is capable of mixing

homogeneous concrete.

4.1.11 Truck mixer

Concrete mixer mounted on a self-propelled chassis, capable of mixing and delivering

homogeneous concrete.

4.1.12 Initial production

Covers production until at least 35 test results are available.

4.1.13 Continuous production

When at least 35 test results are obtained over a period not exceeding 12 months.

Page 12: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

6

4.1.14 Initial assessment

An initial inspection of the ready-mixed concrete plant and its production control for the

purpose of determining whether the prerequisites, in terms of staff and equipment for

orderly production and for the corresponding production control system and conformity

to this CIS 21 appear to be adequate and suitable.

4.1.15 Initial test

Test to check before production begins on how the new concrete shall be composed in

order to meet all specified requirements in fresh and hardened states.

4.1.16 Conformity test

Test performed by the producer to assess conformity of the concrete.

4.1.17 Spot test

Test conducted by the certification body in parallel to those of the producer’s.

4.1.18 Identity test

Test to determine whether selected batches or loads come from a conforming

population.

4.1.19 Product certification

Product certification is an attestation by an independent certification body that the

producer has passed the initial assessment and has complied with specified

requirements.

4.1.20 Certification body

Agency that is accredited as a product certification body by Standards Malaysia or other

certification bodies that are compliant with ISO/IEC 17065.

4.2 Abbreviations

The abbreviations used in this publication are as follows:

4.2.1 CIDB

Construction Industry Development Board Malaysia

4.2.2 CIS 21

Construction Industry Standard 21

Page 13: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

7

4.2.3 MS

Malaysian Standard

4.2.4 SAMM

Skim Akreditasi Makmal Malaysia (Malaysian Laboratory Accreditation Scheme)

4.2.5 RMC

Ready-mixed concrete

4.2.6 CB

Certification body

4.2.7 ISO

International Standard Organisation

4.2.8 PPS

PPS (Perakuan Pematuhan Standard) or Certificate of Standard Compliance issued by

CIDB for products that comply with the standard(s) specified by CIDB for regulatory

purposes under Schedule IV of CIDB Act 520 (Amendment 2011)

5. General Requirements

The following requirements shall be complied with for conformity to CIS 21.

5.1 Legal

The producer shall be a legally incorporated company operating in Malaysia, and the

company shall be the owner of the ready-mixed concrete plant and shall be fully

responsible for the quality of the concrete produced and supplied to the casting site.

5.2 Production control

5.2.1 The producer shall have an authorised production control system manual

(however named), which addresses the applicable requirements and procedures of

Clause 9, MS 523: Part 1:2005 and Clause 13, MS 523-3:2010; and where the

production control differs from these requirements, they shall be documented.

Page 14: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

8

5.2.2 The production control system shall comply with quality management

requirements in Clause 6.

5.3 Technical personnel

The producer shall engage a quality control manager and competent batching plant

operators as follows:

(A) A Quality Control Manager (however named) with recognised:

i) Degree in Engineering or Science; or

ii) Diploma in Engineering or Science with at least 3 years experience in the

concrete industry; or

iii) Certificate in engineering or science with at least 5 years experience in

concrete industry; or

iv) Other appropriate and suitable certificate, as assessed and determined by the

certification body.

(B)1 A competent batching plant operator with:

i) A minimum of secondary education with Sijil Pelajaran Malaysia (SPM); or

ii) Technician Grade 1, certified by National Ready Mixed Concrete Association

of Malaysia (NRMCA), with at least 2 years experiences in concrete industry

and at least 1 year experience in operating a batching plant; or

iii) Other appropriate and suitable certificate as assessed and determined by the

certification body.

Note 1: A skill/competency standard is in the midst of being developed by CIDB. Upon completion, item

(B) will be replaced with skill/competency standard.

5.4 Batching plant, silos, stockpiles, mixer, testing

5.4.1 The ready-mixed concrete shall be produced at the producer’s batching facility

and the batching process shall be controlled using a computerized system.

Computerised batching records shall also be generated for each batch of concrete

produced.

5.4.2 Silos shall be constructed from such materials and, in such manner, are known to

produce weatherproof container, permitting free flow and efficient discharge of their

contents. Each silo shall be fitted with an independent filter, cleaned at regular

intervals, as defined in the producer’s production control manual or any other method of

dust control, which is sufficient to allow the delivery as to maintain the correct pressure.

Page 15: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

9

5.4.3 Adequate stockpile facilities shall be provided to ensure that aggregates are

stored on clean surface in separate stockpiles or bunkers.

5.4.4 Silos and storage compartment shall be clearly marked in order to avoid errors in

use of constituent materials.

5.4.5 Facilities shall be provided to enable collection of representative samples, e.g.

from stockpiles, silos and bins.

5.4.6 The producer shall take precautions to ensure that bagged cement does not

become damp, either from the weather or from the ground. The store shall be managed

so that the cement is used in the same order as it is delivered. Cement that has been

adversely affected by the damp or other causes shall not be used.

5.4.7 The concrete mixer1 shall be capable of achieving a uniformed distribution of the

constituent materials, and a uniformed consistence of concrete within the mixing time

and the mixing capacity.

Note 1: For dry batching, the speed of truck mixer should not be less than fifteen (15) revolution per

minute (RPM) and each truckload of concrete should be mixed for seventy (70) revolutions after the

addition of water.

5.4.8 All conformity testing shall be conducted by trained and competent personnel

and the equipment used shall be properly calibrated and maintained. The testing shall

be conducted in accordance with requirements of relevant test methods.

5.5 Constituent material and concrete

5.5.1 Constituent materials

The constituent materials shall comply with the applicable requirements in MS 523-

3:2010 and MS 523: Part 1:2005. Where applicable and where appropriate Malaysian

Standards is available, the constituent materials and testing methods shall comply and

be tested in accordance with the Malaysian Standard.

5.5.2 Resistance to alkali-silica reactions

i. The risk of damaging alkali-silica reaction shall be minimised in accordance with

the guidance set out in BRE Digest 330 except:

Page 16: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

10

a) for prescribed concrete; and

b) where the specifier has specified provisions for resisting alkali-silica reaction.

For cases that are exceptions, the specifier is responsible for ensuring that the

concrete is not subjected to damaging alkali-silica reaction, but they may have,

by specification, placed this requirement on the producer (see MS 523-2:2011,

A8.1).

ii. When a value for alkali content in accordance with BRE Digest 330 for cement,

fly ash or ground-granulated blast-furnace slag (GGBS) is required, it shall be

made available in accordance with their respective standards. For other

materials, it shall follow the requirements in MS 523-3:2010, Clause 5.2a–g.

5.5.3 Concrete

i. Concrete code and compositions

The producer shall give a coding for each composition of concrete, which is produced at

its ready-mixed concrete plant(s). The coding shall be at the sole discretion of the

producer and shall be able to identify the individual concrete composition without

confusion. For designated and standard prescribed concrete, it shall follow the

designation and composition as specified in MS 523-3:2010.

ii. Chloride content

When determining conformity of chloride content in accordance with MS 523: Part

1:2005, 8.2.3.2, the method for determining the chloride content of constituent materials

shall be in accordance with Table 4, MS 523-3:2010.

5.6 Conformity control and conformity criteria

The producer is responsible for the evaluation of conformity for specified requirements

of the concrete. The conformity control and conformity criteria shall comply with Clause

8, of MS 523: Part 1: 2005.

5.6.1 Designed Concrete

i. For compressive strength, the conformity control shall be assessed against the

requirements of Clause 8.2.1 of MS 523: Part 1: 2005 and for conformity criteria, the

Page 17: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

11

conformity assessment shall be assessed against the requirements of Clause 8.2.1.3 of

MS 523: Part 1: 2005.

ii. For tensile splitting strength (where required), the conformity control shall be

assessed against the requirements of Clause 8.2.2 of MS 523: Part 1:2005 and for

conformity criteria, the conformity assessment shall be assessed against the

requirements of Clause 8.2.2.3 of MS 523: Part 1:2005.

iii. Sampling of concrete shall be randomly and taken in accordance with MS 26-1-

1:2009. The minimum rate of sampling and testing shall be in accordance with Table 1,

at the rate that gives the highest number of sample for initial or continuous production,

as appropriate.

Table 1. Minimum rate of sampling for assessing conformity

Production Minimum rate of sampling

First 50m3 of production

Subsequent to first 50m3 of production

a

(the highest rate given by):

Concrete with product

certification

Concrete without product

certification

Initial (until at least 35

test results are obtained)

3 samples 1/200 m3

or 2/production week

1/150m

3

or 1/production day

Continuousb

, when at least 35 test results are available

- 1/400 m3

or 1/production week

a) Sampling shall be distributed throughout the production and should not be more than 1 sample within each 25 m3. b) Where the standard deviation of the last 15 test results exceeds 1.37σ, the sampling rate shall be increased to that required for initial production for the next 35 test results. Note : This table is a full adoption of Table 13, MS 523: Part 1: 2005 with modification on the term `production control’ change to `product’.

iv. Conformity testing shall be based on samples taken at or before delivery. The place

of sampling shall be chosen such that the relevant concrete properties and concrete

composition do not change significantly between the place of sampling and the place of

delivery. In dry batching, the samples shall be traceable to the truck mixer.

Page 18: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

12

v. The samples shall be taken after any water or admixtures are added to the concrete

under the responsibility of the producer.

vi. The test results shall be obtained from an individual specimen or the average of the

results when two or more specimens made from one sample are tested at the same

age. When two or more specimens are made from one sample and the range of the

test values is more than 15% of the mean, then the results shall be disregarded, unless

an investigation reveals an acceptable reason to justify it.

vii. The minimum compressive strengths for applicable compressive strength class are

highlighted in Table 7 and Table 8 of MS 523: Part 1: 2005. Additional classes are found

in Table 9 of MS 523-3:2010.

viii. The characteristic compressive strength at 28 days shall be of 150 mm cubes

(fck,cube) or150 mm diameter by 300 mm cylinders (fck,cyl).

ix. If conformity to the specified compressive strength class is determined using 100 mm

cubes, the minimum characteristic 100 mm cube strength shall be that given for 150

mm cubes in MS 523:Part1: 2005, Table 7 and 8.

x. The conformity criteria for compressive strength of designed concrete shall be

assessed according to Clause 8.2.1.3 of MS 523: Part 1:2005.

xi. The producer shall decide whether to use individual concrete or concrete family

concept, in the conformity control and conformity, solely at its own choice taking into

consideration of their capacity and capability.

xii. For properties other than strength, the conformity control and conformity criteria shall

be assessed against the requirement of Clause 8.2.3 of MS 523:Part1:2005.

5.6.2 Prescribed and standardised prescribed concrete

The conformity shall be assessed against the requirements in Clause 8.3 of MS 523:

Part 1:2005.

5.6.3 Designated Concrete

The conformity shall be assessed against the requirements of Clause 6.4 of MS 523-

3:2010.

Page 19: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

13

5.6.4 Proprietary concrete

The proprietary concrete shall comply with Clause 10 of MS 523-3:2010.

5.6.5 Action in the case of non-conformity of the product

The producer shall take appropriate action in the event of non-conformity in accordance

with Clause 8.4 of MS 523: Part 1:2005.

5.7 Transportation and delivery of concrete

5.7.1 Ready-mixed concrete shall be transported to the casting site in accordance with

Clause 14.1 of MS 523-3:2010.

5.7.2 The truck operator shall be trained on handling the transport vehicle, discharging

the concrete, cleaning of concrete spill and cleaning the vehicle.

5.7.3 The truck shall comply with the relevant law for its operation and shall be

properly cleaned and maintained. The producer shall establish and maintain a list of

trucks used in the transportation of concrete.

5.7.4 At delivery, the producer shall provide the user with a delivery ticket (however

named) for each load of concrete on which it is printed, stamped or written with relevant

information, as in Clause 7.3, MS 523: Part 1:2005.

5.7.5 The delivery ticket shall contain the plant identification as indicated in 9.1 and the

PPS number in 9.2.

5.7.6 The producer shall ensure that each truck load of ready-mixed concrete does not

exceed the designed capacity of the drum to avoid concrete spill onto public roads

during transportation and/or where appropriate, to introduce additional measures to

prevent such spill.

5.7.7 The ready-mixed concrete shall be delivered to the casting site within 2 hours

after the time of loading when transported in truck mixers, or within 1 hour after the time

of loading, where non-agitating equipment is used, unless a shorter time is specified or

a longer period is permitted by the specifier.

Page 20: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

14

5.7.8 The identity of the truck mixer, agitator or the truck shall be traceable to the

delivery ticket (see 5.7.4). If a producer outsources the transportation to another party,

the truck mixer, agitator or the truck shall be properly identified and labeled, and the

producer shall take full responsibility of the concrete and the concrete quality.

6. Exchange of Information

If and where applicable, the exchange of information on concrete between the producer

and the specifier shall comply with Clause 5 of MS 523-2:2011.

7. Quality Management Requirements

The producer shall establish and maintain a quality management system that is capable

of consistently meeting the requirements of CIS 21, in accordance with either Option A

or Option B.

7.1 Option A1

The producer has fulfilled the requirement of CIS 21, if it has established and

maintained a management system that is in accordance with the requirement of ISO

9001, and that is capable of supporting and demonstrating the consistent fulfillment of

ISO 9001 standards as well as the requirement of Clause 7.2.

Note 1: Option A does not require the producer management system to be certified to ISO 9001.

However, if it is certified by a recognised Certification Body, the producer is deemed to have fulfilled the

requirement of Option B provided it includes requirements of 7.2.

7.2 Option B

The quality management system shall comply with the quality system requirements,

addressing the following:

i. General quality system documentation (7.2.1)

ii. Management & Resources (7.2.2)

iii. Production control procedures (7.2.3)

iv. Calibration (7.2.4)

v. Control of documents (7.2.5)

vi. Control of records (7.2.6)

vii. Internal audit (7.2.7)

Page 21: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

15

viii. Management review (7.2.8)

ix. Corrective action (7.2.9)

x. Preventive action (7.2.10)

xi. Complaints (7.2.11)

7.2.1 General quality system documentation

The producer shall have a quality manual in establishing, implementing and maintaining

a management system related to ready-mixed concrete production, production control

and conformity assessment, including transportation and delivery.

The manual shall document the producer’s quality policy and objectives, organisational

structure and top management, policies and procedures, and shall include, at least, the

following:

i. description of producer’s company organization;

ii. description of responsibilities of key personnel involved in production and

production control;

iii. description of the ready-mixed concrete plant; and

iv. description of the concrete code and specification.

The system’s documentation shall be communicated to, understood by, available to,

and implemented by the appropriate personnel.

7.2.2 Management and resources (Option B)

i. Top management shall provide evidence of its commitment to the development

and implementation of the quality management system and continually improving its

effectiveness by:

a) establishing and defining appropriate quality policy;

b) establishing quality objective; c) communicating to the organisation the importance of meeting customer as

well as statutory and regulatory requirements; d) ensuring the availability of resources; and e) conducting management reviews.

ii. The quality policy shall be appropriate and is communicated and understood within the organisation and is reviewed for continuing suitability to the purpose of the producer. It shall include:

Page 22: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

16

a) commitment to comply with requirements and continually improve the

effectiveness of the quality management system; and

b) framework for establishing and reviewing quality objectives.

iii. The responsibilities and authorities of key personnel are defined, documented and

communicated within the organisation; interrelation between all personnel who

manage, perform and verify work that affects quality shall be established and shall

ensure the independence and authority to perform these tasks.

iv. The producer shall determine the necessary competence for key personnel; provide training, evaluate and maintain record. 7.2.3 Production control procedures (Option B)

The producer shall establish and maintain procedures for production control. These

shall include:

i. Procedure to ensure correct delivery, storage, use of constituent materials,

control of materials (see Table 22, MS 523: Part 1:2005), and a documented

batching instruction (see Clause 9.7 and Table 21, MS 523: Part 1:2005).

ii. Procedure for equipment inspection and testing to ensure they are calibrated and

in good working condition and that they conform to the specified requirements.

iii. Procedure for planned maintenance of batching plant, equipment and transport

facilities so that the properties and quality of concrete are not adversely affected

(see Table 23, MS 523: Part 1:2005).

iv. Procedure to control the quality of concrete (see Table 24, MS 523: Part 1:2005).

v. Procedure for conducting initial test (see Annex A on MS 523: Part 1:2005).

vi. Procedure for conducting concrete conformity assessment (see Clause 8 of MS

523: Part 1: 2005).

vii. Procedure for production, transport to the point of delivery and delivery.

viii. Procedure on outsourcing truck mixers, agitators or trucks, where applicable. In

this case, the producers shall take full responsibility for the quality and delivery of

the concrete and the training of the drivers.

7.2.4. Calibration (Option B)

The producer shall maintain a list of measuring equipment. All equipments used to

monitor critical processes, testing and inspection shall be calibrated or verified at

specific intervals, or prior to use, against measurement standards traceable to the

International System of Units (SI units), where applicable, and the equipment shall be

properly maintained.

Page 23: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

17

7.2.5 Document control (Option B)

i. The producer shall establish and maintain procedures to control the documents

(internal and external) that relates to production and production control, conformity,

transportation and delivery of ready-mixed concrete that are required in MS 523 and

CIS 21.

ii. The procedures shall ensure that documents are:

a) authorised editions and are available at all locations;

b) periodically reviewed and, where necessary, revised to ensure continuing

suitability and compliance with applicable requirements;

c) legible and readily identifiable;

d) prepared, approved and signed by authorised person and any change in the

person shall be authorised;

e) invalid or obsolete documents are promptly removed from all points of issue

or use; and

f) obsolete documents to be retained shall be suitably marked.

7.2.6 Control of records (Option B)

i. The producer shall establish and maintain procedures to control record, which shall

ensure that:

a) controls needed for the identification, storage, protection, retrieval, retention

time and disposition of records are defined and the records are legible,

readily identifiable and retrievable;

b) all relevant data from the production shall be recorded (see Table 20, MS 523: Part 1:2005) and records are retained for at least 3 years unless legal obligations require a longer period.

7.2.7 Internal audit (Option B)

i. The producer shall establish procedures for internal audit, define the

responsibilities and requirement for planning, conduct, reporting and maintaining

the audit records.

ii. Internal audits shall be conducted at least once a year as to verify that it fulfilled

the requirements of MS 523: Part 1:2005, MS 523-3:2010 and CIS 21, and the

quality management system is effectively implemented and maintained.

Page 24: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

18

iii. The internal audit shall address all elements in quality management system,

including the production control and shall be carried out by trained and qualified

personnel who are, wherever resources permit, independent of the activity to be

audited.

iv. The area of activity audited, the audit findings and corrective actions that arise

from them shall be recorded.

v. Follow-up audit activities shall verify and record the implementation and

effectiveness of the corrective action taken.

7.2.8 Management review

i. The producer’s top management shall establish a procedure to review its quality

management system, including the production control at planned intervals, in order to

ensure its continuing suitability, adequacy and effectiveness and to introduce necessary

changes and improvements.

ii. The review shall take account of:

a) results of internal and external audits;

b) customer feedback;

c) complaints;

d) status of corrective and preventive action; and

e) recommendations for improvement.

7.2.9 Corrective action (Option B)

i. The producer shall establish a policy and procedure, and designate appropriate

personnel for implementing corrective action whenever nonconformity is identified.

ii. The producer shall establish a procedure for corrective action and the procedure

shall define requirements for the following:

a) review of the nonconformity;

b) determine the root cause(s) of the problem;

c) evaluate the need to eliminate the problem and to prevent recurrence;

d) determine, select and implement the most suitable action(s);

e) record all actions taken; and

f) review the results to ensure that the corrective actions taken have been effective.

Note: Auditing of the activity may be needed if the identified nonconformity cast doubts.

Page 25: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

19

7.2.10 Preventive action (Option B)

i. Preventive action shall be a proactive process to identify opportunities for

improvement and eliminate potential nonconformities from occurring.

ii. The producer shall establish a procedure for preventive action and the procedure

shall define requirements for the following:

a) identify potential nonconformities and their likely causes;

b) evaluate the need for action to prevent the occurrence of nonconformities;

c) determine and implement the action needed;

d) record the results of actions taken; and

e) review the effectiveness of the preventive actions taken.

Note: The procedure for corrective and preventive actions does not necessarily have to be separate.

7.2.11 Complaints

The producer shall have a documented procedure for receiving, evaluating,

investigating, making decisions, action taken and record of complaints regarding ready-

mixed concrete, batching plant and trucks.

8. Certification

8.1 The producer shall make arrangement with independent third-party certification

body recognised by CIDB for product certification to CIS 21.

8.2 The certification body shall follow the provisions for assessment, surveillance and

certification as stated in Annex C, MS 523: Part 1:2005, and where additional

procedures are incorporated in certification scheme, they shall be documented.

8.3 The initial assessment of production control shall at least check the provisions in

Clause C.2.1 of MS 523: Part 1:2005.

8.4 To provide confidence in the results of the production control, the certification

body shall perform spots1 test in parallel to those of the producers.

Page 26: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

20

Note 1: Collection of sample for spot tests should be based on random sampling. The maximum amount

of sample shall not exceed 30% of the delivery.

8.5 All testing by the producer and the certification body for certification in

accordance to CIS 21 shall be conducted at SAMM accredited laboratory.

8.6 Certificate issued by the certification body shall contain at least the following

information:

i. name and address of the producer;

ii. name and address of the ready-mixed concrete plant;

iii. identification of the ready-mixed concrete plant (see 9.1);

iv. statement of compliance to MS523: Part 1:2005, and CIS 21;

v. producer’s concrete code;

vi. strength class, max w/c ratio;

vii. minimum cement content;

viii. consistence class;

ix. maximum aggregate size;

x. source of aggregate;

xi. type of cement used and source of suppliers; and

xii. source of water for concreting.

Other relevant information may be included, subject to the agreement between the

producer and the certification body.

8.7 Concrete not specified in the certificate in Clause 8.6 may be produced by the

certificate holder and supply the concrete to a user, subject to the mutual agreement

between the producer and the user, and the specification addresses and complies with

the applicable requirements of MS 523.

9. Identification of Ready-Mixed Concrete Plant and Signage

9.1 Identification

The ready-mixed concrete plant shall be identified as follows:

@-S-X-#

@ - name of company/abbreviation

S - number corresponding to the states as per list:

Page 27: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

21

01-Johor

02-Kedah

03-Kelantan

04-Melaka

05-Negeri Sembilan

06-Pahang

07-Pulau Pinang

08-Perak

09-Perlis

010-Selangor

011-Terengganu

012-Sabah

013-Sarawak

014-Wilayah Persekutuan (Kuala Lumpur)

015-Wilayah Persekutuan (Labuan)

016-Wilayah Persekutuan (Putrajaya)

X - W (for wet batching) or D(for dry batching)

# - plant serial number

Example: Company A has two (2) plants; one wet batching and one dry plant on its

site in Johor. So the plant identifications are:

Plant 1: A-01-W-1

Plant 2: A-01-D- 2

9.2 Signage

The ready-mixed concrete plant shall have proper signage placed at the site. It shall

contain at least the following information:

i. name and address of plant;

ii. plant identity;

iii. CIDB PPS number1; and

iv. name and certificate number of the certification body.

Note 1: To obtain PPS, please refer to CIDB

Page 28: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

22

Appendix A

Figure 1 : A typical schematic diagram of wet and dry batching plant

Page 29: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

23

ACKNOWLEDGEMENT

Deepest appreciation is expressed to the committee members, who have spent time

and effort in developing CIS 21 for the betterment of the construction industry. They are:

Dato’ Ir. Ang Cheng Ho (Chairman) National Ready Mixed Concrete

Association of Malaysia

Ir. Soo Thong Phor (Vice Chairman) The Cement and Concrete Association

of Malaysia

Ir. Dr. Hj. Mukhtar Bin Che Ali

Construction Industry Development

Board Malaysia

Ir. Ihsan bin Atan Jabatan Kerja Raya Malaysia

Tong How Peng National Ready Mixed Concrete

Association of Malaysia

Ir. Gunasagaran s/o Krishnan The Institution of Engineers Malaysia

Syed Hazni Bin Abdul Gani Construction Research Institute of

Malaysia

Prof. Dr. Hamidah bt Mohd Saman Persatuan Konkrit Malaysia

Lim Eng Hock American Concrete Institute

(KL Chapter)

Michael Thong Yew Meng Master Builders Association Malaysia

Wan Ahmad Jailani bin Wan Mahmud SIRIM QAS International Sdn Bhd

Faizal Amir bin Mohd Zain Industrial Concrete Products Sdn Bhd

Ir. Dr. Mohd Sabri bin Abdullah

Association of Consulting Engineers

Malaysia

Engr. Hj. Yahya bin Hj. Ariffin (rapporteur) Iqramxpert Sdn Bhd

Nor Hamiza bt Zahar (secretariat)

Construction Industry Development

Board Malaysia

Zulkefli bin Ismail (secretariat)

Construction Industry Development

Board Malaysia

Page 30: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

24

Notes

Page 31: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

25

Notes

Page 32: STANDARD INDUSTRI PEMBINAAN -  · PDF file5.1 Legal 7 5.2 Production ... This Malaysian Construction Industry Standard No. 21 ... Production control system (new, see 4.1.7),

ISBN 978-967-0997-04-9