state of hawaii · honolulu, hawaii 96819 february 9, 2018 chairperson and members board of land...

21
Item J-4 State of Hawaii DEPARTMENT OF LAND AND NATURAL RESOURCES Division of Boating and Ocean Recreation Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT: APPROVE THE INSTALLATION OF THREE EXISTING OFFSHORE MOORINGS DECLARE EXEMPTION FROM REQUIREMENTS OF CHAPTER 343, HAWAII REVISED STATUES, AND TITLE 11, CHAPTER 200, HAWAII ADMINISTRATIVE RULES, LAHAINA ROADSTEAD OFFSHORE MOORING AREA, LAHAINA, ISLAND OF MAUI, FOR HONE HEKE CORPORATION DBA EXPEDITIONS. REQUEST: The Division of Boating and Ocean Recreation (“DOBOR”) is requesting that the Board of Land and Natural Resources (“Board”) approve the installation of three (3) existing offshore moorings within the Lahaina Roadstead Offshore Mooring Area and declare the installation exempt from the requirements of Chapter 343, Hawaii Revised Statutes, and Title 11, Chapter 200, Hawaii Administrative Rules to prepare an Environmental Assessment (“EA”), due to the use of submerged State land. The applicant, Hone Heke Corporation DBA Expeditions (“Applicant”), uses three (3) existing offshore moorings installed within the Lahaina Roadstead Offshore Mooring Zone that have been in place for several years. They are requesting that the Board approve the installation of the offshore moorings and declare their installation exempt from the requirement to prepare an EA, as required by Chapter 343, HRS, and Chapter 11-200, HAR due to the use of submerged State land. The Applicant’s request is attached as Exhibit A. PERMITS AND COMPLIANCE WITH STATE AND FEDERAL LAW: In order to comply with Federal Law (Section 10 of the Rivers and Harbors act of 1899), DOBOR is requiring that all offshore moorings under their jurisdiction obtain a permit from the U.S. Army Corps of Engineers (“ACOE”). In addition, to ensure that the mooring system is structurally sound, DOBOR is requiring that all offshore mooring permittees submit an Offshore Mooring Installation Plan, prepared by a licensed structural engineer, for approval. The Applicant has obtained a Nationwide Permit Verification from the ACOE authorizing the installation and use of the existing moorings. Mooring Installation Plans for all three (3) moorings, prepared by a licensed structural engineer, have also been submitted to and approved by DOBOR Engineering Branch. The ACOE Permit and approved Mooring Installation Plan are also attached with Exhibit A.

Upload: others

Post on 17-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Item J-4

State of Hawaii DEPARTMENT OF LAND AND NATURAL RESOURCES

Division of Boating and Ocean Recreation Honolulu, Hawaii 96819

February 9, 2018

Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members:

SUBJECT: APPROVE THE INSTALLATION OF THREE EXISTING OFFSHORE MOORINGS DECLARE EXEMPTION FROM REQUIREMENTS OF CHAPTER 343, HAWAII REVISED STATUES, AND TITLE 11, CHAPTER 200, HAWAII ADMINISTRATIVE RULES, LAHAINA ROADSTEAD OFFSHORE MOORING AREA, LAHAINA, ISLAND OF MAUI, FOR HONE HEKE CORPORATION DBA EXPEDITIONS.

REQUEST: The Division of Boating and Ocean Recreation (“DOBOR”) is requesting that the Board of Land and Natural Resources (“Board”) approve the installation of three (3) existing offshore moorings within the Lahaina Roadstead Offshore Mooring Area and declare the installation exempt from the requirements of Chapter 343, Hawaii Revised Statutes, and Title 11, Chapter 200, Hawaii Administrative Rules to prepare an Environmental Assessment (“EA”), due to the use of submerged State land. The applicant, Hone Heke Corporation DBA Expeditions (“Applicant”), uses three (3) existing offshore moorings installed within the Lahaina Roadstead Offshore Mooring Zone that have been in place for several years. They are requesting that the Board approve the installation of the offshore moorings and declare their installation exempt from the requirement to prepare an EA, as required by Chapter 343, HRS, and Chapter 11-200, HAR due to the use of submerged State land. The Applicant’s request is attached as Exhibit A. PERMITS AND COMPLIANCE WITH STATE AND FEDERAL LAW: In order to comply with Federal Law (Section 10 of the Rivers and Harbors act of 1899), DOBOR is requiring that all offshore moorings under their jurisdiction obtain a permit from the U.S. Army Corps of Engineers (“ACOE”). In addition, to ensure that the mooring system is structurally sound, DOBOR is requiring that all offshore mooring permittees submit an Offshore Mooring Installation Plan, prepared by a licensed structural engineer, for approval. The Applicant has obtained a Nationwide Permit Verification from the ACOE authorizing the installation and use of the existing moorings. Mooring Installation Plans for all three (3) moorings, prepared by a licensed structural engineer, have also been submitted to and approved by DOBOR Engineering Branch. The ACOE Permit and approved Mooring Installation Plan are also attached with Exhibit A.

Page 2: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:
Page 3: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Declare Existing Offshore Moorings February 9, 2018 Exempt from EA Requirements Item J-4 Hone Heke Corporation DBA Expeditions Lahaina Roadstead Offshore Mooring Zone, Lahaina, Island of Maui

3

Attachment: Exhibit A – Applicant’s request for approval of mooring, approved Mooring

Installation Plans, Nationwide Permit Verification Letter from Army Corps of Engineers

Page 4: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:
cmccafd
Typewritten Text
EXHIBIT A
Page 5: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:
Page 6: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:
Page 7: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:
Page 8: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

DEPARTMENT OF THE ARMY HONOLULU DISTRICT, U.S. ARMY CORPS OF ENGINEERS

FORT SHAFTER, HAWAII 96858-5440

Regulatory Division POH-2017-204

Hone Heke Corporation, DBA Expeditions Attention: Mr. Bill Caldwell 658 Front Street 127 Lahaina, Hawaii 96761

Dear Mr. Caldwell:

This is in response to your December 2, 2016, application for a Department of the Army (DA) permit in order to construct three mooring buoys for commercial vessels. It has been assigned number POH-2017-204, Lahaina Bay, which should be referred to in all future correspondence with this office. The project sites are located in Lahaina Bay near Lahaina, Maui in Hawaii at the following locations:

a. Mooring Buoy one (1), identified as Expedition 4, 20.8696° N, -156.6841° Wb. Mooring Buoy two (2), identified as Expedition 5, 20.8775° N, -156.6886° Wc. Mooring Buoy three (3), identified as Expedition 6, 20.8691° N, -156.6851° W

DA permit authorization is necessary because your project will involve work in and the placement of structures into waters of the U.S. under our regulatory jurisdiction. The project descriptions are as follows:

a. Expedition 4: This project is in references to an already installed (2003) single pointmooring buoy for commercial vessels deployed in approximately 56-foot deep water,located approximately 2,243-linear feet from the shoreline in Lahaina Bay nearLahaina, near the Island of Maui at 20.8696 N, -156.6841° W. The existing mooringanchoring system is comprised of two 3800 pound concrete blocks with one MR-SRManta anchor installed at a minimum of 7-linear feet below the seafloor. The anchor isattached to one of the cement blocks via 3/4-inch galvanized mooring chain which issegmented at the sea floor surface and connected via 3/4-inch galvanized bolt anchorshackles and seizing wires. The dimensions for the concrete blocks are 5-linear feet inlength by 18-inches in height by 5-linear feet in width. A 3/4-inch galvanized“Campbell” dock chain 10-linear feet in length is wrapped around and connected at thecenter of both cement blocks via 3/4-inch galvanized bolt-anchor-shackles and seizing-wire. A 5/8-inch mooring chain 4-linear feet in length connects to a 12-inch float via a1-inch swivel and 3/4-inch shackle.

cmccafd
Typewritten Text
EXHIBIT A
Page 9: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

-2-

The float is connected to a 1 1/2-inch “blue steel” 3 strand rope approximately 54-linear feet in length with thimble eyes on both ends and a second float attached to the rope near the terminus of the rope. The rope, in turn, connects to a 5/8-inch galvanized mooring chain via a 5/8-inch galvanized bolt-anchor-shackle and seizing-wire which is connected to 1-inch forged eye-to-eye swivel to the rope. The mooring chain is 50-linear feet in length and connects to the 1-inch swivel via a 5/8-inch shackle then to a 32-inch mooring buoy. The mooring buoy has a 1-inch Masterlink which attaches via two 7/8-inch shackles with seizing wire to two 30-linear feet in length, 1 1/4-inch 3-strand nylon ropes. The mooring chain threads through the center of the buoy and connects to the Masterlink via a 7/8-inch bolt shackle with seizing wire. The total length of working chain and rope is approximately 145 feet. All of the mentioned hardware has replaced old and is new since 2017.

b. Expedition 5: This project is in references to an already installed (2015) singlepoint mooring buoy for commercial vessels deployed in approximately 53-footdeep water, located approximately 2,000-linear feet from the shoreline in LahainaBay near Lahaina, near the Island of Maui at 20.8775° N, 156.6886° W. Theexisting mooring anchoring system is comprised of two (2) 3800 pound concreteblocks with one MR-SR Manta anchor installed at a minimum of 7-linear feetbelow the seafloor. The anchor is attached to the cement block via 3/4-inchgalvanized mooring chains which are segmented at the surface and connectedvia 3/4-inch galvanized bolt anchor shackles and seizing wire.

The dimensions for the concrete block are 5-linear feet in length by 18-inches in height by 5-linear feet in width. A 3/4-inch galvanized “Campbell” dock chain 10-linear feet in length is wrapped around and connected at the center of both blocks via 3/4-inch galvanized bolt anchor shackles and seizing wire. A 5/8-inch mooring chain 15-linear feet in length connects to 12 inch float via a 1-inch swivel with a 3/4-inch shackle. The float is connected to a 1 1/2-inch “blue steel” 3-strand rope approximately 40-linear feet in length with thimble eyes on both ends and a second float attached to the rope. The rope, in turn, connects to a 5/8-inch mooring chain via a 3/4-inch galvanized bolt anchor shackle and seizing wire which is connected to 1-inch forged eye-to-eye swivel to the rope. The mooring chain is 30-linear feet in length and connects to a 32-inch mooring buoy. The mooring buoy has a 1-inch Masterlink which would attach to two 7/8-inch shackles to two 30-linear feet in length, 1 1/4-inch 3-strand nylon ropes with eye splices and hawser thimbles on the shackle ends and eye splices on the other end. The mooring chain threads through the center of the buoy and connects to the Masterlink via a 7/8-inch bolt shackle with seizing wire. The total length of working chain and rope is approximately 115 feet. All of the mentioned hardware has replaced the old and is new since 2017.

Page 10: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

-3-

c. Expedition 6: This project is in references to an already installed (2006) single pointmooring buoy for commercial vessels deployed in approximately 76-foot deep water,located approximately 2,630-linear feet from the shoreline in Lahaina Bay nearLahaina, near the Island of Maui at 20.8691° N, 156.6851 ° W. The existing mooringanchoring system is comprised of two 3800 pound concrete blocks with two MR-SRManta anchors installed at a minimum of 7-linear feet below the seafloor. The anchorsare attached to each of the cement blocks individually via 3/4-inch galvanized mooringchain which is segmented once it extends out of the sea floor and is connected via a3/4-inch galvanized bolt anchor shackle and seizing wire to another 3/4-inchgalvanized mooring chain that in turn is connected to one of the cement blocks via a3/4-inch shackle.

The dimensions for the concrete blocks are 5-linear feet in length by 18-inches in height by 5-linear feet in width. A 3/4-inch galvanized “Campbell” dock chain 22-linear feet in length is wrapped around and connected at the center of both cement blocks via 3/4-inch galvanized bolt anchor shackles and seizing wire. A 5/8-inch mooring chain 46-linear feet in length connects to a 5/8-inch galvanized chain via 3/4-shackle which connects to a 12-inch float via a 3/4-inch shackle. The float is connected to a 1 1/2-inch “blue steel” 3-strand rope 75-linear feet in length with thimble eyes on both ends and a second float attached to the rope near the terminus of the rope. The rope connects to a 3/4-inch galvanized mooring chain via a 3/4-inch galvanized bolt anchor shackle and 1-inch swivel. The mooring chain is 50-linear feet in length and connects to a 32-inch mooring buoy. The mooring buoy has a 1-inch Masterlink which would attach to two 30-linear feet in length, 1 1/4-inch 3-strand nylon ropes via 7/8-inch shackles with seizing wire. The mooring chain threads through the center of the buoy and connects to a 1-inch Masterlink via a 7/8-inch bolt shackle with seizing wire. The total length of working chain and rope is approximately 205 feet. All hardware has been replaced in 2017.

Based upon the information and plans you provided, we hereby verify that the work described under item “a” above, which would be performed in accordance with the enclosed plan (sheets 1-3), dated November 14, 2017, is authorized by Nationwide Permit (NWP) No. 09, Structures in Fleeting and Anchorage Areas. The work described under item “b” above, which would be performed in accordance with the enclosed plan (sheets 1-3), dated November 14, 2017, is authorized by NWP No. 09, Structures in Fleeting and Anchorage Areas. The work described under item “c” above, which would be performed in accordance with the enclosed plan (sheets 1-3), dated November 14, 2017, is authorized by NWP No. 09, Structures in Fleeting and Anchorage Areas. NWPs No. 09 and their associated Regional and General Conditions can be accessed at our website at www.poh.usace.army.mil/Missions/ Regulatory/Permits. You must comply with all terms and conditions associated with NWPs No. 09.

Page 11: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

-4-

Further, please note General Condition 30 requires that you submit a signed certification to us once any work and required mitigation are completed. Enclosed is the form for you to complete and return to us.

This verification is valid until the NWPs are modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 19, 2022. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued.

Please contact me via email at [email protected], by mail at the address above or by phone at (808) 835-4303 if you have questions. For more information about the Regulatory Program, please visit our website at www.poh.usace.army.mil/Missions/Regulatory.

Sincerely,

Tunis W. McElwainChief, Regulatory BranchHonolulu District Enclosures:

1. Certification2. Expedition 4 Plan Sheets 1-33. Expedition 5 Plan Sheets 1-34. Expedition 6 Plan Sheets 1-3

Page 12: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

US Army Corps of Engineers Alaska District Permit Number: POH-2017-204 Name of Permittee: Hone Heke Corporation DBA Expeditions Date of Issue: Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to Mr. Tunis W. McElwain at the following address:

U.S. Army Corps of Engineers Honolulu District, Regulatory Branch Fort Shafter, Hawaii 96858-5440

Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above-referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. _________________________ _______________________ Signature of Permittee Date

Page 13: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

1-3

OF

FS

HO

RE

MO

OR

ING

-LA

HA

INA

MO

OR

ING

ZO

NE

F

OR

BIL

L C

ALD

WE

LL -

EX

PE

DIT

ION

S 4

,.....,

~...u

-

<$"~

~

-I);- "-

STAT

E O

F H

AW

AII

' @

I ~-

,,..,.

IND

EX

TO

D

RA

WIN

GS

SH

EE

T

OR

A'M

NG

N

UM

BE

R

NU

MB

ER

D

ES

CR

IPTI

ON

T-1

11

T1£

IND

EX

TO

DR

AW

ING

S.

AN

D

VIC

INIT

Y

MA

P

S-1

M

OO

RIN

G N

OlE

S A

ND

EL

EVA

TIO

N

S-

2 M

OO

RIN

G P

LAN

PR

OJE

CT

LQ

CA

JlO

N

LAH

AIN

A

MO

ORI

NG

ZO

NE

GP

S C

OO

RD

INA

TE

S O

F M

OO

RIN

G:

20'5

2'10

.S"N

, 15

6'41

'03.

0"W

AP

PR

OX

IMA

TE

WA

TE

R D

EP

TH

: 56

'

SC

ALE

IN

MIL

ES

VIC

INIT

Y

MA

P

De

pa

rtm

en

t of l

an

d a

nd N

atur

al R

esou

rc11

1 D

ivis

ion

of B

oa

ting

and

Oce

an

Rec

reat

ion

PLA

N R

EV

IEW

:

l8l A

pp

rove

d

0 R

eje

cte

d

0 A

pp

rove

d,

as

no

ted

0

Re

vise

.& R

esub

mit

By: _

_ 1:.._4J

_

_ D

ate

:_1_2

121_1s

__

Cor

rect

ions

, co

mm

ents

or

appr

oval

of p

lan

s sh

al

no

t re

lieve

· th

e c

on

tra

cto

r fro

m o

the

r lo

cal,

sta

te,

fed

era

l o

r o

the

r a

ge

ncy

re

gu

latio

ns

or

pe

rmit

co

nd

itio

ns.

T

his

re

vie

w i

s fo

r g

en

era

l co

nfo

rma

nce

w

ith

e·n

gin

ee

rin

g d

esi

gn

gu

ide

line

s. T

he

co

ntr

act

or

is r

esp

on

sib

le f

or

con

firm

ing

all di

men

sion

s,

qu

an

titi

es.

fa

bri

catio

n r

eq

ulr

em

en

ta,

an

d

coo

rdin

ati

on

with

all

oth

er

tra

de

s.

LOC

ATI

ON

M

AP

LAH

AJN

A O

FFSH

OR

E M

OO

RIN

G Z

ON

E BO

UN

DAR

IES

PH R

EE

CR

EA

TIO

NS,

LLC

. 5

1-6

55

KAM

EHAM

EHA

HIGH

WAY

HA

L.ElW

A,

HAW

AII

9671

2 •

(806

) 34

9-49

90

CEN

EJW

.NO

TE5

~--<>CDl-

'UW'

f-­

--AlllC.-11:~

....alDMl-llC-

-""

JlfTDQCDI

OT-Dl:SCllJIWCIDfm~

.... C

QI01

llUC!O

O,....

.. __

fD~"""'~

....

._C

OO

CH

l!IH

wtS

feD

UN

No

r...

...v

no

n:o

r-

~':'~=~~ewm-or...oc

RtV

ISIO

NIM

RK

• Oi

J.TE

• DE

SCRI

PTIO

N

PRO

POSE

D

OFF

SHO

RE

MO

ORI

NG

LAHA

INA

MO

ORI

NG

ZON

E

FOR:

P•o.m

:r

BILL

CA

LDW

ELL

EXPE

Dm

ON

S 65

8 FR

ONT

STR

EET,

SU

ITE

127

LAHA

INA.

H

I 96

761

PHO

NE:

(B

OB

) 6

61

-37

56

GPS

COO

RDIN

ATES

: 2o

·s2·

10.e

~N

156"

41'0

3.0"

W

TITL

E S

HE

ET

JCS

NO.

20

15

-00

07

.25

DR

A\lllN

C NO

.

CRAW

N Jl

.lM

T-1

!».T

E NO

V. J

, 20

16

Sl-

&r

1 O

F 3

Page 14: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

2-3

~

A.

WO

RKM

ANSH

IP

AND

M

ATER

IALS

S

HA

LL

CO

NFO

RM

TO

TH

E

BUIL

DIN

G

CO

DE

I'S

ST

ATED

BE

LOW

. H

OW

EVER

, W

HER

E R

EFER

ENC

E IS

M

ADE

TO

PERF

ORM

AN

CE

CON

FORM

ING

TO

O

THER

ST

AND

ARD

S TH

E

MO

RE

STR

ING

EN

T S

HA

U A

PP

LY.

1.

CO

UN

'TY

O

F M

AU

I A

ME

ND

ED

IB

C,

20

06

e.

THE

C

ON

TRAC

TOR

S

HA

LL T

AK

E

FIEL

D

MEA

SUR

EMEN

TS

ANO

VE

RIF

Y FJ

ELD

CO

ND

mO

NS

AND

S

HA

LL

CO

MPA

RE

SUC

H

FIEL

D

MEA

SUR

EMEN

TS

AND

C

ON

DIT

ION

S W

ITH

THE

DR

AWIN

GS

BEFO

RE

CO

MM

ENC

ING

W

OR

K.

REP

OR

T IN

W

Rm

NG

TO

TH

E

ENG

INEE

R

ALL

IN

CO

NS

ISTE

NC

IES

AND

O

MIS

SIO

NS

.

C.

THE

C

ON

TRA

CTO

R

SH

ALL

B

E

RE

SP

ON

SIB

LE

FOR

M

rn-1

00

5

OF

CO

NS

TRU

CTI

ON

, W

OR

KMAN

SHIP

AN

D

JOB

SA

FETY

.

D.

DET

AILS

N

OTE

D

AS

lYP

ICA

L O

N

THE

ST

RU

CTU

RAL

D

RAW

ING

S S

HA

LL A

PP

LY

IN

ALL

C

ON

Dm

ON

S

UN

LES

S

SP

EC

IFIC

ALLY

SH

OW

N

OR

N

OTE

D.

E.

PR

OD

UC

T D

ATA

REQ

UIR

ED

BY

THE

SE

N

OTE

S S

HA

LL

BE

SUBM

ITTE

D

TO

nlE

EN

GIN

EER

FO

R

REV

IEW

AN

D

AP

PR

OV

AL

PR

IOR

TO

FA

BRIC

ATIO

N.

QE

SJG

N

CR

!TF

R!A

·

A.

MIN

IMU

M

DE

SIG

N

CR

ITE

RIA

FO

R

MO

OR

ING

IN

A

CC

OR

DA

NC

E

WIT

H

UFC

4

-15

9-0

J:

1. T

YPE

118

ST

OR

M

MO

OR

ING

B

. W

IND

D

ESIG

N

DAT

A:

1.

BASI

C

WIN

D

SP

EE

D:

1 05

M

PH

C.

CU

RR

EN

T:

1.

MA

X

CU

RR

EN

T:

2 KN

OTS

0.

W

AVES

AN

O

TID

AL

VAR

IATI

ON

S:

1.

PEAK

W

AVE

HE

IGK

T:

B F

EET

DES

IGN

V

ES

SE

L:

EXP

ED

mO

NS

4

1.

LOA

: 6

4'-

s•

2.

BEAM

: 2

3'-

6'"

3

. D

RA

FT:

s·-o

· 4

. W

EIG

HT:

3

1 TO

NS

. •M

OO

RIN

G

IS

DES

IGN

ED

FOR

D

ESIG

N

VE

SS

EL

ON

LY,

ANY

CH

ANG

E IN

M

OO

RE

D V

ESSE

L R

EQU

IRES

R

E-A

NA

LYS

IS.

E"AR

JH

ANC

HO

RS•

A.

SE

l.EC

TlO

N

OF

ANC

HO

R

TYPE

S

HA

LL

BE

BASE

D

UPO

N S

UR

VEY

SITE

AN

O

SO

IL

PR

OB

ING

ro

MIN

IMU

M

DEP

TH

OF

1 o'

AT

PRO

POSE

D

ANC

HO

R

LOC

ATIO

N.

CO

NTR

ACTO

R

SH

ALL

PR

OVI

DE

RE

SU

LTS

O

F SU

RVE

Y,

SO

IL

PRO

BIN

G,

ANO

PR

OPO

SED

AN

CH

OR

TY

PE T

O

ENG

INEE

R

FOR

AP

PRO

VAL

PRIO

R

TO

INST

ALLA

TIO

N.

B.

INST

ALL

ANC

HO

RS

PER

M

ANU

FAC

TUR

ERS

INS

TRU

CTI

ON

S.

PRO

OF

TES

T TO

M

INIM

UM

U

PLI

FT

CA

PA

Crr

f ST

ATED

O

N

DES

IGN

DR

AWIN

GS.

S

UB

MIT

D

OC

UM

EN

TATI

ON

O

F P

RO

OF

LOAD

TE

STIN

G

TO

ENG

INEE

R

FOLL

OW

ING

IN

STAL

LATI

ON

.

C.

MAN

TA

ANC

HO

RS

SH

ALL

N

OT

BE

INST

AU.E

O

IN

LOC

ATIO

NS

WH

ERE

SHIF

TIN

G

SAN

D

MAY

R

ES

ULT

IN

R

EDU

CED

S

OIL

C

OVE

R

OVE

R

ANC

HO

R

HEA

D.

CH

AIN

H

ARD

WAR

E R

OpE

AN

D

MO

OR

ING

C

OM

PON

ENTS

A.

ALL

C

HAI

N

AND

H

ARD

WAR

E S

HA

LL

BE

HO

T D

IP

GAL

VAN

IZED

IN

AC

CO

RD

ANC

E W

ITH

AST

M

A15

3.

8.

THIM

BLE

S

OR

C

HAF

E G

UAR

DS

SH

ALL

BE

U

SE

D

WIT

H R

OPE

S AT

ALL

PO

INTS

O

F C

ON

TAC

T.

C.

SU

BM

IT

PRO

DU

CT

DAT

A O

F A

LL

CH

AIN

S,

HAR

DW

ARE

. R

OPE

. AN

O

MO

OR

ING

C

OM

PON

EN"

TS

TO

ENG

INEE

R

FOR

A

PP

RO

VA

L PR

IOR

TO

FA

BRIC

ATIO

N.

MO

OR

ING

H

ARQ

WAR

E M

A!N

JEN

ANC

E AN

Q

INS

pFC

DQ

N

A.

THE

VE

SS

EL

OW

NER

S

HA

U.

BE

R

ES

PO

NS

IBLE

FO

R M

AIN

TAIN

ING

TH

E

VE

SS

EL'

S

MO

OR

ING

H

AR

DW

ARE.

A

NY

FA

IWR

E

RES

ULT

ING

FR

OM

N

ON

M

AIN

TAIN

ED

CO

MPO

NEN

TS

OR

U

NR

EPAJ

REO

D

AMAG

E O

F TH

E

MO

OR

ING

R

ESU

LTIN

G

FRO

M

NO

RM

AL

USE

S

HA

LL

BE

TH

E

RE

SP

ON

SIB

ILIT

Y

OF

TH

E

VE

SS

EL

OW

NER

.

B.

THE

V

ES

SE

L O

WN

ER

SH

ALL

IN

SP

EC

T A

LL

MO

OR

ING

H

ARD

WAR

E.

RO

PES,

AN

D

CH

AIN

S

FRO

M

SEA

FLO

OR

TO

P

EN

DA

NT

FOR

SA

FETY

AN

D

SEC

UR

ITY

NO

LESS

TH

AN

TYr'O

TI

MES

PE

R

YEAR

. IN

SPEC

TIO

N

RE

PO

RT/

RE

CO

RD

S

SH

ALL

BE

K

EP

T BY

VE

SS

EL

OW

NER

.

C.

THE

VE

SS

EL

OW

NER

IS

R

ESPO

NS

IBLE

FO

R

tNS

TAW

NG

AN

O

MAI

NTA

ININ

G

CH

AFlN

G

GEA

R

ON

A

LL

MO

OR

ING

LI

NES

.

0 I ;..

=

1.

FOR

ST

OR

M

OR

LO

NG

TE

RM

MO

OR

ING

U

SE

A T

HIR

D.

30

' LO

NG

M

IN ••

1}

4"

3-S

TR

AN

D

NYL

ON

PE

ND

ANT

PS

BA

CK

UP

. U

SE

CH

AFE

GU

ARD

S AT

ALL

PO

INTS

O

F C

ON

TAC

T.

2.

THIS

IS

AN

EX

ISTI

NG

M

OO

RIN

G

LOC

AllO

N.

THE

MAN

TA

ANC

HO

RAG

E SY

STEM

A

ND

A

DD

mO

NA

L C

ON

CR

ETE

BLO

CK

IS

NEW

, A

LL

HAR

DW

ARE

AN

O

CO

MPO

NEN

TS

ARE

EXIS

TIN

G

UN

LES

S

NO

TED

O

THER

WIS

E.

(N)

12'"0

FL

OAT

(N) *•

0 GAL

VAN

IZED

BO

LT

ANC

HO

R

SH

AC

KLE

W

ITH

SE

IZIN

G

WIR

E

(N) * •

GALVAN

IZED

'"C

AM

PB

ELL

" FE

ND

ER

DO

CK

CH

AIN

, 10

LO

NG

M

IN.

(N)

*"0

G

ALVA

NIZ

ED

BOLT

AN

CH

OR

S

HA

CK

LE

WIT

H S

EIZ

ING

W

IRE

(N)

*"0

GAL

VAN

IZED

BO

LT

ANC

HO

R

SH

AC

KLE

W

ITH

SE

tZIN

G

WIR

E.

lYP

.

(N)

MAN

TA

EYE

NU

T AN

O

ALL

-Ti

iRE

AO

C

OU

PLE

R,

TYP.

(N)

MR

-SR

M

ANTA

AN

CH

OR

, IN

STA

LL T

O

SU

FFlC

IEN

T D

EPTH

, M

INIM

UM

7

', TO

AC

HIE

VE

A M

INIM

UM

U

PLI

FT

CAP

ACIT

Y O

F 1

0 K

IPS

, TY

P.

MO

OR

ING

ELE

VA

TIO

N

NO

T TO

SC

ALE

1 •0

tJ

AS

TER

UN

K

(E)

35

•0

MO

OR

ING

BU

OY

(E)

%"•

CHA

IN,

50

' LO

NG

(E)

1.

SWIV

EL

(N)

FLO

AT

(E)

1)i'"

0 B

LUE

STE

EL

RO

PE

54

' LO

NG

SEAF

LOO

R

(N)

*."' G

ALVA

NIZ

ED

BOLT

AN

CH

OR

S

HA

CK

LE

WIT

H

SEIZ

ING

W

IRE

(N)

5'x

5'x

1e

· C

ON

CR

ETE

AN

CH

OR

, A

PP

RO

X.

WEI

GH

T 3

80

0

LBS.

PHR

EE

CR

EA

TIO

NS

, LLC

. 61

-65

5 KA

MEH

AMEH

A HI

GHW

AY

HALE

IWA,

HA

WAI

I 96

712

•(B

OB

) 34

9-49

90

~---CICOllUJloUWTH.1.­

-mrcnaa>.Jl>C.-.C-l'llOCaDOOC~IK­

~""'"~°'-~-llCQ,UftlO,.

H.L~:si.....-TOIKNlllNIDllloll'ICll'W

~01X11:-11Cwar_,.or~n:ar_.,.

~#IOO~IUJ/O'ITICCIT'flUJIXIO.O<ll'Ql'WICJlt

Tlt:ll"llO.io;flSl.OCO.mllUJ-•O_.,~

RtV

!SIO

NM

AR\i:

[).I.T

E •

DESC

RIPT

ION

PR

OP

Osm

O

FFSH

ORE

M

OO

RING

lA

HAI

NA

MO

ORI

NG

ZONE

FO

R:

BILL

C

ALD

WEL

L EX

PED

moN

S

65B

FR

ONT

STR

EET,

SU

ITE

127

LAHA

!NA.

Ht

9576

1 PH

ONE

: {S

OS)

6

61

-37

56

GPS

CO

ORD

INAT

ES:

20"5

2'10

.S'"N

15

041'

03.0

"W

MO

OR

ING

NO

TES

A

ND

ELE

VA

TIO

N

JOB

N

O.

2015

-000

7.25

O~WINC

NO

.

S-1

DATE

NO

V.

3 20

16

SH

EE

T 2

OF

3

Page 15: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

3-3

Page 16: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

1-3

Page 17: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

2-3

Page 18: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

3-3

Page 19: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

1-3

Page 20: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

2-3

Page 21: State of Hawaii · Honolulu, Hawaii 96819 February 9, 2018 Chairperson and Members Board of Land and Natural Resources State of Hawaii Honolulu, Hawaii Land Board Members: SUBJECT:

Perm

it: P

OH

-201

7-20

4A

pplic

ant:

Hon

e H

eke

Cor

p.Pr

ojec

t: M

oorin

g Bu

oyW

ater

way

: Lah

aina

Bay

Dat

e: 1

4/N

OV

/201

7Sh

eet:

3-3