Copyright © 2017 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com innacle created the 3D Models and prepared P construction document of Start of Hope - a residential project consisting of 8 Buildings with 3 floors (Ground+1+Roof) for design review of client (constructability review). 3D BIM Model Project Speciality Trades Covered: Plumbing Software Used: Revit 2016 LOD: 300 We have implemented the sovent system in DWV (Drainage West Vent) instead of normal venting system. BIM Start Date May, 2016 Project Area 303,500 Sq ft Architect 5 Engineers Kirksey Architecture Team Size General Contractor Fretz Construction Co. BIM End Date June, 2017 MEP Engineer DBR Engineering Consultants Inc. Subs Contractor* Mitchell Chuoke Plumbing Developer/Owner Star of Hope Pinnacle’s Value Addition We have raised 28 RFIs for constructability issues and have provided design assistance to our client. We have performed constructability review, identified conflicts and fixed them efficiently. Our 3D BIM model helped to prepare efficient and accurate construction plans to make effective evaluation, detection and production of clash report. 3D BIM Model Scope of Work Our scope of work for the project is to prepare 3D model of plumbing pipe & associate plumbing fitting with equipment. We are also responsible for validating the base design model provided by the client and updating the same with Revit Model to prepare construction document set.

Upload: others

Post on 12-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STAR OF HOPE - pinnaclecad · Developer/Owner Star of Hope Pinnacle’s Value Addition We have raised 28 RFIs for constructability issues and have provided design assistance to our

Copyright © 2017 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

innacle created the 3D Models and prepared Pconstruction document of Start of Hope - a residential project consisting of 8 Buildings

with 3 floors (Ground+1+Roof) for design review of client (constructability review).

3D BIM Model

Project Speciality

Trades Covered: Plumbing

Software Used: Revit 2016

LOD: 300

We have implemented the sovent system in DWV (Drainage West Vent) instead of normal venting system.

BIM Start Date May, 2016

Project Area 303,500 Sq ft

Architect

5 Engineers

Kirksey Architecture

Team Size

General Contractor Fretz Construction Co.

BIM End Date June, 2017

MEP Engineer DBR Engineering Consultants Inc.

Subs Contractor* Mitchell Chuoke Plumbing

Developer/Owner Star of Hope

Pinnacle’s Value Addition

We have raised 28 RFIs for constructability issues and have provided design assistance to our client. We have performed constructability review, identified conflicts and fixed them efficiently. Our 3D BIM model helped to prepare efficient and accurate construction plans to make effective evaluation, detection and production of clash report.

3D BIM Model

Scope of Work

Our scope of work for the project is to prepare 3D model of plumbing pipe & associate plumbing fitting with equipment. We are also responsible for validating the base design model provided by the client and updating the same with Revit Model to prepare construction document set.

STAR OF HOPE

Texas, USA

[Family Campus]