Page | i
STANDARD OPERATING PROCEDURE (SOP)
EARLY WARNING SYSTEM BEFORE BANJIR BANDANG OCCURRENCE IN CATCHMENT AREA OF KALIPAKIS IN KABUPATEN JEMBER
UNDER COOPERATION
YAYASAN PENGABDI MASYARAKAT (YPM)
with
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)
2011
Page | ii
PREFACE
It is delivered gratitude to The God Almighty for the blessing that
Yayasan Pengabdi Masyarakat (YPM) has finished creation of Standard
Operating Procedure (SOP) Early Warning System before Banjir Bandang in
Catchment Area of Kalipakis in Kabupaten Jember.
The SOP is created based on result of Focus Group Discussion, Site
Watching, and Table Top Exercise that held on 17-18 September 2011 in
Desa Pakis Kecamatan Panti Kabupaten Jember. This book consists of SOP
Early Warning System in general for upstream area, middlestream area and
downstream area of Catchment Area Kalipakis on: (1) normal condition; (2)
rain and banjir bandang condition; (3) evacuation condition; and (4) post of
flood disaster or return into normal condition.
Yayasan Pengabdi Masyarakat delivered gratitude to: (a) Japan
International Cooperation Agency (JICA) for the trust to YPM for the creation
of SOP; (b) Government of Kabupaten Jember that had given aids expecially
to Assistant II and Bakesbangpol Linmas; (c) Participant of Activity (Satlak
Kabupaten Jember, Afdeling of Kahendran Plantation, Camat Panti within
staff, as well as Head Desa Pakis within staff and also community.
Hopefully this SOP can give benefit for related stakeholders, especially
for those communities who live in surrounded area of Catchment Area
Kalipakis so that they can anticipate and reduce risk of banjir bandang
disaster.
Jember, September 2011
Yayasan Pengabdi Masyarakat Head,
Evita Soliha Hani
Page | iii
TABLE OF CONTENT
PREFACE ................................................................................................... ii
TABLE OF CONTENT ................................................................................. iii
I. INTRODUCTION ....................................................................................... 1
II. SCHEME OF GENERAL SOP DAS KALIPAKIS ...................................... 3
III. SCHEME OF UPSTREAM AREA SOP DAS KALIPAKIS ....................... 4
IV. SCHEME OF MIDDLESTREAM AREA DAS KALIPAKIS ....................... 5
V. SCHEME OF DOWNSTREAM AREA DAS KALIPAKIS .......................... 6
VI. SCHEME OF SATLAK PBP SOP DAS KALIPAKIS ................................ 7
VII. EXPLANATION OF SCHEME SOP DAS KALIPAKIS
7.1 Pattern of Communication ...................................................................... 8
7.2 Activity of Stakeholders in Certain Condition .......................................... 11
VIII. SOP BANJIR BANDANG DAS KALIPAKIS IN CERTAIN CONDITION
8.1 Key Person of SOP Banjir Bandang DAS Kalipakis ............................... 19
8.2 Monitoring System Equipments of Early Warning DAS Kalipakis ........... 21
8.3 SOP Early Warning System Banjir Bandang DAS Kalipakis in certain
condition................................................................................................. 24
IX. CLOSING ................................................................................................ 57
Page | 1
I. INTRODUCTION
Indonesia has high risk of natural disaster occurrence. This is caused
by many factors starting from nature condition until human fault. Geologically,
Climatologicaly, and geographically, Indonesia is included as disaster
vulnerable area.
Geology structures in Indonesia had made the surface of nature in
Indonesia becomes in series of mountains and valley as well as many rivers
that results the potential of banjir bandang, landslide and erosion occurrence.
Banjir bandang is as one of most often disaster that occurs (by 60%) in
Indonesia. Banjir bandang generally occurs in west area of Indonesia in which
this part area receives rainfall more amount than Indonesia in east area.
Kabupaten Jember is as one of west area of Indonesia that vulnerable
to banjir bandang occurrence. Banjir bandang in Kabupaten Jember that
results most serious victims had occurred in 2006 at Kecamatan Panti, and
then at Silo was in 2008 and 2009.
The increase of disaster occurrence in Indonesia had encouraged
every concerned side to be more aware and arrange the management of
disaster countermeasure that had been occurred. One of foreign institution
that conducts study of natural disaster in Kabupaten Jember is Japan
International Cooperation Agency (JICA). In 2010, JICA put trust on Yayasan
Pengabdi Masyarakat (YPM) as partner to conduct activity of “Basic Research
and Preparation for Sub Project of Early Warning and Early Evacuation”. In
this case, YPM conducted the research at three disaster hazard locations in
Kabupaten Jember, namely Kecamatan Panti, Kecamatan Sukorambi and
Kecamatan Silo.
As continuation of research activity, YPM was trusted again to hold
activity of Focus Group Discussion, Site Watching, and Table Top Exercise
Early Warning System before Banjir Bandang occurrence to result Standard
Operating Procedure (SOP) Early Warning System Before Banjir Bnadang
occurrence in DAS Kalipakis Kabupaten Jember.
Page | 2
Early Warning System (EWS) is an arrangement of information delivery
based on the prediction of threat to the community before the occurrence that
may result risk. EWS has an objective to give warning so that the information
receiver can immediately make preparedness and act as the existing
condition, situation and in precise time. The main principle of EWS is to give
quick information, accurate, appropriate target, easy to understand, trusted
and sustainable information. Implementation of good and proper early warning
system will be able to protect and save the community from banjir bandang
threat.
Early waning system is as key of an effective risk reduction. This will be
more effective if the system will be able to be recognized and understood by
the community, and the result of detection can be informed to the community,
especially for the community living in surrounding area of banjir bandang
hazard. Therefore, Early warning system will be more effective if it is
established into SOP.
SOP should be able to be well-understood by all community so that it
will be able to enhance the strong consciousness to make it as together
necessities. SOP that created along with the community is a realistic and
trustworthy, because the community know very well about the characteristic of
their own area within the necessities.
SOP of early warning system before banjir bandang occurrence at
Catchment Area (DAS) Kalipakis Kabupaten Jember is created based on
various stages that had been created along with representative of Satlak
Kabupaten Jember, Kecamatan Panti, community/local leader/local officer of
Desa Pakis and Kahendran Plantation.
Pa
ge | 3
1.
Cam
at P
anti
/Drs
. YA
HYA
I 08
13
364
490
77
(0
331)
337
143
(033
1) 7
11
23
4 (
Off
ice
)
2.
Ray
on
Mili
tary
Co
mm
and
/SU
MA
YAR
(033
1)7
1150
1 (o
ffic
e)
(033
1) 7
77
45
42
3.
Bab
insa
/MA
KR
US
081
358
689
30
4
081
249
136
97
4.
Sect
or
Po
lice
/UD
IK
(033
1)3
6328
79
(0
331)
711
330
5.
Inte
llige
nce
Age
nt
/HA
RYA
NTO
(033
1)4
0848
36
6.
Bin
mas
/SU
GEN
G
0813
369
8027
3
7.
Hea
d o
f O
rder
Sec
tio
n o
f C
ivil
Po
lice
/MU
DIA
NT
O
(033
1)3
4307
66
8.
Satl
ak B
akes
ban
g/H
ERI S
ETIA
WA
N
08
1249
707
6
(0
331)
337
853
(Off
ice
)
9.
PU
IRR
IGA
TIO
N
(PA
NTI
OB
SER
VER
)
1.
SULI
/08
135
84
44
82
8
2.
PR
AB
OW
O/(
03
31
) 5
25
59
58
3.
JUR
U P
AK
IS/(
03
31
) 7
86
25
41
10.
BU
PA
TI
Des
a O
ffic
e(H
ead
Des
a/ZA
INI)
0
81
23
460
04
89
08
58
59
778
78
9 (0
33
1)4
03
699
9
Secr
etar
y o
f D
esa/
A.W
AH
ID/0
858
15
240
03
8
Trea
sure
r o
f D
esa
/AG
US
TRI/
08
57
4920
30
49
RT
09
/RW
/06
/SA
TUM
AN
0
81
55
996
31
55
PD
P
- TR
IAN
TO/0
858
5932
654
4
- SU
PA
ND
I/0
858
5979
210
0
Secu
rity
Sec
tio
n/S
ENA
WI
08
15
59
878
53
5
Vic
e H
ead
Du
sun
/SU
PIA
NTO
0
85
85
932
25
72
Hea
d L
MD
H/H
AR
TON
O
08
58
59
676
00
1
Mo
squ
e A
L-M
UB
AR
AQ
Fore
stry
Co
mp
any
Kal
ipu
tih
R
amb
ipu
ji SU
NA
RYO
/08
52
300
30
415
U
PST
REA
M C
OM
MU
NIT
Y
Hea
d D
usu
n K
emu
nd
un
gan
SU
GIT
O/0
85
859
01
677
7
1. R
T 0
8/S
amsu
l/0
857
46
926
6 2
. RT
09
/RO
MLI
/ M
IDD
LEST
REA
M C
OM
MU
NIT
Y
Hea
d D
usu
n C
emp
aka
SUTR
ISN
O/0
85
859
86
603
0
1.
RT
02
/SEN
IMIN
/08
77
578
82
956
2.
RT
03
/HU
SAER
I/(0
331
)52
788
22
3.
RW
0
6/A
TRO
/08
155
96
670
91
/(0
331
)77
744
35
4.
RT
07
/Zae
nu
din
/08
58
595
46
575
5
. R
T 0
9/S
lam
et/0
85
854
97
004
0 6
. R
T 1
0/R
ahm
an/0
815
59
551
07
3
D
OW
NST
REA
M C
OM
MU
NIT
Y
Car
etak
er o
f m
osq
ue
/MA
HR
US
08
58
59
977
73
2
PO
ST 1
PO
ST 2
P
OST
3
3
1
5
1
1 2 3
3
3
1
2
7
= In
form
atio
n b
y H
and
ph
on
e/H
T
=
Info
rmat
ion
by
spea
ker
= In
form
atio
n b
y o
ral/
ken
ton
gan
No
te:
4
1
1
2
6
2
II.
SC
HE
ME
OF
GE
NE
RA
L S
OP
DA
S K
AL
IPA
KIS
Pa
ge | 4
III. S
CH
EM
E O
F S
OP
UP
ST
RE
AM
AR
EA
DA
S K
AL
IPA
KIS
Mai
n S
ou
rce
Up
stre
am K
ahe
nd
ran
: H
ead
RT
09/
RW
06
(M
r. S
atu
man
: 08
155
99
631
55
)
Vic
e H
ead
of
Du
sun
at
Mid
dle
stre
am P
ort
al a
rea
(M
r. S
up
ian
to: 0
85
85
93
22
572
)
UP
STR
EAM
CO
MM
UN
ITY
Car
eta
ker
of
Do
wn
stre
am M
osq
ue
(Mah
rus:
08
58
59
97
773
2)
He
ad o
f se
curi
ty P
DP
(Mr.
Sen
awi:
08
15
59
878
53
5)
) B
yHP
/ O
ral
Lead
er
of
PD
P
- Tr
ian
to 0
85
85
93
265
44
- Su
pan
di:
08
58
597
92
100
B
y H
P/H
T
He
ad D
usu
n C
em
pak
a; D
OW
NST
REA
M
(Su
tris
no
: 08
58
59
86
60
30)
By
HP
/HT
He
ad D
esa
Pak
is
(Bp
. Zai
ni)
08
12
34
600
48
9
08
58
59
778
78
9
03
31
40
369
99
By
: O
ral /
Ke
nto
nga
n
- In
form
atio
n o
f ra
infa
ll
- In
form
atio
n o
f u
pst
ream
co
nd
itio
n
By
HP
/ O
ral
No
te :
: I
nfo
rmat
ion
del
iver
y to
oth
er
stak
eho
lder
: To
ol
Pa
ge | 5
IV.
SC
HE
ME
OF
SO
P M
IDD
LE
ST
RE
AM
AR
EA
DA
S K
AL
IPA
KIS
Mai
n S
ou
rce
Up
stre
am K
ahe
nd
ran
: H
ead
RT
09/
RW
06
(M
r. S
atu
man
: 08
155
99
631
55
)
M
osq
ue
Al-
Mu
bar
oq
Vic
e H
ead
Du
sun
at
Mid
dle
st
ream
Po
rtal
Are
a (
Mr.
Su
pia
nto
: 08
58
59
32
25
72)
He
ad L
MD
H
(Har
ton
o: 0
85
85
96
760
01
)
RT
08
(Sa
msu
l: 0
57
46
926
6)
RT
09
(R
om
li)
No
te :
: In
form
atio
n d
eliv
ery
to o
the
r st
akeh
old
ers
: T
oo
l
MID
DLE
STR
EAM
CO
MM
UN
ITY
Fore
stry
Co
mp
Kal
ipu
tih
R
amb
ipu
ji (S
un
aryo
: 08
52
30
030
41
5)
By
Ora
l/K
ento
nga
n
By
Spea
ker
- In
form
atio
n o
f ra
infa
ll
- In
form
atio
n o
f ri
ver
up
stre
am
con
dit
ion
By
HP
/HT
By
HP
/HT
He
ad D
esa
Pak
is
(Mr.
Zai
ni)
08
12
34
600
48
9
08
58
59
778
78
9
03
31
40
369
99
Pa
ge | 6
Mai
n S
ou
rce
Up
stre
am K
ahe
nd
ran
: H
ead
RT
09/
RW
06
(M
r. S
atu
man
: 08
155
99
631
55
) He
ad D
usu
n C
em
pak
a
(Su
tris
no
: 08
58
59
86
60
30)
Car
eta
ker
of
mo
squ
e
(Mah
rus:
08
58
59
97
773
2)
RT
02
(Se
nim
in: 0
87
75
788
29
56)
RT
03
(H
usa
eri:
03
31
52
78
822
)
RW
06
(A
tro
: 08
15
59
66
709
1/0
33
17
774
435
)
RT
07
(Za
enu
din
: 08
58
59
54
65
75)
RT
09
(S
lam
et: 0
85
85
497
004
0)
RT
10
(Rah
man
: 08
155
95
510
73
)
DO
WN
STR
EAM
C
OM
MU
NIT
Y
No
te :
: In
form
atio
n d
eliv
ery
to o
the
r st
akeh
old
ers
: T
oo
l
By
HP
By
Ora
l/K
ento
nga
n
By
Spea
ker
- In
form
atio
n o
f ra
infa
ll
- In
form
atio
n o
f ri
ver
up
stre
am
con
dit
ion
He
ad D
esa
Pak
is
(Bp
. Zai
ni)
08
12
34
600
48
9
08
58
59
778
78
9
03
31
40
369
99
Res
erve
of
info
rmat
ion
He
ad D
usu
n K
emu
nd
un
gan
SUG
ITO
(0
858
59
016
77
7)
Re
sid
en
t o
f D
usu
n K
em
un
du
nga
n
By
HP
/HT
V. S
CH
EM
E S
OP
DO
WN
ST
RE
AM
AR
EA
DA
S K
AL
IPA
KIS
Pa
ge | 7
Mai
n S
ou
rce
Up
stre
am
Kah
end
ran
: H
ead
RT
09
/RW
06
(M
r. S
atu
man
: 08
155
99
631
55
)
He
ad D
esa
Pak
is
(Mr.
Zai
ni)
08
12
34
600
48
9
08
58
59
778
78
9
03
31
40
369
99
KEC
AM
ATA
N
- H
ead
Kec
amat
an P
anti
: D
rs Y
ahya
(0
81
33
64
490
77
/ 0
33
133
71
431
) -
Civ
il P
olic
e H
ead
Sec
tio
n o
f o
rder
lines
s: M
ud
ian
to
(03
31
34
307
66
)
- Se
cto
r P
olic
e: U
dik
(0
33
13
63
287
9/0
33
171
13
30
)
- In
telli
gen
ce a
gen
t P
olic
e: H
aria
nto
(0
33
14
08
483
8)
- K
ora
mil:
Su
may
ar
03
31
72
150
1/0
33
177
74
52
- B
inm
as: S
uge
ng
(08
13
369
80
273
)
DES
A
- Se
cret
ary
of
Des
a:
A
bd
. Wah
id (
08
58
152
40
038
)
- Tr
easu
rer:
A
gus
Tri (
08
574
92
030
49
)
- -
BaB
insa
: Mak
rus
0
81
35
868
93
04/
08
124
91
369
7
By
HP
By
Ora
l Sp
eak
KA
BU
PA
TEN
- B
ake
sban
glin
mas
: Her
i Set
iaw
an
08
12
49
70
76
6/0
33
13
37
85
3
- P
U Ir
riga
tio
n (
Pan
ti o
bse
rver
)
1.
Suli/
08
13
58
444
82
8 2
. P
rab
ow
o/(
03
31
) 5
255
95
8
3.
Juru
pak
is/(
03
31
) 7
86
25
41
BU
PA
TI
Vic
e H
ead
of
Du
sun
at
Mid
dle
stre
am P
ort
al a
rea
(Mr.
Su
pia
nto
: 08
58
59
32
257
2)
He
ad D
usu
n C
em
pak
a;
DO
WN
STR
EAM
(S
utr
isn
o:
08
58
59
866
03
0)
By
HP
/HT
No
te :
: In
form
atio
n d
eliv
ery
to o
the
r st
akeh
old
ers
: To
ol
VI. S
CH
EM
E O
F S
OP
SA
TL
AK
PB
P D
AS
KA
LIP
AK
IS
Page | 8
VII. EXPLANATION SOP SCHEME OF DAS KALIPAKIS
7.1 Pattern of Communication
Standard Operating Procedures (SOP) has two patterns of
communication, namely: (1) horizontal communication pattern for upstream,
middlestream and downstream area; dan (2) Vertical communication pattern is
on Satlak PBP. Horizontal communication pattern as mentioned is as follow:
SOP Upsteam Area of DAS Kali Pakis:
- Information source in upstream area is Head of RT 09/RW06 (Mr.
Satuman) who acts as coordinator whose also as informant, next is
communicated by using hand phone or by oral to the security (Mr.
Senawi). The information received from security will be informed into the
community who live in upstream area by using kentongan and by oral,
the time needed for the warning information is less than 10 minutes
because houses of residents are close each other.
- Head of RT 09/RW06 (Mr. Satuman) make coordination with
administrator of PDP Kahendran (Mr. Trianto and Supandi) and then
continue by using hand phone to Vice Head of Dusun in Portal area (Mr.
Supianto), Head of Dusun Cempaka (Mr. Sutrisno) and Administrator of
Mosque in downstream (Mr. Mahrus)
- Head of RT 09/RW06 (Mr. Satuman) who acts as coordinator at Post 3
make coordination with Head Desa/Post 1 (Mr. Zaini).
SOP Middlestream Area of DAS Kali Pakis
- Vice Head of Dusun in Middle stream area /Portal (Mr. Supianto) who
act as Head of Forest side Villagers (LMDH) (Mr. Hartono) by using
hand phone as communication tool deliver information to head of RT 08
(Mr. Samsul) and Head of RT 09 (Mr. Romli),
- Vice Head of Dusun in Middle Stream area (at Portal) delivered
information by using hand phone to Head of Dusun Cempaka (Mr.
Page | 9
Sutrisno) and Mosque administrator in downstream (Mr. Mahrus) and
head of desa Pakis (Mr. Zaini)
- Head of Forest side Villagers (LMDH) (Mr. Hartono) delivered
information to Middle Stream area by using loud speaker in the Mosque
Al Mubaroq, and next is making coordination with forestry company of
Kaliputih Rambipuji (Mr. Sunaryo)
- Head of RT 08 (Mr. Samsul) and Head of RT 09 (Mr. Romli) delivered
information to the community in Middle Stream area by using kentongan
and by oral.
SOP Downstream Area of DAS Kali Pakis
- Head of Dusun Cempaka (Mr. Sutrisno) act as coordinator and deliver
information by using hand phone to Head of RT 02 (Mr. Senimin), Head
of RT 03 (Mr. Husaeri), Head of RW 06 (Mr. Atro), Head of RT 07 (Mr.
Zaenuddin), Head of RT 09 (Mr. Slamet) and Head of RT 10 (Mr.
Rahman). Each head of RT deliver information to downstream
community by using kentongan and by oral.
- Head of Dusun Cempaka (Mr. Sutrisno) delivered information to Head of
Dusun Kemundungan (Mr. Sugito) and administrator of Mosque in
Downstream area (Mr. Mahrus)
- Administrator of Mosque in Downstream area (Mr. Mahrus) delivered
information to community in Downstream area by using loud speaker
- Head of Dusun Cempaka (Mr. Sutrisno) as coordinator for Post 3 make
coordination with head of Desa/Post 1 (Bp. Zaini).
Page | 10
Meanwhile vertical communication pattern on SOP banjir bandang DAS
Kalipakis is as follow:
SOP Satlak
- Head of Desa/Post 1 (Mr. Zaini) that had conducted coordination with
Post 2 and Post 3, deliver information by using hand phone to
Secretary and Treasurer of Desa Pakis government officer.
- Head of Desa/Post 1 (Bp. Zaini) that had conducted coordination with
Post 2 and Post 3 deliver information by using hand phone to Head of
Kecamatan Panti (Drs. Yahya), Rayon Military Command (Mr.
Sumayar), Military at Desa Level/Babinsa (Mr. Makrus), Sector Police
(Polsek) Panti (Mr. Udik), Agent of sector Police Panti (Mr. Harianto),
Bimas (Bp Sugeng), Civil Police/Satpol PP Head section of orderliness
(Mr. Mudianto)
Head Desa/Post 1 (Bp. Zaini) deliver information by using hand phone
to coordinator of Satlak in Kabupaten, Bakesbang Linmas Kabupaten
Jember (Mr. Heri), and next is to Bupati of Kabupaten Jember
Page | 11
7.2 Activity of Stakeholders in Certain Condition
In general, the activities conducted by stakeholders in the management
of banjir bandang disaster at DAS Kalipakis can be grouped into 4 conditions
as follow.
1. Normal Condition
No Stakeholders Activity
1. Satlak Kabupaten (Bakesbang,
Resort Police, District Military, Public Relation Office, Irrigation Agency, Health
Agency, and other related agencies)
- Conduct coordination meetings of Satlak in Kabupaten level
- Make socialization about content of disaster law and landslide in hazard area
- Complement and check facilities as well as infrastructure of banjir bnadang disaster.
- Conduct simulation activity of early warning system to community.
- Mapping of Disaster Hazard Area
2. Kecamatan Leader /Muspika (Kecamatan, Sector Police, Rayon Military)
- Participate on Satlak kabupaten activity such as simulation and socialization of disaster countermeasure.
- Make coordination with Satlak Kabupaten in Disaster Countermeasure
- Make cooperation among Kecamatan leaders (Muspika) in disaster mitigation at Kecamatan scope.
- Make communication with Villages, especially in disaster hazard area
3. Desa Pakis - Participate on Satlak kabupaten activity such as simulation and socialization of disaster countermeasure or conduct independently by village.
- Make communication either with Kecamatan leaders (Muspika) or Satlak at Kabupaten level for disaster mitigation
- Reporting disaster hazard area that exist in desa Pakis
- Together with residents create of improve disaster early warning system for banjir bandang that consisting of: disaster hazard map creation, evacuation path and evacuation location.
4. Head Dusun middlestream area (Pakis Utara and Portal area)
- Together with residents and related government create disaster early warning system for banjir bandang that consisting of: disaster hazard map creation, evacuation path and evacuation location.
- Prepare and check equipments that use in early warning system such as kentongan, speaker and
Page | 12
other communication tool. - Participate in disaster activity along with Satlak
Kabupaten at each village level. - Put into habit for making communication with
residents in upstream area and downstream area about climate and weather condition.
5. Head Dusun Downstream area (Dusun Cempoko and Kemundung)
- Together with residents and related governments create disaster early warning system for banjir bandang consisting of: disaster hazard map creation, evacuation path and evacuation location.
- Prepare and check equipments that use in early warning system such as kentongan, speaker and other communication tool.
- Check function of water level sensor at dam cempoko of Kalipakis
- Participate in disaster activity along with Satlak Kabupaten at each village level.
- Put into habit for making communication with residents in upstream area and downstream area about climate and weather condition.
Page | 13
2. Rain Condition
No Stakeholders Activity
1. Upstream Community (Mr.Satuman Head RT 09 and administrator of PDP Afdeling Kahendran Plantation)
- Give information periodically about rainfall condition in upstream area to residents in middlestream area and downstream area that rainfall level in upstream reaches level 3
- Make coordination with Mr. Supiyanto in Middlestream area and downstream area (Head desa Pakis and Head dusun) to give information and expect that residents should start to prepare for evacuation.
- Reminding residents to gather important documents, diploma, etc to be carried into evacuation site
2. Satlak Kabupaten (Bakesbang,
Resort Police, District Military, Public Relation Office, Irrigation Agency, Health
Agency, and other related agencies)
- Make coordination among Satlak member in Kabupaten while keep waiting further information from Head Desa Pakis and Kecamatan Panti
- Satlak will prepare supply of instant food for early aids if there is any evacuation.
- PMI will be prepared and ready to help if there is evacuation to help the victim a.
- PU Irrigation will help to prepare heavy equipments to handle if there is any collapse and change of river flow line, if necessary PU will prepare gabions for any possibility of disaster.
3. Kecamatan Leader /Muspika (Kecamatan, Sector Police, Rayon Military)
After receiving information, then make coordination among Kecamatan leaders (Head Kecamatan, Rayon Military and Sector Police), and will come to the site.
Reporting to Satlak Kabupaten about recent condition
Commander of Sector Police and Rayon Military as well as Kecamatan (Head section of orderliness) check preparedness of personnel.
Stay on alert for disaster post of Kecamatan
4. Desa Pakis Make coordination with upstream, middlestream and village officers
Prepare for possibility of evacuation by preparing personnel and equipments
Check rainfall gauge in Desa Pakis office
Reporting condition to Kecamatan
Go for patrol
5. Head Dusun of middlestream area (Mr.Supiyanto)
- Make communication with upstream area of Kahendran, downstream and head desa Pakis
- Check water level in river by using water level gauge at dam cempoko of Kalipakis and report
Page | 14
(Pakis Utara and Portal area)
- Inform residents through loudspeaker in mosque as well as through head RT and ask residents to stay away from river and prepare for evacuation if needed
6. Head Dusun Downstream Area (Dusun Cempoko and Kemundung)
- Make communication with upstream area of Kahendran, downstream and head desa Pakis
- Check water level in river by using water level gauge at dam cempoko of Kalipakis and report
- Inform residents through loudspeaker in mosque as well as through head RT and ask residents to stay away from river and prepare for evacuation if needed
Page | 15
3. Evacuation and Banjir Bandang Condition
No Stakeholder Activity
1. Upstream Community (Mr.Satuman Head RT 09 and administrator of PDP Afdeling Kahendran Plantation)
- Give warning to conduct evacuation if there is already exist symptoms for possibility of landslide and banjir bandang and go to evacuation site that had been determined before
- Monitor condition and make sure that there is no resident still stay in the house and all have been evacuated.
- Prepare emergency kitchen and establish emergency tents
- Inform condition of evacuation to middlestream and downstream area
- Report and make coordination with head desa Pakis as well as PDP leaders about recent condition
2. Satlak Kabupaten (Bakesbang,
Resort Police, District Military, Public Relation office, Irrigation Agency, Health
Agency, and other related agencies)
- Make coordination with Kecamatan Panti and Desa Pakis
- Make coordination among Satlak member - Make coordination with Resort Police, Civil
police and District Military to prepare personnel. - Deploy of personnel as well as equipments to
help evacuation process - PMI will help victims, PU irrigation will prepare
heavy equipments to handle the collapse soil and change of river flow line if any, or if necessary PU will prepare gabions, meanwhile other agencies will work as each of their function and duties.
3. Kecamatan Leader /Muspika (Kecamatan, Sector Police, Rayon Military)
- Make coordination with desa Pakis
- Together with Satlak Kecamatan and village helping resident evacuation.
- Make sure that all residents in disaster hazard area have been totally evacuated
- Help desa Pakis in preparing emergency kitchen and emergency medical treatment
- Report to Satlak Kabupaten
4. Head Desa Pakis - Head Desa will give instruction to village officers such as to head dusun, head RT, RW and public protection to help for evacuation process.
- Instruct Head Dusun to distribute early logistic. Each Head RT in upstream and downstream will take responsible for each evacuation location. Public protection will check houses security.
- Report to Kecamatan Panti
Page | 16
- Go for patrol to surrounded area
5. Head Dusun of middlestream area (Mr.Supiyanto) (Pakis Utara and Portal area)
- Make coordination with upstream and downstream
- Inform progress condition that evacuation should be already started for middlestream area to residents through speaker or head RT and ask resident to stay away from river and go to evacuation site that has been determined.
- Evacuate resident in hazard area (near river flow line)
- Report and make coordination with head desa Pakis to prepare emergency kitchen and emergency medical treatment
6. Head Dusun Downstream Area (Dusun Cempoko and Kemundung)
- Make coordination with upstream and middlestream area
- Inform progress condition that evacuation should be started for downstream area to residents either by using speaker or head RT and ask residents to staf away from river area and go to evacuation site that has been determined
- Evacuate resident in hazard area (near river flow line)
- Report and make coordination with head desa Pakis to prepare emergency kitchen and emergency medical treatment
Page | 17
4. Post of Flood or Return to Normal Condition
No Stakeholder Activity
1. Upstream Community (Mr.Satuman Head RT 09 and administrator of PDP Afdeling Kahendran Plantation)
- Inform that rainfall condition in afdeling Kahendran (upstream) has been stopped and river flow is decreased by using hand-phone or HT to Head Desa Pakis, Dusun Pakis Utara (middlestream), Head Dusun Cempoko (downstream).
- Evacuation is finished and make inventory of victim.
- Report to Head Desa about condition in evacuation site.
- Request for aid distribution that aimed for refugee especially instant food and medicine supply.
2. Satlak Kabupaten (Bakesbang, Resort
Police, Distrcit Military, Public Relation office, Irrigation Agency,
Health Agency, and other related agencies)
- Take over command in the evacuation site into centralized command for aid giving and information
- Make inventory list for victims and damage by making coordination with Kecamatan and Village
- Conduct emergency reparation, make coordination among Satlak and together with Bakesbang conduct survey to make sure whether it is safe condition or still danger
- Give emergency aid - Report to Bupati
3. Kecamatan Leader /Muspika (Kecamatan, Sector Police, Rayon Military)
- Gather report of victim list in evacuation site as well as other important informations and then report to Satlak Kabupaten.
- Take responsibility for supervision and aid distribution
- Conduct emergency reparation and make coordination among satlak and Bakesbang for survey.
4. Head Desa Pakis - Head Desa will give command to lead village officers such as head RT, RW and public relation office to enter disaster site and start for cleaning.
- Aids start to be received and distribution to victim and refugee.
- Gather report and list material loss as well as victims list and report to kecamatan
- Together with Rayon Military Command and Public Protection for cleaning.
5. Head Dusun - Make victim list.
Page | 18
middelstream area (Mr.Supiyanto) (Portal area)
- Report to Head Desa about condition in evacuation site.
- Require for aids distribution to refugee especially for instant food and medicines.
6. Head Dusun Downstream Area (Dusun Cempoko and Kemundung)
- Make victim list. - Report to Head Desa about condition in
evacuation site. - Require for aids distribution to refugee
especially for instant food and medicines.
Pa
ge | 1
9
VII
I. S
OP
BA
NJ
IR B
AN
DA
NG
DA
S K
AL
IPA
KIS
IN
CE
RT
AIN
CO
ND
ITIO
N
8
.1 K
ey p
ers
on
s o
f S
OP
Ba
njir
Ban
da
ng
at
DA
S K
ali
pak
is
S
OP
Ba
njir
Ba
nd
an
g a
t D
AS
Ka
lipa
kis
will
be
co
nd
ucte
d b
y e
ach
key p
ers
on
s o
r in
ch
arg
e p
ers
on
in t
he
flo
w o
f S
OP
as s
ho
wn
in
fo
llow
ing t
ab
le.
Lis
t n
am
e o
f K
ey p
ers
on
in
Ea
rly W
arn
ing S
yste
m a
nd
Eva
cu
atio
n o
f B
an
jir B
an
dan
g D
AS
Ka
lipa
kis
N
o.
Sta
ke
ho
lde
rs
In c
harg
e p
ers
on
P
osit
ion
T
ele
ph
on
e
1.
Up
str
ea
m A
rea
(R
eg
iona
l P
lanta
tion
Com
pan
y /
PD
P
Afd
elin
g K
ahe
ndra
n)
Sa
tum
an
He
ad R
T 0
9
081 5
59 9
63 1
55
Tria
nto
O
psin
de
r K
ahe
nd
ran
085 8
59 3
26 5
44
- S
upa
nd
i -
Vic
e o
f O
psin
de
r K
ahe
ndra
n
085 8
59 7
92 1
00
- S
ena
wi
- S
ecurity
of
PD
P
081 5
59 8
78 5
35
2.
Mid
dle
str
ea
m A
rea
(D
usun
Pakis
Uta
ra)
Su
pia
nto
V
ice
Hea
d D
usun
Pakis
Uta
ra
085
85
9 3
22 5
72
Sa
msu
l H
ead R
T 0
8
08574926073
Ro
mli
He
ad R
T 0
9
- H
art
ono
He
ad L
MD
H
085
85
9 6
76 0
01
Su
na
ryo
Fore
str
y C
om
p K
alip
utih
Ra
mb
ipuji
085
23
0 0
30 4
15
Su
tris
no
He
ad D
usun
Cem
poko
085
85
9 8
66 0
30
3.
Do
wn
str
eam
Are
a (
Du
sun
C
em
poko a
nd D
usun
K
em
un
dung
an)
Se
nim
in
He
ad R
T 0
2
087
75
7 8
82 9
56
Hu
sae
ri
He
ad R
T 0
3
033
1 5
27
88
22
Atr
o
He
ad R
T 0
6
081
55
9 6
67 0
91
03
31
7774435
Zae
nu
din
H
ead
RT
07
085
85
9 5
46 5
75
Sla
me
t H
ead R
T 0
9
085
54
9 7
00
40
Ra
hm
an
He
ad R
T 1
0
081
55
9 5
51 0
73
Ma
hru
s
Mo
sq
ue C
are
taker
085859977732
Pa
ge | 2
0
Su
gito
He
ad
Dusu
n K
em
un
dung
an
085859016777
4.
De
sa P
akis
Z
ain
i H
ead D
esa P
akis
081
23
4 6
00 4
89 0
85 8
59
7
78
78
9 0
33
1 4
03
69
99
A W
ah
id
Secre
tary
of
Vill
ag
e
085815240038
Ag
us T
ri L
akso
no
Tre
asure
r of
Vill
ag
e
085749203049
Ma
kru
s
Ba
bin
sa P
akis
0
81
35
8 6
89 3
04 0
81 2
49
1
36
97
5.
Ke
cam
ata
n P
anti
Drs
. Y
ahya
I.
He
ad
Ke
cam
ata
n P
anti
081
33
6 4
49 0
77 0
33
1 3
37
143
(033
1)
711
23
4 (
Ka
nto
r)
Ud
ik
Se
cto
r P
olic
e o
f P
anti
033
1 3
63
28
79 0
33
1 7
11 3
30
Ha
rian
to
Po
lice
Ag
ent P
anti
033
1 4
08
48
36
Su
ma
ya
r R
ayo
n M
ilita
ry C
om
ma
nd
Pa
nti
0331 7
11
50
1 0
33
1 7
77 4
54
2
Su
ge
ng
Bin
ma
s
081
33
6 9
80 2
73
He
ri S
etiaw
an
S
atlak P
BP
/Bake
sba
ng
po
l L
inm
as
081
24
9 7
07 6
6 0
33
1 3
37
853
6.
Ka
bu
pa
ten
Jem
ber
Su
li P
anti O
bserv
er
081358444828
Pra
bo
wo
P
U I
rrig
atio
n
(033
1)
525
59
58
Ju
ru P
akis
P
U I
rrig
atio
n
(033
1)
786
25
41
Pa
ge | 2
1
8.2
Mo
nit
ori
ng
Eq
uip
me
nts
of
Ea
rly W
arn
ing
Sys
tem
DA
S K
ali
pak
is
B
esid
es k
ey p
ers
on
wh
ich i
s a
s a
ctiva
tor
in t
he
flo
w o
f S
OP
DA
S K
alip
akis
, it a
lso n
ee
ds m
on
ito
rin
g e
qu
ipm
ents
.
Mo
nito
rin
g e
qu
ipm
en
ts in e
arly w
arn
ing s
yste
m f
or
ban
jir b
an
dan
g a
t D
AS
Ka
lipa
kis
wh
ich w
ere
aid
fro
m J
ap
an
In
tern
atio
na
l
Coo
pe
ratio
n A
gen
cy (
JIC
A)
is s
ho
wn
in
fo
llow
ing t
ab
le.
Mo
nito
rin
g e
qu
ipm
ents
of
Ea
rly W
arn
ing S
yste
m f
rom
JIC
A a
t D
as K
ali
Pa
kis
Desa
Pa
kis
Ke
cam
ata
n P
anti K
ab
upa
ten
Je
mbe
r N
o
Typ
e o
f e
qu
ipm
en
t P
osit
ion
In
ch
arg
e O
ffic
er
No
te
1.
Au
tom
ati
c R
ain
G
au
ge (
we
ath
er
sys
tem
) (b
y b
att
ery
e
ne
rgy s
up
ply
)
Afd
eli
ng
K
ah
en
dra
n
1)
PD
P A
fdeli
ng
K
ah
en
dra
n
2)
He
ad
RT
09 i
n
Ka
he
nd
ran
A
uto
ma
tic W
ea
the
r S
ys
tem
Pa
ge | 2
2
No
T
yp
e o
f e
qu
ipm
en
t P
osit
ion
In
ch
arg
e O
ffic
er
No
te
2.
Au
tom
ati
c R
ain
G
au
ge (
we
ath
er
sys
tem
)
De
sa
Pa
kis
O
ffic
e
H
ead
Des
a P
akis
R
ain
fall G
au
ge
Dis
pla
y s
cre
en
3.
Wa
ter
Leve
l S
en
so
r
Da
m C
em
po
ko
o
f K
ali P
akis
H
ead
Du
su
n C
em
po
ko
W
ate
r L
ev
el
Sen
so
r
Warn
ing
Sen
so
r B
ox
Pa
ge | 2
3
No
T
yp
e o
f e
qu
ipm
en
t P
osit
ion
In
ch
arg
e O
ffic
er
No
te
4.
Ra
infa
ll s
en
so
r M
osq
ue
at
Du
su
n
Ce
mp
ok
o
He
ad
Du
su
n C
em
po
ko
R
ain
fall S
en
so
r T
ub
e
Warn
ing
Sen
so
r B
ox
Pa
ge | 2
4
8.3
SO
P E
arl
y W
arn
ing
Sys
tem
fo
r B
an
jir
Ba
nd
an
g a
t D
AS
Ka
lip
ak
is i
n C
ert
ain
Co
nd
itio
n
No
rma
l C
on
dit
ion
(C
on
dit
ion
1)
Ra
infa
ll L
eve
l
:
0
Wate
r L
eve
l
:
0
Sta
tus
: N
orm
al
No
L
ocati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
A
rea of
DA
S
Kalip
akis
(K
ahe
ndra
n
Pla
nta
tio
n)
1.
Head R
T 0
9 (
Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n
Pla
nta
tio
n (
Trianto
)
2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
- M
on
itori
ng t
he c
ond
itio
n o
f earl
y w
arn
ing s
yste
m.
C
heck the f
unction o
f ra
infa
ll gau
ge
.
M
ain
tain
and
check t
he f
unction
as
well
as
energ
y
sup
ply
fo
r com
munic
ation
to
ol:
HP
, H
T,
dan
speaker.
1.
Rain
fall
gaug
e
2.
Com
munic
ation t
oo
l
H
and
pho
ne
HT
S
peaker
C
ond
uct socia
lizatio
n
abou
t m
ain
tain
ing o
f environm
enta
l pre
serv
atio
n a
nd
natu
ral d
isaste
r anticip
atio
n
C
ond
uct ill
um
ination
an
d
superv
isio
n to t
he a
ctio
n th
at
dam
age
en
viro
nm
ent such a
s ille
gal
log
gin
g, g
arb
age d
isposa
l a
t in
pro
per
pla
ce a
nd
so o
n.
T
ogeth
er
with
com
munity
make
earl
y
warn
ing
syste
m
for
banjir
band
ang c
onsis
ting
: d
isaste
r ha
zard
m
ap,
evacuation
path
, gath
erin
g
poin
ts a
nd e
vacua
tion location
.
H
elp
ing
pro
gra
m
of
Satlak
PB
P
Kab
upate
n J
em
ber
Pa
ge | 2
5
M
ake
com
munic
atio
n
inte
nsiv
ely
w
ith
mid
dle
str
eam
and
do
wnstr
eam
of
DA
S
Kalip
akis
concern
ing
with
we
ath
er
and river
conditio
n o
f K
ali
Pakis
.
Make c
onta
ct
via
HP
and
HT
to
a)
Head D
esa
Pakis
(Z
ain
i)
b)
Vic
e
Head
Dusun
of
Pa
kis
U
tara
(S
up
ianto
) c)
Head D
usu
n o
f dow
nstr
ea
m D
usun
Cem
poko (
Sutr
isno)
Hand
pho
ne
HT
2.
Mid
dle
str
eam
A
rea
DA
S
Kalip
akis
(D
usun
Pakis
Uta
ra)
1.
Vic
e H
ead
D
usun
P
akis
U
tara
(S
up
ianto
)
N
orm
al activity.
M
ake
com
munic
atio
n
with
upstr
eam
are
a
concern
ing
with
weath
er
and
river
conditio
n o
f K
ali
Pakis
.
R
eceiv
e c
onta
ct
via
HP
or
HT
with
H
ead R
T 0
9 K
ahen
dra
n P
lanta
tio
n
(Mr.
Satu
man)
Hand
pho
ne
HT
3.
D
ow
nstr
eam
A
rea
of
DA
S
Kalip
akis
(D
usun C
em
poko
)
1.
Head D
usun C
em
poko
(Sutr
isno)
N
orm
al activity.
M
on
itori
ng co
nd
itio
n of
equ
ipm
ents
of
earl
y
warn
ing s
yste
m.
M
ake
com
munic
atio
n
with
upstr
eam
concern
ing
with
weath
er
conditio
n
an
d
Kalip
akis
riv
er.
M
on
itori
ng f
unctio
n o
f w
ate
r le
vel
in
dam
cem
poko
R
eceiv
e c
onta
ct
via
HP
or
HT
fro
m
Head
R
T 09 K
ah
endra
n P
lanta
tio
n
(Mr.
Satu
man)
1.
Wate
r le
ve
l g
aug
e
2.
Com
munic
ation T
ool
Hand
pho
ne
HT
4.
D
esa P
akis
H
ead D
esa P
akis
(M
r. Z
ain
i)
N
orm
al activity.
M
on
itori
ng co
nd
itio
n of
equ
ipm
ents
of
earl
y
warn
ing s
yste
m.
M
ake
com
munic
atio
n
with
upstr
eam
concern
ing
with
weath
er
conditio
n
an
d
Kalip
akis
riv
er.
C
heck
the
function
of
rain
gau
ge
equ
ipm
ents
at
desa
Pakis
off
ice
R
eceiv
e c
onta
ct
via
HP
or
HT
fro
m
Head R
T 0
9 P
erk
ebunan K
ahen
dra
n
(Mr.
Satu
man)
1.
Rain
fall
gaug
e
2.
Com
munic
ation t
oo
l
Pa
ge | 2
6
Hand
pho
ne
HT
5.
Kecam
ata
n P
anti
Cam
at P
anti (
Drs
. Y
ah
ya
I.)
Norm
al activity.
M
ake
com
munic
atio
n
with H
ead D
esa
Pakis
concern
ing
with
weath
er
and
river
conditio
n o
f K
alip
akis
.
Receiv
e c
onta
ct
via
HP
or
HT
with H
ead
D
esa P
akis
Hand
pho
ne
HT
6.
Kab
upate
n
Jem
ber
Satlak P
B :
B
akesba
ngp
ol
Lin
mas/
Satlak P
BP
(H
eri S
etia
wan).
N
orm
al
activity
wh
ile
waitin
g
for
report
/info
rmation.
Pa
ge | 2
7
Co
nd
itio
n o
f A
tte
nti
on
(C
on
dit
ion
2)
Rain
fall
Le
ve
l
:
1 (
30 m
m/H
ou
r)
Wate
r L
eve
l
:
1 (
100
Cm
) S
tatu
s
: A
tte
ntion
No
L
ocati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
Are
a o
f D
AS
K
alip
akis
(K
ahendra
n
Pla
nta
tio
n)
1.
Head R
T 0
9
(Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n P
lanta
tio
n
(Trianto
)
2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
M
on
itori
ng o
f re
cent
conditio
n
H
ead R
T (
Mr.
S
atu
man)
make
coord
ination a
mong
sta
kehold
ers
in
pla
nta
tion
H
ead
RT
(M
r.
Satu
man)
giv
e
info
rmation to in
charg
e s
takehold
ers
in
outs
ide o
f P
DP
P
lanta
tio
n
G
ive
info
rmation to
lo
cal re
sid
ent
abo
ut
curr
ent cond
itio
n
M
easure
and
monitor
rain
fall
conditio
n o
n r
ain
fall
gau
ge
M
ake c
oord
ination e
ach o
ther
with o
psin
der
(Trianto
), v
ice
opsin
der
(Supa
ndi),s
ecuri
ty
(Sena
wi) a
bou
t ra
infa
ll le
ve
l 1
conditio
n/o
n S
tatu
s o
f A
tte
nti
on
S
en
d info
rmation a
bo
ut ra
infa
ll conditio
n a
nd w
ate
r le
vel
conditio
n o
f upstr
eam
that
alrea
dy in
Att
en
tio
n s
tatu
s
(rain
fall
is 3
0 m
m),
to
: a.
Head D
esa P
akis
(Z
ain
i)
b.
Vic
e H
ea
d D
usu
n P
akis
Uta
ra
(Sup
ianto
) c.
Head D
usun C
em
poko
(Sutr
isno)
G
ive in
form
ation b
y ora
l to
lo
cal
resid
ents
to
be m
ore
aw
are
th
at
conducte
d
by
Hea
d
RT
(M
r.S
atu
man)
and
Secu
rity
of
Kah
endra
n
Pla
nta
tio
n
(S
ena
wi)
th
at
rain
fall
reach
30 c
m a
nd t
o
be m
ore
aw
are
1.
Rain
fall
gaug
e
2.
Com
munic
ation
tool
Hand
pho
ne
HT
2.
Mid
dle
str
eam
A
rea
D
AS
K
alip
akis
(D
usun
Vic
e
Hea
d
Dusun
Pakis
U
tara
(S
up
ianto
)
Make
coord
inatio
n
with
Kahe
ndra
n
R
eceiv
e
info
rmation
and
m
ake
coord
ination
with
Ka
hendra
n
Com
munic
ation t
oo
l
Pa
ge | 2
8
Pakis
Uta
ra)
Pla
nta
tio
n
M
ake
coord
inatio
n
with L
MD
H a
nd R
T 0
8
and 0
9
R
eport
re
cen
t conditio
n
Pla
nta
tio
n (M
r. S
atu
man)
about
rain
fall
cond
itio
n
In
form
via
HP
/HT
to h
ea
d L
MD
H
(Hart
ono)
and
H
ea
d
RT
08
(Sam
sul)
as
well
as
RT
09
(Rom
li)
that
info
rmation
fr
om
upstr
eam
is t
hat
rain
fall
reach 3
0
cm
(le
vel 1)
to b
e a
ware
C
ontinu
e info
rmation d
eliv
ery
via
H
P/H
T t
o F
ore
str
y C
om
pan
y o
f K
alip
utih R
am
bip
uji
Asp
er
(Sunary
o)
con
ducte
d b
y L
MD
H
(Hart
ono).
R
eport
ing
to H
ead
Desa P
akis
(Z
ain
i)
Hand
pho
ne
HT
3.
Do
wnstr
eam
A
rea
of
DA
S K
alip
akis
(D
usun
Cem
poko
)
1.
Head D
usun
Cem
poko (
Sutr
isno
)
M
ake c
oord
ination
with K
ahen
dra
n
Pla
nta
tio
n
M
ake
coord
inatio
n
with
RT
and
instr
uct
head
RT
to
be
m
ore
a
ware
M
ake
coord
inatio
n
with
Hea
d
Dusu
n
Kem
undung
an
R
eport
ing
recen
t conditio
n
R
eceiv
e c
onta
ct
via
HP
or
HT
fr
om
Head R
T 0
9 o
f K
ah
en
dra
n
Pla
nta
tio
n (
Mr.
Satu
man)
about
ra
infa
ll cond
itio
n
C
heck w
ate
r le
ve
l con
ditio
n in
wate
r le
vel ga
uge a
t th
e r
iver
of
dam
cem
poko K
alip
akis
M
ake c
onta
ct
via
HP
/HT
with:
a)
Head R
T 0
2 (
Se
nim
in)
b)
Head
RT
03 (
Husaeri
) c)
Head
RW
06 (
Atr
o)
d)
Head
RT
07 (
Zain
ud
in)
e)
Head R
T 0
9 (
Sla
met)
f)
H
ead R
T 1
0 (
Rahm
an)
1.W
ate
r le
vel ga
uge
2.
Com
munic
atio
n to
ol
Hand
pho
ne
HT
Pa
ge | 2
9
In
form
to H
ead D
usun
Kem
undung
an (
Sug
ito)
abo
ut
rain
fall
info
rmation in u
pstr
eam
and w
ate
r le
ve
l in
Kalip
akis
that
it
has e
nte
red le
ve
l 1
R
eport
ing
to h
ea
d d
esa
Pa
kis
(Z
ain
i) a
bo
ut
info
rmation f
rom
upstr
eam
and c
heckin
g r
esult o
f w
ate
r le
vel in
the
riv
er
of
Kali
Pakis
that
it h
as e
nte
red
le
ve
l 1
4.
D
esa P
akis
H
ead D
esa P
akis
(Z
ain
i)
M
on
itori
ng c
ond
itio
n o
f ra
in
gaug
e
equ
ipm
ents
M
ake
coord
inatio
n
with
Kahe
ndra
n
pla
nta
tion
M
ake
coord
inatio
n
with
He
ad
Dusun
to
be m
ore
aw
are
R
eport
ing
recen
t conditio
n
to
Kecam
ata
n
R
eceiv
e info
rmation v
ia H
P o
r H
T
from
H
ead
R
T
09
Perk
ebuna
n
Kah
endra
n (
Mr.
Satu
man).
R
ecord
incom
ing info
rmation f
rom
upstr
eam
, m
iddle
str
eam
and
do
wnstr
eam
are
a.
C
heck
rain
fall
co
nditio
n
and
com
pare
ra
infa
ll b
etw
ee
n
upstr
eam
and
do
wnstr
ea
m
on
rain
gau
ge a
t desa
Pakis
off
ice
C
onta
ct
Hea
d D
usu
n P
akis
Uta
ra
(Sup
ianto
) an
d H
ead D
usu
n o
f C
em
poko (
Sutr
isno)
to c
he
ck
info
rmation a
nd
instr
ucting
to
monitor
recent con
ditio
n a
s w
ell
as m
akin
g c
oord
ination a
mong
dusuns.
R
eport
ing
recent co
nd
itio
n
(rain
fall
and
wate
r le
ve
l o
n leve
l 1)
to:
1.
Rain
fall
gaug
e
2
. C
om
mu
nic
atio
n
too
l
Ha
ndp
hon
e H
T
Pa
ge | 3
0
a.
Kecam
ata
n P
anti (
Cam
at
Panti/Y
ah
ya)
b.
Satlak K
abu
pate
n
(Heri/B
akesbang)
c.
5.
Kecam
ata
n P
anti
1.
Cam
at P
anti (
Drs
. Y
ah
ya I
.)
N
orm
al activity.
M
ake
com
munic
atio
n
with H
ea
d D
esa P
akis
concern
ing
with
river
conditio
n o
f K
alip
akis
.
P
repare
d
isaste
r p
ost
of
kecam
ata
n
an
d
check facili
ties
R
eport
ing
recen
t conditio
n
to
Satlak
Kab
upate
n
R
eceiv
e co
nta
ct
via
H
P
or
H
T
from
Head D
esa P
akis
M
ake
coord
ination
am
ong
Kecam
ata
n L
ead
ers
(M
usp
ika
) of
Kecam
ata
n
Panti
that
rain
fall
conditio
n i
n P
akis
reaches 3
0 c
m
and r
iver
wate
r le
ve
l 1 a
s f
ollo
w:
a.
Civ
il P
olic
e
Hea
d
of
Ord
erlin
ess
Kecam
ata
n
(Mudia
nto
) b.
Ra
yo
n
Mili
tary
C
om
mand
P
anti (
Ca
pta
in.S
um
ayar)
c.
Secto
r P
olic
e P
an
ti (
Udik
)
P
repare
d
isaste
r post
of
kecam
ata
n
R
eport
ing
re
cent
cond
itio
n
to
Satlak
Kab
upate
n
(Heri/B
akesbangpo
l L
inm
as)
Ha
ndp
hon
e H
T
6.
Kab
upate
n J
em
ber
Satl
ak P
B:
1.
Bakesbangp
ol
Lin
mas/
Satlak
PB
P
(Heri S
etia
wa
n)
N
orm
al activity.
R
eceiv
e
info
rmation
fr
om
Head D
esa P
akis
as w
ell
as K
ecam
ata
n
Panti,
and
m
ake
coord
ination
am
ong
S
atlak
mem
ber
R
eceiv
e
conta
ct
via
H
P
or
HT
fr
om
H
ead
Desa
P
akis
(Z
ain
i)
and
Kecam
ata
n
Pa
nti
(Yah
ya)/
Cam
at P
anti)
S
atlak
(Bakesbang/H
eri)
make
coord
ination
abo
ut
info
rmation
Ha
ndp
hon
e H
T
Pa
ge | 3
1
concern
ing
with
w
eath
er
and
river
conditio
n o
f K
alip
akis
.
report
fr
om
D
esa
Pakis
and
K
ecam
ata
n
Panti
with
rela
ted
agencie
s a
s S
atlak m
em
ber
: a. P
MI
b. P
U P
eng
aira
n
c.
Oth
er
rela
ted
agencie
s
of
Satlak m
em
ber
- M
ake
coord
ination
am
ong
Satlak
mem
ber
to
pre
pare
fa
cili
ties
an
d
equ
ipm
ents
th
at
ma
y be need
ed fo
r th
e p
ossib
ility
of
dis
aste
r occurr
ence
while
waitin
g f
or
furt
her
info
rmation
Pa
ge | 3
2
Co
nd
itio
n o
f A
wa
re (
Co
nd
itio
n 3
)
Ra
infa
ll Le
vel
: 2 (
60 m
m/h
our)
W
ate
r Level
: 2 (
120
cm
) S
tatu
s
: A
ware
No
L
ocati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
A
rea
of
DA
S
Kalip
akis
(K
ahendra
n
Pla
nta
tio
n)
1. H
ead R
T 0
9 (
Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n P
lanta
tio
n
(Trianto
)
2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
M
on
itor
recen
t w
eath
er
cond
itio
n
In
form
to r
ela
ted
sta
kehold
ers
.
G
ive
an
nou
ncem
ent
to
resid
ent
that
floo
d
sta
tus i
s A
WA
RE
an
d
it i
s e
xpecte
d t
o m
ake
pre
para
tio
n
of
evacu
ation
.
M
on
itor
rain
fall
cond
itio
n
by
usin
g
exis
ting
tool
inte
nsiv
ely
and
als
o
see
upstr
eam
river
conditio
n.
.
S
en
d
info
rmation
about
rain
fall
level
that
alre
ad
y
on
sta
tus
of
AW
AR
E to
:
1.
Security
of
PD
P (
Sen
aw
i)
2.
Opsin
der
(Trianto
) and
V
ice
O
psin
der
(Sup
ianto
) of
Kah
endra
n P
lanta
tio
n
3.
Vic
e
Hea
d
Dusu
n
Pakis
U
tara
(S
up
ianto
) 4.
Head
D
usun
Ce
mpoko
(Sutr
isno
) 5.
Head D
esa P
akis
(Z
ain
i)
In
form
to
re
sid
ent
of
pla
nta
tio
n
abou
t A
WA
RE
con
ditio
n
and
m
ake p
repara
tion o
f evacu
atio
n b
y
usin
g spe
aker
help
ed b
y S
ecurity
P
DP
(S
ena
wi).
1.
Rain
fall
gaug
e
2.
Com
munic
ation
tool
H
andp
hon
e H
T
3.
Spe
aker
2.
Mid
dle
str
eam
A
rea
DA
S
Kalip
akis
(D
usun
Pakis
U
tara
)
1.
Vic
e
Hea
d
Dusun
P
akis
Uta
ra (
Supia
nto
)
M
ake
coord
inatio
n
with P
lanta
tion
.
M
ake
coord
inatio
n
with
LM
DH
an
d
Fore
str
y c
om
pan
y
R
eceiv
e p
rogre
ss o
f in
form
atio
n
ab
ou
t ra
infa
ll and
upstr
eam
conditio
n v
ia H
P/H
T f
rom
K
ah
endra
n P
lanta
tio
n (
Mr.
S
atu
man)
ab
out ra
infa
ll con
ditio
n
1.
Com
munic
ation
tool
Pa
ge | 3
3
G
ive
an
nou
ncem
ent
to
resid
ents
th
at
floo
d
sta
tus i
s A
WA
RE
an
d
it is e
xp
ecte
d t
ha
t th
ey
will
m
ake
pre
para
tio
n
for
evacuatio
n.
M
ake
coord
inatio
n
with H
ea
d R
T 0
8 a
nd
R
T 0
9.
R
eport
rece
nt
weath
er
conditio
n.
that
on le
vel 2.
In
form
via
HP
/HT
to :
a.
Head L
MD
H (
Hart
ono)
b.
Head R
T 0
8(S
am
sul)
and
c.
RT
09 (
Rom
li)
That
info
rmation fr
om
upstr
eam
m
ention
rain
fall
reach
60
cm
le
vel
2
and
ente
r
AW
AR
E
ST
AT
US
Continu
e in
form
ation via
H
P/H
T
to
Asper
Fore
str
y
Co
mpan
y
Kalip
utih R
am
bip
uji
(Su
nary
o)
by
LM
DH
(H
art
on
o).
In
str
uct
LM
DH
(H
art
on
o)
to
info
rm
the
com
munity
abou
t A
WA
RE
cond
itio
n
and
m
ake
pre
para
tio
n
of
evacua
tio
n
by
usin
g m
osque s
pe
aker.
In
str
uct
Hea
d
RT
08
(Sam
sul)
dan
RT
09
(Rom
li)
to
giv
e
info
rmation b
y ora
l to
re
sid
ents
to
be
more
aw
are
a
nd
m
ake
pre
para
tio
n
for
evacu
ation
if
need
ed
R
eport
recent
con
ditio
n t
o H
ead
Desa
Pakis
(Z
ain
i)
H
andp
hon
e H
T
2.
Spe
aker
3.
Do
wnstr
eam
Are
a o
f D
AS
K
alip
akis
(D
usun
C
em
poko
)
1.
Head D
usun
Cem
poko (
Sutr
isno
)
Make c
oord
ination
with K
ahen
dra
n
Pla
nta
tio
n (
Mr.
S
atu
man)
C
heck
wate
r le
ve
l
R
eceiv
e c
onta
ct
via
HP
an
d H
T
from
Head
RT
09 (
Kah
endra
n
Pla
nta
tio
n)
C
heck r
iver
wate
r le
ve
l in
wate
r
1. W
ate
r le
vel ga
uge
Pa
ge | 3
4
gaug
e
in
Ka
li p
akis
river
M
ake
coord
inatio
n
with
Hea
d
R
T
an
d
instr
uct
Head
RT
to b
e
more
aw
are
b
y
the
sta
tus o
f A
WA
RE
M
ake
coord
inatio
n
with
Hea
d
Dusu
n
Kem
undung
an
R
eport
ing
recen
t conditio
n
level ga
uge
at d
am
cem
poko o
f K
ali
Pakis
riv
er
M
ake c
onta
ct via
HP
/HT
to:
a)
Head R
T 0
2 (
Se
nim
in)
b)
Head
RT
03 (
Husaeri
) c)
Head
RW
06 (
Atr
o)
d)
Head
RT
07 (
Zain
ud
in)
e)
Head R
T 0
9 (
Sla
met)
f)
H
ead R
T 1
0 (
Rahm
an)
In
form
to H
ead D
usun
K
em
undung
an (
Sug
ito)
abo
ut
rain
fall
info
rmation in u
pstr
eam
fr
om
pla
nta
tion a
nd
wate
r le
ve
l in
K
ali
Pakis
that
ente
r le
ve
l 2
R
eport
ing
to h
ea
d d
esa
Pa
kis
(Z
ain
i) a
bo
ut
info
rmation f
rom
upstr
eam
and c
heckin
g r
esult o
f w
ate
r le
vel in
riv
er
Kali
Pakis
that
ente
r le
ve
l 2
In
str
uct to
care
taker
of m
osque
(Mahru
s)
to w
idespre
ad
in
form
ation that
on A
WA
RE
sta
tus to t
he r
esid
ents
by u
sin
g
speaker
and m
ake p
repara
tion o
f evacu
ation if
need
ed
2. C
om
munic
atio
n
tool
Hand
pho
ne
HT
3. S
peaker
4.
Desa P
akis
H
ead
Desa P
akis
(Z
ain
i)
R
eceiv
e a
nd r
ecord
in
form
ation f
rom
upstr
eam
, m
iddle
str
eam
and
do
wnstr
eam
about
A
WA
RE
sta
tus
R
eceiv
e
info
rmation
via
H
P
or
HT
fro
m H
ead R
T 0
9 K
ahe
ndra
n
Pla
nta
tio
n (
Mr.
Satu
man).
R
ecord
in
com
ing
info
rmation
from
upstr
eam
are
a,
mid
dle
str
eam
are
a
and
1.R
ain
fall
ga
uge
Pa
ge | 3
5
C
heck r
ain
ga
uge in
Desa p
akis
off
ice
C
onta
ct
Hea
d D
usu
n
to m
ake c
oord
inatio
n
C
heck a
nd p
rep
are
fa
cili
ties a
s w
ell
as
make p
atr
ol
R
eport
rece
nt
conditio
n
do
wnstr
eam
are
a.
C
heck
rain
fall
con
ditio
n
and
com
pare
rain
fall
of
upstr
ea
m a
nd
do
wnstr
eam
in t
he r
ain
ga
uge a
t desa P
akis
off
ice
C
onta
ct
Hea
d d
usu
n P
akis
Uta
ra
(Sup
ianto
) an
d H
ead d
usun
C
em
poko (
Sutr
isno)
to c
he
ck
info
rmation a
nd
instr
uct
to
monitor
recent con
ditio
n a
nd
make c
oord
ination e
ach o
ther
am
ong
dusun ,
as w
ell
as
info
rmin
g the r
esid
ents
abo
ut
AW
AR
E s
tatu
s a
nd to m
ake
pre
para
tio
n f
or
evacuation if
need
ed.
M
ake a
patr
ol aro
un
d d
isaste
r ha
zard
are
a in D
esa P
akis
to
check p
rogre
ss c
onditio
n
C
onta
ct secre
tary
of
desa (
A.
Wahid
) and tre
asure
r of
de
sa to
pre
pare
desa o
ffic
e a
nd f
acili
ties
for
possib
ility
of
evacuatio
n
R
eport
ing
recent co
nd
itio
n t
o :
a.
Kecam
ata
n P
anti (
Cam
at
Panti/Y
ah
ya)
b.
Satlak
Kabup
ate
n
(Heri/B
akesbang)
2. C
om
mu
nic
atio
n
too
l
Hand
pho
ne
HT
Pa
ge | 3
6
5.
Kecam
ata
n P
anti
1.
Cam
at P
anti (
Drs
. Y
ah
ya I
)
M
ake
com
munic
atio
n
with H
ea
d D
esa P
akis
concern
ing
with
w
eath
er
and
river
conditio
n o
f K
alip
akis
.
P
repare
d
isaste
r p
ost
of
kecam
ata
n
an
d
check facili
ties
R
eport
ing
recen
t conditio
n
to
Satlak
Kab
upate
n
R
eceiv
e co
nta
ct
via
H
P o
r H
T
from
Head D
esa P
akis
M
ake
coord
ina
tio
n
am
ong
Kecam
ata
n
Le
aders
(M
uspik
a)
Kecam
ata
n
Panti
that
rain
fall
conditio
n in P
akis
reaches 6
0 c
m
and
river
wate
r le
ve
l 2
th
at
alrea
dy o
n A
WA
RE
sta
tus t
o:
a.
Civ
il P
olic
e
Hea
d
of
Ord
erlin
ess
Kecam
ata
n
(Mudia
nto
) b.
Ra
yo
n
Mili
tary
C
om
mand
P
anti (
Ca
pt.
Sum
ayar)
c.
Secto
r P
olic
e P
an
ti (
Udik
)
P
repare
d
isaste
r p
ost
of
kecam
ata
n
and
pre
pare
pers
onn
el
for
an
y
possib
ility
of
help
ing evacuation
if n
ee
ded
in
ha
zard
are
a
R
eport
ing
recent
co
nditio
n
to
Satlak
Kabu
pate
n
(Heri/B
akesbangpo
l L
inm
as)
H
andp
hon
e
HT
6.
Kab
upate
n J
em
ber
Satl
ak P
B:
2.
Bakesbangp
ol
Lin
mas/
Satlak
PB
P
(Heri S
etia
wa
n)
R
eceiv
e
info
rmation
fr
om
Head D
esa P
akis
as w
ell
as K
ecam
ata
n
Panti,
and
m
ake
coord
ination
am
ong
S
atlak
mem
ber
concern
ing
with
w
eath
er
and
river
conditio
n o
f K
alip
akis
.
R
eceiv
e
conta
ct
via
H
P
or
HT
fr
om
H
ead
Desa
P
akis
(Z
ain
i)
and
Kecam
ata
n
Panti
(Yah
ya)/
Cam
at P
anti)
S
atlak
(Bakesbang/H
eri
) m
ake
coord
ination
about
info
rmation
report
fr
om
D
esa
Pakis
and
K
ecam
ata
n
Panti
with
rela
ted
H
andp
hon
e H
T
Pa
ge | 3
7
agencie
s a
s S
atlak m
em
ber
: a.
PM
I b.
PU
Pen
gair
an
c.
Oth
er
rela
ted
ag
encie
s o
f
Satlak m
em
ber
M
ake c
oord
inatio
n a
mong S
atlak
mem
ber
to p
repare
facili
tie
s a
nd
equ
ipm
ents
that
ma
y b
e n
eede
d
for
the
possib
ility
of
dis
aste
r occurr
ence
wh
ile
waitin
g
for
furt
her
info
rmation
Pa
ge | 3
8
Co
nd
itio
n o
f E
va
cu
ati
on
(C
on
dit
ion
4)
Ra
infa
ll Le
vel
:
3 (
90 m
m/h
ou
r)
Wate
r Level
:
3 (
140
Cm
) S
tatu
s
: E
va
cu
ation
No
L
ocati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
A
rea
of
DA
S
Kalip
akis
(K
ahendra
n
Pla
nta
tio
n)
1.
Head R
T 0
9
(Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n P
lanta
tio
n
(Trianto
) 2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
M
on
itor
recen
t w
eath
er
cond
itio
n
In
form
to
re
late
d
sta
kehold
ers
th
at
rain
fall
level is
on le
ve
l 3.
In
str
uct
resid
en
t to
go
fo
r evacuatio
n
C
ond
uct
evacuatio
n
pro
cess
toge
ther
with
pla
nta
tion
resid
ents
K
ee
p
monitoring
rain
fall
conditio
n,
wate
r le
ve
l and
possib
ility
of
soil
cra
ck b
y u
sin
g
exis
tin
g
equ
ipm
ents
if
the
conditio
n i
s s
till
possib
le f
or
this
checkin
g.
S
en
d
info
rmation
about
rain
fall
level,
wate
r le
vel
th
at
it
is
on
level
3
whic
h
means
EV
AC
UA
TIO
N to :
1.
Security
of
PD
P (
Sen
aw
i)
2.
Opsin
der
(Trianto
) and V
ice
Opsin
der
(Sup
ianto
) of
Kah
endra
n P
lanta
tio
n
3.
Vic
e
hea
d
Dusu
n
Pakis
U
tara
(S
up
ianto
) 4.
Head
Dusun
Cem
poko
(Sutr
isno)
5.
Head D
esa P
akis
(Z
ain
i)
In
form
re
sid
ents
to
g
o
for
EV
AC
UA
TIO
N b
y usin
g e
xis
ting
equ
ipm
ents
.
H
elp
th
e pro
cess of
evacuation
as w
ell
as g
o into
evacuation s
ite
that m
ore
safe
are
a
1.
Rain
fall
gaug
e
2.
Com
munic
ation
tool
H
andp
hon
e H
T
3.
Spe
aker
and
kento
ngan
Evac
uat
ion
to
ol:
Pa
ge | 3
9
a.
pal
anke
en
b. T
ent
c.
load
er v
ehic
le
Ev
acu
atio
n s
ite
:
2.
Mid
dle
str
eam
A
rea
DA
S
Kalip
akis
(D
usun
Pakis
U
tara
)
Vic
e
Hea
d
Dusun
Pakis
U
tara
(S
up
ianto
)
M
ake
coord
inatio
n
with P
lanta
tion
In
form
re
sid
ent
to
go
fo
r evacuatio
n.
H
elp
re
sid
ent
in
conducting
evacu
ation
.
M
ake c
oord
ination w
ith
kahendra
n P
lanta
tio
n (
Mr.
S
atu
man)
ab
out ra
infa
ll le
vel,
wate
r le
vel an
d r
ecent
land
slid
e.
In
str
uct re
sid
ent of
Dusu
n P
akis
U
tara
to
gor
for
EV
AC
UA
TIO
N to
pro
vid
ed s
ite
.
M
ake c
oord
ination w
ith
: 1.
Head L
MD
H (
Hart
ono)
2.
Head R
T 0
8(S
am
sul) a
nd
3.
RT
09 (
Rom
li)
To h
elp
resid
ent in
con
ducting
E
VA
CU
AT
ION
and r
em
indin
g
1.
Com
munic
ation
tool
H
andp
hon
e H
T
2. S
peaker
and
kento
ngan
Pa
ge | 4
0
each o
ther
abou
t ra
infa
ll conditio
nas w
ell
as w
ate
r le
ve
l th
at re
ached le
ve
l 3
an
d a
lso
info
rmin
g to
resid
ents
for
evacu
ating into
safe
r pla
ce
. -
Report
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation c
onditio
n
Evac
uat
ion
to
ol:
a.
Pal
anke
en
b. T
ent
c.
load
er v
ehic
le
Ev
acu
atio
n s
ite
:
3.
Do
wnstr
eam
Are
a o
f D
AS
K
alip
akis
(D
usun
C
em
poko
)
Head D
usun
Cem
poko (
Sutr
isno
)
Make
coord
inatio
n
with P
lanta
tion
C
heck
wate
r le
ve
l gaug
e
in
Ka
li p
akis
river
M
ake c
oord
ination w
ith
K
ah
endra
n p
lanta
tion
(M
r.
Satu
man)
ab
out ra
infa
ll le
vel,
wate
r le
vel an
d r
ecent
land
slid
e
occurr
ence
.
1. W
ate
r le
vel ga
uge
Pa
ge | 4
1
In
form
re
sid
ent
to
go
fo
r evacuatio
n.
H
elp
th
e
resid
ent
to
conduct e
vacu
ation
.
C
heck w
ate
r le
ve
l in
wa
ter
leve
l gaug
e a
t dam
cem
poko o
f K
ali
Pakis
riv
er
In
str
uct re
sid
ent of
Dusu
n
Cem
poko
to E
VA
CU
AT
E in
to
pro
vid
ed s
ite
.
M
ake c
oord
ination w
ith
: 1.
Head R
T 0
2 (
Se
nim
in)
2.
Head
RT
03 (
Husaeri
) 3.
Head
RW
06 (
Atr
o)
4.
Head
RT
07 (
Zain
ud
in)
5.
Head R
T 0
9 (
Sla
met)
6.
Head R
T 1
0 (
Rahm
an)
To h
elp
resid
en
t in
con
ducting
E
VA
CU
AT
ION
and r
em
indin
g
each o
ther
that ra
infa
ll con
ditio
n
and w
ate
r le
ve
l is
on level 3 a
nd
info
rm to r
esid
ent fo
r go
ing u
ntu
k
safe
EV
AC
UA
TIO
N s
ite.
In
str
uct care
taker
of m
osque
(Mahru
s)
to w
idespre
ad
in
form
ation o
f E
VA
CU
AT
ION
sta
tus to r
esid
en
ts b
y u
sin
g
speaker
and to
im
media
tely
co
nduct e
vacu
ation into
safe
r pla
ce
.
In
form
Head D
usu
n
Kem
undung
an (
Sug
ito)a
bo
ut
info
rmation o
f r
ain
fall
in
upstr
eam
receiv
ed f
rom
pla
nta
tion
an
d e
vacu
ation
conditio
n
R
eport
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation c
onditio
n
2. C
om
munic
atio
n
tool
Hand
pho
ne
HT
3. S
peaker
and
kento
ngan
4. E
vacu
atio
n t
oo
l:
a.
Pal
anke
en
b. T
ent
c.
load
er v
ehic
le
Pa
ge | 4
2
5. E
vacu
atio
n s
ite
:
4.
Desa P
akis
H
ead D
esa P
akis
(Z
ain
i)
M
ake c
oord
ination
with p
lanta
tio
n
C
heck r
ain
ga
uge in
Desa p
akis
off
ice
In
form
resid
ent to
conduct e
vacu
ation
.
H
elp
resid
ent
in
conducting
evacu
ation
.
M
ake
coord
ination
w
ith
K
ah
endra
n
Pla
nta
tion
(M
r.
Satu
man
) about
rain
fall
leve
l,
wate
r le
vel
and r
ecen
t la
ndslid
e
occurr
ence
.
R
ecord
in
com
ing
info
rmation
from
upstr
eam
are
a,
mid
dle
str
eam
are
a
and
do
wnstr
eam
are
a.
C
heck
rain
fall
con
ditio
n
and
com
pare
rain
fall
of
upstr
ea
m a
nd
do
wnstr
eam
in t
he r
ain
ga
uge a
t desa P
akis
off
ice
In
str
uct
task f
orc
e a
t vill
ag
e l
evel
se
cre
tary
of
vill
age
(A.
Wahid
) and t
reasure
r of
vill
ag
e (
Ag
us)
to
help
re
sid
ent
in
cond
ucting
E
VA
CU
AT
ION
and
rem
ind
ing
each o
ther
tha
t ra
infa
ll co
nditio
n
and w
ate
r le
vel
is o
n l
evel
3 a
nd
info
rm
resid
ent
to
go
fo
r E
VA
CU
AT
ION
into
safe
r p
lace
.
R
eport
ing
th
at
resid
ent
conduct
EV
AC
UA
TIO
N to
:
1. R
ain
fall
ga
uge
2
. Co
mm
un
icat
ion
too
l
Hand
pho
ne
HT
Pa
ge | 4
3
a.
Kecam
ata
n P
anti (
Cam
at
Panti/Y
ah
ya)
b.
Satlak K
abu
pate
n
(Heri/B
akesbang)
5.
Kecam
ata
n P
anti
2.
Cam
at P
anti (
Drs
. Y
ah
ya I
.)
M
ake
coord
inatio
n
with
pla
nta
tio
n
abou
t re
cent
weath
er
conditio
n.
H
elp
re
sid
ent
in
conducting e
vacuation
R
eport
ing
recen
t conditio
n.
M
ake
coord
inatio
n
with
head
D
esa
Pakis
(Z
ain
i)
abou
t re
sid
ent
evacu
ation
(L
ocation
, num
ber
evacue
es, ne
eds)
P
repare
and d
ep
loy p
ers
on
nel as
well
as
activating
d
isaste
r post
for
24
hours
and
togeth
er
with
Kecam
ata
n
leader
(Mu
spik
a)
Kecam
ata
n
Panti
help
ing
evacu
ation
by
usin
g
facili
ties
such
as
car,
pala
nkeen,
etc
to
help
evacua
tio
n p
rocess.
R
eport
ing
rece
nt
co
nditio
n
(rain
fall
level
and w
ate
r le
ve
l on
le
vel
3)
and
a
lso a
bout
refu
gee
conditio
n
in
Kahe
ndra
n
Pla
nta
tio
n an
d D
esa K
lun
gkung
to
Satlak
Kab
upa
ten
(H
ery
S
etia
wa
n B
akesbang).
H
andp
hon
e H
T
. Eva
uat
ion
To
ol:
a.
Pal
anke
en
b. T
ent
c.
Lo
ader
veh
icle
6.
Kab
upate
n J
em
ber
Satl
ak P
B:
3.
Bakesbangp
ol
Lin
mas/
Satlak
PB
P
(Heri S
etia
wa
n)
M
ake
coord
inatio
n
with
pla
nta
tio
n
abou
t re
cent cond
itio
n.
H
elp
re
sid
ent
to
conduct e
vacu
ation
R
eport
ing
recen
t
M
ake
coord
ination
with
H
ead
D
esa
Pakis
(Z
ain
i)
and
K
ecam
ata
n P
an
ti (Y
ah
ya)
abou
t re
sid
ent
evacu
ation
(L
ocation
, num
ber
evacue
es, ne
eds).
T
ogeth
er
with K
abu
pate
n l
eader
H
andp
hon
e H
T
Pa
ge | 4
4
conditio
n.
(Muspid
a)
he
lp t
he e
vacuation
by
usin
g
facili
ties
such
as
car,
pala
nkeen,
etc
and p
repare
aid
s
durin
g e
vacu
ation p
rocess.
R
eport
ing
rece
nt
co
nditio
n
(rain
fall
level
and w
ate
r le
ve
l on
le
vel
3)
and
a
lso a
bout
refu
gee
conditio
n in
Desa P
akis
to B
up
ati
Jem
ber.
Pa
ge | 4
5
Co
nd
itio
n o
f C
riti
ca
l (C
on
dit
ion
5)
Rai
nfa
ll Le
vel
: 4 (
12
0 m
m/h
ou
r)
Wat
er L
evel
: 4 (
16
0 C
m)
Stat
us
: C
riti
cal
No
L
ocati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
A
rea
of
DA
S
Kalip
akis
(K
ahendra
n
Pla
nta
tio
n)
1. H
ead R
T 0
9 (
Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n P
lanta
tio
n
(Trianto
)
2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
S
tay i
n t
he e
vacuatio
n
site
wh
ile
keep
m
onitoring
recen
t w
eath
er
cond
itio
n.
In
form
in
charg
e
sta
kehold
ers
th
at
sta
tus is C
RIT
ICA
L.
In
form
re
sid
ent
tha
t E
vacuation sh
ou
ld b
e
finis
hed
.
S
tay
in
the
evacuation
site
(evacua
tion
) a
nd
co
ord
inating
re
fugee
of
pla
nta
tio
n
resid
ents
concern
ing
with
ne
eds
and
refu
gee r
ecord
S
en
d
info
rmation
about
rain
fall
level
co
nditio
n
an
d
wate
r le
vel
that
under
CR
ITIC
AL
co
nditio
n
to:
1.
Security
of
PD
P (
Sen
aw
i)
2.
Opsin
der
(Trianto
) an
d
vic
e
Opsin
der
(Su
pia
nto
) of
Kah
endra
n P
lanta
tio
n
3.
Vic
e
Hea
d
Dusun
P
akis
U
tara
(S
up
ianto
) 4.
Head
Dusun
Cem
poko
(Sutr
isno)
5.
Head D
esa P
akis
(Z
ain
i)
C
ontr
olli
ng
re
sid
ent
co
nditio
n of
pla
nta
tion
are
a
and
info
rm
resid
ent
that
CR
ITIC
AL c
onditio
n
and
als
o
EV
AC
UA
TIO
N
should
be
alread
y
fin
ish
an
d
becare
ful
on t
he r
iver
wate
r flo
w b
ecause
rain
goes
hea
vie
r in
sert
ed
with
lan
dslid
e.
1.
Rain
fall
gaug
e
2.
Evacuation T
oo
l
H
andp
hon
e H
T
3.
Spe
aker
2.
Mid
dle
str
eam
A
rea
DA
S
Kalip
akis
(D
usun
Pakis
1.
Vic
e H
ea
d D
usu
n P
akis
U
tara
(S
up
ianto
)
Make
coord
inatio
n
with P
lanta
tion
M
ake c
oord
ination w
ith
Kah
endra
n P
lanta
tio
n (
Mr.
2.
Com
munic
ation
tool
Pa
ge | 4
6
Uta
ra)
M
ake
coord
inatio
n
with
oth
er
sta
kehold
ers
th
at
evacu
ation
shou
ld
be
finis
hed
.
Satu
man)
ab
out ra
infa
ll le
vel
wate
r le
vel an
d r
ecent
land
slid
e.
In
str
uct re
sid
ent of
Dusu
n P
akis
U
tara
to
cond
uct
EV
AC
UA
TIO
N
to p
rovid
ed p
lace
.
M
ake c
oord
ination w
ith
: 1.
Head L
MD
H (
Hart
ono)
2.
Head R
T 0
8(S
am
sul) a
nd
3.
RT
09 (
Rom
li)
That it is a
lrea
dy C
RIT
ICA
L
conditio
n a
nd s
till
he
lp r
esid
ent
in
conducting E
VA
CU
AT
ION
and
rem
indin
g e
ach o
ther
that ra
infa
ll conditio
n a
nd w
ate
r le
vel is
on
level fo
ur
and
info
rm r
esid
ent
that
EV
AC
UA
TIO
N P
RO
CE
SS
should
be
fin
ishe
d.
- R
eport
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation c
onditio
n
H
andp
hon
e H
T
2. S
peaker
Ev
acu
atio
n T
oo
l:
a. P
alan
keen
b. T
ent
c.
Lo
ader
Veh
icle
Pa
ge | 4
7
Evac
uat
ion
sit
e:
3.
Do
wnstr
eam
Are
a o
f D
AS
K
alip
akis
(D
usun
C
em
poko
)
2.
Head D
usun
Cem
poko (
Sutr
isno
)
Make
coord
inatio
n
with p
lanta
tio
n
C
heck
wate
r le
ve
l gaug
e
in
dam
cem
poko o
f K
ali
pakis
river.
M
ake
coord
inatio
n
with
oth
er
sta
kehold
ers
th
at
evacu
ation
shou
ld
be
finis
hed
.
M
ake c
oord
ination w
ith
kahendra
n P
lanta
tio
n (
Mr.
S
atu
man)
ab
out ra
infa
ll le
vel,
wate
r le
vel an
d r
ecent
land
slid
e.
C
heck r
iver
wate
r le
ve
l in
wate
r le
vel ga
uge a
t d
am
cem
poko
and info
rm to H
ead d
esa P
akis
(Z
ain
i)
In
str
uct re
sid
ent of
Dusu
n
Cem
poko t
o c
ond
uct
EV
AC
UA
TIO
N to the
pro
vid
ed
pla
ce
.
M
ake c
oord
ination w
ith
: 1.
Head R
T 0
2 (
Se
nim
in)
2.
Head R
T 0
3 (
Husaeri)
3.
Head
RW
06 (
Atr
o)
4.
Head
RT
07 (
Zain
ud
in)
5.
Head R
T 0
9 (
Sla
met)
6.
Head R
T 1
0 (
Rahm
an)
That it is C
RIT
ICA
L c
on
ditio
n
and h
elp
EV
AC
UA
TIO
N a
nd
rem
indin
g e
ach o
ther
that ra
infa
ll conditio
n a
nd w
ate
r le
vel is
on
level fo
ur
and
info
rm to r
esid
ent
that
EV
AC
UA
TIO
N s
hould
be
finis
hed
.
1. W
ate
r le
vel ga
uge
2. C
om
munic
atio
n
Tool
Hand
pho
ne
HT
3. S
peaker
4. E
vacu
ation T
ool:
a. P
alan
keen
Pa
ge | 4
8
In
str
uct to
care
taker
of m
osque
(Mahru
s)
to w
idespre
ad
in
form
ation
that
it is o
n
CR
ITIC
AL
sta
tus to t
he r
esid
ents
b
y u
sin
g s
peaker
and e
vacuation
should
be
fin
ishe
d.
R
eport
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation c
onditio
n
b. T
ent
c.
Lo
ader
Veh
icle
5
. Eva
cuat
ion
sit
e:
4.
Desa P
akis
H
ead D
esa P
akis
(Z
ain
i)
M
ake c
oord
ination
with p
lanta
tio
n.
C
heck r
ain
ga
uge in
desa P
akis
off
ice
In
str
uct T
ask F
orc
e to
help
resid
ent
in
conducting e
vacuation
and instr
uct th
at
evacu
ation s
hould
be
finis
hed
.
M
ake c
oord
ination
with o
ther
sta
he
old
ers
S
tay in
th
e evacuation
site an
d
keep
makin
g
coord
inatio
n
with
Kah
endra
n
pla
nta
tio
n
abou
t ra
infa
ll le
ve
l,
wate
r le
vel
and
re
cent la
ndslid
e c
on
ditio
n.
R
ecord
in
com
ing
info
rmation
from
upstr
eam
are
a,
mid
dle
str
eam
are
a
and
do
wnstr
eam
are
a.
C
heck
rain
fall
con
ditio
n
and
com
pare
rain
fall
of
upstr
ea
m a
nd
do
wnstr
eam
in t
he r
ain
ga
uge a
t desa P
akis
off
ice
In
str
uct
task f
orc
e a
t vill
ag
e l
evel
1. C
om
munic
atio
n
Tool
Hand
pho
ne
HT
Pa
ge | 4
9
se
cre
tary
of
vill
age
(A
. W
ahid
) and
treasure
r of
vill
age
(Agus)
that
it i
s o
n C
RIT
ICA
L c
onditio
n
and
still
he
lp
resid
ent
in
conducting
EV
AC
UA
TIO
N
and
rem
indin
g e
ach o
ther
that
rain
fall
and w
ate
r le
vel
is o
n le
vel
four
and
info
rm
that
EV
AC
UA
TIO
N
pro
cess s
hould
be
fin
ishe
d.
R
eport
ing
that
evacuation
pro
cess s
hould
be
fin
ishe
d t
o:
a.
Kecam
ata
n P
anti (
Cam
at
Panti/Y
ah
ya)
b.
Satlak K
abu
pate
n
(Heri/B
akesbang)
5.
Kecam
ata
n P
anti
3.
Cam
at P
anti (
Drs
. Y
ah
ya I
.)
H
elp
in
cond
uctin
g
resid
ent
evacuatio
n
and
instr
uct
tha
t evacu
ation
shou
ld
be
alrea
dy f
inis
he
d.
R
eport
ing
recen
t conditio
n
to
Satlak
Kab
upate
n.
T
ogeth
er
with
K
eca
mata
n
Lead
er
(Musp
ika)
Kecam
ata
n P
anti
help
ing
the
evacuation
b
y
usin
g
facili
ties
such
as
car,
p
ala
nkeen,
etc
, an
d
info
rm
that
evacua
tio
n
should
be
fin
ishe
d.
M
ake
coord
ination
with
H
ead
desa P
akis
(Z
ain
i) a
bo
ut
resid
ent
evacu
ation
.
R
eport
ing
rece
nt
co
nditio
n
(rain
fall
level
and w
ate
r le
ve
l on
le
vel
4)
and
a
lso a
bout
refu
gee
conditio
n
in
Kahe
ndra
n
Pla
nta
tio
n
and
Desa
klu
ngkung
to
Satlak
Kab
upa
ten
(H
ery
S
etia
wa
n-
Bakesbang).
H
andp
hon
e H
T
Evac
uat
ion
to
ol:
a.
Pal
anke
en
b. T
ent
Pa
ge | 5
0
c.
Lo
ader
veh
icle
6.
Kab
upate
n J
em
ber
Satl
ak P
B:
1.
Bakesbang
pol
Lin
mas/
Satlak
PB
P
(Heri
S
etia
wa
n)
M
ake
coord
inatio
n
with
pla
nta
tio
n
abou
t re
cent
weath
er
conditio
n.
H
elp
re
sid
ent
in
conducting
evacu
ation.
R
eport
ing
recen
t conditio
n.
T
ogeth
er
with K
ab
upate
n le
aders
(M
uspid
a)
to h
elp
evacu
ation b
y
usin
g
facili
ties
such
as
car,
pala
nkeen
, e
tc
to
pre
pare
he
lp
durin
g e
vacu
ation p
rocess.
M
ake
coord
ination
with
H
ead
D
esa
Pakis
(Z
ain
i)
and
K
ecam
ata
n P
an
ti (Y
ah
ya)
abou
t re
sid
ent
evacu
ation
(L
ocation
, num
ber,
needs).
R
eport
ing
rece
nt
co
nditio
n
(rain
fall
level
and w
ate
r le
ve
l on
le
vel
4)
as w
ell
as a
bo
ut
refu
gee
conditio
n in D
esa P
akis
to B
up
ati
Jem
ber.
H
andp
hon
e H
T
Evac
uat
ion
to
ol:
a.
Pal
anke
en
b. T
ent
c.
Lo
ader
veh
icle
Pa
ge | 5
1
Co
ns
itio
n o
f D
an
ger
(Co
nd
itio
n 6
)
Rai
nfa
ll Le
vel
: 5 (
15
0 m
m/h
ou
r)
Wat
er L
evel
: 5 (
18
0 c
m)
Stat
us
: D
ange
r N
o
Lo
cati
on
S
takeh
old
er
Acti
vit
y
Mech
an
ism
E
qu
ipm
en
t
1.
Upstr
eam
A
rea
of
DA
S
Kalip
akis
(K
ahendra
n
Pla
nta
tio
n)
1. H
ead R
T 0
9 (
Satu
man)
O
thers
:
1.
Opsin
der
of
Kah
endra
n P
lanta
tio
n
(Trianto
)
2.
Vic
e O
psin
der
Kah
endra
n P
lanta
tio
n
(Supa
nd
i)
3.
Security
Kah
en
dra
n
Pla
nta
tio
n (
Sena
wi)
S
tay i
n t
he e
vacuatio
n
site
(und
er
evacu
ation
)
M
on
itor
recen
t w
eath
er
con
ditio
n
if
still
possib
le.
G
ive
info
rmation
tha
t ra
infa
ll cond
itio
n
an
d
wate
r le
vel
is
on
sta
tus o
f D
AN
GE
R.
G
ive
info
rmation
to
resid
ent
tha
t evacu
ation pro
cess is
finis
hed
.
S
tay
in
the
evacuation
site
(under
evacuation
) b
y
coord
inating
refu
gee
of
pla
nta
tion
are
a
concern
ing
with
needs a
nd lis
t of
refu
gee
S
en
d
info
rmation
and
m
ake
coord
ination
abo
ut
rain
fall
leve
l cond
itio
n,
wate
r le
ve
l o
n
leve
l 5
th
at
means
DA
NG
ER
co
nditio
n
to:
1.
Security
of
PD
P (
Sen
aw
i)
2.
Opsin
der
(Trianto
) an
d
vic
e
Opsin
der
(S
up
ianto
) of
Kah
endra
n P
lanta
tio
n
3.
Vic
e
Hea
d
Dusun
P
akis
U
tara
(S
up
ianto
) 4.
Head
Dusun
Cem
poko
(Sutr
isno)
5.
Head D
esa P
akis
(Z
ain
i)
In
form
re
sid
ent
that
it
is
on
DA
NG
ER
conditio
n
and
EV
AC
UA
TIO
N s
hould
be a
lread
y
finis
hed
, keep
sta
yin
g
in
the
evacu
ation s
ite a
nd b
e a
ware
to
river
wa
ter
flo
w
line
be
cause
rain
fall
becom
es h
eavie
r in
sert
ed
4.
Rain
fall
gaug
e
5.
Com
munic
atio
n
Tool
H
andp
hon
e H
T
6.
Spe
aker
Pa
ge | 5
2
with la
ndslid
e.
2.
Mid
dle
str
eam
A
rea
DA
S
Kalip
akis
(D
usun
Pakis
U
tara
)
1.
Vic
e H
ea
d D
usu
n P
akis
U
tara
(S
up
ianto
)
M
ake
coord
inatio
n
with P
lanta
tion.
M
ake
coord
inatio
n
with
oth
er
sta
kehold
ers
th
at
evacu
ation
shou
ld
be
finis
hed.
M
ake c
oord
ination w
ith
Kah
endra
n P
lanta
tio
n (
Mr.
Satu
man)
ab
out ra
infa
ll le
vel
wate
r le
vel an
d r
ecent
land
slid
e.
In
str
uct re
sid
ent of
Dusu
n P
akis
Uta
ra t
hat con
ditio
n is D
AN
GE
R
and s
till
he
lp r
esid
ent
in
EV
AC
UA
TIO
N s
ite
, keep s
tayin
g
in e
vacu
ation s
ite a
nd r
em
indin
g
each o
ther
that ra
infa
ll a
nd w
ate
r
level re
aches le
ve
l five
an
d
info
rm r
esid
ent th
at
EV
AC
UA
TIO
N p
rocess s
hould
be f
inis
hed
.
M
ake c
oord
ination w
ith
: 1.
Head L
MD
H (
Hart
ono)
2.
Head R
T 0
8(S
am
sul)
and
3.
RT
09 (
Rom
li)
Abo
ut ra
infa
ll le
ve
l and a
nd
w
ate
r le
vel th
at on
le
ve
l five
and info
rm r
esid
ent th
at
EV
AC
UA
TIO
N p
rocess
should
be
fin
ishe
d.
-
Report
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation c
onditio
n
3.
Com
munic
ation
tool
H
andp
hon
e H
T
2. S
peaker
Ev
acu
atio
n t
oo
l:
a. P
alan
keen
b. T
ent
Pa
ge | 5
3
c. L
oad
er V
ehic
le
Evac
uat
ion
sit
e:
3.
Do
wnstr
eam
Are
a o
f D
AS
K
alip
akis
(D
usun
C
em
poko
)
1.
Head D
usun
Cem
poko (
Sutr
isno
)
Sta
y i
n t
he e
vacuatio
n
site
M
ake
coord
inatio
n
with p
lanta
tio
n
H
elp
re
sid
ent
in
conducting e
vacuatio
n
and
the
evacuatio
n
should
be
fin
ishe
d.
M
ake
coord
inatio
n
with
oth
er
sta
kehold
ers
.
M
ake c
oord
ination w
ith
K
ah
endra
n p
lanta
tion
(M
r.
Satu
man)
ab
out ra
infa
ll le
vel,
wate
r le
vel an
d r
ecent
land
slid
e
occurr
ence.
In
str
uct re
sid
ent of
Dusu
n P
akis
Uta
ra t
hat
it is D
AN
GE
R
conditio
n a
nd s
till
he
lp r
esid
ent
in
the E
VA
CU
AT
ION
site, keep
sta
yin
g in t
he e
vacuation
site
and r
em
indin
g e
ach o
ther
that
rain
fall
an
d w
ate
r le
vel is
on le
ve
l
five a
nd info
rm to r
esid
ents
that
evacu
ation p
rocess s
hould
be
finis
h.
M
ake c
oord
ination w
ith
: 1.
Head R
T 0
2 (
Se
nim
in)
2.
Head
RT
03 (
Husaeri
) 3.
Head
RW
06 (
Atr
o)
4.
Head
RT
07 (
Zain
ud
in)
5.
Head R
T 0
9 (
Sla
met)
1. W
ate
r le
vel ga
uge
2. C
om
munic
atio
n
tool
Hand
pho
ne
HT
3. S
peaker
4
. Eva
cuat
ion
to
ol:
Pa
ge | 5
4
6.
Head R
T 1
0 (
Rahm
an)
Abo
ut ra
infa
ll le
ve
l and w
ate
r le
ve
l th
at
on le
vel five a
nd
info
rm r
esid
en
ts
that
EV
AC
UA
TIO
N p
rocess s
hould
be a
lrea
dy f
inis
h.
In
str
uct to
care
taker
of m
osque
(Mahru
s)
to w
idespre
ad
in
form
ation
that
it is o
n D
AN
GE
R
sta
tus t
o t
he r
esid
ent th
oru
gh
speaker
and th
at e
vacu
atio
n
should
be
alr
ead
y f
inis
h.
R
eport
to H
ead D
esa P
akis
(Z
ain
i) a
bo
ut re
sid
ent
evacu
ation
co
nditio
n
a. P
alan
keen
b. T
ent
c.
Lo
ader
Veh
icle
5
. Eva
cuat
ion
sit
e:
4.
Desa P
akis
H
ead D
esa P
akis
(Z
ain
i)
M
ake c
oord
ination
with p
lanta
tio
n
In
str
uct ta
sk f
orc
e to
help
resid
ent
in
conducting e
vacuation
and instr
uct th
at
evacu
ation s
hould
be
finis
hed.
M
ake c
oord
ination
with o
ther
sta
kehold
ers
In
the e
vacuation s
ite a
nd
make
coord
ination
with
K
ahe
ndra
n
Pla
nta
tio
n
abou
t ra
infa
ll le
ve
l,
wate
r le
vel
and r
ecen
t la
ndslid
e
occurr
ence.
In
str
uct
task f
orc
e a
t vill
ag
e l
evel
se
cre
tary
of
vill
age
(A
. W
ahid
) and
treasure
r of
vill
age
(Agus)
that
it is
o
n D
AN
GE
R co
nditio
n
and
still
he
lp
resid
ent
in
conducting
EV
AC
UA
TIO
N
and
re
min
din
g e
ach o
ther
that
rain
fall
rain
fall
and w
ate
r le
ve
l is
on level
five
an
d
info
rm
that
EV
AC
UA
TIO
N
pro
cess
should
1. C
om
munic
atio
n
tool
Hand
pho
ne
HT
Pa
ge | 5
5
be f
inis
hed
.
R
eport
ing
th
at
EV
AC
UA
TIO
N
pro
cess s
hould
be
fin
ishe
d t
o:
c.
Kecam
ata
n P
anti (
Cam
at
Panti/Y
ah
ya)
d.
Satlak K
abu
pate
n
(Heri/B
akesbang)
5.
Kecam
ata
n P
anti
4.
Cam
at P
anti (
Drs
. Y
ah
ya I
.)
H
elp
re
sid
en
t evacu
ation
an
d
instr
uct
tha
t evacu
ation
shou
ld
be
finis
h.
R
eport
ing
recen
t conditio
n
to
Satlak
Kab
upate
n.
T
ogeth
er
with
Keca
mata
n
Lead
er
(Muspik
a)
Keca
mata
n
Panti
help
th
e
evacuation
by
usin
g
facili
ties
such
as
car,
pala
nkeen,
etc
a
nd
info
rm
that
evacu
ation s
hould
be f
inis
hed.
M
ake
coord
ination
with
desa
Pakis
(Z
ain
i)
abo
ut
resid
ent
evacu
ation
.
R
eport
ing
rece
nt
co
nditio
n
(rain
fall
leve
l and
w
ate
r le
ve
l is
on
leve
l 5)
and
als
o
refu
gee
conditio
n
in
Kahe
ndra
n
pla
nta
tion
as
we
ll as
in
Desa
Klu
ngkung to
S
atlak K
abu
pate
n
(Hery
Setia
wa
n-
Bakesbang).
H
andp
hon
e H
T
6.
Kab
upate
n J
em
ber
Satl
ak P
B:
1.
Bakesbang
pol
Lin
mas/
Satlak
PB
P
(Heri
S
etia
wa
n)
M
ake
coord
inatio
n
with
pla
nta
tio
n
abou
t re
cent
weath
er
conditio
n.
H
elp
ing
resid
ent
in
conducting
evacu
ation.
R
eport
ing
recen
t conditio
n.
D
eplo
yin
g a
dditio
na
l oth
er
Satlak
mem
ber
if
needed
to
he
lp
the
refu
gee
duri
ng
the
evacuation
pro
cess (
Socia
l A
gency,
PM
I, P
U
Pe
nga
iran,
Resort
Polic
e,
Dis
tric
t M
ilita
ry)
such
as
for
location
security
, em
erg
ency k
itche
n, etc
.
K
ee
p
makin
g
coord
inatio
n
with
Head
D
esa
P
akis
(Z
ain
i)
and
H
andp
hon
e H
T
Pa
ge | 5
6
abou
t ra
infa
ll con
ditio
n,
wate
r le
vel
and
rece
nt
lan
dslid
e
occurr
ence.
M
ake c
oord
ination
with a
ll S
atlak
mem
ber:
a.
Dis
tric
t M
ilita
ry
b.
Resort
Polic
e,
c.
PU
Pen
gair
an A
ge
ncy,
d.
Socia
l A
ge
ncy
e.
PM
I f.
K
ecam
ata
n P
anti
and
giv
e
info
rmation
that
Kah
endra
n
Pla
nta
tion
is
hea
vy
rain
, ra
infa
ll an
d w
ate
r le
ve
l is
on
le
vel
5
and
instr
uct
to
help
re
sid
ent
at
the
evacuatio
n
site,
meanw
hile
rain
goes h
ea
vie
r and
conditio
n is D
AN
GE
R.
U
sin
g
exis
tin
g
eq
uip
ments
and
evacu
ation (
car,
evacua
tio
n s
ite,
evacu
ation t
ent, e
tc)
to e
vacuate
th
e r
esid
ent.
R
equ
ire
the
resid
ents
to
keep
sta
yin
g
in
the
evacuatio
n
site
because it is
still
un
der
danger
conditio
n.
T
ake
over
com
mand
into
centr
aliz
ed
com
mand
at
the
evacu
ation s
ite,
cond
uct
dis
aste
r site surv
ey an
d m
ake sure
th
at
conditio
n is
safe
fo
r re
sid
ent
to
retu
rn h
om
e into
resid
en
tia
l are
a.
Page | 57
IX. CLOSING
Standard Operating Procedures (SOP) of Early Warning System for
Banjir Bandang DAS Kalipakis is as result of stakeholders through Focus
Group Discussion, Site Watching, and Table Top Exersice. Thereby, this book
has been well-underastood before. YPM had arranged the result into
systematic form namely SOP book. This book is expected to be utilized as
handbook or guidance for community as well as stakeholders around
catchment area (DAS) in anticipating and countermeasuring banjir bandang
disaster.