Copyright © 2015 The eVSM Group, All Rights Reserved This tutorial will guide you through the steps to draw a simple map, perform common calculations, and plot charts using the Standard Work Wizard. Standard Work Wizard Tutorial Viewing/printing eVSM Tutorial: This tutorial is designed for two page layout. If printing, you will need double-sided print. For on-screen viewing, save the PDF file to your PC and then open it in Acrobat Reader (not in a web browser). In the Acrobat menus, click “View>Page Display", make sure “Show Cover Page in Two Page View” is checked and then select "Two Page View”. A001 0 A00 30 A00 40 A00 50 A00 70 A00 80 A00 90 A002 0 A006 0 Demand Take Order Pick Lemons for Prep Deliver to Customer Prep Lemons Start Juicer Unload Juicer Server Maker

Upload: lamhanh

Post on 21-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Copyright © 2015 The eVSM Group, All Rights Reserved

This tutorial will guide you through the steps to draw a simple map, perform

common calculations, and plot charts using the Standard Work Wizard.

Standard Work Wizard Tutorial

Viewing/printing eVSM Tutorial:

This tutorial is designed for two

page layout. If printing, you will

need double-sided print.

For on-screen viewing, save the PDF

file to your PC and then open it in

Acrobat Reader (not in a web

browser). In the Acrobat menus,

click “View>Page Display", make

sure “Show Cover Page in Two Page

View” is checked and then select

"Two Page View”.

A001

0

A00

30

A00

40

A00

50

A00

70

A00

80

A00

90

A002

0

A006

0

Demand

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep

Lemons

Start Juicer

Unload

Juicer

Server Maker

Copyright © 2015 The eVSM Group, All Rights Reserved

On your Desktop, click

the “Start eVSM” icon.

1

Click to enable

macros.Click “Trust all from

publisher” to avoid the

security notice in future.

3

4

If you see a message like this,

you must “Enable” macros.

2

Step 1: Start eVSM

Copyright © 2015 The eVSM Group, All Rights Reserved

Copyright © 2015 The eVSM Group, All Rights Reserved

Quick_eVSM

Learn eVSM BasicsStep 2:

Avoid re-sizing eVSM shapes. Instead

grow the drawing page when needed.

To resize the page, hold down the “Ctrl”

key, and then drag any page edge to the

required size. This method works on all

four edges of the page.

2

VSM

Save your Visio file and then

insert a new page via the right-

mouse menus on the page-tabs.

5

Copyright © 2015 The eVSM Group, All Rights Reserved

Learn eVSM Basics

Blue icons in the main stencil

represent families of shapes. Drag

out the Transport icon.

3

Use the shape’s

right-mouse menus

to turn it into a car

4

eVSM Help resources are available in

the Learn module of the toolbar. Hover

over each one to see what they do.

1

Copyright © 2015 The eVSM Group, All Rights Reserved

Click the Open button. Select

Standard Work in the Wizard

column and click OK.

Initiate the map Standard Work WizardStep 3:

StandardWork Data

Customer Center

Open

Drag out the

red icons first.

This is very

important!

Enter the

amount of hours

per day.

The Standard Work

Wizard stencil will

open on the left.

3

1

4

2

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

eVSM Data

WizStandard

Work

8.04.0345.0

Copyright © 2015 The eVSM Group, All Rights Reserved

Initiate the map Standard Work Wizard

allA001

0

Demand

DemandItemDay75

Takt Time MinAuto

Enter the

customer

demand

here.

5

Copyright © 2015 The eVSM Group, All Rights Reserved

Draw the FlowStep 4:

Activity Center

Resource Center

P

P

P

P

P

P

A002

0

A003

0

A004

0

A005

0

A006

0

A007

0

A010

0

A011

0

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep Lemons

Start Juicer

Unload Juicer

Server Maker

Machine Time

Min0

Manual Time

Min1

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min1.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min2

Manual Wait

Min0

Batch Size Item1

Machine Time

Min1.5

Manual Time

Min0.5

Manual Wait

Min1.5

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.75

Manual Wait

Min0

Batch Size Item1

Resource Takt

MinAutoResource

TaktMinAuto

The green shapes are

called “Centers”. Use

the centers to represent

the flow.

Complete as shown

below, including

annotation and data

values.

Do not change

any of the “Auto”

fields. These will

calculated later.

1

2

3

eVSM Data

WizStandard

Work

8.04.0345.0

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

all all

Copyright © 2015 The eVSM Group, All Rights Reserved

Draw the Flow

allA001

0

Demand

DemandItemDay75

Takt Time MinAuto

Copyright © 2015 The eVSM Group, All Rights Reserved

Sequence ArrowsStep 5:

Sequence

P

P

P

P

P

P

A002

0

A003

0

A004

0

A005

0

A006

0

A007

0

A010

0

A011

0

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep Lemons

Start Juicer

Unload Juicer

Server Maker

Machine Time

Min0

Manual Time

Min1

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min1.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min2

Manual Wait

Min0

Batch Size Item1

Machine Time

Min1.5

Manual Time

Min0.5

Manual Wait

Min1.5

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.75

Manual Wait

Min0

Batch Size Item1

Resource Takt

MinAutoResource

TaktMinAuto

Hold down the SHIFT key and

select the centers in the order

shown here. This is the

sequence in which the server

will perform their tasks. Do

NOT connect a sequence

arrow from the last task back

to the server

Click the Sequence

button to add sequence

arrows.

1

2

A

B

C

D

eVSM Data

WizStandard

Work

8.04.0345.0

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

all all

Copyright © 2015 The eVSM Group, All Rights Reserved

Sequence Arrows

allA001

0

Demand

DemandItemDay75

Takt Time MinAuto

Copyright © 2015 The eVSM Group, All Rights Reserved

Sequence Arrows Part 2Step 6:

P

P

P

1 1

A002

0

A003

0

A004

0

A005

0

A006

0

A007

0

A010

0

A011

0

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep Lemons

Start Juicer

Unload Juicer

Server Maker

Machine Time

Min0

Manual Time

Min1

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min1.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min2

Manual Wait

Min0

Batch Size Item1

Machine Time

Min1.5

Manual Time

Min0.5

Manual Wait

Min1.5

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.75

Manual Wait

Min0

Batch Size Item1

Resource Takt

MinAutoResource

TaktMinAuto

Walk Time

Sec15

Walk Time

Sec1

Walk Time

Sec15

Sequence arrows have

been added with data on it

as well. Enter the Walk

Time from each center.

Double-click the unit to

change it from Min to Sec.

Hold down the SHIFT

key and select the

centers in the order

shown here for the

second resource and

associated set of

activities.

12

A

B

C

D

eVSM Data

WizStandard

Work

8.04.0345.0

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

P

P

P

Copyright © 2015 The eVSM Group, All Rights Reserved

Click the Sequence button to add

sequence arrows.

Sequence Arrows Part 2

Sequence

allA001

0

Demand

DemandItemDay75

Takt Time MinAuto

3

Copyright © 2015 The eVSM Group, All Rights Reserved

Perform CalculationsStep 7:

SWCS Summary

1

1

1

2

2

2

1 2

A003

0

A004

0

A005

0

A007

0

A008

0

A009

0

A002

0

A006

0

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep Lemons

Start Juicer

Unload Juicer

Server Maker

Machine Time

Min0

Manual Time

Min1

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min1.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min2

Manual Wait

Min0

Batch Size Item1

Machine Time

Min1.5

Manual Time

Min0.5

Manual Wait

Min1.5

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.75

Manual Wait

Min0

Batch Size Item1

Resource Takt

MinAutoResource

TaktMinAuto

Walk Time

Sec15

Walk Time

Sec1

Walk Time

Sec15

Walk Time

Sec10

Walk Time

Sec1

Walk Time

Sec1

Fill in the

remaining Walk

Times.

1

eVSM Data

WizStandard

Work

8.04.0345.0

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

Copyright © 2015 The eVSM Group, All Rights Reserved

Click the Solve button

in the toolbar.Click the Auto Path button

and the Auto Tag button to

create path numbers and

tags for each resource.

This is a critical step to get

the standard work chart to

plot in the correct order

Perform Calculations

Auto Path Auto Tag

Solve

all

all

A001

0

Z001

0

Demand

SWCS Summary

DemandItemDay75

Takt Time MinAuto

CapacityItemDay

Auto

FTE StaffAuto

Drag out the

Summary Center

4

3

2

Copyright © 2015 The eVSM Group, All Rights Reserved

Visualize with ChartsStep 8:

1

1

1

2

2

2

1 2

A003

0

A004

0

A005

0

A007

0

A008

0

A009

0

A002

0

A006

0

Take Order

Pick Lemons

for Prep

Deliver to

Customer

Prep Lemons

Start Juicer

Unload Juicer

Server Maker

Machine Time

Min0

Manual Time

Min1

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min1.5

Manual Wait

Min0

Batch Size Item1

Machine Time

Min0

Manual Time

Min2

Manual Wait

Min0

Batch Size Item1

Machine Time

Min1.5

Manual Time

Min0.5

Manual Wait

Min1.5

Batch Size Item1

Machine Time

Min0

Manual Time

Min0.75

Manual Wait

Min0

Batch Size Item1

Resource Takt

Min6.40Resource

TaktMin6.40

Walk Time

Sec15

Walk Time

Sec1

Walk Time

Sec15

Walk Time

Sec10

Walk Time

Sec1

Walk Time

Sec1

eVSM Data

WizStandard

Work

8.04.0345.0

8

Day

Hr

60

Hr

Min

60

Min

Sec

Units

Copyright © 2015 The eVSM Group, All Rights Reserved

Visualize with Charts

all

all

A001

0

Z001

0

Demand

SWCS Summary

DemandItemDay75

Takt Time Min6.40

CapacityItemDay

96.97

FTE Staff1.32

SWCS

ChartBalance

Chart

Standard Work Chart

Min0 1 2 3 4 5 6 7

Unload Juicer : A0090

Start Juicer : A0080

Prep Lemons : A0070

Maker : A0060

Deliver to Customer : A0050

Pick Lemons for Pre.. : A0040

Take Order : A0030

Server : A0020

Upstream Walk

Legend

Eff Manual Time

Eff Manual Wait

Eff Machine Time

Resource Time

Eff Act Takt Time

Operator Balance Chart

Min

0

1

2

3

4

5

6

7

A0020

Ser

ver

A0060

Mak

er

Resource Time

Legend

Resource Takt

All Auto fields are

now calculated.

Drag out the SWCS

chart shape and right-

click to Plot Chart.

Drag out the Balance

chart shape and right-

click to Plot Chart.

1

32

20150512