state university construction fund (sucf) contracts

1300
Project Number Contract Number 06X203 T005251 08X441 D005314 09X375 T006080 271006 T006108 32X468 T006113 801801 T006361 09X312 T006081 12X287 T004928 01XA68 T006145 21X231 T005840 28X358 T005175 141000 T006472 26X290 T005627 251018 T006461 111037 D006655 311021 T006370 Page 1 of 1300 01/02/2022 State University Construction Fund (SUCF) Contracts: Beginni

Upload: others

Post on 03-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Project Number Contract Number

06X203 T005251

08X441 D005314

09X375 T006080

271006 T006108

32X468 T006113

801801 T006361

09X312 T006081

12X287 T004928

01XA68 T006145

21X231 T005840

28X358 T005175

141000 T006472

26X290 T005627

251018 T006461

111037 D006655

311021 T006370

Page 1 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Title Status

CONSTR: Replace Windows - Welles Hall Closed

CONSTR: Replace Roof - Elting Gymnasium Closed

CONSTR: Replace Athletic Track Closed

DESIGN: Replace Roofs -Bailey and Bicknell Halls Closed

CONSTR: Fit-Out Active

DESIGN: Architectural Services - MDSzerbaty + Associates - Master Term Agreement Active

CONSTR: Rehabilitate Physical Science Building, Bldg no. 0025 Closed

DESIGN: Upgrade Laboratories --Stowell Hall Closed

CONSTR: Rehab Exterior Envelope, Downtown - Various Buildings Closed

DESIGN: Replace Roofs, Various Buildings Active

DESIGN: Commissioning Services - Acheson Hall Closed

CONSTR: Job Order Contracting - NYC Region Active

DESIGN: Commissioning Agent- New Business School Closed

CONSTR: Replace Boilers & Chillers, Various Buildings Closed

CONSTR: Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall Active

DESIGN: Construct New Surface Parking Lots Phase 1 Active

Page 2 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Procurement Type Award Type

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 3 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Contract Award Date Contract End Date Contract Amount

02/08/2007 03/28/2011 1235715.00

07/09/2007 06/30/2010 1184681.00

06/10/2014 08/22/2015 170037.00

06/08/2016 08/18/2021 148240.74

10/23/2014 12/31/2020 153106312.00

06/30/2017 09/27/2025 5000000.00

06/12/2014 08/15/2018 28020231.00

04/02/2007 09/30/2011 15214.38

03/27/2015 04/21/2019 4559322.00

01/09/2012 07/30/2018 520018.64

10/31/2006 08/30/2013 251701.86

01/29/2019 04/11/2022 961992.00

02/14/2012 12/31/2018 149509.67

09/18/2018 09/16/2020 1226338.00

06/17/2021 04/13/2023 541000.00

11/15/2017 10/19/2026 270000.00

Page 4 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Expended Amount YTD Expended Amount LTD Remaining Balance

0.00 1235715.00 0.00

0.00 1184681.00 0.00

0.00 170037.00 0.00

0.00 148240.74 0.00

0.00 146357064.00 6749248.00

0.00 0.00 5000000.00

0.00 28020231.00 0.00

0.00 138214.38 -123000.00

0.00 4559322.00 0.00

122334.68 485740.78 34277.86

62673.25 251701.86 0.00

0.00 961992.00 0.00

13950.23 149509.67 0.00

0.00 1226338.00 0.00

0.00 108533.00 432467.00

0.00 243286.52 26713.48

Page 5 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Number of Bids MWBE MWBE Proposals

6 N 0

7 N 0

2 N 0

0 N 0

2 N 0

86 N 19

8 N 0

0 Y 0

6 N 1

0 N 0

5 N 0

3 N 1

0 N 0

1 Y 0

1 N 0

0 N 0

Page 6 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Vendor Name

Window Specialist, Inc.

International Contractors Corp.

Copeland Coating Co.,Inc.

Architecture +

EW Howell Company, Inc.

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Fahs Construction Group Inc.

Envision Architects, D.P.C.

Murnane Building Contractors, Inc.

Hoffmann Architects, Inc.

Affiliated Engineers, Inc

Volmar Construction, Inc

OLA Consulting Engineers, PC

Wilkins Mechanical, Inc.

Murnane Building Contractors, Inc.

M.J. Engineering and Land Surveying, P.C.

Page 7 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Address Line 1 Address Line 2

188 Erie Street

P. O. Box 574 20 Hornbech Road

P.O. Box 595

297 River Street

Suite 600 245 Newtown Road

307 Seventh Avenue Suite 1501

2224 Pierce Creek Road

52 James Street

P.O. Box 3048 104 Sharron Avenue

462 Seventh Avenue

5802 Research Park Blvd P. O. Box 44991

4400 Second Avenue

50 Broadway

6923 Herman Road

P.O. Box 3048 104 Sharron Avenue

1533 Crescent Road

Page 8 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

City State Zip Code Country

Lancaster NY 14086 USA

Neversink NY 12765 USA

Nassau NY 12123 USA

Troy NY 12180 USA

Plainview NY 11803 USA

New York NY 10001 USA

Binghamton NY 13903 USA

Albany NY 12207 USA

Plattsburgh NY 12901 USA

New York NY 10018 USA

Madison WI 53744 USA

Brooklyn NY 11232 USA

Hawthorne NY 10532 USA

Syracuse NY 13209 USA

Plattsburgh NY 12901 USA

Clifton Park NY 12065 USA

Page 9 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

GeoreferenceNYS Municipal

BoundariesNew York Zip

CodesCounties

POINT (-78.66020442.905747)

286 532 2041

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.99353640.746986)

749 717 2095

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.75023942.651717)

814 44 2030

POINT (-73.99000240.751854)

749 741 2095

POINT (-89.48024143.055761)

867

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.79736141.107546)

963 1251 2185

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.77188842.819305)

1009 1190 2141

Page 10 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

221000 T006098

291031 T006472

39X161 T005830

23X167 D005412

091059 T006370

13XD74 T006054

24X268 T005610

061014 T006522

22X224 T005742

02X366 T006066

30XA60 T005389

15X7B1 T005632

15X412 T004881

101027 T006440

021012 T006248

40X030 T005196

Page 11 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Addition to Athletic Field Gateway Building Closed

CONSTR: Job Order Contracting - NYC Region Active

DESIGN: Replace Roof - Donovan Hall Closed

CONSTR: Convocation Athletic Recreation Center - Site Utilites Closed

DESIGN: Site Accessibility Upgrades Active

CONSTR: Replacement Elec Feeders Closed

CONSTR: Library Upgrades Interior, Exterior, Elevator and Mechanical Systems Closed

CONSTR: Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls Active

DESIGN: Construction Manager - Student Union / Activities Center Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: EOC (Educational Opportunity Center) Buffalo Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: University Hospital Vertical Expansion - Hospital Closed

DESIGN: Renovate Hewitt Hall Active

DESIGN: Replace Emergency Generators, Campus Wide Closed

DESIGN: Commissioning Regn Centr Rochester Closed

Page 12 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 13 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/10/2015 11/03/2021 236875.58

01/29/2019 04/11/2022 578102.00

02/28/2012 10/25/2015 166980.10

07/22/2008 06/30/2010 597455.00

07/22/2020 10/19/2026 924000.00

03/24/2014 03/23/2018 17767549.00

12/22/2009 08/15/2012 2377335.00

08/27/2019 12/07/2021 3091385.00

12/29/2010 12/21/2015 1751217.71

04/23/2015 02/11/2018 15935.00

05/21/2008 07/31/2016 2006879.52

12/18/2009 12/09/2015 1622686.00

02/24/2004 01/30/2011 8869180.75

09/21/2021 12/12/2028 166350.00

06/08/2016 07/25/2021 493972.60

05/22/2009 08/21/2018 67554.41

Page 14 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 236875.58 0.00

0.00 578102.00 0.00

55204.72 166980.10 0.00

0.00 597455.00 0.00

0.00 330768.56 593231.44

0.00 17767549.00 0.00

195935.00 2377335.00 0.00

0.00 2854822.00 236563.00

538500.55 1751217.71 0.00

0.00 15935.00 0.00

290882.07 2006879.52 0.00

319419.00 1622686.00 0.00

0.00 8869180.75 0.00

0.00 3935.00 162415.00

0.00 493972.60 0.00

0.00 67554.41 0.00

Page 15 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 1

0 N 0

5 N 0

0 N 0

8 N 1

16 N 1

2 N 1

16 N 1

0 N 0

6 N 0

0 N 0

5 N 0

36 N 6

21 N 3

0 N 0

Page 16 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Kideney Architects, P.C.

Volmar Construction, Inc

Fontanese Folts Aubrecht Ernst Architects, P.C.

T. J. Fiacco Construction LLC

M.J. Engineering and Land Surveying, P.C.

Eldor Contracting Corp

AOW Associates, Inc.

Manning Squires Hennig Co. Inc

LeChase Construction Services, LLC

Sorensen Gross Construction Services

Holt Architects, P.C.

Sorensen Gross Construction Services

Karlsberger Architecture, P.C.

Horizon Engineering Associates, LLP

IBC Engineering, Pc

C.J. Brown Energy & Engineering, P.C.

Page 17 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

143 Genesee Street

4400 Second Avenue

6395 West Quaker Street

7666 State Hwy 56

1533 Crescent Road

30 Corporate Drive

30 Essex Street

8426 Seven Springs Road PO Box 685

Suite 102 11849 East Corning Road

3407 torrey Road

217 North Aurora Street

3407 torrey Road

320 West 13th Street` 9 Floor

358 West Jefferson Street Suite 300

Suite 219 3445 Winton Place

Suite 204 4245 Union Road

Page 18 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14203 USA

Brooklyn NY 11232 USA

Orchard Park NY 14127 USA

Norwood NY 13668 USA

Clifton Park NY 12065 USA

Holtsville NY 11742 USA

Albany NY 12206 USA

Batavia NY 14020 USA

Corning NY 14830 USA

Flint MI 48507 USA

Ithaca NY 14850 USA

Flint MI 48507 USA

New York NY 10014 USA

Syracuse NY 13204 USA

Rochester NY 14623 USA

Buffalo NY 14225 USA

Page 19 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.819305)

POINT (-78.86903142.890071)

300 34 2041

POINT (-74.01363540.652263)

894 899 2090

POINT (-78.74730242.766453)

282 956 2041

POINT (-74.99143444.762288)

319 1590 2140

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.03939240.804249)

1022 1226 2179

POINT (-73.77972242.677542)

814 43 2030

POINT (-78.13339143.006019)

792 489 2086

POINT (-83.73256442.976697)

438

POINT (-76.49572242.44107)

709 1786 2181

POINT (-83.73256442.976697)

438

POINT (-76.15821943.047105)

687 711 2132

Page 20 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41X034 T005445

24X235 D005291

36X124 T006011

271047 T006591

391010 T006370

29X410 T005817

361020 T006107

07XA45 T005677

261043 T006363

14X496 T006294

05X338 T005843

29X266 T005106

201018 D006569

11X305 T005737

12X316 T005537

05X296 T005528

091051 T006353

Page 21 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Upgrade Building Fire Alarm System Optometry Closed

CONSTR: Campus Site Lighting - Phase II Closed

CONSTR: General Infrastructure/Space rehab Plaza Closed

DESIGN: Campus Energy Master Plan - Study Active

DESIGN: Reconstruct Technology Drive and Residential Drive Active

CONSTR: Performing Arts Center Roof Replacement Closed

DESIGN: Condition Assessment - Plaza Bldg Exterior Closed

DESIGN: Rehab Exterior - Engineering Building Closed

DESIGN: Investigate and Repair Facades at Gleeson and Laffin Halls Active

CONSTR: Upgrade HVAC Systems BSB Closed

DESIGN: Addition and Renovation RAC - 3rd Floor HVAC and Sprinklers Closed

CONSTR: Rehab of Library for Academic Support Space and Technology Closed

CONSTR: Renovate Marshall Hall Active

CONSTR: Field House Mechanical Rehabilitation Closed

CONSTR: Replace U/G Fuel Oil Tanks Heating Plant Closed

CONSTR: Rehabilitate Maytum Bldg - Phase II Closed

DESIGN: Update Facilities Master Plan Active

Page 22 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 23 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/05/2009 06/25/2011 1988021.00

06/11/2007 06/30/2010 493189.00

02/01/2013 11/15/2014 1165795.00

02/15/2021 09/14/2023 364587.80

11/08/2017 10/19/2026 292351.67

03/31/2011 04/30/2015 2441199.00

08/04/2017 03/31/2022 84143.04

07/13/2010 07/06/2015 98387.47

12/04/2019 08/30/2025 724000.00

12/16/2016 01/24/2020 3395387.00

07/10/2014 05/16/2018 310889.59

12/09/2005 09/30/2012 6191876.00

06/22/2020 01/09/2024 31517128.00

10/18/2010 10/31/2012 4174169.00

04/27/2009 11/15/2010 456682.00

05/13/2009 10/01/2011 4793808.00

09/03/2020 06/02/2025 599746.00

Page 24 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 1988021.00 0.00

0.00 493189.00 0.00

0.00 1165795.00 0.00

0.00 102354.34 262233.46

0.00 274676.71 17674.96

575914.00 2441199.00 0.00

0.00 84143.04 0.00

0.00 98387.47 0.00

0.00 250464.19 473535.81

0.00 3395387.00 0.00

0.00 310889.59 0.00

0.00 6191876.00 0.00

0.00 12144117.00 19373011.00

149982.00 4174169.00 0.00

0.00 456682.00 0.00

12453.00 4793754.00 54.00

0.00 81578.93 518167.07

Page 25 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

8 Y 2

9 Y 3

0 N 0

0 N 0

18 N 2

0 N 0

41 N 3

0 N 0

4 Y 2

49 N 0

6 N 0

2 N 0

5 N 0

11 N 0

8 Y 1

0 Y 0

Page 26 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

NJD Wiring & Electric, Inc.

Stilsing Electric, Inc.

Duncan & Cahill, Inc.

Ramboll Americas Engineering Solutions, Inc.

M.J. Engineering and Land Surveying, P.C.

USA General Contractor Corp.

Architecture +

Wank Adams Slavin Associates LLP

Hesnor Engineering Associates, PLLC

ACS System Associates, Inc.

M/E Engineering, P.C.

Summit Construction Services Group, Inc.

The Pike Company Inc

J. Hogan Refrigeration & Mechanical, Inc.

Bach Environmental, Inc.

Burgio and Campofelice, Inc.

Chiang O'Brien Architects

Page 27 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

213-08 99th Avenue

P.O.Box 27 555 South Street

11 Oakwood Avenue

333 West Washington St PO Box 4873

1533 Crescent Road

980 Dehart Place

297 River Street

740 Broadway

22 Computer Drive West

160 West Lincoln Avenue

Suite 320 60 Lakefront Boulevard

230 Ferris Avenue

One Circle Street

P.O. Box 67

11176 County Route 9

2570 Walden Avenue

Crescent Building 217 North Aurora Street

Page 28 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Queens Village NY 11429 USA

Rensselaer NY 12144 USA

Troy NY 12181 USA

Syracuse NY 13221 USA

Clifton Park NY 12065 USA

Elizabeth NJ 7207 USA

Troy NY 12180 USA

New York NY 10003 USA

Albany NY 12205 USA

Mount Vernon NY 10550 USA

Buffalo NY 14202 USA

White Plains NY 10603 USA

Rochester NY 14607 USA

Peru NY 12972 USA

Clayton NY 13624 USA

Cheektowaga NY 14225 USA

Ithaca NY 14850 USA

Page 29 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.74520140.714378)

196 1214 2137

POINT (-73.67898742.741041)

110 11 2138

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-74.22238740.658707)

2532

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.99300840.729896)

749 719 2095

POINT (-73.80771442.721269)

834 42 2030

POINT (-73.84303140.915138)

962 1329 2185

POINT (-73.77422641.043324)

949 1436 2185

POINT (-76.14752744.167628)

854 1511 2089

POINT (-78.74085942.908593)

298 160 2041

Page 30 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

141000 D006636

03X404 T005792

31X221 T005431

12X287 T005516

30XA95 T005661

21X197 T005491

081018 T006539

30XA99 T005727

141109 T006589

131059 D006612

35X116 T005407

07XA37 T005350

03X387 T006023

12X369 T006183

011005 T006097

15X448 T005074

10X349 T005756

Page 31 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Upgrade Electrical System UHB Active

CONSTR: Replace Roofs: Ketchum, Bacon and Donald Savage Buildings Closed

CONSTR: Renovate Bookstore/Student Services Area Campus Center Closed

CONSTR: Upgrade Laboratories --Stowell Hall Closed

DESIGN: Replace Fire Alarm Systems North Campus Active

DESIGN: New Academic Building Closed

CONSTR: Upgrade Lecture Center Mechanical System Active

DESIGN: Restoration of Site & Underground Utilities - North Campus Ph I Closed

DESIGN: Replace R-22 Air Handlin Units - Critical Care Units - UHB Active

CONSTR: Repair Facade - Melville Library and Staller Center Active

DESIGN: Rehab 3rd Flr/North Wing - McMahon Hall Closed

DESIGN: Rehab Domestic Water Distrib Systems Closed

CONSTR: Renovate Science Building - Bldg. 15, Phase II Closed

DESIGN: Renovate Timerman Hall Closed

DESIGN: Renovate Sub-Basement lecture Ctr South Closed

DESIGN: Rehab Labs and Vivarium Space Bldg 2 Closed

CONSTR: Replace Roof - Penfield Library Closed

Page 32 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 33 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/26/2021 09/03/2025 32304788.00

02/04/2011 12/31/2012 1850764.00

11/24/2008 12/16/2010 1746042.00

04/21/2009 08/15/2011 867123.00

07/20/2010 11/22/2022 4602583.63

04/27/2009 12/31/2018 3947818.62

01/31/2020 12/22/2022 9054712.00

10/08/2010 10/01/2015 718620.28

08/31/2021 09/14/2023 920698.22

01/27/2021 08/17/2023 2367258.00

07/21/2008 07/10/2013 404717.36

05/01/2009 10/01/2014 453714.92

08/20/2013 09/25/2016 21056327.00

11/12/2015 12/10/2020 808672.06

07/22/2014 05/21/2023 374768.00

10/31/2005 10/28/2010 701462.22

12/16/2010 04/11/2013 845883.00

Page 34 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2480644.00 29824144.00

0.00 1850764.00 0.00

83301.00 1746042.00 0.00

0.00 867123.00 0.00

476851.76 4380916.95 221666.68

873421.08 3947818.62 0.00

0.00 8782021.00 272691.00

117393.96 718620.28 0.00

0.00 0.00 920698.22

0.00 1079339.00 1287919.00

1208.07 404717.36 0.00

54693.90 453714.92 0.00

0.00 21056327.00 0.00

0.00 808672.06 0.00

0.00 411745.43 -36977.43

0.00 701462.22 0.00

58715.00 845883.00 0.00

Page 35 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 2

8 N 0

13 N 0

5 N 1

15 N 2

48 N 2

1 N 0

17 N 1

0 N 0

4 Y 1

5 N 0

0 N 0

5 N 0

20 N 1

0 N 0

5 N 0

8 N 2

Page 36 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JEMCO Electrical Contractors, Inc.

Rodems Construction Corp.

Stalco Construction Inc.

J.E. Sheehan Contracting Corp.

Ove Arup & Partners Consulting Engineers

Einhorn Yaffee Prescott Architecture & Engr, P.C.

Daniel O'Connell's Sons Inc.

Saratoga Associates

RMF Engineering, Inc., P.C.

Metropolitan Construction Corp.

The Hall Partnership Architects, LLP

Jacobs Civil Consultants, Inc.

L.P. Ciminelli Construction Inc.

Mach Architecture, P.C.

Hyman Hayes Assoc., LLC

Quinlivan,Pierik & Krause A/E DBA Qpk Design

W.J. Farley Roofing Corporation

Page 37 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

271 42nd Street

3555 North Buffalo Road

1316 Motor Parkway

208 Sissonville Road

77 Water Street

Nanofab East 257 Fuller Road 1st Floor

800 Kelly Way

443 Broadway

1A Pine West Plaza

349 Union Avenue

42 East 21st Street

Suite 0603 2 Penn Plaza

2421 Main Street

2000 Sheridan Drive

6 Wembley Court

450 South Salina Street P.O. Box 29

280 E. Main Street

Page 38 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11433 USA

Orchard Park NY 14127 USA

Islandia NY 11749 USA

Potsdam NY 13676 USA

New York NY 10005 USA

Albany NY 12203 USA

Holyoke MA 1040 USA

Saratoga Springs NY 12866 USA

Albany NY 12205 USA

Westbury NY 11590 USA

New York NY 10010 USA

New York NY 10121 USA

Buffalo NY 14214 USA

Tonawanda NY 14223 USA

Albany NY 12205 USA

Syracuse NY 13201 USA

Gouverneur NY 13642 USA

Page 39 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01047940.652508)

894 815 2090

POINT (-78.75002942.787061)

282 956 2041

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-75.00240344.691026)

312 1597 2140

POINT (-74.00844440.704434)

749 721 2095

POINT (-72.65226442.164952)

1913

POINT (-73.78511343.082412)

994 147 2141

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.58532440.753776)

60 997 2094

POINT (-73.98829240.739319)

749 734 2095

POINT (-78.84411242.93462)

300 70 2041

POINT (-78.85968342.980965)

278 158 2041

POINT (-73.84467942.740546)

834 42 2030

POINT (-76.15225243.045606)

687 711 2132

POINT (-75.458562 330 1525 2140

Page 40 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08X471 T005595

09X332 D005530

30XA56 T005265

211031 T006360A

34X102 T005349

341000 T006308

01XA94 T006331

261017 T006333

261032 T006365

14X7A6 T005402

28X425 T005441

07XA47 T005348

05X339 T005918

30XB05 T006298

15XA07 T0F5593

391014 T006372

Page 41 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Library Renovation Sojourner Truth Library Closed

CONSTR: Upgrade Elevators - Hunt Union And Science II Closed

DESIGN: New Engineering Building - Phase I Closed

DESIGN: Repair Stone Facade and Masonry at Fort Schuyler Active

DESIGN: Replace Fire Alarms - Barton Lab Closed

CONSTR: Rehab Agricultural Research Pilot Plant Closed

CONSTR: Renovate Lecture Center Closed

DESIGN: Construct Infrastructure Transportation & Security Center (2020) Closed

DESIGN: Steam Distribution Systems Conditions Assessment Closed

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: South Campus Underground Utilities Phase II Closed

DESIGN: Rehab Science III Basment Closed

CONSTR: Exterior Rehabilitation LoGrasso Hall Closed

CONSTR: Replace Roof - Center For the Arts (CFA) Closed

DESIGN: IHP Expansion Closed

DESIGN: Reconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian Bridge Active

Page 42 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 43 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/23/2009 09/08/2017 1895044.92

04/17/2009 10/30/2010 262793.00

05/24/2007 12/15/2013 3785578.28

05/09/2019 11/09/2025 359886.62

12/04/2008 04/18/2017 127454.20

02/17/2017 12/31/2019 9738726.00

05/25/2017 06/21/2019 2036056.00

06/02/2017 08/08/2022 61466.49

09/05/2018 07/12/2021 290054.76

06/02/2008 01/21/2014 103143.00

02/11/2009 07/31/2015 908435.72

06/18/2010 05/14/2015 787350.60

01/13/2012 12/07/2013 1569737.00

01/06/2017 09/13/2018 2269213.00

01/06/2010 12/05/2014 4329341.03

11/15/2018 04/28/2029 517527.80

Page 44 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

314632.63 1895044.92 0.00

0.00 262793.00 0.00

0.00 3785578.28 0.00

0.00 205066.50 154820.12

1045.10 127454.20 0.00

0.00 9738726.00 0.00

0.00 2036056.00 0.00

0.00 61466.49 0.00

0.00 290054.76 0.00

103143.00 103143.00 0.00

169511.86 908435.72 0.00

118391.25 787350.60 0.00

1043395.00 1569737.00 0.00

0.00 2269213.00 0.00

654127.70 4329341.03 0.00

0.00 311096.45 206431.35

Page 45 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40 N 3

2 N 0

5 N 0

0 N 0

0 N 0

6 N 0

4 N 0

12 N 2

0 N 0

0 N 0

17 N 0

0 N 0

7 N 0

3 N 0

0 N 0

0 N 0

Page 46 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ayers Saint Gross Architects

Thyssen Krupp Elevator Corporation

Perkins & Will Architects P.C.

Mosaic Associates Architects, DPC

M/E Engineering, P.C.

Welliver McGuire, Inc.

Bunkoff General Contractors, Inc.

Richard McElhiney Architect, LLC

Lizardos Engineering Associates P.C.

JEMCO Electrical Contractors, Inc.

Hunt Engineers, Archs., & Landsurveyors, PC

Architectural Resources, P.C.

Resetarits Construction

Elmer W. Davis,Inc.

Goody Clancy Architecture LLC

C & S Engineers, Inc.

Page 47 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 100 1040 Hull Street

6067 Corporate Drive

4th Floor 215 Park Avenue South

2 Third Street Suite 440

300 Trolley Boulevard

250 North Genesee Street

790 Watervliet Shaker Rd.

347 West 36 Street Suite 1501

200 Old Country Road Suite 670

271 42nd Street

Airport Corporate Park 100 Hunt Center

505 Franklin Street

1115 Delaware Avenue

1217 Clifford Avenue

420 Boylston Street

499 Col. Eileen Collins Blvd.

Page 48 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Baltimore MD 21230 USA

East Syracuse NY 13057 USA

New York NY 10003 USA

Troy NY 12180 USA

Rochester NY 14606 USA

Montour Falls NY 14865 USA

Latham NY 12110 USA

New York NY 20029 USA

Mineola NY 11501 USA

Brooklyn NY 11433 USA

Horseheads NY 14845 USA

Buffalo NY 14202 USA

Buffalo NY 14209 USA

Rochester NY 14621 USA

Boston MA 2116 USA

Syracuse NY 13212 USA

Page 49 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

44.338286)

POINT (-76.08756543.104073)

702 426 2132

POINT (-73.69002842.732277)

110 11 2138

POINT (-77.68189143.171416)

549 1664 2093

POINT (-76.85309342.348955)

644 53 2143

POINT (-73.7967442.739147)

834 1288 2030

POINT (-73.99447740.7543)

749 741 2095

POINT (-73.63875140.739038)

62 1265 2094

POINT (-74.01047940.652508)

894 815 2090

POINT (-78.87207542.900014)

300 33 2041

POINT (-78.86950342.914257)

300 65 2041

POINT (-77.5906543.175451)

537 1663 2093

POINT (-71.07265142.351364)

1918

POINT (-76.13224343.113906)

690 730 2132

Page 50 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X397 T005787

06X362 T006098

13XB35 T004617

02X408 T005835

16X281 T005417

081034 T006352

151085 T006354

08X7A4 T005395

101031 T006356

31X822 T005049

13XC94 T005376

40X812 T005662

26X293 T005880

231042 T006673

02X340 D005301

401010 T006321

09X354 T005351

Page 51 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: University Police Department-Relocation Closed

DESIGN: Construct New Storage Building at Moench Track Closed

DESIGN: Rehab for ADA, Various Bldgs., Phase I Closed

DESIGN: Replace Windows/Rehab Exterior- Allen Administration Building Closed

DESIGN: Building Commissioning - Stocking Hall Closed

DESIGN: Repair Replace Facade, Fine Arts Building Active

DESIGN: Renovate Heart & Vascular Center - UH 6th fl. Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Update Facilities Master Plan - Oswego Closed

DESIGN: CM For Academ Village Rehabs, Paving & Signage Projects Closed

DESIGN: Re-Roof Life Sciences Building Closed

DESIGN: Empire State College Facilities Master Plan Closed

CONSTR: Locker Room Renovations - Nold Hall Closed

DESIGN: Replace HVAC - French Hall Active

CONSTR: Abate Asbestos/Remove Equipment/Refinish Heating Plant - Bldg 34 Closed

DESIGN: Rehab Interior & Replace Lighting 111 West Closed

DESIGN: Rehab Showers/Locker Rooms/ADA Modifications, - Chase PE Building Closed

Page 52 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 53 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/07/2011 07/02/2013 3425705.00

12/28/2016 11/03/2021 35191.69

10/16/2000 05/02/2009 145935.38

09/27/2012 05/05/2019 71529.72

09/26/2008 09/30/2016 430444.46

04/23/2018 11/01/2026 576000.00

01/14/2019 09/18/2027 1310373.25

04/15/2008 09/30/2014 212634.00

08/09/2018 02/06/2027 131627.31

06/09/2006 09/30/2008 241245.97

05/28/2008 02/06/2017 137744.65

07/22/2010 01/20/2012 384814.69

11/04/2011 08/16/2014 16389596.00

12/07/2021 10/24/2024 80051.60

07/16/2007 06/30/2010 2730461.00

03/29/2017 06/09/2022 93120.38

02/08/2010 12/31/2017 206470.86

Page 54 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

407395.00 3425705.00 0.00

0.00 35191.69 0.00

0.00 127845.38 18090.00

11635.45 71529.72 0.00

88086.54 429594.77 849.69

0.00 245282.06 330717.94

0.00 955826.55 354546.70

0.00 212634.00 0.00

0.00 131627.31 0.00

0.00 213953.09 27292.88

0.00 137744.65 0.00

0.00 384814.69 0.00

7181863.00 16389596.00 0.00

0.00 0.00 80051.60

0.00 2730461.00 0.00

0.00 93120.38 0.00

4593.86 206470.86 0.00

Page 55 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

17 N 0

0 N 0

5 N 0

0 N 0

4 N 1

0 N 0

0 N 0

0 Y 0

0 Y 0

0 N 0

0 N 0

21 Y 2

23 N 0

0 N 0

3 N 1

0 Y 0

0 N 0

Page 56 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

A.P. Construction

Kideney Architects, P.C.

Abramovitz-Kingsland- Schiff, P.C.

Bell & Spina Architects-Planners, P.C.

Horizon Engineering Associates, LLP

Bell & Spina Architects-Planners, P.C.

HBT Architects

Cutting Edge Group, LLC

JMZ Architects & Planners PC

Jacobs Facilities, Inc.

San Fanandre Justin Architects P.C.

JMZ Architects & Planners PC

GII Construction Co., Inc

Genesys Engineering, P.C.

Frank J. Marianacci, Inc.

JMZ Architects & Planners PC

Architecture +

Page 57 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

707 Summers Street

143 Genesee Street

P.H. Floor 45 West 34th Street

Suite 201, The Bindery 215 Wyoming Street

800 Veterans Memorial Highway, Suite 310

Suite 201, The Bindery 215 Wyoming Street

2 Elton Street

14 Walkup Cutoff Road P.O. Box 733

190 Glen Street P. O. Box 725

260 Madison Avenue Floor 12

2nd Floor 200 Sunrise Highway

190 Glen Street P. O. Box 725

3391 Merrick Road

38 Maiden Lane

6905 Route 5 & 20

190 Glen Street P. O. Box 725

297 River Street

Page 58 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Stamford CT 6901 USA

Buffalo NY 14203 USA

New York NY 10001 USA

Syracuse NY 13204 USA

Hauppauge NY 11788 USA

Syracuse NY 13204 USA

Rochester NY 14118 USA

Lake George NY 12845 USA

Glens Falls NY 12801 USA

New York NY 10016 USA

Rockville Centre NY 11570 USA

Glens Falls NY 12801 USA

Wantagh NY 11793 USA

Kingston NY 12401 USA

Bloomfield NY 14469 USA

Glens Falls NY 12801 USA

Troy NY 12180 USA

Page 59 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.54014341.058086)

1040

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.20607540.821625)

1019 1428 2179

POINT (-77.58011543.154897)

537 1665 2093

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.98092640.750541)

749 739 2095

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.50522740.664901)

62 1424 2094

POINT (-74.01451641.931949)

425 79 2182

POINT (-77.4107942.884786)

811 239 2133

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.69016242.73246)

110 11 2138

Page 60 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X407 T005577

211026 T006356

311031 T006358

03X368 T005624

041011 T006362

141058 T006359

25X281 T004924

371007 T006681

241024 T006360A

30X492 T005230

271008 T006105

13XB69 T005753

231032 T006368

23X206 T005913

051010 D006616

26X277 T005111

32X468 T006009

Page 61 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade Water Lines & Metering - Various Buildings Closed

DESIGN: Renovate Vander Clute Hall & Heritage Hall for Student Union Active

DESIGN: Replace Roof - Student Union Building Active

DESIGN: Commissioning - Rehab Rockwell Hall 2nd Floor Closed

DESIGN: Upgrade Site Lighting - Campus wide Active

DESIGN: Demolish Admin Trailers Active

DESIGN: Replace Roof Thurston Hall, Bldg. 03 Closed

DESIGN: Legal Services to Support Design-Build Project Delivery Active

DESIGN: Upgrade Facilities Complex Active

DESIGN: Rehabilitate Elevators - Various Buildings Closed

DESIGN: Replace Direct Burial MTHW and Domestic Water Lines, Greenhouse to Library Closed

CONSTR: Rehab Old Chem Classroom Bldg #02 Closed

DESIGN: Replace Switchgear and Electrical Panels - Wicks and MacArthur Halls Active

DESIGN: Campus Wide Site Utilities Survey Closed

CONSTR: Rehabilitate Plaza Maytum/Reed/McEwen Active

DESIGN: Replace Roof, Nold Hall Assigned to Vendor

DESIGN: CM MART New Beds & Support Tower Closed

Page 62 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 63 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/09/2012 02/03/2018 270534.69

08/09/2018 02/06/2027 1455315.00

09/22/2020 02/01/2026 754000.00

07/27/2010 10/31/2018 77588.46

11/01/2017 01/24/2026 1011000.00

03/28/2018 12/02/2025 150882.00

01/27/2006 04/30/2009 41108.58

10/08/2021 11/22/2026 500000.00

11/13/2017 11/09/2025 404586.88

02/23/2007 11/11/2012 492357.59

05/25/2016 09/12/2020 68422.50

11/15/2010 12/01/2014 24723904.00

04/23/2019 09/28/2026 275400.06

02/17/2012 02/24/2017 807278.64

02/26/2021 12/19/2023 4395000.00

01/31/2006 07/02/2014 140345.57

01/17/2013 06/21/2018 4922684.38

Page 64 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

53614.51 270534.69 0.00

0.00 897872.08 557442.92

0.00 127090.02 626909.98

21124.58 77588.46 0.00

0.00 660055.39 350944.61

0.00 118036.98 32845.02

0.00 41108.58 0.00

0.00 0.00 500000.00

0.00 247879.34 156707.54

5598.77 492357.59 0.00

0.00 68422.50 0.00

11156461.00 24723904.00 0.00

0.00 126756.32 148643.74

698912.74 807278.64 0.00

0.00 1599474.00 2795526.00

0.00 140345.57 0.00

0.00 4922684.38 0.00

Page 65 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 Y 0

0 N 0

0 N 0

0 N 0

0 N 0

0 N 0

0 N 0

0 N 0

5 N 0

0 N 0

10 N 0

0 Y 0

18 N 1

1 N 0

5 N 0

17 N 0

Page 66 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

C & S Engineers, Inc.

JMZ Architects & Planners PC

Lacey Thaler Reilly Wilson Arch &Preservation

Bergmann Associates, Inc.

C & S Engineers, Inc.

Lothrop Associates LLP Architects

Collins & Scoville Architects, P.C.

Venable LLP

Mosaic Associates Architects, DPC

Bergmann Associates, Inc.

Hunt Engineers, Archs., & Landsurveyors, PC

J. Kokolakis Contracting, Inc

Pathfinder Engineers & Architects LLP

C.T. Male Associates, P.C

Savarino Companies LLC

Ward Associates, P.C.

LiRo/Structure Tone JV

Page 67 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

499 Col. Eileen Collins Blvd.

190 Glen Street P. O. Box 725

4th Floor 79 North Pearl Street

28 East Main Street 200 First Federal Plaza

499 Col. Eileen Collins Blvd.

333 Westchester Avenue

40 Beaver Street

1270 Ave of the Americas 24th Floor

2 Third Street Suite 440

28 East Main Street 200 First Federal Plaza

Airport Corporate Park 100 Hunt Center

Suite A 1500 Ocean Avenue

134 South Fitzhugh Street

50 Century Hill Drive

500 Seneca Street

1500 Lakeland Avenue

3 Aerial Way

Page 68 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13212 USA

Glens Falls NY 12801 USA

Albany NY 12208 USA

Rochester NY 14614 USA

Syracuse NY 13212 USA

White Plains NY 10604 USA

Albany NY 12207 USA

New York NY 10020 USA

Troy NY 12180 USA

Rochester NY 14614 USA

Horseheads NY 14845 USA

Bohemia NY 11716 USA

Rochester NY 14608 USA

Latham NY 12110 USA

Buffalo NY 14204 USA

Bohemia NY 11716 USA

Syosset NY 11791 USA

Page 69 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.6447743.309981)

824 783 2183

POINT (-77.61117743.156034)

537 1673 2093

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.74502841.030178)

949 1437 2185

POINT (-73.75257842.648466)

814 44 2030

POINT (-73.98020940.760208)

749 742 2095

POINT (-73.69002842.732277)

110 11 2138

POINT (-77.61117743.156034)

537 1673 2093

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.75974442.773945)

834 1288 2030

POINT (-78.8572442.877333)

300 61 2041

POINT (-73.110840.780494)

1019 1073 2179

POINT (-73.51801540.800801)

59 1431 2094

Page 70 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X7A3 T005395

141077 T006411

261001 T006100

36X110 T005355

011007 T006103

29X266 T004180

121013 T006554

15XA36 T005349

07XA14 T005222

02X343 D005268

401002 T006466

03X396 T005637

26X291 T005704

40X034 T005364

14XB18 T006052

061061 T006581

20X206 T005579

Page 71 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace BSB Chiller Active

DESIGN: Renovate Knapp Hall, Phase I Closed

DESIGN: Plaza Building Boiler Replacement Ph 2 Suspended

DESIGN: Decommission Former Data Center Bldg 56 Closed

DESIGN: Rehab of Library for Academic Support Space and Technology Closed

CONSTR: Construct Addition, Renovate Bishop Hall., Bldg. No. 009C Active

DESIGN: Upgrade Electrical Service Closed

DESIGN: Science III/IV Addition - Construction Manager Closed

CONSTR: Replace Roof - Drake Memorial Library Closed

CONSTR: Renovate 3 Union Avenue Active

CONSTR: Exterior Restoration - Campus House Closed

CONSTR: Replace Various Roofs, Phase II Closed

DESIGN: Rehabilitate Elevator 1 Union Avenue Closed

CONSTR: Trad & Alt Energy Sources Closed

DESIGN: Replace Roofs - Fraser Hall & Lauderdale Health Center Active

CONSTR: Parking & Site Modifications, Gateway Building Closed

Page 72 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 73 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/15/2008 09/30/2014 88550.00

03/07/2019 06/06/2024 584077.00

08/11/2015 02/05/2024 261797.95

12/17/2008 06/12/2020 84305.25

10/10/2015 01/01/2023 70105.17

02/25/1999 01/07/2014 846448.83

04/10/2020 08/08/2023 21532625.00

09/14/2010 04/18/2017 144983.87

03/14/2007 03/11/2012 1441280.67

04/25/2007 04/23/2008 2572208.00

11/01/2018 12/05/2020 2366764.00

12/22/2009 09/03/2011 250006.00

07/16/2010 06/15/2013 1038682.00

10/08/2010 07/16/2014 29267.96

02/26/2014 07/12/2015 6000000.00

05/27/2021 09/14/2023 288000.00

10/07/2009 08/15/2011 2525274.00

Page 74 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 88550.00 0.00

0.00 92749.47 491327.53

0.00 261797.95 0.00

0.00 84305.25 0.00

0.00 70105.17 0.00

0.00 846448.83 0.00

0.00 15174649.00 6357976.00

63776.93 144983.87 0.00

25948.34 1441280.67 0.00

0.00 2572208.00 0.00

0.00 2323825.00 42939.00

13693.00 250006.00 0.00

49865.00 1038682.00 0.00

2428.15 29004.74 263.22

0.00 0.00 6000000.00

0.00 10566.90 277433.10

0.00 2525274.00 0.00

Page 75 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

0 N 0

0 N 0

0 N 0

0 N 0

5 N 1

0 N 0

0 N 0

4 N 0

4 N 0

3 N 1

8 N 0

13 N 0

0 N 0

0 N 0

0 Y 0

2 N 0

Page 76 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

Jacobs Project Management Co.

Peter Gisolfi Associates

C & S Engineers, Inc.

IBC Engineering, Pc

Kevin Hom Architects, P.C

Northland Associates, Incorporated

M/E Engineering, P.C.

Gilbane Construction Company

Ssm & Rc, Inc. DBA Spring Sheet Metal & Roofing Co.

The VMJR Companies, LLC

Grove Roofing Services, Inc.

BBR Contracting Corp.

Syska Hennessy Group, Inc

The Research Foundation for SUNY

Dwyer Architectural, LLC

The Delaney Group, Inc.

Page 77 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

Suite 0603 Two Penn Plaza

566 Warburton Avenue

499 Col. Eileen Collins Blvd.

Suite 219 3445 Winton Place

16th Floor 15 West 37th Street

4701 Buckley Road P.O. Box 2549

300 Trolley Boulevard

Suite 300 3150 Brunswick Pike

678 S. Clinton Avenue

73 Mohican Street P. O. Box 518

131 Reading Street

163 22nd Street

14th Floor 1515 Broadway

PO Box 9

120 E. Washington Street Ste 822

2736 State Hwy 30

Page 78 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

New York NY 10121 USA

Hastings-On-Hudson NY 10706 USA

Syracuse NY 13212 USA

Rochester NY 14623 USA

New York NY 10018 USA

Liverpool NY 13220 USA

Rochester NY 14606 USA

Lawrenceville NJ 8648 USA

Rochester NY 14620 USA

Glens Falls NY 12801 USA

Buffalo NY 14220 USA

Brooklyn NY 11232 USA

New York NY 10038 USA

Albany NY 12201 USA

Syracuse NY 13202 USA

Gloversville NY 12078 USA

Page 79 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.800801)

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.8821840.995664)

974 1445 2185

POINT (-76.13224343.113906)

690 730 2132

POINT (-77.68189143.171416)

549 1664 2093

POINT (-77.6006243.144098)

537 1679 2093

POINT (-73.64747843.304633)

824 783 2183

POINT (-78.82783142.840927)

300 109 2041

POINT (-73.99685440.662507)

894 815 2090

POINT (-76.15124743.049565)

687 711 2132

POINT (-74.27664443.092508)

382 1291 2085

Page 80 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

121033 T006673

07X839 T005593

09X322 T005608

081013 T006287

35X100 T004934

301014 T006423

25X290 T006201

091026 D006686

28X432 T005777

03X824 T005293

09X345 T005818

21X164 T005379

031046 T006354

091002 T006103

241010 T006386

141011 T006438

11X348 T006029

Page 81 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Carson Hall, Construct Two Elevators Active

DESIGN: Facilities Master Plan Closed

CONSTR: Replace HVAC/Domestic Hot Water Equipment, Instructional Resource Center Closed

DESIGN: Exterior Rehab Various Buildings Assigned to Vendor

DESIGN: Install Heat Recovery System BINNS-MERRILL HALL Closed

CONSTR: Replace Electrical Service - Cooke and Hochstetter Closed

CONSTR: Site Utilities Study and Infrastructure Improvement Project Closed

CONSTR: Replace Windows and Roof - Netzer Admin & Morris Complex Active

DESIGN: Crosby Hall Building Wide Restoration Closed

DESIGN: Program Study For New Athletic Stadium Closed

CONSTR: Upgrade Central Heating Plant - Phase III Closed

DESIGN: Replace Campus Steam Distribution Assigned to Vendor

DESIGN: Campus Space & Classroom Utilization Study Active

DESIGN: Rehabilitate Mechanical Systems - Morris Hall Closed

CONSTR: Renovate Bouck Theater, Gym and Lobby Closed

DESIGN: Renovate Pharmacy UHB Basement Closed

DESIGN: Renovate Sibley Hall Phase 1 Closed

Page 82 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 83 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/07/2021 10/24/2024 52538.40

12/15/2009 06/09/2011 1404858.28

12/18/2009 08/12/2012 1453262.00

11/28/2016 01/16/2022 384774.59

02/24/2006 11/28/2011 -7500.00

04/24/2018 08/02/2020 3839477.00

11/25/2015 09/15/2018 3630887.00

11/15/2021 09/04/2023 831754.00

02/24/2011 07/30/2019 1220487.28

08/01/2007 01/26/2009 301087.11

04/11/2011 11/14/2013 3781650.00

04/24/2008 03/31/2016 512990.41

02/11/2019 09/18/2027 195520.00

08/22/2016 01/01/2023 149072.13

11/20/2017 01/11/2020 4504835.00

07/03/2019 10/20/2027 260.00

11/04/2013 11/06/2018 935043.95

Page 84 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 0.00 52538.40

7256.73 1404858.28 0.00

102339.00 1453262.00 0.00

0.00 384774.59 0.00

14887.84 253266.56 -260766.56

0.00 3839477.00 0.00

0.00 3630887.00 0.00

0.00 0.00 831754.00

197785.59 1220487.28 0.00

0.00 301087.11 0.00

1310895.00 3781650.00 0.00

34871.83 512990.41 0.00

0.00 153681.83 41838.17

0.00 149072.13 0.00

0.00 4504835.00 0.00

0.00 260.00 0.00

0.00 935043.95 0.00

Page 85 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24 N 3

35 N 0

5 N 0

20 N 2

0 N 0

3 N 0

4 N 0

2 N 0

32 N 1

4 N 0

4 N 0

5 N 1

0 N 0

0 N 0

3 Y 1

0 N 0

32 Y 3

Page 86 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Genesys Engineering, P.C.

Perkins & Will Architects P.C.

Andrew R. Mancini Associates Inc.

Mosaic Associates Architects

R.P. Morrow Associates, P.C.

Ferguson Electric Construction Co., Inc.

Nelcorp Electrical Contracting Corporation

Eastman Associates, Inc.

Chaintreuil Jensen Stark Architects, LLP

CHA Consulting, Inc

All State Boiler & Construction, Inc.

Schuyler Engineering, P.C.

HBT Architects

IBC Engineering, Pc

Hoosick Valley Contractors, Inc.

Genesys Engineering, P.C.

JMZ Architects & Planners PC

Page 87 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

38 Maiden Lane

4th Floor 215 Park Avenue South

129 Odell Avenue

The Frear Building 2 Third Street, Suite 440

56 Dana Road

333 Ellicott St.

35 North Kelly Avenue

6 Railroad Avenue PO Box 810

755 Seneca St

3 Winners Circle P.O. Box 5269

449 Cooke Street

Suite 6 163 North Wellwood Avenue

2 Elton Street

Suite 219 3445 Winton Place

52 Melrose Valley Falls Road

38 Maiden Lane

190 Glen Street P. O. Box 725

Page 88 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Kingston NY 12401 USA

New York NY 10003 USA

Endicott NY 13760 USA

Troy NY 12180 USA

Buffalo NY 14216 USA

Buffalo NY 14203 USA

Endwell NY 13760 USA

Oneonta NY 13820 USA

Buffalo NY 14210 USA

Albany NY 12205 USA

Farmington CT 6034 USA

Lindenhurst NY 11757 USA

Rochester NY 14118 USA

Rochester NY 14623 USA

Melrose NY 12121 USA

Kingston NY 12401 USA

Glens Falls NY 12801 USA

Page 89 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.04917542.110866)

938 388 2033

POINT (-78.86890242.938021)

300 105 2041

POINT (-78.87134442.887775)

300 34 2041

POINT (-76.02526642.109078)

938 388 2033

POINT (-75.04886342.453988)

903 447 2136

POINT (-78.84892142.876151)

300 66 2041

POINT (-73.79798342.719854)

834 42 2030

POINT (-72.84438341.693111)

1041

POINT (-77.58011543.154897)

537 1665 2093

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.6447743.309981)

824 783 2183

Page 90 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15X412 T005161

251001 T006263

251009 T006097

011008 T006503

291014 T006524

141090 T006371

29X7A7 T005402

23X213 T005577

28X360 T005513

26X325 T006164

06X318 T005615

06X318 T005394

01XA51 T005706

281007 T006437

14XB08 T005892

29X402 T005871

21X165 T005461

Page 91 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: University Hospital Vertical Expansion Core/Shell Closed

CONSTR: Replace Fire Alarms - Various Buildings Closed

DESIGN: Upgrade Cooking Labs MacDonald Hall Closed

CONSTR: Rehab Toilet Rooms for ADA - Hawley, Draper, Milne, Richardson & Fine Arts Active

CONSTR: Rehab HTHW System Phase 2 Active

DESIGN: Replace Diesel Fuel Tanks #8 & #9 Active

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Rehab/Replace Pedestrian Foot Bridge Closed

CONSTR: Cary Farber Sherman - Replace/Repair Mechanical/Electrical/Plumbing Systems Closed

DESIGN: Construct School of Applied Social Sciences Active

CONSTR: Replace Campus Main Electrical Switchgear - Service Bldg. No. 17 Closed

DESIGN: Replace Campus Main Electrical Switchgear - Service Bldg. No. 17 Closed

CONSTR: New Business School/Parking & Site Work Closed

DESIGN: Renovate Crosby Hall Active

DESIGN: Replace Existing Admin Complex Closed

DESIGN: 29847 CM - Center for Integrated Tech learning Closed

DESIGN: Rehab/Upgrade HVAC Systems Various Bldgs Active

Page 92 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 93 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/21/2006 10/31/2011 40919879.00

06/22/2016 01/20/2018 223826.00

12/09/2015 05/21/2023 59871.20

04/30/2019 05/18/2022 3359477.00

09/12/2019 01/05/2022 2709000.00

08/04/2020 06/17/2025 524000.00

06/02/2008 01/21/2014 98260.00

11/16/2010 02/03/2018 138885.32

04/23/2009 06/15/2013 3991058.00

08/10/2015 03/25/2026 3232000.00

12/04/2009 06/30/2012 709304.00

05/28/2008 05/12/2013 72510.71

07/07/2010 10/15/2012 3553913.00

01/11/2021 10/25/2027 58338.20

02/13/2012 02/16/2017 155478.57

10/20/2014 07/30/2021 1349884.00

02/23/2009 12/31/2016 784000.00

Page 94 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 40919879.00 0.00

0.00 223826.00 0.00

0.00 59871.20 0.00

0.00 3162959.00 196518.00

0.00 2634730.00 74270.00

0.00 132185.08 391814.92

82371.00 98260.00 0.00

34800.78 138885.32 0.00

132038.00 3991058.00 0.00

0.00 2462554.00 769446.00

7308.00 709304.00 0.00

0.00 72510.71 0.00

178873.00 3553913.00 0.00

0.00 5230.00 53108.20

118055.82 155478.57 0.00

0.00 1985741.22 -635857.22

70390.57 713338.76 70661.24

Page 95 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2 N 0

6 N 0

0 N 0

4 N 0

3 N 1

0 N 0

0 N 0

0 N 0

6 N 1

26 N 2

8 N 0

5 Y 1

10 N 1

33 N 4

37 N 5

49 N 2

12 N 1

Page 96 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

LeChase Construction Services, LLC

Total Facility Solutions Inc.

Hyman Hayes Assoc., LLC

Wainschaf Associates, Inc.

All State Boiler & Construction, Inc.

Ramboll Americas Engineering Solutions, Inc.

JEMCO Electrical Contractors, Inc.

C & S Engineers, Inc.

D.V. Brown & Associates, Inc.

Urbahn Architects PLLC

O'Connell Electric Co.

Pathfinder Engineers & Architects LLP

DelSignore Blacktop Paving, Inc.

C.J. Brown Energy & Engineering, P.C.

Murphy Burnham & Buttrick Architects

Hill International, Inc

Gannett Fleming Engineers & Architects / PC

Page 97 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

205 Indigo Creek Drive

20 Teck Trail, Suite 202

6 Wembley Court

589 Third Avenue Ext

449 Cooke Street

333 West Washington St PO Box 4873

271 42nd Street

499 Col. Eileen Collins Blvd.

567 Vickers Street

49 West 37th Street 6th Floor

830 Phillips Road

134 South Fitzhugh Street

42 Brick Church Road

Suite 204 4245 Union Road

14th Floor 48 West 37th Street

Suite 3415 One Penn Plaza

PO Box 829160

Page 98 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14626 USA

Malta NY 12020 USA

Albany NY 12205 USA

Rensselaer NY 12144 USA

Farmington CT 6034 USA

Syracuse NY 13221 USA

Brooklyn NY 11433 USA

Syracuse NY 13212 USA

Tonawanda NY 14150 USA

New York NY 10018 USA

Victor NY 14564 USA

Rochester NY 14608 USA

Troy NY 12180 USA

Buffalo NY 14225 USA

New York NY 10018 USA

New York NY 10119 USA

Philadelphia PA 19182 USA

Page 99 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.69216343.184897)

548 1685 2093

POINT (-73.76415542.964939)

1001 1148 2141

POINT (-73.84467942.740546)

834 42 2030

POINT (-73.70317642.644169)

129 1309 2138

POINT (-72.84438341.693111)

1041

POINT (-76.15589443.049616)

687 711 2132

POINT (-74.01047940.652508)

894 815 2090

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.85471943.01223)

280 8 2041

POINT (-73.98564540.751377)

749 741 2095

POINT (-77.45589942.99842)

799 413 2133

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.57492242.751533)

130 11 2138

Page 100 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

081058 T006587

36X126 T006171

08X438 T005956

02X367 T005487

29X337 T004949

311004 T006102

07XA84 T006094

80X700 T006570

151119 T006354

36X079 T004925

111024 T006428

09X382 T005365

20X232 T006108

41X056 T006153

311008 D006638

07XA41 T005606

Page 101 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade Elevators Campus Wide Active

CONSTR: Rehab Plaza Garage Deck - Priority 1 and 2 Repairs Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Replace Roof - Cooper Hall Closed

DESIGN: Site / Civil Repair ( near Campus Cntr South) Closed

DESIGN: Replace Electrical Substation 45 Active

DESIGN: Construct School of Pharmacy Closed

DESIGN: Job Order Contract (JOC) Consultant Active

DESIGN: Replace Canopy at ED Entrance - University Hospital Active

DESIGN: Upgrade Elevators - State University Plaza Closed

CONSTR: Replace HTHW Lines from Heating Plant to Manholes 12A&B Closed

DESIGN: Replace Windows - Hulbert Hall Closed

DESIGN: Rehab Skylights, Roof - Bray Hall and Moon Library Closed

DESIGN: Rehab Building Systems Bid Pkg 07 Closed

CONSTR: Replace Electrical Switchgear and AHU's - Campus Center Active

DESIGN: Commissioning Services- OConnor, Johnson Closed

Page 102 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 103 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/18/2021 09/14/2023 1051000.00

07/21/2015 01/06/2017 348104.00

04/18/2012 11/20/2018 43863.00

03/20/2009 10/31/2011 2441220.00

04/11/2007 12/31/2013 245258.74

11/20/2015 07/10/2023 216755.00

09/19/2014 10/16/2019 4264649.31

06/22/2020 07/01/2025 1500000.00

09/18/2020 09/18/2027 560000.00

01/03/2007 02/28/2012 118542.13

05/04/2018 09/09/2019 560139.00

01/18/2011 04/14/2017 170914.16

04/22/2015 08/18/2021 221137.93

10/15/2015 02/07/2022 505762.56

04/30/2021 08/12/2024 4125000.00

06/29/2012 07/23/2021 90266.53

Page 104 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 98450.94 952549.06

0.00 348104.00 0.00

0.00 43863.00 0.00

13475.00 2441220.00 0.00

35914.46 245258.74 0.00

0.00 166181.31 50573.69

0.00 4264649.31 0.00

0.00 181917.57 1318082.43

0.00 166549.86 393450.14

0.00 110981.43 7560.70

0.00 560139.00 0.00

46143.86 170914.16 0.00

0.00 221137.93 0.00

0.00 505762.68 -0.12

0.00 0.00 4125000.00

1468.30 90266.53 0.00

Page 105 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

6 N 1

0 Y 0

4 N 0

0 N 0

0 N 0

20 N 1

0 N 0

0 N 0

0 N 0

2 N 0

0 N 0

0 N 0

12 Y 1

5 N 0

0 N 0

Page 106 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

DeBrino Caulking Associates, Inc.

Cutting Edge Group, LLC

Ssm & Rc, Inc. DBA Spring Sheet Metal & Roofing Co.

Hoffmann Architects, Inc.

Labella Associates, D.P.C

S/L/A/M/ Architects & Engineers P.C.

The Gordian Group, Inc

HBT Architects

Architecture +

Steven E. Fuller Excavating

Architecture +

Architecture +

Velez Organization

Global Electrical Contr'g of Westchester, Inc.

Genesys Engineering, P.C.

Page 107 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

307 Seventh Avenue Suite 1501

1304 Route 9

14 Walkup Cutoff Road P.O. Box 733

678 S. Clinton Avenue

462 Seventh Avenue

Suite 201 300 State Street

80 Glastonbury Blvd.

30 Patewood Drive Bldg 2, Suite 350

2 Elton Street

297 River Street

8 Chesterfield Street P.O. Box 386

297 River Street

297 River Street

61 Broadway, Suite 1915

965 Nepperham Avenue

38 Maiden Lane

Page 108 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10001 USA

Castleton NY 12033 USA

Lake George NY 12845 USA

Rochester NY 14620 USA

New York NY 10018 USA

Rochester NY 14614 USA

Glastonbury CT 6033 USA

Greenville SC 29615 USA

Rochester NY 14118 USA

Troy NY 12180 USA

Keeseville NY 12944 USA

Troy NY 12180 USA

Troy NY 12180 USA

New York NY 10006 USA

Yonkers NY 10703 USA

Kingston NY 12401 USA

Page 109 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.99353640.746986)

749 717 2095

POINT (-73.67736542.511887)

112 1158 2138

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.6006243.144098)

537 1679 2093

POINT (-73.99000240.751854)

749 741 2095

POINT (-72.61857941.721624)

1041

POINT (-82.32428634.849262)

654

POINT (-77.58011543.154897)

537 1665 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.47397644.495232)

454 273 2084

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-74.01242840.70685)

749 721 2095

POINT (-73.8735640.957324)

948 1442 2185

POINT (-74.01451641.931949)

425 79 2182

Page 110 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

201000 T006311

111040 T006360A

21X234 T006034

801802 T006365

20X200 T004921

09X367 T005779

31X244 T005840

35X124 T005624

29X405 T005544

221005 T006324

09X820 T005191

12X319 T005945

27X225 T005500

12X370 T006312

141055 T006359

34X101 T005364

05X325 T005808

Page 111 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Wanakena Ranger School - Various Building and Site Improvements Closed

DESIGN: Construct Storage Building Active

CONSTR: Renovate Central Heating Plant Closed

DESIGN: Engineering Services - Lizardos Engineering Associates - Master Term Agreement Closed

DESIGN: Sitework/Paving Repairs & Upgrades Main Campus Closed

CONSTR: Replace Roof - Hulbert Dining Hall Closed

DESIGN: Repl Roofs: H, I, J Wings Closed

DESIGN: Commissioning - Heat Recovery Phase 2 Closed

CONSTR: Rehabilitate Elevators - PH IIB Closed

CONSTR: Install Satellite Boilers - Phase 3 Closed

DESIGN: Rehabilitate Fine Arts Building, Ph II Commissioning Closed

CONSTR: Replace Windows Various Buildings Closed

CONSTR: Building Conversion/Construct Design Facility Closed

CONSTR: Rehab Kellas Hall, Bldg 25 Closed

DESIGN: Rehab for New Adult Infusion Unit UHB Closed

DESIGN: Upgrade Elevators, Barton Lab Closed

CONSTR: Williams Center Rehabilitation Closed

Page 112 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 113 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/02/2017 08/18/2019 2395506.00

12/06/2019 11/09/2025 136098.14

10/02/2013 02/17/2016 1836191.00

09/14/2017 07/12/2021 5000000.00

04/04/2007 02/13/2012 241470.07

01/29/2011 08/12/2012 162680.00

03/12/2014 07/30/2018 109537.43

10/14/2011 10/31/2018 39314.83

05/21/2009 08/01/2012 2865477.00

04/11/2017 01/06/2019 2016141.00

04/04/2007 12/31/2015 0.00

03/23/2012 08/16/2014 2023390.00

04/15/2009 12/31/2012 9014109.00

03/02/2017 08/01/2019 6801300.00

05/29/2018 12/02/2025 86901.34

03/11/2009 07/16/2014 81018.10

02/18/2011 08/07/2013 10843259.00

Page 114 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2395506.00 0.00

0.00 92530.25 43567.89

0.00 1836191.00 0.00

0.00 0.00 5000000.00

0.00 241470.07 0.00

1676.00 162680.00 0.00

0.00 109537.43 0.00

21740.30 39314.83 0.00

0.00 2865477.00 0.00

0.00 2016141.00 0.00

0.00 33499.73 -33499.73

604746.00 2023390.00 0.00

43942.00 9014109.00 0.00

0.00 6801300.00 0.00

0.00 86901.34 0.00

5267.78 80470.46 547.64

4241326.00 10843259.00 0.00

Page 115 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 Y 1

0 N 0

14 N 1

62 N 10

0 N 0

10 N 2

0 N 0

0 N 0

4 N 0

4 N 1

0 N 0

5 N 0

7 N 0

5 N 1

0 N 0

4 N 1

8 N 0

Page 116 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

Mosaic Associates Architects, DPC

Maric Mechanical, Inc.

Lizardos Engineering Associates P.C.

Quinlivan,Pierik & Krause A/E DBA Qpk Design

Moisture Barriers, Inc

Hoffmann Architects, Inc.

Bergmann Associates, Inc.

Thyssenkrupp Elevator Corp.

John W. Danforth Co.

Genesys Engineering P.C.

Nep Glass Co., Ltd.

Heuber-Breuer Construction Co., Inc.

Murnane Building Contractors, Inc.

Lothrop Associates LLP Architects

Syska Hennessy Group, Inc

Manning Squires Hennig Co. Inc

Page 117 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

2 Third Street Suite 440

19-53 46th Street, 2nd Fl

200 Old Country Road Suite 670

450 South Salina Street P.O. Box 29

2 Commerce Avenue

462 Seventh Avenue

28 East Main Street 200 First Federal Plaza

519 8th Avenue, Floor 5

930 Old Dutch Road

Suite #111 629 Fifth Avenue

P.O.Box 277 6224 State Route 5

148 Berwyn Avenue P.O. Box 515

P.O. Box 3048 104 Sharron Avenue

333 Westchester Avenue

14th Floor 1515 Broadway

8426 Seven Springs Road PO Box 685

Page 118 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

Troy NY 12180 USA

Astoria NY 11105 USA

Mineola NY 11501 USA

Syracuse NY 13201 USA

Albany NY 12206 USA

New York NY 10018 USA

Rochester NY 14614 USA

New York NY 10018 USA

Victor NY 14564 USA

Pelham NY 10803 USA

Little Falls NY 13365 USA

Syracuse NY 13205 USA

Plattsburgh NY 12901 USA

White Plains NY 10604 USA

New York NY 10038 USA

Batavia NY 14020 USA

Page 119 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.69002842.732277)

110 11 2138

POINT (-73.89728540.774581)

196 877 2137

POINT (-73.63875140.739038)

62 1265 2094

POINT (-76.15225243.045606)

687 711 2132

POINT (-73.76984342.674904)

814 43 2030

POINT (-73.99000240.751854)

749 741 2095

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.99269540.753263)

749 741 2095

POINT (-77.48203243.001202)

799 413 2133

POINT (-76.13896943.023333)

687 728 2132

POINT (-73.74502841.030178)

949 1437 2185

POINT (-78.13339143.006019)

792 489 2086

Page 120 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

36X136 T006097

08X416 T004837

221021 T006357

02X388 T005368

41X059 T005342

251023 T006438

16X826 T005678

12X343 T005867

24X251 T005191

09X343 T005365

11X252 T005190

02X7A3 T005631

14X490 T006302

06X337 T006066

15XA07 T005618

29X393 T005739

12X292 T005372

Page 121 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehab Center Tower Floors 5-13 and South Tower Floors 6-9 Active

DESIGN: Replace High Temperature Hot Water Lines In Guarantee

DESIGN: Student Leadership Center - Remaining Construction Active

DESIGN: Site Infrastructure Improvements - Electric Distribution, Ph II Closed

DESIGN: Rehab Research Areas Floors 16 & 17 Closed

DESIGN: Renovate North Hall for Admissions and UPD Active

DESIGN: Facilities Master Plan - Cornell Closed

CONSTR: Replace Roofs - Maxcy & Van Housen Closed

DESIGN: Building Commissioning - Wheeler Hall Laboratory Addition Closed

DESIGN: Replace Windows - Physical Education Building Closed

DESIGN: Hudson Hall Phase I Commissioning Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: Provide Additional Electrical Power-BSB Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Construction Manager - IHP Addition Closed

CONSTR: Critical Maintenance Repairs Exterior Maintenance Visual Arts #58 Closed

DESIGN: Fire Alarm Replacement - Various Buildings Closed

Page 122 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 123 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/24/2015 05/21/2023 575000.00

06/04/2003 07/02/2014 1138174.73

12/20/2018 12/23/2025 190342.00

04/06/2009 11/25/2016 495157.96

08/31/2010 12/31/2017 244859.94

11/26/2018 10/20/2027 58215.90

07/22/2010 01/15/2012 1149376.98

09/21/2011 08/08/2013 1687017.00

09/28/2007 12/31/2015 0.00

06/01/2009 04/14/2017 120249.28

06/03/2008 12/31/2013 113264.08

12/18/2009 01/31/2018 110062.00

01/26/2017 02/07/2021 7396590.00

04/23/2015 02/11/2018 20764.00

02/24/2010 02/17/2015 2509230.51

10/07/2010 09/21/2016 9749636.00

04/01/2008 03/24/2013 245025.19

Page 124 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 494568.32 80431.68

0.00 1110736.02 27438.71

0.00 92361.76 97980.24

13826.72 495157.96 0.00

19377.60 244859.94 0.00

0.00 540.00 57675.90

0.00 1149376.98 0.00

694601.00 1687017.00 0.00

4169.06 79906.87 -79906.87

0.00 120249.28 0.00

14558.76 113264.08 0.00

104559.00 110062.00 0.00

0.00 7396590.00 0.00

0.00 20764.00 0.00

793070.94 2509230.51 0.00

3241289.00 9749636.00 0.00

5344.87 245025.19 0.00

Page 125 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

5 N 0

0 N 0

0 N 0

0 N 0

0 N 0

32 N 0

5 Y 2

0 N 0

0 N 0

0 N 0

0 N 0

5 Y 1

0 N 0

14 N 0

11 N 0

5 N 0

Page 126 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Hyman Hayes Assoc., LLC

Ambrosino, De Pinto & Schmieder Consult Engr,PC

Kideney Architects, P.C.

Lizardos Engineering Associates P.C.

Perkins Eastman Architects, P.C.

Genesys Engineering P.C.

Sasaki Associates, Inc.

PTL Contracting Corp.

Genesys Engineering P.C.

Architecture +

C.J. Brown Energy & Engineering, P.C.

Sorensen Gross Construction Services

Sajiun Electric, Inc.

Sorensen Gross Construction Services

Turner Construction Company

MPCC Corp.

Bergmann Associates, Inc.

Page 127 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 Wembley Court

275 Seventh Ave 21st Fl

143 Genesee Street

200 Old Country Road Suite 670

115 Fifth Avenue - 3rd Fl

Suite #111 629 Fifth Avenue

64 Pleasant Street

27840 County Road 193

Suite #111 629 Fifth Avenue

297 River Street

Suite 204 4245 Union Road

3407 torrey Road

109 West 26th Street Unit 2B

3407 torrey Road

Suite 200 50 Lakefront Boulevard

81 Rockdale Avenue

28 East Main Street 200 First Federal Plaza

Page 128 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Albany NY 12205 USA

New York NY 10001 USA

Buffalo NY 14203 USA

Mineola NY 11501 USA

New York NY 10003 USA

Pelham NY 10803 USA

Watertown MA 2472 USA

Theresa NY 13691 USA

Pelham NY 10803 USA

Troy NY 12180 USA

Buffalo NY 14225 USA

Flint MI 48507 USA

New York NY 10001 USA

Flint MI 48507 USA

Buffalo NY 14202 USA

New Rochelle NY 10801 USA

Rochester NY 14614 USA

Page 129 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.84467942.740546)

834 42 2030

POINT (-73.99446940.745681)

749 717 2095

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.63875140.739038)

62 1265 2094

POINT (-73.991540.738916)

749 719 2095

POINT (-71.18796742.366181)

1915

POINT (-73.69016242.73246)

110 11 2138

POINT (-83.73256442.976697)

438

POINT (-73.99204640.745066)

749 717 2095

POINT (-83.73256442.976697)

438

POINT (-73.79305740.905212)

960 1450 2185

POINT (-77.61117743.156034)

537 1673 2093

Page 130 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

031005 T006557

30XA83 T005575

13XC74 T004947

36X137 T006212

31X230 T005364

201022 T006356

14XA91 T005613

29X442 T006151

01XA40 T005386

231004 T006097

26X279 T005424

10X357 T005577

241013 T006477

09X375 T006154

36X115 T005365

11X304 T005428

071013 T006266

Page 131 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Reconstruct Iroquois Drive Active

DESIGN: Replace Roofs - Various Buildings North & South Campuses Closed

DESIGN: Modification for Prevention of Water Infiltration Closed

CONSTR: Replace Fire Pumps - SUNY Plaza Closed

DESIGN: Elevator Renovation & Upgrade-Camp Wide Closed

DESIGN: Program Study - Illick Hall Closed

DESIGN: New Academic Building School of Public Health Active

CONSTR: Rehabilitate Utilidors - Phase I High Temperature Hot Water System Closed

DESIGN: Install Podium Sky Light Domes Closed

DESIGN: RENOVATE DANA HALL Closed

DESIGN: Construction Manager - Major Projects Phase 1 Closed

DESIGN: Infrastructure Improvement - Electrical Capacity, Campuswide Closed

CONSTR: Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall Active

CONSTR: Rehab Athletic Fields Closed

DESIGN: Exterior Restorations Closed

DESIGN: Fine Arts Ventilation Upgrades Closed

DESIGN: Renovate Science II - Phase 1 Physics Wing Active

Page 132 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 133 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/17/2020 01/13/2022 3027110.00

10/09/2009 01/31/2016 933802.52

07/10/2007 08/31/2010 124795.47

12/22/2015 07/04/2017 183300.00

01/13/2010 07/16/2014 160341.03

02/01/2019 02/06/2027 101491.80

02/17/2010 05/18/2020 9225932.05

04/21/2015 11/27/2016 2915204.00

04/24/2008 04/15/2013 507861.19

09/29/2015 05/21/2023 133060.88

02/11/2009 07/01/2017 2943870.36

10/05/2010 02/03/2018 347104.58

02/15/2019 07/17/2021 8955543.00

04/29/2015 09/30/2016 1152865.00

05/20/2009 04/14/2017 178684.90

01/27/2009 01/13/2014 489194.13

08/16/2016 08/24/2021 2028355.00

Page 134 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2966787.00 60323.00

281299.75 933802.52 0.00

0.00 124795.47 0.00

0.00 183300.00 0.00

11847.59 160341.03 0.00

0.00 101491.80 0.00

479922.80 8178670.43 1047261.62

0.00 2915204.00 0.00

14401.50 507861.19 0.00

0.00 133060.88 0.00

441775.37 2943870.36 0.00

123599.05 347104.58 0.00

0.00 8869218.00 86325.00

0.00 1152865.00 0.00

52791.11 174242.19 4442.71

9488.62 489194.13 0.00

0.00 1882858.69 145496.31

Page 135 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 1

22 Y 2

0 N 0

2 N 0

0 N 0

0 Y 0

52 N 0

9 N 1

5 N 1

0 N 0

16 N 2

0 N 0

3 N 1

8 N 0

0 N 0

11 N 2

21 N 1

Page 136 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Accadia Site Contracting, Inc.

Foit-Albert Associates, Arch,Engring & Survey,PC

San Fanandre Justin Architects P.C.

Condor Fire Sprinkler

Syska Hennessy Group, Inc

JMZ Architects & Planners PC

Ennead Architects LLP

All State Boiler & Construction, Inc.

Robert Siegel Architects

Hyman Hayes Assoc., LLC

Gilbane Building Company

C & S Engineers, Inc.

Fahs Construction Group Inc.

Ballard Construction Inc.

Architecture +

Lewis Engineering, P.C.

M/E Engineering, P.C.

Page 137 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5636 Transit Road

763 Main Street

2nd Floor 200 Sunrise Highway

3434 Carman Road

14th Floor 1515 Broadway

190 Glen Street P. O. Box 725

1 World Trade Center 40th Floor

449 Cooke Street

432 Jay Street

6 Wembley Court

88 Pine Street, 27th Flr

499 Col. Eileen Collins Blvd.

2224 Pierce Creek Road

320 Bridge St

297 River Street

Suite 201 94 New Karner Road

300 Trolley Boulevard

Page 138 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Depew NY 14043 USA

Buffalo NY 14203 USA

Rockville Centre NY 11570 USA

Schenectady NY 12303 USA

New York NY 10038 USA

Glens Falls NY 12801 USA

New York NY 10007 USA

Farmington CT 6034 USA

Katonah NY 10536 USA

Albany NY 12205 USA

New York NY 10005 USA

Syracuse NY 13212 USA

Binghamton NY 13903 USA

Syracuse NY 13209 USA

Troy NY 12180 USA

Albany NY 12203 USA

Rochester NY 14606 USA

Page 139 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.69689942.909183)

286 506 2041

POINT (-78.87135342.894814)

300 34 2041

POINT (-73.94224442.746356)

832 72 2030

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.0134140.712909)

749 722 2095

POINT (-72.84438341.693111)

1041

POINT (-73.65655341.247592)

977 1254 2185

POINT (-73.84467942.740546)

834 42 2030

POINT (-74.0063740.705427)

749 721 2095

POINT (-76.13224343.113906)

690 730 2132

POINT (-75.88027242.08193)

967 477 2033

POINT (-76.21695843.064213)

699 727 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.68189143.171416)

549 1664 2093

Page 140 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01X470 T005191

13X7A6 T005968

12X262 T005849

141031 T006336

04X336 T005606

271004 T006237

36X098 T004932

32X446 T005622

281001 T006418

27X235 T005717

31X247 T006102

22X155 T004833

26X301 T005764

231001 T006337

04X818 T005012

39X128 T005366

291053 T006590

Page 141 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning Service For Rehab Of Husted Hall (01470) Closed

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: Rehab HVAC Hosmer Concert Hall Closed

DESIGN: Rehab Mechanical Systems- Isolation & Operating Rooms UHB Assigned to Vendor

DESIGN: Commissioning - Dowd Fine Arts Closed

DESIGN: Rehabilitate Electric Feeder and Distribution System Closed

DESIGN: Emergency Power For Computer Room, Federal Building Closed

DESIGN: HSC Deck Rehab Closed

CONSTR: Renovate Townsend Hall-Phase 1 Abatement, Demolition and Exterior Improvements Closed

DESIGN: Renovate Charlton Hall, Ph I Closed

DESIGN: Removal of Aboveground Fuel Oil Tank Closed

DESIGN: Construction Manager Engineering Tech Closed

DESIGN: Rehabilitate Conklin Hall Closed

CONSTR: Rehabilitate Exterior Envelope Dana Hall Closed

DESIGN: Program Study - Moffet Center Closed

DESIGN: Replace Roof - Donovan Hall Suspended

DESIGN: Rehab Stormwater Management Infrastructure Active

Page 142 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 143 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/29/2007 12/31/2015 95777.92

05/21/2012 08/31/2018 58395.00

06/24/2011 08/20/2013 1496894.00

06/30/2017 07/28/2022 463030.17

11/02/2010 07/23/2021 95382.31

05/18/2016 07/21/2021 1446393.81

07/19/2005 01/31/2014 97683.97

02/03/2010 10/01/2017 2289218.73

03/26/2018 12/27/2019 1926093.00

09/14/2010 09/07/2015 1029587.05

01/21/2015 07/10/2023 86878.30

04/30/2003 03/04/2003 269895.80

02/07/2011 10/31/2019 1385686.59

07/18/2017 12/06/2019 3684035.00

06/23/2006 09/23/2008 64907.57

07/26/2010 07/15/2013 20741.29

09/23/2020 09/14/2023 306892.63

Page 144 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 103220.46 -7442.54

0.00 58395.00 0.00

485349.00 1496894.00 0.00

0.00 463030.17 0.00

4879.24 95382.31 0.00

0.00 1446393.81 0.00

0.00 110086.29 -12402.32

333730.54 2289218.73 0.00

0.00 1926093.00 0.00

263441.49 1029587.05 0.00

0.00 86878.30 0.00

0.00 269895.80 0.00

417291.56 1385686.59 0.00

0.00 3684035.00 0.00

0.00 64907.57 0.00

0.00 20741.29 0.00

0.00 161696.79 145195.84

Page 145 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

3 N 0

0 N 0

0 N 0

19 N 3

0 N 0

22 N 1

4 N 0

46 N 3

0 N 0

5 N 0

68 N 5

1 N 0

0 N 0

0 N 0

0 N 0

Page 146 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Genesys Engineering P.C.

Corbex, Inc.

Burns Brothers Contractors, Inc.

Kallen & Lemelson, Consulting Engineers, LLP

Genesys Engineering, P.C.

C & S Engineers, Inc.

Schaefer Lewis Engineers, P.C.

URS Architecture & Engineering - NY, PC

Rodems Construction Corp.

Ashley McGraw Architects DPC

Labella Associates, D.P.C

Welliver McGuire, Inc.

Butler Rogers Baskett Architects

Northern Tier Contracting

March Associates Architects & Planners

Architecteam Schleicher-Soper

M.J. Engineering and Land Surveying, P.C.

Page 147 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite #111 629 Fifth Avenue

74-16 Grand Avenue

7504 Us Hwy 11

17th Flr 520 Eighth Avenue

38 Maiden Lane

499 Col. Eileen Collins Blvd.

Suite 201 94 New Karner Road

1255 Broad Street Suite 201

3555 North Buffalo Road

15th Floor 125 East Jefferson Street

Suite 201 300 State Street

250 North Genesee Street

245 West 29th Street Suite 1203

329A Scotch Settlement Rd

116 Business Park Drive

614 James Street

1533 Crescent Road

Page 148 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Pelham NY 10803 USA

Elmhurst NY 11373 USA

Potsdam NY 13676 USA

New York NY 10018 USA

Kingston NY 12401 USA

Syracuse NY 13212 USA

Albany NY 12203 USA

Clifton NJ 7013 USA

Orchard Park NY 14127 USA

Syracuse NY 13202 USA

Rochester NY 14614 USA

Montour Falls NY 14865 USA

New York NY 10001 USA

Gouverneur NY 13642 USA

Utica NY 13502 USA

Syracuse NY 13203 USA

Clifton Park NY 12065 USA

Page 149 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.171416)

POINT (-73.88686240.730363)

196 843 2137

POINT (-75.02627544.665789)

312 1597 2140

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.17929340.853074)

2493

POINT (-78.75002942.787061)

282 956 2041

POINT (-76.85309342.348955)

644 53 2143

POINT (-73.99469440.748598)

749 717 2095

POINT (-75.42571244.350272)

330 1525 2140

POINT (-75.28565643.090028)

984 1274 625

POINT (-76.1438743.054619)

687 712 2132

POINT (-73.771888 1009 1190 2141

Page 150 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24X287 T005351

05X267 D006617

801803 T006370

08X475 T005627

22X220 D005485

37X048 T006098

25X290 T005558

351011 T006357

07X488 D005330

30X480 T005543

41X050 T006123

01XA18 T004928

31X227 T006222

25X219 D005027

20X205 T005602

291014 T006432

Page 151 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Wheeler Hall Interior Renovation Closed

CONSTR: Renovate Houghton Hall Active

DESIGN: Site Infrastructure, Civil Engineering & Surveying Services - MJ Engineering - Master Term Agreement Active

DESIGN: Commissioning - Wooster Renovation Active

CONSTR: Replace Roof/Abate Asbestos - Allied Health Building Closed

DESIGN: Retooling the Southern Tier Closed

DESIGN: Site Utilities Study and Infrastructure Improvement Project Closed

DESIGN: Rehabilitate Service Building for Ceramics Foundry Terminated

CONSTR: Site Utility Upgrades, HTW, Phase II Closed

CONSTR: Hochstetter - Replace Air Handling Units Closed

CONSTR: Lobby Renovation Closed

DESIGN: Uptown Exterior Rehab-Various Buildings Phase 1 Closed

CONSTR: Job Order Contracting: NYC Region Closed

CONSTR: Alteration To Heating Plant And Replacement Of Steam Distribution System Closed

DESIGN: Construction Manager - Gateway Building Closed

CONSTR: Rehab HTHW System - Box Tunnel Piping Replacement Closed

Page 152 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 153 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/21/2010 12/31/2017 513203.20

02/26/2021 01/02/2023 2622045.00

09/14/2017 10/19/2026 5000000.00

11/03/2010 12/31/2018 188400.00

03/26/2009 08/01/2011 652862.00

04/22/2015 11/03/2021 98114.63

09/04/2009 05/08/2019 2178974.67

10/22/2019 12/23/2025 11724.32

12/21/2007 06/30/2010 5005850.00

06/09/2009 11/15/2011 3579089.00

01/05/2015 07/04/2017 4634304.00

12/22/2005 09/30/2011 163275.22

02/29/2016 04/30/2019 7440.00

06/29/2005 12/31/2010 3660512.00

02/04/2010 01/22/2015 1537850.97

05/21/2018 08/29/2020 3472447.00

Page 154 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

218017.93 513203.20 0.00

0.00 1549809.00 1072236.00

0.00 0.00 5000000.00

4916.79 178761.04 9638.96

0.00 652862.00 0.00

0.00 104798.20 -6683.57

165300.25 2178974.67 0.00

0.00 11724.32 0.00

0.00 5005850.00 0.00

0.00 3579089.00 0.00

0.00 4634304.00 0.00

0.00 158199.24 5075.98

0.00 13097.00 -5657.00

0.00 3660512.00 0.00

458996.56 1537850.97 0.00

0.00 3472447.00 0.00

Page 155 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 0

29 N 6

0 N 0

5 N 0

0 N 0

29 N 1

0 N 0

1 N 0

5 N 0

9 N 0

0 Y 0

0 N 0

3 N 0

15 N 0

4 N 1

Page 156 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Architecture +

Peak Construction Group, LLC

M.J. Engineering and Land Surveying, P.C.

OLA Consulting Engineers, PC

Streeter Associates,Inc.

Kideney Architects, P.C.

C.T. Male Associates, P.C

Kideney Architects, P.C.

North Central Mechanical Inc.

Quackenbush Company Inc.

Stalco Construction Inc.

Envision Architects, D.P.C.

Volmar Construction, Inc

E.W. Tompkins Co., Inc.

Turner Construction Company

Maric Mechanical, Inc.

Page 157 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 River Street

701 Seneca Street Suite 604

1533 Crescent Road

50 Broadway

101 E. Woodlawn Ave. P.O. Box 118

143 Genesee Street

50 Century Hill Drive

143 Genesee Street

100 North Michael St Suite 202 PO Box 1997

495 Kennedy Road

1316 Motor Parkway

52 James Street

4400 Second Avenue

124-126 Sheridan Avenue

Suite 200 50 Lakefront Boulevard

19-53 46th Street, 2nd Fl

Page 158 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Buffalo NY 14202 USA

Clifton Park NY 12065 USA

Hawthorne NY 10532 USA

Elmira NY 14902 USA

Buffalo NY 14203 USA

Latham NY 12110 USA

Buffalo NY 14203 USA

St. Mary's PA 15857 USA

Buffalo NY 14227 USA

Islandia NY 11749 USA

Albany NY 12207 USA

Brooklyn NY 11232 USA

Albany NY 12210 USA

Buffalo NY 14202 USA

Astoria NY 11105 USA

Page 159 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.819305)

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.8515742.876307)

300 66 2041

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.79736141.107546)

963 1251 2185

POINT (-76.81571142.110455)

485 926 2036

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.75974442.773945)

834 1288 2030

POINT (-78.86903142.890071)

300 34 2041

POINT (-78.56197941.428892)

730

POINT (-78.77608542.896967)

298 162 2041

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-73.75023942.651717)

814 44 2030

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.75556142.655633)

814 47 2030

POINT (-73.897285 196 877 2137

Page 160 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

17X7A2 T005632

271023 T006542

24X303 T006227

01X470 T005224

20X163 T005606

31X207 T004950

09X316 D005465

03X421 T005974

06X320 T005512

271029 T006471

01XA49 T005956

141042 T006355

23X161 T004927

09X399 T005842

211021 D006601

011014 T006097

Page 161 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Construct Alternative Energy Building Active

CONSTR: Demolish Ryder Hall Closed

CONSTR: Rehabilitate Husted Hall, Downtown Campus, Building No. 3 Closed

DESIGN: Commissioning Services- Academic Research Building Closed

DESIGN: Refurbish Teaching & Public Areas Academic Village Closed

CONSTR: Upgrade Lighting, Replace Ceilings, Various Buildings Closed

DESIGN: Construction Manager for Upton and Caudell Restoration Closed

CONSTR: Red Jacket Improvements, Including HVAC Closed

CONSTR: Rehabilitate Dairy Complex Digester Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace Exterior Doors- BSB and HSEB Active

DESIGN: Renovations To Room 107 Payson Hall Suspended

DESIGN: Upgr Plumb & Exh - Chase Closed

CONSTR: Renovate Marvin Tode S&E Bldg Active

DESIGN: ADA Compliance Study - Campus Wide Closed

Page 162 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 163 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/18/2009 12/09/2015 197255.00

02/10/2020 07/15/2022 16143303.00

12/17/2015 08/15/2017 402842.00

01/19/2007 01/01/2013 15326785.50

09/19/2012 07/23/2021 8786.25

06/22/2005 07/28/2017 126693.45

01/07/2009 01/10/2011 353633.00

08/09/2012 08/14/2017 1219818.15

04/06/2009 12/15/2010 1800309.00

12/21/2018 09/30/2020 880188.00

04/18/2012 11/20/2018 545257.00

11/14/2017 01/13/2025 178366.85

06/21/2005 08/31/2010 8543.12

02/24/2012 12/31/2017 49078.69

12/02/2020 10/06/2022 4693724.00

03/29/2016 05/21/2023 299550.86

Page 164 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

162146.00 197255.00 0.00

0.00 14810619.00 1332684.00

0.00 402842.00 0.00

0.00 15326785.00 0.50

0.00 8786.25 0.00

0.00 126693.45 0.00

0.00 353633.00 0.00

0.00 1219818.15 0.00

0.00 1800309.00 0.00

0.00 880188.00 0.00

0.00 545257.00 0.00

0.00 75423.97 102942.88

0.00 8543.12 0.00

29570.16 49078.69 0.00

0.00 2740915.00 1952809.00

0.00 299550.86 0.00

Page 165 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

1 N 0

11 Y 2

2 N 0

0 N 0

0 N 0

10 N 1

10 N 0

5 N 0

1 Y 1

0 Y 0

0 Y 0

0 N 0

0 N 0

10 N 2

0 N 0

Page 166 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sorensen Gross Construction Services

Northland Associates, Incorporated

Diversified Construction Services Inc.

The Pike Company Inc

Genesys Engineering, P.C.

Kliment Halsband Architects, LLP

Andrew R. Mancini Associates Inc.

LiRo Program and Construction Mgmt, P.C.

Michael A. Ferrauilo Plumbing & Heating, Inc.

Wilkins Mechanical, Inc.

Cutting Edge Group, LLC

Ismael Leyva Architects, P.C.

Dodge Chamberlin Luzine Weber Assoc. Architects

Delta Engineers, Archs & Land Survs, DPC

Boilermatic Welding Industries, Inc.

Hyman Hayes Assoc., LLC

Page 167 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3407 torrey Road

4701 Buckley Road P.O. Box 2549

18a Cherry Street

One Circle Street

38 Maiden Lane

20th Floor 322 Eighth Avenue

129 Odell Avenue

690 Delaware Avenue

1600 Jay Street

6923 Herman Road

14 Walkup Cutoff Road P.O. Box 733

13th Floor 48 West 37th Street

73 Troy Road

860 Hooper Road

17 Peconic Avenue

6 Wembley Court

Page 168 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Flint MI 48507 USA

Liverpool NY 13220 USA

Phoenix NY 13135 USA

Rochester NY 14607 USA

Kingston NY 12401 USA

New York NY 10001 USA

Endicott NY 13760 USA

Buffalo NY 14209 USA

Rochester NY 14611 USA

Syracuse NY 13209 USA

Lake George NY 12845 USA

New York NY 10018 USA

East Greenbush NY 12061 USA

Endwell NY 13760 USA

Medford NY 11763 USA

Albany NY 12205 USA

Page 169 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.774581)

POINT (-83.73256442.976697)

438

POINT (-76.29368943.227626)

233 671 2135

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.04917542.110866)

938 388 2033

POINT (-78.87283242.902878)

300 65 2041

POINT (-77.66444943.159407)

537 1669 2093

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.70279442.614608)

129 1186 2138

POINT (-76.0306842.12898)

938 388 2033

POINT (-72.96754440.817776)

1022 1313 2179

POINT (-73.84467942.740546)

834 42 2030

Page 170 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

291025 T006359

08X475 T006472

301014 T006104

23X234 T006102

35X120 T005795

36X128 T006205

031005 T006496

29X405 T005364

28X353 T005008

211042 T006656

09X386 T006152

10X7A4 T005632

061030 T006356

081000 T006109

311006 T006102

021035 T006354

31X229 T005540

21X244 T006159

Page 171 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehab Roofs Music & Museum Active

CONSTR: Job Order Contracting - NYC Region Active

DESIGN: Replace Electrical Service and Emergency Power Equipment - Cooke and Hochstetter Closed

DESIGN: Replace Underground Natural Gas and Site Lighting Systems, Campus Wide Closed

DESIGN: Infill Projects - Various Buildings Closed

CONSTR: Mechanical Systems Upgrade Ph 2 Closed

CONSTR: Reconstruct Iroquois Drive Phase 1 Closed

DESIGN: Rehabilitate Elevators - PH IIB Closed

DESIGN: Kimball Hall - Masonry/Window Restoration Closed

DESIGN: Upgrade Pier for New Ship Active

CONSTR: Upgrade Telecommunications & Data Infrastructure Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Renovate Milne Library Closed

DESIGN: Upgrade HVAC Systems at Dorsky Museum, Bldg. No. 31B Closed

DESIGN: Parking and Traffic Study Closed

DESIGN: Renovate Seymour Student Union Closed

DESIGN: Renovation of Library/Academic Space Active

CONSTR: 21244 Water System Improvements, Phase 1 Closed

Page 172 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 173 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/14/2018 12/02/2025 568000.00

01/29/2019 04/11/2022 26189.00

05/18/2016 07/25/2023 413186.59

11/02/2014 07/10/2023 272392.69

03/18/2011 07/31/2017 1432634.24

12/09/2015 09/05/2017 820910.00

04/05/2019 10/28/2020 2167212.00

03/09/2009 07/16/2014 81515.97

06/21/2005 02/28/2013 426412.09

06/17/2021 07/19/2026 1698193.34

04/24/2015 11/01/2017 3693177.00

12/18/2009 12/09/2015 708432.00

12/21/2018 02/06/2027 0.00

02/25/2015 02/14/2021 116993.41

02/18/2016 07/10/2023 41767.60

07/22/2019 09/18/2027 96432.34

07/17/2009 02/01/2021 3446630.89

04/20/2015 07/01/2017 2841870.00

Page 174 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 379156.70 188843.30

0.00 26189.00 0.00

0.00 413186.59 0.00

0.00 272392.69 0.00

363089.60 1432634.24 0.00

0.00 820910.00 0.00

0.00 2167212.00 0.00

0.00 81515.97 0.00

9138.21 426412.09 0.00

0.00 629134.65 1069058.69

0.00 3693177.00 0.00

443000.00 708432.00 0.00

0.00 135595.59 -135595.59

0.00 116993.41 0.00

0.00 41767.60 0.00

0.00 96432.34 0.00

133509.60 3304129.29 142501.60

0.00 2841870.00 0.00

Page 175 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 1

0 N 0

0 N 0

34 N 4

3 N 0

5 N 1

0 N 0

5 N 0

8 N 1

6 N 1

0 N 0

30 Y 8

0 N 0

0 N 0

0 N 0

59 N 3

0 Y 0

Page 176 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lothrop Associates LLP Architects

Volmar Construction, Inc

M/E Engineering, P.C.

Labella Associates, D.P.C

NBBJ Architecture PLLC

Digesare Mechanical,Inc.

Mark Cerrone, Inc.

Syska Hennessy Group, Inc

Fontanese Folts Aubrecht Ernst Architects, P.C.

M.G. McLaren Engineering and Land Surveying, P.C.

Matco Electric Co., Inc.

Sorensen Gross Construction Services

JMZ Architects & Planners PC

OLA Consulting Engineers, PC

Labella Associates, D.P.C

HBT Architects

Cannon Design, Inc.

G & M Earth Moving, Inc.

Page 177 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

333 Westchester Avenue

4400 Second Avenue

Suite 320 60 Lakefront Boulevard

Suite 201 300 State Street

One Beacon Street Suite 5200

3434 Carmen Road

2368 Maryland Avenue

14th Floor 1515 Broadway

6395 West Quaker Street

131 West 35th Street 4th Floor

3913 Gates Road

3407 torrey Road

190 Glen Street P. O. Box 725

50 Broadway

Suite 201 300 State Street

2 Elton Street

11th Floor 360 Madison Avenue

345 Ellsworth Street

Page 178 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

White Plains NY 10604 USA

Brooklyn NY 11232 USA

Buffalo NY 14202 USA

Rochester NY 14614 USA

Boston MA 2108 USA

Schenectady NY 12303 USA

Niagara Falls NY 14305 USA

New York NY 10038 USA

Orchard Park NY 14127 USA

New York NY 10001 USA

Vestal NY 13850 USA

Flint MI 48507 USA

Glens Falls NY 12801 USA

Hawthorne NY 10532 USA

Rochester NY 14614 USA

Rochester NY 14118 USA

New York NY 10017 USA

Holbrook NY 11741 USA

Page 179 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.74502841.030178)

949 1437 2185

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.94224442.746356)

832 72 2030

POINT (-79.03548343.125204)

160 169 2131

POINT (-78.74730242.766453)

282 956 2041

POINT (-73.98875140.751091)

749 741 2095

POINT (-75.97953842.107571)

937 466 2033

POINT (-83.73256442.976697)

438

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.79736141.107546)

963 1251 2185

POINT (-77.58011543.154897)

537 1665 2093

POINT (-73.075283 1019 1119 2179

Page 180 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

30XB08 T006047

20X205 T005553

08X7B3 T005395

21X231 T006005

091029 T006102

11X297 T005754

251026 T006439

12X334 T005702

09X370 T005355

101004 T006199

111034 T006360

02X351 T005638

05X336 T005930

30XA76 T005341

21X194 T005501

20X823 T005852

Page 181 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: New Schl. Med/Biomed Ph 1 Active

DESIGN: Building Commissioning - Gateway Bldg Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Replace Roof - Marvin Tode Building Closed

DESIGN: Site Improvements & Safety Upgrades Baseball-Softball Fields Voided

CONSTR: Hudson Hall Rehab Ph II Closed

DESIGN: Renovate Farnsworth Hall Active

DESIGN: Construction Manager - Performing Arts Building Closed

DESIGN: Upgrade Plumbing/HVAC Systems - Bugbee Hall Closed

DESIGN: Rehab Tyler Hall Phase II Closed

DESIGN: Repair Masonry Kehoe, Yokum, Angell, Myers and Feinberg. Assigned to Vendor

CONSTR: Renovate Restrooms, Various Buildings Closed

CONSTR: Upgrade Domestic Water Systems Phase II Closed

DESIGN: Cooling Tower Replacement Baker Chilled Water Closed

CONSTR: Replace Fuel Oil Tanks Closed

DESIGN: Program Study - Rehabilitate Marshall Hall Study Closed

Page 182 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 183 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/05/2014 12/31/2018 59900203.00

10/01/2009 05/31/2015 185789.05

04/15/2008 09/30/2014 194417.00

01/09/2012 08/01/2013 121546.00

09/14/2017 07/10/2023 424807.08

12/17/2010 12/14/2014 21918709.00

04/25/2019 05/04/2027 139696.00

08/04/2010 07/29/2015 1619944.28

08/24/2010 06/12/2020 469638.00

12/31/2015 02/02/2021 1794498.76

08/19/2019 09/26/2020 9867.10

01/04/2010 07/29/2012 877313.00

03/09/2012 08/01/2014 2290428.00

09/26/2008 04/01/2014 390458.79

03/27/2009 06/30/2012 1986418.00

09/21/2012 08/16/2014 186053.00

Page 184 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 59654196.00 246007.00

73634.86 185789.05 0.00

184696.00 194417.00 0.00

0.00 121546.00 0.00

0.00 0.00 424807.08

8622184.00 21918709.00 0.00

0.00 52145.15 87550.85

428151.47 1662442.23 -42497.95

100776.44 872170.90 -402532.90

0.00 1794498.76 0.00

0.00 9867.10 0.00

53280.00 877313.00 0.00

2091044.00 2290428.00 0.00

13358.40 390458.79 0.00

27799.00 1986418.00 0.00

51751.20 186053.00 0.00

Page 185 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

21 N 1

0 Y 0

0 N 0

0 N 0

6 N 0

15 N 4

15 N 0

0 N 0

15 N 0

0 N 0

14 N 1

6 N 0

0 N 0

10 N 0

0 N 0

Page 186 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

L.P. Ciminelli Construction Inc.

Genesys Engineering, P.C.

Cutting Edge Group, LLC

Ahura Construction Management, Inc.

Labella Associates, D.P.C

Northland Associates, Incorporated

Guth Deconzo Consulting Engineers, P.C.

Gilbane Building Company

C & S Engineers, Inc.

Architectural Resources, P.C.

Mosaic Associates Architects

Betacon Construction, Inc

New Frontier Excavating & Paving, Inc.

Wendel Duchscherer Arch. & Engs., P.C.

R. J. I. Mechanical Inc.

Architecture +

Page 187 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2421 Main Street

38 Maiden Lane

14 Walkup Cutoff Road P.O. Box 733

5 Equestrian Court

Suite 201 300 State Street

4701 Buckley Road P.O. Box 2549

242 West 30th Street

7 Southwoods Boulevard 3rd Floor

499 Col. Eileen Collins Blvd.

505 Franklin Street

The Frear Building 2 Third Street, Suite 440

6920 State Route 5 and 20

8265 East Eden Road

Suite 201 140 James Audubon Pkwy

75 East Bethpage Road P. O. Box 349

297 River Street

Page 188 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14214 USA

Kingston NY 12401 USA

Lake George NY 12845 USA

Huntington NY 11743 USA

Rochester NY 14614 USA

Liverpool NY 13220 USA

New York NY 10001 USA

Albany NY 12211 USA

Syracuse NY 13212 USA

Buffalo NY 14202 USA

Troy NY 12180 USA

Bloomfield NY 14469 USA

Eden NY 14057 USA

Amherst NY 14228 USA

Plainview NY 11803 USA

Troy NY 12180 USA

Page 189 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.776914)

POINT (-78.84411242.93462)

300 70 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.43980940.804792)

1020 1120 2179

POINT (-73.99438840.749291)

749 717 2095

POINT (-73.77073242.683397)

834 48 2030

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.87207542.900014)

300 33 2041

POINT (-77.41198842.885218)

811 239 2133

POINT (-78.82751442.661468)

293 513 2041

POINT (-73.45588740.781659)

59 1490 2094

POINT (-73.69016242.73246)

110 11 2138

Page 190 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

26X279 T005721

24X235 T004929

30XA81 T005957

12X345 T005816

05X830 T006098

15X7B2 T005632

361006 T006281

411016 T006361

031015 T006391

24X266 T005606

141044 T006367

14XA95 T006013

12X372 T006161

08X436 T005549

07XA26 T005857

02X389 T005869

261001 T006402

Page 191 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Construct Student Center Closed

DESIGN: Campus Site Lighting - Phase II Closed

CONSTR: ADA Imrpovements- Ph IIB North Closed

DESIGN: Rehabilitate Ice Arena Maxcy Hall Closed

DESIGN: Program & Phasing Study for New Academic Space Active

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Rehab Plaza 1st Floor South - Plaza Active

DESIGN: Rehab 14th Floor to Enable 7th Floor Rehab Active

CONSTR: Upgrade Mechanical Systems for Safety at Upton Hall Closed

DESIGN: Center for Agriculture and Natural Resources - Commissioning Services Closed

DESIGN: Replace Main Cooling Tower - UHB Closed

DESIGN: Ambulatory Services Expansion Phase 1 Closed

CONSTR: Replace Surface on Athletic Turf Closed

DESIGN: Upgrade Site Electric Distribution System Active

CONSTR: Central Plant Upgrade Ph 1 Terminated

DESIGN: Construction Manager - Liberal Arts Building/Tuttle Exterior Closed

CONSTR: Knapp Hall Renovation - Phase 1 (Exterior Shell & Sitework) Closed

Page 192 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 193 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/17/2010 10/28/2013 21563953.00

12/01/2005 01/31/2011 44242.13

05/14/2012 01/14/2015 1766627.00

04/29/2011 04/28/2016 1031091.29

03/28/2016 11/03/2021 195246.00

12/18/2009 12/09/2015 648103.00

10/31/2016 01/16/2022 391270.63

09/26/2019 09/27/2025 302000.00

12/11/2017 01/14/2020 4956021.00

01/13/2011 07/23/2021 171898.80

11/01/2017 08/24/2025 412178.23

09/08/2010 11/30/2018 187167.00

05/19/2015 09/30/2017 1027546.00

08/10/2009 05/28/2020 1271000.00

08/08/2011 11/02/2013 5369620.00

10/17/2012 09/30/2015 532401.59

03/07/2018 10/26/2020 2659163.00

Page 194 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10074345.00 21563953.00 0.00

0.00 44242.13 0.00

916722.00 1766627.00 0.00

188869.87 1031091.29 0.00

0.00 29589.65 165656.35

24956.00 648103.00 0.00

0.00 313163.44 78107.19

0.00 118836.88 183163.12

0.00 4956021.00 0.00

9411.69 172370.40 -471.60

0.00 412178.23 0.00

0.00 187167.00 0.00

0.00 1027546.00 0.00

80216.81 1177364.03 93635.97

2847273.00 5369620.00 0.00

0.00 532401.59 0.00

0.00 2659163.00 0.00

Page 195 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

16 N 0

0 N 0

9 N 0

11 N 0

0 N 0

0 N 0

14 N 2

0 N 0

5 N 0

0 N 0

0 N 0

0 N 0

4 N 0

30 N 1

2 N 0

0 N 0

3 N 0

Page 196 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

J. Kokolakis Contracting, Inc

CHA Consulting, Inc

S&W Contracting of WNY, Inc

Architectural Resources, P.C.

Kideney Architects, P.C.

Sorensen Gross Construction Services

Lacey Thaler Reilly Wilson Arch &Preservation

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Sicoli Construction Services, Inc.

Genesys Engineering, P.C.

Ramboll Americas Engineering Solutions, Inc.

Perkins Eastman Architects, P.C.

J.E. Sheehan Contracting Corp.

C & S Engineers, Inc.

Nicholson & Hall Corp.

Gilbane/Omega, A Joint Venture

All-Con Contracting Corp.

Page 197 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite A 1500 Ocean Avenue

3 Winners Circle P.O. Box 5269

701 Seneca Street Suite 425

505 Franklin Street

143 Genesee Street

3407 torrey Road

4th Floor 79 North Pearl Street

307 Seventh Avenue Suite 1501

4800 Hyde Park Boulevard

38 Maiden Lane

333 West Washington St PO Box 4873

115 Fifth Avenue - 3rd Fl

208 Sissonville Road

499 Col. Eileen Collins Blvd.

41 Columbia Street

16 Corporate Woods Blvd.

66 Brooklyn Avenue

Page 198 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bohemia NY 11716 USA

Albany NY 12205 USA

Buffalo NY 14210 USA

Buffalo NY 14202 USA

Buffalo NY 14203 USA

Flint MI 48507 USA

Albany NY 12208 USA

New York NY 10001 USA

Niagara Falls NY 14305 USA

Kingston NY 12401 USA

Syracuse NY 13221 USA

New York NY 10003 USA

Potsdam NY 13676 USA

Syracuse NY 13212 USA

Buffalo NY 14203 USA

Albany NY 12211 USA

Westbury NY 11590 USA

Page 199 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.79798342.719854)

834 42 2030

POINT (-78.8515742.876307)

300 66 2041

POINT (-78.87207542.900014)

300 33 2041

POINT (-78.86903142.890071)

300 34 2041

POINT (-83.73256442.976697)

438

POINT (-73.99353640.746986)

749 717 2095

POINT (-79.03985943.131099)

159 169 2131

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.991540.738916)

749 719 2095

POINT (-75.00240344.691026)

312 1597 2140

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.8727242.873598)

300 61 2041

POINT (-73.76499242.682572)

834 48 2030

POINT (-73.559492 60 997 2094

Page 200 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

31X247 T006238

111043 T006585

12X300 T005506

08X471 T006090

301033 T006576

09X308 T005759

11X316 T005576

31X216 T005189

22X7A7 T005631

801802 T006366

14X340 T004357

251029 D006604

031008 T006459

011044 T006358

151036 D006593

201039 T006578

Page 201 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Removal of Aboveground Fuel Oil Tank Closed

DESIGN: Replace Roof - Kehoe Administration Building Active

CONSTR: Rehab Computer Center - Stillman Hall Closed

CONSTR: Library Renovation Sojourner Truth Library Closed

DESIGN: Replace Emergency Generators - Cooke, Hochstetter and Dorsheimer Buildings Active

DESIGN: ConstructionMangement Services Rehabilitation of Fitzelle Hall (09308) Closed

DESIGN: Window Replacement Various Buildings Closed

DESIGN: Replace Main Electric Switchgear Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Engineering Services - McFarland-Johnson - Master Term Agreement Active

CONSTR: Rehabilitate Boiler #3, BSB Closed

CONSTR: Repair Masonry and Replace Windows - Evenden Tower Active

CONSTR: Selective Renovations - Butler Library Closed

DESIGN: Renovate Gym & Infill Pool - PE Building Active

CONSTR: Construct Health and Wellness Center Active

DESIGN: Renovate Bathrooms - Ranger School Active

Page 202 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 203 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/10/2016 02/19/2018 268099.00

12/11/2020 09/14/2023 97679.76

04/22/2009 03/01/2011 341343.00

08/04/2014 03/08/2017 9998536.00

07/14/2021 09/14/2023 490000.00

02/07/2011 01/30/2016 1170455.32

10/16/2009 10/08/2014 807455.00

12/05/2006 12/30/2011 164762.70

12/18/2009 01/31/2018 16664.00

09/14/2017 12/29/2025 5000000.00

10/07/1999 08/27/2004 462323.00

12/21/2020 08/12/2023 3610000.00

09/11/2018 12/03/2020 15946078.00

01/17/2020 02/01/2026 608446.88

08/11/2020 12/22/2023 96009253.00

11/01/2021 09/14/2023 384000.00

Page 204 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 268099.00 0.00

0.00 24379.62 73300.14

0.00 341343.00 0.00

0.00 9998536.00 0.00

0.00 3658.34 486341.66

262856.22 1170455.32 0.00

95766.32 807455.00 0.00

0.00 164762.70 0.00

0.00 16664.00 0.00

0.00 0.00 5000000.00

0.00 462323.00 0.00

0.00 1594365.00 2015635.00

0.00 15946078.00 0.00

0.00 234825.41 373621.47

0.00 33990385.00 62018868.00

0.00 0.00 384000.00

Page 205 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

8 N 1

0 Y 0

6 N 0

7 N 0

0 Y 0

16 N 0

22 N 1

5 N 1

0 N 0

62 N 10

4 N 1

4 N 1

5 N 1

0 N 0

0 N 0

0 N 0

Page 206 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Gemstar Construction Corp

JMZ Architects & Planners PC

Murnane Building Contractors, Inc.

Meyer Contracting Corp.

Pathfinder Engineers & Architects LLP

Gilbane Building Company

Richard Henry Behr Architect P.C.

Lockwood, Kessler & Bartlett, Inc.

Sorensen Gross Construction Services

Mc Farland-Johnson, Inc.

McNeil Sales & Service American

LeChase Construction Services LLC

Rodems Construction Co Inc

Lacey Thaler Reilly Wilson Arch &Preservation

Fahs Construction Group Inc.

Architecture +

Page 207 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

83 Jewett Avenue

190 Glen Street P. O. Box 725

P.O. Box 3048 104 Sharron Avenue

12 Charles Street

134 South Fitzhugh Street

7 Southwoods Boulevard 3rd Floor

2 Weaver Street

1 Aerial Way

3407 torrey Road

49 Court St, Metrocenter

15 Marlen Drive

Suite 303 31 Lewis Street

3555 N Buffalo Road

4th Floor 79 North Pearl Street

2224 Pierce Creek Road

297 River Street

Page 208 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Staten Island NY 10302 USA

Glens Falls NY 12801 USA

Plattsburgh NY 12901 USA

Pleasant Valley NY 12569 USA

Rochester NY 14608 USA

Albany NY 12211 USA

Scarsdale NY 10583 USA

Syosset NY 11791 USA

Flint MI 48507 USA

Binghamton NY 13902 USA

Robbinsville NJ 8691 USA

Binghamton NY 13901 USA

Orchard Park NY 14127 USA

Albany NY 12208 USA

Binghamton NY 13903 USA

Troy NY 12180 USA

Page 209 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.756646)

POINT (-74.12886640.635173)

585 605 2139

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.83373841.747473)

589 1003 2040

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.77519140.984241)

951 1343 2185

POINT (-73.51908640.801207)

59 1431 2094

POINT (-83.73256442.976697)

438

POINT (-75.91316742.098705)

968 475 2033

POINT (-74.6274240.203656)

2489

POINT (-78.75002942.787061)

282 956 2041

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.69016242.73246)

110 11 2138

Page 210 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

36X7A3 T005402

21X198 T005531

291014 T006440

071030 D006564

121009 T006502

31X215 T005455

24X293 T005982

01XA47 T006129

26X7A1 T005402

13X7A2 T005402

01XA95 D006659

091017 T006107

221009 T006468

26X278 D005275

13XD12 T005607

04X334 T005720

10X340 T005947

Page 211 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Rehab Elevators Closed

DESIGN: Rehab HTHW System Phase 2 Active

CONSTR: Renovate Data Center in Computer Center Building Active

CONSTR: Renovate Student Union, Bldg. No 29 Active

CONSTR: New Academic Building Closed

CONSTR: Construct New Water Tank Phase I Closed

DESIGN: Renovate Health Center Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Renovate Former Albany HS Building - Phase II Active

DESIGN: Rehab Roofs Various Buildings Closed

CONSTR: Install Emergency Generator Systems - Various Buildings Closed

CONSTR: Dental Hygiene Care Center Closed

DESIGN: New Computer Science Building Closed

DESIGN: Construction Manager-Bowers Hall Upgrade SciencesPhase I Closed

CONSTR: Renovations/Addition to Rice Creek Field Station Closed

Page 212 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 213 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/02/2008 01/21/2014 32835.00

06/09/2009 04/18/2011 425200.00

06/12/2019 12/12/2028 37056.92

06/04/2020 08/31/2022 2953038.00

04/26/2019 01/24/2022 7490536.00

01/23/2009 05/15/2013 55886393.00

07/11/2012 10/23/2013 308309.00

10/10/2015 05/14/2018 269640.00

06/02/2008 01/21/2014 134594.00

06/02/2008 01/21/2014 100293.00

06/17/2021 05/02/2024 23175000.00

11/15/2016 03/31/2022 11053.00

12/12/2018 01/25/2021 2304900.00

05/08/2007 08/21/2009 839818.00

01/05/2010 08/31/2016 2673904.94

11/09/2010 11/03/2015 1630885.81

03/21/2012 04/19/2015 5271842.00

Page 214 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 32835.00 0.00

0.00 425200.00 0.00

0.00 35287.93 1768.99

0.00 2657423.00 295615.00

0.00 7480536.00 10000.00

4065204.00 55886393.00 0.00

201478.00 308309.00 0.00

0.00 269640.00 0.00

0.00 134594.00 0.00

0.00 100293.00 0.00

0.00 419410.00 22755590.00

0.00 270730.34 -259677.34

0.00 2304900.00 0.00

0.00 839818.00 0.00

165747.35 2673904.94 0.00

584055.27 1630885.81 0.00

2709440.00 5271842.00 0.00

Page 215 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 0

14 N 3

5 N 2

1 N 0

3 N 0

4 N 0

38 N 3

0 N 0

0 N 0

2 N 0

0 N 0

2 N 0

7 N 0

41 N 0

22 N 0

6 N 0

Page 216 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JEMCO Electrical Contractors, Inc.

Centennial Elevator Industries, Inc.

Horizon Engineering Associates, LLP

William H. Lane, Inc.

Murnane Building Contractors, Inc.

MPCC Corp.

Jat Construction Co., Inc.

Turner Construction Company

JEMCO Electrical Contractors, Inc.

JEMCO Electrical Contractors, Inc.

Consigli Construction Co. Inc.

Architecture +

Kircher Construction, Inc

Stalco Construction Inc.

Mitchell/Giurgola Architects, LLP

Barr & Barr, Inc

R.J.Taylor Gen Contractor DBA Taylor The Builder

Page 217 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

271 42nd Street

23-82 Brooklyn Queens Expressway (Bqe) West

358 West Jefferson Street Suite 300

113 Court Street

P.O. Box 3048 104 Sharron Avenue

81 Rockdale Avenue

2109 River Road

Suite 200 50 Lakefront Boulevard

271 42nd Street

271 42nd Street

199 West Road Suite 100

297 River Street

3090 Mt. Morris-Geneseo

1316 Motor Parkway

Film Center Bldg, Ste 711 630 Ninth Avenue

260 Cochituate Road 2nd Floor

2580 Baird Road

Page 218 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11433 USA

Long Island City NY 11103 USA

Syracuse NY 13204 USA

Binghamton NY 13901 USA

Plattsburgh NY 12901 USA

New Rochelle NY 10801 USA

Coeymans NY 12045 USA

Buffalo NY 14202 USA

Brooklyn NY 11433 USA

Brooklyn NY 11433 USA

Pleasant Valley NY 12569 USA

Troy NY 12180 USA

Mount Morris NY 14510 USA

Islandia NY 11749 USA

New York NY 10036 USA

Framingham MA 1701 USA

Penfield NY 14526 USA

Page 219 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01047940.652508)

894 815 2090

POINT (-76.15821943.047105)

687 711 2132

POINT (-75.90988242.099089)

968 475 2033

POINT (-73.79305740.905212)

960 1450 2185

POINT (-73.74910542.543417)

112 1158 2138

POINT (-74.01047940.652508)

894 815 2090

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.8433841.749544)

589 1003 2040

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.85900242.730769)

740 321 2091

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-71.40292242.30266)

1915

POINT (-77.4627243.110943)

540 366 2093

Page 220 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X364 T005680

231020 T006368

12X261 D005411

06X836 T005853

14X7B2 T005968

05X267 T006441

321087 T006589

02X385 T005746

26X273 T005419

03X383 T005630

801801 T006357

36X118 T005395

27X230 T005566

04X336 T005981

29X414 T005741

07XA14 T005193

30XA36 T006170

251005 T006470

Page 221 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Roof - Various Buildings Closed

DESIGN: Mechanical & Electrical Systems Study - MacArthur & Wicks Halls Closed

CONSTR: Upgrade Underground Site Infrastructure - Site Improvements, Phase I Closed

DESIGN: Program and Phasing Study: Sturges Quad Area Projects Closed

CONSTR: Job Order Contracting Program - New York Closed

DESIGN: Renovate Houghton Hall Active

DESIGN: Study - Domestic Hot Water System Design/Technical Review and Investigation - MART/NBT Active

CONSTR: Upgrde Elevators, Various Buildings Closed

CONSTR: Rehab Hale Hall/Abate Asbestos Closed

CONSTR: JOCs - Buffalo Region Closed

DESIGN: Architectural Services - Kideney Architects - Master Term Agreement Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Student Activity Center Renovation (STUAC), Ph II Closed

CONSTR: Dowd Renovations - Phase II Closed

DESIGN: Rehabilitate Plaza Exterior Pathways Active

DESIGN: Science III/IV Addition - Commissioning Services Closed

DESIGN: Renovate Cooke/Hochsetter Closed

CONSTR: Replace Emergency Generators Various Buildings, Phase 2 Closed

Page 222 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 223 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/16/2010 01/01/2012 887537.00

01/19/2018 09/28/2026 50974.70

07/16/2008 12/31/2010 3125482.00

12/12/2013 12/14/2015 112860.75

05/21/2012 08/31/2018 169159.00

12/20/2018 07/26/2029 156123.20

05/17/2021 09/14/2023 122860.00

11/15/2010 09/15/2013 1264295.00

09/09/2008 03/01/2013 25282280.00

12/18/2009 12/08/2015 397896.00

09/14/2017 12/23/2025 5000000.00

04/15/2008 09/30/2014 891413.00

09/25/2009 09/17/2014 998586.68

06/26/2012 12/15/2014 17223042.00

12/29/2010 12/15/2015 1079032.54

03/29/2007 12/31/2013 149111.78

08/06/2015 11/23/2020 1004240.15

12/17/2018 04/30/2021 807861.00

Page 224 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29158.00 887537.00 0.00

0.00 50974.70 0.00

0.00 3125482.00 0.00

0.00 112860.75 0.00

0.00 169159.00 0.00

0.00 138360.64 17762.56

0.00 1164.02 121695.98

350280.00 1264295.00 0.00

660920.00 25282280.00 0.00

0.00 397896.00 0.00

0.00 0.00 5000000.00

99413.00 891410.00 3.00

39719.63 998586.68 0.00

3894026.00 17223042.00 0.00

251853.91 1076430.81 2601.73

18794.15 149111.78 0.00

0.00 1004240.15 0.00

0.00 807861.00 0.00

Page 225 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

22 N 3

0 Y 0

4 N 0

0 N 0

0 N 0

0 N 0

0 N 0

3 N 0

3 N 0

0 N 0

86 N 19

0 Y 0

31 N 1

8 N 0

30 N 0

0 N 0

16 N 1

4 N 2

Page 226 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Dimitri Enterprises, Inc.

Pathfinder Engineers & Architects LLP

Barrett Paving Materials, Inc.

Stieglitz Snyder Architecture

Corbex, Inc.

Wendel WD Arch, Engr, Surv. & Land Architecture

RMF Engineering, Inc., P.C.

Schindler Elevator Corporation

EW Howell Company, Inc.

Sorensen Gross Construction Services

Kideney Architects, P.C.

Cutting Edge Group, LLC

Sasaki Associates, Inc.

Bette & Cring, LLC

Abel Bainnson Butz, LLP

C.J. Brown Energy & Engineering, P.C.

Ashley McGraw Architects DPC

Nelcorp Electrical Contracting Corporation

Page 227 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2nd Floor 135 58th Street

134 South Fitzhugh Street

26572 Nys Rt. 37

425 Franklin Street

74-16 Grand Avenue

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

1A Pine West Plaza

50 Vantage Point Drive

Suite 600 245 Newtown Road

3407 torrey Road

143 Genesee Street

14 Walkup Cutoff Road P.O. Box 733

64 Pleasant Street

18438 U.S. Route 11

Suite 1105 80 Eighth Avenue

Suite 204 4245 Union Road

15th Floor 125 East Jefferson Street

35 North Kelly Avenue

Page 228 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11220 USA

Rochester NY 14608 USA

Watertown NY 13601 USA

Buffalo NY 14202 USA

Elmhurst NY 11373 USA

Williamsville NY 14221 USA

Albany NY 12205 USA

Rochester NY 14624 USA

Plainview NY 11803 USA

Flint MI 48507 USA

Buffalo NY 14203 USA

Lake George NY 12845 USA

Watertown MA 2472 USA

Watertown NY 13601 USA

New York NY 10011 USA

Buffalo NY 14225 USA

Syracuse NY 13202 USA

Endwell NY 13760 USA

Page 229 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.61223443.150506)

537 1666 2093

POINT (-78.87302942.897113)

300 33 2041

POINT (-73.88686240.730363)

196 843 2137

POINT (-73.86458842.710592)

814 42 2030

POINT (-77.75770543.155466)

543 1683 2093

POINT (-83.73256442.976697)

438

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.64807743.386894)

818 128 2183

POINT (-71.18796742.366181)

1915

POINT (-75.93432943.933537)

840 1466 2089

POINT (-76.02526642.109078)

938 388 2033

Page 230 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01XA51 T005712

05X257 D005148

22X197 T005624

351001 T006437

01XA87 T006208

311009 T006450

29X441 T005840

14X496 T005806

03X435 T006065

201000 T006108

30XA95 T006487

01X7A9 T005956

36X094 T004924

80X700 T006405

03X368 T005510

251002 T006291

23X200 T005409

Page 231 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Construction Management Services - New Business School Closed

CONSTR: Rehab Rockefeller Arts Center Bldg #4 Closed

DESIGN: Commissioning - Allied Health Closed

DESIGN: Update/Replace HVAC Components - Harder Hall Active

DESIGN: Construct ETEC Building - 2020 Active

CONSTR: Replace Roofs, Natural Science & Clark Center Active

DESIGN: Rehabilitate Exteriors - Various Buildings Active

DESIGN: Upgrade HVAC Systems BSB Active

CONSTR: JOCs - Buffalo Region Closed

DESIGN: Wanakena Ranger School & Cranberry Lk BS CM Energy Conserv & ADA Closed

CONSTR: South Campus Fire Alarm Replacement - Abbott Library Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Restoration Of Exterior Windows And Door Closed

CONSTR: Job Order Contracting - Syracuse Region Active

DESIGN: Rehab Rockwell Hall - 2nd Floor Closed

CONSTR: Repl Exhaust Fans & Upgrade Fume Hood Controls Evenden Hall Closed

DESIGN: Convocation, Athletic Recreation Center Closed

Page 232 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 233 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/06/2010 09/29/2015 1698184.63

05/23/2006 12/30/2009 4116159.00

10/07/2010 10/31/2018 102791.10

06/13/2019 10/25/2027 49780.00

01/26/2016 07/23/2022 13296963.84

07/12/2018 01/20/2021 2500000.00

05/21/2012 07/30/2018 534565.82

05/06/2011 08/31/2022 5265819.00

04/23/2015 05/01/2018 34536.00

04/22/2015 08/18/2021 580861.01

03/15/2019 12/01/2020 912080.00

04/18/2012 11/20/2018 126270.00

01/27/2006 04/30/2009 108710.25

03/12/2018 06/01/2022 8000000.00

05/12/2009 05/04/2014 1275298.46

11/30/2016 01/04/2019 1035920.00

07/30/2008 07/24/2013 1712848.93

Page 234 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

390980.32 1698184.63 0.00

0.00 4116159.00 0.00

60025.35 102791.10 0.00

0.00 43117.75 6662.25

0.00 10681785.36 2615178.48

0.00 1716696.00 783304.00

0.00 520766.66 13799.16

170566.30 4685400.01 580418.99

0.00 34536.00 0.00

0.00 618603.01 -37742.00

0.00 912080.00 0.00

98045.00 126270.00 0.00

0.00 82119.90 26590.35

0.00 5750010.00 2249990.00

233445.63 1275298.46 0.00

0.00 1035920.00 0.00

39902.06 1712848.93 0.00

Page 235 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

21 N 0

1 N 0

0 N 0

0 N 0

25 N 0

6 N 1

0 N 0

24 N 4

0 N 0

0 N 0

2 N 0

0 Y 0

0 N 0

1 N 0

28 N 3

2 N 0

11 N 0

Page 236 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Skanska Usa Building, Inc

B R D, Inc.

Bergmann Associates, Inc.

C.J. Brown Energy & Engineering, P.C.

Cannon Design Arch & Engineering

ICON Construction Group Inc.

Hoffmann Architects, Inc.

Joseph R. Loring & Associates, Inc.

Sorensen Gross Construction Services

Architecture +

O'Connell Electric Co.

Cutting Edge Group, LLC

Collins & Scoville Architects, P.C.

Upstate Companies 1, LLC

Architectural Resources, P.C.

J & K Plumbing & Heating Co, Inc.

Architectural Resources, P.C.

Page 237 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1633 Littleton Road

82 Pearl Street

28 East Main Street 200 First Federal Plaza

Suite 204 4245 Union Road

360 Madison Avenue 11th Floor

500 Mamaroneck Avenue

462 Seventh Avenue

21 Pennsylvania Plaza 14th Floor

3407 torrey Road

297 River Street

830 Phillips Road

14 Walkup Cutoff Road P.O. Box 733

40 Beaver Street

1690 State Highway 8

505 Franklin Street

24 Thorp St PO Box 25 Westview Stat

505 Franklin Street

Page 238 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Parsippany NJ 7054 USA

Buffalo NY 14202 USA

Rochester NY 14614 USA

Buffalo NY 14225 USA

New York NY 10017 USA

Harrison NY 10528 USA

New York NY 10018 USA

New York NY 10001 USA

Flint MI 48507 USA

Troy NY 12180 USA

Victor NY 14564 USA

Lake George NY 12845 USA

Albany NY 12207 USA

Mt. Upton NY 13809 USA

Buffalo NY 14202 USA

Binghamton NY 13905 USA

Buffalo NY 14202 USA

Page 239 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.4598140.847402)

2492

POINT (-78.87702342.881202)

300 33 2041

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.97774740.754913)

749 740 2095

POINT (-73.74306940.976938)

973 1249 2185

POINT (-73.99000240.751854)

749 741 2095

POINT (-83.73256442.976697)

438

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.45589942.99842)

799 413 2133

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.75257842.648466)

814 44 2030

POINT (-75.38238442.424467)

269 441 2037

POINT (-78.87207542.900014)

300 33 2041

POINT (-75.92500542.103463)

968 479 2033

POINT (-78.872075 300 33 2041

Page 240 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07XA41 T005989

12X339 T005672

32X468 T006472

07XA58 T006286

02X395 T005907

24X267 T005355

21X151 T005555

101025 T006455

28X358 T005069

291028 T006492

36X124 T005395

111011 T006097

401010 T006458

30XA13 T005356

031003 T006098

241045 T006578

Page 241 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Const Manager - OConnor Johnson Closed

DESIGN: Upgrade HVAC/Labs Stowell Hall Closed

CONSTR: Job Order Contracting - NYC Region Active

CONSTR: Rehabilitate Science IV Ph 1 Closed

CONSTR: Replace Roofs - Brockway and Dailey Halls Closed

DESIGN: Upgrade Campus-Wide Fire Alarm Hub (University Police Station) Closed

CONSTR: Replace Roof Riesenberg Hall Closed

DESIGN: Replace/Reconstruct Terracotta - Sheldon Hall Active

DESIGN: Kapoor Hall Renovation Closed

CONSTR: Replace Exterior Windows & Doors PAC & Natural Science Buildings Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Mechanical Systems Study Memorial Hall Closed

CONSTR: Interior Rehab & Lighting 111 West Avenue Closed

DESIGN: Replace Roofs - Various Buildings Closed

DESIGN: Renovate B-Wing at Buckham Hall Closed

DESIGN: Renovate Warehouse and PM Shop and Replace Pole Barn Active

Page 242 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 243 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/28/2012 09/04/2017 34221.60

07/16/2010 12/31/2015 1028748.93

01/29/2019 04/11/2022 218534.00

11/23/2016 07/01/2019 11313609.00

01/05/2012 08/22/2013 900938.00

05/28/2008 06/12/2020 232595.71

07/23/2009 08/01/2011 828970.00

07/26/2018 09/24/2023 1352000.00

10/17/2005 08/05/2015 4606513.23

03/29/2019 12/15/2021 2286366.00

04/15/2008 09/30/2014 483522.00

02/16/2016 05/21/2023 68633.39

09/05/2018 09/24/2020 981703.00

02/12/2009 05/29/2015 340932.83

11/04/2015 11/03/2021 482832.69

08/04/2021 09/14/2023 293000.00

Page 244 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 34221.60 0.00

154932.18 1028748.93 0.00

0.00 218534.00 0.00

0.00 11313609.00 0.00

829094.00 900938.00 0.00

6357.00 232595.71 0.00

0.00 828970.00 0.00

0.00 537297.31 814702.69

83619.43 4574772.53 31740.70

0.00 2167297.00 119069.00

0.00 483522.00 0.00

0.00 68633.39 0.00

0.00 981703.00 0.00

37544.29 340932.83 0.00

0.00 482832.69 0.00

0.00 15346.44 277653.56

Page 245 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13 N 0

17 N 4

3 N 1

9 N 1

5 N 0

0 N 0

21 N 1

11 N 0

5 N 0

3 N 0

0 Y 0

0 N 0

3 N 1

0 N 0

0 N 0

0 N 0

Page 246 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

LeChase Construction Services, LLC

CS Arch

Volmar Construction, Inc

Fahs Construction Group Inc.

Ssm & Rc, Inc. DBA Spring Sheet Metal & Roofing Co.

C & S Engineers, Inc.

USA General Contractor Corp.

John G. Waite Associates, Architects, PLLC

S/L/A/M/ Architects & Engineers P.C.

L Holzner Electric Co. dba Holzner Construction

Cutting Edge Group, LLC

Hyman Hayes Assoc., LLC

Bast Hatfield Construction LLC

Bell & Spina Architects-Planners, P.C.

Kideney Architects, P.C.

Architecture +

Page 247 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

33 Frederick Street

40 Beaver Street

4400 Second Avenue

2224 Pierce Creek Road

678 S. Clinton Avenue

499 Col. Eileen Collins Blvd.

980 Dehart Place

384 Broadway

80 Glastonbury Blvd.

596 John Street

14 Walkup Cutoff Road P.O. Box 733

6 Wembley Court

1399 Vischers Ferry Road

Suite 201, The Bindery 215 Wyoming Street

143 Genesee Street

297 River Street

Page 248 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Binghamton NY 13901 USA

Albany NY 12207 USA

Brooklyn NY 11232 USA

Binghamton NY 13903 USA

Rochester NY 14620 USA

Syracuse NY 13212 USA

Elizabeth NJ 7207 USA

Albany NY 12207 USA

Glastonbury CT 6033 USA

Bridgeport CT 6604 USA

Lake George NY 12845 USA

Albany NY 12205 USA

Clifton Park NY 12065 USA

Syracuse NY 13204 USA

Buffalo NY 14203 USA

Troy NY 12180 USA

Page 249 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.900014)

POINT (-75.89947342.111222)

968 475 2033

POINT (-73.75257842.648466)

814 44 2030

POINT (-74.01363540.652263)

894 899 2090

POINT (-75.88027242.08193)

967 477 2033

POINT (-77.6006243.144098)

537 1679 2093

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.22238740.658707)

2532

POINT (-73.75040342.647659)

814 44 2030

POINT (-72.61857941.721624)

1041

POINT (-73.1973741.174967)

1040

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.84467942.740546)

834 42 2030

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.690162 110 11 2138

Page 250 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

39X145 T005194

08X7B9 T005956

22X244 T006043

07XA08 T004942

31X229 T006130

141011 T006411

14X7A5 T005402

271037 T006353

05X267 T006024

061030 T006550

23X201 T005350

091030 T006533

21X813 T005533

03X351 T005542

09X313 T005226

03X414 T005925

28X422 T005863

Page 251 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning Services - Field House Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Pioneer Center Satellite Boiler Install Closed

DESIGN: Site Utilities-Replace HTW Distribution Piping To Science I & II Closed

DESIGN: Renovation of Library/Academic Space Closed

DESIGN: Renovate Pharmacy UHB Basement Closed

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Renovate Educational Opportunity Center - Syracuse Active

DESIGN: Renovate Houghton Hall Active

DESIGN: Renovate Milne Library Active

DESIGN: Replace Campus Electric Substation, Provide Emergency Power System Closed

CONSTR: Construct New Emergency Services Building Active

DESIGN: Facilities Master Plan - Maritime College Closed

DESIGN: Exterior Rehab - Various Bldgs, Ph III Closed

DESIGN: Rehabilitate Fine Arts Building, Phase II Closed

DESIGN: Replace Central Heating Plant Closed

CONSTR: Hayes Hall Building Wide Restoration Closed

Page 252 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 253 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/19/2008 12/31/2013 90577.83

04/18/2012 11/20/2018 122409.00

12/11/2013 11/19/2015 410020.00

12/28/2005 06/18/2010 88047.84

11/10/2015 08/30/2022 416359.00

01/22/2019 06/06/2024 1379.04

06/02/2008 01/21/2014 58568.00

09/16/2020 06/02/2025 1085031.00

09/25/2013 02/01/2022 4527792.63

03/19/2020 07/17/2025 3641000.00

09/19/2008 10/01/2014 150941.34

12/10/2019 03/14/2022 5660700.00

07/16/2009 01/10/2011 565671.88

07/22/2009 03/30/2015 955137.69

02/23/2007 09/09/2012 1340926.14

03/14/2012 11/09/2012 154778.00

08/31/2011 08/09/2014 10403858.00

Page 254 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

252.60 93475.45 -2897.62

0.00 122409.00 0.00

0.00 410020.00 0.00

0.00 88047.84 0.00

0.00 804686.66 -388327.66

0.00 1379.04 0.00

0.00 58568.00 0.00

0.00 64027.28 1021003.72

0.00 3650844.74 876947.89

0.00 1394025.55 2246974.45

3314.16 553941.34 -403000.00

0.00 5195482.00 465218.00

0.00 565671.88 0.00

220794.10 955137.69 0.00

0.00 1340926.14 0.00

112450.00 154778.00 0.00

3502067.00 10403858.00 0.00

Page 255 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 Y 0

7 N 0

0 N 0

59 N 3

0 N 0

0 N 0

0 Y 0

28 N 1

30 Y 8

0 N 0

6 N 0

12 N 1

25 N 4

5 N 0

18 N 2

7 Y 1

Page 256 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

SmartEdge

Cutting Edge Group, LLC

Frey & Campbell, Inc.

C & S Engineers, Inc.

Jacobs Project Management Co.

Jacobs Project Management Co.

JEMCO Electrical Contractors, Inc.

Chiang O'Brien Architects

Mitchell/Giurgola Architects, LLP

JMZ Architects & Planners PC

Jacobs Civil Consultants, Inc.

Murnane Building Contractors, Inc.

Perkins Eastman Architects, P.C.

DiDonato Associates Engineering & Architectur

Architecture +

RMF Engineering, Inc., P.C.

SLR Contracting & Service Co, Inc.

Page 257 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 Peuquet Parkway

14 Walkup Cutoff Road P.O. Box 733

87 Lake Street P.O. Box 219

499 Col. Eileen Collins Blvd.

Suite 0603 Two Penn Plaza

Suite 0603 Two Penn Plaza

271 42nd Street

Crescent Building 217 North Aurora Street

Film Center Bldg, Ste 711 630 Ninth Avenue

190 Glen Street P. O. Box 725

Suite 0603 2 Penn Plaza

P.O. Box 3048 104 Sharron Avenue

115 Fifth Avenue - 3rd Fl

689 Main Street

297 River Street

Suite 300 5520 Research Park Drive

260 Michigan Avenue

Page 258 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Tonawanda NY 14150 USA

Lake George NY 12845 USA

Hammondsport NY 14840 USA

Syracuse NY 13212 USA

New York NY 10121 USA

New York NY 10121 USA

Brooklyn NY 11433 USA

Ithaca NY 14850 USA

New York NY 10036 USA

Glens Falls NY 12801 USA

New York NY 10121 USA

Plattsburgh NY 12901 USA

New York NY 10003 USA

Buffalo NY 14203 USA

Troy NY 12180 USA

Baltimore MD 21228 USA

Buffalo NY 14203 USA

Page 259 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.73246)

POINT (-78.86566943.01577)

280 8 2041

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.21916742.40922)

21 1779 2178

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.991540.738916)

749 719 2095

POINT (-78.87201942.89263)

300 34 2041

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.86998642.878521)

300 61 2041

Page 260 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07XA48 T005728

14XB03 T006033

11X293 T004925

30XB08 T006008

30XB27 T006200

411006 T006375

021028 T006370

03X390 T005341

30XA80 T005526

35X105 T005292

02X344 T005624

081013 T006497

151036 T006535

12X355 T006079

22X816 T005853

13XD63 T006160

05X338 T005926

08X496 T006106

Page 261 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade HTHW Interconnect Zone 1&2 Closed

CONSTR: Replace Windows BSB Closed

DESIGN: Renovate Sundowner Dining Closed

DESIGN: SMBS Commissioning BO Closed

CONSTR: Restore Crofts Hall Plaza & Site Closed

DESIGN: Renovate 10th floor for Pediatric Clinic Active

DESIGN: Reconstruct Allen Loop Plaza and New Campus Drive Closed

DESIGN: Demolish Laundry/Bakery Buildings Closed

DESIGN: Rehab Elevators Various Buildings Closed

DESIGN: Expansion of the School of Arts & Design Closed

DESIGN: Commissioning Services- Renovate Lathrop and Neff Hall Closed

CONSTR: Exterior Rehab Various Buildings Active

CONSTR: Construct Health and Wellness Center Active

CONSTR: Replace Roof, Service Complex Closed

DESIGN: Program Study - Agricultural Sciences Building Closed

DESIGN: Student Union Rehab Active

DESIGN: Construction Manager Rockerfeller Art Center Closed

DESIGN: Replace Plaza Deck, Haggerty Administration & Student Union Bldgs 39 and 38 Closed

Page 262 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 263 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/22/2010 04/06/2016 448119.49

10/03/2013 07/04/2016 4903729.00

12/14/2007 02/28/2012 273842.85

01/14/2013 05/01/2021 904839.31

11/25/2015 09/01/2017 800994.00

10/03/2017 11/14/2022 329825.00

12/07/2018 10/19/2026 29489.00

07/22/2008 04/01/2014 435464.75

06/15/2009 06/03/2014 415058.45

08/10/2007 10/31/2013 997713.70

08/22/2012 10/31/2018 80851.40

04/05/2019 12/07/2021 3898447.00

01/09/2020 09/18/2021 4753625.00

06/05/2014 12/31/2016 659161.00

02/10/2012 12/14/2015 76709.27

01/01/1900 05/02/2022 2689680.00

03/20/2012 12/31/2017 1660869.49

01/21/2015 02/09/2022 221471.39

Page 264 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

177668.96 448119.49 0.00

0.00 4903729.00 0.00

0.00 273842.85 0.00

0.00 904839.31 0.00

0.00 800994.00 0.00

0.00 248280.78 81544.22

0.00 29489.00 0.00

1558.65 435464.75 0.00

98389.40 415058.45 0.00

6787.61 997713.70 0.00

2915.50 80851.40 0.00

0.00 3819371.00 79076.00

0.00 4645976.00 107649.00

0.00 659161.00 0.00

76709.27 76709.27 0.00

0.00 2619072.45 70607.55

57086.66 1660869.49 0.00

0.00 221471.39 0.00

Page 265 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15 N 0

8 N 1

0 N 0

16 N 1

9 N 0

16 N 2

0 N 0

0 N 0

13 N 2

5 N 0

0 N 0

2 N 0

1 N 0

3 Y 1

0 N 0

63 N 6

13 N 1

0 N 0

Page 266 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Schuyler Engineering, P.C.

APS Contracting Inc.

Architecture +

Facility Dynamics Engineering

Manning Squires Hennig Co. Inc

NK Architects

M.J. Engineering and Land Surveying, P.C.

Wendel Duchscherer Arch. & Engs., P.C.

Architectural Resources, P.C.

Ikon.5 Architects

Bergmann Associates, Inc.

Bast Hatfield Construction LLC

Northland Associates, Incorporated

PTL Contracting Corp.

Stieglitz Snyder Architecture

Jacobs Project Management Co.

Campus Construction Management Group, Inc.

Hoffmann Architects, Inc.

Page 267 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 6 163 North Wellwood Avenue

155-161 Pennsylvania Ave

297 River Street

6760 Alexander Bell Drive Suite 200

8426 Seven Springs Road PO Box 685

The Woolworth Building 233 Broadway, Suite 2150

1533 Crescent Road

Suite 201 140 James Audubon Pkwy

505 Franklin Street

864 Mapleton Road

28 East Main Street 200 First Federal Plaza

1399 Vischers Ferry Road

4701 Buckley Road P.O. Box 2549

27840 County Road 193

425 Franklin Street

Suite 0603 Two Penn Plaza

6225 Sheraton Drive Suite 100

462 Seventh Avenue

Page 268 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lindenhurst NY 11757 USA

Paterson NJ 7503 USA

Troy NY 12180 USA

Columbia MD 21046 USA

Batavia NY 14020 USA

New York NY 10279 USA

Clifton Park NY 12065 USA

Amherst NY 14228 USA

Buffalo NY 14202 USA

Princeton NJ 8540 USA

Rochester NY 14614 USA

Clifton Park NY 12065 USA

Liverpool NY 13220 USA

Theresa NY 13691 USA

Buffalo NY 14202 USA

New York NY 10121 USA

Williamsville NY 14221 USA

New York NY 10018 USA

Page 269 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.15343840.898965)

2493

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.81120139.186874)

421

POINT (-78.13339143.006019)

792 489 2086

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-78.87207542.900014)

300 33 2041

POINT (-74.62907840.340091)

2490

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-78.87302942.897113)

300 33 2041

POINT (-73.99000240.751854)

749 741 2095

Page 270 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28X390 T006143

36X126 T005971

351000 T006101

111035 T006360A

01XA93 T006253

26X284 T005599

05X340 T005647

131062 T006439

15X478 T004921

211003 T006100

391010 T006431

141037 T006476

111052 T006578

36X113 T006126

12X312 D005421

07XA46 T005937

091015 T006345

Page 271 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Biomed Education Building - HVAC Improvements Closed

DESIGN: Rehab Plaza Garage Deck Closed

DESIGN: Rehab/Reconstruct Outdoor Kiln Facility Closed

DESIGN: Install Turf Field at the Field House Active

CONSTR: Replace Exterior Doors Uptown - Phase 1 Active

CONSTR: Exterior Rehabilitation - Whitman Hall, Bldg. No. 50 Closed

DESIGN: Rehabilitate Upgrade Elevators Closed

DESIGN: Rehabilitate Javits Lecture Center Active

DESIGN: Repair Historic Stone Wall - Weiskotten Hall Closed

DESIGN: Program Study - Rehabilitation & Addition - Marvin Tode S&E Building Closed

CONSTR: Reconstruct Various Roadways and Parking Active

DESIGN: Renovate Cafeteria Servery and Dining Area Active

DESIGN: Study - Welcome Center - Redcay Hall Active

CONSTR: Site Improvements - Phase 3B Closed

CONSTR: Rep. Windows/ Rep. Masonry - Maxcy Hall Replace Windows/Repair Masonry, Maxcy Closed

DESIGN: Renovate Computer Center Terminated

DESIGN: Rehabilitate Alumni Hall Active

Page 272 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 273 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/26/2015 12/30/2016 3398700.00

08/08/2012 06/28/2019 269810.20

06/11/2015 10/10/2023 111504.48

07/21/2019 11/09/2025 347309.16

04/19/2016 06/26/2020 2399098.00

11/06/2009 02/14/2013 1045715.00

03/19/2010 07/28/2017 237733.41

02/10/2021 05/04/2027 113308.00

02/12/2007 02/13/2012 41093.89

10/02/2015 02/05/2024 145421.21

05/18/2018 09/27/2019 824400.00

04/12/2019 04/15/2024 2276770.00

12/15/2021 09/14/2023 266760.00

01/20/2015 11/05/2016 1025649.00

10/06/2008 08/01/2010 508140.00

04/17/2012 04/20/2017 231405.97

08/30/2017 11/14/2022 2301157.00

Page 274 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 3398700.00 0.00

0.00 269810.20 0.00

0.00 157266.56 -45762.08

0.00 159219.21 188089.95

0.00 2178843.00 220255.00

0.00 1045715.00 0.00

0.00 237733.41 0.00

0.00 4882.01 108425.99

0.00 41093.89 0.00

0.00 145421.21 0.00

0.00 729021.00 95379.00

0.00 829213.09 1447556.91

0.00 0.00 266760.00

0.00 1025649.00 0.00

0.00 508140.00 0.00

175262.27 231405.97 0.00

0.00 1412770.61 888386.39

Page 275 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 0

18 N 5

0 N 0

0 N 0

5 N 2

13 N 0

5 N 0

14 N 4

0 N 0

0 N 0

5 N 0

27 N 9

0 N 0

6 N 1

5 N 0

34 N 2

35 N 5

Page 276 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Northland Associates, Incorporated

Hoffmann Architects, Inc.

Bell & Spina Architects-Planners, P.C.

Mosaic Associates Architects, DPC

Flower City Glass Co. of New York, LLC

Arrow Steel Window Corporation

Delta Engineers, Archs & Land Survs, DPC

Guth DeConzo Consulting Engineers, P.C.

Quinlivan,Pierik & Krause A/E DBA Qpk Design

Peter Gisolfi Associates

Central Paving Inc.

Francis Cauffman, Inc.

Architecture +

Bunkoff General Contractors, Inc.

Continental Construction, LLC

Ashley McGraw Architects DPC

Lacey Thaler Reilly Wilson Arch &Preservation

Page 277 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4701 Buckley Road P.O. Box 2549

462 Seventh Avenue

Suite 201, The Bindery 215 Wyoming Street

2 Third Street Suite 440

188 Mt. Hope Avenue

133 East Carmans Road

860 Hooper Road

433 River Street Suite 6004

450 South Salina Street P.O. Box 29

566 Warburton Avenue

4247 Acme Road

40 Worth Street Suite 300

297 River Street

790 Watervliet Shaker Rd.

PO Box 358 2125 State Hwy 812

15th Floor 125 East Jefferson Street

4th Floor 79 North Pearl Street

Page 278 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Liverpool NY 13220 USA

New York NY 10018 USA

Syracuse NY 13204 USA

Troy NY 12180 USA

Rochester NY 14620 USA

East Farmingdale NY 11735 USA

Endwell NY 13760 USA

Troy NY 12180 USA

Syracuse NY 13201 USA

Hastings-On-Hudson NY 10706 USA

Frankfort NY 13340 USA

New York NY 10013 USA

Troy NY 12180 USA

Latham NY 12110 USA

Gouverneur NY 13642 USA

Syracuse NY 13202 USA

Albany NY 12208 USA

Page 279 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.99000240.751854)

749 741 2095

POINT (-73.69002842.732277)

110 11 2138

POINT (-77.60942243.145739)

537 1679 2093

POINT (-73.42951240.728175)

1023 1115 2179

POINT (-76.0306842.12898)

938 388 2033

POINT (-73.68704742.736573)

110 11 2138

POINT (-76.15225243.045606)

687 711 2132

POINT (-73.8821840.995664)

974 1445 2185

POINT (-75.05966943.02887)

681 552 2088

POINT (-74.0067140.717277)

749 737 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.7967442.739147)

834 1288 2030

Page 280 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13XB53 T005132

10X340 T005609

02X383 T005356

30XA95 T006146

36X814 T005653

15X412 T004891

06X332 D005381

09X362 T005355

321039 T006352

22X7A5 T005631

04X159 T005090

16X283 T005493

01XA52 T005636

09X305 T004930

31X220 T005258

121033 T006603

09X364 T005872

09X418 T006279

Page 281 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: New Bio Technology Facility Closed

DESIGN: CM - Major Improvements to the Education & Science Buildings Closed

DESIGN: Replace Roofs, Exterior Envelope Improvements, Various Buildings, Ph I Closed

CONSTR: Replace Fire Alarm Systems North Campus PH III Closed

DESIGN: Facilities Master Plan Closed

DESIGN: Construction Manager For Vertical Expansion Project Closed

CONSTR: Infrastructure Improvements - Newton Closed

DESIGN: Replace HVAC/Domestic Hot Water Equipment - Alumni Hall Closed

DESIGN: Study - Exterior Envelope Conditions - Health Sciences Center Active

CONSTR: JOCs - Rochester Region Closed

CONSTR: Abate Asbestos-Sperry Learning Resource Center, Building 26 Closed

CONSTR: Barton Hall Masonry Repair & Restoration Closed

CONSTR: Replace Uptown Windows, Phase 1 Closed

DESIGN: Replace Cooling Towers, Milne Library Closed

DESIGN: Heat/Chill Plant And Distribution System Closed

DESIGN: Renovate Carson Hall, Construct Two Elevators Active

CONSTR: Replace Windows - Fine Arts & Lee Hall Closed

CONSTR: Construct New Welcome Center Closed

Page 282 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 283 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/31/2006 12/30/2013 1639963.52

01/29/2010 01/21/2015 3802935.57

09/10/2008 05/29/2015 22000.00

04/01/2015 03/31/2019 2176974.00

04/05/2010 09/26/2011 149027.06

08/20/2004 07/31/2011 6071108.04

04/01/2008 01/16/2010 2521626.00

06/18/2010 06/12/2020 232931.80

06/04/2018 11/01/2026 377771.08

12/18/2009 01/31/2018 125629.00

10/31/2005 10/31/2010 10643357.00

04/06/2009 08/13/2011 2984987.00

01/27/2010 08/08/2012 2988743.00

10/04/2005 03/31/2011 35045.56

04/24/2007 06/30/2013 790412.20

12/11/2020 12/29/2025 984438.40

08/02/2011 08/10/2013 1303186.00

10/12/2016 12/27/2018 4472430.00

Page 284 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

50690.97 1639963.51 0.01

1254349.50 3802935.57 0.00

7410.82 313178.21 -291178.21

0.00 2176974.00 0.00

8480.41 149027.06 0.00

665347.77 6071108.04 0.00

0.00 2521626.00 0.00

0.00 226283.85 6647.95

0.00 145594.89 232176.19

125629.00 125629.00 0.00

0.00 10643357.00 0.00

0.00 2984987.00 0.00

16831.00 2988743.00 0.00

0.00 35045.56 0.00

12308.53 790412.20 0.00

0.00 183125.44 801312.96

1259825.00 1303186.00 0.00

0.00 4472430.00 0.00

Page 285 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

13 N 0

0 N 0

3 Y 1

10 N 0

5 N 0

7 N 1

0 N 0

0 N 0

0 N 0

7 N 0

6 Y 1

6 N 0

0 N 0

5 Y 1

24 N 3

6 N 0

9 N 0

Page 286 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Davis, Brody, Bond, LLP

The Whiting-Turner Contracting Company

Bell & Spina Architects-Planners, P.C.

Weydman Electric, Inc.

Perkins Eastman Architects, P.C.

The Pike Company Inc

Holdsworth Klimowski Construction, LLC

C & S Engineers, Inc.

Bell & Spina Architects-Planners, P.C.

Sorensen Gross Construction Services

Sarkisian Brothers,Inc.

Lupini Construction, Inc.

Bunkoff General Contractors, Inc.

Sage Engineering Associates, L.L.P.

WM Group Engineers, P.C.

Mach Architecture, P.C.

Forno Enterprises, Inc.

Murnane Building Contractors, Inc.

Page 287 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 4200 One New York Plaza

Suite 180 1720 Spillman Drive

Suite 201, The Bindery 215 Wyoming Street

747 Young Street

422 Summer Street

One Circle Street

51 Goodway Drive South

499 Col. Eileen Collins Blvd.

Suite 201, The Bindery 215 Wyoming Street

3407 torrey Road

11 Charlotte Street P.O. Box 1925

6081 Trenton Rd

790 Watervliet Shaker Rd.

1211 Western Avenue

Two Penn Plaza, 380 Seventh Avenue #552

2000 Sheridan Drive

9330 County Highway 27

P.O. Box 3048 104 Sharron Avenue

Page 288 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10004 USA

Bethlehem PA 18015 USA

Syracuse NY 13204 USA

Tonawanda NY 14150 USA

Stamford CT 6901 USA

Rochester NY 14607 USA

Rochester NY 14623 USA

Syracuse NY 13212 USA

Syracuse NY 13204 USA

Flint MI 48507 USA

Binghamton NY 13902 USA

Utica NY 13502 USA

Latham NY 12110 USA

Albany NY 12203 USA

New York NY 10121 USA

Tonawanda NY 14223 USA

Trout Creek NY 13847 USA

Plattsburgh NY 12901 USA

Page 289 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.85788243.003747)

280 8 2041

POINT (-73.54042541.056236)

1040

POINT (-77.57812343.091163)

546 1682 2093

POINT (-76.13224343.113906)

690 730 2132

POINT (-83.73256442.976697)

438

POINT (-75.9306542.104909)

968 479 2033

POINT (-75.2130743.155128)

923 1465 625

POINT (-73.7967442.739147)

834 1288 2030

POINT (-73.82140642.675897)

814 40 2030

POINT (-78.85968342.980965)

278 158 2041

POINT (-75.28398842.21367)

562 457 2039

Page 290 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03X375 T005514

241033 D006641

04X339 T005999

131043 T006413

121002 T006264

31X206 T005125

301028 T006352

141077 T006367

07XA23 T005625

14X839 T006020

02X366 T005227

271023 T006385

10X345 T005364

231018 T006396

06X330 T005484

25X287 T005655

41X056 T005199

Page 291 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Science Bldg. #15 - Steam Tunnel Imp Closed

CONSTR: Renovate Bouck Hall - Bookstore & Related Student Life Active

CONSTR: Construct Student Life Center Closed

DESIGN: Rehab Chemistry Active

CONSTR: Replace Roofs PH 2 - Brainerd & Flagg Hall Closed

CONSTR: Rehabilitate Piping Insulation & Related Work-Public Areas-Academic VIllage Closed

DESIGN: Replace Roofs Beane Service and Helm Warehouse Closed

DESIGN: Replace BSB Chiller Active

CONSTR: Site Utilities Upgrades Elect Dist Ph 3 Closed

DESIGN: Materials Management Plan Closed

DESIGN: Special Events Recreation Center Closed

DESIGN: Construct Alternative Energy Building Active

DESIGN: Rehab of Elevators at Various Buildings Closed

DESIGN: Renovation and Addition Dana Hall Active

CONSTR: Infrastructure Improvements - Merritt Closed

CONSTR: Renovate Smith Hall-Phase II Building 8 Closed

DESIGN: Commissioning for 41056 Closed

Page 292 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 293 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/28/2009 10/30/2010 1581303.00

05/05/2021 09/26/2023 3573151.00

10/10/2012 05/21/2016 47240680.00

03/19/2018 04/17/2022 7217554.85

06/30/2016 12/30/2017 980760.00

01/26/2006 06/30/2010 695743.00

01/03/2018 11/01/2026 340899.14

02/01/2019 08/24/2025 822590.95

01/14/2010 02/15/2012 922048.00

10/11/2013 02/15/2015 222899.38

02/23/2007 01/31/2017 3131302.64

11/14/2017 12/05/2022 1725706.68

05/14/2009 07/16/2014 198801.44

01/26/2018 02/12/2023 1288884.04

03/26/2009 11/01/2010 1365357.00

02/05/2010 08/15/2012 2636896.00

11/18/2009 12/31/2013 7163.30

Page 294 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 1581303.00 0.00

0.00 1097939.00 2475212.00

3318825.00 47240680.00 0.00

0.00 4724347.86 2493206.99

0.00 980760.00 0.00

0.00 695743.00 0.00

0.00 340899.14 0.00

0.00 513280.94 309310.01

0.00 922048.00 0.00

0.00 222899.38 0.00

109867.84 3131302.64 0.00

0.00 1539986.46 185720.22

0.00 198801.44 0.00

0.00 1129168.34 159715.70

0.00 1365357.00 0.00

10346.00 2636896.00 0.00

5030.00 7163.30 0.00

Page 295 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10 N 0

5 N 0

12 N 0

29 N 3

6 Y 2

5 N 2

0 N 0

0 N 0

6 N 0

4 N 0

5 N 0

8 N 1

0 N 0

18 N 3

5 N 0

10 N 0

0 N 0

Page 296 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ingalls Site Development, Inc.

AOW Associates, Inc.

Fahs Construction Group Inc.

Goody Clancy Architecture LLC

PTL Contracting Corp.

Nirman Construction, Inc.

Bell & Spina Architects-Planners, P.C.

Ramboll Americas Engineering Solutions, Inc.

Mohawk Valley Utility Construction Corp.

The Schachinger Group, Inc

King & King Architects, LLP

SWBR Architects & Engineers, P.C.

Syska Hennessy Group, Inc

Mach Architecture, P.C.

John W. Danforth Co.

LeChase Construction Services, LLC

Syska Hennessy Group, Inc

Page 297 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 Meyer Road

21 Essex Street

2224 Pierce Creek Road

420 Boylston Street

27840 County Road 193

34-30 75th Street

Suite 201, The Bindery 215 Wyoming Street

333 West Washington St PO Box 4873

1 Prospect Avenue

3256 Goodview Court

358 West Jefferson Street

387 East Main Street

14th Floor 1515 Broadway

2000 Sheridan Drive

930 Old Dutch Road

205 Indigo Creek Drive

14th Floor 1515 Broadway

Page 298 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

West Seneca NY 14224 USA

Albany NY 12206 USA

Binghamton NY 13903 USA

Boston MA 2116 USA

Theresa NY 13691 USA

Jackson Heights NY 11372 USA

Syracuse NY 13204 USA

Syracuse NY 13221 USA

Albany NY 12206 USA

Fairfax VA 22031 USA

Syracuse NY 13202 USA

Rochester NY 14604 USA

New York NY 10038 USA

Tonawanda NY 14223 USA

Victor NY 14564 USA

Rochester NY 14626 USA

New York NY 10038 USA

Page 299 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.76098642.845655)

276 159 2041

POINT (-73.7785542.676983)

814 43 2030

POINT (-75.88027242.08193)

967 477 2033

POINT (-71.07265142.351364)

1918

POINT (-73.89138940.752139)

196 842 2137

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.77261842.673362)

814 43 2030

POINT (-76.15821943.047105)

687 711 2132

POINT (-77.60201543.158145)

537 1663 2093

POINT (-78.85968342.980965)

278 158 2041

POINT (-77.48203243.001202)

799 413 2133

POINT (-77.69216343.184897)

548 1685 2093

Page 300 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01XA94 T006408

221018 T006483

02X366 T005327

09X325 D005498

36X084 D005357

13XC29 T004947

06X7A6 T005631

221008 T006485

13XB61 T005492

241007 T006102

02X341 D005370

401009 T006278

03X393 T005443

231042 T006576

071049 T006407

15XA19 T005606

011005 T006377

Page 301 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Lecture Center Active

CONSTR: Upgrade HVAC Huntington Administration Closed

DESIGN: Building Commissioing - Special Events Recreation Center (SERC) Closed

CONSTR: ADA Modifications - Various Buildings, Phase II Closed

CONSTR: Replace Water Main - State University Plaza Closed

DESIGN: Repair Roof System - South Bldg/Stadium Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: Hinkle Library - Exterior Repair Active

CONSTR: Upgrade Site Utilities Phase 1 - Part 2 HSC and West Campus Closed

DESIGN: Upgrade Old Quad Electrical Distribution System Active

CONSTR: Swing Spaces - Various Buildings Phase 1 Closed

DESIGN: Program Study - Campus Wide FMP Update Closed

DESIGN: Underground Utility Improvements Phase 1 Closed

DESIGN: Replace HVAC - French Hall Active

DESIGN: Renovate Bartle Library, Third floor South and Penthouse Active

DESIGN: Commissioning Services New Academic Building Closed

CONSTR: Renovate Lecture Center Sub-Basement Closed

Page 302 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 303 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/19/2020 02/23/2028 670658.00

03/01/2019 01/31/2021 2040394.00

01/22/2008 08/29/2014 192193.50

04/15/2009 10/30/2010 767453.00

02/14/2008 06/30/2010 422012.00

09/16/2005 08/31/2010 108741.82

12/18/2009 01/31/2018 103364.00

03/06/2019 01/25/2022 4036342.00

03/27/2009 08/01/2012 7719482.00

06/11/2015 07/10/2023 462705.00

02/28/2008 07/01/2010 1997440.00

10/13/2016 11/04/2021 327817.21

02/10/2009 04/15/2015 2169014.76

11/09/2020 09/14/2023 742261.25

05/18/2021 10/15/2027 1249000.00

04/17/2012 07/23/2021 116778.00

10/10/2017 07/01/2020 5218703.00

Page 304 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 207381.87 463276.13

0.00 2040394.00 0.00

86079.52 192193.50 0.00

0.00 767453.00 0.00

0.00 422012.00 0.00

0.00 108741.82 0.00

34005.00 103364.00 0.00

0.00 4003838.00 32504.00

309882.00 7719482.00 0.00

0.00 675347.15 -212642.15

0.00 1997440.00 0.00

0.00 327817.21 0.00

282122.10 2169014.76 0.00

0.00 269327.76 472933.49

0.00 0.00 1249000.00

0.00 168877.59 -52099.59

0.00 5218703.00 0.00

Page 305 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

26 N 4

1 N 0

5 N 0

3 N 0

6 Y 1

0 N 0

0 N 0

1 N 1

8 N 1

0 N 0

7 N 1

11 N 1

13 N 0

0 Y 0

28 N 3

0 N 0

2 N 0

Page 306 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Gilbane Building Company

John W. Danforth Co.

Bergmann Associates, Inc.

Conmas Incorporated

Casale Excavating Inc

San Fanandre Justin Architects P.C.

Sorensen Gross Construction Services

Savarino Companies LLC

All State Boiler & Construction, Inc.

Labella Associates, D.P.C

Testa Construction Inc.

Plan A Architecture & Design PLLC

Labella Associates, D.P.C

Pathfinder Engineers & Architects LLP

Buffalo Construction Consultants, Inc.

Genesys Engineering, P.C.

MLB Construction Services LLC

Page 307 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 Southwoods Boulevard 3rd Floor

930 Old Dutch Road

28 East Main Street 200 First Federal Plaza

19 Alice Street

551 Main Ave

2nd Floor 200 Sunrise Highway

3407 torrey Road

500 Seneca Street

449 Cooke Street

Suite 201 300 State Street

12 Industrial Park Circle

1 Little West 12th Street

Suite 201 300 State Street

134 South Fitzhugh Street

496 Kennedy Road

38 Maiden Lane

One Stone Break Road

Page 308 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Albany NY 12211 USA

Victor NY 14564 USA

Rochester NY 14614 USA

Binghamton NY 13904 USA

Wynantskill NY 12198 USA

Rockville Centre NY 11570 USA

Flint MI 48507 USA

Buffalo NY 14204 USA

Farmington CT 6034 USA

Rochester NY 14614 USA

Rochester NY 14624 USA

New York NY 10014 USA

Rochester NY 14614 USA

Rochester NY 14608 USA

Buffalo NY 14227 USA

Kingston NY 12401 USA

Malta NY 12020 USA

Page 309 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.77073242.683397)

834 48 2030

POINT (-77.48203243.001202)

799 413 2133

POINT (-77.61117743.156034)

537 1673 2093

POINT (-75.89345542.105808)

968 478 2033

POINT (-73.61959642.689957)

125 38 2138

POINT (-83.73256442.976697)

438

POINT (-78.8572442.877333)

300 61 2041

POINT (-72.84438341.693111)

1041

POINT (-77.7377643.130125)

549 1683 2093

POINT (-74.0063340.739613)

749 738 2095

POINT (-77.61223443.150506)

537 1666 2093

POINT (-78.77606842.897923)

298 162 2041

POINT (-74.01451641.931949)

425 79 2182

Page 310 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

26X301 T005627

14X496 T006269

291009 T006370

201021 T006356

03X7A3 T005630

11X309 T005862

801801 T006353

25X280 T004924

081005 T006297

081043 T006358

051022 D006559

01XA80 T006341

291009 D006678

03X316 T004778

35X102 D005382

26X269 T005089

30XB27 T006102

051009 T006481

Page 311 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning Agent- Rehab Conklin Hall Closed

CONSTR: Upgrade HVAC Systems BSB Active

DESIGN: Install Backflow Prevention and Pump Station Active

DESIGN: Update Facilities Master Plan Closed

CONSTR: JOCs - Buffalo Region Closed

CONSTR: Facility Enhancements for the School of Business Closed

DESIGN: Architectural Services - Chiang O'Brien Architects - Master Term Agreement Active

DESIGN: Replace Roof, Farnsworth Hall, Bldg. No. 9 Closed

CONSTR: Replace Roof, Fine Arts Building Closed

DESIGN: Masonry Repairs at Exterior Entrances and Site Work - Old Main Active

CONSTR: Replace Roofs Dods & McEwen Halls Active

CONSTR: Renovate Building 27 Closed

CONSTR: Install Backflow Prevention and Pump Station Active

DESIGN: Masonry Restoration, Various Buildings Phase I Closed

CONSTR: Replace Roof - Harder Hall, Bldg. No. 8 Closed

DESIGN: Water Distribution System Improvements Closed

DESIGN: Restore Crofts Hall Plaza & Site Closed

CONSTR: Replace Windows Rockefeller Arts Closed

Page 312 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 313 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/09/2011 12/31/2018 85666.73

06/07/2016 09/01/2022 27663291.00

07/08/2019 10/19/2026 403392.00

02/01/2019 02/06/2027 270842.54

12/18/2009 12/08/2015 45082.00

09/09/2011 08/31/2015 15311531.00

06/30/2017 06/02/2025 5000000.00

01/11/2006 04/30/2009 44930.76

12/22/2016 10/22/2018 989122.00

08/27/2019 02/01/2026 266000.00

04/22/2020 07/18/2023 2930435.00

08/10/2017 03/06/2021 30635659.00

10/05/2021 11/02/2023 2632000.00

09/24/2002 03/06/2010 993983.06

03/12/2008 12/14/2009 754617.00

11/28/2005 07/02/2014 236825.38

01/21/2015 07/10/2023 100842.00

02/27/2019 12/07/2020 1417707.00

Page 314 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12273.21 85666.73 0.00

0.00 26032775.00 1630516.00

0.00 233136.41 170255.59

0.00 270842.54 0.00

45082.00 45082.00 0.00

8805977.00 15311531.00 0.00

0.00 0.00 5000000.00

0.00 44930.76 0.00

0.00 989122.00 0.00

0.00 122572.75 143427.25

0.00 2639120.00 291315.00

0.00 30635659.00 0.00

0.00 0.00 2632000.00

4230.63 939153.37 54829.69

0.00 754617.00 0.00

0.00 236825.38 0.00

0.00 118356.73 -17514.73

0.00 1417707.00 0.00

Page 315 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

7 N 1

0 N 0

0 Y 0

0 N 0

8 N 0

86 Y 19

0 N 0

12 N 2

0 N 0

1 N 0

3 N 0

1 N 0

5 N 1

1 N 0

5 N 0

0 N 0

1 N 1

Page 316 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

OLA Consulting Engineers, PC

H. M. Hughes Co., Inc.

M.J. Engineering and Land Surveying, P.C.

JMZ Architects & Planners PC

Sorensen Gross Construction Services

The Pike Company Inc

Chiang O'Brien Architects

Collins & Scoville Architects, P.C.

Aktor Corp.

Lacey Thaler Reilly Wilson Arch &Preservation

A. W. Farrell & Son, Inc.

Consigli Construction NY LLC

All State Boiler & Construction, Inc.

Flynn Battaglia Architects, P.C.

Universal Builders General Contractors, Inc.

Malcolm Pirnie, Inc

Labella Associates, D.P.C

Savarino Companies LLC

Page 317 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

50 Broadway

323 East 65th Street

1533 Crescent Road

190 Glen Street P. O. Box 725

3407 torrey Road

One Circle Street

Crescent Building 217 North Aurora Street

40 Beaver Street

44 Tivoli Street

4th Floor 79 North Pearl Street

3761 East Lake Road

199 West Road, Suite 100

449 Cooke Street

Suite S401 617 Main Street

5 East Main Street

Suite 600 50 Fountain Plaza

Suite 201 300 State Street

500 Seneca Street

Page 318 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Hawthorne NY 10532 USA

New York NY 10065 USA

Clifton Park NY 12065 USA

Glens Falls NY 12801 USA

Flint MI 48507 USA

Rochester NY 14607 USA

Ithaca NY 14850 USA

Albany NY 12207 USA

Albany NY 12207 USA

Albany NY 12208 USA

Dunkirk NY 14048 USA

Pleasant Valley NY 12569 USA

Farmington CT 6034 USA

Buffalo NY 14203 USA

Canisteo NY 14823 USA

Buffalo NY 14202 USA

Rochester NY 14614 USA

Buffalo NY 14204 USA

Page 319 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.79736141.107546)

963 1251 2185

POINT (-73.96059340.76393)

749 2095

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.6447743.309981)

824 783 2183

POINT (-83.73256442.976697)

438

POINT (-73.75257842.648466)

814 44 2030

POINT (-73.74605342.664917)

814 44 2030

POINT (-73.8433841.749544)

589 1003 2040

POINT (-72.84438341.693111)

1041

POINT (-77.60354342.269501)

42 1769 2178

POINT (-78.8572442.877333)

300 61 2041

Page 320 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

281001 T006479

141077 T006438

26X302 T005752

36X103 T004926

04X339 T005778

161026 T006440

03X387 T005865

07XA23 T005436

011008 D006598

12X335 T005629

03X404 T005356

01XA52 T005433

06X203 T004578

02X341 T005176

081013 T006287A

12X369 T006326

07X7B2 T005632

Page 321 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Renovate Townsend Hall -Interior Renovation Active

DESIGN: Replace BSB Chiller Active

DESIGN: Rehabilitate Elevators, Various Building Closed

DESIGN: Rehab 3rd Floor South Bldg 5 Closed

DESIGN: Commissioning - Construct Student Life Center Closed

DESIGN: Renovate Plant Science Building Active

DESIGN: Construction Management Sci Bldg PhaseII Closed

DESIGN: Site Utilities Upgrades Elect Dist Ph 3 Closed

CONSTR: Rehab Toilet Rooms for ADA - Podium Active

CONSTR: Rehabilitate Elevators, Raymond & Crane Halls, Bldg Nos. 001 & 09B Closed

DESIGN: Roof Replacements, Group B Various Bldgs Closed

DESIGN: Replace Uptown Windows, Phase 1 Closed

DESIGN: Replace Windows - Welles Hall Closed

DESIGN: Fire Alarm/HVAC Upgrades Abate Asbestos - Tower FA/Smith Closed

DESIGN: Exterior Rehab Various Buildings Active

CONSTR: Renovate Timerman Hall Closed

CONSTR: JOCs - Syracuse Region Closed

Page 322 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 323 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/26/2019 11/05/2021 6857640.00

01/23/2021 10/20/2027 86379.00

01/20/2011 05/02/2017 302651.89

11/27/2007 03/31/2011 20614.42

03/30/2011 03/21/2016 138278.53

08/24/2021 12/12/2028 169370.00

10/17/2013 06/01/2016 999829.40

02/11/2009 01/29/2014 453239.99

11/20/2020 12/15/2023 2662000.00

12/17/2009 07/31/2013 736773.00

09/01/2009 05/29/2015 503130.99

01/27/2009 01/14/2014 478326.55

09/08/2000 01/29/2014 154068.08

10/17/2006 04/24/2013 1522999.43

01/16/2017 01/16/2022 1254823.76

04/19/2017 10/12/2019 5889224.00

12/18/2009 12/09/2015 261987.00

Page 324 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 6828154.00 29486.00

0.00 3622.50 82756.50

118385.71 302651.89 0.00

0.00 160436.35 -139821.93

4718.44 138278.53 0.00

0.00 9310.00 160060.00

0.00 999829.40 0.00

26605.57 453239.99 0.00

0.00 860168.00 1801832.00

70489.00 736773.00 0.00

4983.31 503130.99 0.00

3767.82 478288.21 38.34

3846.38 154068.08 0.00

4974.27 1522999.43 0.00

0.00 187196.83 1067626.93

0.00 5889224.00 0.00

0.00 261987.00 0.00

Page 325 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 1

0 N 0

13 N 5

0 Y 0

25 N 1

35 N 5

0 N 0

11 N 1

6 N 0

2 N 0

0 N 0

19 N 1

3 N 0

5 N 0

0 N 0

5 N 1

0 N 0

Page 326 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rodems Construction Co Inc

Genesys Engineering, P.C.

H2M Archs, Engs, Land Surveying & Landscape

JMZ Architects & Planners PC

Genesys Engineering, P.C.

Horizon Engineering Associates, LLP

Turner Construction Company

Stantec Consulting Services Inc.

Wainschaf Associates, Inc.

Thyssen Krupp Elevator Corporation

Bell & Spina Architects-Planners, P.C.

Architecture +

SWBR Architects & Engineers, P.C.

Wendel Duchscherer Arch. & Engs., P.C.

Mosaic Associates Architects, DPC

Northern Tier Contracting

Sorensen Gross Construction Services

Page 327 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3555 N Buffalo Road

38 Maiden Lane

538 Broad Hollow Road 4th Floor East

190 Glen Street P. O. Box 725

38 Maiden Lane

358 West Jefferson Street Suite 300

1 Computer Drive South

13980 Collections Center

589 Third Avenue Ext

6067 Corporate Drive

Suite 201, The Bindery 215 Wyoming Street

297 River Street

387 East Main Street

Suite 201 140 James Audubon Pkwy

2 Third Street Suite 440

329A Scotch Settlement Rd

3407 torrey Road

Page 328 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Orchard Park NY 14127 USA

Kingston NY 12401 USA

Melville NY 11747 USA

Glens Falls NY 12801 USA

Kingston NY 12401 USA

Syracuse NY 13204 USA

Albany NY 12205 USA

Chicago IL 60693 USA

Rensselaer NY 12144 USA

East Syracuse NY 13057 USA

Syracuse NY 13204 USA

Troy NY 12180 USA

Rochester NY 14604 USA

Amherst NY 14228 USA

Troy NY 12180 USA

Gouverneur NY 13642 USA

Flint MI 48507 USA

Page 329 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.75002942.787061)

282 956 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.42240340.772002)

1020 1122 2179

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.15821943.047105)

687 711 2132

POINT (-73.81058842.719116)

834 42 2030

POINT (-73.70317642.644169)

129 1309 2138

POINT (-76.08756543.104073)

702 426 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.60201543.158145)

537 1663 2093

POINT (-73.69002842.732277)

110 11 2138

POINT (-75.42571244.350272)

330 1525 2140

POINT (-83.73256442.976697)

438

Page 330 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X346 T005365

041002 T006204

081047 T006361

28X431 T005909

241011 T006103

09X325 T005351

08X438 T005174

111017 T006438

12X339 T005901

01XA94 D006597

21X164 T005705

031036 T006486

15XA07 T005851

801801 T006465

151062 T006437

101027 T006595

411004 T006100

Page 331 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roofs - Morris, Bacon, Denison Halls Closed

DESIGN: Renovate Park Center Facade Closed

DESIGN: Replace Roofs - Smiley Arts, College Theater, Dorsky Museum and Faculty Office Building Active

CONSTR: Replace Roof Kimball Hall Closed

DESIGN: Upgrade Mechanicaland Plumbing Systems Prentice Hall Active

DESIGN: ADA Modifications - Various Buildings, Phase II Closed

DESIGN: Renovate Building 1 - Old Main In Guarantee

DESIGN: Renovate Memorial Hall Active

CONSTR: Upgrade HVAC/Labs Stowell Hall Closed

CONSTR: Renovate Lecture Center Active

CONSTR: Replace Steam Distribution, Phase 1 Closed

DESIGN: Renovate Classroom Building Active

CONSTR: IHP Expansion Closed

DESIGN: Architectural Services Master Term Agreement Active

DESIGN: Renovate Silverman Hall Active

DESIGN: Renovate Hewitt Hall Active

DESIGN: Renovate Lower Lobby Closed

Page 332 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 333 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/25/2009 04/14/2017 61808.19

01/14/2016 02/04/2021 1121059.49

08/26/2019 09/27/2025 75000.00

01/13/2012 11/26/2013 666351.00

07/31/2015 01/01/2023 551500.00

05/15/2008 12/31/2017 119257.81

10/17/2006 01/15/2013 2666091.66

10/21/2019 10/20/2027 83353.60

01/12/2012 01/31/2017 9295644.00

10/27/2020 11/08/2022 3498042.00

07/14/2010 11/01/2012 2808861.00

03/27/2019 03/28/2024 6761000.00

07/25/2011 06/30/2015 47471191.00

10/23/2018 01/13/2024 5000000.00

04/21/2021 10/25/2027 74434.60

07/28/2020 10/30/2025 2948050.00

12/02/2015 02/05/2024 312560.13

Page 334 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 61808.19 0.00

0.00 1121059.49 0.00

0.00 262230.42 -187230.42

553347.00 666351.00 0.00

0.00 498307.87 53192.13

0.00 120722.56 -1464.75

62128.90 2643246.05 22845.61

0.00 40497.36 42856.24

5964566.00 9295644.00 0.00

0.00 3134937.00 363105.00

120379.00 2808861.00 0.00

0.00 2364318.17 4396681.83

25174885.00 47471191.00 0.00

0.00 0.00 5000000.00

0.00 2305.00 72129.60

0.00 128736.26 2819313.74

0.00 312560.13 0.00

Page 335 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

22 N 2

0 N 0

5 N 0

0 N 0

0 N 0

5 N 0

19 N 4

4 N 0

4 N 1

9 N 0

29 N 2

8 N 0

86 N 19

23 N 6

36 N 6

0 N 0

Page 336 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Architecture +

Flynn Battaglia Architects, P.C.

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Grove Roofing Services, Inc.

IBC Engineering, Pc

Architecture +

The Hall Partnership Architects, LLP

Genesys Engineering, P.C.

Northland Associates, Incorporated

AOW Associates, Inc.

R & L Heating & Air Conditioning, Inc.

Architectural Resources, P.C.

Northland Associates, Incorporated

Labella Associates, D.P.C

C.J. Brown Energy & Engineering, P.C.

Turner Construction Company

Peter Gisolfi Associates

Page 337 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 River Street

Suite S401 617 Main Street

307 Seventh Avenue Suite 1501

131 Reading Street

Suite 219 3445 Winton Place

297 River Street

42 East 21st Street

38 Maiden Lane

4701 Buckley Road P.O. Box 2549

30 Essex Street

Unit 323 63 Flushing Avenue

505 Franklin Street

4701 Buckley Road P.O. Box 2549

Suite 201 300 State Street

Suite 204 4245 Union Road

1 Computer Drive South

566 Warburton Avenue

Page 338 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Buffalo NY 14203 USA

New York NY 10001 USA

Buffalo NY 14220 USA

Rochester NY 14623 USA

Troy NY 12180 USA

New York NY 10010 USA

Kingston NY 12401 USA

Liverpool NY 13220 USA

Albany NY 12206 USA

Brooklyn NY 11205 USA

Buffalo NY 14202 USA

Liverpool NY 13220 USA

Rochester NY 14614 USA

Buffalo NY 14225 USA

Albany NY 12205 USA

Hastings-On-Hudson NY 10706 USA

Page 339 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.976697)

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.99353640.746986)

749 717 2095

POINT (-78.82783142.840927)

300 109 2041

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.98829240.739319)

749 734 2095

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.77972242.677542)

814 43 2030

POINT (-78.87207542.900014)

300 33 2041

POINT (-73.81058842.719116)

834 42 2030

POINT (-73.8821840.995664)

974 1445 2185

Page 340 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

111037 T006360

221000 T006272

36X138 T006107

24X280 T005351

31X230 T005889

291025 D006565

39X145 T005674

29X442 T006215

03X375 T005247

061016 T006349

21X165 T005738

081068 T006590

021012 T006452

39X129 T004921

141057 T006412

29X337 T005488

29X413 T005731

Page 341 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall Assigned to Vendor

CONSTR: Construct Student Activities Center Closed

DESIGN: Replace Federal Building Windows Active

DESIGN: Dairy Complex Infrastructure Improvement Closed

CONSTR: Elevator Renovation & Upgrade-Camp Wide Closed

CONSTR: Rehab Roofs Music & Museum Active

CONSTR: Field House - Phase II - Site Work 39145 Closed

DESIGN: Rehabilitate Utilidors - Phase I High Temperature Hot Water System Closed

DESIGN: Commissioning Services-Renovate Science Bldg., 15, Phase 1, Bldg. 15 Closed

DESIGN: Renovate Sturges & Fraser Halls, Phase 1 Active

CONSTR: Rehab/Upgrade HVAC Systems Various Bldgs Closed

DESIGN: Water, Sewer and Storm Utility Master Plan Study Active

CONSTR: Replace Emergency Generators, Campus Wide Closed

DESIGN: Reroof Kunsela Hall Closed

DESIGN: Demo 34th Street Parking Garage Active

CONSTR: Site / Civil Repair ( near Campus Cntr South) Closed

DESIGN: Rehabilitate Exteriors / Dining Hall and Physical Education Closed

Page 342 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 343 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09/18/2019 09/26/2020 3529.88

08/12/2016 08/15/2018 1449368.00

02/03/2015 03/31/2022 136000.00

10/08/2008 12/31/2017 367656.04

11/21/2011 02/28/2014 1188760.00

06/04/2020 06/09/2023 3531534.00

04/29/2010 06/16/2013 2443748.00

02/15/2015 06/01/2018 100260.34

04/02/2007 11/29/2013 873655.63

09/08/2017 11/17/2022 3000000.00

10/07/2010 08/01/2014 4088825.00

06/22/2021 09/14/2023 719254.00

07/25/2018 01/11/2021 3154841.00

06/07/2007 02/13/2012 41415.14

02/21/2019 04/03/2025 309814.00

03/27/2009 04/01/2011 808465.00

10/22/2010 04/30/2019 1447922.01

Page 344 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 3529.88 0.00

0.00 1449368.00 0.00

0.00 126639.52 9360.48

74396.39 367656.04 0.00

1072712.00 1188760.00 0.00

0.00 3521534.00 10000.00

133577.00 2443748.00 0.00

0.00 100260.34 0.00

349765.20 873655.63 0.00

0.00 1696732.46 1303267.54

462167.00 4088825.00 0.00

0.00 0.00 719254.00

0.00 3154841.00 0.00

0.00 41415.14 0.00

0.00 128472.50 181341.50

0.00 808465.00 0.00

98103.52 1447922.01 0.00

Page 345 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

6 N 0

0 N 0

0 N 0

4 N 0

4 N 0

9 N 1

0 N 0

5 N 1

29 N 5

10 Y 2

0 N 0

2 N 1

0 N 0

0 N 0

6 N 0

41 N 1

Page 346 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Mosaic Associates Architects

LeChase Construction Services, LLC

Architecture +

Architecture +

Knightsbridge Constr. Corp.

Sea Breeze General Construction, Inc.

Cunningham Excavation, Inc.

Ramboll Americas Engineering Solutions, Inc.

Horizon Engineering Associates, LLP

Flynn Battaglia Architects, P.C.

DDC Air Conditioning

M.J. Engineering and Land Surveying, P.C.

Schuler-Haas Electric Corp.

Quinlivan,Pierik & Krause A/E DBA Qpk Design

LiRo Program and Construction Mgmt, P.C.

Marquise Construction Corp.

Kaeyer,Garment & Davidson Arch'ts. & Engrs., PC

Page 347 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

The Frear Building 2 Third Street, Suite 440

Suite 102 11849 East Corning Road

297 River Street

297 River Street

33 Great Neck Road

24-30 47th Street

3592 Cobblestone Drive PO Box 420

333 West Washington St PO Box 4873

800 Veterans Memorial Highway, Suite 310

Suite S401 617 Main Street

Unit S 375 North Street

1533 Crescent Road

240 Commerce Drive

450 South Salina Street P.O. Box 29

Three Aerial Way

10 St. Charles Street

285 Main Street

Page 348 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Corning NY 14830 USA

Troy NY 12180 USA

Troy NY 12180 USA

Great Neck NY 11021 USA

Astoria NY 11103 USA

Cazenovia NY 13035 USA

Syracuse NY 13221 USA

Hauppauge NY 11788 USA

Buffalo NY 14203 USA

Teterboro NJ 7608 USA

Clifton Park NY 12065 USA

Rochester NY 14623 USA

Syracuse NY 13201 USA

Syosset NY 11791 USA

Thornwood NY 10594 USA

Mount Kisco NY 10549 USA

Page 349 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.72754940.78624)

60 865 2094

POINT (-73.90482340.766936)

196 875 2137

POINT (-75.81828342.908733)

165 354 2092

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.20607540.821625)

1019 1428 2179

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-77.65122243.08094)

546 1682 2093

POINT (-76.15225243.045606)

687 711 2132

POINT (-73.78205541.124539)

963 1348 2185

POINT (-73.72551841.200454)

970 1328 2185

Page 350 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X381 T005895

311004 T006310

371006 T006652

36X083 T004930

271049 T006675

141031 T006336A

29X317 T004820

111028 T006358

141043 D006679

151116 T006585

20X228 T006077

05X309 T005463

231002 T006102

31X226 T005416

291049 T006350

32X468 T005938

12X318 T005380

131043 T006671

Page 351 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Steam Condensate Lines Phase 2 Closed

CONSTR: Replace Electrical Substation No. 45 Closed

DESIGN: General Litigation Support Active

DESIGN: Mechanical System Upgrades State University Plaza Closed

DESIGN: Galbreath Hall ADA and Classroom Renovation Active

DESIGN: Rehab Mechanical Systems- Isolation & Operating Rooms UHB Active

DESIGN: Dance Building Renovation/Waterproofing Closed

DESIGN: Masonry Repairs Study- Various Bldgs. Closed

CONSTR: Renovate Toilets and Locker Rooms- BSB Active

DESIGN: Facilities Master Plan Active

CONSTR: Replace Electrical Substation/Restore Site Closed

DESIGN: Science Technology Building Closed

DESIGN: Rehab Water Distribution System & Related Site Infrastructure Closed

DESIGN: Replace Campus Center Envelope- Bldgs 51 & 56 Closed

DESIGN: Rehab Masonry - Campus Centers North and South, Museum Active

DESIGN: New Medical & Res Trans & Bed Tower Active

DESIGN: Upgrade HVAC - Flagg Hall Closed

DESIGN: Rehab Chemistry Active

Page 352 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 353 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/08/2011 08/16/2014 1431417.00

02/28/2017 03/13/2019 1294064.00

06/02/2020 06/01/2023 200000.00

05/30/2007 03/31/2011 189265.22

11/18/2021 10/22/2024 65410.00

06/30/2017 07/28/2022 523363.65

03/05/2003 07/02/2014 652391.02

07/24/2018 02/01/2026 117448.34

10/05/2021 06/18/2024 2142820.00

08/20/2021 09/14/2023 1020600.00

06/09/2014 11/08/2016 4845641.00

02/20/2009 08/28/2018 4024482.61

06/09/2015 07/10/2023 365337.20

09/23/2008 12/31/2018 2069859.59

03/30/2020 07/16/2025 923243.64

04/04/2012 08/31/2021 37509636.00

04/24/2008 04/15/2013 269051.55

09/10/2021 10/18/2026 3599956.00

Page 354 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

633146.00 1431417.00 0.00

0.00 1294064.00 0.00

0.00 25030.09 174969.91

0.00 174836.62 14428.60

0.00 0.00 65410.00

0.00 136744.06 386619.59

0.00 652391.02 0.00

0.00 117448.34 0.00

0.00 0.00 2142820.00

0.00 25606.72 994993.28

0.00 4845641.00 0.00

389505.17 4024482.61 0.00

0.00 367962.20 -2625.00

131443.83 2069859.59 0.00

0.00 352614.48 570629.16

7336356.98 37464214.90 45421.10

0.00 269051.55 0.00

0.00 0.00 3599956.00

Page 355 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2 N 0

11 N 1

0 N 0

0 N 0

44 N 8

0 N 0

5 N 0

0 N 0

3 Y 1

0 Y 0

6 N 0

28 N 0

0 N 0

19 N 2

0 N 0

24 N 1

5 N 0

29 N 3

Page 356 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

All State Construction, Inc.

Hinck Electrical Contractor, Inc.

Sheats & Bailey PLLC

Sage Engineering Associates, L.L.P.

M/E Engineering, P.C.

MG Engineering DPC

Robert Siegel Architects

Lacey Thaler Reilly Wilson Arch &Preservation

Gryphon Construction, Inc.

JMZ Architects & Planners PC

Matco Electric Co., Inc.

Mitchell/Giurgola Architects, LLP

Labella Associates, D.P.C

Spector Group

Architecture +

AECOM USA, Inc.

Excel Engineering, P.C.

Gilbane Building Company

Page 357 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

449 Cooke Street P. O. Box 805

Suite 1 75 Orville Drive

PO Box 586 609 Vine Street

1211 Western Avenue

Suite 320 60 Lakefront Boulevard

116 West 32nd Street

432 Jay Street

4th Floor 79 North Pearl Street

28 Hilltop Boulevard

190 Glen Street P. O. Box 725

3913 Gates Road

Film Center Bldg, Ste 711 630 Ninth Avenue

Suite 201 300 State Street

220 Crossways Park West

297 River Street

15th Floor, Suite 1500 125 Broad Street

29 British American Blvd

88 Pine Street, 27th Flr

Page 358 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Farmington CT 6032 USA

Bohemia NY 11716 USA

Liverpool NY 13088 USA

Albany NY 12203 USA

Buffalo NY 14202 USA

New York NY 10001 USA

Katonah NY 10536 USA

Albany NY 12208 USA

East Brunswick NJ 8816 USA

Glens Falls NY 12801 USA

Vestal NY 13850 USA

New York NY 10036 USA

Rochester NY 14614 USA

Woodbury NY 11797 USA

Troy NY 12180 USA

New York NY 10004 USA

Latham NY 12110 USA

New York NY 10005 USA

Page 359 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-72.84438341.693111)

1041

POINT (-73.82140642.675897)

814 40 2030

POINT (-73.98964940.748897)

749 717 2095

POINT (-73.65655341.247592)

977 1254 2185

POINT (-74.41458740.438554)

2490

POINT (-73.6447743.309981)

824 783 2183

POINT (-75.97953842.107571)

937 466 2033

POINT (-73.48721540.804874)

59 1487 2094

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.82430442.762876)

834 1288 2030

POINT (-74.0063740.705427)

749 721 2095

Page 360 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

17X090 D005320

12X289 D005495

09X7A8 T005956

14X468 T005264

11X228 T005468

221005 T006397

13XD63 T006296

10X349 T005848

141014 T006334

12X374 T006356

25X237 T004765

221025 T006370

26X284 T004949

20X163 T005730

04X820 T005322

03X426 T006027

14XA18 T006184

Page 361 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Construct Parking Garage and Site Utilities Closed

CONSTR: Upgrade Recital Hall - Dunn Hall Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Replace Fuel Tanks Closed

CONSTR: Replace Cooling Towers/Chillers - Various Bldgs Closed

CONSTR: Install Satellite Boilers - Phase 3B Closed

CONSTR: Student Union Rehab Active

CONSTR: Roof Replacments at Culkin & Penfield Closed

DESIGN: Space Planning Study UHB Closed

DESIGN: Replace Fire Alarm System, Corridor Ceilings & Lighting - Crane Music Complex Closed

DESIGN: Critical Exterior ADA Updates Closed

DESIGN: Rehabilitate Pioneer Track and Field Active

DESIGN: Exterior Rehabilitation - Whitman Hall, Bldg. No. 50 Closed

DESIGN: New Academic Research Building Closed

DESIGN: Program Study - Sciences Closed

CONSTR: Buckham Hall Surge for Caudell Closed

CONSTR: HVAC Upgrade, University Hospital Closed

Page 362 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 363 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/26/2007 12/31/2010 12432627.00

03/19/2009 08/15/2010 662418.00

04/18/2012 11/20/2018 161280.00

04/11/2007 03/31/2013 3157017.00

02/06/2009 04/15/2011 1926873.00

02/02/2018 11/11/2019 1962412.00

12/23/2016 10/21/2021 66141853.00

06/24/2011 12/01/2012 903553.00

06/07/2017 09/14/2020 397477.69

03/13/2018 02/06/2027 153859.34

08/12/2002 07/02/2014 102291.95

10/29/2018 10/19/2026 475000.00

04/09/2008 12/31/2013 155511.71

10/22/2010 05/03/2021 4159911.83

01/07/2008 03/02/2009 455625.47

09/17/2013 05/04/2015 1799648.00

08/21/2015 12/28/2018 10390303.00

Page 364 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 12432627.00 0.00

0.00 662418.00 0.00

0.00 161280.00 0.00

0.00 3157017.00 0.00

0.00 1926873.00 0.00

0.00 1962412.00 0.00

0.00 66131853.00 10000.00

126198.00 903553.00 0.00

0.00 397477.69 0.00

0.00 153859.34 0.00

0.00 102291.95 0.00

0.00 193219.55 281780.45

0.00 155511.71 0.00

859284.22 4159911.83 0.00

0.00 455625.47 0.00

0.00 1799648.00 0.00

0.00 10390303.00 0.00

Page 365 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

6 N 0

0 Y 0

4 N 0

4 N 0

3 N 1

4 N 0

4 N 1

8 N 1

0 Y 0

3 N 0

0 N 0

0 N 0

39 N 0

5 N 0

8 N 0

5 N 1

Page 366 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

The Pike Company Inc

Northeast Construction Services, Inc.

Cutting Edge Group, LLC

James McCullagh Co. Inc.

Brockway Mechanical Systems, Inc.

Landry Mechanical Contractors, Inc.

EW Howell Company, Inc.

PAC & Associates of Oswego, Inc.

NBBJ Architecture, PLLC

JMZ Architects & Planners PC

Keystone Associates Arch, Engs. & Surveyors, LLC

M.J. Engineering and Land Surveying, P.C.

Hoffmann Architects, Inc.

Ellenzweig Associates, Inc.

Burt Hill Inc.

S&W Contracting of WNY Inc. DBA Spicer Group

Dynamic Mechanical Contractors Inc.

Page 367 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

One Circle Street

609 Erie Boulevard West

14 Walkup Cutoff Road P.O. Box 733

75 East Bethpage Road P. O. Box 380

102 Trade Road

164 Flint Hill Road

Suite 600 245 Newtown Road

11-G Fourth Avenue

140 Broadway, 29th Floor

190 Glen Street P. O. Box 725

229-231 State Street

1533 Crescent Road

462 Seventh Avenue

230 Congress Street

400 Morgan Center 101 East Diamond Street

701 Seneca Street Suite 425

2900 Westchester Avenue Suite 207

Page 368 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14607 USA

Syracuse NY 13204 USA

Lake George NY 12845 USA

Plainview NY 11803 USA

Plattsburgh NY 12901 USA

Leroy NY 14482 USA

Plainview NY 11803 USA

Oswego NY 13126 USA

New York NY 10005 USA

Glens Falls NY 12801 USA

Binghamton NY 13901 USA

Clifton Park NY 12065 USA

New York NY 10018 USA

Boston MA 2110 USA

Butler PA 16001 USA

Buffalo NY 14210 USA

Purchase NY 10577 USA

Page 369 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.16437343.049141)

687 713 2132

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.45588740.781659)

59 1490 2094

POINT (-73.46200944.717943)

3 202 2038

POINT (-77.90903242.979158)

747 311 2091

POINT (-76.53084443.451426)

240 667 2135

POINT (-74.01064640.709042)

749 722 2095

POINT (-73.6447743.309981)

824 783 2183

POINT (-75.91123542.102726)

968 475 2033

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.99000240.751854)

749 741 2095

POINT (-71.05438142.354415)

1918

POINT (-78.8515742.876307)

300 66 2041

POINT (-73.69876141.009992)

973 1339 2185

Page 370 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X348 T006174

05X338 T006055

26X277 T005172

15X412 T005269

01X7A7 T005395

28X390 T005997

41X049 T005627

01XA29 T005365

16X7A4 T005632

091002 T006387

41X059 T005958

02X392 T005713

251020 T006107

29X401 T005442

111047 T006578

08X473 T005627

Page 371 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Renovate Sibley Hall Phase 1 Closed

CONSTR: RAC Addition & Renov Closed

CONSTR: Replace Roof, Nold Hall Closed

CONSTR: University Hospital Vertical Expansion Interior Fit-Out Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Biomed Education Bldg- HVAC Improve Ph1 Closed

DESIGN: Commissioning for 3rd Floor Renov Closed

DESIGN: Replace Windows - Downtown Campus Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Rehabilitate Mechanical Systems - Morris Hall Closed

CONSTR: Rehab Research Areas Floors 16 & 17 Closed

DESIGN: Rehabilitate Exterior - Tuttle North & South Closed

DESIGN: Replace Roofs- Various Buildings Closed

DESIGN: Renovation of Humanities - Bldg. 41 Closed

DESIGN: Replace Roof - Central Heating Plant Active

DESIGN: Commissioning - New Science Building Active

Page 372 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 373 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/22/2015 08/08/2018 8223955.00

02/10/2014 10/11/2018 33887567.00

08/21/2006 08/08/2007 1006284.00

04/23/2007 12/31/2012 24739016.00

04/15/2008 09/30/2014 2949.00

08/07/2012 11/04/2014 1996866.00

11/17/2010 12/31/2018 88552.53

03/11/2009 04/14/2017 306074.27

12/18/2009 12/09/2015 170786.00

11/21/2017 10/01/2019 1209445.00

04/30/2012 05/19/2014 1975988.00

08/31/2010 06/01/2016 856239.01

01/01/1900 03/31/2022 67346.44

02/13/2009 12/15/2016 2795714.64

08/02/2021 09/14/2023 81000.00

03/12/2012 12/31/2018 199815.00

Page 374 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 8223955.00 0.00

0.00 33887567.00 0.00

0.00 1006284.00 0.00

0.00 24739016.00 0.00

0.00 2949.00 0.00

0.00 1996866.00 0.00

16946.52 88552.53 0.00

52211.90 259834.07 46240.20

0.00 170786.00 0.00

0.00 1209445.00 0.00

964164.00 1975988.00 0.00

60020.28 856239.01 0.00

0.00 67346.44 0.00

63328.36 2795714.64 0.00

0.00 10063.35 70936.65

28898.37 193236.96 6578.04

Page 375 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 0

4 N 0

12 N 1

2 N 0

0 Y 0

3 N 0

0 N 0

0 N 0

0 N 0

3 Y 1

11 N 0

30 N 3

0 N 0

24 N 1

0 N 0

0 N 0

Page 376 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bette & Cring, LLC

Northland Associates, Incorporated

Metropolitan Construction Systems

Fahs Construction Group Inc.

Cutting Edge Group, LLC

D.V. Brown & Associates, Inc.

OLA Consulting Engineers, PC

Architecture +

Sorensen Gross Construction Services

Wilkins Mechanical, Inc.

Stalco Construction Inc.

Klepper Hahn & Hyatt Engrs & Landscape Arch,PC

Architecture +

Kliment Halsband Architects, LLP

Architecture +

OLA Consulting Engineers, PC

Page 377 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

22 Century Hill Drive

4701 Buckley Road P.O. Box 2549

234 Union Avenue

2224 Pierce Creek Road

14 Walkup Cutoff Road P.O. Box 733

567 Vickers Street

50 Broadway

297 River Street

3407 torrey Road

6923 Herman Road

1316 Motor Parkway

5710 Commons Park Drive

297 River Street

20th Floor 322 Eighth Avenue

297 River Street

50 Broadway

Page 378 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Latham NY 12110 USA

Liverpool NY 13220 USA

Holbrook NY 11741 USA

Binghamton NY 13903 USA

Lake George NY 12845 USA

Tonawanda NY 14150 USA

Hawthorne NY 10532 USA

Troy NY 12180 USA

Flint MI 48507 USA

Syracuse NY 13209 USA

Islandia NY 11749 USA

East Syracuse NY 13057 USA

Troy NY 12180 USA

New York NY 10001 USA

Troy NY 12180 USA

Hawthorne NY 10532 USA

Page 379 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41.009992)

POINT (-73.75749142.771292)

834 1288 2030

POINT (-73.08614840.81175)

1022 1119 2179

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.64807743.386894)

818 128 2183

POINT (-78.85471943.01223)

280 8 2041

POINT (-73.79736141.107546)

963 1251 2185

POINT (-73.69016242.73246)

110 11 2138

POINT (-83.73256442.976697)

438

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-76.05413643.049436)

702 426 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.79736141.107546)

963 1251 2185

Page 380 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28X358 T005206

06X324 T005278

251002 T006107

04X342 T006202

01XA75 T005577

071042 D006566

031009 T006421

06X342 T006063

09X365 T005355

091067 T006589

071049 T006518

30XA60 T005427

041011 D006633

111008 T006325

011045 T006574

271008 T006305

Page 381 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Construction Manager - Acheson Hall Closed

DESIGN: Rehabilitate Bailey Hall Closed

DESIGN: REPLACE ROOF AND EXHAUST FANS EVENDEN HALL Closed

CONSTR: Reconstruct Campus Wide Electrical Distribution Closed

DESIGN: Data Center - Redundant Network Connectivity Closed

CONSTR: Rehabilitate Science IV Ph 2 Active

CONSTR: Replace Steam Line - Moot to Savage Halls Closed

CONSTR: New College Stadium Closed

DESIGN: Upgrade HVAC Systems Lecture Hall & Vivarium - Science I Closed

DESIGN: Underground Electrical Feeder Distribution Study Active

DESIGN: Renovate Bartle Library, Third floor South and Penthouse Active

DESIGN: Construction Manager - Buffalo Educational Opportuniy Center (EOC) Closed

CONSTR: Upgrade Site Lighting - Campus wide Active

CONSTR: Renovate & Upgrade Clinton Dining Hall Closed

DESIGN: Rehabilitate Physical Education Building Active

CONSTR: Replace Direct Burial MTHW Lines, Greenhouse to Library Closed

Page 382 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 383 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/12/2007 06/01/2013 2769959.12

06/13/2007 04/30/2017 2594162.58

06/09/2015 03/31/2022 232542.82

11/25/2015 01/25/2019 5477749.00

06/03/2011 02/03/2018 407908.10

06/04/2020 01/02/2023 13482730.00

04/12/2018 08/17/2019 791267.00

03/27/2014 12/31/2017 9665308.00

06/18/2010 06/12/2020 83387.76

12/09/2020 09/14/2023 350000.00

08/12/2019 09/06/2024 4131000.00

12/16/2008 11/28/2013 1253309.33

04/23/2021 01/08/2023 818900.00

04/11/2017 08/29/2019 6797357.00

07/16/2020 03/25/2026 1377460.00

02/01/2017 08/11/2018 474344.00

Page 384 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2772038.74 -2079.62

407090.67 2594162.58 0.00

0.00 256923.69 -24380.87

0.00 5477749.00 0.00

110265.31 407908.10 0.00

0.00 9909245.00 3573485.00

0.00 791267.00 0.00

0.00 9665308.00 0.00

32550.42 83387.76 0.00

0.00 50924.10 299075.90

0.00 1743452.07 2387547.93

499827.60 1231908.03 21401.30

0.00 67455.00 751445.00

0.00 6797357.00 0.00

0.00 349130.81 1028329.19

0.00 474344.00 0.00

Page 385 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

5 N 1

0 N 0

7 N 0

0 N 0

3 N 1

2 N 0

4 N 0

0 N 0

0 N 0

28 N 3

9 N 0

3 N 0

3 N 0

37 N 4

5 N 0

Page 386 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Turner Construction Company

SWBR Architects & Engineers, P.C.

Architecture +

Ridley Electric Co.,Inc.

C & S Engineers, Inc.

Fahs Construction Group Inc.

Mark Cerrone, Inc.

Fahs Construction Group Inc.

C & S Engineers, Inc.

RMF Engineering, Inc., P.C.

M/E Engineering, P.C.

Cannon Design

Billitier Electric, Inc.

MLB Construction Services LLC

S/L/A/M/ Architects & Engineers P.C.

HMI Mechanical Systems, Inc.

Page 387 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 200 50 Lakefront Boulevard

387 East Main Street

297 River Street

1810 LeMoyne Avenue P.O. Box 316

499 Col. Eileen Collins Blvd.

2224 Pierce Creek Road

2368 Maryland Avenue

2224 Pierce Creek Road

499 Col. Eileen Collins Blvd.

1A Pine West Plaza

300 Trolley Boulevard

2170 Whitehaven Road

760 Brooks Avenue

One Stone Break Road

80 Glastonbury Blvd.

345 Route 14

Page 388 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14202 USA

Rochester NY 14604 USA

Troy NY 12180 USA

Syracuse NY 13208 USA

Syracuse NY 13212 USA

Binghamton NY 13903 USA

Niagara Falls NY 14305 USA

Binghamton NY 13903 USA

Syracuse NY 13212 USA

Albany NY 12205 USA

Rochester NY 14606 USA

Grand Island NY 14072 USA

Rochester NY 14619 USA

Malta NY 12020 USA

Glastonbury CT 6033 USA

Lyons NY 14489 USA

Page 389 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41.107546)

POINT (-77.60201543.158145)

537 1663 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.14606243.085657)

690 726 2132

POINT (-76.13224343.113906)

690 730 2132

POINT (-75.88027242.08193)

967 477 2033

POINT (-79.03548343.125204)

160 169 2131

POINT (-75.88027242.08193)

967 477 2033

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.86458842.710592)

814 42 2030

POINT (-77.68189143.171416)

549 1664 2093

POINT (-78.97294343.021579)

290 526 2041

POINT (-77.65740843.130883)

537 1678 2093

POINT (-72.61857941.721624)

1041

POINT (-76.98927343.024779)

635 315 631

Page 390 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41X066 T005832

22X224 T005762

02X366 T005786

36X125 T005919

02X395 T005916

111041 D006610

41X049 T005346

09X403 T006206

01X844 T005697

201018 T006441

36X110 T005395

311035 T006629

261045 T006599

01XA94 T006508

23X207 T005839

12X334 T005458

Page 391 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renov 2nd Flr Lectur Hall Closed

DESIGN: Commissioning - Student Union / Student Activities Center Closed

CONSTR: Special Events Recreation Center, PH II Closed

DESIGN: Replace Exterior Doors & Security Sys Closed

CONSTR: Replace Roofs - Hartwell and Edwards Halls, Boiler Houses Closed

CONSTR: Reconstruct Kehoe Parking Lot & Walks Active

DESIGN: Multipurpose Space 3rd Floor Closed

CONSTR: Rehabilitate HVAC Mills & Wilsbach Dining Halls Closed

DESIGN: Facilities Master Plan - Albany Closed

DESIGN: Renovate Marshall Hall Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Feasibility Study - Upgrade Clark Athletic Center Building and Fields Active

DESIGN: Replace Campus Steam Distribution System Active

CONSTR: Renovate Lecture Center LC1 LC2 Active

DESIGN: Rreplace Windows & Rehab Entrances for Energy Conservation, Various Bldgs. Closed

DESIGN: Performing Arts Building Closed

Page 392 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 393 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/15/2014 01/16/2019 118496.87

03/11/2011 02/21/2016 148969.17

02/10/2011 02/28/2015 5862263.00

02/27/2012 03/05/2017 201481.79

01/13/2012 08/22/2013 1824655.00

01/22/2021 09/06/2022 978122.00

02/15/2008 08/08/2014 1455682.26

12/11/2015 08/12/2017 1250617.00

08/04/2010 01/27/2012 1614592.67

02/26/2019 07/26/2029 196406.00

04/15/2008 09/30/2014 456503.00

04/05/2021 04/28/2023 499136.00

12/01/2020 02/18/2026 2928000.00

05/31/2019 10/30/2021 7893268.00

06/29/2011 12/31/2018 420537.36

02/13/2009 10/15/2016 4260052.28

Page 394 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 118496.87 0.00

30000.16 148969.17 0.00

1703751.00 5862263.00 0.00

117162.59 201481.79 0.00

1702805.00 1824655.00 0.00

0.00 877217.00 100905.00

343694.83 1455682.26 0.00

0.00 1250617.00 0.00

963421.03 1614592.67 0.00

0.00 88281.63 108124.37

0.00 456503.00 0.00

0.00 10963.54 488172.46

0.00 163035.61 2764964.39

0.00 7883268.00 10000.00

85863.93 420537.36 0.00

637408.44 4260052.28 0.00

Page 395 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

16 N 2

12 N 0

0 Y 0

4 N 0

4 N 0

5 N 1

5 N 1

30 N 0

31 N 6

0 Y 0

38 N 7

28 N 5

2 N 0

0 N 0

32 N 0

Page 396 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Goshow Architects, L.L.P.

Horizon Engineering Associates, LLP

Holdsworth Klimowski Construction, LLC

Hamlin Design Group

Ssm & Rc, Inc. DBA Spring Sheet Metal & Roofing Co.

Con Tech Building Systems

Kliment Halsband Architects, LLP

Digesare Mechanical,Inc.

Perkins & Will Architects P.C.

Wendel WD Arch, Engr, Surv. & Land Architecture

Cutting Edge Group, LLC

CHA Consulting, Inc.

Ramboll Americas Engineering Solutions, Inc.

Bunkoff General Contractors, Inc.

Architecture +

Pfeiffer Partners Architects, Inc.

Page 397 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5th Floor 44 West 28th Street

358 West Jefferson Street Suite 300

51 Goodway Drive South

163 Homestead Avenue

678 S. Clinton Avenue

4524 State Highway 58

20th Floor 322 Eighth Avenue

3434 Carmen Road

4th Floor 215 Park Avenue South

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

14 Walkup Cutoff Road P.O. Box 733

45 Main Street Suite 526

333 West Washington St PO Box 4873

790 Watervliet Shaker Rd.

297 River Street

183 Centre Street 3rd Floor

Page 398 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10001 USA

Syracuse NY 13204 USA

Rochester NY 14623 USA

Albany NY 12203 USA

Rochester NY 14620 USA

Gouverneur NY 13642 USA

New York NY 10001 USA

Schenectady NY 12303 USA

New York NY 10003 USA

Williamsville NY 14221 USA

Lake George NY 12845 USA

Brooklyn NY 11201 USA

Syracuse NY 13221 USA

Latham NY 12110 USA

Troy NY 12180 USA

New York NY 10013 USA

Page 399 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.024779)

POINT (-76.15821943.047105)

687 711 2132

POINT (-77.57812343.091163)

546 1682 2093

POINT (-73.79364842.673408)

814 40 2030

POINT (-77.6006243.144098)

537 1679 2093

POINT (-75.46247944.318838)

330 1525 2140

POINT (-73.94224442.746356)

832 72 2030

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.99067340.702772)

894 880 2095

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.7967442.739147)

834 1288 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.9995840.71849)

749 737 2095

Page 400 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07XA35 T005973

32X468 T006001

03X383 T005660

11X309 T005477

08X475 T005887

07XA47 T005975

141000 T006130

03X409 T005815

30XA83 T005897

26X301 T005977

031027 T006102

061013 T006430

22X210 T005481

01XA58 T005934

31X244 T006119

091036 T006353

351013 T006589

121035 T006575

Page 401 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehab University Union North Ph 2 Closed

DESIGN: Commissioning Services-MART/New Beds and Support Tower Active

DESIGN: Commissioning Agent - New Technology Bld Closed

DESIGN: Facility Enhancements for the School of Business Closed

DESIGN: Construction Manager - Wooster Renovation Active

CONSTR: Rehab Science III Basment Closed

DESIGN: CM Upgrade Electrical System UHB Closed

DESIGN: Rehabilitate Upton Hall, Phase 1 Closed

CONSTR: Replace Roofs - North Campus Ph. A Closed

CONSTR: Rehab Conklin Hall, Phase 1 Closed

DESIGN: Replace Turf and Track at Coyer Field Active

CONSTR: Replace Roofs - Various Buildings Closed

CONSTR: Site Utility Distribution Line Replacement - Phase 1 Closed

CONSTR: Rehabilitate Water Tower and Fountains Closed

CONSTR: Roof Replacement - H&I Wings at Center Building Closed

DESIGN: ADA Accessibility Study Closed

DESIGN: Renovate Old Heating Plant for Ceramics Foundry Active

DESIGN: Demolish Merritt Hall, Restore Site Active

Page 402 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 403 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/08/2012 03/04/2016 10120055.00

11/20/2012 10/08/2021 1612290.00

08/18/2010 08/12/2015 95747.83

04/01/2009 06/30/2016 1694555.71

11/29/2011 09/08/2018 2457301.84

06/14/2012 04/06/2014 4486947.00

09/20/2016 08/30/2022 121637.11

04/29/2011 04/20/2016 1864618.75

11/21/2011 12/01/2013 2336938.00

06/22/2012 07/16/2014 1672530.00

08/07/2017 07/10/2023 380171.41

05/16/2018 11/10/2020 2806397.00

03/20/2009 10/31/2011 1985260.00

03/16/2012 10/03/2014 18311953.00

01/23/2015 05/08/2017 988059.00

07/03/2018 06/02/2025 152263.93

03/25/2021 09/14/2023 947000.00

07/30/2021 09/15/2023 170104.00

Page 404 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2860413.00 10120055.00 0.00

0.00 1534587.36 77702.64

12539.68 95747.83 0.00

295508.06 1694555.71 0.00

366784.20 2434953.50 22348.34

2857949.00 4486947.00 0.00

0.00 121637.11 0.00

1036949.71 1864618.75 0.00

2028848.00 2336938.00 0.00

354113.00 1672530.00 0.00

0.00 377593.27 2578.14

0.00 2806397.00 0.00

0.00 1985260.00 0.00

11649369.00 18311953.00 0.00

0.00 988059.00 0.00

0.00 152263.93 0.00

0.00 0.00 947000.00

0.00 0.00 170104.00

Page 405 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 N 1

18 N 0

14 N 1

22 N 3

19 N 3

6 N 0

0 N 0

34 N 1

4 N 0

18 N 0

0 N 0

2 Y 1

6 N 0

3 N 0

12 N 0

0 Y 0

0 N 0

0 N 0

Page 406 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Fahs Construction Group Inc.

RMF Engineering, Inc., P.C.

C.J. Brown Energy & Engineering, P.C.

Gwathmey Siegel & Assoc. Architects, LLC

Jacobs Project Management Co.

Streeter Associates,Inc.

Jacobs Project Management Co.

Flynn Battaglia Architects, P.C.

Jameson Roofing Co., Inc.

CNA Enterprises, Inc.

Labella Associates, D.P.C

General Roofing Contractors LLC

Michael A. Ferrauilo Plumbing & Heating, Inc.

Jersen Construction Group

Sea Breeze General Construction, Inc.

Chiang O'Brien Architects

RMF Engineering, Inc., P.C.

Architectural Resources, P.C.

Page 407 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2224 Pierce Creek Road

Suite 300 5520 Research Park Drive

Suite 204 4245 Union Road

525 Broadway 7th Floor

Suite 0603 Two Penn Plaza

101 E. Woodlawn Ave. P.O. Box 118

Suite 0603 Two Penn Plaza

Suite S401 617 Main Street

3761 East Lake Road

33-56 11th Street

Suite 201 300 State Street

94 Big Boom Road

1600 Jay Street

6 Industry Drive

24-30 47th Street

Crescent Building 217 North Aurora Street

1A Pine West Plaza

505 Franklin Street

Page 408 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Binghamton NY 13903 USA

Baltimore MD 21228 USA

Buffalo NY 14225 USA

New York NY 10012 USA

New York NY 10121 USA

Elmira NY 14902 USA

New York NY 10121 USA

Buffalo NY 14203 USA

Dunkirk NY 14048 USA

Long Island City NY 11106 USA

Rochester NY 14614 USA

Glens Falls NY 12801 USA

Rochester NY 14611 USA

Waterford NY 12188 USA

Astoria NY 11103 USA

Ithaca NY 14850 USA

Albany NY 12205 USA

Buffalo NY 14202 USA

Page 409 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.99889140.722899)

749 736 2095

POINT (-76.81571142.110455)

485 926 2036

POINT (-73.93723740.765455)

196 878 2137

POINT (-73.67818343.290891)

818 785 2183

POINT (-77.66444943.159407)

537 1669 2093

POINT (-73.67241742.801941)

992 18 2141

POINT (-73.90482340.766936)

196 875 2137

POINT (-73.86458842.710592)

814 42 2030

POINT (-78.87207542.900014)

300 33 2041

Page 410 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X313 T005757

261033 T006356

07X488 D005259

01XA95 T006494

05X287 T005066

15X448 D005186

34X061 D005260

31X215 T005173

211038 T006591

09X331 T005788

28X425 T005673

24X250 T005414

37X048 T006168

30XA56 T005324

271026 T006354

08X7A6 T005395

081033 T006484

Page 411 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Reconstruct Roads & Parking Lots Closed

DESIGN: Rehab Sinclair Hall for Academic Surge Space Closed

CONSTR: Site Utility Upgrades, Phase I Closed

CONSTR: Former Albany HS Phase III - Exterior Renovations Active

DESIGN: Campus Wide Satellite Boilers Closed

CONSTR: Rehab Labs and Vivarium Space Bldg 2 Closed

CONSTR: Replace Steams Line, Geneva Campus Closed

DESIGN: New Academic Building Closed

DESIGN: Study- Rehabilitate or Replace #3 and #4 Boilers and Boiler Controls Active

CONSTR: Replace VAT Flooring, Phase II Closed

CONSTR: South Campus Underground Utilities Phase II Closed

CONSTR: Frisbee Hall Renovation - Building 0001 Closed

CONSTR: Construct Advanced Manufacturing Ctr Alfred/Wellsville Closed

DESIGN: Commisioning - School of Engineering Phase I Closed

DESIGN: Replace Roofs at Charlton and STUAC, Bldg. Nos, 45 and 08 Active

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Replace HTHW line to Old Library Closed

Page 412 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 413 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/20/2010 01/12/2013 1406216.00

12/21/2018 02/06/2027 184740.11

03/28/2007 10/30/2009 1145116.00

04/03/2019 09/16/2021 2594649.00

09/26/2005 03/31/2012 1997663.25

10/19/2006 10/31/2010 7687649.00

03/14/2007 03/31/2009 494671.00

09/28/2006 03/31/2018 4658345.52

08/04/2021 09/14/2023 86609.00

02/04/2011 08/05/2012 107527.00

04/29/2010 11/19/2013 9262108.00

07/28/2008 08/11/2011 6673878.00

06/26/2015 07/08/2017 5151630.00

01/10/2008 07/06/2013 196022.75

09/18/2018 09/18/2027 366000.00

04/15/2008 09/30/2014 0.00

03/01/2019 12/29/2020 613868.00

Page 414 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

63560.00 1406216.00 0.00

0.00 184740.11 0.00

0.00 1145116.00 0.00

0.00 2350210.00 244439.00

0.00 1997663.25 0.00

0.00 7687649.00 0.00

0.00 494671.00 0.00

424784.17 4658345.52 0.00

0.00 0.00 86609.00

1370.00 107527.00 0.00

3512739.00 9262108.00 0.00

0.00 6673878.00 0.00

0.00 5151630.00 0.00

41078.21 196022.75 0.00

0.00 293127.65 72872.35

0.00 124085.00 -124085.00

0.00 613868.00 0.00

Page 415 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 Y 1

0 Y 0

3 N 0

3 N 0

5 N 0

6 N 0

10 N 1

5 N 0

0 N 0

6 N 0

5 N 0

2 N 0

8 N 0

5 N 1

0 N 0

0 Y 0

2 N 1

Page 416 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Carter's Trucking & Blacktopping, Inc.

JMZ Architects & Planners PC

Kimble Inc. Mechanical Contractor

The VMJR Companies, LLC

Bergmann Associates, Inc.

R.J. Ortlieb Construction Co., Inc.

T. Bell Construction Corp

Kliment Halsband Architects, LLP

Ramboll Americas Engineering Solutions, Inc.

Continental Flooring Co.

Concrete Applied Technlgs Corp. /dba/ CATCO

Bunkoff General Contractors, Inc.

LeChase Construction Services, LLC

C.J. Brown Energy & Engineering, P.C.

HBT Architects

Cutting Edge Group, LLC

C.B. Strain - a division of Dynamic Systems Inc.

Page 417 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

P.O.Box 69 249 Salmon River Road

190 Glen Street P. O. Box 725

1004 Sullivan Street

73 Mohican Street P. O. Box 518

28 East Main Street 200 First Federal Plaza

7315 State Fair Blvd. P.O. Box 682

45 Regency Oaks Blvd.

20th Floor 322 Eighth Avenue

333 West Washington St PO Box 4873

9319 N 94 Way Suite 10000

1266 Town Line Road

790 Watervliet Shaker Rd.

Suite 102 11849 East Corning Road

Suite 204 4245 Union Road

2 Elton Street

14 Walkup Cutoff Road P.O. Box 733

417 Manchester Road PO Box 3418

Page 418 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Morrisonville NY 12962 USA

Glens Falls NY 12801 USA

Elmira NY 14901 USA

Glens Falls NY 12801 USA

Rochester NY 14614 USA

Baldwinsville NY 13027 USA

Rochester NY 14624 USA

New York NY 10001 USA

Syracuse NY 13221 USA

Scottsdale AZ 85250 USA

Alden NY 14004 USA

Latham NY 12110 USA

Corning NY 14830 USA

Buffalo NY 14225 USA

Rochester NY 14118 USA

Lake George NY 12845 USA

Poughkeepsie NY 12603 USA

Page 419 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.6447743.309981)

824 783 2183

POINT (-76.80083542.106509)

485 926 2036

POINT (-73.64747843.304633)

824 783 2183

POINT (-77.61117743.156034)

537 1673 2093

POINT (-76.29072243.124623)

685 346 2132

POINT (-77.75657543.137191)

543 1683 2093

POINT (-76.15589443.049616)

687 711 2132

POINT (-111.87694633.569852)

989

POINT (-78.57831942.924983)

286 481 2041

POINT (-73.7967442.739147)

834 1288 2030

POINT (-77.58011543.154897)

537 1665 2093

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.85989141.682284)

594 1022 2040

Page 420 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X252 T005490

12X283 T004932

80X700 T006414

151085 T006440

07XA26 T006218

30XA83 T005894

29X7A6 T005402

80X700 T006416

07XA60 T005349

16X281 T005316

281007 T006457

141092 T006589

13XD75 T005859

101027 D006657

09X349 T005770

15X849 T005691

Page 421 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Hudson Hall - General Reconstruction Closed

DESIGN: Install Fiber Optic & Electronic Entrances - Various Buildings Closed

CONSTR: Job Order Contracting - Buffalo Region Active

DESIGN: Renovate Heart & Vascular Center - UH 6th fl. Active

CONSTR: Central Heating Plant Upgrades Closed

CONSTR: Replace Roofs - South Campus Phase B Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Job Order Contracting - Rochester Region Active

DESIGN: Rehab HVAC systems Iroquois Closed

DESIGN: Stocking Hall Rehab/System Upgrades Closed

DESIGN: Renovate Crosby Hall Active

DESIGN: Upgrade Mechanical Systems Study - HSEB Active

CONSTR: HTHW Replacment Closed

CONSTR: Renovate Hewitt Hall Active

CONSTR: Replace Steam PRVs & HVAC Equipment - Chase PE Building Closed

DESIGN: FMP - Upstate Medical Center Closed

Page 422 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 423 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/01/2009 12/31/2012 12109285.00

11/19/2007 01/31/2014 52917.09

03/20/2018 04/25/2022 12000000.00

07/22/2019 12/12/2028 39650.00

01/21/2016 05/26/2018 12303196.00

12/08/2011 11/15/2013 1336002.00

06/02/2008 01/21/2014 120101.00

03/20/2018 04/25/2022 8000000.00

01/05/2011 04/18/2017 98675.67

10/30/2007 11/01/2016 7132321.66

08/29/2018 10/12/2023 2508000.00

11/20/2020 09/14/2023 143042.00

08/08/2011 06/27/2012 1045492.00

06/17/2021 04/05/2024 18361000.00

01/27/2011 08/15/2013 1638814.00

07/28/2010 01/20/2012 375898.76

Page 424 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

32155.00 12109285.00 0.00

0.00 251821.09 -198904.00

0.00 211087.00 11788913.00

0.00 22936.30 16713.70

0.00 12303196.00 0.00

1221735.00 1336002.00 0.00

120101.00 120101.00 0.00

0.00 2132597.00 5867403.00

3809.08 98675.67 0.00

867282.06 7132321.66 0.00

0.00 1436251.22 1071748.78

0.00 125420.18 17621.82

203500.00 1045492.00 0.00

0.00 2053897.00 16307103.00

680913.00 1638814.00 0.00

0.00 375898.76 0.00

Page 425 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

0 N 0

1 N 0

0 N 0

2 N 0

5 N 0

0 N 0

1 N 0

0 N 0

5 N 0

33 N 4

0 N 0

16 N 0

3 N 1

4 N 0

19 N 0

Page 426 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Northland Associates, Incorporated

Lewis Engineering, P.C.

Kircher Construction, Inc

Horizon Engineering Associates, LLP

J & K Plumbing & Heating Co, Inc.

Weaver Metal & Roofing, Inc.

JEMCO Electrical Contractors, Inc.

Kircher Construction, Inc

M/E Engineering, P.C.

Mitchell/Giurgola Architects, LLP

Andrew Berman Architect

RMF Engineering, Inc., P.C.

Boilermatic Welding Industries, Inc.

DiPasquale Construction, Inc.

J & K Plumbing & Heating Co, Inc.

Stantec Architecture, Inc

Page 427 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4701 Buckley Road P.O. Box 2549

Suite 201 94 New Karner Road

3090 Mt. Morris-Geneseo

358 West Jefferson Street Suite 300

24 Thorp St PO Box 25 Westview Stat

40 Appenheimer Avenue

271 42nd Street

3090 Mt. Morris-Geneseo

300 Trolley Boulevard

Film Center Bldg, Ste 711 630 Ninth Avenue

77 Chambers St, 4th Floor

1A Pine West Plaza

17 Peconic Avenue

5138 West Ridge Road

24 Thorp St PO Box 25 Westview Stat

801 Jones Franklin Road Suite 300

Page 428 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Liverpool NY 13220 USA

Albany NY 12203 USA

Mount Morris NY 14510 USA

Syracuse NY 13204 USA

Binghamton NY 13905 USA

Buffalo NY 14214 USA

Brooklyn NY 11433 USA

Mount Morris NY 14510 USA

Rochester NY 14606 USA

New York NY 10036 USA

New York NY 10007 USA

Albany NY 12205 USA

Medford NY 11763 USA

Spencerport NY 14559 USA

Binghamton NY 13905 USA

Raleigh NC 27606 USA

Page 429 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41.682284)

POINT (-77.85900242.730769)

740 321 2091

POINT (-76.15821943.047105)

687 711 2132

POINT (-75.92500542.103463)

968 479 2033

POINT (-78.8372542.923116)

300 70 2041

POINT (-74.01047940.652508)

894 815 2090

POINT (-77.85900242.730769)

740 321 2091

POINT (-77.68189143.171416)

549 1664 2093

POINT (-74.00679840.714397)

749 723 2095

POINT (-73.86458842.710592)

814 42 2030

POINT (-72.96754440.817776)

1022 1313 2179

POINT (-77.80322343.218078)

542 410 2093

POINT (-75.92500542.103463)

968 479 2033

POINT (-78.7240735.768552)

3158

Page 430 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

231044 T006576

14XA91 T005699

211002 T006249

271048 T006615

231006 T006210

40X030 T006131

211028 D006676

09X375 T006167

07XA24 T005793

29X364 T005376

31X229 T005964

11X304 T005612

05X267 T006407

26X278 T004951

13X871 T005854

13XD10 T005802

04X334 T005743

Page 431 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Improve Accessibility - Nevaldine North & South Active

DESIGN: Commissioning - School of Public Health Active

CONSTR: Water System Improvements, Phase 2 Closed

DESIGN: Renovate Crawford Science Laboratories, Ph. I, Building 16 Active

DESIGN: Renovate Chaney Hall Phase 2 Closed

DESIGN: 808BU Construct Regional Centers Statewide Closed

CONSTR: Upgrade Electrical Distribution for New Ship Active

CONSTR: Rehab Synthetic Turf Athletic Field Closed

CONSTR: Rehabilitate Elevators Various Buildings Closed

DESIGN: Replace Roof - Various Buildings Closed

CONSTR: Renovation of Library/Academic Space Phase I Active

DESIGN: Commissioning - Myers Local Exhaust Ventalation Upgrades Closed

DESIGN: Renovate Houghton Hall Closed

DESIGN: Dental Hygiene Care Center Closed

DESIGN: Building Study- Staller Fine Art Building Closed

CONSTR: ESS Bldg Exterior Rehab In Guarantee

DESIGN: Commissioning Services for Bowers Hall Upgrade to Sciences Phase I Closed

Page 432 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 433 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/22/2021 09/14/2023 156000.00

08/26/2010 04/28/2017 131975.00

05/02/2016 06/17/2018 1462350.00

02/19/2021 03/17/2026 2185000.00

02/08/2016 03/03/2021 825708.37

12/06/2016 06/23/2022 587651.90

09/17/2021 05/04/2024 7844404.00

06/11/2015 09/30/2016 745118.00

01/20/2011 12/01/2013 4203218.00

09/17/2008 02/06/2017 169749.83

05/07/2012 06/30/2017 13523222.00

07/27/2010 04/13/2017 33596.86

08/06/2018 10/15/2027 55000.00

11/07/2006 11/01/2012 129780.80

08/22/2014 05/09/2015 160825.36

02/18/2011 12/13/2015 4298001.00

01/05/2011 02/26/2017 128690.40

Page 434 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 18769.11 137230.89

11181.17 98461.50 33513.50

0.00 1462350.00 0.00

0.00 101402.86 2083597.14

0.00 825708.37 0.00

0.00 587651.90 0.00

0.00 0.00 7844404.00

0.00 745118.00 0.00

272958.00 4203218.00 0.00

1665.09 169749.83 0.00

774314.00 12125940.00 1397282.00

0.00 33596.86 0.00

0.00 661089.40 -606089.40

0.00 129780.80 0.00

0.00 160825.36 0.00

885041.00 4051002.00 246999.00

17637.73 128690.40 0.00

Page 435 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

17 N 0

3 Y 1

44 N 5

21 N 1

5 N 1

0 N 0

2 N 0

3 N 0

0 N 0

18 N 0

0 N 0

0 N 0

0 Y 0

0 N 0

11 N 0

15 N 0

Page 436 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Pathfinder Engineers & Architects LLP

Genesys Engineering, P.C.

G & M Earth Moving, Inc.

Goody Clancy Architecture LLC

Kideney Architects, P.C.

Gilbane Building Company

Verde Electric Corp.

Ballard Construction Inc.

Otis Elevator Company

San Fanandre Justin Architects P.C.

Minelli Construction Co., Inc.

Genesys Engineering, P.C.

Buffalo Construction Consultants, Inc.

David Smotrich & Partners Architects/Planners

Cannon Design Arch & Engineering

Kenstar Construction Corp.

C.J. Brown Energy & Engineering, P.C.

Page 437 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

134 South Fitzhugh Street

38 Maiden Lane

345 Ellsworth Street

420 Boylston Street

143 Genesee Street

7 Southwoods Boulevard 3rd Floor

89 Edison Ave

320 Bridge St

5 Technology Place

2nd Floor 200 Sunrise Highway

300 Corporate Plaza

38 Maiden Lane

6000 N. Bailey, Suilte 2D

Suite 704 443 Park Avenue South

360 Madison Avenue 11th Floor

100 Keyland Court

Suite 204 4245 Union Road

Page 438 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14608 USA

Kingston NY 12401 USA

Holbrook NY 11741 USA

Boston MA 2116 USA

Buffalo NY 14203 USA

Albany NY 12211 USA

Mount Vernon NY 10550 USA

Syracuse NY 13209 USA

East Syracuse NY 13057 USA

Rockville Centre NY 11570 USA

Islandia NY 11749 USA

Kingston NY 12401 USA

Buffalo NY 14226 USA

New York NY 10016 USA

New York NY 10017 USA

Bohemia NY 11716 USA

Buffalo NY 14225 USA

Page 439 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.61223443.150506)

537 1666 2093

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.07528340.776914)

1019 1119 2179

POINT (-71.07265142.351364)

1918

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.82443940.89263)

962 1329 2185

POINT (-76.21695843.064213)

699 727 2132

POINT (-76.05620443.087005)

702 426 2132

POINT (-73.1776540.807782)

1019 1123 2179

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.97774740.754913)

749 740 2095

POINT (-73.09849640.776711)

1019 1073 2179

Page 440 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03X375 T005630

14X7A2 T005402

231033 D006594

22X196 D005202

221018 T006368

32X446 T005940

081019 T006350

26X291 T005804

09X7A4 T005395

08X498 T006434

09X367 T005365

14X466 T005216

201001 T006108

25X308 T005842

35X116 T005671

121018 D006646

Page 441 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: JOCs - Buffalo Region Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Upgrade French Hall Plaza Active

CONSTR: Rehab Athletic Fields Closed

DESIGN: Upgrade HVAC Huntington Administration Closed

CONSTR: HSC Deck Rehab Closed

DESIGN: Replace Roof - Rehab 3rd & 4th Floors Student Union Active

CONSTR: Replace Roofs, Various Buildings, Phase One Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: JOCS - 80700-07- Albany Closed

DESIGN: Replace Roof - Hulbert Dining Hall Closed

CONSTR: Relocate/Upgrade Gross Anatomy Laboratories and Selected Spaces BSB Closed

DESIGN: Marshall Hall-Repair Gutter, Roofing and Masonry Closed

DESIGN: Replace Fire Alarms - Various Buildings Closed

CONSTR: Rehab 3rd Flr/North Wing - McMahon Hall Closed

CONSTR: Replace Roofs - Hosmer and Snell Halls, Crane Music Center Active

Page 442 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 443 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/18/2009 12/08/2015 1834807.00

06/02/2008 01/21/2014 460030.00

09/15/2020 06/10/2022 1048183.00

10/17/2006 06/30/2009 2338901.00

01/05/2018 09/28/2026 343843.43

03/15/2012 03/31/2018 15917851.00

11/03/2017 07/16/2025 794000.00

02/02/2011 08/07/2013 2049905.00

04/15/2008 09/30/2014 133040.00

06/01/2018 06/27/2019 61442.00

06/18/2010 04/14/2017 29806.99

12/20/2006 10/31/2010 8668182.00

04/22/2015 08/18/2021 99304.80

04/14/2014 12/31/2017 105415.38

04/13/2010 07/15/2012 2429815.00

05/17/2021 07/08/2023 895000.00

Page 444 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 1834807.00 0.00

0.00 460030.00 0.00

0.00 843495.00 204688.00

0.00 2338901.00 0.00

0.00 343843.43 0.00

1467902.00 15917851.00 0.00

0.00 694709.41 99290.59

871891.00 2049905.00 0.00

0.00 133040.00 0.00

0.00 61442.00 0.00

378.49 29806.99 0.00

0.00 8668182.00 0.00

0.00 99304.80 0.00

0.00 105415.38 0.00

130089.00 2429815.00 0.00

0.00 0.00 895000.00

Page 445 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

1 N 0

5 N 0

0 Y 0

14 N 0

0 N 0

15 N 1

0 Y 0

2 N 0

0 N 0

6 N 0

0 N 0

0 N 0

12 N 1

3 Y 2

Page 446 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sorensen Gross Construction Services

JEMCO Electrical Contractors, Inc.

Northern Tier Contracting

Babcock Enterprises Inc

Pathfinder Engineers & Architects LLP

ZHN Contracting Corp.

Architecture +

Marpat Construction Corp.

Cutting Edge Group, LLC

Dow Electric, Inc.

Architecture +

L. D. Wenger Construction Co, Inc.

Architecture +

Delta Engineers, Archs & Land Survs, DPC

Spoleta Construction, LLC

PTL Contracting Corp.

Page 447 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3407 torrey Road

271 42nd Street

329A Scotch Settlement Rd

10121 Poages Hole Road

134 South Fitzhugh Street

30 Meadow Street

297 River Street

310 Nassau Avenue

14 Walkup Cutoff Road P.O. Box 733

3874 State Route 11

297 River Street

770 Railroad Avenue

297 River Street

860 Hooper Road

7 Van Auker Street

27840 County Road 193

Page 448 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Flint MI 48507 USA

Brooklyn NY 11433 USA

Gouverneur NY 13642 USA

Dansville NY 14437 USA

Rochester NY 14608 USA

Brooklyn NY 11206 USA

Troy NY 12180 USA

Brooklyn NY 11222 USA

Lake George NY 12845 USA

Malone NY 12953 USA

Troy NY 12180 USA

West Babylon NY 11704 USA

Troy NY 12180 USA

Endwell NY 13760 USA

Rochester NY 14608 USA

Theresa NY 13691 USA

Page 449 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-83.73256442.976697)

438

POINT (-74.01047940.652508)

894 815 2090

POINT (-75.42571244.350272)

330 1525 2140

POINT (-77.70070642.543675)

739 228 2091

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.93599640.710793)

894 884 2090

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.93756440.726274)

894 901 2090

POINT (-73.64807743.386894)

818 128 2183

POINT (-74.26781944.853703)

182 278 621

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.35208140.692842)

1023 1035 2179

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.0306842.12898)

938 388 2033

POINT (-77.62202343.152242)

537 1666 2093

Page 450 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

801801 T006356

14XB28 T005979

40X7A2 T005395

29X409 T005627

401003 T006102

20X207 T005349

30XB01 T005734

29X413 T006176

20X200 D005374

05X266 T005356

09X315 T005522

12X372 T006102

25X291 T005520

301022 T006309

13XD51 T005627

34X062 T005235

30X481 D005336

02X389 T005718

Page 451 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Architectural Services - JMZ Architects & Planners - Master Term Agreement Active

DESIGN: Renovate Division of Comparative Medicine Floors 2 & 4-7 Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Commissioning Services for HVAC Dance Renovation Closed

DESIGN: Upgrade Water and Sanitary Systems Aletta St Closed

DESIGN: Electrical Substation Replacement Closed

DESIGN: Restoration of Site & Underground Utilities - North Campus Ph. II Closed

CONSTR: Rehabilitate Exteriors / Dining Hall and Physical Education Closed

CONSTR: Sitework/Paving Repairs & Upgrades Main Campus Closed

DESIGN: Fenton Hall Exterior Rehabilitation Closed

CONSTR: Rehabilitate Biological Field Station- Cooperstown Facility, Bldg. No. 36 Closed

DESIGN: Replace Surface on Athletic Turf Closed

DESIGN: Renovate Sanford Hall Closed

DESIGN: Claims Analysis & Litigation Services Assigned to Vendor

DESIGN: Commissioning - Javits Lect Hall Rehab Active

DESIGN: Food Research Lab, Reroof/ Systems Upgrades, Bldg. 4394 Closed

CONSTR: Natural Science Complex - Exterior Renovation Closed

DESIGN: Academic Building SI Closed

Page 452 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 453 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/30/2017 02/06/2027 5000000.00

08/22/2012 08/27/2017 71384.60

04/15/2008 09/30/2014 246219.00

06/11/2012 12/31/2018 17580.91

07/29/2015 07/10/2023 57648.65

12/04/2008 04/18/2017 96996.01

10/21/2010 10/13/2015 891591.64

08/06/2015 02/28/2020 9375580.00

03/12/2008 09/26/2009 2042065.00

04/02/2009 05/29/2015 184847.70

05/18/2009 11/12/2011 6117699.00

12/23/2014 07/10/2023 123800.09

06/02/2009 05/27/2014 1160777.41

01/18/2017 01/18/2022 600556.83

12/07/2011 12/31/2018 143455.00

03/01/2007 02/15/2012 1612659.72

12/11/2007 12/31/2010 2044253.00

10/25/2010 10/18/2015 2146337.42

Page 454 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 0.00 5000000.00

0.00 71384.60 0.00

171235.00 246219.00 0.00

17125.38 17580.91 0.00

0.00 57648.65 0.00

0.00 96996.01 0.00

112325.67 891591.64 0.00

0.00 9375580.00 0.00

0.00 2042065.00 0.00

14855.28 184847.70 0.00

54192.00 6117699.00 0.00

0.00 123800.09 0.00

121024.58 1160777.41 0.00

0.00 600556.83 0.00

1908.69 18181.20 125273.80

0.00 1612659.72 0.00

0.00 2044253.00 0.00

357977.37 2146337.42 0.00

Page 455 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

86 Y 19

13 N 0

0 Y 0

0 N 0

0 N 0

0 N 0

14 N 1

5 N 0

3 N 0

0 N 0

6 N 0

0 N 0

44 N 2

0 N 0

0 N 0

5 N 0

7 N 1

42 N 2

Page 456 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JMZ Architects & Planners PC

Henningson, Durham & Richardson, Arch. & Eng.

Cutting Edge Group, LLC

OLA Consulting Engineers, PC

Labella Associates, D.P.C

M/E Engineering, P.C.

Fisher Associates, P.E., L.S., P.C.

Niram, Inc.

Tuscarora Construction Co Inc

Bell & Spina Architects-Planners, P.C.

Bast Hatfield,Inc.

Labella Associates, D.P.C

Mosaic Associates Architects

Navigant Consulting Services Inc.

OLA Consulting Engineers, PC

Ashley McGraw Architects DPC

Allstate General Contracting, Inc.

SWBR Architects & Engineers, P.C.

Page 457 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

190 Glen Street P. O. Box 725

12th Floor 266 West 37th Street

14 Walkup Cutoff Road P.O. Box 733

50 Broadway

Suite 201 300 State Street

300 Trolley Boulevard

135 Calkins Road

4 E. Frederick Place

4530 U.S. Route 11

Suite 201, The Bindery 215 Wyoming Street

1399 Vischers Ferry Road

Suite 201 300 State Street

The Frear Building 2 Third Street, Suite 440

140 Sherman St. 4th Floor

50 Broadway

15th Floor 125 East Jefferson Street

31 Ranier Drive

387 East Main Street

Page 458 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Glens Falls NY 12801 USA

New York NY 10018 USA

Lake George NY 12845 USA

Hawthorne NY 10532 USA

Rochester NY 14614 USA

Rochester NY 14606 USA

Rochester NY 14623 USA

Cedar Knolls NJ 7927 USA

Pulaski NY 13142 USA

Syracuse NY 13204 USA

Clifton Park NY 12065 USA

Rochester NY 14614 USA

Troy NY 12180 USA

Fairfield CT 6824 USA

Hawthorne NY 10532 USA

Syracuse NY 13202 USA

West Seneca NY 14224 USA

Rochester NY 14604 USA

Page 459 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.79736141.107546)

963 1251 2185

POINT (-77.68189143.171416)

549 1664 2093

POINT (-77.64084443.06809)

546 1682 2093

POINT (-74.4514640.811234)

2492

POINT (-76.12626743.545992)

235 683 2135

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-73.25950641.139975)

1040

POINT (-73.79736141.107546)

963 1251 2185

POINT (-78.81183142.814947)

287 107 2041

POINT (-77.602015 537 1663 2093

Page 460 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

091026 T006107

21X234 T006215

22X245 T006150

14XA18 T005987

141056 D006596

14X7A7 T005968

35X096 D005456

17X090 T005397

30XB05 T006463

09X399 T006010

13XB43 D005207

06X337 T005965

251015 T006103

011008 T006448

26X290 T005794

23X207 T006133

Page 461 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Windows and Roof - Netzer Admin & Morris Complex Active

DESIGN: Renovate Central Heating Plant Closed

CONSTR: Install Satellite Boilers - Phase 1 Closed

DESIGN: HVAC Upgrade, University Hospital Closed

CONSTR: Construct Infrastructure Riser BSB Active

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: Replace Windows Buildings 7 & 8 Closed

CONSTR: North Martha Van Rennselaer Hall - Replacement Closed

CONSTR: Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA) Active

CONSTR: Upgrade Plumbing - Chase PE Closed

CONSTR: Repair Plaza - Various Buildings Closed

CONSTR: Doty Building Renovation Closed

DESIGN: Upgrade Building Fire Alarms including Carbon Monoxide Detectors - Various Building Active

CONSTR: Rehab Toilet Rooms for ADA - Library,Performing Arts & Computer Center Closed

DESIGN: Construct School of Business Closed

CONSTR: Replace Windows & Rehab Entrances for Energy Conservation, Various Bldgs. Closed

Page 462 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 463 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/26/2017 03/31/2022 431519.00

02/15/2015 06/01/2018 60653.60

04/03/2015 12/06/2016 2290692.00

01/21/2005 08/06/2020 951886.39

09/18/2020 12/30/2022 3924400.00

05/21/2012 08/31/2018 174427.00

01/13/2009 12/11/2010 1224773.00

04/30/2008 01/11/2013 40687799.00

10/03/2018 10/22/2021 12413713.00

12/18/2012 08/09/2014 281379.00

10/20/2006 12/31/2010 6989666.00

08/24/2010 01/09/2014 16595756.00

07/26/2017 01/01/2023 165800.00

06/29/2018 08/14/2020 1601511.00

03/18/2011 12/31/2017 1639054.69

02/05/2015 10/16/2016 2272176.00

Page 464 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 264985.23 166533.77

0.00 60653.60 0.00

0.00 2290692.00 0.00

0.00 951886.39 0.00

0.00 1534454.00 2389946.00

0.00 174427.00 0.00

0.00 1224773.00 0.00

748175.00 40637861.00 49938.00

0.00 12380681.00 33032.00

0.00 281379.00 0.00

0.00 6989666.00 0.00

9487747.00 16595756.00 0.00

0.00 94358.43 71441.57

0.00 1601511.00 0.00

455127.24 1639054.69 0.00

0.00 2272176.00 0.00

Page 465 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

6 N 1

0 N 0

2 N 1

0 N 0

4 N 0

4 N 0

2 N 0

10 Y 2

5 N 0

0 N 0

0 N 0

2 N 0

52 N 3

6 N 1

Page 466 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Architecture +

Ramboll Americas Engineering Solutions, Inc.

John W. Danforth Co.

Joseph R. Loring & Associates, Inc.

Stalco Construction Inc.

Corbex, Inc.

Window Specialist, Inc.

Murnane Building Contractors, Inc.

Rodems Construction Corp.

Wilkins Mechanical, Inc.

J. Kokolakis Contracting, Inc.

Liberty Mutual Insurance Company

IBC Engineering, Pc

Wainschaf Associates, Inc.

Urbahn Architects PLLC

Bette & Cring, LLC

Page 467 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 River Street

333 West Washington St PO Box 4873

930 Old Dutch Road

21 Pennsylvania Plaza 14th Floor

1316 Motor Parkway

74-16 Grand Avenue

188 Erie Street

6728 Myers Road

3555 North Buffalo Road

6923 Herman Road

585 Route 25a

Suite 4000 1600 North Collins Blvd

Suite 219 3445 Winton Place

589 Third Avenue Ext

49 West 37th Street 6th Floor

22 Century Hill Drive

Page 468 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Syracuse NY 13221 USA

Victor NY 14564 USA

New York NY 10001 USA

Islandia NY 11749 USA

Elmhurst NY 11373 USA

Lancaster NY 14086 USA

East Syracuse NY 13057 USA

Orchard Park NY 14127 USA

Syracuse NY 13209 USA

Rocky Point NY 11778 USA

Richardson TX 75080 USA

Rochester NY 14623 USA

Rensselaer NY 12144 USA

New York NY 10018 USA

Latham NY 12110 USA

Page 469 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.158145)

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.15589443.049616)

687 711 2132

POINT (-77.48203243.001202)

799 413 2133

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-73.88686240.730363)

196 843 2137

POINT (-78.66020442.905747)

286 532 2041

POINT (-76.05633543.093042)

702 426 2132

POINT (-78.75002942.787061)

282 956 2041

POINT (-76.29077843.104591)

685 700 2132

POINT (-72.92623840.947123)

1022 1420 2179

POINT (-73.70317642.644169)

129 1309 2138

POINT (-73.98564540.751377)

749 741 2095

POINT (-73.75749142.771292)

834 1288 2030

Page 470 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14X492 T005200

031008 T006265

28X365 D005447

25X292 T005766

13XC95 T005376

06X319 T005984

311019 T006520

01XA49 T005969

14XB17 T006025

291031 T006505

05X342 T006225

02X406 T005951

08X7C2 T005956

02X367 T005236

121009 T006306

091020 T006102

29X402 T005536

10X357 T005917

Page 471 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning Services for Rehab HVAC & Waterproofing - Animal Labs Closed

DESIGN: Selective Renovations - Butler Library Closed

CONSTR: Repair/Replace HVAC & Plumbing - Various Buildings Closed

CONSTR: Masonry & Mechanical Improvements - Kunsela Hall Closed

DESIGN: Re-Roof Educational Communication Center Suspended

CONSTR: Renovation Letchworth Dining Hall Closed

CONSTR: Rehabilitate Campus Ring Road Phase 1 Closed

CONSTR: Relocate University Data Center Closed

DESIGN: Replace Boilers BSB Closed

CONSTR: Site Improvements for ADA Accessibility Ph1 Active

CONSTR: Rehab McEwen Hall Exterior Closed

DESIGN: Reconstruct Plaza/ADA Access to Pedestrian Bridge Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace Roof - Cooper Hall Closed

DESIGN: Renovate Student Union, Ph. I, Bldg. No 029 Active

DESIGN: Rehabilitate West Dormitory Drive for Pedestrian Safety Closed

DESIGN: Renovate/Construct Center for Integrated Technology Learning Active

CONSTR: Infrastructure Improvement - Electrical Capacity, Campuswide Closed

Page 472 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 473 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/14/2007 12/31/2013 167784.15

08/12/2016 09/16/2021 1722680.31

01/02/2009 11/15/2010 1072872.00

01/20/2011 11/01/2012 2714330.00

06/02/2008 02/06/2017 134907.60

08/02/2012 12/31/2016 13970696.00

08/22/2019 01/01/2021 1902172.00

05/18/2012 09/15/2016 25200976.00

10/15/2013 05/18/2022 3940261.51

05/17/2019 11/15/2021 8877827.00

02/03/2016 10/29/2018 1842380.00

05/16/2012 05/18/2017 117011.36

04/18/2012 11/20/2018 207394.00

02/12/2007 07/02/2014 272756.10

02/13/2017 02/23/2022 941500.00

04/12/2017 07/10/2023 362000.00

07/06/2009 02/25/2022 4567835.57

02/14/2012 09/20/2014 2594267.00

Page 474 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3004.28 167784.15 0.00

0.00 1722680.31 0.00

0.00 1072872.00 0.00

281462.00 2714330.00 0.00

0.00 134907.60 0.00

1150799.00 13970696.00 0.00

0.00 1902172.00 0.00

4321859.00 25200976.00 0.00

0.00 3940261.51 0.00

0.00 8385720.00 492107.00

0.00 1842380.00 0.00

87685.37 117011.36 0.00

0.00 207394.00 0.00

2097.22 272756.10 0.00

0.00 797920.73 143579.27

0.00 367365.99 -5365.99

333762.53 4278953.62 288881.95

1612875.00 2594267.00 0.00

Page 475 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

23 N 2

4 N 0

6 N 0

0 N 0

7 N 0

0 N 0

11 N 0

20 N 5

1 N 0

7 N 1

0 Y 0

0 Y 0

5 N 1

15 N 2

0 N 0

49 N 2

5 N 0

Page 476 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Genesys Engineering P.C.

Architectural Resources, P.C.

Rodems Construction Corp.

LeChase Construction Services, LLC

San Fanandre Justin Architects P.C.

Holdsworth Klimowski Construction, LLC

Pioneer Landscaping & Asphalt Paving Inc.

Jersen Construction Group

RMF Engineering, Inc., P.C.

Montesano Bros., Inc.

Concept Construction Corporation

Razak Associates Arch, Eng & Land Survey, PLLC

Cutting Edge Group, LLC

BHNT Architects, PC

M/E Engineering, P.C.

Labella Associates, D.P.C

FXCollaborative Architects, LLP

Ridley Electric Co.,Inc.

Page 477 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite #111 629 Fifth Avenue

505 Franklin Street

3555 North Buffalo Road

205 Indigo Creek Drive

2nd Floor 200 Sunrise Highway

51 Goodway Drive South

168 Townline Road

6 Industry Drive

Suite 300 5520 Research Park Drive

76 Plain Avenue

2555 Transit Road

5th Floor 45 East 20th Street

14 Walkup Cutoff Road P.O. Box 733

Suite 434 2495 Main Street

300 Trolley Boulevard

Suite 201 300 State Street

22 West 19th Street

1810 LeMoyne Avenue P.O. Box 316

Page 478 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Pelham NY 10803 USA

Buffalo NY 14202 USA

Orchard Park NY 14127 USA

Rochester NY 14626 USA

Rockville Centre NY 11570 USA

Rochester NY 14623 USA

Kings Park NY 11754 USA

Waterford NY 12188 USA

Baltimore MD 21228 USA

New Rochelle NY 10801 USA

Elma NY 14059 USA

New York NY 10003 USA

Lake George NY 12845 USA

Buffalo NY 14214 USA

Rochester NY 14606 USA

Rochester NY 14614 USA

New York NY 10011 USA

Syracuse NY 13208 USA

Page 479 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.87207542.900014)

300 33 2041

POINT (-78.75002942.787061)

282 956 2041

POINT (-77.69216343.184897)

548 1685 2093

POINT (-77.57812343.091163)

546 1682 2093

POINT (-73.28644640.879308)

1014 1127 2179

POINT (-73.67241742.801941)

992 18 2141

POINT (-73.76887640.929523)

960 1450 2185

POINT (-78.6968342.836367)

292 515 2041

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.68189143.171416)

549 1664 2093

POINT (-73.99269340.73964)

749 735 2095

POINT (-76.146062 690 726 2132

Page 480 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

071016 T006456

14X836 T006017

07xA84 T006067

13XB61 T006213

11X335 T006056

231018 T006528

021031 T006356

05X287 D005385

26X273 T005200

02X7A1 T005631

07XA39 T005942

03X421 T005829

251005 T006343

28X422 T006050

12X262 T005355

21X243 T006051

Page 481 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Site Utility Upgrade - Electrical Distribution Ph 5 Closed

DESIGN: Fire Safety Equivalency Survey UHB Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Upgrade Site Utilities, Phase I Closed

CONSTR: Site Infrastructure Closed

CONSTR: Renovations to Dana Hall Active

DESIGN: Renovate Tuttle Complex Closed

CONSTR: Campus Wide Satellite Boilers - Phase II Closed

DESIGN: Commissioning Hale Hall Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: HVAC Rehab IRQ/Tusc Closed

DESIGN: Rehabilitate Caudell Hall, Bldg. No. 18 Closed

CONSTR: Replace Emergency Generators Closed

CONSTR: Hayes Hall Building Wide RestorPhase II Closed

DESIGN: Rehab HVAC Hosmer Concert Hall Closed

CONSTR: Rehab Athletic Field Closed

Page 482 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 483 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/10/2018 04/01/2021 2490970.00

07/26/2013 07/26/2014 107706.00

04/28/2015 05/01/2018 101239.00

02/15/2015 12/31/2017 7574.93

02/11/2014 11/03/2016 3737489.00

11/14/2019 01/25/2022 8218572.00

12/19/2018 02/06/2027 146936.06

03/24/2008 09/30/2010 3661750.00

04/01/2008 12/31/2013 94158.65

12/18/2009 01/31/2018 401051.00

03/15/2012 10/29/2013 2881968.00

05/25/2011 05/29/2018 2174613.83

08/23/2017 04/01/2021 3138152.00

01/16/2014 11/19/2016 27959604.00

07/29/2010 06/12/2020 186579.78

02/06/2014 08/01/2015 862245.00

Page 484 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2490970.00 0.00

0.00 107706.00 0.00

0.00 101239.00 0.00

0.00 7574.93 0.00

0.00 3737489.00 0.00

0.00 7975261.00 243311.00

0.00 146936.06 0.00

0.00 3661750.00 0.00

34984.28 94158.65 0.00

50464.00 401051.00 0.00

2626472.00 2881968.00 0.00

506274.60 2174613.83 0.00

0.00 3138152.00 0.00

0.00 27959604.00 0.00

29640.44 186579.78 0.00

0.00 862245.00 0.00

Page 485 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

0 N 0

0 Y 0

5 N 0

6 N 0

3 N 0

0 Y 0

3 N 0

0 N 0

0 N 0

3 N 1

31 N 1

4 N 0

3 N 0

0 N 0

5 N 0

Page 486 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Nelcorp Electrical Contracting Corporation

Rolf Jensen & Associates, Professional Engrs., P.C.

Cutting Edge Group, LLC

Ramboll Americas Engineering Solutions, Inc.

Luck Bros., Inc.

Northern Tier Contracting

JMZ Architects & Planners PC

John W. Danforth Company

Genesys Engineering P.C.

Sorensen Gross Construction Services

Andrew R. Mancini Associates Inc.

BHNT Architects, PC

Nelcorp Electrical Contracting Corporation

LeChase Construction Services, LLC

C & S Engineers, Inc.

Applied Landscape Technologies Inc.

Page 487 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

35 North Kelly Avenue

Suite 1104 360 West 31st Street

14 Walkup Cutoff Road P.O. Box 733

333 West Washington St PO Box 4873

73 Trade Road

329A Scotch Settlement Rd

190 Glen Street P. O. Box 725

300 Colvin Woods Pkwy

Suite #111 629 Fifth Avenue

3407 torrey Road

129 Odell Avenue

Suite 434 2495 Main Street

35 North Kelly Avenue

Suite 102 11849 East Corning Road

499 Col. Eileen Collins Blvd.

145 River Road

Page 488 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Endwell NY 13760 USA

New York NY 10001 USA

Lake George NY 12845 USA

Syracuse NY 13221 USA

Plattsburgh NY 12901 USA

Gouverneur NY 13642 USA

Glens Falls NY 12801 USA

Tonawanda NY 14150 USA

Pelham NY 10803 USA

Flint MI 48507 USA

Endicott NY 13760 USA

Buffalo NY 14214 USA

Endwell NY 13760 USA

Corning NY 14830 USA

Syracuse NY 13212 USA

Montville NJ 7045 USA

Page 489 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.085657)

POINT (-76.02526642.109078)

938 388 2033

POINT (-73.64807743.386894)

818 128 2183

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.46468444.717698)

3 202 2038

POINT (-75.42571244.350272)

330 1525 2140

POINT (-73.6447743.309981)

824 783 2183

POINT (-78.85710842.99524)

278 8 2041

POINT (-83.73256442.976697)

438

POINT (-76.04917542.110866)

938 388 2033

POINT (-76.02526642.109078)

938 388 2033

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.37288940.890223)

2492

Page 490 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

151085 T006563

13XD75 T005927

141101 T006580

36X118 T005351

07XA52 T005349

22X197 T005434

02X351 T005343

351001 T006500

32X468 T006046

03X375 T005843

281009 T006512

05X325 T005624

211028 T006498

12X345 T005612

01XA87 T006114

08X467 T005466

101005 T006099

15X478 D005309

Page 491 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Renovate Heart & Vascular Center - UH 6th fl. Active

CONSTR: HTHW - Phase II Closed

DESIGN: Feasibility Study for Consolidation of ICU's - UHB Active

DESIGN: Rehabilitate Plaza Building ph 1 Closed

DESIGN: Rehab Fine Arts - HVAC Closed

DESIGN: Rehab Allied Health Building Closed

DESIGN: Renovate Restrooms, Various Buildings Closed

CONSTR: Harder Hall HVAC Upgrades Active

CONSTR: Core and Shell Active

DESIGN: Science Building Water Service Study Closed

DESIGN: Renovate Foster Hall Active

DESIGN: Commissioning - Williams Center Rehabilitation Closed

DESIGN: Upgrade Electrical Distribution for New Ship Active

DESIGN: Commissioning Services - Maxcy Ice Arena Closed

DESIGN: Commissioning Services Construct ETEC Research Building & Parking Structure Active

CONSTR: Replace Roofs - Various Buildings Closed

DESIGN: Program Study - Lee Hall Closed

CONSTR: Repair Historic Stone Wall - Weiskotten Hall Closed

Page 492 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 493 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/29/2020 09/25/2022 10826023.00

02/24/2012 12/31/2014 6099584.00

07/07/2021 09/14/2023 267789.14

10/13/2009 12/31/2017 589268.04

02/09/2010 04/18/2017 136435.44

01/21/2009 07/01/2015 1946351.36

02/26/2009 03/29/2013 230294.22

04/19/2019 12/10/2021 7909894.00

03/06/2014 12/31/2020 162130749.00

04/22/2014 05/16/2018 312520.58

07/22/2019 09/06/2024 3814000.00

07/27/2010 10/31/2018 75150.87

04/10/2019 05/01/2024 1100000.00

03/20/2012 04/13/2017 41078.76

12/05/2014 01/23/2023 436737.75

02/27/2009 12/31/2014 1688540.00

03/28/2016 09/01/2019 69991.08

09/05/2007 07/31/2010 371535.00

Page 494 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 9957354.00 868669.00

4091864.00 6099584.00 0.00

0.00 0.00 267789.14

67744.39 589268.04 0.00

12700.27 136435.44 0.00

331120.93 1946351.36 0.00

5275.81 230294.22 0.00

0.00 7786486.00 123408.00

0.00 160775491.00 1355258.00

0.00 312520.58 0.00

0.00 1950842.32 1863157.68

24589.12 75150.87 0.00

0.00 704696.00 395304.00

7872.87 41078.76 0.00

0.00 355527.16 81210.59

66930.00 1688540.00 0.00

0.00 69991.08 0.00

0.00 371535.00 0.00

Page 495 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 0

10 N 0

0 N 0

0 N 0

0 N 0

14 N 1

0 N 0

0 N 0

8 N 0

0 N 0

34 N 4

0 N 0

11 N 3

0 N 0

25 N 0

13 N 0

0 Y 0

3 N 0

Page 496 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Murnane Building Contractors, Inc.

Ultimate Power, Inc.

Cannon Design Arch & Engineering

Architecture +

M/E Engineering, P.C.

Flynn Battaglia Architects, P.C.

BHNT Architects, PC

Savarino Companies LLC

EW Howell Company, Inc.

M/E Engineering, P.C.

Mitchell/Giurgola Architects, LLP

Bergmann Associates, Inc.

RMF Engineering, Inc., P.C.

Genesys Engineering, P.C.

M/E Engineering, P.C.

Niram, Inc.

JMZ Architects & Planners PC

Over & Under Piping Contractors, Inc.

Page 497 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6728 Myers Road

45 Nancy Street

360 Madison Avenue 11th Floor

297 River Street

300 Trolley Boulevard

Suite S401 617 Main Street

Suite 434 2495 Main Street

500 Seneca Street

Suite 600 245 Newtown Road

Suite 320 60 Lakefront Boulevard

Film Center Bldg, Ste 711 630 Ninth Avenue

28 East Main Street 200 First Federal Plaza

Suite 300 5520 Research Park Drive

38 Maiden Lane

Suite 320 60 Lakefront Boulevard

4 E. Frederick Place

190 Glen Street P. O. Box 725

P.O.Box 278 7285 Mutton Hill Road

Page 498 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

East Syracuse NY 13057 USA

West Babylon NY 11704 USA

New York NY 10017 USA

Troy NY 12180 USA

Rochester NY 14606 USA

Buffalo NY 14203 USA

Buffalo NY 14214 USA

Buffalo NY 14204 USA

Plainview NY 11803 USA

Buffalo NY 14202 USA

New York NY 10036 USA

Rochester NY 14614 USA

Baltimore MD 21228 USA

Kingston NY 12401 USA

Buffalo NY 14202 USA

Cedar Knolls NJ 7927 USA

Glens Falls NY 12801 USA

Auburn NY 13021 USA

Page 499 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.05633543.093042)

702 426 2132

POINT (-73.37495940.737065)

1023 1035 2179

POINT (-73.97774740.754913)

749 740 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.68189143.171416)

549 1664 2093

POINT (-78.8572442.877333)

300 61 2041

POINT (-77.61117743.156034)

537 1673 2093

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.4514640.811234)

2492

POINT (-73.6447743.309981)

824 783 2183

Page 500 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X354 T005214

031009 T006447

24X266 T005588

08X397 T004803

09X335 T005635

12X300 T004928

09X361 T005807

141079 T006367

07XA41 T006021

23X207 T005946

391021 T006606

09X311 T005507

23X200 T005345

36X7B3 T005395

081043 D006662

30XA95 T006137

09X308 T005612

26X285 T005904

Page 501 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Elevator Rehab Ph II Closed

DESIGN: Reconstruct Central Heating Plant Active

DESIGN: Center for Agriculture and Natural Resources Active

CONSTR: Construct Athletic Center In Guarantee

CONSTR: Replace Medium Temperature Water Lines Closed

DESIGN: Rehab Computer Center - Stillman Hall Closed

CONSTR: Upgrade ADA Restrooms - Phase III Closed

DESIGN: Study - UHB-Risk Management for Building Water Systems Closed

CONSTR: Rehabilitate OConnor Johnson Closed

CONSTR: Replace Windows PH I, Cook and Payson Halls Closed

DESIGN: Renovate Campus Center Active

CONSTR: Upgrade Central Heating Plant, Phase II Closed

DESIGN: Construction Management Services Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Masonry Repairs at Exterior Entrances and Site Work - Old Main Active

CONSTR: North Campus PH II Replace Fire Alarm Replacement Closed

DESIGN: Commissioning Services - Rehab Fitzelle Hall Closed

CONSTR: Bunche Plaza Improvements In Guarantee

Page 502 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 503 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/26/2007 01/22/2012 229084.94

06/29/2018 07/27/2023 1699558.00

11/06/2009 12/31/2019 4204020.00

11/22/2002 12/31/2014 22056438.00

01/15/2010 08/19/2012 1287156.00

04/02/2007 09/30/2011 71721.11

03/10/2011 09/16/2012 507093.00

04/01/2019 08/24/2025 745301.34

08/20/2013 07/24/2016 17710360.00

03/26/2012 08/17/2013 444113.00

12/30/2020 03/08/2026 2609000.00

03/26/2009 02/19/2011 692705.00

03/21/2008 03/17/2013 1008804.92

04/15/2008 09/30/2014 117167.00

07/29/2021 02/20/2024 1091069.00

02/17/2015 02/28/2019 3465927.00

06/29/2010 04/13/2017 117019.73

12/15/2011 01/24/2014 1722613.00

Page 504 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 229084.94 0.00

0.00 1521377.61 178180.39

376701.23 4124631.65 79388.35

0.00 21787275.00 269163.00

20556.00 1287156.00 0.00

0.00 71721.11 0.00

28590.00 507093.00 0.00

0.00 745301.34 0.00

0.00 17710360.00 0.00

416861.00 444113.00 0.00

0.00 333952.43 2275047.57

0.00 692705.00 0.00

0.00 1008804.92 0.00

111308.00 117167.00 0.00

0.00 0.00 1091069.00

0.00 3465927.00 0.00

9739.87 117019.73 0.00

1212882.00 1715303.00 7310.00

Page 505 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

19 N 0

30 N 1

5 N 0

8 N 0

0 Y 0

7 N 0

0 N 0

9 N 1

4 N 1

48 N 7

7 N 0

4 N 0

0 Y 0

3 N 1

4 N 1

0 N 0

21 N 0

Page 506 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Charles Calderone Associates, Inc.

Buffalo Construction Consultants, Inc.

Ennead Architects LLP

Fidelity and Guaranty Insurance Company

All State Construction, Inc.

Envision Architects, D.P.C.

F. E. Jones Construction Inc

Ramboll Americas Engineering Solutions, Inc.

Welliver McGuire, Inc.

Nep Glass Co., Ltd.

Ashley McGraw Architects DPC

A. Treffeisen & Son, LLC

C & S Design Build, Inc.

Cutting Edge Group, LLC

The VMJR Companies, LLC

Goodwin Electric Corp

Genesys Engineering, P.C.

Condos Brothers Construction Corp

Page 507 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

121 Front Street

6000 N. Bailey, Suilte 2D

1 World Trade Center 40th Floor

C/O St. Paul Travelers 11 Schilling Road

449 Cooke Street P. O. Box 805

52 James Street

Suite 1 73 Griswold Street

333 West Washington St PO Box 4873

250 North Genesee Street

P.O.Box 277 6224 State Route 5

15th Floor 125 East Jefferson Street

204 Roundhouse Road

499 Col. E. Collins Blvd.

14 Walkup Cutoff Road P.O. Box 733

73 Mohican Street P. O. Box 518

201 South Youngs Road

38 Maiden Lane

PO Box 499

Page 508 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Mineola NY 11501 USA

Buffalo NY 14226 USA

New York NY 10007 USA

Hunt Valley MD 21031 USA

Farmington CT 6032 USA

Albany NY 12207 USA

Binghamton NY 13904 USA

Syracuse NY 13221 USA

Montour Falls NY 14865 USA

Little Falls NY 13365 USA

Syracuse NY 13202 USA

Oneonta NY 13820 USA

Syracuse NY 13212 USA

Lake George NY 12845 USA

Glens Falls NY 12801 USA

Williamsville NY 14221 USA

Kingston NY 12401 USA

Kings Park NY 11754 USA

Page 509 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.63548740.741069)

60 1265 2094

POINT (-74.0134140.712909)

749 722 2095

POINT (-72.84438341.693111)

1041

POINT (-73.75023942.651717)

814 44 2030

POINT (-76.15589443.049616)

687 711 2132

POINT (-76.85309342.348955)

644 53 2143

POINT (-75.07706942.44958)

903 447 2136

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.64747843.304633)

824 783 2183

POINT (-78.72461942.96122)

304 110 2041

POINT (-74.01451641.931949)

425 79 2182

Page 510 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

291010 T006453

07XA52 T005632

30X884 T005703

29X840 T005687

801802 T006369

16X283 T005178

40X026 D005339

36X128 T006111

241030 T006356

13XD12 T005967

161026 T006517

08X7B7 T005956

39X137 T005348

31X215 T005217

27X235 T005606

271001 T006307

09X347 T005365

Page 511 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehab & Enclose PAC Elevator Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Facilities Master Plan University at Buffalo Closed

DESIGN: Purchase College Facilities Master Plan Closed

DESIGN: Engineering Services - RMF Engineering, Inc - Master Term Agreement Active

DESIGN: Barton Hall Exterior/ Roof Repairs Closed

CONSTR: Distance Learning Center Closed

CONSTR: Abate Basement Crawlspace Closed

DESIGN: Agriculture Study Closed

CONSTR: New Computer Science Building Closed

DESIGN: Renovate Plant Science Building Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Renovate Campus Center- Phase I Closed

DESIGN: Construction Manager For New Academic Building Closed

DESIGN: Commissioning - Renovate Charlton Hall Closed

CONSTR: Upgrade Ventilation to Iceplex Bldg Closed

DESIGN: Replace Windows - Alumni/Willsbach/Mills Halls Closed

Page 512 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 513 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/25/2018 11/06/2020 877847.00

12/18/2009 12/09/2015 268310.00

08/18/2010 02/11/2012 1485969.63

07/22/2010 01/14/2012 555737.55

09/14/2017 04/19/2026 5000000.00

10/17/2006 05/30/2013 819509.88

01/22/2008 02/12/2011 10441050.00

10/15/2014 02/14/2016 181290.00

05/07/2018 02/06/2027 23850.89

06/05/2012 03/30/2018 33380781.00

08/06/2019 09/06/2024 7238000.00

04/18/2012 11/20/2018 217547.00

09/02/2010 05/14/2015 553793.41

02/12/2007 12/01/2013 2401227.17

02/24/2012 07/23/2021 48877.88

02/17/2017 08/18/2018 867437.00

11/25/2009 04/14/2017 208551.30

Page 514 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 877847.00 0.00

0.00 268310.00 0.00

0.00 1486023.63 -54.00

0.00 555737.55 0.00

0.00 0.00 5000000.00

22463.46 819509.88 0.00

0.00 10441050.00 0.00

0.00 181290.00 0.00

0.00 23850.89 0.00

3861471.00 33380781.00 0.00

0.00 2704576.28 4533423.72

139674.00 217547.00 0.00

126707.20 553793.41 0.00

204350.02 2401227.17 0.00

2383.11 48877.88 0.00

0.00 867437.00 0.00

1041.83 208551.30 0.00

Page 515 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2 N 0

0 N 0

19 N 1

31 N 0

62 N 10

5 N 0

8 N 0

8 N 0

0 Y 0

9 N 0

35 N 5

0 Y 0

0 N 0

5 N 0

0 N 0

2 N 1

0 N 0

Page 516 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

BJB Construction Corp.

Sorensen Gross Construction Services

RTKL New York Architecture & Engineerin

Sasaki Associates, Inc.

RMF Engineering, Inc., P.C.

Egner Architectural Associates, LLC

Sano-Rubin Construction Co, Inc.

Sunshine Environmental Services, Inc.

JMZ Architects & Planners PC

MPCC Corp.

Ellenzweig Architects of New York, P.C.

Cutting Edge Group, LLC

Architectural Resources, P.C.

URS Corporation - New York

Genesys Engineering, P.C.

John W. Danforth Co.

Architecture +

Page 517 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

38 Long Ridge Road

3407 torrey Road

901 S. Bond Street

64 Pleasant Street

1A Pine West Plaza

408 West State Street

P.O. Box 9078 624 Delaware Avenue

379 North Stafford Avenue

190 Glen Street P. O. Box 725

81 Rockdale Avenue

10th Floor 105 Madison Avenue

14 Walkup Cutoff Road P.O. Box 733

505 Franklin Street

Suite 610 One Penn Plaza

38 Maiden Lane

930 Old Dutch Road

297 River Street

Page 518 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bedford NY 10506 USA

Flint MI 48507 USA

Baltimore MD 21231 USA

Watertown MA 2472 USA

Albany NY 12205 USA

Ithaca NY 14850 USA

Albany NY 12209 USA

Waterville NY 13480 USA

Glens Falls NY 12801 USA

New Rochelle NY 10801 USA

New York NY 10016 USA

Lake George NY 12845 USA

Buffalo NY 14202 USA

New York NY 10119 USA

Kingston NY 12401 USA

Victor NY 14564 USA

Troy NY 12180 USA

Page 519 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.62661941.199755)

977 1196 2185

POINT (-83.73256442.976697)

438

POINT (-76.59497939.28093)

1857

POINT (-71.18796742.366181)

1915

POINT (-73.86458842.710592)

814 42 2030

POINT (-76.5044242.439373)

709 1786 2181

POINT (-75.37234942.937374)

922 1386 625

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.79305740.905212)

960 1450 2185

POINT (-73.64807743.386894)

818 128 2183

POINT (-78.87207542.900014)

300 33 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-77.48203243.001202)

799 413 2133

POINT (-73.69016242.73246)

110 11 2138

Page 520 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

141011 T006361

13X7A3 T005402

151069 T006369

08X438 T005200

29X369 T005518

03X351 T005630

09X373 T006191

01XA95 T006408

23X201 T005690

091030 T006438

11X297 T005612

30XA60 T005763

21X231 T006018

06X324 T005745

14X7B1 T005968

09X313 T005429

Page 521 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Pharmacy UHB Basement Closed

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: NAB Boilers exhaust stack Active

DESIGN: Building Commissioning - Old Main Closed

CONSTR: Rehab Central Plaza Deck and Drainage Closed

CONSTR: JOCs - Buffalo Region Closed

CONSTR: Rehab Health Center Closed

DESIGN: Renovate Former Albany HS Building - Phase II Active

CONSTR: Replace Campus Electric Substation, Provide Emergency Power System Closed

DESIGN: Construct New Emergency Services Building Active

DESIGN: Commissioning for Hudson Hall Rehab Ph 2 Closed

CONSTR: EOC (Educational Opportunity Center) Buffalo Closed

CONSTR: Replace Roof - Marvin Tode Building Active

DESIGN: Commissioning Closed

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: Rehabilitate Fine Arts - Phase IIA Closed

Page 522 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 523 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/31/2018 09/27/2025 258551.90

06/02/2008 01/21/2014 212703.00

08/23/2018 04/19/2026 223000.00

04/04/2007 12/31/2013 93809.35

05/08/2009 08/01/2013 18272198.00

12/18/2009 12/08/2015 137767.00

10/06/2015 08/05/2017 4126593.00

08/13/2019 02/23/2028 948916.80

05/13/2010 04/30/2015 4652132.00

01/23/2019 10/20/2027 0.00

07/27/2010 04/13/2017 140006.96

12/28/2010 02/28/2014 18540591.00

03/29/2013 03/12/2017 1198991.00

02/01/2011 01/24/2016 153489.17

05/21/2012 08/31/2018 54574.00

11/07/2008 09/15/2010 6541473.00

Page 524 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 258551.90 0.00

10730.00 212703.00 0.00

0.00 194185.06 28814.94

17680.35 93809.35 0.00

2993804.00 18272198.00 0.00

0.00 137767.00 0.00

0.00 4126593.00 0.00

0.00 70921.08 877995.72

101542.00 4652132.00 0.00

0.00 47265.02 -47265.02

33207.92 140006.96 0.00

10461894.00 18540591.00 0.00

0.00 1093173.00 105818.00

23183.77 153489.17 0.00

0.00 54574.00 0.00

0.00 6541473.00 0.00

Page 525 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

0 N 0

0 N 0

4 N 0

0 N 0

11 N 1

29 N 2

9 N 0

21 N 2

0 N 0

10 N 1

15 N 0

9 N 0

0 N 0

8 N 0

Page 526 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

JEMCO Electrical Contractors, Inc.

RMF Engineering, Inc., P.C.

Genesys Engineering P.C.

MPCC Corp.

Sorensen Gross Construction Services

Murnane Building Contractors, Inc.

Gilbane Building Company

Mohawk Valley Utility Construction Corp.

Genesys Engineering, P.C.

Genesys Engineering, P.C.

Savarino Company, LLC

Dimitri Enterprises, Inc.

Ramboll Americas Engineering Solutions, Inc.

Corbex, Inc.

Christa Construction, LLC

Page 527 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

307 Seventh Avenue Suite 1501

271 42nd Street

1A Pine West Plaza

Suite #111 629 Fifth Avenue

81 Rockdale Avenue

3407 torrey Road

P.O. Box 3048 104 Sharron Avenue

7 Southwoods Boulevard 3rd Floor

1 Prospect Avenue

38 Maiden Lane

38 Maiden Lane

95 Perry Street Suite 104

2nd Floor 135 58th Street

333 West Washington St PO Box 4873

74-16 Grand Avenue

119 Victor Heights Pkwy

Page 528 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10001 USA

Brooklyn NY 11433 USA

Albany NY 12205 USA

Pelham NY 10803 USA

New Rochelle NY 10801 USA

Flint MI 48507 USA

Plattsburgh NY 12901 USA

Albany NY 12211 USA

Albany NY 12206 USA

Kingston NY 12401 USA

Kingston NY 12401 USA

Buffalo NY 14203 USA

Brooklyn NY 11220 USA

Syracuse NY 13221 USA

Elmhurst NY 11373 USA

Victor NY 14564 USA

Page 529 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.73246)

POINT (-73.99353640.746986)

749 717 2095

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.79305740.905212)

960 1450 2185

POINT (-83.73256442.976697)

438

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.77261842.673362)

814 43 2030

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.87396542.875507)

300 34 2041

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.88686240.730363)

196 843 2137

POINT (-77.44463742.996293)

799 413 2133

Page 530 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X414 T006222

20X205 T005471

13XC29 D005294

411013 T006369

26X290 T005978

14X492 T006134

13XB60 T005340

09X369 T006141

081014 T006100

151036 T006454

24X293 T005577

20X148 T005123

211042 T006627

24X215 D004907

09X423 T006103

25X290 T006006

25X292 T005612

Page 531 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting: NYC Region Closed

DESIGN: Gateway Building Closed

CONSTR: Repair Roof System - South Bldg/Stadium Closed

DESIGN: Rehab Elevator Systems Active

DESIGN: Construction Manager, New Business Bldg and Conklin Hall Rehabilitation Closed

DESIGN: Rehabilitate HVAC & Waterproof Animal Laboratories Closed

CONSTR: Graduate Chemistry Rehab, Phase I Closed

CONSTR: Upgrade HVAC Systems - Netzer Hall Closed

DESIGN: Replace Freight Elevator- Fine Arts Building Active

DESIGN: Construct Health and Wellness Center Active

DESIGN: Water Tanks Closed

CONSTR: BAKER LAB REHAB PHASE III Closed

DESIGN: Upgrade Pier for New Ship Active

CONSTR: Replace Underground Steam Distribution Closed

DESIGN: Replace various mechanical components in Morris Hall Closed

CONSTR: Replace Site Infrastructure - Phase 1 Closed

DESIGN: Commisioning- Mech & Masonry Improvement - Kunsela Hall Closed

Page 532 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 533 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/29/2016 04/30/2019 212072.00

03/10/2009 05/31/2017 3148518.64

05/23/2007 06/30/2010 820108.00

05/15/2019 04/19/2026 715000.00

08/15/2012 07/26/2019 2320346.28

04/27/2006 05/30/2018 2155301.97

11/28/2007 01/01/2013 19113304.00

03/27/2015 08/19/2017 1922490.00

08/24/2016 02/05/2024 31490.75

01/30/2017 07/15/2025 922287.96

11/10/2011 02/03/2018 380979.04

02/09/2006 07/31/2010 15728696.00

12/15/2021 06/17/2024 1044042.00

04/11/2005 12/31/2010 3275558.00

01/16/2015 01/01/2023 178000.00

12/18/2012 11/10/2015 3047718.00

12/13/2010 04/13/2017 7185.82

Page 534 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 212072.00 0.00

331776.45 3148518.64 0.00

0.00 820108.00 0.00

0.00 173511.83 541488.17

0.00 2320346.28 0.00

0.00 2155301.97 0.00

232659.00 18985965.00 127339.00

0.00 1922490.00 0.00

0.00 15823.98 15666.77

0.00 488833.86 433454.10

153002.53 380979.04 0.00

0.00 15728696.00 0.00

0.00 0.00 1044042.00

0.00 3275558.00 0.00

0.00 179378.84 -1378.84

0.00 3047718.00 0.00

2583.73 11848.29 -4662.47

Page 535 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

32 N 0

6 N 0

0 N 0

17 N 2

5 N 0

3 N 0

6 Y 1

0 N 0

0 N 0

0 N 0

4 N 0

8 N 1

7 N 0

0 N 0

3 N 0

0 N 0

Page 536 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Volmar Construction, Inc

Architerra

Statewide Roofing, Inc.

RMF Engineering, Inc., P.C.

Jacobs Project Management Co.

HLW International LLP

EW Howell Company, Inc.

Wilkins Mechanical, Inc.

Peter Gisolfi Associates

Wendel WD Arch, Engr, Surv. & Land Architecture

C & S Engineers, Inc.

Murnane Building Contractors, Inc.

Jacobs Project Management Co.

North Central Mechanical Inc.

IBC Engineering, Pc

Rifenburg Construction Corp.

Genesys Engineering, P.C.

Page 537 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4400 Second Avenue

281 Summer Street

205 Brookville Avenue

1A Pine West Plaza

Suite 0603 Two Penn Plaza

115 Fifth Avenue

Suite 600 245 Newtown Road

6923 Herman Road

566 Warburton Avenue

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

499 Col. Eileen Collins Blvd.

6728 Myers Road

500 7th Avenue 17th Floor

100 North Michael St Suite 202 PO Box 1997

Suite 219 3445 Winton Place

159 Brick Church Road

38 Maiden Lane

Page 538 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11232 USA

Boston MA 2110 USA

Islip NY 11751 USA

Albany NY 12205 USA

New York NY 10121 USA

New York NY 10003 USA

Plainview NY 11803 USA

Syracuse NY 13209 USA

Hastings-On-Hudson NY 10706 USA

Williamsville NY 14221 USA

Syracuse NY 13212 USA

East Syracuse NY 13057 USA

New York NY 10018 USA

St. Mary's PA 15857 USA

Rochester NY 14623 USA

Troy NY 12180 USA

Kingston NY 12401 USA

Page 539 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.21556540.744933)

1019 1124 2179

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.991540.738916)

749 719 2095

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.8821840.995664)

974 1445 2185

POINT (-76.13224343.113906)

690 730 2132

POINT (-76.05633543.093042)

702 426 2132

POINT (-73.98905340.753144)

749 741 2095

POINT (-78.56197941.428892)

730

POINT (-73.58303442.75697)

130 11 2138

POINT (-74.01451641.931949)

425 79 2182

Page 540 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24X250 T005192

22X815 T005853

20X205 T005682

801801 T006352

30XA81 T005921

19X141 T005326

14XA91 T006472

09X322 T005355

28X358 T005524

35X101 T006293

261030 D006630

15X842 T005280

32X373 T004810

141044 T006438

141037 T006439

07XA25 T005548

13XB60 T005082

12X318 T005642

Page 541 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Building Commissioning - Frisbie Hall Closed

DESIGN: Program Study - Campus Gas Service Closed

CONSTR: Gateway Building - Foundations, Steel & Sitework Closed

DESIGN: Architectural Services - Bell & Spina Architects - Master Term Agreement Active

CONSTR: ADA Improvements - Phase IIA Closed

CONSTR: Waste Stream Management Facility Closed

CONSTR: Job Order Contracting - NYC Region Active

DESIGN: Replace HVAC/Domestic Hot Water Equipment, Instructional Resource Center Closed

CONSTR: Kapoor Hall Renovation Closed

CONSTR: Install Satellite Boilers - Multiple Buildings Closed

CONSTR: Replace Windows Lupton Hall Active

DESIGN: Instituional Strategic & Facilities Master Plan Closed

DESIGN: Renovate HSC - Phase I Closed

DESIGN: Replace Main Cooling Tower - UHB Active

DESIGN: Renovate Cafeteria Servery and Dining Area Active

DESIGN: Life Safety System Upgrades Terminated

DESIGN: Graduate Chemistry Rehab, Phase I Closed

CONSTR: Upgrade HVAC - Flagg Hall Closed

Page 542 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 543 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/16/2007 12/31/2013 100967.54

10/31/2011 12/14/2015 52896.00

05/17/2010 12/14/2013 3641516.00

09/13/2017 11/01/2026 5000000.00

02/03/2012 03/29/2014 1353163.00

12/07/2007 10/15/2012 7410421.00

01/29/2019 04/11/2022 488309.00

06/10/2008 06/12/2020 280687.93

05/04/2009 12/31/2014 49239857.00

12/16/2016 02/01/2019 2623248.00

04/13/2021 06/14/2024 4381400.00

07/30/2007 12/15/2008 955632.26

02/21/2003 12/31/2015 1144480.47

02/05/2019 10/20/2027 49290.00

08/24/2021 05/04/2027 53486.00

08/11/2009 07/31/2014 561338.94

11/10/2005 02/25/2013 1615115.82

02/11/2010 10/15/2011 1478669.00

Page 544 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3061.45 100967.54 0.00

52896.00 52896.00 0.00

134278.00 3641516.00 0.00

0.00 0.00 5000000.00

959927.00 1353163.00 0.00

204228.00 7410421.00 0.00

0.00 436383.00 51926.00

3999.13 280687.93 0.00

3569255.00 49239857.00 0.00

0.00 2623248.00 0.00

0.00 84132.00 4297268.00

0.00 955632.26 0.00

17862.11 1144480.47 0.00

0.00 38355.70 10934.30

0.00 5508.00 47978.00

187755.46 561338.94 0.00

39783.27 1615115.82 0.00

0.00 1478669.00 0.00

Page 545 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

10 N 0

86 N 19

16 N 0

4 N 0

3 N 1

0 N 0

5 N 1

9 N 1

7 N 0

4 N 0

5 N 0

0 N 0

27 N 9

24 N 1

6 N 0

4 N 0

Page 546 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syska Hennessy Group, Inc

Stieglitz Snyder Architecture

Murnane Building Contractors, Inc.

Bell & Spina Architects-Planners, P.C.

Trason Development Corp

Streeter Associates,Inc.

Volmar Construction, Inc

C & S Engineers, Inc.

The Pike Company Inc

North Central Mechanical Inc.

Arrow Steel Window Corporation

Karlsberger Architecture, P.C.

HLW International LLP

Genesys Engineering, P.C.

Guth Deconzo Consulting Engineers, P.C.

IBC Engineering, Pc

Facility Leaders In Arch/ Eng. Design, P.C.

Burns Brothers Contractors, Inc.

Page 547 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14th Floor 1515 Broadway

425 Franklin Street

6728 Myers Road

Suite 201, The Bindery 215 Wyoming Street

7350 Boston State Road

101 E. Woodlawn Ave. P.O. Box 118

4400 Second Avenue

499 Col. Eileen Collins Blvd.

One Circle Street

100 North Michael St Suite 202 PO Box 1997

133 East Carmans Road

320 West 13th Street` 9 Floor

115 Fifth Avenue

38 Maiden Lane

242 West 30th Street

Suite 219 3445 Winton Place

Suite 304 One Atlantic Street

7504 Us Hwy 11

Page 548 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10038 USA

Buffalo NY 14202 USA

East Syracuse NY 13057 USA

Syracuse NY 13204 USA

Hamburg NY 14075 USA

Elmira NY 14902 USA

Brooklyn NY 11232 USA

Syracuse NY 13212 USA

Rochester NY 14607 USA

St. Mary's PA 15857 USA

East Farmingdale NY 11735 USA

New York NY 10014 USA

New York NY 10003 USA

Kingston NY 12401 USA

New York NY 10001 USA

Rochester NY 14623 USA

Stamford CT 6901 USA

Potsdam NY 13676 USA

Page 549 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.87302942.897113)

300 33 2041

POINT (-76.05633543.093042)

702 426 2132

POINT (-78.76715142.683985)

302 527 2041

POINT (-76.81571142.110455)

485 926 2036

POINT (-74.01363540.652263)

894 899 2090

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.56197941.428892)

730

POINT (-73.42951240.728175)

1023 1115 2179

POINT (-73.991540.738916)

749 719 2095

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.99438840.749291)

749 717 2095

POINT (-75.026275 312 1597 2140

Page 550 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

36X093 D005131

09X395 T006095

301032 T006534

011011 T006439

32X475 T005840

02X361 T005401

35X120 T005624

13XC74 T005405

30XB02 T005350

311009 T006106

08X475 T006472

23X224 T006022

36X7A9 T005395

26X295 T005954

201038 T006585

291029 T006573

Page 551 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Interior Renovation Of Levin Institute Closed

CONSTR: ADA Modifications & Surge - Lee Hall Closed

DESIGN: Rehabilitate Elevators in Various Buildings - Alumni, Capen, Furnas, NSC, BEB Active

DESIGN: Renovate Building 30 for Engineering/Science Active

DESIGN: Rehab Walkway Campus Underpass Active

DESIGN: Rochester Educational Opportunity Center Closed

DESIGN: Commissioning-McMahon Infill Project Closed

CONSTR: Modification for Prevention of Water Infiltration Closed

DESIGN: Site Restoration - Crofts Hall Closed

DESIGN: Replace Roofs Nat'l Sci. & Clark Ctr. Active

CONSTR: Job Order Contracting - NYC Region Active

CONSTR: Cook Hall Building Stabilization & Restoration Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: New Day Care Center Closed

DESIGN: Facility Master Plan - Satellite Properties Active

DESIGN: Rehabilitate Natural Science Building Active

Page 552 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 553 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/15/2006 06/30/2010 9118299.00

09/23/2014 06/12/2016 1400108.00

12/16/2019 01/17/2025 2249000.00

09/27/2021 05/04/2027 109349.00

06/12/2014 07/30/2018 363000.00

07/02/2008 04/14/2014 1360276.61

04/17/2012 10/31/2018 125223.66

06/16/2008 01/09/2013 387649.00

06/18/2010 10/01/2014 108332.19

08/25/2016 02/09/2022 910150.00

01/29/2019 04/11/2022 46430.00

08/09/2013 08/29/2015 3064035.00

04/15/2008 09/30/2014 300280.00

05/09/2012 09/10/2014 5729197.00

06/17/2021 09/14/2023 377006.00

07/13/2020 10/30/2025 2855000.00

Page 554 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 9118299.00 0.00

0.00 1400108.00 0.00

0.00 548120.15 1700879.85

0.00 486.00 108863.00

0.00 331089.90 31910.10

54776.96 1360276.61 0.00

4517.65 125223.66 0.00

23814.00 387649.00 0.00

0.00 108332.19 0.00

0.00 780771.32 129378.68

0.00 41835.00 4595.00

0.00 3064035.00 0.00

71451.00 300280.00 0.00

1765459.00 5729197.00 0.00

0.00 57552.42 319453.58

0.00 409316.35 2445683.65

Page 555 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 N 0

6 N 1

7 N 0

25 N 3

0 N 0

5 N 0

0 N 0

6 N 0

0 N 0

0 N 0

3 N 1

7 N 0

0 Y 0

15 N 0

0 Y 0

46 N 7

Page 556 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Glenman Industrial & Commercial Contr. Corp.

Murnane Building Contractors, Inc.

Architectural Resources, P.C.

Guth Deconzo Consulting Engineers, P.C.

Hoffmann Architects, Inc.

BHNT Architects, PC

Bergmann Associates, Inc.

Koko Contracting Inc.

Jacobs Civil Consultants, Inc.

Hoffmann Architects, Inc.

Volmar Construction, Inc

DC Building Systems Inc

Cutting Edge Group, LLC

Fratello Construction Corp

JMZ Architects & Planners PC

Goody Clancy Architecture LLC

Page 557 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1 Odell Plaza

P.O. Box 3048 104 Sharron Avenue

505 Franklin Street

242 West 30th Street

462 Seventh Avenue

Suite 434 2495 Main Street

28 East Main Street 200 First Federal Plaza

516 Route 25a

Suite 0603 2 Penn Plaza

462 Seventh Avenue

4400 Second Avenue

19086 US Route 11

14 Walkup Cutoff Road P.O. Box 733

134 Milbar Boulevard

190 Glen Street P. O. Box 725

420 Boylston Street

Page 558 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Yonkers NY 10701 USA

Plattsburgh NY 12901 USA

Buffalo NY 14202 USA

New York NY 10001 USA

New York NY 10018 USA

Buffalo NY 14214 USA

Rochester NY 14614 USA

Mt. Sinai NY 11766 USA

New York NY 10121 USA

New York NY 10018 USA

Brooklyn NY 11232 USA

Watertown NY 13602 USA

Lake George NY 12845 USA

Farmingdale NY 11735 USA

Glens Falls NY 12801 USA

Boston MA 2116 USA

Page 559 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

44.665789)

POINT (-73.88254640.969388)

948 1441 2185

POINT (-78.87207542.900014)

300 33 2041

POINT (-73.99438840.749291)

749 717 2095

POINT (-73.99000240.751854)

749 741 2095

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.01807940.935788)

1022 1316 2179

POINT (-73.99000240.751854)

749 741 2095

POINT (-74.01363540.652263)

894 899 2090

POINT (-75.91747143.943023)

840 1466 2089

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.41703540.750059)

1023 1115 2179

POINT (-73.6447743.309981)

824 783 2183

POINT (-71.07265142.351364)

1918

Page 560 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

291036 T006493

35X105 T005641

01XA37 T005591

10X351 T005606

41X056 T005952

061030 D006621

07XA84 T006228

091016 T006445

29X402 T006472

231006 T006390

271029 T006367

25X287 T005365

02X366 T005573

21X7A1 T005402

241007 T006317

01XA80 T006277

30XB08 T005950

Page 561 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate Administration Building Active

CONSTR: Expansion of the School of Arts & Design Closed

CONSTR: Rehab of Light Wells, Phase II Closed

DESIGN: Commissioning Services for Tyler Hall Rehab Phase I (Project 10351) Closed

CONSTR: Rehab Electrical Ssystems Closed

CONSTR: Renovate Milne Library Active

CONSTR: Construct School of Pharmacy Closed

CONSTR: Repair Masonry - Hunt Union/Alumni Hall Closed

CONSTR: Job Order Contracting - NYC Region Active

CONSTR: Renovate Chaney Hall Phase 2 Closed

DESIGN: Rehabilitate Dairy Complex Digester Closed

DESIGN: Renovate Smith Hall-Phase II Building 8 Closed

DESIGN: Special Events Receation Center - Construction Manager Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Upgrade Electrical Distribution System Active

DESIGN: Renovate Building 27- Business Administration Active

DESIGN: School of Medicine & Biomedical Sciences New Building Downtown - Phase 1 Active

Page 562 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 563 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/01/2019 04/15/2024 1371000.00

01/08/2010 02/28/2015 6307960.00

10/22/2009 08/01/2012 2295376.00

07/09/2013 07/23/2021 119028.79

05/07/2012 08/01/2017 9206385.00

03/08/2021 01/08/2023 1871712.00

04/01/2016 12/31/2019 34587057.00

06/15/2018 08/15/2020 2174219.00

01/29/2019 04/11/2022 194509.00

12/06/2017 03/31/2021 7145404.00

12/22/2017 08/24/2025 174014.24

06/10/2008 04/14/2017 323124.39

11/30/2009 10/21/2014 1874065.76

06/02/2008 01/21/2014 191601.00

03/23/2017 04/18/2020 2807378.00

10/06/2016 01/31/2022 1281190.00

05/11/2012 12/07/2018 27142615.50

Page 564 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 499509.07 871490.93

286892.00 6307960.00 0.00

10005.00 2295376.00 0.00

0.00 119028.79 0.00

1403947.00 9206385.00 0.00

0.00 1349357.00 522355.00

0.00 34587057.00 0.00

0.00 2174219.00 0.00

0.00 171176.00 23333.00

0.00 7145404.00 0.00

0.00 139939.24 34075.00

0.00 323124.39 0.00

406850.68 1874065.76 0.00

41741.00 191601.00 0.00

0.00 2797378.00 10000.00

0.00 1176607.81 104582.19

5019590.55 26805032.29 337583.21

Page 565 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24 N 5

14 N 0

3 N 0

0 N 0

11 Y 2

6 N 2

7 N 0

3 N 0

3 N 1

2 Y 1

0 N 0

0 N 0

11 N 0

0 N 0

6 N 1

58 N 6

19 N 1

Page 566 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Kliment Halsband Architects, LLP

The Pike Company Inc

AOW Associates, Inc.

Genesys Engineering, P.C.

CRC Associates Inc

Bell Mechanical Contractor, Inc.

Fahs Construction Group Inc.

Ganem Contracting Corp.

Volmar Construction, Inc

Black Horse Group

Ramboll Americas Engineering Solutions, Inc.

Architecture +

Gilbane Building Company

JEMCO Electrical Contractors, Inc.

Nelcorp Electrical Contracting Corporation

Gilbane Building Company

Hellmuth, Obata & Kassabaum, P.C.

Page 567 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

20th Floor 322 Eighth Avenue

One Circle Street

30 Essex Street

38 Maiden Lane

Suite 101 300 Maple Avenue

105 Lincoln Parkway

2224 Pierce Creek Road

2023 Route 9 P.O. Box 1349

4400 Second Avenue

800 Starbuck Avenue

333 West Washington St PO Box 4873

297 River Street

7 Southwoods Boulevard 3rd Floor

271 42nd Street

35 North Kelly Avenue

7 Southwoods Boulevard 3rd Floor

6th Floor 1065 Ave. of the Americas

Page 568 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10001 USA

Rochester NY 14607 USA

Albany NY 12206 USA

Kingston NY 12401 USA

South Plainfield NJ 7080 USA

East Rochester NY 14445 USA

Binghamton NY 13903 USA

Clifton Park NY 12065 USA

Brooklyn NY 11232 USA

Watertown NY 13601 USA

Syracuse NY 13221 USA

Troy NY 12180 USA

Albany NY 12211 USA

Brooklyn NY 11433 USA

Endwell NY 13760 USA

Albany NY 12211 USA

New York NY 10018 USA

Page 569 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.77972242.677542)

814 43 2030

POINT (-74.01451641.931949)

425 79 2182

POINT (-77.48102443.116518)

550 230 2093

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.77723542.904588)

1009 1190 2141

POINT (-74.01363540.652263)

894 899 2090

POINT (-75.89492943.984287)

841 1466 2089

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.77073242.683397)

834 48 2030

POINT (-74.01047940.652508)

894 815 2090

POINT (-76.02526642.109078)

938 388 2033

POINT (-73.77073242.683397)

834 48 2030

Page 570 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02X361 T005196

05X336 T005350

03X387 T006420

35X817 T005586

21X198 T004951

021028 D006653

03X393 T005812

15XA19 T005758

111017 T006376

011006 T006127

30XA18 T005503

14X340 T003961

12X357 T006107

201018 T006555

03X7A4 T005630

09X304 T004925

29X441 T006089

Page 571 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning - REOC Closed

DESIGN: Upgrade Domestic Water Systems Phase II Closed

CONSTR: Renovate Science Building No. 15, Building Addition Active

DESIGN: Facilities Master Plan - Alfred Ceramics Closed

DESIGN: Rehab Elevators Closed

CONSTR: Reconstruct Allen Loop Plaza and New Campus Drive Active

CONSTR: Underground Utility Improvements Phase 1, Towers II Closed

DESIGN: New Academic Building Closed

DESIGN: Renovate Memorial Hall Active

DESIGN: Upgrade Central Plant - SUCF Active

CONSTR: Replace Fire Alarm Systems - Various Buildings Closed

DESIGN: Rehabilitate Boiler #3, BSB Closed

DESIGN: Repalce Windows, Various Buildings Closed

CONSTR: Renovate Marshall Hall Active

CONSTR: JOCs - Buffalo Region Closed

DESIGN: Replace VAT Floors, Various Buildings Closed

CONSTR: Rehabilitate Exteriors - Various Buildings Closed

Page 572 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 573 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/21/2009 08/21/2018 69621.99

03/05/2010 10/01/2014 378473.97

03/30/2018 09/02/2021 23771803.00

11/23/2009 05/19/2011 443481.95

10/04/2007 11/01/2012 75133.43

06/08/2021 02/04/2024 5771013.00

03/18/2011 01/01/2013 908802.00

01/26/2011 12/31/2017 3592238.87

10/03/2017 01/19/2023 2877907.95

06/09/2017 08/29/2022 499030.00

04/14/2009 09/30/2011 884770.00

04/24/1998 01/29/2001 57092.82

10/23/2014 03/31/2022 215836.27

04/17/2020 01/27/2022 2170064.00

12/18/2009 12/08/2015 34229.00

09/01/2005 02/28/2012 81550.70

08/04/2014 10/21/2016 614503.00

Page 574 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14128.00 69621.99 0.00

0.00 378473.97 0.00

0.00 23696129.00 75674.00

0.00 443481.95 0.00

0.00 75133.43 0.00

0.00 982943.00 4788070.00

155259.00 908802.00 0.00

769543.52 3592238.87 0.00

0.00 2093280.83 784627.12

0.00 488976.24 10053.76

0.00 884770.00 0.00

0.00 57092.82 0.00

0.00 215836.27 0.00

0.00 2020685.00 149379.00

34229.00 34229.00 0.00

0.00 60965.82 20584.88

0.00 614503.00 0.00

Page 575 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

2 N 0

22 N 1

0 Y 0

6 Y 1

10 N 1

25 N 0

19 N 4

19 N 4

7 N 1

3 Y 1

0 N 0

0 N 0

0 N 0

0 N 0

10 N 1

Page 576 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

C.J. Brown Energy & Engineering, P.C.

Jacobs Civil Consultants, Inc.

Manning Squires Hennig Co. Inc

NBBJ Architecture PLLC

David Smotrich & Partners Architects/Planners

Scott Lawn Yard Inc.

Milherst Construction Inc

Ewing Cole

HOLT Architects, P.C.

Gilbane Building Company

Frey Electric Construction Co., Inc.

Munoz Engineering Pc

Architecture +

Murnane Building Contractors, Inc.

Sorensen Gross Construction Services

Architecture +

Siba Contracting Corp

Page 577 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 204 4245 Union Road

Suite 0603 2 Penn Plaza

8426 Seven Springs Road PO Box 685

One Beacon Street Suite 5200

Suite 704 443 Park Avenue South

3305 Haseley Drive

10025 County Road PO Box 430

100 North 6th Street

619 W. State Street

7 Southwoods Boulevard 3rd Floor

100 Pearce Avenue

505 Eighth Avenue

297 River Street

6728 Myers Road

3407 torrey Road

297 River Street

221 Park Avenue

Page 578 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14225 USA

New York NY 10121 USA

Batavia NY 14020 USA

Boston MA 2108 USA

New York NY 10016 USA

Niagara Falls NY 14314 USA

Clarence Center NY 14032 USA

Philadelphia PA 19106 USA

Ithaca NY 14850 USA

Albany NY 12211 USA

Tonawanda NY 14150 USA

New York NY 10018 USA

Troy NY 12180 USA

East Syracuse NY 13057 USA

Flint MI 48507 USA

Troy NY 12180 USA

West Harrison NY 10604 USA

Page 579 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.13339143.006019)

792 489 2086

POINT (-78.96827743.11648)

160 168 2131

POINT (-78.61541743.031342)

297 496 2041

POINT (-75.14971339.953775)

2602

POINT (-76.50968842.439224)

709 1786 2181

POINT (-73.77073242.683397)

834 48 2030

POINT (-78.89326442.992092)

278 8 2041

POINT (-73.99285840.753037)

749 741 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.05633543.093042)

702 426 2132

POINT (-83.73256442.976697)

438

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.74050741.044809)

973 1437 2185

Page 580 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

061013 T006101

111035 T006360

031065 T006590

36X136 T006231

081007 T006226

051011 T006536

291002 T006289

12X338 T005751

08X416 T005338

26X226 D005147

09X323 T005368

36X813 T005855

10X340 T005606

291026 T006626

30XA95 T006442

141042 D006607

391014 D006637

15X412 T004894

Page 581 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roofs - Various Buildings Closed

DESIGN: Install Turf Field at the Field House Assigned to Vendor

DESIGN: Campus Parking Study Active

CONSTR: Interior Rehab - SUNY Plaza Building Towers Closed

DESIGN: Upgrade HVAC Systems, Coykendall Science Bldg. Closed

CONSTR: Rehabilitate Exterior - Reed Library Active

CONSTR: Rehab Diesel Generator Closed

DESIGN: Upgrade Site Utilites, Phase III Closed

CONSTR: Replace High Temperature Hot Water Lines Closed

CONSTR: Rehabilitation Of Corridors-Lupton Hall Bldg 63 Closed

DESIGN: Replace Steam Condensate Lines, Phase I Closed

DESIGN: Campus Development Study Closed

DESIGN: Commissioning Services - Rice Creek Field Station Closed

DESIGN: Rehab HVAC - Visual Arts Building Active

CONSTR: Replace Fire Alarm Systems, Clemens Hall Closed

CONSTR: Replace Exterior Doors- BSB and HSEB Active

CONSTR: Reconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian Bridge Active

DESIGN: Commissioning For Vertical Expansion - Hospital Closed

Page 582 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 583 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/06/2017 10/10/2023 344247.98

07/21/2019 09/26/2020 43853.21

10/12/2021 09/14/2023 85230.00

03/09/2016 01/01/2018 1116555.00

03/23/2016 04/08/2021 304974.33

01/24/2020 05/22/2022 2727456.00

10/13/2016 06/30/2020 3105335.00

02/07/2011 01/09/2016 874881.58

01/07/2008 01/16/2014 5296407.00

06/06/2006 06/30/2010 6697328.00

07/07/2008 11/25/2016 70414.57

10/31/2011 08/19/2014 196032.00

04/16/2012 07/23/2021 37540.50

08/25/2021 06/17/2024 792000.00

06/06/2018 04/29/2020 3256942.00

01/08/2021 03/16/2023 949997.00

04/27/2021 08/17/2023 2144000.00

08/25/2004 07/31/2009 211195.68

Page 584 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 344247.98 0.00

0.00 43853.21 0.00

0.00 0.00 85230.00

0.00 1116555.00 0.00

0.00 304974.33 0.00

0.00 2446758.00 280698.00

0.00 3105335.00 0.00

140809.02 874881.58 0.00

0.00 5296407.00 0.00

0.00 6697328.00 0.00

0.00 70414.57 0.00

166627.20 196032.00 0.00

13336.01 37540.50 0.00

0.00 0.00 792000.00

0.00 3256942.00 0.00

0.00 24447.00 925550.00

0.00 967557.00 1176443.00

60073.56 211195.68 0.00

Page 585 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

0 N 0

7 N 1

21 N 4

4 N 0

3 N 0

20 N 2

5 N 1

14 N 0

0 N 0

0 N 0

0 N 0

23 Y 6

1 N 0

4 N 0

2 N 0

5 N 1

Page 586 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

Mosaic Associates Architects

M.J. Engineering and Land Surveying, P.C.

Sano-Rubin Construction Services LLC

Ramboll Americas Engineering Solutions, Inc.

Savarino Companies LLC

Northeast Generator Co.

Labella Associates, D.P.C

Northern Construction Service

L. D. Wenger Construction Co, Inc.

Lizardos Engineering Associates P.C.

Perkins & Will Architects P.C.

Genesys Engineering, P.C.

Ellana, Inc.

Ferguson Electric Construction Co., Inc.

Pro Con Group, Inc.

Bette & Cring, LLC

Affiliated Engineers, Inc

Page 587 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

The Frear Building 2 Third Street, Suite 440

1533 Crescent Road

624 Delaware Avenue

333 West Washington St PO Box 4873

500 Seneca Street

625 John Street

Suite 201 300 State Street

Unit 11 775 Pleasant Street

770 Railroad Avenue

200 Old Country Road Suite 670

4th Floor 215 Park Avenue South

38 Maiden Lane

Suite 801 32 Broadway

333 Ellicott St.

520 Industrial Loop

18438 U.S. Route 11

5802 Research Park Blvd P. O. Box 44991

Page 588 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Troy NY 12180 USA

Clifton Park NY 12065 USA

Albany NY 12209 USA

Syracuse NY 13221 USA

Buffalo NY 14204 USA

Bridgeport CT 6604 USA

Rochester NY 14614 USA

Weymouth MA 2189 USA

West Babylon NY 11704 USA

Mineola NY 11501 USA

New York NY 10003 USA

Kingston NY 12401 USA

New York NY 10004 USA

Buffalo NY 14203 USA

Staten Island NY 10309 USA

Watertown NY 13601 USA

Madison WI 53744 USA

Page 589 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.79218642.636455)

814 46 2030

POINT (-76.15589443.049616)

687 711 2132

POINT (-78.8572442.877333)

300 61 2041

POINT (-73.19771741.174822)

1040

POINT (-73.35208140.692842)

1023 1035 2179

POINT (-73.63875140.739038)

62 1265 2094

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.87134442.887775)

300 34 2041

POINT (-74.23132640.548013)

585 612 2139

POINT (-75.93432943.933537)

840 1466 2089

POINT (-89.480241 867

Page 590 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

211020 T006516

06X337 T005197

141000 T006438

24X267 T005755

08X471 T005953

141077 D006645

15X482 T006409

09X344 T005626

28X354 T005399

39X140 T005521

251029 T006359

13XD75 T005729

31X218 T005589

15X324 T004989

271005 T006419

081047 T006628

12X823 T005556

Page 591 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Roofs Various Buildings Active

DESIGN: Commissioning Closed

DESIGN: Upgrade Electrical System UHB Active

CONSTR: Upgrade Campus-Wide Fire Alarm Hub (University Police Station) Closed

CONSTR: Library Renovation Sojourner Truth Library Closed

CONSTR: Replace BSB Chiller Active

DESIGN: CM DLAR Renovations Phase III Weiskotten Hall Closed

CONSTR: Replace Cooling Tower/Transformer - Lee Hall Closed

CONSTR: South Campus Site and Storm Drainage Improvements Phase I Closed

CONSTR: Auxiliary Services Building/Student Center Closed

DESIGN: Repair Masonry and Replace Windows - Evenden Hall Active

DESIGN: HTHW - Phase II Closed

CONSTR: Renovate/Reconstruct Bldg 47 - University Police Closed

CONSTR: Academic Building Closed

CONSTR: Replacement of Underground Utilities and Site Enhancements Active

DESIGN: Replace Roofs - Smiley Arts, College Theater, Dorsky Museum and Faculty Office Building Active

DESIGN: T. Barrington Student Union - Program Study Closed

Page 592 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 593 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/30/2019 09/08/2021 1561000.00

12/04/2009 05/07/2016 95919.00

04/16/2020 10/20/2027 111414.00

12/22/2010 02/28/2013 2142545.00

05/04/2012 08/05/2014 1906405.00

05/14/2021 09/25/2023 4607922.00

09/07/2018 04/17/2021 45554.27

01/13/2010 08/13/2011 327072.00

04/23/2008 10/01/2010 3864894.00

04/30/2009 07/03/2012 12736519.00

08/14/2018 12/02/2025 439399.03

10/08/2010 10/04/2015 821698.93

10/13/2009 05/31/2013 2827965.00

05/02/2005 12/31/2009 9779592.00

03/29/2018 08/15/2021 8921926.00

08/09/2021 06/17/2024 438000.00

09/16/2009 11/09/2010 284960.09

Page 594 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 1527597.00 33403.00

32849.47 139901.99 -43982.99

0.00 2352.50 109061.50

212209.00 2142545.00 0.00

1726330.00 1906405.00 0.00

0.00 149489.00 4458433.00

0.00 45554.27 0.00

0.00 327072.00 0.00

4425.00 3864894.00 0.00

0.00 12736519.00 0.00

0.00 292462.58 146936.45

225641.50 821698.93 0.00

0.00 2827965.00 0.00

0.00 9779592.00 0.00

0.00 8769130.00 152796.00

0.00 0.00 438000.00

0.00 287003.54 -2043.45

Page 595 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1 N 0

0 N 0

23 N 3

5 Y 1

8 N 0

9 N 2

0 N 0

8 N 0

9 N 0

9 N 0

0 N 0

14 N 1

24 N 0

5 N 0

3 N 0

0 Y 0

23 N 2

Page 596 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sea Breeze General Construction, Inc.

SmartEdge

Genesys Engineering, P.C.

Kasselman Electric Co., Inc.

Piazza Inc

Planet Mechanical Corp.

Turner Construction Company

J & K Plumbing & Heating Co, Inc.

Concrete Applied Technlgs Corp. /dba/ CATCO

Charles A. Gaetano Construction Corp.

Lothrop Associates LLP Architects

Schuyler Engineering, P.C.

Aldco Builders Inc.

Murnane Building Contractors, Inc.

CCI Companies, Inc.

The McKissack Group, Inc DBA McKissack & McKissack

Burt Hill

Page 597 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24-30 47th Street

4 Peuquet Parkway

38 Maiden Lane

29 Broad Street P O Box 984

3 West Stevens Avenue

8-17 37th Avenue

Suite 200 50 Lakefront Boulevard

24 Thorp St PO Box 25 Westview Stat

1266 Town Line Road

258 Genesee Street

333 Westchester Avenue

Suite 6 163 North Wellwood Avenue

Suite 204 60 Carleton Avenue

6728 Myers Road

7138 Mt. Pleasant Road PO Box 186

20th Floor. 1001 Avenue of the Americas

53rd Floor 1735 Market Street

Page 598 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Astoria NY 11103 USA

Tonawanda NY 14150 USA

Kingston NY 12401 USA

Albany NY 12201 USA

Hawthorne NY 10532 USA

New York NY 11101 USA

Buffalo NY 14202 USA

Binghamton NY 13905 USA

Alden NY 14004 USA

Utica NY 13502 USA

White Plains NY 10604 USA

Lindenhurst NY 11757 USA

Islip Terrace NY 11752 USA

East Syracuse NY 13057 USA

Canastota NY 13032 USA

New York NY 10018 USA

Philadelphia PA 19103 USA

Page 599 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.055761)

POINT (-73.90482340.766936)

196 875 2137

POINT (-78.86566943.01577)

280 8 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.75773542.641727)

814 39 2030

POINT (-73.9426140.760405)

196 878 2137

POINT (-75.92500542.103463)

968 479 2033

POINT (-78.57831942.924983)

286 481 2041

POINT (-75.23512943.099488)

984 1464 625

POINT (-73.74502841.030178)

949 1437 2185

POINT (-76.05633543.093042)

702 426 2132

POINT (-75.75546943.067475)

136 351 2092

Page 600 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15X482 T005679

10X344 T005747

111017 T006438

08X7B2 T005395

361027 T006350

09X327 T005355

09X386 T005846

12X268 D005392

29X333 T004949

12X342 T005355

411005 T006100

41X056 T006381

12X315 D005378

20X820 T005693

31X228 T005621

04X343 T005606

14XB03 T005985

Page 601 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: DLAR Renovations Phase III Weiskotten Hall Active

CONSTR: Historic Preservation - Sheldon Hall Closed

DESIGN: Renovate Memorial Hall Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Exterior Preservation H. Carl McCall Building Active

DESIGN: Replace Hunt Union Cooling Tower Closed

DESIGN: Upgrade Telecommunications & Data Infrastructure Closed

CONSTR: Exterior Safety Enhancements - Campuswide - Site Closed

DESIGN: Repair/Replace Roofs Campus Center Southand Performing Arts Center Closed

DESIGN: Rehab HVAC Knowles and Lehman Dining Closed

DESIGN: Renovate 7th Floor Reception Closed

CONSTR: Rehab Building Systems Mech Ph 2 Active

CONSTR: Rehab Pool Areas And Equipment-Merritt And Maxcy Halls Closed

DESIGN: Facilities Master Plan - ESF Closed

CONSTR: Replace Service Group Fuel Tanks- Site Work Closed

DESIGN: Commissioning - Campus Wide Satellite Boilers Closed

DESIGN: Replace Windows BSB Closed

Page 602 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 603 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/19/2010 05/19/2020 2613861.90

11/23/2010 05/01/2015 9567535.00

08/09/2021 10/20/2027 61013.00

04/15/2008 09/30/2014 172440.00

06/14/2019 07/16/2025 554562.00

05/28/2008 06/12/2020 23873.96

06/28/2011 02/28/2018 783133.44

04/16/2008 08/01/2010 764606.00

04/04/2007 12/31/2013 94096.42

07/27/2010 06/12/2020 201489.55

10/14/2016 02/05/2024 4297.77

10/30/2017 02/20/2022 7434390.00

03/10/2008 10/31/2010 530450.00

08/02/2010 01/22/2012 518470.62

12/21/2009 02/09/2012 795027.00

10/27/2010 07/23/2021 58207.63

10/19/2011 12/01/2016 204615.82

Page 604 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

202593.24 1992438.18 621423.72

3794419.00 9567535.00 0.00

0.00 3622.50 57390.50

172440.00 172440.00 0.00

0.00 194896.55 359665.45

789.50 23873.96 0.00

205053.49 783133.44 0.00

0.00 764606.00 0.00

0.00 94096.42 0.00

8131.52 201489.55 0.00

0.00 4297.77 0.00

0.00 7424390.00 10000.00

0.00 530450.00 0.00

0.00 518470.62 0.00

0.00 795027.00 0.00

19340.07 58207.63 0.00

0.00 204615.82 0.00

Page 605 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13 N 0

11 N 1

19 N 4

0 Y 0

0 N 0

0 N 0

16 N 1

6 N 0

0 N 0

0 N 0

0 N 0

5 Y 1

3 N 0

19 N 0

7 N 0

0 N 0

0 N 0

Page 606 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

David J. Mastanduno Architect

PAC & Associates of Oswego, Inc.

Genesys Engineering, P.C.

Cutting Edge Group, LLC

Architecture +

C & S Engineers, Inc.

Stantec Consulting Services, Inc.

Acts II Construction,Inc.

Hoffmann Architects, Inc.

C & S Engineers, Inc.

Peter Gisolfi Associates

ACS System Associates, Inc.

Continental Construction, LLC

Mitchell/Giurgola Architects, LLP

Fenley & Nicol Environmental, Inc.

Genesys Engineering, P.C.

Urbahn Architects PLLC

Page 607 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11 Winkle Point Drive

11-G Fourth Avenue

38 Maiden Lane

14 Walkup Cutoff Road P.O. Box 733

297 River Street

499 Col. Eileen Collins Blvd.

Suite 201 111 Grant Avenue

658 US Hwy 11 South

462 Seventh Avenue

499 Col. Eileen Collins Blvd.

566 Warburton Avenue

160 West Lincoln Avenue

PO Box 358 2125 State Hwy 812

Film Center Bldg, Ste 711 630 Ninth Avenue

445 Brook Avenue

38 Maiden Lane

49 West 37th Street 6th Floor

Page 608 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Northport NY 11768 USA

Oswego NY 13126 USA

Kingston NY 12401 USA

Lake George NY 12845 USA

Troy NY 12180 USA

Syracuse NY 13212 USA

Endicott NY 13760 USA

Gouverneur NY 13642 USA

New York NY 10018 USA

Syracuse NY 13212 USA

Hastings-On-Hudson NY 10706 USA

Mount Vernon NY 10550 USA

Gouverneur NY 13642 USA

New York NY 10036 USA

Deer Park NY 11729 USA

Kingston NY 12401 USA

New York NY 10018 USA

Page 609 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.39340340.938631)

1020 1318 2179

POINT (-76.53084443.451426)

240 667 2135

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.13224343.113906)

690 730 2132

POINT (-75.45031244.344049)

330 1525 2140

POINT (-73.99000240.751854)

749 741 2095

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.8821840.995664)

974 1445 2185

POINT (-73.84303140.915138)

962 1329 2185

POINT (-73.3048140.751633)

1023 1110 2179

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.98564540.751377)

749 741 2095

Page 610 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

27X821 T005194

06X7A7 T005631

36X083 T005426

131062 T006412

11X244 D005369

101003 T006322

291065 T006578

251026 T006422

20X152 T005962

091028 T006480

29X409 T006412

071042 T006399

801803 T006373

081013 T006427

14XB40 T006355

29X401 T005896

Page 611 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Building Conversion/Construct Design Facility - Commissioing Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: Mechanical System Upgrades State University Plaza Closed

DESIGN: Rehabilitate Javits Lecture Center Active

CONSTR: Replace Ice Rink Bleachers Closed

CONSTR: Rehab Exterior - Lee Hall Closed

DESIGN: Replace Roof - Dance Building Active

DESIGN: Renovate Farnsworth Hall Active

CONSTR: Exterior Rehab - Illick Hall Closed

CONSTR: Site Improvements & Safety Upgrades Hunt Union Parking - Water Lines & Bugbee rd Closed

DESIGN: CM HVAC Renovations - Dance Building Active

DESIGN: Rehabilitate Science IV Ph 2 Active

DESIGN: Site Infrastructure, Civil Engineering & Surveying Services - RMF Engineering-Master Term Agreement Active

CONSTR: Exterior Rehab Various Buildings - Phase 1 - Roofs Closed

DESIGN: Replace HSEB Roof Active

CONSTR: Renovation of Humanities - Bldg. 41 Closed

Page 612 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 613 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/19/2007 12/31/2013 83468.11

12/18/2009 01/31/2018 389878.00

09/29/2008 12/15/2010 2099288.00

03/26/2021 04/03/2025 717800.00

02/28/2008 06/30/2010 1912419.00

03/31/2017 06/14/2019 2522836.00

08/30/2021 09/14/2023 579000.00

04/19/2018 05/29/2023 3232000.00

05/22/2012 11/30/2014 8987069.00

02/26/2019 08/16/2020 2809775.00

12/18/2018 04/03/2025 362000.00

02/14/2018 03/09/2023 1547197.27

09/14/2017 09/27/2020 5000000.00

05/02/2018 02/26/2020 688318.00

11/07/2017 01/13/2025 315077.00

12/20/2011 12/31/2019 36006234.00

Page 614 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 83468.11 0.00

363691.00 389878.00 0.00

0.00 2099288.00 0.00

0.00 0.00 717800.00

0.00 1912419.00 0.00

0.00 2522836.00 0.00

0.00 112453.91 466546.09

0.00 1896938.21 1335061.79

1644886.00 8987069.00 0.00

0.00 2809775.00 0.00

0.00 357426.51 4573.49

0.00 1239838.92 307358.35

0.00 0.00 5000000.00

0.00 688318.00 0.00

0.00 194585.96 120491.04

5006533.00 36006234.00 0.00

Page 615 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

2 N 0

14 N 4

5 N 0

4 N 1

0 N 0

15 Y 4

3 N 0

5 N 0

0 N 0

10 N 0

29 N 6

6 Y 2

0 Y 0

22 N 0

Page 616 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

SmartEdge

Sorensen Gross Construction Services

Digesare Mechanical,Inc.

LiRo Program and Construction Mgmt, P.C.

Murnane Building Contractors, Inc.

PAC & Associates of Oswego, Inc.

Architecture +

Envision Architects, D.P.C.

Murnane Building Contractors, Inc.

Fahs Construction Group Inc.

LiRo Engineering and Construction Management

Ashley McGraw Architects DPC

RMF Engineering, Inc., P.C.

NUA Construction Corp

Ismael Leyva Architects, P.C.

Niram, Inc.

Page 617 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 Peuquet Parkway

3407 torrey Road

3434 Carmen Road

Three Aerial Way

P.O. Box 3048 104 Sharron Avenue

11-G Fourth Avenue

297 River Street

52 James Street

6728 Myers Road

2224 Pierce Creek Road

3 Aerial Way

15th Floor 125 East Jefferson Street

1A Pine West Plaza

750 Saw Mill River Road

13th Floor 48 West 37th Street

4 E. Frederick Place

Page 618 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Tonawanda NY 14150 USA

Flint MI 48507 USA

Schenectady NY 12303 USA

Syosset NY 11791 USA

Plattsburgh NY 12901 USA

Oswego NY 13126 USA

Troy NY 12180 USA

Albany NY 12207 USA

East Syracuse NY 13057 USA

Binghamton NY 13903 USA

Syosset NY 11791 USA

Syracuse NY 13202 USA

Albany NY 12205 USA

Ardsley NY 10502 USA

New York NY 10018 USA

Cedar Knolls NJ 7927 USA

Page 619 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.751377)

POINT (-78.86566943.01577)

280 8 2041

POINT (-83.73256442.976697)

438

POINT (-73.94224442.746356)

832 72 2030

POINT (-76.53084443.451426)

240 667 2135

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.75023942.651717)

814 44 2030

POINT (-76.05633543.093042)

702 426 2132

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.51801540.800801)

59 1431 2094

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.8456541.013633)

974 748 2185

POINT (-74.4514640.811234)

2492

Page 620 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

071064 T006352

28X422 T005439

291009 T006370

34X7A2 T005631

14X496 T006251

36X125 T006057

41X065 T006031

16X7A7 T005632

11X228 D005420

02X395 T005920

24X7A3 T005395

01X842 T005478

01X850 T005855

20X228 T005577

02X383 T005689

29X396 D005519

03X439 T006195

Page 621 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roofs - Various Bldgs. Active

DESIGN: Hayes Hall Building Wide Restoration Closed

DESIGN: Install Backflow Prevention Active

CONSTR: JOCs - Rochester Region Closed

CONSTR: Upgrade HVAC Systems BSB Closed

CONSTR: Replace Exter Doors & Sec Closed

CONSTR: Rehabilitate First Floor Lecture Halls Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Replace Chillers, Cooling Towers & Associated Equipment Closed

CONSTR: Replace Roofs - Various Buildings Phase II Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Program Study - Renovate Page Hall Closed

DESIGN: Linear Accelerator Upgrades - Study Closed

DESIGN: Replace Electrical Substation/Restore Site Closed

CONSTR: Replace Roofs - Hazen and Brown Halls Closed

CONSTR: Re-roof Social Science Building #55 Closed

CONSTR: Selective Demo & Asbestos Abatement Buckham B Wing Closed

Page 622 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 623 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09/17/2020 11/01/2026 792000.00

01/30/2009 03/15/2017 3539007.79

10/01/2018 10/19/2026 35985.00

12/18/2009 01/31/2018 191708.00

04/06/2016 12/19/2019 7546102.00

02/11/2014 01/29/2016 1340060.00

09/17/2013 08/11/2015 2034886.00

12/18/2009 12/09/2015 7295.00

09/10/2008 10/01/2010 2374061.00

01/12/2012 08/22/2013 1883671.00

04/15/2008 09/30/2014 95266.00

04/01/2009 03/26/2010 273287.89

06/01/2012 08/19/2014 142226.27

11/01/2012 02/03/2018 650921.73

04/13/2010 07/30/2012 1073346.00

04/08/2009 04/21/2011 426427.00

10/26/2015 07/02/2017 970005.00

Page 624 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 210192.77 581807.23

406241.90 3539007.79 0.00

0.00 31364.55 4620.45

0.00 191708.00 0.00

0.00 7546102.00 0.00

0.00 1340060.00 0.00

0.00 2034886.00 0.00

0.00 7295.00 0.00

0.00 2374061.00 0.00

1744830.00 1883671.00 0.00

0.00 95266.00 0.00

0.00 273287.89 0.00

71113.14 142226.27 0.00

12056.20 650921.73 0.00

0.00 1073346.00 0.00

0.00 426427.00 0.00

0.00 970005.00 0.00

Page 625 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

16 N 1

0 N 0

0 N 0

5 N 1

6 N 2

10 N 0

0 N 0

3 N 0

5 N 0

0 Y 0

20 Y 3

0 N 0

0 N 0

4 N 1

22 N 1

9 N 0

Page 626 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

Bergmann Associates, Inc.

M.J. Engineering and Land Surveying, P.C.

Sorensen Gross Construction Services

LoSardo General Contractors Inc.

Bunkoff General Contractors, Inc.

Stalco Construction Inc.

Sorensen Gross Construction Services

J. Hogan Refrigeration & Mechanical, Inc.

Elmer W. Davis,Inc.

Cutting Edge Group, LLC

Envision Architects, D.P.C.

Perkins & Will Architects P.C.

C & S Engineers, Inc.

Leo J. Roth Corp.

A.B.C.D. Construction Corp.

Sicoli Construction Services, Inc.

Page 627 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

28 East Main Street 200 First Federal Plaza

1533 Crescent Road

3407 torrey Road

35 Crescent Street

790 Watervliet Shaker Rd.

1316 Motor Parkway

3407 torrey Road

P.O. Box 67

1217 Clifford Avenue

14 Walkup Cutoff Road P.O. Box 733

52 James Street

4th Floor 215 Park Avenue South

499 Col. Eileen Collins Blvd.

841 Holt Road

5702 Third Avenue

4800 Hyde Park Boulevard

Page 628 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Rochester NY 14614 USA

Clifton Park NY 12065 USA

Flint MI 48507 USA

Brooklyn NY 11208 USA

Latham NY 12110 USA

Islandia NY 11749 USA

Flint MI 48507 USA

Peru NY 12972 USA

Rochester NY 14621 USA

Lake George NY 12845 USA

Albany NY 12207 USA

New York NY 10003 USA

Syracuse NY 13212 USA

Webster NY 14580 USA

Brooklyn NY 11220 USA

Niagara Falls NY 14305 USA

Page 629 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-83.73256442.976697)

438

POINT (-73.87371940.688366)

894 886 2137

POINT (-73.7967442.739147)

834 1288 2030

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-83.73256442.976697)

438

POINT (-77.5906543.175451)

537 1663 2093

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.75023942.651717)

814 44 2030

POINT (-76.13224343.113906)

690 730 2132

POINT (-77.44663643.218198)

534 418 2093

POINT (-74.01894140.643788)

894 899 2090

POINT (-79.03985943.131099)

159 169 2131

Page 630 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

261002 T006627

321027 T006462

01XA47 T006000

11X335 T005577

02X392 T005932

09X7A7 T005956

041038 T006632

01XA58 T005868

36X124 T005395

21X151 T005376

26X293 T005871

08X490 T006234

031003 T006101

09X363 T005355

04X342 T006132

011032 T006439

Page 631 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate Roosevelt Hall Active

DESIGN: Claims Analysis & Litigation Services Active

DESIGN: Renovate Health Center Closed

DESIGN: Site Infrastructure Replacement Closed

CONSTR: Rehabilitate Exterior - Tuttle North & South Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Renovate Wing C - Cornish Van Hoesen Hall Active

DESIGN: CM - Construction Services Rehab. Water Tower & Fountain Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace Roof Riesenberg Hall Closed

DESIGN: Construction Manager, Nold Hall & New Day Care Center Closed

CONSTR: Renovate Locker Rooms, Elting Athletic Complex, Building No. 5 Active

DESIGN: Exterior Rehab. - Renovate B-Wing at Buckham Hall Closed

DESIGN: Replace HVAC Equipment & Domestic Hot Water Heaters - Hulbert Dining Hall Closed

CONSTR: Comprehensive reconstruction and upgrade of Campus Wide Electrical Distribution infrastructure Closed

DESIGN: Renovate Building 35 for Liberal Arts & Social Sciences Active

Page 632 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 633 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/05/2021 06/17/2024 896375.00

09/01/2016 09/02/2021 360365.61

08/05/2013 08/08/2018 1712664.11

03/26/2012 02/03/2018 413152.52

02/28/2012 08/21/2015 7545563.00

04/18/2012 11/20/2018 37238.00

04/16/2021 04/28/2026 3028000.00

03/15/2012 12/01/2015 482961.32

04/15/2008 09/30/2014 153183.00

08/15/2008 02/06/2017 151314.46

04/27/2012 07/30/2021 533731.33

04/11/2016 08/27/2018 4201000.00

10/02/2015 10/10/2023 185220.26

06/18/2010 06/12/2020 247615.66

02/17/2015 04/12/2018 7774279.00

07/25/2019 05/04/2027 61017.00

Page 634 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 0.00 896375.00

0.00 59115.00 301250.61

0.00 1712664.11 0.00

230717.18 413152.52 0.00

3030542.00 7545563.00 0.00

0.00 37238.00 0.00

0.00 425807.36 2602192.64

247751.13 482961.32 0.00

0.00 153183.00 0.00

903.60 151314.46 0.00

159346.30 533731.33 0.00

0.00 4188773.00 12227.00

0.00 185220.26 0.00

95439.81 247615.66 0.00

0.00 7774279.00 0.00

0.00 50532.80 10484.20

Page 635 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

27 N 2

0 N 0

38 Y 3

0 N 0

5 N 0

0 Y 0

43 Y 4

0 N 0

0 Y 0

0 N 0

0 N 0

5 N 0

0 N 0

0 N 0

10 N 0

29 N 3

Page 636 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Jacobs Project Management Co.

Ankura Consulting Group LLC

JMZ Architects & Planners PC

C & S Engineers, Inc.

Christa Construction, LLC

Cutting Edge Group, LLC

JMZ Architects & Planners PC

The Whiting-Turner Contracting Company

Cutting Edge Group, LLC

San Fanandre Justin Architects P.C.

Hill International, Inc

BCI Construction, Inc.

Bell & Spina Architects-Planners, P.C.

C & S Engineers, Inc.

Nelcorp Electrical Contracting Corporation

Guth Deconzo Consulting Engineers, P.C.

Page 637 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

500 7th Avenue 17th Floor

1220 19th Street NW Suite 700

190 Glen Street P. O. Box 725

499 Col. Eileen Collins Blvd.

119 Victor Heights Pkwy

14 Walkup Cutoff Road P.O. Box 733

190 Glen Street P. O. Box 725

Suite 180 1720 Spillman Drive

14 Walkup Cutoff Road P.O. Box 733

2nd Floor 200 Sunrise Highway

Suite 3415 One Penn Plaza

20 Loudonville Road

Suite 201, The Bindery 215 Wyoming Street

499 Col. Eileen Collins Blvd.

35 North Kelly Avenue

242 West 30th Street

Page 638 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10018 USA

Washington DC 20036 USA

Glens Falls NY 12801 USA

Syracuse NY 13212 USA

Victor NY 14564 USA

Lake George NY 12845 USA

Glens Falls NY 12801 USA

Bethlehem PA 18015 USA

Lake George NY 12845 USA

Rockville Centre NY 11570 USA

New York NY 10119 USA

Albany NY 12204 USA

Syracuse NY 13204 USA

Syracuse NY 13212 USA

Endwell NY 13760 USA

New York NY 10001 USA

Page 639 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.131099)

POINT (-73.98905340.753144)

749 741 2095

POINT (-77.04344738.906629)

1049

POINT (-73.6447743.309981)

824 783 2183

POINT (-76.13224343.113906)

690 730 2132

POINT (-77.44463742.996293)

799 413 2133

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.74383442.666444)

814 44 2030

POINT (-76.13224343.113906)

690 730 2132

POINT (-76.02526642.109078)

938 388 2033

POINT (-73.99438840.749291)

749 717 2095

Page 640 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07XA12 D005410

22X245 T005843

02X383 T005694

271037 T006353

061030 T006441

09X418 T006142

091015 D006643

08X7A7 T005395

151062 T006527

111046 T006578

08X473 T005803

12X302 T005761

13XA79 T003835

02X7A5 T005631

30XA81 T006140

071032 T006099

13XC96 T005453

Page 641 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Site Utility Upgrades - Elect Var Bldgs Distribution Sysem, Ph II Closed

DESIGN: Install Satellite Boilers - Phase 1 Closed

CONSTR: Replace Roofs, Exterior Envelope Improvements, Various Buildings, Ph I Closed

DESIGN: Renovate Educational Opportunity Center - Syracuse Active

DESIGN: Renovate Milne Library Active

DESIGN: Construct New Welcome Center Closed

CONSTR: Rehabilitate Alumni Hall Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Renovate Silverman Hall Active

DESIGN: Replace Roof - Field House Active

DESIGN: Construction Manager - New Science Building Closed

CONSTR: Rehab HVAC Systems, Replace Windows Raymond Hall, Bldg. No. 0001 Closed

DESIGN: Renovate Heavy Engineering-Phase I Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: ADA Improvements - Phase II Closed

DESIGN: Building Study - Castle on the Hill Closed

DESIGN: Mechanical Systems Upgrade Life Sciences Active

Page 642 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 643 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/27/2008 08/01/2010 2373136.00

06/19/2014 05/16/2018 278953.42

04/22/2010 08/26/2012 1722360.00

09/20/2019 06/02/2025 330575.00

08/30/2021 07/26/2029 164227.23

06/04/2015 06/04/2020 413752.48

05/05/2021 04/25/2024 16796000.00

04/15/2008 09/30/2014 26881.00

09/27/2019 10/18/2024 2075904.80

09/13/2021 09/14/2023 625000.00

04/04/2011 12/31/2019 2212713.21

12/22/2010 12/31/2013 3656711.00

06/23/1997 07/01/2014 2843746.68

12/18/2009 01/31/2018 195306.00

03/20/2015 10/26/2017 1426535.00

06/08/2017 09/01/2019 139344.15

02/13/2009 08/01/2016 1437292.00

Page 644 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2373136.00 0.00

0.00 278953.42 0.00

84743.00 1722360.00 0.00

0.00 267796.39 62778.61

0.00 7825.00 156402.23

0.00 413752.48 0.00

0.00 5308980.00 11487020.00

0.00 189249.00 -162368.00

0.00 853392.18 1222512.62

0.00 37505.90 587494.10

119066.21 2212713.21 0.00

727950.00 3656711.00 0.00

510.88 2143474.60 700272.08

0.00 195306.00 0.00

0.00 1426535.00 0.00

0.00 139344.15 0.00

51886.29 1325877.69 111414.31

Page 645 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 0

0 N 0

12 N 1

0 Y 0

30 N 8

33 N 8

4 N 1

0 Y 0

23 N 6

0 N 0

20 N 2

5 N 0

4 N 0

0 N 0

5 N 0

0 Y 0

16 N 1

Page 646 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Nelcorp Electrical Contracting Corporation

M/E Engineering, P.C.

Allied Builders, Inc.

Chiang O'Brien Architects

Wendel WD Arch, Engr, Surv. & Land Architecture

Architectural Resources, P.C.

Fahs Construction Group Inc.

Cutting Edge Group, LLC

Ashley McGraw Architects DPC

Architecture +

The Whiting-Turner Contracting Company

Burns Brothers Contractors, Inc.

Urbahn Architects PLLC

Sorensen Gross Construction Services

Transit Construction Services Corp.

JMZ Architects & Planners PC

Genesys Engineering P.C.

Page 647 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

35 North Kelly Avenue

Suite 320 60 Lakefront Boulevard

250 State Street

Crescent Building 217 North Aurora Street

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

505 Franklin Street

2224 Pierce Creek Road

14 Walkup Cutoff Road P.O. Box 733

15th Floor 125 East Jefferson Street

297 River Street

707 Westchester Avenue Suite 101

7504 Us Hwy 11

49 West 37th Street 6th Floor

3407 torrey Road

3181 Transit Road

190 Glen Street P. O. Box 725

Suite #111 629 Fifth Avenue

Page 648 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Endwell NY 13760 USA

Buffalo NY 14202 USA

Brockport NY 14420 USA

Ithaca NY 14850 USA

Williamsville NY 14221 USA

Buffalo NY 14202 USA

Binghamton NY 13903 USA

Lake George NY 12845 USA

Syracuse NY 13202 USA

Troy NY 12180 USA

White Plains NY 10607 USA

Potsdam NY 13676 USA

New York NY 10018 USA

Flint MI 48507 USA

Elma NY 14059 USA

Glens Falls NY 12801 USA

Pelham NY 10803 USA

Page 649 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.02526642.109078)

938 388 2033

POINT (-77.9276543.214448)

535 175 2093

POINT (-78.87207542.900014)

300 33 2041

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.73454241.026425)

949 1437 2185

POINT (-75.02627544.665789)

312 1597 2140

POINT (-73.98564540.751377)

749 741 2095

POINT (-83.73256442.976697)

438

POINT (-78.69693842.854575)

292 515 2041

POINT (-73.6447743.309981)

824 783 2183

Page 650 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X365 T005858

031009 T006275

31X240 T005833

06X337 T005740

36X138 T006235

09X407 T006155

311041 T006591

011046 T006353

271005 T006276

29X7A2 T005402

231003 T006107

01XA41 D005406

11X304 T005656

14XA62 T004951

10X344 T005460

271014 T006370

04X334 T005899

29X401 T005796

Page 651 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Upgrade HVAC Systems Lecture Hall & Vivarium - Science I Closed

DESIGN: Reconstruct Central Heating Plant Active

DESIGN: Cogeneration Improvements Assigned to Vendor

DESIGN: Construction Manager Closed

CONSTR: Replace Federal Building Windows Active

CONSTR: Upgrade Water Lines & Metering - Various Buildings Closed

DESIGN: Study - Campus Wide 15kV Electrical System Short Circuit and Coordination Active

DESIGN: Update Facilities Master Plan Active

DESIGN: Replacement of Underground Utilities and Site Enhancements Active

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Replace Roofs Cooper & Payson Hall Closed

CONSTR: Campus Storm Water Pond Improvements Closed

CONSTR: Fine Arts Ventilation Upgrades Closed

DESIGN: Radioactive Storage BSB Bldg 0001 Closed

DESIGN: Historic Preservation - Sheldon Hall Closed

DESIGN: Reconstruct South Circle Road Active

CONSTR: Bowers Hall Upgrade to Sciences - Phase I Closed

DESIGN: Commissioning - Renovate Humanities Bldg 41 Closed

Page 652 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 653 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/11/2011 08/10/2013 473207.00

09/28/2016 10/17/2024 2840000.00

08/01/2012 04/17/2016 63571.26

01/07/2011 12/30/2015 1578207.08

04/14/2016 10/10/2019 1456049.00

04/29/2015 09/15/2016 406636.00

11/08/2021 09/14/2023 65394.00

09/03/2020 06/02/2025 719822.00

09/30/2016 10/17/2021 1674218.85

06/02/2008 01/21/2014 28126.00

10/07/2015 03/31/2022 175825.22

06/27/2008 05/01/2010 2320371.00

03/15/2010 09/05/2012 4701170.00

03/14/2007 11/01/2012 207321.01

02/13/2009 12/31/2014 1307965.04

09/21/2018 10/19/2026 418919.16

01/04/2012 07/06/2016 34244069.00

04/05/2011 03/25/2016 246918.82

Page 654 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

447412.00 473207.00 0.00

0.00 1874544.90 965455.10

9109.00 63571.26 0.00

542896.07 1578207.08 0.00

0.00 1440756.00 15293.00

0.00 406636.00 0.00

0.00 0.00 65394.00

0.00 271354.79 448467.21

0.00 1454220.52 219998.33

0.00 28126.00 0.00

0.00 175825.22 0.00

0.00 2320371.00 0.00

289654.00 4701170.00 0.00

0.00 341321.01 -134000.00

164905.64 1307965.04 0.00

0.00 316602.29 102316.87

15736927.00 34244069.00 0.00

14529.15 246918.82 0.00

Page 655 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

13 N 0

0 N 0

14 N 0

1 N 0

7 N 1

0 N 0

0 Y 0

13 N 0

0 N 0

0 N 0

2 N 0

4 N 0

0 Y 0

23 N 1

0 N 0

11 N 0

26 N 0

Page 656 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

J & K Plumbing & Heating Co, Inc.

RMF Engineering, Inc., P.C.

Schuyler Engineering, P.C.

Turner Construction Company

Flower City Glass Co. of New York, LLC

Plank LLC

Ramboll Americas Engineering Solutions, Inc.

Chiang O'Brien Architects

C & S Engineers, Inc.

JEMCO Electrical Contractors, Inc.

Architecture +

The Delaney Group, Inc.

Northland Associates, Incorporated

David Smotrich & Partners Architects/Planners

Wank Adams Slavin Associates LLP

M.J. Engineering and Land Surveying, P.C.

Hueber-Breuer Construction Co., Inc.

Joseph R. Loring & Associates, Inc.

Page 657 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24 Thorp St PO Box 25 Westview Stat

Suite 300 5520 Research Park Drive

Suite 6 163 North Wellwood Avenue

1 Computer Drive South

188 Mt. Hope Avenue

376 Broadway Third Floor

333 West Washington St PO Box 4873

Crescent Building 217 North Aurora Street

499 Col. Eileen Collins Blvd.

271 42nd Street

297 River Street

2736 State Hwy 30

4701 Buckley Road P.O. Box 2549

Suite 704 443 Park Avenue South

740 Broadway

1533 Crescent Road

P.O Box 515 148 Berwyn Avenue

21 Pennsylvania Plaza 14th Floor

Page 658 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Binghamton NY 13905 USA

Baltimore MD 21228 USA

Lindenhurst NY 11757 USA

Albany NY 12205 USA

Rochester NY 14620 USA

Schenectady NY 12305 USA

Syracuse NY 13221 USA

Ithaca NY 14850 USA

Syracuse NY 13212 USA

Brooklyn NY 11433 USA

Troy NY 12180 USA

Gloversville NY 12078 USA

Liverpool NY 13220 USA

New York NY 10016 USA

New York NY 10003 USA

Clifton Park NY 12065 USA

Syracuse NY 13205 USA

New York NY 10001 USA

Page 659 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.92500542.103463)

968 479 2033

POINT (-73.81058842.719116)

834 42 2030

POINT (-77.60942243.145739)

537 1679 2093

POINT (-73.94532342.808791)

104 74 2142

POINT (-76.15589443.049616)

687 711 2132

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.69016242.73246)

110 11 2138

POINT (-74.27664443.092508)

382 1291 2085

POINT (-73.99300840.729896)

749 719 2095

POINT (-73.77188842.819305)

1009 1190 2141

Page 660 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

281004 T006352

321054 D006600

36X113 T005350

231002 T006283

09X7A5 T005395

121018 T006350

08X498 T006273

09X376 T005365

08X7A1 T005395

04X339 T005765

25X291 T005612

131046 D006631

231033 T006370

01XA51 T005956

02X341 T005196

301022 T006464

291014 T006292

Page 661 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roofs Cary, Farber and Sherman Annex Active

CONSTR: Replace Pedestrian Bridge at HSC Active

DESIGN: Site Rehab System Admin Closed

CONSTR: Rehab Water Distribution System & Related Site Infrastructure Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace Roofs - Hosmer and Snell Halls, Crane Music Center Active

CONSTR: Rebuild Generator #3 - Central Heating Plant Closed

DESIGN: Replace Roof - Fine Arts Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: SLC Constructiom Manager Closed

DESIGN: Commissioning - Renovate Sanford Hall Closed

CONSTR: Expand and Upgrade Flax Pond Hatchery Active

DESIGN: Upgrade French Hall Plaza Active

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Commissioning - Tower Fine Arts Infrastr Closed

DESIGN: Claims Analysis & Litigation Services Active

DESIGN: Rehab HTHW System Phase 2 Active

Page 662 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 663 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/03/2018 11/01/2026 591000.00

12/02/2020 10/23/2022 844000.00

07/07/2009 10/01/2014 289899.52

11/14/2016 08/15/2018 3604067.00

04/15/2008 09/30/2014 51790.00

07/22/2020 07/16/2025 162229.72

08/01/2016 10/26/2018 835695.00

12/07/2010 04/14/2017 85273.20

04/15/2008 09/30/2014 504839.00

03/18/2011 03/06/2016 1876726.18

10/21/2011 04/13/2017 65820.85

04/13/2021 05/21/2023 3757000.00

09/23/2019 10/19/2026 320795.00

04/18/2012 11/20/2018 10841.00

10/15/2007 08/21/2018 62132.27

01/18/2017 01/18/2022 113108.17

12/15/2016 02/02/2022 1385754.78

Page 664 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 343948.91 247051.09

0.00 520254.00 323746.00

17596.20 287376.52 2523.00

0.00 3604067.00 0.00

0.00 51790.00 0.00

0.00 78376.22 83853.50

0.00 835695.00 0.00

24921.67 85273.20 0.00

0.00 504838.00 1.00

245029.80 1876726.18 0.00

15473.78 61158.38 4662.47

0.00 298318.00 3458682.00

0.00 133736.05 187058.95

0.00 10841.00 0.00

186.68 62132.27 0.00

0.00 26012.50 87095.67

0.00 1360070.83 25683.95

Page 665 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

1 N 0

0 N 0

5 N 0

0 Y 0

0 N 0

1 N 0

0 N 0

0 Y 0

16 N 0

0 N 0

0 N 0

0 N 0

0 Y 0

0 N 0

0 N 0

14 N 3

Page 666 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

The Patriot Organization, Inc.

Jacobs Civil Consultants, Inc.

J.E. Sheehan Contracting Corp.

Cutting Edge Group, LLC

Architecture +

Troy Boiler Works,Inc.

Architecture +

Cutting Edge Group, LLC

C & S Design Build, Inc.

Genesys Engineering, P.C.

Caldwell Marine International, LLC

M.J. Engineering and Land Surveying, P.C.

Cutting Edge Group, LLC

C.J. Brown Energy & Engineering, P.C.

Ankura Consulting Group LLC

Ramboll Americas Engineering Solutions, Inc.

Page 667 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

30 Floyds Run

Suite 0603 2 Penn Plaza

208 Sissonville Road

14 Walkup Cutoff Road P.O. Box 733

297 River Street

2800 Seventh Avenue

297 River Street

14 Walkup Cutoff Road P.O. Box 733

499 Col. E. Collins Blvd.

38 Maiden Lane

1333 Campus Parkway

1533 Crescent Road

14 Walkup Cutoff Road P.O. Box 733

Suite 204 4245 Union Road

1220 19th Street NW Suite 700

333 West Washington St PO Box 4873

Page 668 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Bohemia NY 11716 USA

New York NY 10121 USA

Potsdam NY 13676 USA

Lake George NY 12845 USA

Troy NY 12180 USA

Troy NY 12180 USA

Troy NY 12180 USA

Lake George NY 12845 USA

Syracuse NY 13212 USA

Kingston NY 12401 USA

Wall Township NJ 7553 USA

Clifton Park NY 12065 USA

Lake George NY 12845 USA

Buffalo NY 14225 USA

Washington DC 20036 USA

Syracuse NY 13221 USA

Page 669 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.11539140.782514)

1019 1073 2179

POINT (-75.00240344.691026)

312 1597 2140

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.68151642.744475)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.64807743.386894)

818 128 2183

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.11880340.215177)

2491

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.04344738.906629)

1049

POINT (-76.15589443.049616)

687 711 2132

Page 670 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

351003 D006611

25X237 T005037

14XA27 T005988

04X330 T005194

031062 T006575

20X163 T005996

17X090 T005284

08X436 T006223

251002 T006290

03X426 T005831

41X049 T005773

01X7A6 T005395

06X826 T005198

09X311 T004930

23X224 T005839

801801 T006360

01XA75 T006030

Page 671 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Renovate McMahon for Ceramic Research, Education and Technology Enterprise Active

CONSTR: Critical Exterior ADA Updates Closed

DESIGN: Asbestos Abatement - UH Closed

DESIGN: Commissioning Services - New Education Building W/ Integrated Child Care Closed

DESIGN: Upgrade Mechanical Systems - Butler Library Active

CONSTR: New Academic Research Building - Block D Site Work Closed

DESIGN: Commissioning Services - North Martha Van Rensselaer Rpl W/ Parking Structure Closed

CONSTR: Upgrade Site Electric Distribution System Active

CONSTR: Replace Roof Evenden Hall Closed

DESIGN: Renovate Buckham Hall Phase2 Closed

CONSTR: Multipurpose Space 3rd Floor Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Building Commissioning - Greene Science Closed

DESIGN: Upgrade Central Heating Plant, Phase II Closed

DESIGN: Cook Hall Building Stabilization & Restoration Closed

DESIGN: Architectural Services - Mosaic Associates - Master Term Agreement Assigned to Vendor

CONSTR: Data Center - Redundant Network Connectivity Closed

Page 672 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 673 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/22/2021 09/17/2023 6267763.00

07/01/2005 06/30/2013 1106539.00

04/26/2005 02/01/2015 5832.00

03/30/2007 12/31/2013 95422.16

08/27/2021 09/15/2023 1027000.00

09/19/2012 12/21/2013 1030631.00

07/17/2007 01/08/2014 395630.29

02/03/2016 12/31/2021 4955914.00

11/30/2016 04/26/2019 647625.00

03/16/2012 07/21/2017 481568.35

01/28/2011 04/19/2014 7899840.00

04/15/2008 09/30/2014 106019.00

10/11/2007 12/31/2013 63653.96

04/23/2007 03/31/2011 99373.37

03/29/2012 12/31/2018 630453.42

06/30/2017 09/26/2020 903202.23

09/17/2013 07/29/2014 1150488.00

Page 674 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 4010590.00 2257173.00

103376.00 1106539.00 0.00

0.00 5832.00 0.00

0.00 95422.16 0.00

0.00 13439.57 1013560.43

944505.00 1030631.00 0.00

72477.54 395630.29 0.00

0.00 4924914.00 31000.00

0.00 647625.00 0.00

152860.14 481568.35 0.00

2299428.00 7899840.00 0.00

0.00 106019.00 0.00

0.00 63653.96 0.00

0.00 99373.37 0.00

477391.41 627808.40 2645.02

0.00 0.00 903202.23

0.00 1150488.00 0.00

Page 675 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 N 0

4 N 0

0 N 0

0 N 0

0 N 0

3 N 0

5 N 1

4 N 0

3 Y 1

0 N 0

14 N 0

0 Y 0

0 N 0

0 N 0

0 N 0

86 N 19

6 N 2

Page 676 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Streeter Associates,Inc.

Bast Hatfield,Inc.

Airtek Environmental Corporation

SmartEdge

Architectural Resources, P.C.

Fahs Construction Group Inc.

Horizon Engineering Associates, LLP

M. Scher & Son Inc.

Titan Roofing Inc

Labella Associates, D.P.C

Knightsbridge Constr. Corp.

Cutting Edge Group, LLC

Erdman, Anthony and Associates, Inc.

Sage Engineering Associates, L.L.P.

Architecture +

Mosaic Associates Architects

Adirondack Cabling, Inc

Page 677 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

101 E. Woodlawn Ave. P.O. Box 118

1399 Vischers Ferry Road

39 West 38th St.-7th Flr.

4 Peuquet Parkway

505 Franklin Street

2224 Pierce Creek Road

800 Veterans Memorial Highway, Suite 310

1 Prospect Avenue

200 Tapley Street

Suite 201 300 State Street

33 Great Neck Road

14 Walkup Cutoff Road P.O. Box 733

Suite 200 145 Culver Road

1211 Western Avenue

297 River Street

The Frear Building 2 Third Street, Suite 440

10 Petra Lane

Page 678 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Elmira NY 14902 USA

Clifton Park NY 12065 USA

New York NY 10018 USA

Tonawanda NY 14150 USA

Buffalo NY 14202 USA

Binghamton NY 13903 USA

Hauppauge NY 11788 USA

Albany NY 12206 USA

Springfield MA 1104 USA

Rochester NY 14614 USA

Great Neck NY 11021 USA

Lake George NY 12845 USA

Rochester NY 14620 USA

Albany NY 12203 USA

Troy NY 12180 USA

Troy NY 12180 USA

Albany NY 12205 USA

Page 679 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.81571142.110455)

485 926 2036

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-73.98461140.751778)

749 741 2095

POINT (-78.86566943.01577)

280 8 2041

POINT (-78.87207542.900014)

300 33 2041

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.20607540.821625)

1019 1428 2179

POINT (-73.77261842.673362)

814 43 2030

POINT (-72.56074442.126589)

1913

POINT (-73.72754940.78624)

60 865 2094

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.82140642.675897)

814 40 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.84369142.711425)

834 42 2030

Page 680 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06X323 T005578

14XB17 T006131

251020 T006444

011011 T006425

29X7A5 T005402

28X358 T006065

07XA12 T005211

12X355 T005839

06X305 T004802

01XA51 T005473

08X490 T005832

36X124 T005956

291015 T006467

051022 T006465

20X223 T005838

22X224 T005822

21X194 T004956

Page 681 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: ADA/Elevator Upgrades - Various Bldgs. Closed

DESIGN: Replace Boilers BSB Closed

CONSTR: Replace Roofs- Various Buildings Closed

DESIGN: Renovate Building 30 for Engineering/Science Active

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: JOCs - Buffalo Region Closed

DESIGN: Site Utility Upgrades - Elect Var Bldgs Distrubution System Closed

DESIGN: Replace Roof, Service Complex Closed

DESIGN: Renovation Of Greene Science Building No. 37 Closed

DESIGN: Construct New Business School Closed

DESIGN: Renovate Elting Locker Rm Active

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Roof Replacement Campus Center North Closed

DESIGN: Replace Roofs Dods & McEwen Halls Active

DESIGN: Replace Perimeter Heating - Illick Hall Closed

CONSTR: Student Leadership Center Phase 1 Closed

DESIGN: Replace Fuel Oil Tanks Closed

Page 682 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 683 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09/22/2009 03/11/2012 1687320.00

10/21/2015 06/23/2022 1298720.60

06/15/2018 08/21/2019 662663.00

05/29/2018 05/29/2023 5280301.00

06/02/2008 01/21/2014 103508.00

04/23/2015 05/01/2018 1177685.00

01/03/2007 06/14/2012 796649.04

09/28/2012 12/31/2018 91389.15

01/24/2003 01/05/2014 1790440.13

03/17/2009 08/15/2015 3173761.12

03/12/2014 01/16/2019 514000.00

04/18/2012 11/20/2018 618078.00

11/09/2018 12/11/2020 1647944.00

05/13/2019 01/13/2024 525000.00

06/22/2012 12/15/2015 275129.36

05/04/2011 04/22/2013 6958835.00

11/27/2007 03/30/2012 326268.67

Page 684 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

89971.00 1687320.00 0.00

0.00 1298720.60 0.00

0.00 662663.00 0.00

0.00 658615.69 4621685.31

103508.00 103508.00 0.00

0.00 1177685.00 0.00

37992.89 735986.58 60662.46

32469.59 91389.15 0.00

0.00 1782178.17 8261.96

405753.40 3173761.12 0.00

0.00 412151.47 101848.53

0.00 618078.00 0.00

0.00 1647944.00 0.00

0.00 300183.33 224816.67

85498.96 275129.36 0.00

1782600.00 6958835.00 0.00

0.00 326268.67 0.00

Page 685 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

20 N 5

4 N 2

25 Y 3

0 N 0

0 N 0

5 N 0

0 N 0

5 N 0

28 N 0

0 Y 0

0 Y 0

5 N 1

0 N 0

0 N 0

6 N 0

0 N 0

Page 686 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Christa Construction, LLC

Gilbane Building Company

Mid-State Industries Ltd.

Envision Architects, D.P.C.

JEMCO Electrical Contractors, Inc.

Sorensen Gross Construction Services

Stantec Consulting Services Inc.

Architecture +

Hellmuth, Obata & Kassabaum, P.C.

Perkins & Will Architects P.C.

Goshow Architects, L.L.P.

Cutting Edge Group, LLC

Sea Breeze General Construction, Inc.

Labella Associates, D.P.C

McFarland-Johnson, Inc.

Christa Construction, LLC

Schuyler Engineering, P.C.

Page 687 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

119 Victor Heights Pkwy

7 Southwoods Boulevard 3rd Floor

1105 Catalyn Street

52 James Street

271 42nd Street

3407 torrey Road

13980 Collections Center

297 River Street

6th Floor 1065 Ave. of the Americas

4th Floor 215 Park Avenue South

5th Floor 44 West 28th Street

14 Walkup Cutoff Road P.O. Box 733

24-30 47th Street

Suite 201 300 State Street

49 Court Street Metrocenter

119 Victor Heights Pkwy

Suite 6 163 North Wellwood Avenue

Page 688 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Victor NY 14564 USA

Albany NY 12211 USA

Schenectady NY 12303 USA

Albany NY 12207 USA

Brooklyn NY 11433 USA

Flint MI 48507 USA

Chicago IL 60693 USA

Troy NY 12180 USA

New York NY 10018 USA

New York NY 10003 USA

New York NY 10001 USA

Lake George NY 12845 USA

Astoria NY 11103 USA

Rochester NY 14614 USA

Binghamton NY 13901 USA

Victor NY 14564 USA

Lindenhurst NY 11757 USA

Page 689 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.711425)

POINT (-77.44463742.996293)

799 413 2133

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.94076942.790084)

104 72 2142

POINT (-73.75023942.651717)

814 44 2030

POINT (-74.01047940.652508)

894 815 2090

POINT (-83.73256442.976697)

438

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.90482340.766936)

196 875 2137

POINT (-75.91316742.098705)

968 475 2033

POINT (-77.44463742.996293)

799 413 2133

Page 690 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

091020 T006547

111008 T006219

02X380 T005317

09X381 T005368

311000 T006106

07XA73 T005944

271049 T006613

29X333 T005391

141043 T006361

14X7A3 T005402

201018 T006446

361031 T006587

21X245 T005844

01XA49 T005474

07XA35 T005865

36X7B6 T005956

14X490 T006092

Page 691 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehabilitate West Dormitory Drive for Pedestrian Safety Closed

DESIGN: Renovate & Upgrade Clinton Dining Hall Closed

DESIGN: Infrastructure Improvements - Smith Hall Closed

DESIGN: Replace Steam Condensate Lines Phase 2 Closed

DESIGN: Replace Roofs at Campus Center Active

CONSTR: Flood Rehabilitation UDC Closed

DESIGN: Galbreath Hall ADA and Classroom Renovation Active

CONSTR: Repair/Replace Roofs Campus Center Southand Performing Arts Center Closed

DESIGN: Renovate Toilets and Locker Rooms- BSB Active

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Renovate Marshall Hall Active

DESIGN: Rehabilitate Global Center - East 54th Street Active

DESIGN: Emergency Generator Upgrades Marvin Tode Closed

DESIGN: Relocate University Data Center Closed

DESIGN: Const Manager Uni Union North - 07A35 Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Provide Additional Electrical Power-BSB Assigned to Vendor

Page 692 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 693 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/26/2020 08/14/2021 2078225.00

02/29/2016 03/31/2021 669371.27

10/23/2007 12/31/2014 1689373.32

12/10/2010 11/25/2016 150257.33

07/29/2015 02/09/2022 320000.00

03/27/2012 08/15/2013 2281422.00

01/28/2021 02/26/2026 1275000.00

04/10/2008 04/30/2010 354091.00

11/06/2017 09/27/2025 795983.00

06/02/2008 01/21/2014 42873.00

06/25/2018 09/19/2023 3771669.03

08/25/2021 09/14/2023 849000.00

07/10/2014 05/16/2018 122290.29

03/20/2009 10/15/2016 2578526.35

06/01/2012 06/01/2016 565731.07

04/18/2012 11/20/2018 649733.00

09/11/2014 08/27/2021 571387.83

Page 694 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 2078225.00 0.00

0.00 669371.27 0.00

192424.61 1689373.32 0.00

34586.82 150257.33 0.00

0.00 305155.82 14844.18

2053302.00 2281422.00 0.00

0.00 435931.70 839068.30

0.00 354091.00 0.00

0.00 476707.71 319275.29

0.00 42873.00 0.00

0.00 2861086.30 910582.73

0.00 21448.56 827551.44

0.00 122290.29 0.00

483935.72 2578526.35 0.00

207571.61 565731.07 0.00

0.00 649733.00 0.00

0.00 571387.83 0.00

Page 695 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

26 N 3

5 N 0

0 N 0

0 N 0

7 N 1

44 N 8

16 N 0

0 N 0

0 N 0

31 Y 6

0 N 0

0 N 0

10 N 0

0 N 0

0 Y 0

0 N 0

Page 696 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Fahs Construction Group Inc.

Edge Architecture, PLLC

Stantec Architecture Inc.

Lizardos Engineering Associates P.C.

Hoffmann Architects, Inc.

Andrew R. Mancini Associates Inc.

Architecture +

Marfi Contracting Corp.

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

JEMCO Electrical Contractors, Inc.

Chiang O'Brien Architects

Beckhard Richlan Szerbaty & Assoc.,Architecture,LLP

Lilker Associates

EYP Mission Critical Facilities, Inc.

Turner Construction Company

Cutting Edge Group, LLC

Kallen & Lemelson, Consulting Engineers, LLP

Page 697 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2224 Pierce Creek Road

277 Alexander Street Suite 407

Suite 201 111 Grant Avenue

200 Old Country Road Suite 670

462 Seventh Avenue

129 Odell Avenue

297 River Street

826 72nd St

307 Seventh Avenue Suite 1501

271 42nd Street

Crescent Building 217 North Aurora Street

307 Seventh Avenue

1001 Ave of the Americas

420 Columbus Avenue Suite 202

1 Computer Drive South

14 Walkup Cutoff Road P.O. Box 733

17th Flr 520 Eighth Avenue

Page 698 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Binghamton NY 13903 USA

Rochester NY 14607 USA

Endicott NY 13760 USA

Mineola NY 11501 USA

New York NY 10018 USA

Endicott NY 13760 USA

Troy NY 12180 USA

Brooklyn NY 11228 USA

New York NY 10001 USA

Brooklyn NY 11433 USA

Ithaca NY 14850 USA

New York NY 10001 USA

New York NY 10018 USA

Valhalla NY 10595 USA

Albany NY 12205 USA

Lake George NY 12845 USA

New York NY 10018 USA

Page 699 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.63875140.739038)

62 1265 2094

POINT (-73.99000240.751854)

749 741 2095

POINT (-76.04917542.110866)

938 388 2033

POINT (-73.69016242.73246)

110 11 2138

POINT (-74.01594640.62825)

894 811 2090

POINT (-73.99353640.746986)

749 717 2095

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.99353640.746986)

749 717 2095

POINT (-73.98625340.751894)

749 741 2095

POINT (-73.7769641.099374)

963 1349 2185

POINT (-73.81058842.719116)

834 42 2030

POINT (-73.64807743.386894)

818 128 2183

Page 700 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05X309 T005707

801802 T006363

29X409 T006504

14X468 T004754

03X387 T006348

31X220 T005710

12X335 T005364

111035 D006562

031003 T006259

20X163 T006270

09X373 T005351

24X266 T005966

12X371 T006332

27X153 D005081

17X090 T005038

41X065 T005832

221026 T006357

05X338 T006197

Page 701 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning Services - Science Technology Building Closed

DESIGN: Engineering Services - Hesnor Engineering Associates - Master Term Agreement Active

CONSTR: HVAC Renovations - Dance Building Air Handlers/Rehab Ducts Active

DESIGN: Replace Fuel Tanks Closed

CONSTR: Renovate Science Building - Bldg. 15, Phase III Closed

CONSTR: Heat/Chill Plant And Distribution System Closed

DESIGN: Rehabilitate Elevators, Raymond & Crane Halls, Bldg Nos. 001 & 09B Closed

CONSTR: Renovate Field House Active

CONSTR: Renovate B-Wing at Buckham Hall Exterior Rehab Closed

CONSTR: Block D Site Improvement Project Closed

DESIGN: Rehab Health Center Closed

CONSTR: Center for Agriculture and Natural Resources Closed

CONSTR: Construct New Child Care Center Closed

CONSTR: Upgrade Fire Alarm System Closed

DESIGN: North Martha Van Rennselaer Hall - Replacement Closed

DESIGN: Rehabilitate First Floor Lecture Halls Closed

DESIGN: Assessment Study TA Parish & Victorian House Closed

CONSTR: Rockefeller Arts Center (RAC) Third Floor HVAC and Sprinkler Closed

Page 702 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 703 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/26/2010 08/23/2016 190057.31

09/14/2017 08/30/2025 5000000.00

05/14/2019 12/20/2021 7576631.00

07/12/2002 07/02/2014 393114.07

09/07/2017 07/09/2019 5137728.00

07/23/2010 05/31/2013 4422612.00

03/16/2009 07/16/2014 107981.27

05/18/2020 01/23/2023 2306000.00

06/22/2016 01/18/2018 1395147.00

08/10/2016 12/31/2018 589099.00

01/05/2011 12/31/2017 568611.26

05/22/2012 12/30/2016 40540769.00

05/26/2017 12/31/2020 4627041.00

10/13/2005 12/31/2010 1508588.00

08/22/2005 07/02/2014 5072985.96

08/08/2012 01/16/2019 184244.56

12/11/2018 12/23/2025 28446.76

11/25/2015 08/28/2017 2610906.00

Page 704 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

106287.13 190057.31 0.00

0.00 0.00 5000000.00

0.00 6907012.00 669619.00

31589.92 393114.07 0.00

0.00 5137728.00 0.00

265786.00 4422612.00 0.00

0.00 107981.27 0.00

0.00 0.00 2306000.00

0.00 1395147.00 0.00

0.00 589099.00 0.00

100939.46 568611.26 0.00

5315675.00 40540769.00 0.00

0.00 4627041.00 0.00

0.00 1508588.00 0.00

201865.56 5072985.96 0.00

95914.36 184244.56 0.00

0.00 48491.76 -20045.00

0.00 2610906.00 0.00

Page 705 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10 N 0

62 N 10

5 N 2

5 N 0

1 N 0

10 N 1

0 N 0

3 N 0

5 N 0

6 N 0

0 N 0

8 N 0

5 N 1

6 N 0

5 N 0

0 Y 0

0 N 0

4 N 1

Page 706 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

RMF Engineering, Inc., P.C.

Hesnor Engineering Associates, PLLC

B&B Contracting Group LLC

GEA Engineering, P.C.

Mark Cerrone, Inc.

JNS Heating Services, Inc

Syska Hennessy Group, Inc

MLB Construction Services LLC

Rodems Construction Corp.

McGinnis Nelson Construction, Inc.

Architecture +

J. Kokolakis Contracting, Inc

Bette & Cring, LLC

Bagnall Electric Inc.

Gruzen Samton, LLP Architects,Planners

Goshow Architects, L.L.P.

Kideney Architects, P.C.

Northland Associates, Incorporated

Page 707 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 300 5520 Research Park Drive

22 Computer Drive West

247 W. 35 Street Suite 100

Suite 105 100 Airport Executive Pk

2368 Maryland Avenue

1320-1 Lincoln Avenue

14th Floor 1515 Broadway

One Stone Break Road

3555 North Buffalo Road

4833 Appletree Ridge

297 River Street

Suite A 1500 Ocean Avenue

18438 U.S. Route 11

45 Classic Street P. O. Box 577

9th Floor 320 West 13th Street

5th Floor 44 West 28th Street

143 Genesee Street

4701 Buckley Road P.O. Box 2549

Page 708 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Baltimore MD 21228 USA

Albany NY 12205 USA

New York NY 10001 USA

Nanuet NY 10954 USA

Niagara Falls NY 14305 USA

Holbrook NY 11741 USA

New York NY 10038 USA

Malta NY 12020 USA

Orchard Park NY 14127 USA

Manilus NY 13104 USA

Troy NY 12180 USA

Bohemia NY 11716 USA

Watertown NY 13601 USA

Sherburne NY 13460 USA

New York NY 10014 USA

New York NY 10001 USA

Buffalo NY 14203 USA

Liverpool NY 13220 USA

Page 709 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.80771442.721269)

834 42 2030

POINT (-73.99187240.752402)

749 741 2095

POINT (-79.03548343.125204)

160 169 2131

POINT (-73.08427240.783164)

1019 1119 2179

POINT (-78.75002942.787061)

282 956 2041

POINT (-76.00757443.004341)

696 643 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-75.93432943.933537)

840 1466 2089

POINT (-75.49869542.686594)

256 1373 2037

POINT (-78.86903142.890071)

300 34 2041

Page 710 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28X390 T005683

08X416 T005273

01XA94 T006127

02X389 T006117

09X343 T005651

10X340 T005587

13XB41 T005203

091016 T006107

15X844 T005195

391018 T006356

031008 T006127

16X200 T004872

411004 T006410

12X294 T005373

06X342 T005905

02X410 T006062

11X253 D005285

02X336 T005462

Page 711 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Biomed Education Building - HVAC Improvements Closed

CONSTR: Replace HTHW - Phase II Closed

DESIGN: CM Renovate Lecture Center Active

DESIGN: Liberal Arts Building (02836) Closed

CONSTR: Replace Roof - Physical Education Bldg. Closed

DESIGN: Commissioning Agent - Science Building Closed

CONSTR: Abate Asbestos/Replace Roofs East and West Power Plants Closed

DESIGN: Repair Masonry - Hunt Union/Alumni Hall Closed

DESIGN: Commissioning Services for Cell/Dev Ph III Labs Closed

DESIGN: Facility Master Planning - Albany Campus Closed

DESIGN: Bid 03 - Selective Renovations - Butler Library Closed

CONSTR: Rehabilitation Of Mann Library Closed

DESIGN: CM Services - Renovate Lower Lobby Active

DESIGN: Upgrade Energy Management Systems - Various Buildings Closed

CONSTR: New College Stadium Closed

CONSTR: ADA Access to Ped Bridge Closed

CONSTR: Replace HTHW - Phase II Closed

CONSTR: Exterior Building Shell Work - Drake Library (55) & Tuttle North (53) Closed

Page 712 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 713 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/13/2010 06/30/2017 912749.25

04/11/2007 12/31/2010 3602015.00

03/28/2017 08/29/2022 899571.00

01/09/2015 09/30/2015 304851.32

03/03/2010 08/13/2011 803538.00

12/04/2009 03/31/2015 182620.58

10/30/2006 08/31/2010 5807103.00

11/15/2016 03/31/2022 259760.00

11/28/2007 12/31/2013 41823.95

04/22/2019 02/06/2027 98627.61

03/28/2018 08/29/2022 379474.68

10/16/2003 08/30/2008 25415450.00

06/07/2018 03/14/2023 359680.00

04/01/2008 03/24/2013 235951.56

01/06/2012 07/21/2015 6679266.00

03/17/2014 05/13/2017 3148508.00

06/07/2007 12/31/2010 4850418.00

01/07/2009 12/31/2012 2417480.00

Page 714 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

106230.41 912749.25 0.00

0.00 3602015.00 0.00

0.00 767123.34 132447.66

0.00 304851.32 0.00

0.00 803538.00 0.00

53449.73 182620.58 0.00

0.00 5807103.00 0.00

0.00 352750.34 -92990.34

0.00 41823.95 0.00

0.00 98627.61 0.00

0.00 379474.68 0.00

0.00 25415450.00 0.00

0.00 354874.00 4806.00

0.00 235951.56 0.00

3747121.00 6679266.00 0.00

0.00 3148508.00 0.00

0.00 4850418.00 0.00

10000.00 2417480.00 0.00

Page 715 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13 N 1

3 Y 1

0 N 0

42 N 2

12 N 2

19 N 0

2 N 0

0 N 0

0 N 0

0 Y 0

23 N 2

3 N 0

0 Y 0

5 N 0

8 N 0

6 Y 1

2 N 0

9 N 1

Page 716 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Labella Associates, D.P.C

Megrant Corporation

Gilbane Building Company

Gilbane Building Company/ Jai II, Inc. A Joint Vent

Henderson-Johnson Co., Inc.

Genesys Engineering, P.C.

Pav-Lak Contracting, Inc.

Architecture +

Genesys Engineering P.C.

JMZ Architects & Planners PC

Gilbane Building Company

The Pike Company Inc

Ellana, Inc.

Bergmann Associates, Inc.

The Pike Company Inc

Black Horse Group

L. H. La Plante Company, Inc.

Testa Construction Inc.

Page 717 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201 300 State Street

86 Otis Street

7 Southwoods Boulevard 3rd Floor

16 Corporate Woods Blvd

918 Canal Street P.O. Box 6964

38 Maiden Lane

325 Marcus Boulevard

297 River Street

Suite #111 629 Fifth Avenue

190 Glen Street P. O. Box 725

7 Southwoods Boulevard 3rd Floor

One Circle Street

Suite 801 32 Broadway

28 East Main Street 200 First Federal Plaza

One Circle Street

800 Starbuck Avenue

P.O. Box 496 52 Main Mill Street

12 Industrial Park Circle

Page 718 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14614 USA

West Babylon NY 11704 USA

Albany NY 12211 USA

Albany NY 12211 USA

Syracuse NY 13217 USA

Kingston NY 12401 USA

Hauppauge NY 11788 USA

Troy NY 12180 USA

Pelham NY 10803 USA

Glens Falls NY 12801 USA

Albany NY 12211 USA

Rochester NY 14607 USA

New York NY 10004 USA

Rochester NY 14614 USA

Rochester NY 14607 USA

Watertown NY 13601 USA

Plattsburgh NY 12901 USA

Rochester NY 14624 USA

Page 719 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.37435340.73911)

1023 1035 2179

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.76499242.682572)

834 48 2030

POINT (-76.12549843.051451)

687 728 2132

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.24848240.820739)

1014 1428 2179

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.77073242.683397)

834 48 2030

POINT (-77.61117743.156034)

537 1673 2093

POINT (-75.89492943.984287)

841 1466 2089

POINT (-77.73776 549 1683 2093

Page 720 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X349 T005355

30XB05 T005961

231048 T006585

211002 T006303

03X375 T005085

41X7A7 T005402

39X129 T005649

041011 D006572

31X218 T005276

10X7A3 T005632

14X834 T005681

26X279 T005199

30X487 D005245

13XD10 T005435

071016 T006329

01XA87 T006328

Page 721 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Steam PRVs & HVAC Equipment - Chase PE Building Closed

DESIGN: Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA) Active

DESIGN: Replace Roofs - Chaney and MacArthur Halls Active

CONSTR: Water System Improvements, Phase 2B Active

DESIGN: Renovate Science Building, Bldg. No. 15 Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Reroof Kunsela Hall Closed

CONSTR: Upgrade Site Lighting - Campus wide Active

DESIGN: Renovate/Reconstruct Bldg 47 - University Police Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: FMP -Downstate Closed

DESIGN: Commissioning for Student Center Closed

CONSTR: Replace Roofs - Various Buildings Closed

DESIGN: ESS Bldg Exterior Rehab Closed

DESIGN: Site Utility Upgrade - Electrical Distribution Ph 5 Closed

CONSTR: Construct ETEC Building - 2020 Closed

Page 722 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 723 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/04/2009 06/12/2020 150211.71

06/12/2012 11/14/2022 2479896.00

07/13/2021 09/14/2023 329000.00

01/27/2017 12/31/2021 1955898.00

11/21/2005 02/28/2019 4828984.86

06/02/2008 01/21/2014 82359.00

02/23/2010 08/15/2011 573150.00

07/10/2020 08/15/2022 2401611.00

06/07/2007 06/30/2013 324087.26

12/18/2009 12/09/2015 370831.00

07/22/2010 01/14/2012 585435.11

04/09/2008 12/31/2013 96794.75

02/15/2007 09/01/2010 4596932.00

01/27/2009 08/01/2015 637274.69

05/22/2017 06/25/2022 245790.15

05/09/2017 02/27/2019 3969110.00

Page 724 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

45545.62 150211.71 0.00

532185.27 2233884.76 246011.24

0.00 51994.63 277005.37

0.00 1848276.00 107622.00

306743.75 4828984.86 0.00

8901.00 82359.00 0.00

0.00 573150.00 0.00

0.00 1910363.00 491248.00

20066.02 324087.26 0.00

0.00 370831.00 0.00

58490.77 585435.11 0.00

59974.75 96794.75 0.00

0.00 4596932.00 0.00

109962.63 637274.69 0.00

0.00 245790.15 0.00

0.00 3969110.00 0.00

Page 725 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

17 N 0

0 Y 0

2 N 1

5 N 0

0 N 0

6 Y 2

6 N 1

5 N 0

0 N 0

20 N 1

0 N 0

4 N 0

19 N 2

17 N 3

6 N 0

Page 726 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

C & S Engineers, Inc.

DiDonato Associates Engineering & Architectur

JMZ Architects & Planners PC

Bancker Construction Corp.

Cannon Design, Inc.

JEMCO Electrical Contractors, Inc.

Titan Roofing Inc

Billitier Electric, Inc.

Graf & Lewent Architects, L.L.P.

Sorensen Gross Construction Services

Ehrenkrantz Eckstut & Kuhn Architects, P.C.

Syska Hennessy Group, Inc

Jameson Roofing Co., Inc.

Hoffmann Architects, Inc.

D&K Consulting Engineers, P.C.

Jersen Construction Group

Page 727 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

499 Col. Eileen Collins Blvd.

689 Main Street

190 Glen Street P. O. Box 725

218 Blydenburgh Road

11th Floor 360 Madison Avenue

271 42nd Street

200 Tapley Street

760 Brooks Avenue

91-31 Queens Blvd. Suite 209

3407 torrey Road

115 Fifth Avenue 3rd Floor

14th Floor 1515 Broadway

3761 East Lake Road

462 Seventh Avenue

28 North Main Street PO Box 339

6 Industry Drive

Page 728 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13212 USA

Buffalo NY 14203 USA

Glens Falls NY 12801 USA

Islandia NY 11749 USA

New York NY 10017 USA

Brooklyn NY 11433 USA

Springfield MA 1104 USA

Rochester NY 14619 USA

Elmhurst NY 11373 USA

Flint MI 48507 USA

New York NY 10003 USA

New York NY 10038 USA

Dunkirk NY 14048 USA

New York NY 10018 USA

Randolph VT 5060 USA

Waterford NY 12188 USA

Page 729 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.130125)

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.87201942.89263)

300 34 2041

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.01047940.652508)

894 815 2090

POINT (-72.56074442.126589)

1913

POINT (-77.65740843.130883)

537 1678 2093

POINT (-73.8695440.733401)

196 843 2137

POINT (-83.73256442.976697)

438

POINT (-73.991540.738916)

749 719 2095

POINT (-73.99000240.751854)

749 741 2095

POINT (-72.66561143.92485)

3207

POINT (-73.67241742.801941)

992 18 2141

Page 730 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

25X286 T005499

141031 T006412

09X419 T006304

221013 T006530

39X165 T006067

061032 T006370

26X290 T005998

13XB68 T005112

13XC01 T004948

32X373 T005570

251005 T006103

26X301 T006073

03X383 T005825

25X308 T006147

061014 T006104

07XA14 T005502

01XA87 T006085

Page 731 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Roofs, Buildings 05, 24, 26, 33 Closed

DESIGN: Rehab Mechanical Systems- Isolation & Operating Rooms UHB Active

CONSTR: Milne Library Partial Interior Renovation Closed

DESIGN: Campus Wide Site Utility Rehab - Phase 1 Active

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Program Study, College Circle Closed

CONSTR: Construct School of Business Closed

DESIGN: Rehab Mechanical Systems-Life Sciences Building Closed

DESIGN: Replace Roof & Flooring - Flax Pond Research Facility Closed

CONSTR: Replace Roof, Clinical Science Tower Closed

DESIGN: Replace Emergency Generators - Delhi Active

CONSTR: Rehabilitate Conklin Hall Closed

CONSTR: New Technology Building Closed

CONSTR: Replace Building Fire Alarm System - Various Buildings Closed

DESIGN: Reconstruct Merritt Mechanical Room and Abate Room 53 Schrader Hall Closed

DESIGN: Rehab Sci, I, II, III, IV Study Closed

DESIGN: Construct ETEC Building - 2020 Closed

Page 732 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 733 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/06/2009 12/30/2011 856312.00

01/11/2019 04/03/2025 945400.00

02/01/2017 12/30/2019 6058510.00

11/19/2019 12/18/2024 4118000.00

04/28/2015 05/01/2018 593080.00

11/26/2018 10/19/2026 32000.00

09/10/2012 03/13/2016 19472263.00

01/31/2006 07/01/2014 367125.20

08/09/2005 09/30/2011 115820.89

05/21/2009 08/27/2011 1038694.00

06/09/2015 01/01/2023 361000.00

04/22/2014 09/30/2019 10716166.00

04/25/2011 10/31/2014 25106070.00

02/17/2015 09/03/2016 655470.00

05/18/2017 07/25/2023 24200.00

07/06/2009 06/28/2011 293594.40

07/25/2014 03/19/2019 496081.07

Page 734 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 856312.00 0.00

0.00 460619.39 484780.61

0.00 6058510.00 0.00

0.00 1396693.71 2721306.29

0.00 593080.00 0.00

0.00 32000.00 0.00

626005.00 19472263.00 0.00

501.75 367125.20 0.00

0.00 115820.89 0.00

10000.00 1038694.00 0.00

0.00 470913.81 -109913.81

0.00 10716166.00 0.00

13581366.00 24718879.37 387190.63

0.00 655470.00 0.00

0.00 24200.00 0.00

0.00 293594.40 0.00

0.00 496081.07 0.00

Page 735 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10 N 2

0 N 0

6 N 0

14 N 1

0 Y 0

0 N 0

10 N 0

6 N 1

0 N 0

10 N 0

0 N 0

13 N 0

8 N 1

5 N 0

0 N 0

14 N 0

10 N 0

Page 736 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Apple Roofing Corp.

LiRo Program and Construction Mgmt, P.C.

Andrew R. Mancini Associates Inc.

C & S Engineers, Inc.

Cutting Edge Group, LLC

M.J. Engineering and Land Surveying, P.C.

Stalco Construction Inc.

Pennoni Engineering Of New York, P.C.

The Hall Partnership Architects, LLP

Milcon Construction Corp.

IBC Engineering, Pc

Stalco Construction Inc.

Manning Squires Hennig Co. Inc

Matco Electric Co., Inc.

M/E Engineering, P.C.

Stantec Consulting Services, Inc.

Skanska Usa Building, Inc

Page 737 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6720 Commerce Boulevard P.O. Box 3105

Three Aerial Way

129 Odell Avenue

499 Col. Eileen Collins Blvd.

14 Walkup Cutoff Road P.O. Box 733

1533 Crescent Road

1316 Motor Parkway

One Drexel Plaza 3001 Market Street

42 East 21st Street

142 Dale Street

Suite 219 3445 Winton Place

1316 Motor Parkway

8426 Seven Springs Road PO Box 685

3913 Gates Road

Suite 320 60 Lakefront Boulevard

Suite 201 111 Grant Avenue

1633 Littleton Road

Page 738 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13211 USA

Syosset NY 11791 USA

Endicott NY 13760 USA

Syracuse NY 13212 USA

Lake George NY 12845 USA

Clifton Park NY 12065 USA

Islandia NY 11749 USA

Philadelphia PA 19104 USA

New York NY 10010 USA

West Babylon NY 11704 USA

Rochester NY 14623 USA

Islandia NY 11749 USA

Batavia NY 14020 USA

Vestal NY 13850 USA

Buffalo NY 14202 USA

Endicott NY 13760 USA

Parsippany NJ 7054 USA

Page 739 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.09048943.095953)

702 426 2132

POINT (-76.04917542.110866)

938 388 2033

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-73.98829240.739319)

749 734 2095

POINT (-73.39147640.733529)

1023 1035 2179

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-78.13339143.006019)

792 489 2086

POINT (-75.97953842.107571)

937 466 2033

POINT (-74.4598140.847402)

2492

Page 740 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08X475 T005956

011008 D006670

291049 D006683

14XB33 T005840

03X393 T005949

40X810 T005191

29X413 T005968

09X420 T006232

05X266 T005676

081007 T006323

12X260 D005329

01XA29 T005847

09X315 T005297

141015 T006100

301054 T006668

07X486 T004905

021000 T006066

Page 741 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Rehab Toilet Rooms for ADA - Podium Active

CONSTR: Rehab Masonry - Campus Centers North and South, Museum Active

DESIGN: Repair Upper Floors- Parking Garage Closed

CONSTR: Underground Utility Improvements Phase 1 Closed

DESIGN: Commissioning Services - CDL Closed

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: Rehab North Quad Closed

CONSTR: Fenton Hall Exterior Rehabilitation Closed

CONSTR: Upgrade HVAC Systems, Coykendall Science Bldg. Closed

CONSTR: Replace Windows/Repoint Brick - Crumb Library Closed

CONSTR: Replace Windows - Downtown Campus Closed

DESIGN: Rehabilitate Biological Field Station- Cooperstown Facility, Bldg. No. 36 Closed

DESIGN: Upgrade CO Detection Systems Various Buildings Closed

DESIGN: Upgrade Fire Protection Systems - NC Various Bldgs Active

DESIGN: Construction Manager, Construct Academic Building Closed

CONSTR: JOCs - Rochester Region Closed

Page 742 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 743 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/18/2012 11/20/2018 129482.00

09/10/2021 06/13/2024 2444000.00

10/22/2021 02/18/2024 2566000.00

11/16/2012 07/30/2018 369608.32

03/27/2012 12/02/2014 7344282.00

03/29/2007 12/31/2015 87324.98

05/21/2012 08/31/2018 69026.00

04/05/2016 11/01/2017 1520209.00

05/07/2010 08/15/2012 1643288.00

04/03/2017 05/01/2019 2012338.00

12/11/2007 08/15/2010 1312526.00

06/14/2011 08/20/2013 1111476.00

07/18/2007 12/30/2013 812260.51

06/08/2016 02/05/2024 91006.34

08/25/2021 09/20/2025 4022000.00

05/26/2005 03/16/2010 1280000.00

04/23/2015 02/11/2018 977964.00

Page 744 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 129482.00 0.00

0.00 0.00 2444000.00

0.00 0.00 2566000.00

0.00 369608.32 0.00

1948588.00 7344282.00 0.00

0.00 79882.44 7442.54

0.00 69026.00 0.00

0.00 1520209.00 0.00

79123.00 1643288.00 0.00

0.00 2012338.00 0.00

0.00 1312526.00 0.00

614445.00 1111476.00 0.00

54363.65 812260.51 0.00

0.00 91006.34 0.00

0.00 70687.43 3951312.57

0.00 1099770.41 180229.59

0.00 977964.00 0.00

Page 745 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

3 N 1

5 N 2

0 N 0

8 N 0

0 N 0

0 N 0

5 N 0

10 N 1

8 Y 1

4 N 0

8 N 2

5 N 0

0 N 0

16 N 4

5 N 0

0 N 0

Page 746 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

AOW Associates, Inc.

Atlantic Specialty, Inc.

Hoffmann Architects, Inc.

Concrete Applied Technlgs Corp. /dba/ CATCO

Genesys Engineering P.C.

Corbex, Inc.

R.B. Robinson Contracting Inc

Rodems Construction Corp.

Wilkins Mechanical, Inc.

Continental Construction, LLC

Bunkoff General Contractors, Inc.

Perkins Eastman Architects, P.C.

Peter Gisolfi Associates

ARUP US, Inc.

LeChase Construction Services, LLC

Sorensen Gross Construction Services

Page 747 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

21 Essex Street

727 Richmond Rd

462 Seventh Avenue

1266 Town Line Road

Suite #111 629 Fifth Avenue

74-16 Grand Avenue

535 Ithaca Road P.O. Box 121

3555 North Buffalo Road

6923 Herman Road

PO Box 358 2125 State Hwy 812

790 Watervliet Shaker Rd.

115 Fifth Avenue - 3rd Fl

566 Warburton Avenue

77 Water Street

205 Indigo Creek Drive

3407 torrey Road

Page 748 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

Albany NY 12206 USA

East Meadow NY 11554 USA

New York NY 10018 USA

Alden NY 14004 USA

Pelham NY 10803 USA

Elmhurst NY 11373 USA

Candor NY 13743 USA

Orchard Park NY 14127 USA

Syracuse NY 13209 USA

Gouverneur NY 13642 USA

Latham NY 12110 USA

New York NY 10003 USA

Hastings-On-Hudson NY 10706 USA

New York NY 10005 USA

Rochester NY 14626 USA

Flint MI 48507 USA

Page 749 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.7785542.676983)

814 43 2030

POINT (-73.57599340.701921)

62 1459 2094

POINT (-73.99000240.751854)

749 741 2095

POINT (-78.57831942.924983)

286 481 2041

POINT (-73.88686240.730363)

196 843 2137

POINT (-78.75002942.787061)

282 956 2041

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.7967442.739147)

834 1288 2030

POINT (-73.991540.738916)

749 719 2095

POINT (-73.8821840.995664)

974 1445 2185

POINT (-74.00844440.704434)

749 721 2095

POINT (-77.69216343.184897)

548 1685 2093

POINT (-83.73256442.976697)

438

Page 750 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

091027 T006350

051003 T006102

14XA18 T006071

041002 T006417

28X431 T005356

03X342 D005400

26X277 T006207

091003 T006103

22X7A4 T005631

241011 T006379

35X096 D005267

21X164 T005735

11X7A5 T005633

37X032 T006216

15X412 T005606

12X283 T005711

Page 751 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Interior Renovations Various Buildings Active

DESIGN: Demolish Academic Spine Bridge Closed

CONSTR: HVAC Upgrade, University Hospital - Basement and Sub-Basement Closed

CONSTR: Renovate Park Center Facade Closed

DESIGN: Replace Roof Kimball Hall Closed

CONSTR: Electrical Substation Rehab Closed

DESIGN: Replace Roof, Nold Hall Closed

DESIGN: Replace Humidification and DHW Systems - Milne Library Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: Upgrade Mechanical and Plumbing Systems Prentice Hall Closed

CONSTR: Replace Windows - Harder Hall Closed

CONSTR: Replace Campus Steam Distribution Closed

CONSTR: JOCs - Plattsburg Region - General State Closed

DESIGN: Construct Anaerobic Digesters - Multiple Campuses - Morrisville Closed

DESIGN: Commissioning AHUs at Vertical Expansion Closed

CONSTR: Install Fiber Optic & Electronic Entrances - Various Buildings Closed

Page 752 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 753 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/01/2017 07/16/2025 130000.00

11/20/2015 07/10/2023 260053.24

04/18/2014 02/20/2018 4135314.00

03/23/2018 05/19/2021 11532723.00

09/27/2010 05/29/2015 85689.45

05/07/2008 01/15/2011 6245982.00

11/06/2013 07/02/2014 3693.23

05/23/2016 01/01/2023 98326.80

12/18/2009 01/31/2018 199745.00

10/26/2017 10/31/2020 5017954.00

04/30/2007 04/01/2010 946441.00

09/22/2010 04/30/2015 2227441.00

12/18/2009 12/08/2015 170582.00

01/13/2016 01/13/2021 322134.07

09/30/2010 07/23/2021 51941.91

07/09/2010 03/31/2014 1117094.00

Page 754 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 116563.93 13436.07

0.00 260053.24 0.00

0.00 4135314.00 0.00

0.00 11532723.00 0.00

19855.18 85689.45 0.00

0.00 6245982.00 0.00

0.00 3693.23 0.00

0.00 98326.80 0.00

0.00 199745.00 0.00

0.00 5017954.00 0.00

0.00 946441.00 0.00

474273.00 2227441.00 0.00

36959.00 170582.00 0.00

0.00 322134.07 0.00

2923.25 51941.91 0.00

202420.00 1117094.00 0.00

Page 755 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

12 Y 1

3 N 0

0 N 0

5 N 0

5 N 0

0 N 0

0 N 0

2 N 1

1 N 0

11 N 0

0 N 0

15 N 0

0 N 0

3 N 0

Page 756 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Architecture +

Labella Associates, D.P.C

ACS System Associates, Inc.

Welliver McGuire, Inc.

Bell & Spina Architects-Planners, P.C.

O'Connell Electric Co.

BBS Architects & Engineers, P.C.

IBC Engineering, Pc

Sorensen Gross Construction Services

Fahs Construction Group Inc.

Flower City Glass Co. of New York, LLC

Maric Mechanical, Inc.

Sorensen Gross Construction Services

GHD Consulting Services, Inc.

Genesys Engineering, P.C.

Dow Electric, Inc.

Page 757 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 River Street

Suite 201 300 State Street

160 West Lincoln Avenue

250 North Genesee Street

Suite 201, The Bindery 215 Wyoming Street

830 Phillips Road

244 East Main Street

Suite 219 3445 Winton Place

3407 torrey Road

2224 Pierce Creek Road

188 Mt. Hope Avenue

19-53 46th Street, 2nd Fl

3407 torrey Road

One Remington Park Drive

38 Maiden Lane

3874 State Route 11

Page 758 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Rochester NY 14614 USA

Mount Vernon NY 10550 USA

Montour Falls NY 14865 USA

Syracuse NY 13204 USA

Victor NY 14564 USA

Patchogue NY 11772 USA

Rochester NY 14623 USA

Flint MI 48507 USA

Binghamton NY 13903 USA

Rochester NY 14620 USA

Astoria NY 11105 USA

Flint MI 48507 USA

Cazenovia NY 13035 USA

Kingston NY 12401 USA

Malone NY 12953 USA

Page 759 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.976697)

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.84303140.915138)

962 1329 2185

POINT (-76.85309342.348955)

644 53 2143

POINT (-77.45589942.99842)

799 413 2133

POINT (-73.00759440.765963)

1022 1322 2179

POINT (-83.73256442.976697)

438

POINT (-75.88027242.08193)

967 477 2033

POINT (-77.60942243.145739)

537 1679 2093

POINT (-73.89728540.774581)

196 877 2137

POINT (-83.73256442.976697)

438

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.26781944.853703)

182 278 621

Page 760 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28X358 T005387

80X700 T006415

07XA43 T005750

111037 T006360A

80X700 T006434

06X319 T005624

311019 T006370

24X280 T005714

07XA73 T005606

36X118 T005821

141094 T006364

091075 T006589

101027 T006435

221001 T006104

05X338 T005624

11X337 T006038

061016 T006407

Page 761 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Demolition & Abatement at Acheson Hall Closed

CONSTR: Job Order Contracting - Plattsburgh Region Closed

DESIGN: Rehab Lect Hall Student Wing Closed

DESIGN: Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall Active

CONSTR: JOCS - 80700-07- Albany Closed

DESIGN: Commissioning Closed

DESIGN: Rehabilitate Campus Ring Road Phase 1 Closed

CONSTR: Dairy Complex Upgrades - Lagoon and Accessories Closed

DESIGN: Commissioning Services Flood Rehab UDC Closed

CONSTR: Rehabilitate Plaza Building ph 1 Closed

DESIGN: Upgrade / Replace Fire Suppression System Active

DESIGN: Replace Underground Electrical Feeder Distribution System Active

DESIGN: Renovate Hewitt Hall Active

DESIGN: Install Satellite Boilers Ph 2 Closed

DESIGN: Commissioning - Rockefeller Arts Center Addition and Renovation Closed

DESIGN: HTHW Generator Replacement Active

DESIGN: Renovate Sturges & Fraser Halls, Phase 1 Active

Page 762 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 763 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/25/2008 12/31/2012 5708340.00

03/20/2018 04/27/2019 26853.00

01/03/2011 12/31/2017 1412709.94

09/18/2019 11/09/2025 95239.60

06/01/2018 06/27/2019 61442.00

07/27/2010 10/31/2018 87754.59

01/03/2019 10/19/2026 80348.35

08/02/2010 07/23/2013 990400.00

02/14/2012 07/23/2021 15018.50

05/12/2011 03/01/2013 2475951.00

09/17/2020 05/19/2025 397300.00

09/17/2021 09/14/2023 278468.00

06/04/2018 08/09/2023 6783000.00

05/14/2015 07/25/2023 264160.92

02/10/2012 10/31/2018 197320.87

01/07/2014 12/16/2021 1787969.00

01/24/2020 10/15/2027 888460.00

Page 764 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

670034.00 5708340.00 0.00

0.00 26853.00 0.00

131168.21 1412709.94 0.00

0.00 46107.91 49131.69

0.00 61442.00 0.00

7696.81 87754.59 0.00

0.00 80348.35 0.00

31290.00 990400.00 0.00

14058.12 15018.50 0.00

411784.00 2475951.00 0.00

0.00 22693.20 374606.80

0.00 0.00 278468.00

0.00 3396263.63 3386736.37

0.00 264160.92 0.00

12792.84 197320.87 0.00

0.00 1677007.70 110961.30

0.00 0.00 888460.00

Page 765 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

2 N 0

39 N 2

0 N 0

2 N 0

0 N 0

0 N 0

13 N 1

0 N 0

11 N 1

0 Y 0

0 N 0

36 N 6

0 N 0

0 N 0

11 N 1

29 N 5

Page 766 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Titan Wrecking & Environments for Health,

Dow Electric, Inc.

Architecture +

Mosaic Associates Architects, DPC

Dow Electric, Inc.

Bergmann Associates, Inc.

M.J. Engineering and Land Surveying, P.C.

James H. Maloy, Inc.

Genesys Engineering, P.C.

Sano-Rubin Construction Co, Inc.

IAQ Systems, Inc

RMF Engineering, Inc., P.C.

Cannon Design Architecture & Engineering, P.C.

M/E Engineering, P.C.

Bergmann Associates, Inc.

RMF Engineering, Inc., P.C.

Buffalo Construction Consultants, Inc.

Page 767 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

153 Wales Avenue PO Box 646

3874 State Route 11

297 River Street

2 Third Street Suite 440

3874 State Route 11

28 East Main Street 200 First Federal Plaza

1533 Crescent Road

421 Albany-Shaker Road P.O. Box 11016

38 Maiden Lane

P.O. Box 9078 624 Delaware Avenue

555 8th Avenue Suite 1502

1A Pine West Plaza

50 Fountain Plaza Mezzanine

300 Trolley Boulevard

28 East Main Street 200 First Federal Plaza

Suite 300 5520 Research Park Drive

6000 N. Bailey, Suilte 2D

Page 768 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Tonawanda NY 14151 USA

Malone NY 12953 USA

Troy NY 12180 USA

Troy NY 12180 USA

Malone NY 12953 USA

Rochester NY 14614 USA

Clifton Park NY 12065 USA

Loudonville NY 12211 USA

Kingston NY 12401 USA

Albany NY 12209 USA

New York NY 10018 USA

Albany NY 12205 USA

Buffalo NY 14202 USA

Rochester NY 14606 USA

Rochester NY 14614 USA

Baltimore MD 21228 USA

Buffalo NY 14226 USA

Page 769 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.85952843.015948)

280 8 2041

POINT (-74.26781944.853703)

182 278 621

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69002842.732277)

110 11 2138

POINT (-74.26781944.853703)

182 278 621

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.77169842.69963)

834 48 2030

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.9917740.754541)

749 741 2095

POINT (-73.86458842.710592)

814 42 2030

POINT (-78.87420242.888784)

300 33 2041

POINT (-77.68189143.171416)

549 1664 2093

POINT (-77.61117743.156034)

537 1673 2093

Page 770 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

261042 T006361

08X441 D005347

41X032 T005289

081069 T006590

111041 T006370

021025 D006571

091019 T006482

40X030 T006087

05X267 T006384

271033 T006478

361006 T006523

30XA56 T005534

29X317 T004966

08X830 T004606

02X366 T006066

111030 T006358

Page 771 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Feasibility Study - Broadhollow Bio Park Bldg. 1 Closed

CONSTR: Replace/Repair Roofs - Various Bldgs Elting Gymnasium & Lecture Center Closed

CONSTR: Rehabilitate Elevators - College Of Opt Closed

DESIGN: Rehab Stairs, Ramps and Walkways - Campus Wide Active

DESIGN: Reconstruct Kehoe Parking Lot & Walks Active

CONSTR: Infrastructure Improvements, North Campus Phase 2 Active

CONSTR: Replace Water Mains - East Dorm Drive Closed

CONSTR: Regional Center Rochester Closed

CONSTR: Renovate Houghton Hall - Demo/Abatement & Envelope Closed

CONSTR: Replace MTHW Water Lines & Sitework, Whipple to STUAC Closed

CONSTR: Rehab Plaza 1st Floor South - Plaza Active

CONSTR: School of Engineering - Site Preparation and Structure Closed

CONSTR: Dance Building Renovation/Waterproofing Closed

DESIGN: Campus Capital Plan, New Paltz Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Repair Masonry Memorial Hall Closed

Page 772 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 773 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/23/2019 09/27/2025 7704.25

01/11/2008 06/15/2010 682086.00

05/21/2007 01/07/2011 1585705.00

08/16/2021 09/14/2023 782000.00

01/03/2020 10/19/2026 141108.66

07/02/2020 04/11/2023 10496647.00

02/27/2019 08/16/2020 504817.00

08/05/2014 07/31/2017 9841940.00

11/09/2017 12/19/2019 5445775.00

02/21/2019 11/30/2020 2498369.00

09/11/2019 10/09/2021 2567553.00

06/12/2009 04/30/2011 6029622.00

02/09/2005 12/31/2010 5845976.00

10/12/2000 05/30/2002 182616.28

04/23/2015 02/11/2018 624.00

01/25/2019 02/01/2026 107708.16

Page 774 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 7704.25 0.00

0.00 682086.00 0.00

127660.00 1585705.00 0.00

0.00 0.00 782000.00

0.00 120859.48 20249.18

0.00 8374691.00 2121956.00

0.00 504817.00 0.00

0.00 9841940.00 0.00

0.00 5445775.00 0.00

0.00 2498369.00 0.00

0.00 2557553.00 10000.00

0.00 6029622.00 0.00

0.00 5845976.00 0.00

0.00 182616.28 0.00

0.00 37970.00 -37346.00

0.00 107708.16 0.00

Page 775 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

11 N 0

6 N 0

0 N 0

0 N 0

3 Y 1

5 N 0

11 N 0

5 N 1

1 N 0

4 N 1

10 Y 2

5 N 0

5 N 0

0 N 0

0 N 0

Page 776 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

BBR Contracting Corp.

Thyssenkrupp Elevator Corporation

M.J. Engineering and Land Surveying, P.C.

M.J. Engineering and Land Surveying, P.C.

Scott Lawn Yard Inc.

Winn Construction Services Inc.

Allied Builders, Inc.

Resetarits Construction Corporation

Burrell's Excavating, Inc

Bunkoff General Contractors, Inc.

Burgio and Campofelice, Inc.

U. W. Marx, Inc.

Wallace Roberts & todd, LLC

Sorensen Gross Construction Services

Lacey Thaler Reilly Wilson Arch &Preservation

Page 777 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

307 Seventh Avenue Suite 1501

163 22nd Street

54-20 Broadway

1533 Crescent Road

1533 Crescent Road

3305 Haseley Drive

74 Hudson River Road

250 State Street

1500 Union Road Suite 100

6146 County Route 32

790 Watervliet Shaker Rd.

2570 Walden Avenue

20 Gurley Avenue

1700 Market Street 28th Floor

3407 torrey Road

4th Floor 79 North Pearl Street

Page 778 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10001 USA

Brooklyn NY 11232 USA

Woodside NY 10377 USA

Clifton Park NY 12065 USA

Clifton Park NY 12065 USA

Niagara Falls NY 14314 USA

Waterford NY 12010 USA

Brockport NY 14420 USA

West Seneca NY 14224 USA

Norwich NY 13815 USA

Latham NY 12110 USA

Cheektowaga NY 14225 USA

Troy NY 12182 USA

Philadelphia PA 19103 USA

Flint MI 48507 USA

Albany NY 12208 USA

Page 779 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.99353640.746986)

749 717 2095

POINT (-73.99685440.662507)

894 815 2090

POINT (-73.90625940.752993)

196 846 2137

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-78.96827743.11648)

160 168 2131

POINT (-73.66813642.80337)

992 18 2141

POINT (-77.9276543.214448)

535 175 2093

POINT (-78.75416142.841107)

276 159 2041

POINT (-73.7967442.739147)

834 1288 2030

POINT (-78.74085942.908593)

298 160 2041

POINT (-73.66534542.776974)

110 12 2138

POINT (-75.16911339.953077)

2602

POINT (-83.73256442.976697)

438

Page 780 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

31X229 T005866

03X351 T005861

151114 T006354

09X402 T005839

091030 T006350

01XA94 T006440

30XB08 T006093

07XA47 T005632

11X309 T005612

09X369 T005915

081019 T006546

01XA65 T005365

03X391 T005350

03X409 T005624

30XA83 T005903

21X231 T006044

Page 781 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Construction Manager Library Rehabilitation, Stage 1 Closed

CONSTR: Exterior Rehab - Various Bldgs, Ph III Closed

DESIGN: Space Study - Install 4 ORs 5th fl. Surgical Unit - UH Closed

DESIGN: Ext. Doors & Windows Closed

DESIGN: Construct New Emergency Services Building Active

DESIGN: Renovate Lecture Center Active

CONSTR: The School of Medicine & BioMedical Sciences Shell & Fitout Active

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Commissioning - GNU Building Project Closed

CONSTR: Upgrade HVAC Systems - Lee Hall - College at Oneonta Closed

CONSTR: Replace Roof - Rehabilitate 4th Floors Student Union Active

DESIGN: Rehabiltate/Replace Stone & Masonry - Husted Hall Closed

DESIGN: Demolish Ruslander Building and Site Restoration Closed

DESIGN: Commisssioning Upton Hall Closed

CONSTR: Replace Roofs - Various Buildings North & South Campuses Closed

CONSTR: Replace Roofs, Various Buildings Closed

Page 782 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 783 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/20/2013 02/01/2019 475999.31

08/09/2011 12/31/2014 5951270.00

04/10/2020 09/18/2027 28914.00

02/27/2012 12/31/2018 29405.00

12/26/2017 07/16/2025 636206.50

07/22/2021 12/12/2028 36046.00

12/12/2014 02/28/2019 241231677.00

12/18/2009 12/09/2015 930916.00

12/13/2010 04/13/2017 64934.45

02/10/2012 08/17/2013 1291534.00

02/26/2020 07/14/2022 6612513.00

10/29/2010 04/14/2017 155584.80

01/13/2010 10/01/2014 215489.74

06/29/2012 10/31/2018 4757.62

12/21/2011 11/15/2013 1840444.00

12/20/2013 03/31/2017 1987149.00

Page 784 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 547938.89 -71939.58

3472394.00 5951270.00 0.00

0.00 28914.00 0.00

29405.00 29405.00 0.00

0.00 557871.01 78335.49

0.00 2535.00 33511.00

0.00 241226677.00 5000.00

207162.00 930916.00 0.00

20312.91 64934.45 0.00

1204493.00 1291534.00 0.00

0.00 6587070.00 25443.00

22060.51 155584.80 0.00

0.00 215489.74 0.00

958.63 4757.62 0.00

1490686.00 1840444.00 0.00

0.00 1987149.00 0.00

Page 785 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

9 N 0

0 N 0

0 N 0

21 N 2

26 N 4

3 N 0

0 N 0

0 N 0

3 N 0

3 N 0

0 N 0

0 N 0

0 N 0

4 N 0

24 N 0

Page 786 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Jacobs Project Management Co.

R. B. Mac Construction Co, Inc.

HBT Architects

Architecture +

Architecture +

Horizon Engineering Associates, LLP

L.P. Ciminelli Construction Inc.

Sorensen Gross Construction Services

Genesys Engineering, P.C.

Andrew R. Mancini Associates Inc.

Bast Hatfield Construction LLC

Architecture +

Jacobs Civil Consultants, Inc.

Bergmann Associates, Inc.

Jameson Roofing Co., Inc.

Rising Sun Construction LLC

Page 787 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 0603 Two Penn Plaza

P. O. Box 424 6688 Lincoln Avenue

2 Elton Street

297 River Street

297 River Street

358 West Jefferson Street Suite 300

2421 Main Street

3407 torrey Road

38 Maiden Lane

129 Odell Avenue

1399 Vischers Ferry Road

297 River Street

Suite 0603 2 Penn Plaza

28 East Main Street 200 First Federal Plaza

3761 East Lake Road

54 Magnolia Avenue Unit 4-5

Page 788 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10121 USA

Lockport NY 14094 USA

Rochester NY 14118 USA

Troy NY 12180 USA

Troy NY 12180 USA

Syracuse NY 13204 USA

Buffalo NY 14214 USA

Flint MI 48507 USA

Kingston NY 12401 USA

Endicott NY 13760 USA

Clifton Park NY 12065 USA

Troy NY 12180 USA

New York NY 10121 USA

Rochester NY 14614 USA

Dunkirk NY 14048 USA

Jersey City NJ 7306 USA

Page 789 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.58011543.154897)

537 1665 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.15821943.047105)

687 711 2132

POINT (-78.84411242.93462)

300 70 2041

POINT (-83.73256442.976697)

438

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.04917542.110866)

938 388 2033

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.61117743.156034)

537 1673 2093

POINT (-74.05695240.72934)

488

Page 790 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13XE03 T005840

12X289 T004925

151036 T006429

131062 D006650

091043 T006350

12X334 T005191

221008 T006101

261038 T006358

10X340 T005801

24X251 T005532

12X369 T006392

13XD74 T005776

211031 D006649

09X335 T005368

02X389 T005624

031027 T006474

15X445 T004921

22X811 T005603

Page 791 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Roof Replacement Grad Chemistry Bldg Active

DESIGN: Upgrade Recital Hall - Dunn Hall Closed

DESIGN: CM - Construct Health and Wellness Center Active

CONSTR: Rehabilitate Javits Lecture Center Active

DESIGN: Rehabilitate Elevators Milne Library Active

DESIGN: Commissioning - Performing Arts Building Closed

DESIGN: Hinkle Library - Exterior Repair Active

DESIGN: Study - Greenhouse Conditions Assessment Active

CONSTR: Renovation/Additions to Science Engineering and Technologies Phase I Closed

CONSTR: Wheeler Hall Laboratory Addition Building 12 Closed

CONSTR: Renovate Timerman Hall Closed

DESIGN: Replacement of Electric Trans Feeders Active

CONSTR: Repair Stone Facade and Masonry at Fort Schuyler Active

DESIGN: Replace Medium Temperature Water Lines Closed

DESIGN: Commissioning - New Academic Building Closed

CONSTR: Replace Turf and Track at Coyer Field - Turf Replacement Closed

DESIGN: Roof Repairs/Replacement - AC Silverman Closed

DESIGN: Facilities Master Plan - Alfred Closed

Page 792 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 793 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/07/2011 07/30/2018 413964.00

02/26/2008 02/28/2012 84758.88

05/04/2018 05/23/2023 5273867.72

05/27/2021 06/25/2024 26255000.00

01/28/2019 07/16/2025 274438.01

12/30/2009 12/31/2015 94044.82

07/25/2017 10/10/2023 411000.00

08/29/2019 02/01/2026 113460.00

02/25/2011 10/30/2016 26713315.00

05/21/2009 02/09/2013 11092524.00

01/17/2018 08/17/2019 590701.00

02/24/2011 08/06/2020 4532777.00

05/27/2021 01/20/2023 1339000.00

08/12/2008 11/25/2016 175975.12

07/14/2011 10/31/2018 110143.44

01/29/2019 08/29/2020 1084130.00

02/13/2007 02/13/2012 34812.36

01/13/2010 07/01/2011 620353.71

Page 794 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15289.71 258908.08 155055.92

0.00 84758.88 0.00

0.00 2231850.17 3042017.55

0.00 1207614.00 25047386.00

0.00 196354.66 78083.35

6245.48 94044.82 0.00

0.00 559367.33 -148367.33

0.00 64510.19 48949.81

10147582.00 26713315.00 0.00

224154.00 11092524.00 0.00

0.00 590701.00 0.00

789942.98 3771350.96 761426.04

0.00 298746.00 1040254.00

0.00 175975.12 0.00

14973.65 110143.94 -0.50

0.00 1084130.00 0.00

0.00 34812.36 0.00

0.00 620353.71 0.00

Page 795 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

0 N 0

5 N 1

0 N 0

0 N 0

0 N 0

0 N 0

6 N 0

9 N 0

6 Y 2

18 N 1

3 N 0

0 N 0

0 N 0

2 N 0

0 N 0

24 N 1

Page 796 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Hoffmann Architects, Inc.

Architecture +

The Whiting-Turner Contracting Company

Niram, Inc.

Architecture +

Genesys Engineering P.C.

Bell & Spina Architects-Planners, P.C.

Lacey Thaler Reilly Wilson Arch &Preservation

Fahs Construction Group Inc.

AOW Associates, Inc.

PTL Contracting Corp.

RMF Engineering, Inc., P.C.

RK Contracting, Inc.

Lizardos Engineering Associates P.C.

Bergmann Associates, Inc.

Occhino Corp

Quinlivan,Pierik & Krause A/E DBA Qpk Design

WTW Architects

Page 797 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

462 Seventh Avenue

297 River Street

Suite 180 1720 Spillman Drive

4 E. Frederick Place

297 River Street

Suite #111 629 Fifth Avenue

Suite 201, The Bindery 215 Wyoming Street

4th Floor 79 North Pearl Street

2224 Pierce Creek Road

30 Essex Street

27840 County Road 193

Suite 300 5520 Research Park Drive

37-16 92nd Street

200 Old Country Road Suite 670

28 East Main Street 200 First Federal Plaza

2650 Seneca Street

450 South Salina Street P.O. Box 29

Timber Court 127 anderson Street

Page 798 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10018 USA

Troy NY 12180 USA

Bethlehem PA 18015 USA

Cedar Knolls NJ 7927 USA

Troy NY 12180 USA

Pelham NY 10803 USA

Syracuse NY 13204 USA

Albany NY 12208 USA

Binghamton NY 13903 USA

Albany NY 12206 USA

Theresa NY 13691 USA

Baltimore MD 21228 USA

Jackson Heights NY 11372 USA

Mineola NY 11501 USA

Rochester NY 14614 USA

West Seneca NY 14224 USA

Syracuse NY 13201 USA

Pittsburgh PA 15212 USA

Page 799 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.99000240.751854)

749 741 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-74.4514640.811234)

2492

POINT (-73.69016242.73246)

110 11 2138

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.77972242.677542)

814 43 2030

POINT (-73.87491740.750196)

196 842 2137

POINT (-73.63875140.739038)

62 1265 2094

POINT (-77.61117743.156034)

537 1673 2093

POINT (-78.79452842.844651)

276 159 2041

POINT (-76.15225243.045606)

687 711 2132

Page 800 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

021030 T006356

05X287 T005263

07XA27 T005459

12X344 T005882

141044 T006507

34X061 T004942

30XA56 T005328

14X7A8 T005968

28X429 T005708

12X319 T005365

09X361 T005351

081033 T006371

15X412 T005153

13XB60 D005281

391011 T006356

15XA07 T005767

02X361 T005574

Page 801 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Holmes Hall Closed

CONSTR: Campus Wide Satellite Boilers, Phase I Closed

DESIGN: Central Campus Quad - Site Rehab Closed

CONSTR: Renovate Flagg Hall - ADA Elevator Closed

CONSTR: Replace Main Cooling Tower - UHB Closed

DESIGN: Replace Steams Line, Geneva Campus Closed

DESIGN: Construction Manager - School of Engineering Phase I Closed

CONSTR: Job Order Contracting Program - New York Closed

DESIGN: Site Restoration South Campus Closed

DESIGN: Replace Windows Various Buildings Closed

DESIGN: Upgrade ADA Restrooms - Phase III Closed

DESIGN: Replace HTHW line to Old Library Closed

CONSTR: University Hospital Vertical Expansion Electrical Closed

CONSTR: Rehabilitate Elevators, Grad Chem Bldg. Closed

DESIGN: Facility Master Planning - Academic Buildings Closed

CONSTR: Construct Foundation, Steel & Site Work IHP Expansion Closed

DESIGN: Rochester Educational Opportunity Center - Construction Manager Closed

Page 802 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 803 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/21/2018 02/06/2027 68386.13

04/04/2007 12/31/2010 4491800.00

02/13/2009 02/05/2014 731008.45

11/10/2011 10/17/2013 267330.00

05/30/2019 03/15/2021 5476599.00

02/28/2006 06/18/2010 55253.88

02/04/2008 12/23/2013 2515268.64

05/21/2012 08/31/2018 30813.00

09/10/2010 09/03/2015 565826.34

04/15/2011 04/14/2017 286172.29

06/18/2010 12/31/2017 69633.95

06/11/2018 06/17/2025 99623.21

06/09/2006 12/31/2012 16461436.00

03/29/2007 06/30/2010 808402.00

01/29/2018 02/06/2027 116191.86

01/20/2011 11/02/2012 7933594.00

10/30/2009 10/16/2014 1041587.22

Page 804 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 68386.13 0.00

0.00 4491800.00 0.00

169463.75 731008.45 0.00

184806.00 267330.00 0.00

0.00 5476599.00 0.00

0.00 55253.88 0.00

38168.12 2515268.64 0.00

0.00 30813.00 0.00

0.00 565826.34 0.00

37015.30 286172.29 0.00

295.15 69633.95 0.00

0.00 99623.21 0.00

522209.00 16461436.00 0.00

0.00 808402.00 0.00

0.00 116191.86 0.00

550934.00 7933594.00 0.00

0.00 1041587.22 0.00

Page 805 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

3 N 0

10 Y 2

3 N 0

5 N 3

0 N 0

5 N 0

0 N 0

22 N 0

0 N 0

0 N 0

0 N 0

3 N 0

2 N 0

0 Y 0

5 N 0

12 N 0

Page 806 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JMZ Architects & Planners PC

D.V. Brown & Associates, Inc.

Trowbridge Wolf Michaels Landscape Architects LLP

Continental Construction, LLC

Dynamic US Inc.

C & S Engineers, Inc.

Turner Construction Company

Corbex, Inc.

Pressley Associates, Inc.

Architecture +

Architecture +

Ramboll Americas Engineering Solutions, Inc.

Ridley Electric Co.,Inc.

Otis Elevator Co.

JMZ Architects & Planners PC

LeChase Construction Services, LLC

LiRo Engineers, Inc.

Page 807 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

190 Glen Street P. O. Box 725

567 Vickers Street

Suite 101 1001 West Seneca Street

PO Box 358 2125 State Hwy 812

2900 Westchester Avenue Suite 207

499 Col. Eileen Collins Blvd.

Suite 200 50 Lakefront Boulevard

74-16 Grand Avenue

Unit 136 28 Atlantic Avenue

297 River Street

297 River Street

333 West Washington St PO Box 4873

1810 LeMoyne Avenue P.O. Box 316

516 West 34th Street

190 Glen Street P. O. Box 725

609 Erie Blvd West

690 Delaware Avenue

Page 808 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Glens Falls NY 12801 USA

Tonawanda NY 14150 USA

Ithaca NY 14850 USA

Gouverneur NY 13642 USA

Purchase NY 10577 USA

Syracuse NY 13212 USA

Buffalo NY 14202 USA

Elmhurst NY 11373 USA

Boston MA 2110 USA

Troy NY 12180 USA

Troy NY 12180 USA

Syracuse NY 13221 USA

Syracuse NY 13208 USA

New York NY 10001 USA

Glens Falls NY 12801 USA

Syracuse NY 13204 USA

Buffalo NY 14209 USA

Page 809 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.6447743.309981)

824 783 2183

POINT (-78.85471943.01223)

280 8 2041

POINT (-73.69876141.009992)

973 1339 2185

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.88686240.730363)

196 843 2137

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.15589443.049616)

687 711 2132

POINT (-76.14606243.085657)

690 726 2132

POINT (-74.00019940.755022)

749 717 2095

POINT (-73.6447743.309981)

824 783 2183

POINT (-76.16437343.049141)

687 713 2132

POINT (-78.87283242.902878)

300 65 2041

Page 810 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

30XA95 T005980

231018 T006491

321027 T006271

06X337 T005377

24X285 T005666

26X293 T005627

291010 T006100

131046 T006356

801802 T006368

16X281 T005744

10X340 T005748

11X244 T004926

36X7A5 T005402

09X308 T005452

141028 T006380

09X366 T005355

201035 T006353

Page 811 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Fire Alarm Systems North Campus - Phase I Closed

CONSTR: Demolition and Infrastructure Upgrades - Dana Hall Closed

DESIGN: Claims Analysis & Litigation Services Assigned to Vendor

DESIGN: Doty Building Renovation Closed

CONSTR: Building Shell Improvements - Warner - Holmes - SUNY Cobleskill Closed

DESIGN: Commissioning, Locker Rm Rehab at Nold Closed

DESIGN: Rehab & Enclose PAC Elevator Active

DESIGN: Expand and Upgrade Flax Pond Hatchery Active

DESIGN: Engineering Services - Pathfinder Engineers & Architects - Master Term Agreement Active

CONSTR: Stocking Hall Rehab/System Upgrades Closed

CONSTR: Piez Hall Addition- Science Engineering and Technology Closed

DESIGN: Replace Ice Rink Bleachers Closed

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Rehabilitation of Fitzelle Hall, Bldg. No. 26 Closed

DESIGN: Claims Analysis & Litigation Services Active

DESIGN: Replace HVAC Equipment - Hunt College Union Closed

DESIGN: Rehabilitate 4th Floor HVAC-Bray Hall Active

Page 812 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 813 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/11/2012 11/15/2014 3292021.00

03/22/2019 11/25/2020 2513118.00

09/01/2016 09/02/2021 436974.39

04/24/2008 12/31/2015 3018610.79

03/31/2010 02/13/2013 1205160.00

10/08/2010 12/31/2018 134148.32

06/09/2016 02/05/2024 153000.00

10/30/2017 02/06/2027 727600.00

09/14/2017 09/28/2026 5000000.00

11/22/2010 05/28/2016 72574640.00

11/26/2010 03/31/2015 45395505.00

03/20/2007 03/31/2011 264530.05

06/02/2008 01/21/2014 48976.00

02/11/2009 11/15/2016 2653771.31

09/27/2017 10/25/2022 758170.00

06/18/2010 06/12/2020 504000.00

09/11/2020 06/02/2025 389673.65

Page 814 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2174008.00 3292021.00 0.00

0.00 2513118.00 0.00

0.00 436974.39 0.00

253062.98 3018610.79 0.00

0.00 1205160.00 0.00

25786.54 134148.32 0.00

0.00 66692.88 86307.12

0.00 602720.26 124879.74

0.00 0.00 5000000.00

24346264.00 72574640.00 0.00

15763525.00 45395505.00 0.00

0.00 264530.05 0.00

0.00 48976.00 0.00

366355.48 2653771.31 0.00

0.00 145932.08 612237.92

98251.75 970854.90 -466854.90

0.00 155554.97 234118.68

Page 815 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4 N 1

2 N 0

0 N 0

5 N 0

11 N 0

0 N 0

0 N 0

0 Y 0

62 Y 10

7 N 0

11 N 0

0 Y 0

0 N 0

21 N 3

8 N 0

0 N 0

0 Y 0

Page 816 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Frey Electric Construction Co., Inc.

Northern Tier Contracting

Navigant Consulting Services Inc.

Kliment Halsband Architects, LLP

Bast Hatfield,Inc.

OLA Consulting Engineers, PC

Peter Gisolfi Associates

JMZ Architects & Planners PC

Pathfinder Engineers & Architects LLP

The Pike Company Inc

The Pike Company Inc

Joy McCoola & Zilch Architects & Planners, PC

JEMCO Electrical Contractors, Inc.

Architecture +

HKA Global, Inc.

C & S Engineers, Inc.

Chiang O'Brien Architects

Page 817 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

100 Pearce Avenue

329A Scotch Settlement Rd

140 Sherman St. 4th Floor

20th Floor 322 Eighth Avenue

1399 Vischers Ferry Road

50 Broadway

566 Warburton Avenue

190 Glen Street P. O. Box 725

134 South Fitzhugh Street

One Circle Street

One Circle Street

190 Glen Street P.O. Box 725

271 42nd Street

297 River Street

One Commerce Square 2005 Market St, 17th Flr

499 Col. Eileen Collins Blvd.

Crescent Building 217 North Aurora Street

Page 818 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Tonawanda NY 14150 USA

Gouverneur NY 13642 USA

Fairfield CT 6824 USA

New York NY 10001 USA

Clifton Park NY 12065 USA

Hawthorne NY 10532 USA

Hastings-On-Hudson NY 10706 USA

Glens Falls NY 12801 USA

Rochester NY 14608 USA

Rochester NY 14607 USA

Rochester NY 14607 USA

Glens Falls NY 12801 USA

Brooklyn NY 11433 USA

Troy NY 12180 USA

Philadelphia PA 19103 USA

Syracuse NY 13212 USA

Ithaca NY 14850 USA

Page 819 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.89326442.992092)

278 8 2041

POINT (-75.42571244.350272)

330 1525 2140

POINT (-73.25950641.139975)

1040

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-73.79736141.107546)

963 1251 2185

POINT (-73.8821840.995664)

974 1445 2185

POINT (-73.6447743.309981)

824 783 2183

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.13224343.113906)

690 730 2132

Page 820 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

141057 T006359

041036 T006353

241024 T006537

25X288 T005810

121004 T006241

39X137 T005877

10X351 T005684

27X230 T005879

41X056 T005870

07XA24 T005364

12X261 T005547

37X032 T006189

13XD12 T005823

15X445 D005408

03X375 T005590

091019 T006102

06X324 T005922

13XB61 T004896

Page 821 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Demo 34th Street Parking Garage Active

DESIGN: Abate & Renovate 2nd Floor - Miller Building Active

CONSTR: Upgrade Facilities Complex Active

CONSTR: Child Care Center Closed

CONSTR: Construct New ADA Restrooms, Kellas Hall Closed

CONSTR: Renovate Campus Center- Phase I Closed

DESIGN: Tyler Rehab-Lower Level & Partial Main Closed

CONSTR: Student Activity Center Renovation (STUAC), Ph II Closed

DESIGN: Construction Manager for 41059 & 41060 Closed

DESIGN: Rehabilitate Elevators Various Buildings Closed

CONSTR: Upgrade Underground Site Infrastructure,Site Improvements Closed

DESIGN: Construct Anaerobic Digesters - Cobleskill, Delhi, & Morrisville Closed

DESIGN: CM Services - New Comp Science Bldg Active

CONSTR: Roof Repairs/Replacement - AC Silverman Closed

CONSTR: Renovate Science Building, Bldg. No. 15 Closed

DESIGN: Replace Water Mains - Hunt Union, Alumni, Track Facility Closed

CONSTR: Rehabilitate Bailey Hall Closed

DESIGN: Upgrade Site Utilities, Phase I Assigned to Vendor

Page 822 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 823 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/28/2018 12/02/2025 806567.00

12/16/2019 06/02/2025 1055287.42

01/24/2020 03/03/2022 7424406.00

02/25/2011 07/01/2013 4086672.00

04/29/2016 09/30/2017 369513.00

09/30/2011 07/15/2013 4534490.00

07/16/2010 08/04/2017 3331420.57

10/28/2011 05/22/2014 9857671.00

05/21/2012 10/01/2018 716544.17

09/18/2008 07/16/2014 35021.28

07/01/2009 08/07/2011 3327050.00

11/23/2015 01/13/2021 271852.58

05/27/2011 06/30/2019 3178982.01

06/09/2008 08/31/2010 362793.00

09/25/2009 11/30/2014 34568507.00

04/12/2017 07/10/2023 79000.00

02/14/2012 12/31/2016 22028847.00

05/09/2005 12/31/2017 1624845.94

Page 824 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 487043.15 319523.85

0.00 449907.79 605379.63

0.00 6987556.00 436850.00

307190.00 4086672.00 0.00

0.00 369513.00 0.00

3700814.00 4534490.00 0.00

832248.56 3331420.57 0.00

7016530.00 9857671.00 0.00

0.00 716544.17 0.00

39435.63 411021.28 -376000.00

0.00 3327050.00 0.00

0.00 271852.58 0.00

670804.42 2890097.76 288884.25

0.00 362793.00 0.00

7186577.02 34304080.02 264426.98

0.00 103218.15 -24218.15

7608717.00 22028847.00 0.00

0.00 1624845.94 0.00

Page 825 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 Y 0

3 N 1

12 N 0

4 N 0

9 N 0

38 N 3

11 N 0

0 Y 0

0 N 0

7 N 0

14 N 0

19 N 2

4 N 0

8 N 2

0 N 0

11 N 0

5 N 0

Page 826 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lothrop Associates LLP Architects

Chiang O'Brien Architects

LeChase Construction Services, LLC

Jersen Construction Group

Northern Tier Contracting

LeChase Construction Services, LLC

Pfeiffer Partners Architects, Inc.

Bette & Cring, LLC

The McKissack Group, Inc DBA McKissack & McKissack

Syska Hennessy Group, Inc

J.E. Sheehan Contracting Corp.

GHD Consulting Services, Inc.

URS Corporation - New York

Apple Roofing Corp.

Christa Construction, LLC

Labella Associates, D.P.C

Fahs Construction Group Inc.

Schuyler Engineering, P.C.

Page 827 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

333 Westchester Avenue

Crescent Building 217 North Aurora Street

205 Indigo Creek Drive

6 Industry Drive

329A Scotch Settlement Rd

609 Erie Blvd West

183 Centre Street 3rd Floor

18438 U.S. Route 11

20th Floor. 1001 Avenue of the Americas

14th Floor 1515 Broadway

208 Sissonville Road

One Remington Park Drive

Suite 610 One Penn Plaza

6720 Commerce Boulevard P.O. Box 3105

119 Victor Heights Pkwy

Suite 201 300 State Street

2224 Pierce Creek Road

Suite 6 163 North Wellwood Avenue

Page 828 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

White Plains NY 10604 USA

Ithaca NY 14850 USA

Rochester NY 14626 USA

Waterford NY 12188 USA

Gouverneur NY 13642 USA

Syracuse NY 13204 USA

New York NY 10013 USA

Watertown NY 13601 USA

New York NY 10018 USA

New York NY 10038 USA

Potsdam NY 13676 USA

Cazenovia NY 13035 USA

New York NY 10119 USA

Syracuse NY 13211 USA

Victor NY 14564 USA

Rochester NY 14614 USA

Binghamton NY 13903 USA

Lindenhurst NY 11757 USA

Page 829 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.74502841.030178)

949 1437 2185

POINT (-77.69216343.184897)

548 1685 2093

POINT (-73.67241742.801941)

992 18 2141

POINT (-75.42571244.350272)

330 1525 2140

POINT (-76.16437343.049141)

687 713 2132

POINT (-73.9995840.71849)

749 737 2095

POINT (-75.93432943.933537)

840 1466 2089

POINT (-75.00240344.691026)

312 1597 2140

POINT (-76.09048943.095953)

702 426 2132

POINT (-77.44463742.996293)

799 413 2133

POINT (-75.88027242.08193)

967 477 2033

Page 830 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

051009 T006101

02X366 T005624

14X7A9 T005968

08X473 T006039

29X414 T005983

13XC68 T004954

241007 T006318

36X117 T005342

04X343 T005623

24X287 T005888

401005 T006107

03X383 T005390

011006 T006185

291065 T006472

22X210 T004937

20X152 T005700

251008 T006314

Page 831 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Windows Rockefeller Arts Closed

DESIGN: Commissioning - SERC PH II Closed

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: New Science Building Active

CONSTR: Rehabilitate Plaza Exterior Pathways Active

DESIGN: HVAC Modifications - Heavy Engineering Thermal Spray Lab Closed

CONSTR: Upgrade Switchgear at Main Campus Substation Closed

DESIGN: Renovate SUNY Global Center Closed

DESIGN: Campus Wide Satellite Boilers Assigned to Vendor

CONSTR: Wheeler Hall Interior Renovation Closed

DESIGN: Rehab Envelope 111 West Closed

DESIGN: New Technology Building Closed

DESIGN: Upgrade Central Plant Active

CONSTR: Job Order Contracting - NYC Region Active

DESIGN: Site Utility Distribution Line Replacement - Phase 1 Closed

DESIGN: Exterior Rehab - Illick Hall Closed

CONSTR: Replace Windows & Refinish Exterior Walls - Bush Hall Closed

Page 832 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 833 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/08/2017 10/10/2023 213636.88

10/25/2010 10/31/2018 37899.75

05/21/2012 08/31/2018 18124.00

11/20/2013 12/31/2019 36102682.00

08/07/2012 01/23/2015 2172361.00

05/08/2007 01/31/2011 30981.17

03/23/2017 06/11/2019 1942656.00

09/28/2009 12/31/2017 95702.63

02/04/2010 12/08/2016 1138480.51

11/07/2011 08/15/2013 4609609.00

03/21/2016 03/31/2022 166092.63

06/04/2008 01/30/2016 2618316.03

11/13/2015 06/30/2023 1550500.00

01/29/2019 04/11/2022 5286.00

06/13/2007 12/31/2011 390597.12

07/28/2010 09/30/2016 1519870.16

03/17/2017 08/20/2019 2373426.00

Page 834 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 213636.88 0.00

16933.25 36919.45 980.30

0.00 18124.00 0.00

0.00 36087150.00 15532.00

359567.00 1971003.00 201358.00

0.00 30981.17 0.00

0.00 1942656.00 0.00

0.00 95702.63 0.00

307391.13 1138480.51 0.00

3550155.00 4609609.00 0.00

0.00 166092.63 0.00

428469.99 2618316.03 0.00

0.00 1088348.57 462151.43

0.00 0.00 5286.00

7648.20 390597.12 0.00

260451.74 1519870.16 0.00

0.00 2373426.00 0.00

Page 835 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

0 N 0

8 N 0

12 N 0

0 Y 0

6 N 0

0 N 0

24 N 3

13 N 1

5 N 1

5 N 0

19 Y 4

3 N 1

0 N 0

24 N 1

4 N 0

Page 836 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

Bergmann Associates, Inc.

Corbex, Inc.

Niram, Inc.

Fourmen Construction, Inc

Lakhani & Jordan Engineers, P.C.

Mohawk Valley Utility Construction Corp.

Perkins Eastman Architects, P.C.

Schuyler Engineering, P.C.

AOW Associates, Inc.

Architecture +

S/L/A/M/ Architects & Engineers P.C.

WM Group Engineers, P.C.

Volmar Construction, Inc

Hatch Mott Macdonald NY, Inc.

Ashley McGraw Architects DPC

Fahs Construction Group Inc.

Page 837 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

28 East Main Street 200 First Federal Plaza

74-16 Grand Avenue

4 E. Frederick Place

1008 Main Street

315 Madison Avenue 10th Floor

1 Prospect Avenue

115 Fifth Avenue - 3rd Fl

Suite 6 163 North Wellwood Avenue

30 Essex Street

297 River Street

80 Glastonbury Blvd.

429 Wendover Drive

4400 Second Avenue

Suite 700 438 Main Street

15th Floor 125 East Jefferson Street

2224 Pierce Creek Road

Page 838 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Rochester NY 14614 USA

Elmhurst NY 11373 USA

Cedar Knolls NJ 7927 USA

Peekskill NY 10566 USA

New York NY 10017 USA

Albany NY 12206 USA

New York NY 10003 USA

Lindenhurst NY 11757 USA

Albany NY 12206 USA

Troy NY 12180 USA

Glastonbury CT 6033 USA

Princeton NJ 8540 USA

Brooklyn NY 11232 USA

Buffalo NY 14202 USA

Syracuse NY 13202 USA

Binghamton NY 13903 USA

Page 839 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.88686240.730363)

196 843 2137

POINT (-74.4514640.811234)

2492

POINT (-73.91928941.291796)

956 1334 2185

POINT (-73.97914840.752993)

749 740 2095

POINT (-73.77261842.673362)

814 43 2030

POINT (-73.991540.738916)

749 719 2095

POINT (-73.77972242.677542)

814 43 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-72.61857941.721624)

1041

POINT (-74.69935140.351081)

2489

POINT (-74.01363540.652263)

894 899 2090

POINT (-75.88027242.08193)

967 477 2033

Page 840 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03X7A5 T005630

11X313 T005695

14X496 T006130

081000 T006299

801801 T006355

07X7B1 T005632

071065 T006589

03X392 T005343

01XA87 T006268

09X322 D005475

291002 T006109

12X338 T005933

02X396 T005356

35X101 T006104

01X854 T005855

30X482 D005363

391003 T006099

Page 841 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: JOCs - Buffalo Region Closed

CONSTR: Roads and Parking Lots Phase I Closed

DESIGN: Upgrade HVAC Systems BSB Active

CONSTR: Upgrade HVAC Systems at Dorsky Museum, Bldg. No. 31B Closed

DESIGN: Architectural Services - Ismael Leyva Architects - Master Term Agreement Active

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Upgrade Electric Distribution, Phase VI Active

DESIGN: Rehab Moore Hall for Central Services Closed

DESIGN: CM Construct ETEC Building - 2020 Active

CONSTR: Replace HVAC/DHW Equipment Instructional Resource Center - Phase 1 Closed

DESIGN: Rehab Diesel Generator Active

CONSTR: Upgrade Site Utilites, Phase III Closed

DESIGN: Replace Roofs - Various Buildings Phase III Closed

DESIGN: Install Satellite Boilers - Multiple Buildings Closed

DESIGN: Classroom Improvement Study Closed

CONSTR: Replace Fire Alarms - Various Buildings Closed

DESIGN: Renovate Campus Center Phase 2 - Health & Wellness Closed

Page 842 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 843 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/18/2009 12/08/2015 48041.00

06/08/2010 01/15/2013 1941417.00

08/25/2015 08/30/2022 684935.00

01/10/2017 02/14/2019 942393.00

06/30/2017 01/13/2025 5000000.00

12/18/2009 12/09/2015 465527.00

07/05/2021 09/14/2023 806539.00

08/15/2008 03/29/2013 268739.64

08/22/2016 07/23/2022 7439295.00

03/04/2009 08/10/2010 962553.00

07/28/2015 02/14/2021 304000.00

02/29/2012 08/22/2014 7330247.00

07/26/2010 05/29/2015 186595.80

01/23/2015 07/25/2023 562748.68

05/08/2012 08/19/2014 67290.00

02/22/2008 08/31/2010 1281905.00

07/13/2015 09/01/2019 184453.10

Page 844 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 48041.00 0.00

101603.00 1941417.00 0.00

0.00 550073.41 134861.59

0.00 942393.00 0.00

0.00 0.00 5000000.00

0.00 465527.00 0.00

0.00 0.00 806539.00

2123.58 268739.64 0.00

0.00 6796633.73 642661.27

0.00 962553.00 0.00

0.00 306464.11 -2464.11

3472663.00 7330247.00 0.00

60760.12 186595.80 0.00

0.00 562748.68 0.00

37682.26 67290.00 0.00

0.00 1281905.00 0.00

0.00 184453.10 0.00

Page 845 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

6 N 0

24 N 4

5 Y 1

86 Y 19

0 N 0

0 N 0

0 N 0

31 N 0

4 N 0

0 N 0

12 N 0

0 N 0

0 N 0

0 N 0

4 N 1

0 Y 0

Page 846 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sorensen Gross Construction Services

CFI Construction, Inc.

Jacobs Project Management Co.

Wilkins Mechanical, Inc.

Ismael Leyva Architects, P.C.

Sorensen Gross Construction Services

RMF Engineering, Inc., P.C.

BHNT Architects, PC

Turner Construction Company

J & K Plumbing & Heating Co, Inc.

OLA Consulting Engineers, PC

CCI Companies, Inc.

Bell & Spina Architects-Planners, P.C.

M/E Engineering, P.C.

Perkins & Will Architects P.C.

Frey Electric Construction Co., Inc.

JMZ Architects & Planners PC

Page 847 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3407 torrey Road

286 Sacandaga Road

Suite 0603 Two Penn Plaza

6923 Herman Road

13th Floor 48 West 37th Street

3407 torrey Road

1A Pine West Plaza

Suite 434 2495 Main Street

1 Computer Drive South

24 Thorp St PO Box 25 Westview Stat

50 Broadway

7138 Mt. Pleasant Road PO Box 186

Suite 201, The Bindery 215 Wyoming Street

300 Trolley Boulevard

4th Floor 215 Park Avenue South

100 Pearce Avenue

190 Glen Street P. O. Box 725

Page 848 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Flint MI 48507 USA

Johnstown NY 12095 USA

New York NY 10121 USA

Syracuse NY 13209 USA

New York NY 10018 USA

Flint MI 48507 USA

Albany NY 12205 USA

Buffalo NY 14214 USA

Albany NY 12205 USA

Binghamton NY 13905 USA

Hawthorne NY 10532 USA

Canastota NY 13032 USA

Syracuse NY 13204 USA

Rochester NY 14606 USA

New York NY 10003 USA

Tonawanda NY 14150 USA

Glens Falls NY 12801 USA

Page 849 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-83.73256442.976697)

438

POINT (-74.26743343.017727)

379 1219 2085

POINT (-76.29077843.104591)

685 700 2132

POINT (-83.73256442.976697)

438

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.81058842.719116)

834 42 2030

POINT (-75.92500542.103463)

968 479 2033

POINT (-73.79736141.107546)

963 1251 2185

POINT (-75.75546943.067475)

136 351 2092

POINT (-77.68189143.171416)

549 1664 2093

POINT (-78.89326442.992092)

278 8 2041

POINT (-73.6447743.309981)

824 783 2183

Page 850 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X324 D005497

261054 T006586

36X087 T005451

23X200 T005191

07XA41 T005632

141087 T006356

271027 T006350

36X7B4 T005956

09X395 T006125

32X475 T006240

141000 T006339

07XA52 T005860

09X345 T005614

26X285 T005789

30X492 T005454

28X354 T005019

39X165 T005834

21X154 T005564

Page 851 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Replace Bugbee Hall Roof Closed

DESIGN: Replace Windows at Lupton Hall - Phase 2 of 2 Active

CONSTR: Window Replacement - State University Plaza Closed

DESIGN: Commissioning Services - Convocation, Athletics, Recreation Center Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Library Study Closed

DESIGN: Academic Planning & Partial Update Facilities Master Plan 2018 Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: ADA Modifications Various Buildings Ph. III Closed

CONSTR: Rehab Walkway Campus Underpass Closed

DESIGN: Upgrade Electrical System UHB Active

CONSTR: Rehab Fine Arts - HVAC Closed

DESIGN: Upgrade Central Heating Plant - Phase III Closed

CONSTR: Reconfigure Loop Road / Rehabilitate Parking Lots and Landscaping Closed

CONSTR: Rehabilitate Elevators - Various Buildings Closed

DESIGN: South Campus Site and Storm Drainage Improvements Phase I Closed

DESIGN: Renovate Bio-Chem Lab Closed

CONSTR: Rehabilitate and Expand Pier & Other Waterfront Structures Closed

Page 852 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 853 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/15/2009 10/30/2010 594190.00

02/09/2021 09/14/2023 441000.00

01/21/2009 10/15/2011 1625779.00

03/03/2008 12/31/2015 108447.84

12/18/2009 12/09/2015 149691.00

10/10/2019 02/06/2027 182241.00

08/15/2018 07/16/2025 419952.39

04/18/2012 11/20/2018 497603.00

01/12/2015 08/15/2016 1275194.00

04/08/2016 05/24/2018 2759581.00

07/24/2017 08/14/2022 2708685.00

08/22/2011 04/01/2013 744515.00

01/29/2010 01/14/2015 674065.05

02/14/2011 08/15/2013 6407252.00

01/07/2009 11/15/2011 3469478.00

07/05/2005 01/29/2014 744410.75

03/12/2014 03/15/2016 71166.28

06/16/2009 04/01/2015 7796614.00

Page 854 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 594190.00 0.00

0.00 121557.16 319442.84

10400.00 1625779.00 0.00

5597.05 108447.84 0.00

149691.00 149691.00 0.00

0.00 172007.88 10233.12

0.00 419952.39 0.00

84714.00 497603.00 0.00

0.00 1275194.00 0.00

0.00 2759581.00 0.00

0.00 612623.02 2096061.98

60448.00 744515.00 0.00

129288.00 674065.05 0.00

1110795.00 6407252.00 0.00

0.00 3469478.00 0.00

10164.68 744410.75 0.00

0.00 71166.28 0.00

76605.00 7796614.00 0.00

Page 855 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 N 2

0 N 0

5 N 0

0 N 0

0 N 0

0 Y 0

0 N 0

0 Y 0

7 N 1

5 N 1

23 N 3

4 N 0

15 N 1

16 N 0

7 N 1

5 N 0

0 N 0

6 N 0

Page 856 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Weatherguard Roofing Co., LLC

Lacey Thaler Reilly Wilson Arch &Preservation

Ajay Glass & Mirror Co.

Genesys Engineering P.C.

Sorensen Gross Construction Services

JMZ Architects & Planners PC

Architecture +

Cutting Edge Group, LLC

Fahs Construction Group Inc.

Vanguard Construction & Development Co., Inc.

LiRo Program and Construction Mgmt, P.C.

Evans Mechanical, Inc.

RMF Engineering, Inc., P.C.

Laser Industries, Inc

Patrick Development, Inc.

Hunt Engineers, Archs., & Landsurveyors, PC

CSArch Arch, Eng, Constr Management

D'Onofrio General Contractors Corp.

Page 857 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2880 Curry Road

4th Floor 79 North Pearl Street

7 West Avenue P. O. Box 100

Suite #111 629 Fifth Avenue

3407 torrey Road

190 Glen Street P. O. Box 725

297 River Street

14 Walkup Cutoff Road P.O. Box 733

2224 Pierce Creek Road

307 West 38th Street 7th Floor

Three Aerial Way

314 Maple Street

Suite 300 5520 Research Park Drive

P.O. Box 315 1775 Route 25

8600 Transit Road

Airport Corporate Park 100 Hunt Center

40 Beaver Street

202 28 Street

Page 858 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Schenectady NY 12303 USA

Albany NY 12208 USA

Manchester NY 14504 USA

Pelham NY 10803 USA

Flint MI 48507 USA

Glens Falls NY 12801 USA

Troy NY 12180 USA

Lake George NY 12845 USA

Binghamton NY 13903 USA

New York NY 10018 USA

Syosset NY 11791 USA

Endicott NY 13760 USA

Baltimore MD 21228 USA

Ridge NY 11961 USA

East Amherst NY 14051 USA

Horseheads NY 14845 USA

Albany NY 12207 USA

Brooklyn NY 11232 USA

Page 859 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.91084342.747778)

834 72 2030

POINT (-77.23304942.967455)

805 317 2133

POINT (-83.73256442.976697)

438

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.64807743.386894)

818 128 2183

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.99232540.755001)

749 741 2095

POINT (-76.0700242.098418)

938 388 2033

POINT (-78.69693343.001685)

304 509 2041

POINT (-73.75257842.648466)

814 44 2030

POINT (-73.99841 894 815 2090

Page 860 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

311008 T006280

071042 T006440

29X402 T006118

15X324 T004850

40X005 D005077

15XA19 T005914

161026 T006677

08X7B6 T005956

02X392 T006066

081048 T006589

12X370 T006193

24X268 D005545

111017 T006548

09X347 T005769

09X327 T005511

08X438 T005418

Page 861 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace AHUs Campus Center F, I, K Wings Active

DESIGN: Rehabilitate Science IV Ph 2 Active

CONSTR: Renovate/Construct Center for Integrated Technology Learning Closed

DESIGN: Academic Building Closed

CONSTR: Rehabilitate 28 Union Avenue Closed

DESIGN: Construction Manager - New Academic Building Closed

DESIGN: Renovate Plant Science Building Active

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Replace Central Heating Plant Makeup Water System Active

DESIGN: Rehab Kellas Hall, Bldg 25 Active

CONSTR: Library Basement Repair Closed

CONSTR: Renovate Memorial Hall Active

CONSTR: Replace Windows - Alumni/Willsbach/Mills Halls Closed

CONSTR: Replace Hunt Union Cooling Tower Closed

CONSTR: Renovate Building 1 - Old Main Closed

Page 862 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 863 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/31/2016 01/22/2022 1839100.00

01/13/2020 12/12/2028 60597.83

01/15/2015 05/30/2021 32331236.00

07/28/2003 07/02/2014 1054824.91

10/13/2005 09/30/2009 3459372.00

02/27/2012 03/05/2017 1300619.59

10/04/2021 12/16/2026 3227272.50

04/18/2012 11/20/2018 53564.00

04/23/2015 02/11/2018 100123.00

03/10/2021 09/14/2023 302493.00

12/08/2015 01/13/2021 1099577.00

06/26/2009 12/28/2010 437938.00

02/28/2020 10/17/2022 12035929.00

01/13/2011 08/15/2014 1123388.00

03/26/2009 06/15/2011 199761.00

07/21/2008 01/15/2014 28336574.00

Page 864 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 645252.38 1193847.62

0.00 30093.86 30503.97

0.00 32331236.00 0.00

0.00 1001002.36 53822.55

0.00 3459372.00 0.00

80572.27 1300619.59 0.00

0.00 0.00 3227272.50

53564.00 53564.00 0.00

0.00 112174.00 -12051.00

0.00 71792.84 230700.16

0.00 819524.27 280052.73

0.00 437938.00 0.00

0.00 10679727.00 1356202.00

0.00 1123388.00 0.00

0.00 199761.00 0.00

1834338.00 28336574.00 0.00

Page 865 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13 Y 1

10 N 0

5 N 0

5 N 0

4 N 0

14 N 0

35 N 5

0 Y 0

0 N 0

0 N 0

16 N 1

3 N 0

1 N 0

9 N 0

6 N 0

5 N 0

Page 866 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Setty & Associates, Ltd. PC

Horizon Engineering Associates, LLP

Worth Construction Co., Inc.

Holt Architects, P.C.

Malone & Tate Builders, Inc.

The Whiting-Turner Contracting Company

LeChase Construction Services, LLC

Cutting Edge Group, LLC

Sorensen Gross Construction Services

RMF Engineering, Inc., P.C.

M/E Engineering, P.C.

Bennett Contracting, Inc.

MLB Construction Services LLC

Ajay Glass & Mirror Co., Inc.

All State Construction, Inc.

Piazza Brothers, Inc.

Page 867 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

535 8th Avenue Suite 21 S

358 West Jefferson Street Suite 300

24 Taylor Avenue P.O. Box 420

217 North Aurora Street

2217 Central Avenue

Suite 180 1720 Spillman Drive

609 Erie Blvd West

14 Walkup Cutoff Road P.O. Box 733

3407 torrey Road

1A Pine West Plaza

300 Trolley Boulevard

693 South Pearl Street

One Stone Break Road

101 North Street

449 Cooke Street P. O. Box 805

3 West Stevens Avenue

Page 868 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10018 USA

Syracuse NY 13204 USA

Bethel CT 6801 USA

Ithaca NY 14850 USA

Schenectady NY 12304 USA

Bethlehem PA 18015 USA

Syracuse NY 13204 USA

Lake George NY 12845 USA

Flint MI 48507 USA

Albany NY 12205 USA

Rochester NY 14606 USA

Albany NY 12202 USA

Malta NY 12020 USA

Canandaigua NY 14424 USA

Farmington CT 6032 USA

Hawthorne NY 10532 USA

Page 869 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.657978)

POINT (-73.99224340.753883)

749 741 2095

POINT (-76.15821943.047105)

687 711 2132

POINT (-73.41440541.367008)

1040

POINT (-76.49572242.44107)

709 1786 2181

POINT (-73.88458942.763066)

834 73 2030

POINT (-76.16437343.049141)

687 713 2132

POINT (-73.64807743.386894)

818 128 2183

POINT (-83.73256442.976697)

438

POINT (-73.86458842.710592)

814 42 2030

POINT (-77.68189143.171416)

549 1664 2093

POINT (-73.76639742.629208)

814 39 2030

POINT (-77.29826942.902988)

780 178 2133

POINT (-72.84438341.693111)

1041

Page 870 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

31X228 T005368

23X202 T005449

12X342 T005790

36X128 T005842

061030 T006407

03X421 T005624

28X423 T005450

20X7A6 T005632

411008 T006361

14XA98 T005805

09X313 T005541

03X350 T005171

07XA51 T005577

02X336 T005177

111038 T006366

251026 D006648

141095 T006369

101003 T006108

Page 871 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Service Group Fuel Tanks- Site Work Closed

DESIGN: Information Technology Infrastructure Upgrades, Ph I Closed

CONSTR: Rehab HVAC Knowles and Lehman Dining Closed

DESIGN: mechanical systems upgrade ph 2 Active

DESIGN: Renovate Milne Library Active

DESIGN: Commissioning for Caudell Hall Restoration Closed

DESIGN: Reconstruct Pump House South Campus Closed

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Renovate 7th floor for Clinical Operations Active

CONSTR: Replace Roof BSB Closed

CONSTR: Rehabilitate Fine Arts Building, Phase II Closed

DESIGN: Academic Quad/Bulger Plaza Renovations Closed

DESIGN: Site Improvements - Parking & East/West Drives Closed

DESIGN: Exterior Building Shell Work - Drake Library (55) & Tuttle North (53) Closed

DESIGN: Replace Catch Basins Active

CONSTR: Renovate Farnsworth Hall Active

DESIGN: Study R-22 Units for Replace/Upgrade UHB Closed

DESIGN: Lee Hall - Window and Door Replacement for Critical Maintenance Closed

Page 872 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 873 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/11/2008 11/25/2016 92147.33

02/11/2009 02/01/2014 290052.03

02/16/2011 10/15/2013 1542245.00

06/18/2012 12/31/2017 235000.00

11/13/2020 10/15/2027 1142600.00

06/29/2012 10/31/2018 98388.25

02/11/2009 02/01/2014 564537.33

12/18/2009 12/09/2015 503012.00

05/11/2018 09/27/2025 886443.00

02/14/2011 02/27/2013 1448740.00

06/16/2009 08/06/2011 4558829.00

09/01/2006 05/04/2012 730195.39

07/09/2010 02/03/2018 138406.65

10/17/2006 12/31/2013 483096.11

09/18/2019 12/29/2025 93706.98

05/26/2021 06/09/2025 23756000.00

09/21/2020 04/19/2026 103004.93

06/11/2015 08/18/2021 264280.10

Page 874 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5450.00 92147.33 0.00

181.76 290052.03 0.00

35037.00 1542245.00 0.00

0.00 169227.77 65772.23

0.00 105740.00 1036860.00

4677.89 98388.25 0.00

90144.03 564537.33 0.00

307447.00 503012.00 0.00

0.00 438060.36 448382.64

78347.00 1448740.00 0.00

0.00 4558829.00 0.00

433.13 730195.39 0.00

28808.02 138406.65 0.00

3370.09 483096.11 0.00

0.00 67685.25 26021.73

0.00 1697320.00 22058680.00

0.00 103004.93 0.00

0.00 264280.10 0.00

Page 875 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

7 N 1

6 N 0

0 N 0

30 N 8

0 N 0

13 N 1

0 N 0

0 N 0

18 N 2

4 N 0

5 N 0

0 N 0

5 N 0

0 N 0

3 N 0

0 N 0

0 N 0

Page 876 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lizardos Engineering Associates P.C.

SEI Design Group

Burns Brothers Contractors, Inc.

Delta Engineers, Archs & Land Survs, DPC

Buffalo Construction Consultants, Inc.

Bergmann Associates, Inc.

Nussbaumer & Clarke, Inc.

Sorensen Gross Construction Services

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Dimitri Enterprises, Inc.

Spoleta Construction, LLC

Watts Architecture & Engineering, P.C.

C & S Engineers, Inc.

Klepper Hahn & Hyatt Engrs & Landscape Arch,PC

Mc Farland-Johnson, Inc.

LeChase Construction Services LLC

RMF Engineering, Inc., P.C.

Architecture +

Page 877 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

200 Old Country Road Suite 670

Suite 205 187 Wolf Road

7504 Us Hwy 11

860 Hooper Road

6000 N. Bailey, Suilte 2D

28 East Main Street 200 First Federal Plaza

Suite 500 3556 Lake Shore Road

3407 torrey Road

307 Seventh Avenue Suite 1501

2nd Floor 135 58th Street

7 Van Auker Street

Suite 300 95 Perry Street

499 Col. Eileen Collins Blvd.

5710 Commons Park Drive

49 Court St, Metrocenter

Suite 303 31 Lewis Street

1A Pine West Plaza

297 River Street

Page 878 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Mineola NY 11501 USA

Albany NY 12205 USA

Potsdam NY 13676 USA

Endwell NY 13760 USA

Buffalo NY 14226 USA

Rochester NY 14614 USA

Buffalo NY 14219 USA

Flint MI 48507 USA

New York NY 10001 USA

Brooklyn NY 11220 USA

Rochester NY 14608 USA

Buffalo NY 14203 USA

Syracuse NY 13212 USA

East Syracuse NY 13057 USA

Binghamton NY 13902 USA

Binghamton NY 13901 USA

Albany NY 12205 USA

Troy NY 12180 USA

Page 879 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.63875140.739038)

62 1265 2094

POINT (-75.02627544.665789)

312 1597 2140

POINT (-76.0306842.12898)

938 388 2033

POINT (-77.61117743.156034)

537 1673 2093

POINT (-83.73256442.976697)

438

POINT (-73.99353640.746986)

749 717 2095

POINT (-77.62202343.152242)

537 1666 2093

POINT (-76.13224343.113906)

690 730 2132

POINT (-76.05413643.049436)

702 426 2132

POINT (-75.91316742.098705)

968 475 2033

POINT (-73.86458842.710592)

814 42 2030

POINT (-73.690162 110 11 2138

Page 880 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

35X7A2 T005631

091028 T006102

081018 D006620

12X357 T006175

221001 T006239

05X333 T005898

02X344 T006035

24X280 T005908

14XB40 D006560

13XD51 T005675

34X103 T005992

05X342 T005835

101009 T006099

08X467 T005376

131070 T006663

07XA25 T005886

15X468 T005413

Page 881 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: JOCs - Rochester Region Closed

DESIGN: Site Improvements & Safety Upgrades Hunt Union Parking - Water Lines & Bugbee rd Closed

CONSTR: Upgrade Lecture Center Mechanical System Active

CONSTR: Repalce Windows, Various Buildings Closed

CONSTR: Install Satellite Boilers Ph2 Closed

CONSTR: Electrical Distribution Upgrade Closed

CONSTR: Renovate Lathrop Hall Upgrades, Bldg. 07 Closed

CONSTR: Dairy Complex Infrastructure Improvement Closed

CONSTR: Replace HSEB Roof Active

DESIGN: Rehabilitation of Javits Lecture Hall Closed

CONSTR: Replace Roofs - Geneva/Barton Lab Closed

DESIGN: Exterior Rehab. - McEwen Hall Closed

DESIGN: Program Study - Laker Hall Closed

DESIGN: Replace Roofs - Various Buildings Closed

DESIGN: Rehabilitate Staller Center Mechanical, Electrical, and Plumbing Systems Active

CONSTR: Fire Alarm System Upgrades ph1 Closed

CONSTR: Rehab Labs For Cell Dev. Ph III Old Weiskotten Hall Closed

Page 882 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 883 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/18/2009 01/31/2018 292640.00

09/14/2017 07/10/2023 374145.27

03/02/2021 07/15/2023 1569199.00

07/29/2015 08/12/2017 1210009.00

04/11/2016 01/19/2018 1458168.00

12/08/2011 07/16/2014 3688175.00

09/26/2013 07/24/2016 11636026.00

01/26/2012 08/17/2013 1306013.00

05/13/2020 10/06/2022 3605000.00

07/16/2010 07/09/2015 1222707.82

08/09/2012 06/20/2014 783611.00

07/10/2014 05/05/2019 440000.00

02/18/2016 09/01/2019 74124.92

06/27/2008 02/06/2017 7299.05

08/05/2021 09/08/2026 2052400.00

11/17/2011 08/31/2013 1770081.00

07/25/2008 07/31/2011 5482510.00

Page 884 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

31963.00 292640.00 0.00

0.00 387132.39 -12987.12

0.00 385220.00 1183979.00

0.00 1210009.00 0.00

0.00 1458168.00 0.00

3288395.00 3688175.00 0.00

0.00 11636026.00 0.00

1256162.00 1306013.00 0.00

0.00 3058791.00 546209.00

341663.94 1222707.82 0.00

331661.00 783611.00 0.00

0.00 488395.92 -48395.92

0.00 74124.92 0.00

510.70 281299.05 -274000.00

0.00 0.00 2052400.00

711746.00 1770081.00 0.00

0.00 5482510.00 0.00

Page 885 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

3 N 0

7 N 0

4 N 0

7 N 0

11 N 0

12 N 1

4 N 0

45 N 2

5 N 0

0 N 0

0 Y 0

0 N 0

23 N 4

3 N 0

4 N 0

Page 886 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sorensen Gross Construction Services

Labella Associates, D.P.C

Bast Hatfield Construction LLC

Northland Associates, Incorporated

Monroe Piping & Sheet Metal, Inc.

O'Connell Electric Co.

Manning Squires Hennig Co. Inc

Bette & Cring, LLC

Alliance Tri-State Construction Inc

Beyer Blinder Belle Architects & Planners,LLP

Northeastern Insulation Co.Inc DBA J.L.Giambrone

Bell & Spina Architects-Planners, P.C.

JMZ Architects & Planners PC

San Fanandre Justin Architects P.C.

Mitchell/Giurgola Architects, LLP

Matco Electric Co., Inc.

PAC & Associates of Oswego, Inc.

Page 887 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3407 torrey Road

Suite 201 300 State Street

1399 Vischers Ferry Road

4701 Buckley Road P.O. Box 2549

68 Humboldt Street PO Box 90600

830 Phillips Road

8426 Seven Springs Road PO Box 685

22 Century Hill Drive

1409 Richmond Avenue

120 Broadway, 20th Floor

1240 Research Forest

Suite 201, The Bindery 215 Wyoming Street

190 Glen Street P. O. Box 725

2nd Floor 200 Sunrise Highway

Film Center Bldg, Ste 711 630 Ninth Avenue

3913 Gates Road

11-G Fourth Avenue

Page 888 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Flint MI 48507 USA

Rochester NY 14614 USA

Clifton Park NY 12065 USA

Liverpool NY 13220 USA

Rochester NY 14609 USA

Victor NY 14564 USA

Batavia NY 14020 USA

Latham NY 12110 USA

Staten Island NY 10314 USA

New York NY 10271 USA

Macedon NY 14502 USA

Syracuse NY 13204 USA

Glens Falls NY 12801 USA

Rockville Centre NY 11570 USA

New York NY 10036 USA

Vestal NY 13850 USA

Oswego NY 13126 USA

Page 889 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.73246)

POINT (-83.73256442.976697)

438

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-77.56669343.15503)

537 1668 2093

POINT (-77.45589942.99842)

799 413 2133

POINT (-78.13339143.006019)

792 489 2086

POINT (-73.75749142.771292)

834 1288 2030

POINT (-74.1577540.614002)

585 616 2139

POINT (-74.0109640.70865)

749 599 2095

POINT (-77.31898843.120048)

634 316 631

POINT (-73.6447743.309981)

824 783 2183

POINT (-75.97953842.107571)

937 466 2033

POINT (-76.530844 240 667 2135

Page 890 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X226 D005515

11X297 T005325

261027 T006568

031009 T006509

02X380 T005631

141031 T006438

30XA95 T006300

261002 T006194

10X349 T005366

29X396 T004949

301032 D006651

01XA47 T006244

081035 T006352

09X376 T005906

08X471 T005871

13XC81 T005331

Page 891 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: ADA Upgrades - Various Buildings Closed

DESIGN: Hudson Hall Rehab Ph II Closed

DESIGN: Rehabilitate Thompson Hall Active

CONSTR: Reconstruct Central Heating Plant Active

CONSTR: JOCs - Rochester Region Closed

DESIGN: Rehab Mechanical Systems- Isolation & Operating Rooms UHB Active

CONSTR: Replace Fire Alarms, Biomedical Education Building North Campus Closed

DESIGN: Rehabilitate Roosevelt Hall Ph. 1 Active

DESIGN: Roof Replacments at Culkin & Penfield Closed

DESIGN: Re-roof Social Science Building #55 Closed

CONSTR: Rehabilitate Elevators in Various Buildings - Alumni, Capen, Furnas, NSC, BEB Active

CONSTR: Renovate Health Center Parking Management Trailer Closed

DESIGN: Masonry Restoration, Various Buildings, Phase 1 Closed

CONSTR: Replace Roof - Fine Arts - College at Oneonta Closed

DESIGN: Construction Manager- Library Renovation Sojourner Truth Library Closed

DESIGN: Waste Water Treatment System Southampton Closed

Page 892 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 893 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/27/2009 11/20/2010 976135.00

01/10/2008 07/31/2014 2278064.86

06/17/2020 10/30/2025 2045000.00

07/03/2019 08/28/2022 12065097.00

12/18/2009 01/31/2018 1000000.00

01/24/2020 10/20/2027 141812.00

01/13/2017 09/21/2018 1164133.00

12/08/2015 02/09/2026 3148100.00

10/20/2009 07/15/2013 296241.22

12/27/2007 12/31/2013 65392.36

06/04/2021 01/18/2024 2316300.00

04/29/2016 02/01/2019 921220.00

06/07/2018 11/01/2026 13963.50

01/26/2012 08/10/2013 715154.00

05/10/2012 07/30/2021 171266.54

02/11/2008 11/25/2016 540417.89

Page 894 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 976135.00 0.00

257325.24 2278064.86 0.00

0.00 92033.61 1952966.39

0.00 10783392.00 1281705.00

0.00 1000000.00 0.00

0.00 4115.00 137697.00

0.00 1164133.00 0.00

0.00 1617208.27 1530891.73

69918.36 296241.22 0.00

0.00 65392.36 0.00

0.00 100269.00 2216031.00

0.00 921220.00 0.00

0.00 13963.50 0.00

677489.00 715154.00 0.00

198281.94 171266.54 0.00

0.00 540417.89 0.00

Page 895 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

5 Y 1

47 N 11

1 N 0

0 N 0

0 N 0

4 N 1

27 N 2

0 N 0

0 N 0

1 N 0

3 N 0

0 N 0

8 N 2

0 N 0

5 N 0

Page 896 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Neagley & Chase Construction Co.

Envision Architects, D.P.C.

Francis Cauffman, Inc.

D.V. Brown & Associates, Inc.

Sorensen Gross Construction Services

Genesys Engineering, P.C.

CIR Electrical Construction Corp.

Plan A Architecture & Design PLLC

Architecteam Schleicher-Soper

Hoffmann Architects, Inc.

Bison Elevator Service, Inc.

AOW Associates, Inc.

Bell & Spina Architects-Planners, P.C.

RSI Roofing, Inc.

Hill International, Inc

H2M Archs, Engs, Land Surveying & Landscape

Page 897 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 105 1150 Airport Drive

52 James Street

40 Worth Street Suite 300

567 Vickers Street

3407 torrey Road

38 Maiden Lane

400 Ingham Avenue

1 Little West 12th Street

614 James Street

462 Seventh Avenue

295 Main Street Suite 932

30 Essex Street

Suite 201, The Bindery 215 Wyoming Street

44 County Route 9

Suite 3415 One Penn Plaza

538 Broad Hollow Road 4th Floor East

Page 898 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

South Burlington VT 5403 USA

Albany NY 12207 USA

New York NY 10013 USA

Tonawanda NY 14150 USA

Flint MI 48507 USA

Kingston NY 12401 USA

Buffalo NY 14218 USA

New York NY 10014 USA

Syracuse NY 13203 USA

New York NY 10018 USA

Buffalo NY 14203 USA

Albany NY 12206 USA

Syracuse NY 13204 USA

Gouverneur NY 13642 USA

New York NY 10119 USA

Melville NY 11747 USA

Page 899 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.451426)

POINT (-73.75023942.651717)

814 44 2030

POINT (-74.0067140.717277)

749 737 2095

POINT (-78.85471943.01223)

280 8 2041

POINT (-83.73256442.976697)

438

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.8406942.816118)

287 107 2041

POINT (-74.0063340.739613)

749 738 2095

POINT (-76.1438743.054619)

687 712 2132

POINT (-73.99000240.751854)

749 741 2095

POINT (-78.87550642.882195)

300 34 2041

POINT (-73.77972242.677542)

814 43 2030

POINT (-75.53317744.260521)

311 1525 2140

POINT (-73.42240340.772002)

1020 1122 2179

Page 900 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X413 T005924

08X7A2 T005395

11X330 T005891

09X363 T005876

251030 T006372

01XA58 T005617

26X295 T005719

09X308 T005956

351000 T006245

13XD74 T006070

04X342 T005923

011032 T006556

141076 T006553

121013 T006438

09X373 T005612

04X330 T005315

Page 901 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehabilitate Exterior Dining Hall Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Renovate Beaumont Hall Closed

CONSTR: Replace HVAC Equipment & Domestic Hot Water Heaters - Hulbert Dining Hall Closed

DESIGN: Construct Artificial Turf Field Active

DESIGN: Rehabilitate Water Tower and Fountains Closed

DESIGN: New Day Care Center Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Rehab/Reconstruct Outdoor Kiln Facility Closed

CONSTR: Replacement of Electric Trans Feeders Closed

CONSTR: Campus Wide Electric Distribution Ph I Closed

CONSTR: Renovate Building 35 for Liberal Arts & Social Sciences Active

DESIGN: Facilities Master Plan Active

DESIGN: Construct Addition, Renovate Bishop Hall., Bldg. No. 009C Active

DESIGN: Commissioning - Rehab. Health Center Closed

CONSTR: New School of Education w/ Integrated Child Care Center Closed

Page 902 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 903 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/14/2012 12/31/2013 2682448.00

04/15/2008 09/30/2014 6443.00

02/09/2012 02/15/2017 961370.98

10/13/2011 08/17/2013 2121595.00

12/07/2018 04/28/2029 319000.00

02/04/2010 01/24/2016 1763850.16

09/23/2010 09/14/2015 702139.50

04/18/2012 11/20/2018 54176.00

04/29/2016 11/05/2017 864998.00

03/27/2014 10/07/2018 18706097.00

02/03/2012 01/16/2014 3321217.00

04/17/2020 12/06/2022 9044919.00

02/17/2021 08/19/2022 1107692.00

10/29/2019 10/20/2027 89918.40

02/24/2012 04/13/2017 24746.08

09/26/2007 08/03/2010 13396259.00

Page 904 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2457619.00 2682448.00 0.00

0.00 6443.00 0.00

522044.04 961370.98 0.00

1922848.00 2121595.00 0.00

0.00 172342.10 146657.90

498445.92 1763850.16 0.00

117482.30 702139.50 0.00

0.00 75208.00 -21032.00

0.00 864998.00 0.00

0.00 18706097.00 0.00

3049069.00 3321217.00 0.00

0.00 8249418.00 795501.00

0.00 196633.80 911058.20

0.00 39795.54 50122.86

1399.38 24746.08 0.00

0.00 13396259.00 0.00

Page 905 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28 N 1

0 Y 0

36 Y 3

3 N 0

0 N 0

6 N 0

48 N 6

0 Y 0

5 N 0

6 N 0

10 N 0

5 N 1

15 N 1

14 N 2

0 N 0

8 N 0

Page 906 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Caladri Development Corp

Cutting Edge Group, LLC

JMZ Architects & Planners PC

J & K Plumbing & Heating Co, Inc.

C & S Engineers, Inc.

Mach Architecture, P.C.

D. W. Arthur Associates Architecture, Inc., P.C.

Cutting Edge Group, LLC

Frank J. Marianacci, Inc.

Elecnor Hawkeye LLC

Mohawk Valley Utility Construction Corp.

AOW Associates, Inc.

Francis Cauffman, Inc.

Genesys Engineering, P.C.

Genesys Engineering, P.C.

Fahs Construction Group Inc.

Page 907 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1223 Park Street

14 Walkup Cutoff Road P.O. Box 733

190 Glen Street P. O. Box 725

24 Thorp St PO Box 25 Westview Stat

499 Col. Eileen Collins Blvd.

2000 Sheridan Drive

46 Plympton Street

14 Walkup Cutoff Road P.O. Box 733

6905 Route 5 & 20

100 Marcus Blvd. Ste 1

1 Prospect Avenue

30 Essex Street

40 Worth Street Suite 300

38 Maiden Lane

38 Maiden Lane

2224 Pierce Creek Road

Page 908 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Peekskill NY 10566 USA

Lake George NY 12845 USA

Glens Falls NY 12801 USA

Binghamton NY 13905 USA

Syracuse NY 13212 USA

Tonawanda NY 14223 USA

Boston MA 2118 USA

Lake George NY 12845 USA

Bloomfield NY 14469 USA

Hauppauge NY 11788 USA

Albany NY 12206 USA

Albany NY 12206 USA

New York NY 10013 USA

Kingston NY 12401 USA

Kingston NY 12401 USA

Binghamton NY 13903 USA

Page 909 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.91395341.290876)

956 1334 2185

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.6447743.309981)

824 783 2183

POINT (-75.92500542.103463)

968 479 2033

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.85968342.980965)

278 158 2041

POINT (-71.0679442.338762)

1918

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.4107942.884786)

811 239 2133

POINT (-73.24703240.811046)

1014 1428 2179

POINT (-73.77261842.673362)

814 43 2030

POINT (-73.77972242.677542)

814 43 2030

POINT (-74.0067140.717277)

749 737 2095

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.01451641.931949)

425 79 2182

POINT (-75.88027242.08193)

967 477 2033

Page 910 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

271001 T006105

151071 T006513

17X090 T005209

02X383 T005771

36X817 T005855

29X369 T005358

231032 D006608

09X375 T005959

12X265 T004926

06X828 T005567

13X7A4 T005402

01XA95 T006342

26X273 T005145

41X056 T006180

36X106 T005384

26X302 T005990

05X267 T006495

Page 911 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade Ventilation to Iceplex Bldg 105 Closed

DESIGN: Fire Suppression - UH (02) & UUH at CG (30) Active

DESIGN: Construction Management Services For MVRN Replacement Closed

CONSTR: Replace Roof - Metro Center Closed

DESIGN: Update Development Study Closed

CONSTR: Foundation WP/Drainage Repair Various Buildings Closed

CONSTR: Replace Switchgear and Electrical Panels - Wicks and MacArthur Halls Active

DESIGN: Rehab Athletic Fields Closed

DESIGN: Exterior Masonry Repairs - Campus Wide Closed

DESIGN: Facilities Master Plan - Geneseo Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Renovate Former Albany HS Building - Phase II Closed

DESIGN: Rehab Hale Hall/Abate Asbestos Closed

CONSTR: Rehab Building Systems Mech Ph 1 Closed

DESIGN: Exterior Restoration - Plaza Building Closed

CONSTR: Rehabilitate Elevators, Various Building Closed

CONSTR: Houghton Hall 1st and 2nd Floor Fitout Active

Page 912 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 913 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/16/2015 09/12/2020 92157.47

08/27/2019 08/28/2024 1693000.00

01/17/2007 01/09/2013 2835940.33

01/29/2011 11/30/2012 774578.00

04/15/2014 08/19/2014 27456.47

02/14/2008 09/12/2009 2033939.00

01/15/2021 04/09/2023 840000.00

07/02/2012 07/03/2017 262646.51

01/20/2006 03/31/2011 118513.00

10/09/2009 04/05/2011 629003.12

06/02/2008 01/21/2014 367087.00

08/10/2017 11/05/2019 5328388.00

06/19/2006 08/28/2013 2290300.02

09/29/2015 05/06/2019 5455365.00

05/08/2008 04/30/2013 589011.86

07/19/2012 10/11/2016 3214988.00

04/03/2019 08/16/2022 16773170.00

Page 914 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 92157.47 0.00

0.00 288922.34 1404077.66

99477.22 2835940.33 0.00

0.00 774578.00 0.00

0.00 27456.47 0.00

0.00 2033939.00 0.00

0.00 67021.00 772979.00

74310.84 262646.51 0.00

0.00 118513.00 0.00

0.00 629003.12 0.00

150336.00 367087.00 0.00

0.00 5328388.00 0.00

0.00 2290300.02 0.00

0.00 5455365.00 0.00

20329.99 589011.86 0.00

0.00 3214988.00 0.00

0.00 15942596.00 830574.00

Page 915 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

5 N 3

5 N 0

8 N 0

0 N 0

9 N 0

4 N 1

15 N 1

0 Y 0

34 Y 2

0 N 0

3 N 0

5 Y 1

10 N 1

5 N 0

3 N 0

0 N 0

Page 916 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Hunt Engineers, Archs., & Landsurveyors, PC

M/E Engineering, P.C.

LeChase Construction Services, LLC

Elmer W. Davis,Inc.

Perkins & Will Architects P.C.

MPCC Corp.

Dow Electric, Inc.

HMH Site & Sports Design

Joy McCoola & Zilch Architects & Planners, PC

JMZ Architects & Planners PC

JEMCO Electrical Contractors, Inc.

Bunkoff General Contractors, Inc.

David Smotrich & Partners Architects/Planners

C.D.E. Air Conditioning Company, Inc.

Simpson Gumpertz & Heger Inc. Consulting Engineers

Lipsky Entreprises, Inc.

Savarino Companies LLC

Page 917 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Airport Corporate Park 100 Hunt Center

Suite 320 60 Lakefront Boulevard

205 Indigo Creek Drive

1217 Clifford Avenue

4th Floor 215 Park Avenue South

81 Rockdale Avenue

3874 State Route 11

330 East State Street Second Floor

190 Glen Street P.O. Box 725

190 Glen Street P. O. Box 725

271 42nd Street

790 Watervliet Shaker Rd.

Suite 704 443 Park Avenue South

321 39th Street

Building #1, Suite 500 41 Seyon Street

814 Montauk Highway

500 Seneca Street

Page 918 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Horseheads NY 14845 USA

Buffalo NY 14202 USA

Rochester NY 14626 USA

Rochester NY 14621 USA

New York NY 10003 USA

New Rochelle NY 10801 USA

Malone NY 12953 USA

Ithaca NY 14850 USA

Glens Falls NY 12801 USA

Glens Falls NY 12801 USA

Brooklyn NY 11433 USA

Latham NY 12110 USA

New York NY 10016 USA

Brooklyn NY 11232 USA

Waltham MA 2453 USA

Bayport NY 11705 USA

Buffalo NY 14204 USA

Page 919 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.69216343.184897)

548 1685 2093

POINT (-77.5906543.175451)

537 1663 2093

POINT (-73.79305740.905212)

960 1450 2185

POINT (-74.26781944.853703)

182 278 621

POINT (-76.49445442.439519)

709 1786 2181

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.7967442.739147)

834 1288 2030

POINT (-74.00764140.653512)

894 815 2090

POINT (-73.0517540.746999)

1019 1066 2179

POINT (-78.8572442.877333)

300 61 2041

Page 920 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

27X255 T005838

32X468 T006037

12X830 T006112

20X152 T006032

09X423 T006220

22X224 T005554

801803 T006372

29X441 T006181

29X401 T005864

20X205 T005780

25X290 T006078

06X7A3 T005631

19X141 T005208

24X822 T005668

801801 T006359

03X439 T006098

14X492 T005659

Page 921 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate Electrical Feeder & Distribution System Closed

CONSTR: Early Site Package Closed

DESIGN: Crane Music Complex - Master Plan Implementaion Study Active

CONSTR: Upgrade Emergency Generator - Illick Hall Closed

CONSTR: Upgrade Mechanical Systems Morris Hall Closed

DESIGN: Student Leadership Center - Phase 2 Closed

DESIGN: Site Infrastructure, Civil Engineering & Surveying Services - C&S Engineers - Master Term Agreement Active

CONSTR: Rehabilitate Exteriors - Various Buildings Closed

DESIGN: Construction Management Services Renovation of Humanities Building 41 Closed

CONSTR: Gateway Building Closed

CONSTR: Replace Site Infrastructure PH II Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Construction Management Services for Waste Management Closed

DESIGN: SUNY COBLESKILL FACILITIES MASTER PLAN Closed

DESIGN: Architectural Services - Lothrop Associates - Master Term Agreement Active

DESIGN: Selective Demo & Asbestos Abatement Buckham B & A Wings Closed

DESIGN: Construction Mananger Services for DLAR Closed

Page 922 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 923 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/10/2014 12/15/2015 256926.46

11/19/2013 08/28/2015 4192600.00

10/22/2014 11/11/2016 640000.00

10/09/2013 06/26/2015 727496.00

01/12/2016 09/15/2017 1155930.00

09/03/2009 08/31/2016 2307785.96

09/14/2017 04/28/2029 5000000.00

09/24/2015 12/09/2018 3359121.00

10/14/2011 10/19/2016 1653600.80

02/07/2011 06/05/2017 18255709.00

06/13/2014 02/27/2016 1552661.00

12/18/2009 01/31/2018 91900.00

01/31/2007 05/26/2013 589158.09

07/22/2010 01/14/2012 488711.99

09/14/2017 12/02/2025 5000000.00

01/27/2015 11/03/2021 278513.25

07/13/2010 07/11/2015 1613911.25

Page 924 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 256926.46 0.00

0.00 4192600.00 0.00

0.00 286817.96 353182.04

0.00 727496.00 0.00

0.00 1155930.00 0.00

317034.29 2307785.96 0.00

0.00 0.00 5000000.00

0.00 3359121.00 0.00

273287.17 1653600.80 0.00

7791068.00 18255709.00 0.00

0.00 1552661.00 0.00

0.00 91900.00 0.00

55495.20 589158.09 0.00

0.00 488711.99 0.00

0.00 0.00 5000000.00

0.00 278513.25 0.00

378966.28 1613911.25 0.00

Page 925 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

5 Y 1

25 N 1

5 N 1

3 Y 1

65 N 1

29 N 6

5 N 0

24 N 1

6 N 0

3 N 0

0 N 0

3 N 0

21 N 2

86 N 19

0 N 0

14 N 1

Page 926 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

McFarland-Johnson, Inc.

G & M Earth Moving, Inc.

Cannon Design Arch & Engineering

Beken Contracting Services LLC

Wilkins Mechanical, Inc.

William Rawn Associates, Architects, Inc.

C & S Engineers, Inc.

Niram, Inc.

Pavarini McGovern LLC

Murnane Building Contractors, Inc.

Vacri Construction Corp.

Sorensen Gross Construction Services

C & S Design Build, Inc.

Perkins Eastman Architects, P.C.

Lothrop Associates LLP Architects

Kideney Architects, P.C.

URS Corporation - New York

Page 927 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

49 Court Street Metrocenter

345 Ellsworth Street

360 Madison Avenue 11th Floor

725 Erie Boulevard West

6923 Herman Road

Suite 1010 10 Post Office Square

499 Col. Eileen Collins Blvd.

4 E. Frederick Place

10th Floor 770 Broadway

6728 Myers Road

One Brick Avenue

3407 torrey Road

499 Col. E. Collins Blvd.

115 Fifth Avenue - 3rd Fl

333 Westchester Avenue

143 Genesee Street

Suite 610 One Penn Plaza

Page 928 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Binghamton NY 13901 USA

Holbrook NY 11741 USA

New York NY 10017 USA

Syracuse NY 13204 USA

Syracuse NY 13209 USA

Boston MA 2109 USA

Syracuse NY 13212 USA

Cedar Knolls NJ 7927 USA

New York NY 10003 USA

East Syracuse NY 13057 USA

Binghamton NY 13901 USA

Flint MI 48507 USA

Syracuse NY 13212 USA

New York NY 10003 USA

White Plains NY 10604 USA

Buffalo NY 14203 USA

New York NY 10119 USA

Page 929 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.91316742.098705)

968 475 2033

POINT (-73.07528340.776914)

1019 1119 2179

POINT (-73.97774740.754913)

749 740 2095

POINT (-76.16870643.048192)

687 713 2132

POINT (-76.29077843.104591)

685 700 2132

POINT (-76.13224343.113906)

690 730 2132

POINT (-74.4514640.811234)

2492

POINT (-76.05633543.093042)

702 426 2132

POINT (-83.73256442.976697)

438

POINT (-73.991540.738916)

749 719 2095

POINT (-73.74502841.030178)

949 1437 2185

POINT (-78.86903142.890071)

300 34 2041

Page 930 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

051011 T006101

13XB69 T005650

291026 T006511

01XA49 T005605

141040 T006359

251015 T006460

01XA65 T005902

031027 T006538

09X344 T005355

39X145 T005563

29X835 T005221

35X124 T005341

291031 T006370

23X7A8 T005633

801802 T006362

30XA18 T005231

21X150 T004949

Page 931 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate Exterior - Reed Library Active

DESIGN: Commissioning for Old Chem Classroom Bld Active

DESIGN: Rehab HVAC - Visual Arts Building Active

DESIGN: Commissioning - Relocate University Data Center Closed

DESIGN: Renovate Interventional Areas/ Bi Plane Active

CONSTR: Upgrade Building Fire Alarms including Carbon Monoxide Detectors - Various Building Closed

CONSTR: Rehabiltate/Replace Stone & Masonry - Husted Hall Closed

CONSTR: Replace Turf and Track at Coyer Field Closed

DESIGN: Replace Cooling Tower/Transformer - Lee Hall Closed

CONSTR: Field House Closed

DESIGN: Campus Wide Space Program Study Closed

DESIGN: Heat Recovery - Phase II, Binns Merrill Hall Closed

DESIGN: Site Improvements for ADA Accessibility Ph1 Active

CONSTR: JOCs - Plattsburg Region - General State Closed

DESIGN: Engineering Services - C&S Engineers - Master Term Agreement Active

DESIGN: Replace Fire Alarm Systems - Various Buildings Closed

DESIGN: Replace Roof Vander Clute Hall - Bldg 40 Closed

Page 932 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 933 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/24/2017 10/10/2023 463500.00

04/05/2010 03/26/2015 79093.56

07/16/2019 08/28/2024 3742374.08

01/21/2010 07/31/2015 331996.66

08/28/2018 12/02/2025 565119.23

09/18/2018 04/15/2021 912337.00

12/15/2011 11/01/2013 1141042.00

01/27/2020 09/09/2021 1497248.00

02/27/2009 06/12/2020 75426.09

08/25/2009 08/24/2013 15374660.00

02/12/2007 10/31/2008 312324.46

11/10/2010 04/01/2014 264852.61

11/21/2017 10/19/2026 754135.00

12/18/2009 12/08/2015 2279579.00

07/26/2017 01/24/2026 5000000.00

03/01/2007 11/17/2012 203459.19

07/14/2005 12/31/2013 107829.61

Page 934 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 373828.84 89671.16

10665.58 71783.35 7310.21

0.00 1398278.45 2344095.63

124408.77 331996.66 0.00

0.00 284023.32 281095.91

0.00 912337.00 0.00

654640.00 1141042.00 0.00

0.00 1497248.00 0.00

0.00 75426.09 0.00

197815.00 15374660.00 0.00

0.00 312324.46 0.00

85620.75 264852.61 0.00

0.00 668265.52 85869.48

1930060.30 2211811.30 67767.70

0.00 0.00 5000000.00

0.00 198399.19 5060.00

0.00 107829.61 0.00

Page 935 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

15 N 0

23 N 6

16 N 0

0 N 0

1 N 0

9 N 1

3 N 0

0 N 0

15 N 0

5 N 0

0 N 0

0 N 0

0 N 0

62 N 10

5 N 1

0 N 0

Page 936 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

Horizon Engineering Associates, LLP

Lizardos Engineering Associates P.C.

Cosentini Associates

Lothrop Associates LLP Architects

Nelcorp Electrical Contracting Corporation

Western Building Restoration Co., Inc.

Occhino Corp

C & S Engineers, Inc.

Northeast Construction Services, Inc.

Perkins Eastman Architects, P.C.

Wendel Duchscherer Arch. & Engs., P.C.

M.J. Engineering and Land Surveying, P.C.

Sorensen Gross Construction Services

C & S Engineers, Inc.

Labella Associates, D.P.C

Hoffmann Architects, Inc.

Page 937 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

Suite 201 50 Karl Avenue

200 Old Country Road Suite 670

Two Pennsylvania Plaza

333 Westchester Avenue

35 North Kelly Avenue

50 Yardboro Avenue

2650 Seneca Street

499 Col. Eileen Collins Blvd.

609 Erie Boulevard West

115 Fifth Avenue - 3rd Fl

Suite 201 140 James Audubon Pkwy

1533 Crescent Road

3407 torrey Road

499 Col. Eileen Collins Blvd.

Suite 201 300 State Street

462 Seventh Avenue

Page 938 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Smithtown NY 11787 USA

Mineola NY 11501 USA

New York NY 10121 USA

White Plains NY 10604 USA

Endwell NY 13760 USA

Albany NY 12205 USA

West Seneca NY 14224 USA

Syracuse NY 13212 USA

Syracuse NY 13204 USA

New York NY 10003 USA

Amherst NY 14228 USA

Clifton Park NY 12065 USA

Flint MI 48507 USA

Syracuse NY 13212 USA

Rochester NY 14614 USA

New York NY 10018 USA

Page 939 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.63875140.739038)

62 1265 2094

POINT (-73.74502841.030178)

949 1437 2185

POINT (-76.02526642.109078)

938 388 2033

POINT (-73.8017642.688152)

814 42 2030

POINT (-78.79452842.844651)

276 159 2041

POINT (-76.13224343.113906)

690 730 2132

POINT (-76.16437343.049141)

687 713 2132

POINT (-73.991540.738916)

749 719 2095

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-83.73256442.976697)

438

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.99000240.751854)

749 741 2095

Page 940 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24X223 D005290

271058 T006582

02X7A6 T005631

111016 T006443

031003 T006274

05X287 T005383

15X483 T004946

15X482 T006115

07X846 T005931

011032 T006404

141011 T006100

08X7B1 T005395

061021 T006475

09X382 T006120

07XA84 T006196

311005 T006106

11X303 T005628

Page 941 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Water Tank / Water System Rehab Campus Wide Closed

DESIGN: Demolish Structure - 908-912 Montgomery Street, Syracuse NY Active

CONSTR: JOCs - Rochester Region Closed

CONSTR: Replace Roof Sibley Hall Closed

CONSTR: Renovate B-Wing at Buckham Hall Closed

CONSTR: Campus Wide Satellite Boilers Closed

DESIGN: Electric Service/Pad Upgrade Suspended

CONSTR: Complete Chilled Water Loop Weiskotten Addition 15A80 Closed

DESIGN: Harpur Science Prog Study Closed

DESIGN: Renovate Building 35 for Liberal Arts & Social Sciences Active

DESIGN: Renovate Pharmacy UHB Basement Terminated

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Replace Roof at Welles Hall Active

CONSTR: Replace Windows - Hulbert Hall Closed

CONSTR: Construct School of Pharmacy Site Demolition Closed

DESIGN: Replace Road Salt Sand Shed (SUCF) Closed

CONSTR: Replace Low Pressure Steam with Direct Bury HTW Closed

Page 942 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 943 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/30/2007 12/31/2010 916962.00

07/21/2021 09/14/2023 190000.00

12/18/2009 01/31/2018 733693.00

06/11/2018 05/06/2020 3163694.00

08/23/2016 05/03/2018 3549657.00

03/24/2008 10/02/2010 5825417.00

02/05/2007 04/29/2011 167255.70

12/09/2014 03/31/2016 941178.00

03/20/2012 03/20/2017 215828.13

03/09/2018 03/27/2023 1254740.83

04/13/2016 02/05/2024 270365.48

04/15/2008 09/30/2014 63427.00

02/01/2019 10/26/2021 1965874.00

01/05/2015 08/07/2016 658985.00

11/25/2015 05/02/2017 136813.00

01/12/2016 02/09/2022 51117.16

01/21/2010 10/01/2011 2169889.00

Page 944 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 916962.00 0.00

0.00 0.00 190000.00

0.00 733693.00 0.00

0.00 3163694.00 0.00

0.00 3549657.00 0.00

70078.00 5825417.00 0.00

0.00 167255.70 0.00

0.00 941178.00 0.00

149044.30 215828.13 0.00

0.00 1130309.92 124430.91

0.00 270365.48 0.00

0.00 63427.00 0.00

0.00 1955124.00 10750.00

0.00 658985.00 0.00

0.00 136813.00 0.00

0.00 51117.16 0.00

0.00 2169889.00 0.00

Page 945 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2 N 1

0 Y 0

0 N 0

3 Y 1

10 N 0

4 N 0

0 N 0

6 N 1

27 N 2

29 Y 3

0 N 0

0 Y 0

2 N 0

3 N 0

9 N 2

0 N 0

8 N 0

Page 946 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Blue Heron Construction Co.

Foit-Albert Associates, Arch, Engring & Survey,PC

Sorensen Gross Construction Services

Titan Roofing Inc

Rodems Construction Corp.

MLP Plumbing & Mechanical, Inc.

Mc Farland-Johnson, Inc.

Edward Joy Company

Ellenzweig Architects of New York, P.C.

JMZ Architects & Planners PC

Peter Gisolfi Associates

Cutting Edge Group, LLC

New Britain Roof Co. , Inc.

Forno Enterprises, Inc.

Regional Environmental Demolition, Inc.

Hoffmann Architects, Inc.

K & L Plumbing & Heating, Inc.

Page 947 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

9289 Bonta Bridge Road

295 Main Street Suite 200

3407 torrey Road

200 Tapley Street

3555 North Buffalo Road

Suite 300 3198 Union Road

49 Court St, Metrocenter

903 Canal Street P.O. Box 8079

10th Floor 105 Madison Avenue

190 Glen Street P. O. Box 725

566 Warburton Avenue

14 Walkup Cutoff Road P.O. Box 733

721 Fox Street

9330 County Highway 27

6281 Wendt Dr.

462 Seventh Avenue

7 Kaycee Loop Road

Page 948 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Jordan NY 13080 USA

Buffalo NY 14203 USA

Flint MI 48507 USA

Springfield MA 1104 USA

Orchard Park NY 14127 USA

Cheektowaga NY 14227 USA

Binghamton NY 13902 USA

Syracuse NY 13217 USA

New York NY 10016 USA

Glens Falls NY 12801 USA

Hastings-On-Hudson NY 10706 USA

Lake George NY 12845 USA

Horseheads NY 14845 USA

Trout Creek NY 13847 USA

Niagara Falls NY 14304 USA

New York NY 10018 USA

Plattsburgh NY 12901 USA

Page 949 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.51279243.067785)

85 631 618

POINT (-78.87550642.882195)

300 34 2041

POINT (-83.73256442.976697)

438

POINT (-72.56074442.126589)

1913

POINT (-78.75002942.787061)

282 956 2041

POINT (-75.91316742.098705)

968 475 2033

POINT (-76.12625143.051235)

687 728 2132

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.8821840.995664)

974 1445 2185

POINT (-73.64807743.386894)

818 128 2183

POINT (-76.8342542.157867)

478 1783 2036

POINT (-75.28398842.21367)

562 457 2039

POINT (-78.93506643.119889)

132 168 2131

POINT (-73.99000240.751854)

749 741 2095

POINT (-73.502892 3 202 2038

Page 950 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X7A4 T005402

20X204 T005551

201001 T006254

07XA27 T005775

02X352 T005911

35X108 T005393

41X032 T005167

21X197 T005774

30XA81 T005525

29X409 T005749

05X325 T005572

31X226 T005798

14X132 D004207

07XA39 T005348

08X498 T006109

281009 T006437

25X292 T005365

Page 951 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Upgrade/Rehab Elevators - Various Bldgs Closed

CONSTR: Marshall Hall - Repair Gutter, Roofing and Masonry Closed

CONSTR: Central Campus Quad - Site Rehab Closed

CONSTR: Site Infrastructure Improvements - East Campus Closed

CONSTR: Abate Asbestos/Modify HVAC - 2nd Floor Harder Hall Closed

DESIGN: Rehabilitate Elevators - College Of Opt Closed

CONSTR: New Academic Building Closed

DESIGN: ADA Improvements - Phase II Assigned to Vendor

DESIGN: HVAC Renovations - Dance Building Active

DESIGN: Williams Center Rehabilitation Closed

CONSTR: Replace Campus Center Envelope- Bldgs 51 & 56 Closed

CONSTR: Rehabilitation Of Basic Science Building Phase II Closed

DESIGN: HVAC Rehab IRQ/Tusc Closed

DESIGN: Rebuild Generator #3 - Central Heating Plant Closed

DESIGN: Renovate Foster Hall Active

DESIGN: Masonry & Mechanical Improvements - Kunsela Hall Closed

Page 952 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 953 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/02/2008 01/21/2014 45084.00

06/16/2009 08/15/2011 1218890.00

04/19/2016 10/06/2018 998372.00

01/28/2011 11/01/2013 3720674.00

01/12/2012 11/01/2014 4868217.00

04/09/2008 12/01/2010 1058159.00

09/06/2006 06/18/2011 163061.42

01/20/2011 08/01/2014 24130726.00

06/08/2009 09/01/2017 810110.34

02/09/2011 06/30/2022 1824000.00

10/09/2009 06/01/2017 1375102.76

02/24/2011 12/31/2016 18607958.00

02/02/1999 06/30/2007 24245460.00

10/14/2009 05/14/2015 483605.56

02/06/2015 02/14/2021 234710.71

02/08/2021 10/25/2027 69305.00

08/10/2009 04/14/2017 254519.36

Page 954 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 45084.00 0.00

61904.00 1218890.00 0.00

0.00 998372.00 0.00

1229546.00 3720674.00 0.00

4295172.00 4868217.00 0.00

0.00 1058159.00 0.00

0.00 163061.42 0.00

9342734.00 24130726.00 0.00

105985.28 810110.34 0.00

472848.26 1679667.00 144333.00

216874.43 1375102.76 0.00

2960241.00 18607958.00 0.00

0.00 24245460.00 0.00

111380.75 483605.56 0.00

0.00 259935.10 -25224.39

0.00 2565.00 66740.00

38745.66 254519.36 0.00

Page 955 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

4 N 0

2 N 1

2 N 0

8 N 0

2 N 0

5 N 0

17 N 0

22 N 1

30 N 2

26 N 1

18 N 0

9 N 0

0 N 0

0 N 0

34 N 4

0 N 0

Page 956 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JEMCO Electrical Contractors, Inc.

Thyssen Krupp Elevator Corporation

Josall Syracuse, Inc.

Smith Site Development, LLC

Villager Construction Inc

John W. Danforth Co.

Charles Calderone Associates, Inc.

J. Kokolakis Contracting, Inc

Sandberg Kessler Architecture&Engineering

Cannon Design, Inc.

Chaintreuil Jensen Stark Architects, LLP

J. Kokolakis Contracting, Inc

Ksi Contracting LLC

Architectural Resources, P.C.

OLA Consulting Engineers, PC

C.J. Brown Energy & Engineering, P.C.

Architecture +

Page 957 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

271 42nd Street

6067 Corporate Drive

6432 Baird Avenue PO Box 158 Eastwood Stn

1249 Front Street Ste. 110

425 Old Macedon Center Rd

930 Old Dutch Road

121 Front Street

Suite A 1500 Ocean Avenue

500 East Sixth Street

11th Floor 360 Madison Avenue

755 Seneca St

Suite A 1500 Ocean Avenue

P. O. Box 8044

505 Franklin Street

50 Broadway

Suite 204 4245 Union Road

297 River Street

Page 958 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11433 USA

East Syracuse NY 13057 USA

Syracuse NY 13206 USA

Binghamton NY 13905 USA

Fairport NY 14450 USA

Victor NY 14564 USA

Mineola NY 11501 USA

Bohemia NY 11716 USA

Jamestown NY 14701 USA

New York NY 10017 USA

Buffalo NY 14210 USA

Bohemia NY 11716 USA

Parsippany NJ 7054 USA

Buffalo NY 14202 USA

Hawthorne NY 10532 USA

Buffalo NY 14225 USA

Troy NY 12180 USA

Page 959 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

44.692591)

POINT (-74.01047940.652508)

894 815 2090

POINT (-76.08756543.104073)

702 426 2132

POINT (-76.11537543.082429)

702 715 2132

POINT (-75.89634442.156134)

966 475 2033

POINT (-77.42621143.095834)

540 231 2093

POINT (-77.48203243.001202)

799 413 2133

POINT (-73.63548740.741069)

60 1265 2094

POINT (-79.23530642.100079)

209 1687 2035

POINT (-78.84892142.876151)

300 66 2041

POINT (-78.87207542.900014)

300 33 2041

POINT (-73.79736141.107546)

963 1251 2185

POINT (-73.690162 110 11 2138

Page 960 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12X373 T006192

111036 T006673

28X396 T005432

36X136 T006313

061000 T006327

14XA91 T005993

26X282 T005444

211020 T006359

29X346 T005423

16X7A5 T005632

201035 D006680

21X819 T005854

09X312 T005960

16X7A8 T006067

08X436 T005956

12X315 T004930

Page 961 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Restore Exterior Envelope - Kellas and Thatcher Halls Closed

DESIGN: Upgrade Mechanical System for Performing Arts - Myers Hall Active

CONSTR: Replace Fire Alarm Systems - Various Buildings Closed

CONSTR: Interior Rehab - SUNY Plaza Center Tower Floors 6-12 Closed

CONSTR: Reconstruct Site Electric & Steam Infrastructure at Sturges Quad Area Closed

CONSTR: New Academic Building School of Public Health Active

CONSTR: Replace Roof/Repair Masonry Greenly Lib Closed

DESIGN: Replace Roofs Various Buildings Ph 2 Active

CONSTR: Masonry Repair and Window Replacement Various Buildings Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Rehabilitate 4th Floor HVAC-Bray Hall Active

DESIGN: Study - Renovation and Expansion of Riesenberg Gym Closed

DESIGN: Rehabilitate Physical Science Building, Bldg no. 0025 Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Rehab Pool Areas And Equipment-Merritt And Maxcy Halls Closed

Page 962 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 963 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/02/2015 03/30/2018 750898.00

12/07/2021 10/24/2024 61640.08

12/15/2008 05/01/2011 574642.00

03/03/2017 11/07/2019 4217152.00

05/03/2017 07/07/2020 11075891.00

08/24/2012 12/31/2020 73217987.00

01/05/2009 12/01/2011 1922695.00

11/03/2017 12/02/2025 22890.64

10/10/2008 12/17/2010 1101276.00

12/18/2009 12/09/2015 817476.00

10/07/2021 06/20/2023 2699000.00

11/01/2012 05/09/2015 143918.00

06/04/2012 06/06/2017 3514732.10

04/28/2015 05/01/2018 85722.00

04/18/2012 11/20/2018 0.00

06/21/2006 03/31/2011 122892.03

Page 964 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 750898.00 0.00

0.00 0.00 61640.08

0.00 573792.00 850.00

0.00 4217152.00 0.00

0.00 11075891.00 0.00

1124752.00 68371422.00 4846565.00

10000.00 1922695.00 0.00

0.00 233895.47 -211004.83

0.00 1101276.00 0.00

0.00 817476.00 0.00

0.00 0.00 2699000.00

0.00 143918.00 0.00

237555.82 3514732.10 0.00

0.00 85722.00 0.00

0.00 0.00 0.00

0.00 117195.98 5696.05

Page 965 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

0 N 0

6 N 1

4 N 0

2 N 0

13 N 0

12 N 1

0 N 0

10 N 0

0 N 0

4 N 2

0 N 0

40 N 3

0 Y 0

0 Y 0

0 N 0

Page 966 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Continental Construction, LLC

Genesys Engineering, P.C.

CIR Electrical Construction Corp.

Sano-Rubin Construction Services LLC

Concrete Applied Technlgs Corp. /dba/ CATCO

Tutor Perini Corp

Stalco Construction Inc.

Lothrop Associates LLP Architects

MPCC Corp.

Sorensen Gross Construction Services

Northland Associates, Incorporated

Cannon Design Architecture & Enginering

Ellenzweig Associates, Inc.

Cutting Edge Group, LLC

Cutting Edge Group, LLC

Sage Engineering Associates, L.L.P.

Page 967 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

PO Box 358 2125 State Hwy 812

38 Maiden Lane

400 Ingham Avenue

624 Delaware Avenue

1266 Town Line Road

1000 Main Street

1316 Motor Parkway

333 Westchester Avenue

81 Rockdale Avenue

3407 torrey Road

4701 Buckley Road P.O. Box 2549

2170 Whitehaven Road

230 Congress Street

14 Walkup Cutoff Road P.O. Box 733

14 Walkup Cutoff Road P.O. Box 733

1211 Western Avenue

Page 968 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Gouverneur NY 13642 USA

Kingston NY 12401 USA

Buffalo NY 14218 USA

Albany NY 12209 USA

Alden NY 14004 USA

New Rochelle NY 10801 USA

Islandia NY 11749 USA

White Plains NY 10604 USA

New Rochelle NY 10801 USA

Flint MI 48507 USA

Liverpool NY 13220 USA

Grand Island NY 14072 USA

Boston MA 2110 USA

Lake George NY 12845 USA

Lake George NY 12845 USA

Albany NY 12203 USA

Page 969 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.73246)

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.8406942.816118)

287 107 2041

POINT (-73.79218642.636455)

814 46 2030

POINT (-78.57831942.924983)

286 481 2041

POINT (-73.79712940.899499)

960 1450 2185

POINT (-73.19406240.806518)

1019 1123 2179

POINT (-73.74502841.030178)

949 1437 2185

POINT (-73.79305740.905212)

960 1450 2185

POINT (-83.73256442.976697)

438

POINT (-78.97294343.021579)

290 526 2041

POINT (-71.05438142.354415)

1918

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.82140642.675897)

814 40 2030

Page 970 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01X7B2 T005956

36X7B7 T005956

231040 T006368

221036 T006576

32X373 T005658

09X7A6 T005395

25X814 T004543

29X410 T005376

05X309 T005726

31X221 T004950

30XA95 T006531

20X163 T006256

40X030 T006338

09X370 T006335

14XB17 T006288

25X291 T005869

Page 971 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Replace Mechanical Systems Study - French Hall Closed

DESIGN: Rehab Study Pioneer HVAC and Orvis Natatorium Mechanical Active

CONSTR: Renovate HSC - Phase I Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Campus Capital Plan Closed

DESIGN: Performing Arts Center Roof Replacement In Guarantee

DESIGN: Construction Manager - Science Tech Building Closed

DESIGN: Renovate Bookstore/Student Services Area Campus Center Closed

CONSTR: Replace Fire Alarm Systems North Campus Active

DESIGN: CM New Academic Research Building Closed

CONSTR: Construct Regional Center Statewide-Suffolk County Closed

CONSTR: Upgrade Plumbing/HVAC Systems - Bugbee Hall Closed

CONSTR: Replace Boilers BSB Closed

DESIGN: Construction Manager Renovate Sanford Hall Closed

Page 972 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 973 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/18/2012 11/20/2018 37284.00

04/18/2012 11/20/2018 122472.00

01/17/2020 09/28/2026 52126.00

09/20/2021 09/14/2023 91955.00

03/15/2010 08/31/2015 7296800.00

04/15/2008 09/30/2014 49889.00

09/06/2000 12/31/2001 90627.59

02/08/2010 02/06/2017 376368.81

11/22/2010 11/14/2015 1754295.39

04/11/2007 07/28/2017 0.00

12/05/2019 12/31/2022 3029089.00

07/06/2016 09/16/2021 47887.81

07/19/2017 03/29/2020 13052227.00

06/12/2017 01/13/2020 5186906.00

10/27/2016 12/08/2020 65002805.00

08/21/2012 09/30/2015 15045.84

Page 974 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 37284.00 0.00

110532.00 122472.00 0.00

0.00 52126.00 0.00

0.00 0.00 91955.00

834983.00 7296800.00 0.00

49889.00 49889.00 0.00

0.00 90627.59 0.00

28634.17 375479.88 888.93

543980.62 1754295.39 0.00

4771.80 189413.35 -189413.35

0.00 2346689.00 682400.00

0.00 47887.81 0.00

0.00 13052227.00 0.00

0.00 5186906.00 0.00

0.00 65002805.00 0.00

0.00 15045.84 0.00

Page 975 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

0 Y 0

0 Y 0

0 Y 0

4 N 0

0 Y 0

5 N 1

0 N 0

14 N 0

0 N 0

3 N 0

21 N 0

3 N 1

3 N 0

4 N 0

0 N 0

Page 976 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

Cutting Edge Group, LLC

Pathfinder Engineers & Architects LLP

Pathfinder Engineers & Architects LLP

West-Rac Contracting Corp

Cutting Edge Group, LLC

Ashley McGraw Architects DPC

San Fanandre Justin Architects P.C.

LeChase Construction Services, LLC

Kliment Halsband Architects, LLP

Ferguson Electric Construction Co., Inc.

The Whiting-Turner Contracting Company

J. Anthony Enterprises, Inc.

Andrew R. Mancini Associates Inc.

Dynamic Mechanical Contractors Inc.

Gilbane/Omega, A Joint Venture

Page 977 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

14 Walkup Cutoff Road P.O. Box 733

134 South Fitzhugh Street

134 South Fitzhugh Street

687 Old Willets Path

14 Walkup Cutoff Road P.O. Box 733

15th Floor 125 East Jefferson Street

2nd Floor 200 Sunrise Highway

205 Indigo Creek Drive

20th Floor 322 Eighth Avenue

333 Ellicott St.

Suite 180 1720 Spillman Drive

175 Engineers Road

129 Odell Avenue

2900 Westchester Avenue Suite 207

16 Corporate Woods Blvd.

Page 978 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

Lake George NY 12845 USA

Rochester NY 14608 USA

Rochester NY 14608 USA

Hauppauge NY 11788 USA

Lake George NY 12845 USA

Syracuse NY 13202 USA

Rockville Centre NY 11570 USA

Rochester NY 14626 USA

New York NY 10001 USA

Buffalo NY 14203 USA

Bethlehem PA 18015 USA

Hauppauge NY 11788 USA

Endicott NY 13760 USA

Purchase NY 10577 USA

Albany NY 12211 USA

Page 979 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.675897)

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.61223443.150506)

537 1666 2093

POINT (-77.61223443.150506)

537 1666 2093

POINT (-73.23352740.811207)

1014 1428 2179

POINT (-73.64807743.386894)

818 128 2183

POINT (-77.69216343.184897)

548 1685 2093

POINT (-78.87134442.887775)

300 34 2041

POINT (-73.24129240.813539)

1014 1428 2179

POINT (-76.04917542.110866)

938 388 2033

POINT (-73.69876141.009992)

973 1339 2185

POINT (-73.76499242.682572)

834 48 2030

Page 980 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

35X108 T005457

09X323 D005483

30X480 T005033

13XD74 T005991

291014 T006398

091023 T006526

16X821 T005118

02X388 T005760

211011 T006367

221020 T006552

091003 T006319

34X101 T005663

41X058 T005364

251001 T006103

35X100 T005552

141037 T006551

251023 T006360A

Page 981 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Upgrade HVAC Systems - Harder Hall Closed

CONSTR: Replace Steam Condensate Lines, Phase I Closed

DESIGN: Hochstetter - Replace Air Handling Units Closed

CONSTR: Feeder Replacement BO - 7 Duct Banks Closed

CONSTR: Piping and Valve Replacement Closed

CONSTR: Renovate Hunt Union- West for Applied Learning Active

DESIGN: Program Study Stocking Hall Closed

CONSTR: Site Infrastructure Improvements - Electric Distribution, Ph II Closed

DESIGN: Campus Electrical Capacity Study Closed

CONSTR: Replace Roofs - Orvis, Ag Science, Huntington and Pioneer Active

CONSTR: Replace Humidification and DHW Systems - Milne Library Closed

CONSTR: Upgrade Elevators, Barton Lab Closed

DESIGN: Rehabilitate Elevators Closed

DESIGN: Repl Fire Alarms Various Bldgs - Delhi Closed

CONSTR: Install Heat Recovery System BINNS-MERRILL HALL Closed

DESIGN: Renovate Cafeteria Servery and Dining Area Active

DESIGN: Renovate North Hall for Admissions and UPD Active

Page 982 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 983 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/02/2009 08/14/2010 824181.00

03/13/2009 10/15/2010 627389.00

08/03/2005 06/02/2012 528024.66

08/28/2012 11/01/2017 17216662.00

02/14/2018 01/31/2020 2342213.00

09/25/2019 08/31/2021 4527733.00

03/10/2006 03/06/2008 401162.41

12/16/2010 04/30/2015 3558305.00

05/01/2018 08/24/2025 38097.68

03/26/2020 01/14/2023 3195527.00

03/29/2017 10/31/2018 389063.00

03/01/2010 03/01/2012 293508.00

03/09/2009 07/16/2014 12724.08

06/09/2015 01/01/2023 42798.41

07/13/2009 03/26/2011 1639139.00

03/25/2020 03/08/2026 2103078.00

11/02/2017 11/09/2025 274803.60

Page 984 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 824181.00 0.00

0.00 627389.00 0.00

0.00 528024.66 0.00

1415664.00 17216662.00 0.00

0.00 2342213.00 0.00

0.00 4515994.00 11739.00

0.00 401162.41 0.00

892376.00 3558305.00 0.00

0.00 38097.68 0.00

0.00 3185527.00 10000.00

0.00 389063.00 0.00

3186.00 293508.00 0.00

0.00 12724.08 0.00

0.00 42798.41 0.00

0.00 1639139.00 0.00

0.00 30496.36 2072581.64

0.00 18292.76 256510.84

Page 985 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1 N 0

6 N 0

5 N 0

8 N 0

5 N 2

1 N 0

5 N 1

9 N 0

0 N 0

1 N 0

5 N 0

2 N 0

0 N 0

0 N 0

3 N 0

27 N 9

0 N 0

Page 986 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

John W. Danforth Co.

Eastman Associates, Inc.

R.P. Morrow Associates, P.C.

Eldor Contracting Corp

Maric Plumbing & Heating, Inc.

LeChase Construction Services LLC

S/L/A/M/ Architects & Engineers P.C.

East Coast Electric, LLC

Ramboll Americas Engineering Solutions, Inc.

LeChase Construction Services, LLC

Digesare Mechanical,Inc.

Otis Elevator Corp.

Syska Hennessy Group, Inc

IBC Engineering, Pc

Postler & Jaeckle Corp.

Jacobs Project Management Co.

Mosaic Associates Architects, DPC

Page 987 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

930 Old Dutch Road

6 Railroad Avenue PO Box 810

56 Dana Road

30 Corporate Drive

50-40 69th Place

Suite 303 31 Lewis Street

80 Glastonbury Blvd.

546 Lyell Avenue

333 West Washington St PO Box 4873

Suite 102 11849 East Corning Road

3434 Carmen Road

2 townline Circle

14th Floor 1515 Broadway

Suite 219 3445 Winton Place

615 South Avenue

500 7th Avenue 17th Floor

2 Third Street Suite 440

Page 988 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Victor NY 14564 USA

Oneonta NY 13820 USA

Buffalo NY 14216 USA

Holtsville NY 11742 USA

Woodside NY 11377 USA

Binghamton NY 13901 USA

Glastonbury CT 6033 USA

Rochester NY 14606 USA

Syracuse NY 13221 USA

Corning NY 14830 USA

Schenectady NY 12303 USA

Rochester NY 14623 USA

New York NY 10038 USA

Rochester NY 14623 USA

Rochester NY 14620 USA

New York NY 10018 USA

Troy NY 12180 USA

Page 989 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-77.48203243.001202)

799 413 2133

POINT (-75.04886342.453988)

903 447 2136

POINT (-78.86890242.938021)

300 105 2041

POINT (-73.03939240.804249)

1022 1226 2179

POINT (-73.89508240.735792)

196 846 2137

POINT (-72.61857941.721624)

1041

POINT (-77.64476943.164633)

537 1664 2093

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.94224442.746356)

832 72 2030

POINT (-77.62775943.09573)

553 1682 2093

POINT (-77.60479743.14352)

537 1679 2093

POINT (-73.98905340.753144)

749 741 2095

POINT (-73.69002842.732277)

110 11 2138

Page 990 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X7A6 T005633

29X397 T005342

011009 T006260

23X213 T005900

091023 T006097

251021 T006363

09X403 T005842

01XA80 T006002

26X288 T005342

02X7A4 T005631

14X490 T006130

13XB41 T004859

14XB17 T006166

06X319 T005476

28X360 T005159

301028 T006488

13XC96 T005627

291031 T006411

Page 991 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: JOCs - Plattsburg Region - General State Closed

DESIGN: University Police Department-Relocation Closed

DESIGN: Upgrade Controls Study/Pilot Campus Wide Closed

CONSTR: Rehab/Replace Pedestrian Foot Bridge Closed

DESIGN: Renovate Hunt Union- West for Applied Learning Active

DESIGN: Upgrade Building Management Systems - Various Buildings Active

DESIGN: Rehabilitate HVAC Mills & Willbach Dining Halls Closed

DESIGN: Renovate Building 27- Business Administration Active

DESIGN: Construct Surge Space Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: CM Provide Additional Electrical Power-BSB Closed

DESIGN: Abate Asbestos/Replace Roofs East and West Power Plants Closed

DESIGN: Replace Boilers BSB Active

DESIGN: Renovation Letchworth Dining Hall Closed

DESIGN: Cary Farber Sherman - Replace/Repair Mechanical/Electrical/Plumbing Systems Closed

CONSTR: Replace Roof, Beane Service and Helm Warehouse Closed

DESIGN: Commissioning - Mech Sys Upgrd Life Sci Active

DESIGN: Site Improvements for ADA Accessibility Ph1 Active

Page 992 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 993 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/18/2009 12/08/2015 127953.00

09/17/2008 12/31/2017 626089.27

07/29/2016 08/24/2019 198820.27

01/04/2012 08/14/2013 1164423.00

06/15/2017 05/21/2023 559892.01

11/06/2017 08/30/2025 362000.00

06/18/2012 12/31/2017 297908.47

08/06/2013 02/18/2022 2953486.84

10/28/2008 12/31/2017 136079.67

12/18/2009 01/31/2018 549975.00

08/25/2015 08/30/2022 632049.09

09/11/2003 02/20/2013 391930.32

07/22/2015 12/05/2021 2422461.00

04/06/2009 12/02/2016 1649009.21

07/31/2006 04/01/2014 881994.42

03/19/2019 12/22/2020 2370104.00

12/10/2010 12/31/2018 130175.00

12/19/2018 06/06/2024 539066.00

Page 994 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 127953.00 0.00

42111.01 626089.27 0.00

0.00 198820.27 0.00

1080901.00 1164423.00 0.00

0.00 440772.24 119119.77

0.00 217842.78 144157.22

40414.86 297908.47 0.00

0.00 2852015.27 101471.57

0.00 136079.67 0.00

0.00 549975.00 0.00

0.00 632049.09 0.00

0.00 391930.32 0.00

0.00 2357651.54 64809.46

136984.63 1649009.21 0.00

0.00 881994.42 0.00

0.00 2370104.00 0.00

37961.49 114350.11 15824.89

0.00 532222.19 6843.81

Page 995 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

7 N 1

4 N 0

0 N 0

0 N 0

0 N 0

47 N 4

0 N 0

0 N 0

0 N 0

10 N 0

31 N 10

23 N 1

5 N 0

4 N 0

0 N 0

0 N 0

Page 996 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Sorensen Gross Construction Services

Perkins Eastman Architects, P.C.

M/E Engineering, P.C.

Murnane Building Contractors, Inc.

Hyman Hayes Assoc., LLC

Hesnor Engineering Associates, PLLC

Delta Engineers, Archs & Land Survs, DPC

Cannon Design, Inc.

Perkins Eastman Architects, P.C.

Sorensen Gross Construction Services

Jacobs Project Management Co.

STV Incorporated

Jacobs Project Management Co.

Clark Patterson Lee Associates

Erdman, Anthony and Associates, Inc.

S&L Roofing & Sheetmetal Inc.

OLA Consulting Engineers, PC

Jacobs Project Management Co.

Page 997 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3407 torrey Road

115 Fifth Avenue - 3rd Fl

Suite 320 60 Lakefront Boulevard

P.O. Box 3048 104 Sharron Avenue

6 Wembley Court

22 Computer Drive West

860 Hooper Road

50 Fountain Plaza Suite 200

115 Fifth Avenue - 3rd Fl

3407 torrey Road

Suite 0603 Two Penn Plaza

225 Park Avenue South

Suite 0603 Two Penn Plaza

Suite 500 205 St. Paul Street

Suite 200 145 Culver Road

2706 New Scotland Road

50 Broadway

Suite 0603 Two Penn Plaza

Page 998 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Flint MI 48507 USA

New York NY 10003 USA

Buffalo NY 14202 USA

Plattsburgh NY 12901 USA

Albany NY 12205 USA

Albany NY 12205 USA

Endwell NY 13760 USA

Buffalo NY 14202 USA

New York NY 10003 USA

Flint MI 48507 USA

New York NY 10121 USA

New York NY 10003 USA

New York NY 10121 USA

Rochester NY 14604 USA

Rochester NY 14620 USA

Voorheesville NY 12186 USA

Hawthorne NY 10532 USA

New York NY 10121 USA

Page 999 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-83.73256442.976697)

438

POINT (-73.991540.738916)

749 719 2095

POINT (-73.84467942.740546)

834 42 2030

POINT (-73.80771442.721269)

834 42 2030

POINT (-76.0306842.12898)

938 388 2033

POINT (-78.87420242.888784)

300 33 2041

POINT (-73.991540.738916)

749 719 2095

POINT (-83.73256442.976697)

438

POINT (-73.98836440.737356)

749 719 2095

POINT (-73.96870542.622702)

830 16 2030

POINT (-73.79736141.107546)

963 1251 2185

Page 1000 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

36X124 T005956

051025 T006357

07XA12 T005580

08X475 T006506

22X224 T005881

091000 T006103

311031 D006688

20X223 T006064

30XA81 T006250

02X380 T005197

07XA73 T005869

01XA40 T005639

121025 T006358

11X337 T006282

201018 T006540

13XB68 T005527

32X468 T006016

Page 1001 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Condition Assessment Study Fenner House Closed

CONSTR: Site Utility Upgrades - Elect Var Bldgs Distrubution System Closed

CONSTR: JOCS - 80700-09 - Albany Active

CONSTR: Student Leadership Center - Phase 2 Closed

DESIGN: Replace Maintenance Operations Center Boiler Plant and Related Asbestos Work Closed

CONSTR: Replace Roof - Student Union Building Active

CONSTR: Rep Perimeter Heating Closed

DESIGN: ADA Improvements - Phase II Closed

DESIGN: Infrastructure Improvements Smith Hall Commissioning Closed

DESIGN: Construction Manager Flood Rehab UDC Closed

CONSTR: Install Podium Sky Light Domes, Phase 1 Closed

DESIGN: Academic Planning & Partial Update Facilities Master Plan 2018 Active

CONSTR: HTHW Generator Replacement Phase I Closed

DESIGN: Renovate Marshall Hall Active

CONSTR: Rehab Mechanical Systems-Life Sciences Building Closed

CONSTR: MRI Closed

Page 1002 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1003 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/18/2012 11/20/2018 692213.00

12/20/2018 12/23/2025 16931.76

10/02/2009 12/15/2011 3636034.00

05/29/2019 08/28/2022 63014.00

10/28/2011 08/08/2014 17547966.00

07/22/2015 01/01/2023 74569.23

11/24/2021 12/20/2023 1443000.00

03/12/2014 10/16/2015 1148236.00

06/01/2016 09/01/2017 62632.62

06/17/2008 05/07/2016 108631.99

03/09/2012 09/30/2015 145818.42

02/05/2010 12/30/2013 3382292.00

04/02/2018 02/01/2026 364444.00

10/12/2016 01/02/2019 10439809.00

07/16/2020 07/16/2025 1686648.00

05/19/2009 05/07/2011 1500108.00

07/08/2013 11/20/2014 2580664.00

Page 1004 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

310553.00 692213.00 0.00

0.00 16931.76 0.00

0.00 3636034.00 0.00

0.00 63014.00 0.00

12839351.00 17547966.00 0.00

0.00 74569.23 0.00

0.00 0.00 1443000.00

0.00 1148236.00 0.00

0.00 62632.62 0.00

51046.26 106590.09 2041.90

144323.27 145818.42 0.00

253785.00 3344037.00 38255.00

0.00 278023.34 86420.66

0.00 10439809.00 0.00

0.00 625182.96 1061465.04

88512.00 1500108.00 0.00

0.00 2580664.00 0.00

Page 1005 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

0 N 0

8 N 0

1 N 0

10 N 0

0 N 0

10 N 2

4 N 1

22 N 1

0 N 0

0 N 0

7 N 0

0 N 0

3 N 0

31 N 6

9 N 0

2 N 1

Page 1006 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

Kideney Architects, P.C.

The Chappy Corporation

Upstate Companies 1, LLC

Manning Squires Hennig Co. Inc

IBC Engineering, Pc

Niko K. Construction Corp.

Airside Technology Corporation

Labella Associates, D.P.C

SmartEdge

Gilbane/Omega, A Joint Venture

Sano-Rubin Construction Co, Inc.

Lacey Thaler Reilly Wilson Arch &Preservation

Frank Lill & Sons, Inc.

LeChase Construction Services, LLC

Roland Electric, Inc.

Stalco Construction Inc.

Page 1007 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

143 Genesee Street

90 Spencer Ave

1690 State Highway 8

8426 Seven Springs Road PO Box 685

Suite 219 3445 Winton Place

45-67 196th Place

900 Old Liverpool Road

Suite 201 300 State Street

4 Peuquet Parkway

16 Corporate Woods Blvd.

P.O. Box 9078 624 Delaware Avenue

4th Floor 79 North Pearl Street

785 Old Dutch Road

609 Erie Blvd West

307 Suburban Avenue

1316 Motor Parkway

Page 1008 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

Buffalo NY 14203 USA

Chelsea MA 2150 USA

Mt. Upton NY 13809 USA

Batavia NY 14020 USA

Rochester NY 14623 USA

Flushing NY 11358 USA

Liverpool NY 13088 USA

Rochester NY 14614 USA

Tonawanda NY 14150 USA

Albany NY 12211 USA

Albany NY 12209 USA

Albany NY 12208 USA

Victor NY 14564 USA

Syracuse NY 13204 USA

Deer Park NY 11729 USA

Islandia NY 11749 USA

Page 1009 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.64807743.386894)

818 128 2183

POINT (-78.86903142.890071)

300 34 2041

POINT (-71.02496442.39707)

1918

POINT (-75.38238442.424467)

269 441 2037

POINT (-78.13339143.006019)

792 489 2086

POINT (-73.78432940.754211)

196 828 2137

POINT (-76.19761643.097723)

690 637 2132

POINT (-78.86566943.01577)

280 8 2041

POINT (-73.76499242.682572)

834 48 2030

POINT (-77.48206143.003958)

799 413 2133

POINT (-76.16437343.049141)

687 713 2132

POINT (-73.30197940.752932)

1023 1110 2179

POINT (-73.19406240.806518)

1019 1123 2179

Page 1010 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11X305 T005612

23X202 T005692

36X106 T005600

03X404 T005811

07XA35 T005606

03X387 T005469

30XA83 T006075

091043 T006545

31X240 T006215

21X197 T005627

281001 T006186

07XA14 T005440

141111 T006591

39X140 T005234

24X251 T005286

36X137 T006103

021011 T006247

Page 1011 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Commissioning - Field House Mech Rehab Closed

CONSTR: Information Technology Infrastructure Upgrades, Ph I Closed

CONSTR: Exterior Restoration - Plaza Building Closed

CONSTR: Roof Replacements, Group B Various Bldgs Closed

DESIGN: Commissioning UUNorth Phase 2 Closed

DESIGN: Renovate Science Building - Bldg. 15, Phase II Active

CONSTR: Replace Roofs, Phase II Various Building Closed

CONSTR: Rehabilitate Elevators Milne Library Active

DESIGN: Cogeneration Improvements Closed

DESIGN: Commissioning Agent - New Academic Bldg. Closed

DESIGN: Renovate Townsend Hall - Phase II Interior Renovation Active

CONSTR: Science III/IV Addition Closed

DESIGN: Replace OR Chiller - UHB Active

DESIGN: Auxiliary Services Building/Student Center Closed

DESIGN: Wheeler Hall Laboratory Addition Building 12 Closed

DESIGN: Replace fire pumps at SUNY Plaza including one in the Plaza Building and one in the Federal Building Closed

DESIGN: Renovate Exterior Facade & Perimeter Heating System at Allen Hall Closed

Page 1012 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1013 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/21/2010 04/13/2017 23486.15

05/13/2010 02/16/2013 2053357.00

10/30/2009 12/01/2012 3194546.00

03/03/2011 12/31/2012 1575429.00

08/16/2011 07/23/2021 37070.91

03/10/2009 02/28/2022 4787584.17

05/15/2014 10/30/2015 1367657.00

02/12/2020 11/20/2021 965013.00

02/15/2015 06/01/2018 585.49

09/27/2010 12/31/2018 133815.13

11/18/2015 05/06/2022 1312000.00

01/02/2009 06/15/2013 23869112.00

07/12/2021 09/14/2023 286000.00

02/12/2007 06/26/2012 1030805.06

07/10/2007 01/30/2013 1169321.72

02/06/2015 01/01/2023 36502.41

06/07/2016 07/22/2021 1066057.57

Page 1014 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

9346.03 23486.15 0.00

191216.00 2053357.00 0.00

272504.00 3194546.00 0.00

134527.00 1575429.00 0.00

2650.78 37070.91 0.00

175085.41 4526391.74 261192.43

0.00 1367657.00 0.00

0.00 951678.00 13335.00

0.00 585.49 0.00

15196.36 133815.13 0.00

0.00 1179968.80 132031.20

754415.00 23869112.00 0.00

0.00 70733.29 215266.71

0.00 1030805.06 0.00

3619.08 1169321.72 0.00

0.00 36502.41 0.00

0.00 1066057.57 0.00

Page 1015 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 0

7 Y 1

11 N 0

0 N 0

9 N 0

4 N 0

1 N 0

0 N 0

0 N 0

30 N 2

7 N 0

0 N 0

5 N 1

5 N 1

0 N 0

20 N 4

Page 1016 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Genesys Engineering, P.C.

S & L Electric, Inc.

Lupini Construction, Inc.

Weaver Metal & Roofing, Inc.

Genesys Engineering, P.C.

Cannon Design, Inc.

Jameson Roofing Co., Inc.

Andrew R. Mancini Associates Inc.

Ramboll Americas Engineering Solutions, Inc.

OLA Consulting Engineers, PC

SWBR Architects & Engineers, P.C.

Fahs Construction Group Inc.

Ramboll Americas Engineering Solutions, Inc.

Quinlivan,Pierik & Krause A/E DBA Qpk Design

Architecture +

IBC Engineering, Pc

Flynn Battaglia Architects, P.C.

Page 1017 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

38 Maiden Lane

5313 State Highway 56

6081 Trenton Rd

40 Appenheimer Avenue

38 Maiden Lane

50 Fountain Plaza Suite 200

3761 East Lake Road

129 Odell Avenue

333 West Washington St PO Box 4873

50 Broadway

387 East Main Street

2224 Pierce Creek Road

333 West Washington St PO Box 4873

450 South Salina Street P.O. Box 29

297 River Street

Suite 219 3445 Winton Place

Suite S401 617 Main Street

Page 1018 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Kingston NY 12401 USA

Colton NY 13625 USA

Utica NY 13502 USA

Buffalo NY 14214 USA

Kingston NY 12401 USA

Buffalo NY 14202 USA

Dunkirk NY 14048 USA

Endicott NY 13760 USA

Syracuse NY 13221 USA

Hawthorne NY 10532 USA

Rochester NY 14604 USA

Binghamton NY 13903 USA

Syracuse NY 13221 USA

Syracuse NY 13201 USA

Troy NY 12180 USA

Rochester NY 14623 USA

Buffalo NY 14203 USA

Page 1019 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01451641.931949)

425 79 2182

POINT (-74.96727844.578792)

314 1512 2140

POINT (-75.2130743.155128)

923 1465 625

POINT (-78.8372542.923116)

300 70 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.87420242.888784)

300 33 2041

POINT (-76.04917542.110866)

938 388 2033

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.79736141.107546)

963 1251 2185

POINT (-77.60201543.158145)

537 1663 2093

POINT (-75.88027242.08193)

967 477 2033

POINT (-76.15589443.049616)

687 711 2132

POINT (-76.15225243.045606)

687 711 2132

POINT (-73.69016242.73246)

110 11 2138

Page 1020 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15X468 T005180

351003 T006449

061014 T006104

08X471 T005845

12X344 T005351

28X423 T005963

08X416 T005244

261030 T006358

01XA94 T006172

341000 T006188

07XA47 T005606

031048 T006357

09X343 T005646

30XA39 D005252

151075 T006363

391014 T006567

Page 1021 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehab Labs For Cell Dev. Ph III Old Weiskotten Hall Closed

DESIGN: Renovate McMahon for Advanced Ceramic Manufacturing and Education Active

DESIGN: Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls Active

CONSTR: Replace Roof - Sojourner Truth Library Closed

DESIGN: Renovate Flagg Hall - ADA Elevator Closed

CONSTR: Reconstruct Pump House South Campus Closed

CONSTR: Replace High Temperature Hot Water PHASE I Closed

DESIGN: Replace Windows Lupton Hall Active

DESIGN: Renovate Lecture Center Active

DESIGN: Rehab Agricultural Pilot Plan Closed

DESIGN: Comm/Rehab Sci III basement Closed

DESIGN: Renovation Moore Hall for Student Life Closed

CONSTR: Replace Windows - Physical Education Building Closed

CONSTR: Replace/Repair Walks, Exteroir Stairs and Curbs Closed

DESIGN: Replace OR Air Handler AHU-1 UH at Community Campus (30) Active

CONSTR: Reconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian Bridge Active

Page 1022 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1023 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/17/2006 10/09/2011 564091.27

07/26/2018 07/27/2023 1424529.00

07/26/2017 07/25/2023 565576.00

06/03/2011 11/30/2012 844990.00

11/23/2010 12/31/2017 46952.96

05/09/2012 08/27/2015 4057111.00

02/07/2007 12/31/2014 2449640.00

11/05/2018 02/01/2026 1066732.13

08/31/2015 02/21/2029 3353224.18

11/18/2015 12/02/2020 1286169.24

08/26/2011 07/23/2021 34991.29

08/30/2019 12/23/2025 54472.98

02/23/2010 08/13/2011 562272.00

03/19/2007 10/27/2009 2431843.00

09/18/2020 08/30/2025 600000.00

06/16/2020 06/22/2022 1039100.00

Page 1024 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

112174.26 564091.27 0.00

0.00 953363.01 471165.99

0.00 494710.44 70865.56

46586.00 844990.00 0.00

13263.83 46952.96 0.00

2032420.00 4057111.00 0.00

0.00 2449640.00 0.00

0.00 457941.91 608790.22

0.00 1874220.23 1479003.95

0.00 1286169.24 0.00

11876.50 34991.29 0.00

0.00 54472.98 0.00

0.00 562272.00 0.00

0.00 2431843.00 0.00

0.00 53389.86 546610.14

0.00 875139.00 163961.00

Page 1025 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 0

13 N 3

0 N 0

9 N 1

0 N 0

8 N 1

3 Y 1

12 N 2

26 N 4

12 N 1

0 N 0

0 N 0

4 N 0

12 N 0

0 N 0

1 N 0

Page 1026 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Quinlivan,Pierik & Krause A/E DBA Qpk Design

Kideney Architects, P.C.

M/E Engineering, P.C.

Marpat Construction Corp.

Architecture +

Kandey Company, Inc

Megrant Corporation

Lacey Thaler Reilly Wilson Arch &Preservation

Architecture +

SWBR Architects & Engineers, P.C.

Genesys Engineering, P.C.

Kideney Architects, P.C.

Ajay Glass & Mirror Co., Inc.

Ingalls Site Development, Inc.

Hesnor Engineering Associates, PLLC

Central Paving Inc.

Page 1027 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

450 South Salina Street P.O. Box 29

143 Genesee Street

Suite 320 60 Lakefront Boulevard

310 Nassau Avenue

297 River Street

19 Ransier Drive

86 Otis Street

4th Floor 79 North Pearl Street

297 River Street

387 East Main Street

38 Maiden Lane

143 Genesee Street

101 North Street

297 Meyer Road

22 Computer Drive West

4247 Acme Road

Page 1028 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13201 USA

Buffalo NY 14203 USA

Buffalo NY 14202 USA

Brooklyn NY 11222 USA

Troy NY 12180 USA

West Seneca NY 14224 USA

West Babylon NY 11704 USA

Albany NY 12208 USA

Troy NY 12180 USA

Rochester NY 14604 USA

Kingston NY 12401 USA

Buffalo NY 14203 USA

Canandaigua NY 14424 USA

West Seneca NY 14224 USA

Albany NY 12205 USA

Frankfort NY 13340 USA

Page 1029 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.15225243.045606)

687 711 2132

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.93756440.726274)

894 901 2090

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.74487542.849817)

276 159 2041

POINT (-73.37435340.73911)

1023 1035 2179

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.60201543.158145)

537 1663 2093

POINT (-74.01451641.931949)

425 79 2182

POINT (-78.86903142.890071)

300 34 2041

POINT (-77.29826942.902988)

780 178 2133

POINT (-78.76098642.845655)

276 159 2041

POINT (-73.80771442.721269)

834 42 2030

POINT (-75.05966943.02887)

681 552 2088

Page 1030 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

21X207 T005665

31X229 T006472

13XA79 T005023

30XA95 T006295

09X362 T006007

12X302 T005535

081034 T006561

08X7A3 T005395

07XA73 T005632

281007 D006661

23X198 T004929

251033 T006576

101027 T006440

29X442 T005833

16X283 T005494

12X286 D005388

Page 1031 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: New Secondary Electrical System - Fort Closed

CONSTR: Job Order Contracting - NYC Region Active

CONSTR: Rehab Heavy Engineering Phase 2 Closed

CONSTR: Replace Fire Alarm Systems Knox Hall North Campus Closed

CONSTR: Replace HVAC/Domestic Hot Water Equipment - Alumni Hall Closed

DESIGN: Rehab HVAC Systems, Replace Windows Raymond Hall, Bldg. No. 0001 Closed

CONSTR: Repair Replace Facade, Fine Arts Building Active

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Renovate Crosby Hall Active

DESIGN: Demolish Dana Hall Suspended

DESIGN: Upgrade Data Infrastructure - Study Active

DESIGN: Renovate Hewitt Hall Active

DESIGN: Rehabilitate Utilidors - Phase I High Temperature Hot Water System Assigned to Vendor

CONSTR: Barton Hall Exterior/ Roof Repairs Closed

CONSTR: Rehabilitate HVAC - Crumb Library Closed

Page 1032 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1033 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/07/2010 01/01/2012 627189.00

01/29/2019 04/11/2022 89869.00

06/21/2005 09/30/2012 2510732.00

12/16/2016 08/25/2018 264775.00

12/18/2012 08/15/2014 1457404.00

07/06/2009 06/29/2014 382667.32

05/18/2020 10/19/2022 4720000.00

04/15/2008 09/30/2014 63508.00

12/18/2009 12/09/2015 918124.00

07/02/2021 07/29/2024 20809530.00

02/21/2008 01/31/2011 60740.06

02/21/2021 09/14/2023 68483.00

06/17/2021 12/12/2028 48795.00

07/22/2014 04/17/2016 317492.80

04/08/2009 12/31/2012 2887986.00

04/22/2008 09/30/2010 1355893.00

Page 1034 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

116542.00 627189.00 0.00

0.00 89869.00 0.00

0.00 2510732.00 0.00

0.00 264775.00 0.00

0.00 1457404.00 0.00

41688.57 382667.32 0.00

0.00 4056217.00 663783.00

0.00 63508.00 0.00

918124.00 918124.00 0.00

0.00 1240653.00 19568877.00

0.00 60740.06 0.00

0.00 59433.10 9049.90

0.00 0.00 48795.00

0.00 317492.80 0.00

58118.00 2887986.00 0.00

0.00 1355893.00 0.00

Page 1035 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12 N 0

3 N 1

3 N 0

5 Y 2

7 N 0

20 N 2

3 N 0

0 Y 0

0 N 0

1 N 0

0 N 0

0 Y 0

36 N 6

0 N 0

4 N 1

3 N 0

Page 1036 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Global Electrical Contr'g of Westchester, Inc.

Volmar Construction, Inc

L. D. Wenger Construction Co, Inc.

Weydman Electric, Inc.

Murnane Building Contractors, Inc.

Mach Architecture, P.C.

The VMJR Companies, LLC

Cutting Edge Group, LLC

Sorensen Gross Construction Services

Manning Squires Hennig Co. Inc

CHA Consulting, Inc

Pathfinder Engineers & Architects LLP

Horizon Engineering Associates, LLP

Schuyler Engineering, P.C.

Streeter Associates,Inc.

Northern Mechanicals,Inc

Page 1037 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

965 Nepperham Avenue

4400 Second Avenue

770 Railroad Avenue

747 Young Street

15 Wood Road

2000 Sheridan Drive

73 Mohican Street P. O. Box 518

14 Walkup Cutoff Road P.O. Box 733

3407 torrey Road

8426 Seven Springs Road PO Box 685

3 Winners Circle P.O. Box 5269

134 South Fitzhugh Street

358 West Jefferson Street Suite 300

Suite 6 163 North Wellwood Avenue

101 E. Woodlawn Ave. P.O. Box 118

2 Baldwin Avenue P.O. Box 195

Page 1038 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Yonkers NY 10703 USA

Brooklyn NY 11232 USA

West Babylon NY 11704 USA

Tonawanda NY 14150 USA

Whitesboro NY 13492 USA

Tonawanda NY 14223 USA

Glens Falls NY 12801 USA

Lake George NY 12845 USA

Flint MI 48507 USA

Batavia NY 14020 USA

Albany NY 12205 USA

Rochester NY 14608 USA

Syracuse NY 13204 USA

Lindenhurst NY 11757 USA

Elmira NY 14902 USA

Norwood NY 13668 USA

Page 1039 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.02887)

POINT (-73.8735640.957324)

948 1442 2185

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.35208140.692842)

1023 1035 2179

POINT (-78.85788243.003747)

280 8 2041

POINT (-75.30401943.130254)

978 1395 625

POINT (-78.85968342.980965)

278 158 2041

POINT (-73.64747843.304633)

824 783 2183

POINT (-73.64807743.386894)

818 128 2183

POINT (-83.73256442.976697)

438

POINT (-78.13339143.006019)

792 489 2086

POINT (-73.79798342.719854)

834 42 2030

POINT (-77.61223443.150506)

537 1666 2093

POINT (-76.15821943.047105)

687 711 2132

POINT (-76.81571142.110455)

485 926 2036

POINT (-74.993822 312 1590 2140

Page 1040 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03X368 T005826

14XA62 T005582

241033 T006356

021025 T006451

15X7A9 T005632

40X030 T005335

13XC96 T005785

231003 T006262

26X279 T005233

211026 D006658

061016 T006441

11X305 T005355

24X223 T004929

311000 T006257

391009 T006099

29X335 T004948

Page 1041 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehab Rockwell Hall - 2nd Floor Closed

CONSTR: Radioactive Storage BSB Bldg 0001 Closed

DESIGN: Renovate Bouck Hall - Bookstore & Related Student Life Active

DESIGN: Infrastructure Improvements, North Campus Phase 2 Active

CONSTR: JOCs - Syracuse Region Closed

DESIGN: Construct Regional Centers Statewide Active

CONSTR: Mechanical Systems Upgrade Life Sciences Active

CONSTR: Replace Roofs - Cooper & Payson Hall Closed

DESIGN: Construct Student Center Closed

CONSTR: Renovate Vander Clute Hall & Heritage Hall for Student Union Active

DESIGN: Renovate Sturges & Fraser Halls, Phase 1 Active

DESIGN: Field House Mechanical Rehabilitation Closed

DESIGN: Water Tank / Water System Rehab Campus Wide Closed

CONSTR: Replace Roofs at Campus Center Active

DESIGN: Program Study - Campus Center Closed

DESIGN: Humanities Re-roof and 2nd Floor Abate. Closed

Page 1042 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1043 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/27/2011 08/28/2013 7566359.00

09/17/2009 03/31/2013 1353193.00

11/16/2018 02/06/2027 413319.00

07/18/2018 08/24/2023 3012000.00

12/18/2009 12/09/2015 387699.00

04/08/2008 03/09/2022 3051702.36

01/12/2011 12/26/2014 14031840.00

06/30/2016 08/11/2018 1489621.00

02/12/2007 10/28/2015 2462638.51

06/17/2021 12/26/2023 9652179.00

02/14/2020 07/26/2029 135218.00

08/20/2008 06/12/2020 455883.37

06/21/2006 01/31/2011 102612.35

05/26/2016 12/19/2018 2383100.00

08/02/2017 09/01/2019 68106.22

12/27/2007 09/30/2011 177974.00

Page 1044 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3083534.00 7566359.00 0.00

0.00 1353193.00 0.00

0.00 265398.98 147920.02

0.00 1540192.43 1471807.57

214304.00 387699.00 0.00

147341.33 3022998.45 28703.91

3388777.00 13958404.00 73436.00

0.00 1489621.00 0.00

363596.85 2462638.51 0.00

0.00 698635.00 8953544.00

0.00 2555.00 132663.00

7188.32 455883.37 0.00

0.00 102612.35 0.00

0.00 2373100.00 10000.00

0.00 68106.22 0.00

0.00 177974.00 0.00

Page 1045 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 N 0

4 N 1

0 Y 0

11 N 1

0 N 0

5 Y 1

7 N 0

4 N 1

6 N 0

4 Y 1

29 N 5

0 N 0

0 N 0

16 N 0

0 Y 0

0 N 0

Page 1046 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Concept Construction Corporation

Structure tone, Inc.

JMZ Architects & Planners PC

C & S Engineers, Inc.

Sorensen Gross Construction Services

JMZ Architects & Planners PC

Framan Mechanical, Inc.

Northern Tier Contracting

Kevin Hom Architects, P.C

Gryphon Construction, Inc.

Wendel WD Arch, Engr, Surv. & Land Architecture

C & S Engineers, Inc.

CHA Consulting, Inc

Statewide Roofing, Inc.

JMZ Architects & Planners PC

The Hall Partnership Architects, LLP

Page 1047 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2555 Transit Road

770 Broadway

190 Glen Street P. O. Box 725

499 Col. Eileen Collins Blvd.

3407 torrey Road

190 Glen Street P. O. Box 725

259 New Brunswick Avenue

329A Scotch Settlement Rd

16th Floor 15 West 37th Street

28 Hilltop Boulevard

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

499 Col. Eileen Collins Blvd.

3 Winners Circle P.O. Box 5269

2120 Fifth Avenue

190 Glen Street P. O. Box 725

42 East 21st Street

Page 1048 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Elma NY 14059 USA

New York NY 10003 USA

Glens Falls NY 12801 USA

Syracuse NY 13212 USA

Flint MI 48507 USA

Glens Falls NY 12801 USA

Fords NJ 8863 USA

Gouverneur NY 13642 USA

New York NY 10018 USA

East Brunswick NJ 8816 USA

Williamsville NY 14221 USA

Syracuse NY 13212 USA

Albany NY 12205 USA

Ronkonkoma NY 11779 USA

Glens Falls NY 12801 USA

New York NY 10010 USA

Page 1049 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

44.751462)

POINT (-78.6968342.836367)

292 515 2041

POINT (-73.99135340.730928)

749 719 2095

POINT (-73.6447743.309981)

824 783 2183

POINT (-76.13224343.113906)

690 730 2132

POINT (-83.73256442.976697)

438

POINT (-73.6447743.309981)

824 783 2183

POINT (-74.30123840.525336)

2490

POINT (-75.42571244.350272)

330 1525 2140

POINT (-74.41458740.438554)

2490

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.79798342.719854)

834 42 2030

POINT (-73.13868140.794136)

1019 1421 2179

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.98829240.739319)

749 734 2095

Page 1050 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

30X488 D005240

10X340 T006067

14X7A4 T005402

36X079 D005321

20X232 T006243

26X291 T005539

27X235 T005994

21X234 T005833

08X7B5 T005395

20X163 T005303

09X369 T005355

131046 T006489

111040 D006669

231001 T006107

291048 T006369

131059 T006501

Page 1051 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: ADA Upgrades - North Campus Closed

CONSTR: JOCs - Syracuse Region Closed

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Upgrade Elevators - State University Plaza Closed

CONSTR: Rehab Skylights, Roof - Bray Hall and Moon Library Closed

DESIGN: Replace Roofs, Various Buildings, Phase One Closed

CONSTR: Renovate Charlton Hall, Ph I Closed

DESIGN: Renovate Central Heating Plant Assigned to Vendor

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Combined Site & Program Study for New Academic, Outreach/Tech Transfer Facils Closed

DESIGN: Upgrade HVAC Systems - Lee Hall Closed

CONSTR: Expand and Upgrade Flax Pond Hatchery - Phase 1 Building Work Active

CONSTR: Construct Storage Building Active

DESIGN: REHAB EXTERIOR ENVELOPE DANA HALL Closed

DESIGN: Electrical Feeder Study - Campus Wide Active

DESIGN: Repair Facade - Melville Library and Staller Center Active

Page 1052 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1053 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/31/2007 08/22/2009 3739510.00

04/28/2015 05/01/2018 65735.00

06/02/2008 01/21/2014 370140.00

11/02/2007 06/30/2010 1547734.00

04/13/2016 09/07/2018 1275980.00

07/17/2009 07/07/2014 300743.95

08/28/2012 11/30/2014 6650820.00

11/20/2012 04/17/2016 274199.06

04/15/2008 09/30/2014 276737.00

09/10/2007 12/01/2008 409110.68

08/24/2010 06/12/2020 500714.03

03/20/2019 07/01/2022 5481493.00

09/01/2021 10/25/2023 841250.00

06/10/2015 03/31/2022 409199.84

12/17/2019 04/19/2026 95529.00

04/22/2019 05/20/2024 506000.00

Page 1054 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 3739510.00 0.00

0.00 65735.00 0.00

31159.00 370140.00 0.00

0.00 1547734.00 0.00

0.00 1275980.00 0.00

28208.95 300743.95 0.00

1691105.00 6650820.00 0.00

0.00 274199.06 0.00

193878.00 276737.00 0.00

0.00 409110.68 0.00

143692.63 500714.03 0.00

0.00 5199050.00 282443.00

0.00 0.00 841250.00

0.00 409199.84 0.00

0.00 71964.29 23564.71

0.00 210313.94 295686.06

Page 1055 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 N 0

0 Y 0

0 N 0

4 N 1

4 Y 1

70 N 3

10 N 0

0 N 0

0 Y 0

5 N 0

0 N 0

2 N 0

2 N 0

0 N 0

0 N 0

15 N 3

Page 1056 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Concept Construction Corporation

Cutting Edge Group, LLC

JEMCO Electrical Contractors, Inc.

Bunkoff General Contractors, Inc.

Titan Roofing Inc

BBS Architects & Engineers, P.C.

Richard E. Alexander Co., Inc.

Schuyler Engineering, P.C.

Cutting Edge Group, LLC

King & King Architects, LLP

C & S Engineers, Inc.

Boilermatic Welding Industries, Inc.

C & S Technical Resources, Inc.

Architecture +

RMF Engineering, Inc., P.C.

Superstructures Engineering + Architecture, PLLC

Page 1057 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2555 Transit Road

14 Walkup Cutoff Road P.O. Box 733

271 42nd Street

790 Watervliet Shaker Rd.

200 Tapley Street

244 East Main Street

8 Scharbach Drive

Suite 6 163 North Wellwood Avenue

14 Walkup Cutoff Road P.O. Box 733

358 West Jefferson Street

499 Col. Eileen Collins Blvd.

17 Peconic Avenue

499 Col. Eileeen Collins Blvd

297 River Street

1A Pine West Plaza

32 Avenue of the Americas

Page 1058 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Elma NY 14059 USA

Lake George NY 12845 USA

Brooklyn NY 11433 USA

Latham NY 12110 USA

Springfield MA 1104 USA

Patchogue NY 11772 USA

Marcy NY 13403 USA

Lindenhurst NY 11757 USA

Lake George NY 12845 USA

Syracuse NY 13202 USA

Syracuse NY 13212 USA

Medford NY 11763 USA

Syracuse NY 13212 USA

Troy NY 12180 USA

Albany NY 12205 USA

New York NY 10013 USA

Page 1059 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.739319)

POINT (-78.6968342.836367)

292 515 2041

POINT (-73.64807743.386894)

818 128 2183

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.7967442.739147)

834 1288 2030

POINT (-72.56074442.126589)

1913

POINT (-73.00759440.765963)

1022 1322 2179

POINT (-75.27792343.135679)

923 574 625

POINT (-73.64807743.386894)

818 128 2183

POINT (-76.15821943.047105)

687 711 2132

POINT (-76.13224343.113906)

690 730 2132

POINT (-72.96754440.817776)

1022 1313 2179

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.86458842.710592)

814 42 2030

POINT (-74.00522640.720087)

749 737 2095

Page 1060 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

081018 T006330

801802 T006364

801803 T006371

05X267 D006558

24X287 T005612

221005 T006104

12X290 T005353

401002 T006103

09X821 T005645

28X390 T005624

27X225 T005305

01XA37 T004928

31X227 T005883

41X050 T004950

051003 T006236

141055 T006222

Page 1061 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade Lecture Center Mechanical System Active

DESIGN: Engineering Services - IAQ Systems, Inc - Master Term Agreement Active

DESIGN: Site Infrastructure, Civil Engineering & Surveying Services - O'Brien & Gere - Master Term Agreement Active

CONSTR: Renovate Houghton Hall Active

DESIGN: Wheeler Hall Interior Renovation - Commissioning Closed

DESIGN: Install Satellite Boilers - Phase 3 Closed

DESIGN: Upgrade Electrical Distribution System - Various Buildings Closed

DESIGN: Renovate 3 Union Avenue Active

DESIGN: Facilities Master Plan - Oneonta Closed

DESIGN: Commissioning BEB HVAC Improvments Closed

DESIGN: Building Conversion/Construct Design Facility Closed

DESIGN: Rehab of Light Wells, Phase II Closed

CONSTR: Rehab Campus Center-H, I & K Wings Closed

DESIGN: Lobby Renovations Closed

CONSTR: Demolish Academic Spine Bridge Closed

CONSTR: Job Order Contracting: NYC Region Closed

Page 1062 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1063 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/22/2017 06/09/2022 1398000.00

09/14/2017 05/19/2025 5000000.00

09/14/2017 06/17/2025 5000000.00

04/22/2020 06/20/2022 2253581.00

02/14/2011 04/13/2017 49241.19

08/02/2016 07/25/2023 617635.65

03/11/2008 03/03/2013 451063.89

04/27/2017 01/01/2023 370946.56

03/31/2010 09/24/2011 619038.13

08/29/2011 10/31/2018 63958.31

09/11/2007 12/31/2014 915140.52

01/25/2008 09/30/2011 257815.93

11/07/2011 02/10/2015 3251507.00

09/18/2007 07/28/2017 80542.13

04/22/2016 08/15/2017 453914.00

02/29/2016 04/30/2019 393117.00

Page 1064 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 889966.77 508033.23

0.00 0.00 5000000.00

0.00 0.00 5000000.00

0.00 2064393.00 189188.00

36299.50 49241.19 0.00

0.00 617635.65 0.00

0.00 451063.89 0.00

0.00 290463.29 80483.27

0.00 619038.13 0.00

6244.64 63958.31 0.00

0.00 915140.52 0.00

0.00 257815.88 0.05

1791065.00 3251507.00 0.00

62444.55 670945.13 -590403.00

0.00 453914.00 0.00

0.00 393117.00 0.00

Page 1065 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24 N 5

62 Y 10

29 N 6

0 N 0

0 N 0

0 N 0

5 N 0

0 N 0

29 N 1

0 N 0

5 N 0

0 Y 0

26 N 1

0 N 0

5 N 0

0 N 0

Page 1066 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ramboll Americas Engineering Solutions, Inc.

IAQ Systems, Inc

Ramboll Americas Engineering Solutions, Inc.

Huber Construction, Inc.

Genesys Engineering, P.C.

M/E Engineering, P.C.

C & S Engineers, Inc.

IBC Engineering, Pc

Ayers Saint Gross Architects

Bergmann Associates, Inc.

Perkins Eastman Architects, P.C.

Envision Architects, D.P.C.

Sigma Contracting Corp

Kliment Halsband Architects, LLP

Union Concrete and Construction Corp.

Volmar Construction, Inc

Page 1067 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

333 West Washington St PO Box 4873

555 8th Avenue Suite 1502

333 West Washington St PO Box 4873

136 Taylor Drive

38 Maiden Lane

Suite 320 60 Lakefront Boulevard

499 Col. Eileen Collins Blvd.

Suite 219 3445 Winton Place

Suite 100 1040 Hull Street

28 East Main Street 200 First Federal Plaza

115 Fifth Avenue - 3rd Fl

52 James Street

2419 East 63 Street

20th Floor 322 Eighth Avenue

105 Center Road P.O. Box 410

4400 Second Avenue

Page 1068 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13221 USA

New York NY 10018 USA

Syracuse NY 13221 USA

Depew NY 14043 USA

Kingston NY 12401 USA

Buffalo NY 14202 USA

Syracuse NY 13212 USA

Rochester NY 14623 USA

Baltimore MD 21230 USA

Rochester NY 14614 USA

New York NY 10003 USA

Albany NY 12207 USA

Brooklyn NY 11234 USA

New York NY 10001 USA

West Seneca NY 14224 USA

Brooklyn NY 11232 USA

Page 1069 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.720087)

POINT (-76.15589443.049616)

687 711 2132

POINT (-73.9917740.754541)

749 741 2095

POINT (-76.15589443.049616)

687 711 2132

POINT (-78.72245742.915633)

298 506 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.13224343.113906)

690 730 2132

POINT (-77.61117743.156034)

537 1673 2093

POINT (-73.991540.738916)

749 719 2095

POINT (-73.75023942.651717)

814 44 2030

POINT (-73.90954340.611281)

894 817 2090

POINT (-78.77938242.839789)

276 159 2041

POINT (-74.01363540.652263)

894 899 2090

Page 1070 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01X7A5 T005395

251025 T006360

24X303 T005995

12X371 T006182

14X496 T006130

03X421 T006058

02X389 T005972

09X318 T004925

05X339 T005356

06X323 T004917

271033 T006372

031008 T006127

36X087 T004925

29X393 T005332

01XA51 T005652

36X124 T005351

02X338 D005243

Page 1071 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Alumni Hall Culinary Arts Space Study Assigned to Vendor

DESIGN: Renovation and Addition to Home Economic Building Closed

DESIGN: Construct New Child Care Center Closed

DESIGN: Upgrade HVAC Systems BSB Closed

CONSTR: Rehabilitate Caudell Hall Closed

CONSTR: Liberal Arts Building Closed

DESIGN: Replace Roof, Milne Library, Bldg. 40 Closed

DESIGN: Exterior Rehabilitation LoGrasso Hall Closed

DESIGN: ADA/Elevator Upgrades - Various Bldgs. Closed

DESIGN: Replace MTHW/Water Lines & Sitework, Whipple to STUAC Closed

DESIGN: Bid 01- Selective Renovations - Butler Library Closed

DESIGN: Window Replacement - State University Plaza Closed

DESIGN: Critical Maintenance Repairs Exterior Maintenance Visual Arts #58 Closed

DESIGN: Commissioning Services - Construct New Business School Closed

DESIGN: General Infrastructure/Space rehab Plaza Closed

CONSTR: Replace Roof - Hartwell Hall Closed

Page 1072 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1073 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/15/2008 09/30/2014 179063.00

01/22/2018 09/26/2020 60258.36

11/02/2012 11/06/2017 622051.01

11/12/2015 12/10/2020 603105.23

08/25/2015 08/30/2022 15745.00

02/24/2014 06/15/2018 22309438.00

06/08/2012 04/06/2015 21993967.00

09/01/2005 02/28/2012 61297.27

11/10/2009 05/29/2015 298150.75

12/27/2007 01/31/2012 301460.63

04/06/2018 04/28/2029 281768.24

07/19/2017 08/29/2022 43590.00

06/07/2007 02/28/2012 249113.02

02/21/2008 02/01/2015 1528296.45

04/05/2010 03/29/2015 205793.67

02/09/2011 12/31/2017 366907.17

01/31/2007 08/18/2010 3755770.00

Page 1074 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 179063.00 0.00

0.00 60258.36 0.00

26353.89 622051.01 0.00

0.00 603105.23 0.00

0.00 1013580.67 -997835.67

0.00 22309438.00 0.00

5937168.00 21993967.00 0.00

0.00 32858.51 28438.76

113628.48 298150.75 0.00

0.00 301460.63 0.00

0.00 281768.24 0.00

0.00 43590.00 0.00

645.31 249113.02 0.00

193666.14 1528296.45 0.00

19678.15 205793.67 0.00

119416.05 366907.17 0.00

0.00 3755770.00 0.00

Page 1075 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

0 N 0

37 N 7

21 N 3

24 N 4

9 N 0

9 N 0

0 N 0

0 N 0

0 N 0

0 N 0

23 N 2

0 N 0

5 N 0

24 N 2

0 N 0

3 N 0

Page 1076 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Cutting Edge Group, LLC

Mosaic Associates Architects

Mesick Cohen Wilson Baker Architects, LLP

Architectural Resources, P.C.

Jacobs Project Management Co.

Northland Associates, Incorporated

LeChase Construction Services, LLC

Architecture +

Bell & Spina Architects-Planners, P.C.

Fontanese Folts Aubrecht Ernst Architects, P.C.

C & S Engineers, Inc.

Gilbane Building Company

Architecture +

Robert Siegel Architects

Horizon Engineering Associates, LLP

Architecture +

A. W. Farrell & Son, Inc.

Page 1077 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14 Walkup Cutoff Road P.O. Box 733

The Frear Building 2 Third Street, Suite 440

388 Broadway

505 Franklin Street

Suite 0603 Two Penn Plaza

4701 Buckley Road P.O. Box 2549

205 Indigo Creek Drive

297 River Street

Suite 201, The Bindery 215 Wyoming Street

6395 West Quaker Street

499 Col. Eileen Collins Blvd.

7 Southwoods Boulevard 3rd Floor

297 River Street

432 Jay Street

454 Warren Street

297 River Street

3761 East Lake Road

Page 1078 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Lake George NY 12845 USA

Troy NY 12180 USA

Albany NY 12207 USA

Buffalo NY 14202 USA

New York NY 10121 USA

Liverpool NY 13220 USA

Rochester NY 14626 USA

Troy NY 12180 USA

Syracuse NY 13204 USA

Orchard Park NY 14127 USA

Syracuse NY 13212 USA

Albany NY 12211 USA

Troy NY 12180 USA

Katonah NY 10536 USA

Hudson NY 12534 USA

Troy NY 12180 USA

Dunkirk NY 14048 USA

Page 1079 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.75043442.64774)

814 44 2030

POINT (-78.87207542.900014)

300 33 2041

POINT (-77.69216343.184897)

548 1685 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.74730242.766453)

282 956 2041

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.65655341.247592)

977 1254 2185

POINT (-73.78687542.249794)

515 977 619

POINT (-73.69016242.73246)

110 11 2138

Page 1080 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09X267 D005141

30XB05 T006053

06X337 T005724

02X410 T006019

02X366 T006066

30XA56 T005583

25X286 T004927

41X034 T004952

09X407 T006084

071013 T006469

10X821 T005157

10X351 T006061

01X470 T004728

13XB69 T005800

261043 D006635

801801 T006350

36X098 D005312

Page 1081 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Rehabilitation Of Science I Building Phase I Closed

CONSTR: CFA Replace North Stair and Plaza Deck Closed

CONSTR: Doty Building Renovation Closed

DESIGN: ADA Access to Pedestrian Bridge Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: New Engineering Building - Phase I Closed

DESIGN: Replace Roofs, Buildings 05, 24, 26, 33 Closed

DESIGN: Upgrade Building Fire Alarm System Optometry Closed

CONSTR: Upgrade Water Lines & Metering - Various Buildings 09415 Closed

CONSTR: Renovate Science II - Phase 1 Physics Wing Active

DESIGN: Program Study For Science, Engineering Technology, Phase I Closed

CONSTR: Tyler Hall Rehab 1 Closed

DESIGN: Rehabilitate Husted Hall, Downtown Campus, Building No. 3 Closed

DESIGN: CM Services Old Chem, ESS Rehabs Active

CONSTR: Investigate and Repair Facades at Gleeson and Laffin Halls Active

DESIGN: Architectural Services - Architecture+ - Master Term Agreement Active

CONSTR: Emergency Power For Computer Room, Federal Building Closed

Page 1082 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1083 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/04/2006 12/31/2009 11007751.00

01/15/2014 12/20/2016 7065441.00

04/24/2008 08/15/2012 11402447.00

09/04/2013 09/09/2018 227217.08

04/23/2015 02/11/2018 30500.00

10/06/2009 12/15/2014 39506494.00

04/01/2008 08/31/2010 57000.00

07/11/2006 06/30/2013 306562.94

07/23/2014 03/06/2016 918794.00

12/13/2018 08/20/2022 19205603.00

08/21/2006 08/09/2008 492960.36

03/14/2014 03/17/2018 24345184.00

05/01/2002 02/28/2015 2141320.82

03/30/2011 03/21/2016 2234024.00

04/26/2021 12/08/2022 480000.00

09/13/2017 07/16/2025 5000000.00

09/19/2007 06/30/2010 808930.00

Page 1084 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 11007751.00 0.00

0.00 7065441.00 0.00

0.00 11402447.00 0.00

0.00 227217.08 0.00

0.00 30500.00 0.00

917745.00 39506494.00 0.00

0.00 114447.55 -57447.55

9541.89 306562.94 0.00

0.00 918794.00 0.00

0.00 19143913.00 61690.00

0.00 486861.36 6099.00

0.00 24345184.00 0.00

12004.18 2141320.82 0.00

525630.86 2201386.94 32637.06

0.00 324339.00 155661.00

0.00 0.00 5000000.00

0.00 808930.00 0.00

Page 1085 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

7 N 0

4 N 0

11 N 1

0 Y 0

0 N 0

5 N 0

0 N 0

0 N 0

3 Y 1

5 N 1

5 N 0

8 N 0

5 N 1

20 N 3

5 N 2

86 N 19

7 N 3

Page 1086 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Andrew R. Mancini Associates Inc.

Rodems Construction Corp.

Liberty Mutual Insurance Company

Razak Associates Arch, Eng & Land Survey, PLLC

Sorensen Gross Construction Services

L.P. Ciminelli Construction Corp

Mosaic Associates Architects

STV Incorporated

Wilkins Mechanical, Inc.

Fahs Construction Group Inc.

SWBR Architects & Engineers, P.C.

Bette & Cring, LLC

Perkins Eastman Architects, P.C.

LiRo Program and Construction Mgmt, P.C.

All-Con Contracting Corp.

Architecture +

Arcon Construction & Management Services, Inc.

Page 1087 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

129 Odell Avenue

3555 North Buffalo Road

Suite 4000 1600 North Collins Blvd

5th Floor 45 East 20th Street

3407 torrey Road

2421 Main Street

The Frear Building 2 Third Street, Suite 440

225 Park Avenue South

6923 Herman Road

2224 Pierce Creek Road

387 East Main Street

18438 U.S. Route 11

115 Fifth Avenue - 3rd Fl

Three Aerial Way

66 Brooklyn Avenue

297 River Street

8 Railroad Avenue

Page 1088 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Endicott NY 13760 USA

Orchard Park NY 14127 USA

Richardson TX 75080 USA

New York NY 10003 USA

Flint MI 48507 USA

Buffalo NY 14214 USA

Troy NY 12180 USA

New York NY 10003 USA

Syracuse NY 13209 USA

Binghamton NY 13903 USA

Rochester NY 14604 USA

Watertown NY 13601 USA

New York NY 10003 USA

Syosset NY 11791 USA

Westbury NY 11590 USA

Troy NY 12180 USA

Albany NY 12205 USA

Page 1089 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.04917542.110866)

938 388 2033

POINT (-78.75002942.787061)

282 956 2041

POINT (-83.73256442.976697)

438

POINT (-78.84411242.93462)

300 70 2041

POINT (-73.98836440.737356)

749 719 2095

POINT (-76.29077843.104591)

685 700 2132

POINT (-75.88027242.08193)

967 477 2033

POINT (-77.60201543.158145)

537 1663 2093

POINT (-75.93432943.933537)

840 1466 2089

POINT (-73.991540.738916)

749 719 2095

POINT (-73.55949240.756646)

60 997 2094

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.80758642.690555)

834 42 2030

Page 1090 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

011008 T006198

30XB08 T006091

01XA87 T006028

13XE03 T006026

251004 T006301

28X429 T005941

39X105 D005087

08X475 T005970

04X339 T005504

02X341 T005517

01XA51 T005768

12X322 D005354

061048 T006372

03X387 T006162

03X396 T005356

36X133 T006060

07X486 D005219

081013 D006666

Page 1091 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehab Toilet Rooms for ADA - Podium Active

DESIGN: School of Medicine & Biomedical Sciences New Building Downtown - Phase 1 Closed

DESIGN: Construct ETEC Building - 2020 Closed

CONSTR: Roof Replacement Grad Chemistry Bldg Active

CONSTR: Upgrade Mechanical Systems Various Buildings Closed

CONSTR: Site Restoration - South Campus Phase I Closed

CONSTR: Renovate Kunsela Hall - Library Wing Closed

CONSTR: Wooster Building Renovations Active

DESIGN: Construct Student Life Center Closed

CONSTR: Fire Alarm/HVAC Upgrades Abate Asbestos - Tower FA/Smith Closed

CONSTR: Construct New Business School Closed

CONSTR: Upgrade Locker Rooms, Maxcy Hall Closed

DESIGN: Reconstruct Plaza, Roads & Utilities - College Circle & College Drive Active

DESIGN: CM Renovate Science Building - Bldg. 15, Phase III Closed

DESIGN: Exterior Restoration - Campus House Closed

CONSTR: Site Rehab Sys Admin IIIA Terminated

CONSTR: Demolish 55 Washington Stree, City Of Binghamton (AVRE) Closed

CONSTR: Exterior Rehab Various Buildings Active

Page 1092 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1093 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/30/2015 11/15/2024 1510694.31

08/29/2014 05/13/2019 274356.90

11/01/2013 07/03/2019 5790613.13

07/23/2013 07/03/2017 2897536.00

01/13/2017 02/22/2019 2748184.00

03/20/2012 08/27/2013 1054346.00

10/25/2005 10/31/2009 4956295.00

06/07/2012 06/01/2017 28727421.00

06/12/2009 06/15/2016 3320209.91

04/21/2009 12/01/2012 9582211.00

01/12/2011 08/21/2014 37641497.00

02/12/2008 11/13/2009 643269.00

11/12/2019 04/28/2029 1078000.00

10/06/2015 08/25/2021 1689575.44

09/22/2008 05/29/2015 45935.39

02/21/2014 01/30/2016 21145.00

12/15/2006 06/30/2009 385782.00

08/18/2021 01/29/2025 6105000.00

Page 1094 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 1025550.02 485144.29

0.00 274356.90 0.00

0.00 5790613.13 0.00

0.00 2590133.00 307403.00

0.00 2748184.00 0.00

927255.00 1054346.00 0.00

0.00 4956295.00 0.00

3478622.00 26553615.00 2173806.00

193910.31 3320209.91 0.00

563348.00 9582211.00 0.00

17020060.00 37641497.00 0.00

0.00 643269.00 0.00

0.00 307457.68 770542.32

0.00 1689575.44 0.00

879.53 45935.39 0.00

0.00 21145.00 0.00

0.00 385782.00 0.00

0.00 0.00 6105000.00

Page 1095 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

25 N 4

19 Y 1

25 N 0

21 N 0

7 Y 1

11 N 1

6 N 0

6 N 0

34 N 1

8 N 0

9 N 0

7 N 0

0 N 0

16 N 0

0 N 0

11 N 1

9 N 0

3 N 0

Page 1096 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Dembling + Dembling Architects, P.C.

Landon & Rian Enterprises Inc.

Cannon Design Arch & Engineering

A & J Construction of NY, Inc.

Wilkins Mechanical, Inc.

Zoladz Construction Co.

Park City Builders of New York, Incorporated

APS Contracting Inc.

H2L2 Architects/Planners, LLP

LeChase Construction Services, LLC

Kirchhoff-Consigli Construction Mgmt., LLC

Continental Construction, LLC

C & S Engineers, Inc.

Turner Construction Company

Bell & Spina Architects-Planners, P.C.

Callanan Industries, Inc.

Danair, Inc.

Butler Construction Group, Inc.

Page 1097 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

307 Washington Avenue

P. O. Box 92534

360 Madison Avenue 11th Floor

163 Foxwood Road

6923 Herman Road

13600 Railroad Street PO Box 157

1211 River Road PO Box 356

155-161 Pennsylvania Ave

Suite 1801 80 Broad Street

205 Indigo Creek Drive

Suite 100 199 West Road

PO Box 358 2125 State Hwy 812

499 Col. Eileen Collins Blvd.

1 Computer Drive South

Suite 201, The Bindery 215 Wyoming Street

1245 Kings Road, Colonie P.O. Box 15097

70 Snyder Drive

275 Union St

Page 1098 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Albany NY 12206 USA

Rochester NY 14692 USA

New York NY 10017 USA

West Nyack NY 10994 USA

Syracuse NY 13209 USA

Alden NY 14004 USA

Hamilton NY 13346 USA

Paterson NJ 7503 USA

New York NY 10004 USA

Rochester NY 14626 USA

Pleasant Valley NY 12569 USA

Gouverneur NY 13642 USA

Syracuse NY 13212 USA

Albany NY 12205 USA

Syracuse NY 13204 USA

Albany NY 12212 USA

Leighton PA 18235 USA

Montgomery NY 12549 USA

Page 1099 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.76760842.658846)

814 43 2030

POINT (-73.97774740.754913)

749 740 2095

POINT (-73.98461841.090176)

532 856 628

POINT (-76.29077843.104591)

685 700 2132

POINT (-78.48070342.895243)

305 481 2041

POINT (-75.57203942.780528)

137 557 2092

POINT (-74.15343840.898965)

2493

POINT (-77.69216343.184897)

548 1685 2093

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.81058842.719116)

834 42 2030

POINT (-75.64030140.843571)

2461

POINT (-74.25231 893 986 2134

Page 1100 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

29X419 T005402

03X316 T005144

09X332 T005364

211031 T006360

241013 T006224

12X343 T005836

21X164 T006217

37X048 T006072

291015 T006106

15X843 T005195

141089 T006644

07XA43 T006122

801801 T006360A

80X700 T006506

16X281 T005596

26X312 T006242

10X340 T005333

Page 1101 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Job Order Contracting Program - New York City Closed

CONSTR: Masonry Restoration, Various Buildings Phase I Closed

DESIGN: Upgrade Elevators - Hunt Union And Science II Closed

DESIGN: Repair Stone Facade and Masonry at Fort Schuyler Assigned to Vendor

DESIGN: Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall Active

CONSTR: Replace Roof Van Housen Hall Closed

DESIGN: Replace Campus Steam Distribution Closed

DESIGN: Construction Advanced Manufacutring Ctr - Wellsville Closed

DESIGN: Roof Replacement Campus Center North Active

DESIGN: Commissioning Services - Rehab Labs and Vivarium Final Paid

DESIGN: Rehab Building Envelope - Student Activities Building Active

CONSTR: Rehab Lect Hall Student Wing Closed

DESIGN: Architectural Services - Mosaic Associates - Master Term Agreement - General State Active

CONSTR: JOCS - 80700-09 - Albany Active

DESIGN: Construction Manager - Stocking Hall Closed

CONSTR: 26312 - Nold Hall - Gymnasium Rehabilitation Closed

DESIGN: Renovation/Additions to Science Engineering and Technologies Phase I Closed

Page 1102 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 1103 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/02/2008 01/21/2014 616627.00

05/01/2006 08/31/2010 5718019.00

06/30/2008 07/16/2014 40423.70

05/09/2019 09/26/2020 8113.38

03/21/2016 03/30/2021 806000.00

05/23/2011 08/15/2012 254130.00

02/15/2015 03/31/2016 2532.10

05/28/2014 06/02/2019 735256.09

07/19/2016 02/09/2022 271315.00

07/23/2007 12/31/2013 62900.19

05/10/2021 06/16/2026 957000.00

01/20/2015 05/13/2017 12080332.00

09/26/2017 11/09/2025 4096797.77

05/29/2019 08/28/2022 6000000.00

01/05/2010 09/30/2016 3997329.28

04/13/2016 12/28/2018 2415373.00

03/31/2008 07/24/2018 8011515.55

Page 1104 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

71036.00 616627.00 0.00

0.00 5718019.00 0.00

0.00 40423.70 0.00

0.00 8113.38 0.00

0.00 709342.29 96657.71

0.00 254130.00 0.00

0.00 2532.10 0.00

0.00 735256.09 0.00

0.00 286855.15 -15540.15

0.00 62900.19 0.00

0.00 0.00 957000.00

0.00 12080332.00 0.00

0.00 0.00 4096797.77

0.00 368967.00 5631033.00

710040.88 3997329.28 0.00

0.00 2415373.00 0.00

1121184.30 8011515.55 0.00

Page 1105 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

3 N 0

0 N 0

0 N 0

22 N 4

4 Y 1

5 N 1

20 N 2

0 N 0

0 N 0

27 N 7

8 N 1

86 N 19

1 N 0

12 N 0

9 N 0

5 N 0

Page 1106 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

JEMCO Electrical Contractors, Inc.

Thomas Johnson Inc.

Syska Hennessy Group, Inc

Mosaic Associates Architects

Hesnor Engineering Associates, PLLC

PTL Contracting Corp.

Ramboll Americas Engineering Solutions, Inc.

SWBR Architects & Engineers, P.C.

Hoffmann Architects, Inc.

Genesys Engineering P.C.

Superstructures Engineering + Architecture, PLLC

LeChase Construction Services LLC

Mosaic Associates Architects, DPC

Upstate Companies 1, LLC

Gilbane Building Company

All-Con Contracting Corp.

Cannon Design

Page 1107 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

271 42nd Street

3566 North Buffalo Road

14th Floor 1515 Broadway

The Frear Building 2 Third Street, Suite 440

22 Computer Drive West

27840 County Road 193

333 West Washington St PO Box 4873

387 East Main Street

462 Seventh Avenue

Suite #111 629 Fifth Avenue

14 Wall Street, 25th Floo

Suite 303 31 Lewis Street

2 Third Street Suite 440

1690 State Highway 8

7 Southwoods Boulevard 3rd Floor

66 Brooklyn Avenue

2170 Whitehaven Road

Page 1108 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Brooklyn NY 11433 USA

Orchard Park NY 14127 USA

New York NY 10038 USA

Troy NY 12180 USA

Albany NY 12205 USA

Theresa NY 13691 USA

Syracuse NY 13221 USA

Rochester NY 14604 USA

New York NY 10018 USA

Pelham NY 10803 USA

New York NY 10005 USA

Binghamton NY 13901 USA

Troy NY 12180 USA

Mt. Upton NY 13809 USA

Albany NY 12211 USA

Westbury NY 11590 USA

Grand Island NY 14072 USA

Page 1109 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

41.512158)

POINT (-74.01047940.652508)

894 815 2090

POINT (-78.74985842.786813)

282 956 2041

POINT (-73.80771442.721269)

834 42 2030

POINT (-76.15589443.049616)

687 711 2132

POINT (-77.60201543.158145)

537 1663 2093

POINT (-73.99000240.751854)

749 741 2095

POINT (-74.01099640.707301)

749 721 2095

POINT (-73.69002842.732277)

110 11 2138

POINT (-75.38238442.424467)

269 441 2037

POINT (-73.77073242.683397)

834 48 2030

POINT (-73.55949240.756646)

60 997 2094

POINT (-78.972943 290 526 2041

Page 1110 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

041010 T006108

06X305 T005319

251026 T006639

12X292 T005546

28X353 T005620

411004 T006424

39X161 T006059

11X254 D005188

09X354 T005809

05X338 T005722

31X216 T005430

36X126 T006230

21X165 T005199

08X438 T005871

241024 T006439

241024 T006360

Page 1111 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Restore/Replace Stadium Masonry Closed

CONSTR: Renovation Of Greene Science Building No. 37 Closed

DESIGN: Renovate Farnsworth Hall Active

CONSTR: Fire Alarm Replacement - Various Buildings Closed

CONSTR: Kimball Hall - Masonry/Window Restoration Closed

CONSTR: Renovate Lower Lobby Closed

CONSTR: Repl Roof - Donovan Closed

CONSTR: Replace HTHW Generator - CHP Closed

CONSTR: Rehab Showers/Locker Rooms/ADA Modifications, - Chase PE Building Closed

DESIGN: Addition and Renovation Rockefeller Arts Center Closed

CONSTR: Replace Main Electric Switchgear Closed

CONSTR: Rehab Plaza Garage Deck Level 5 Connection Replacement Closed

DESIGN: Commissioning - Upgrade/ Rehab HVAC Various Buildings Closed

DESIGN: Construction Manager for Old Main Closed

DESIGN: Upgrade Facilities Complex Active

DESIGN: Upgrade Facilities Complex Assigned to Vendor

Page 1112 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1113 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/15/2017 08/18/2021 70213.01

10/17/2007 03/31/2011 12693353.00

06/03/2021 06/09/2026 890206.00

07/01/2009 08/15/2011 2296275.00

01/07/2010 12/31/2012 2082721.00

04/25/2018 05/27/2020 2579780.00

01/28/2014 02/16/2016 1077811.00

10/18/2006 12/31/2009 1648128.00

03/15/2011 09/30/2012 1250008.00

09/23/2010 09/24/2019 3191362.04

11/26/2008 06/30/2011 1154566.00

03/07/2016 11/12/2017 315448.00

01/14/2010 12/31/2013 82392.64

12/05/2011 07/30/2021 127978.60

07/05/2019 05/04/2027 55202.00

11/13/2017 09/26/2020 473383.90

Page 1114 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 70213.01 0.00

39731.00 12693353.00 0.00

0.00 0.00 890206.00

0.00 2296275.00 0.00

127112.00 2082721.00 0.00

0.00 2579780.00 0.00

0.00 1077811.00 0.00

0.00 1648128.00 0.00

0.00 1250008.00 0.00

1123883.85 3191362.04 0.00

0.00 1154566.00 0.00

0.00 315448.00 0.00

40093.21 82392.64 0.00

67178.83 127978.60 0.00

0.00 49122.05 6079.95

0.00 473383.90 0.00

Page 1115 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

5 N 0

15 N 4

2 N 0

8 N 0

3 N 0

10 Y 2

5 N 0

10 N 0

49 Y 0

6 N 0

8 Y 1

0 N 0

0 N 0

0 N 0

0 N 0

Page 1116 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Architecture +

Christa Construction, LLC

Jacobs Project Management Co.

Dow Electric, Inc.

Allstate General Contracting, Inc.

M&J Electrical Contractors Corp

Titan Roofing Inc

John V. Warren, Inc.

Bast Hatfield Construction LLC

Deborah Berke & Partners Architects, LLP

Hinck Electrical Contractor, Inc.

Lupini Construction, Inc.

Syska Hennessy Group, Inc

Hill International, Inc

Guth Deconzo Consulting Engineers, P.C.

Mosaic Associates Architects

Page 1117 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

297 River Street

119 Victor Heights Pkwy

500 7th Avenue 17th Floor

3874 State Route 11

31 Ranier Drive

2324 Steinway Street

200 Tapley Street

2a Tibbits Avenue

1399 Vischers Ferry Road

220 Fifth Avenue 7th Floor

Suite 1 75 Orville Drive

6081 Trenton Rd

14th Floor 1515 Broadway

Suite 3415 One Penn Plaza

242 West 30th Street

The Frear Building 2 Third Street, Suite 440

Page 1118 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Troy NY 12180 USA

Victor NY 14564 USA

New York NY 10018 USA

Malone NY 12953 USA

West Seneca NY 14224 USA

Astoria NY 11105 USA

Springfield MA 1104 USA

Green Island NY 12182 USA

Clifton Park NY 12065 USA

New York NY 10001 USA

Bohemia NY 11716 USA

Utica NY 13502 USA

New York NY 10038 USA

New York NY 10119 USA

New York NY 10001 USA

Troy NY 12180 USA

Page 1119 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

43.021579)

POINT (-73.69016242.73246)

110 11 2138

POINT (-77.44463742.996293)

799 413 2133

POINT (-73.98905340.753144)

749 741 2095

POINT (-74.26781944.853703)

182 278 621

POINT (-78.81183142.814947)

287 107 2041

POINT (-73.90891340.77052)

196 877 2137

POINT (-72.56074442.126589)

1913

POINT (-73.69602342.749252)

833 13 2030

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-73.98808340.743612)

749 734 2095

POINT (-75.2130743.155128)

923 1465 625

POINT (-73.99438840.749291)

749 717 2095

Page 1120 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

361019 T006347

081070 T006578

36X114 T005657

01XA87 T006403

141031 D006614

09X382 T005939

03X357 D005323

151111 T006363

271004 T006400

111030 T006405

04X336 T005437

14X7B3 T005968

31X229 T005627

36X084 T004929

41X056 T006153

411006 T006473

Page 1121 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehab Plaza - 5th Floor South Active

DESIGN: Rehabilitate 3rd Floor and Multi-Purpose Room, Student Union Active

CONSTR: Replace Windows Plaza Building Ph 2 Closed

CONSTR: Construct ETEC Building - 2020 Active

CONSTR: Rehab Mechanical Systems- Isolation & Operating Rooms UHB Active

CONSTR: Rplace Windows - Schumacher & Central Heating Plant Closed

CONSTR: Power Plant - Upgrade Electrical Service Install Generators in Various Buildings Closed

DESIGN: Upgrade Chiller - UH 3W6W Active

CONSTR: Rehabilitate Electric Feeder and Distribution System Closed

CONSTR: Job Order Contracting - Syracuse Region Active

DESIGN: Dowd Renovations - Phase II Closed

CONSTR: Job Order Contracting Program - New York Closed

DESIGN: Commissioning Agent - Renovate Library Active

DESIGN: Replace Water Main - State University Plaza Closed

DESIGN: Rehab Building Systems Bid Pkg 08 Closed

CONSTR: Renovate 10th floor for Pediatric Clinic Active

Page 1122 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1123 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/30/2017 09/28/2022 588418.29

11/16/2021 09/14/2023 1069000.00

03/11/2010 06/09/2012 1890705.00

03/08/2018 07/24/2022 115653815.00

02/18/2021 03/05/2024 10965106.00

02/27/2012 01/31/2014 896401.00

10/30/2007 05/31/2010 986006.00

09/18/2020 08/30/2025 195000.00

02/22/2018 08/15/2021 11722047.00

03/12/2018 06/01/2022 885976.00

01/21/2009 07/31/2015 2098501.12

05/21/2012 08/31/2018 751637.00

03/12/2012 12/31/2018 155193.00

01/17/2007 01/31/2011 84106.00

03/29/2018 02/07/2022 835304.72

01/29/2019 04/30/2021 2591323.00

Page 1124 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 282554.33 305863.96

0.00 0.00 1069000.00

10000.00 1890705.00 0.00

0.00 111511545.00 4142270.00

0.00 4685920.00 6279186.00

823498.00 896401.00 0.00

0.00 986006.00 0.00

0.00 22085.99 172914.01

0.00 11722047.00 0.00

0.00 1019904.00 -133928.00

365447.00 2098501.12 0.00

0.00 751637.00 0.00

13719.09 140036.91 15156.09

0.00 40369.23 43736.77

0.00 835304.72 0.00

0.00 2571715.00 19608.00

Page 1125 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

22 N 7

0 N 0

4 N 0

2 N 0

2 Y 1

5 N 0

5 N 0

0 N 0

3 N 0

1 N 0

15 N 2

0 N 0

0 N 0

0 N 0

0 Y 0

4 N 0

Page 1126 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

HOLT Architects, P.C.

Architecture +

TGR Enterprises, Inc.

Consigli Construction NY LLC

ACS System Associates, Inc.

Window Specialist, Inc.

O'Connell Electric Co.

Hesnor Engineering Associates, PLLC

Ridley Electric Co.,Inc.

Upstate Companies 1, LLC

Sacco + McKinney, Pc

Corbex, Inc.

OLA Consulting Engineers, PC

CHA Consulting, Inc

Velez Organization

All-Con Contracting Corp.

Page 1127 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

619 W. State Street

297 River Street

248 Leiw Road

199 West Road, Suite 100

101 New South Road

188 Erie Street

830 Phillips Road

22 Computer Drive West

1810 LeMoyne Avenue P.O. Box 316

1690 State Highway 8

11 British American Blvd.

74-16 Grand Avenue

50 Broadway

3 Winners Circle P.O. Box 5269

61 Broadway, Suite 1915

66 Brooklyn Avenue

Page 1128 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ithaca NY 14850 USA

Troy NY 12180 USA

West Seneca NY 14214 USA

Pleasant Valley NY 12569 USA

Hicksville NY 11801 USA

Lancaster NY 14086 USA

Victor NY 14564 USA

Albany NY 12205 USA

Syracuse NY 13208 USA

Mt. Upton NY 13809 USA

Latham NY 12110 USA

Elmhurst NY 11373 USA

Hawthorne NY 10532 USA

Albany NY 12205 USA

New York NY 10006 USA

Westbury NY 11590 USA

Page 1129 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.50968842.439224)

709 1786 2181

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.71203142.842306)

276 159 2041

POINT (-73.8433841.749544)

589 1003 2040

POINT (-73.50647340.761202)

59 1489 2094

POINT (-78.66020442.905747)

286 532 2041

POINT (-77.45589942.99842)

799 413 2133

POINT (-73.80771442.721269)

834 42 2030

POINT (-76.14606243.085657)

690 726 2132

POINT (-75.38238442.424467)

269 441 2037

POINT (-73.81759142.759182)

834 1288 2030

POINT (-73.88686240.730363)

196 843 2137

POINT (-73.79736141.107546)

963 1251 2185

POINT (-73.79798342.719854)

834 42 2030

POINT (-74.01242840.70685)

749 721 2095

POINT (-73.55949240.756646)

60 997 2094

Page 1130 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14XA98 T005559

02X385 T005364

04X343 T005874

221012 T006357

13XC32 T004951

091029 T006370

27X230 T005606

401005 T006389

101004 T006395

251026 T006515

29X414 T005948

07XA14 T005166

05X247 T004889

291059 T006590

211002 T006102

26X282 T005246

34X102 T005619

Page 1131 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roof BSB In Guarantee

DESIGN: Upgrde Elevators, Various Buildings Closed

CONSTR: Campus Wide Satellite Boilers Closed

DESIGN: Update Facilities Master Plan Study Closed

DESIGN: Building Assessment/Renovation Suspended

DESIGN: Site Improvements & Safety Upgrades Baseball-Softball Fields Active

DESIGN: Commissioning - Student Activities Center Renovation, (STUAC), PH II Closed

CONSTR: Rehab Envelope 111 West Closed

CONSTR: Rehab Tyler Hall Phase II Closed

CONSTR: Renovate Farnsworth Hall-South/Thurston Surge Space Active

CONSTR: Rehabilitate Plaza Exterior Pathways Phase I Closed

DESIGN: Science III/IV Addition Closed

CONSTR: Renovate And Construction Addition Cranston Hall Closed

DESIGN: Site Improvements for ADA Accessibility - Phase 2 Active

DESIGN: Water System Improvements, Phase 2 Active

DESIGN: Replace Roof/Repair Masonry Greenly Lib Assigned to Vendor

CONSTR: Replace Fire Alarms - Barton Lab Closed

Page 1132 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1133 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

09/04/2009 08/26/2014 323973.00

03/09/2009 07/16/2014 205749.29

09/28/2011 10/23/2014 8755374.00

06/15/2018 12/23/2025 341754.78

10/13/2005 11/01/2012 99347.53

11/02/2017 10/19/2026 424807.08

03/11/2011 07/23/2021 65819.46

12/06/2017 11/12/2019 2036229.00

01/24/2018 07/02/2021 10976175.00

07/26/2019 01/28/2022 3055519.00

03/20/2012 02/01/2017 5921282.00

09/06/2006 12/31/2013 2812798.43

06/17/2004 12/31/2010 17771643.00

04/27/2021 09/14/2023 826000.00

07/07/2015 07/10/2023 698995.80

03/14/2007 03/11/2012 177732.78

01/07/2010 10/15/2011 376098.00

Page 1134 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 278237.07 45735.93

13450.02 205749.29 0.00

5314293.00 8755374.00 0.00

0.00 341754.78 0.00

0.00 99347.53 0.00

0.00 309651.80 115155.28

20424.31 65819.46 0.00

0.00 2036229.00 0.00

0.00 10976175.00 0.00

0.00 3045519.00 10000.00

2373186.00 5921282.00 0.00

77755.15 2812798.43 0.00

0.00 17771643.00 0.00

0.00 50467.20 775532.80

0.00 891552.59 -192556.79

0.00 177732.78 0.00

0.00 376098.00 0.00

Page 1135 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

25 N 2

0 N 0

7 N 0

0 N 0

0 Y 0

0 N 0

0 N 0

4 N 1

2 N 0

1 N 0

20 N 0

5 N 0

7 N 0

0 N 0

0 N 0

5 N 0

8 N 1

Page 1136 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Superstructures Engineering + Architecture, PLLC

Syska Hennessy Group, Inc

J & K Plumbing & Heating Co, Inc.

Kideney Architects, P.C.

David Smotrich & Partners Architects/Planners

M.J. Engineering and Land Surveying, P.C.

Genesys Engineering, P.C.

Bast Hatfield Construction LLC

PAC & Associates of Oswego, Inc.

Andrew R. Mancini Associates Inc.

MPCC Corp.

S/L/A/M/ Architects & Engineers P.C.

Lecesse Construction Co.

M.J. Engineering and Land Surveying, P.C.

Labella Associates, D.P.C

Ward Associates, P.C.

O'Connell Electric Co.

Page 1137 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

32 Avenue of the Americas

14th Floor 1515 Broadway

24 Thorp St PO Box 25 Westview Stat

143 Genesee Street

Suite 704 443 Park Avenue South

1533 Crescent Road

38 Maiden Lane

1399 Vischers Ferry Road

11-G Fourth Avenue

129 Odell Avenue

81 Rockdale Avenue

80 Glastonbury Blvd.

75 Thruway Park Drive

1533 Crescent Road

Suite 201 300 State Street

1500 Lakeland Avenue

830 Phillips Road

Page 1138 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10013 USA

New York NY 10038 USA

Binghamton NY 13905 USA

Buffalo NY 14203 USA

New York NY 10016 USA

Clifton Park NY 12065 USA

Kingston NY 12401 USA

Clifton Park NY 12065 USA

Oswego NY 13126 USA

Endicott NY 13760 USA

New Rochelle NY 10801 USA

Glastonbury CT 6033 USA

West Henrietta NY 14586 USA

Clifton Park NY 12065 USA

Rochester NY 14614 USA

Bohemia NY 11716 USA

Victor NY 14564 USA

Page 1139 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.00522640.720087)

749 737 2095

POINT (-75.92500542.103463)

968 479 2033

POINT (-78.86903142.890071)

300 34 2041

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-76.53084443.451426)

240 667 2135

POINT (-76.04917542.110866)

938 388 2033

POINT (-73.79305740.905212)

960 1450 2185

POINT (-72.61857941.721624)

1041

POINT (-77.66613743.045681)

546 420 2093

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-73.110840.780494)

1019 1073 2179

POINT (-77.45589942.99842)

799 413 2133

Page 1140 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

28X396 T005232

801801 T006354

07X486 D005152

11X259 D005396

06X7A5 T005631

01XA18 D005249

131062 T006525

12X373 T006107

14X492 T005446

02X396 T005912

11X293 T005523

03X435 T006102

02X380 T005782

19X141 T004349

01X7B1 T005956

261002 D006682

Page 1141 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Fire Alarm Systems - Various Buildings Closed

DESIGN: Architectural Services - HBT Architects - Master Term Agreement Active

CONSTR: Construct Downtown Academic Building - Building MEP Systems & Interior Fit-Out Closed

CONSTR: Demolish Maintenance Storage Building Closed

CONSTR: JOCs - Rochester Region Closed

CONSTR: Uptown Exterior Rehab-Various Buildings Phase 1 Closed

DESIGN: Rehabilitate Javits Lecture Center Active

DESIGN: Restore Exterior Envelope - Kellas Hall Closed

CONSTR: Rehabilitate HVAC & Waterproof Animal Laboratories Closed

CONSTR: Replace Roofs - Various Buildings Phase III Closed

CONSTR: Renovate Sundowner Dining Closed

DESIGN: Replace Sanitary Sewer Twin Rise to South Rockwell Closed

CONSTR: Infrastructure Improvements - Smith Hall Closed

DESIGN: Waste Stream Management Facility Closed

CONSTR: Job Order Contracting Program - Albany Closed

CONSTR: Rehabilitate Roosevelt Hall Active

Page 1142 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1143 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

02/05/2007 01/29/2012 142738.72

06/30/2017 09/18/2027 5000000.00

06/15/2006 07/31/2010 8892422.00

04/11/2008 10/15/2010 1103206.00

12/18/2009 01/31/2018 44543.00

02/20/2007 12/31/2009 531379.00

10/17/2019 10/18/2024 3147097.00

12/12/2014 03/31/2022 114292.79

11/03/2008 06/30/2015 23411609.00

01/18/2012 08/03/2013 2457707.00

05/18/2009 12/31/2011 1980109.00

01/21/2015 07/10/2023 81258.81

02/07/2011 07/02/2013 12301227.00

10/15/1999 07/02/2014 906742.27

04/18/2012 11/20/2018 31433.00

10/22/2021 05/20/2025 35110235.00

Page 1144 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1404.65 142738.72 0.00

0.00 0.00 5000000.00

0.00 8892422.00 0.00

0.00 1103206.00 0.00

0.00 44543.00 0.00

0.00 531379.00 0.00

0.00 1609122.56 1537974.44

0.00 114292.79 0.00

6192403.00 23411609.00 0.00

2270500.00 2457707.00 0.00

0.00 1980109.00 0.00

0.00 81258.81 0.00

4701972.00 12301227.00 0.00

68320.00 906742.27 0.00

0.00 31433.00 0.00

0.00 0.00 35110235.00

Page 1145 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

5 N 2

86 N 19

7 N 1

5 N 0

0 N 0

6 N 0

14 N 4

0 N 0

5 N 0

5 N 0

3 N 0

0 N 0

10 N 0

10 N 0

0 Y 0

5 N 1

Page 1146 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Labella Associates, D.P.C

HBT Architects

Christa Construction, LLC

Ritter & Paratore Contracting, Inc.

Sorensen Gross Construction Services

AOW Associates, Inc.

DLR Group Architecture & Engineering, P.C.

Architecture +

H. M. Hughes Co., Inc.

Proton Construction Corp.

Murnane Building Contractors, Inc.

Labella Associates, D.P.C

Christa Construction, LLC

Malcolm Pirnie, Inc

Cutting Edge Group, LLC

The Morganti Group, Inc.

Page 1147 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201 300 State Street

2 Elton Street

119 Victor Heights Pkwy

2435 State Route 5

3407 torrey Road

30 Essex Street

33 East 33rd Street Suite 401

297 River Street

323 East 65th Street

1171 61 Street

P.O. Box 3048 104 Sharron Avenue

Suite 201 300 State Street

119 Victor Heights Pkwy

Suite 600 50 Fountain Plaza

14 Walkup Cutoff Road P.O. Box 733

100 Reserve Road Suite D210

Page 1148 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14614 USA

Rochester NY 14118 USA

Victor NY 14564 USA

Utica NY 13502 USA

Flint MI 48507 USA

Albany NY 12206 USA

New York NY 10016 USA

Troy NY 12180 USA

New York NY 10065 USA

Brooklyn NY 11219 USA

Plattsburgh NY 12901 USA

Rochester NY 14614 USA

Victor NY 14564 USA

Buffalo NY 14202 USA

Lake George NY 12845 USA

Danbury CT 6810 USA

Page 1149 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.99842)

POINT (-77.58011543.154897)

537 1665 2093

POINT (-77.44463742.996293)

799 413 2133

POINT (-75.14054343.09411)

669 1465 2088

POINT (-83.73256442.976697)

438

POINT (-73.77972242.677542)

814 43 2030

POINT (-73.98270540.746794)

749 739 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.96059340.76393)

749 2095

POINT (-74.00164640.629777)

894 897 2090

POINT (-77.44463742.996293)

799 413 2133

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.5359441.383132)

1040

Page 1150 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

231018 T006438

01XA49 T005736

271026 T006549

111045 T006590

26X293 T005538

22X7A8 T005631

06X342 T005467

311013 T006394

11X316 T005875

031009 D006622

36X097 T004925

21X154 T005114

35X120 T006049

25X288 T005598

031005 T006285

011044 D006685

151036 T006406

28X368 D005296

Page 1151 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovations to Dana Hall Active

DESIGN: Construction Management Services - Relocate University Data Center Closed

CONSTR: Replace Roofs at Charlton and STUAC, Bldg. Nos, 45 and 08 Active

DESIGN: Reconstruct Parking Lots 27 and 28 - Banks Hall Active

DESIGN: Locker Room Renovations - Nold Hall Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: New College Stadium Closed

DESIGN: Addition and Rehab Natural Sciences Building Active

CONSTR: Window Replacement Various Buildings Closed

CONSTR: Reconstruct Central Heating Plant Active

DESIGN: Replacement Of Exterior Doors And Security System Upgrade Closed

DESIGN: Rehabilitate and Expand Pier & Other Waterfront Structures Closed

CONSTR: Infill Projects - Various Buildings Closed

DESIGN: Child Care Center Closed

DESIGN: Reconstruct Iroquois Drive Active

CONSTR: Renovate Gym & Infill Pool - PE Building Active

DESIGN: Construct Health and Wellness Center Active

CONSTR: Replace Roofs - Various Buildings Closed

Page 1152 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1153 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10/29/2019 10/20/2027 82016.00

11/15/2010 11/08/2015 1377182.50

03/04/2020 07/19/2022 3271809.00

07/06/2021 09/14/2023 361558.00

07/16/2009 12/31/2015 1237888.64

12/18/2009 01/31/2018 109411.00

02/27/2009 03/14/2017 1946390.06

01/19/2018 04/02/2023 10139580.00

10/13/2011 08/17/2014 6171746.00

03/16/2021 03/12/2023 3288000.00

07/14/2005 02/28/2012 88346.07

01/31/2006 05/29/2015 986939.89

12/18/2013 09/30/2017 9584200.00

11/30/2009 11/18/2014 471811.82

11/21/2016 12/28/2021 1022500.00

11/08/2021 12/21/2023 2971700.00

03/14/2018 06/18/2023 9454985.18

06/05/2007 06/30/2010 2277488.00

Page 1154 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 51337.63 30678.37

486405.25 1377182.50 0.00

0.00 3261809.00 10000.00

0.00 0.00 361558.00

62973.28 1237888.64 0.00

0.00 109411.00 0.00

211576.18 1946390.06 0.00

0.00 3372921.71 6766658.29

2421108.00 6171746.00 0.00

0.00 961874.00 2326126.00

0.00 83770.63 4575.44

0.00 986939.89 0.00

0.00 9584200.00 0.00

39132.30 471811.82 0.00

0.00 927515.50 94984.50

0.00 0.00 2971700.00

0.00 6826376.25 2628608.93

0.00 2277488.00 0.00

Page 1155 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

18 N 3

16 N 0

1 N 1

0 N 0

30 N 1

0 N 0

9 N 0

29 N 3

4 N 0

2 N 1

0 N 0

5 N 0

10 N 0

45 N 2

14 N 3

5 N 0

0 N 0

3 N 0

Page 1156 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Genesys Engineering, P.C.

LeChase Construction Services, LLC

Northland Associates, Incorporated

M.J. Engineering and Land Surveying, P.C.

Butler Rogers Baskett Architects

Sorensen Gross Construction Services

Clough Harbour & Associates

BSA LifeStructures of New York, LLC

Murnane Building Contractors, Inc.

Mark Cerrone, Inc.

Architecture +

M. G. Mc Laren, P.C. Consulting Engineers

LeChase Construction Services, LLC

D. W. Arthur Associates Architecture, Inc., P.C.

Wendel WD Arch, Engr, Surv. & Land Architecture

AOW Associates, Inc.

Stantec Architecture, Inc

Weaver Metal & Roofing, Inc.

Page 1157 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

38 Maiden Lane

205 Indigo Creek Drive

4701 Buckley Road P.O. Box 2549

1533 Crescent Road

5th Floor 475 Tenth Avenue

3407 torrey Road

2200 Main Place tower

9365 Counselors Row Suite 300

P.O. Box 3048 104 Sharron Avenue

2368 Maryland Avenue

297 River Street

100 Snake Hill Road

Suite 102 11849 East Corning Road

46 Plympton Street

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

21 Essex Street

722 12th Street NW Suite 100

40 Appenheimer Avenue

Page 1158 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Kingston NY 12401 USA

Rochester NY 14626 USA

Liverpool NY 13220 USA

Clifton Park NY 12065 USA

New York NY 10018 USA

Flint MI 48507 USA

Buffalo NY 14202 USA

Indianapolis IN 46240 USA

Plattsburgh NY 12901 USA

Niagara Falls NY 14305 USA

Troy NY 12180 USA

West Nyack NY 10994 USA

Corning NY 14830 USA

Boston MA 2118 USA

Williamsville NY 14221 USA

Albany NY 12206 USA

Washington DC 20005 USA

Buffalo NY 14214 USA

Page 1159 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01451641.931949)

425 79 2182

POINT (-77.69216343.184897)

548 1685 2093

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-83.73256442.976697)

438

POINT (-86.10463739.92324)

1904

POINT (-79.03548343.125204)

160 169 2131

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.95931141.101954)

532 856 628

POINT (-71.0679442.338762)

1918

POINT (-73.7785542.676983)

814 43 2030

POINT (-77.02806238.899151)

1049

POINT (-78.83725 300 70 2041

Page 1160 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

071030 T006315

20X127 D005218

111016 T006107

36X7A4 T005402

121004 T006097

29X402 T006042

041010 T006393

121002 T006107

24X293 T006040

061030 T006368

091015 T006438

09X419 T006139

08X475 T005561

051003 T006320

241010 T006097

30XB08 T006012

Page 1161 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Data Center in Computer Center Building Active

CONSTR: Replace Domestic Water Lines at Walters Hall Closed

DESIGN: Replace Roof Sibley Hall Active

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Construct New Restrooms, Kellas hall Closed

DESIGN: Building Systems Commissioning Services- CITL Project 29402 Active

CONSTR: Restore/Replace Stadium Masonry Closed

DESIGN: Replace Roofs PH 2 - Brainerd & Flagg Hall Closed

CONSTR: Provide Water and Storm Sewer Improvement Closed

DESIGN: Renovate Milne Library Active

DESIGN: Rehabilitate Alumni Hall Active

DESIGN: Partial Interior Renovation - Adding Program to Library Closed

DESIGN: Wooster Building Renovations Active

CONSTR: Demolish Academic Spine Bridge-Site Restoration Closed

DESIGN: Renovate Bouck Hall Theater, Gym and Lobby Active

DESIGN: SMBS Construction Manager- School of Medicine & Biomedical Sciences Closed

Page 1162 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1163 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/20/2017 03/30/2022 543000.00

12/22/2006 10/31/2010 2471228.00

07/07/2017 03/31/2022 369571.91

06/02/2008 01/21/2014 119229.00

09/29/2015 05/21/2023 69124.09

01/14/2014 09/29/2022 249952.00

01/19/2018 08/17/2019 268270.00

11/25/2015 03/31/2022 153874.54

12/12/2013 09/20/2016 2839211.00

01/27/2020 09/28/2026 552000.00

03/08/2019 10/20/2027 117643.00

06/10/2015 06/12/2020 681908.53

09/16/2009 03/07/2018 3186789.00

03/29/2017 11/02/2018 856671.00

07/23/2015 05/21/2023 670000.00

03/27/2013 11/30/2018 11172969.61

Page 1164 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 441436.58 101563.42

0.00 2471228.00 0.00

0.00 244039.09 125532.82

0.00 119229.00 0.00

0.00 69124.09 0.00

0.00 249862.49 89.51

0.00 268270.00 0.00

0.00 153874.54 0.00

0.00 2839211.00 0.00

0.00 393466.67 158533.33

0.00 21222.72 96420.28

0.00 681908.53 0.00

362636.91 3015093.21 171695.79

0.00 856671.00 0.00

0.00 474590.41 195409.59

0.00 11172969.61 0.00

Page 1165 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13 N 1

4 N 0

0 N 0

0 N 0

0 N 0

14 N 1

2 N 1

0 N 0

7 Y 1

30 Y 8

35 N 5

35 N 3

78 N 2

1 N 0

0 N 0

17 N 0

Page 1166 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

M/E Engineering, P.C.

Hueber-Breuer Construction Co., Inc.

Architecture +

JEMCO Electrical Contractors, Inc.

Hyman Hayes Assoc., LLC

Joseph R. Loring & Associates, Inc.

Heritage Masonry Restoration, Inc.

Architecture +

Casale Excavating Inc

Pathfinder Engineers & Architects LLP

Genesys Engineering, P.C.

Architecture +

Croxton Collaborative Architects, P.C.

Perry Construction Group

Hyman Hayes Assoc., LLC

Gilbane/LiRo A Joint Venture

Page 1167 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

300 Trolley Boulevard

P.O Box 515 148 Berwyn Avenue

297 River Street

271 42nd Street

6 Wembley Court

21 Pennsylvania Plaza 14th Floor

222 Midler Park Drive

297 River Street

551 Main Ave

134 South Fitzhugh Street

38 Maiden Lane

297 River Street

22nd Floor 475 Fifth Avenue

1440 West 21st Street

6 Wembley Court

16 Corporate Woods Blvd

Page 1168 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Rochester NY 14606 USA

Syracuse NY 13205 USA

Troy NY 12180 USA

Brooklyn NY 11433 USA

Albany NY 12205 USA

New York NY 10001 USA

Syracuse NY 13206 USA

Troy NY 12180 USA

Wynantskill NY 12198 USA

Rochester NY 14608 USA

Kingston NY 12401 USA

Troy NY 12180 USA

New York NY 10017 USA

Erie PA 16502 USA

Albany NY 12205 USA

Albany NY 12211 USA

Page 1169 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.923116)

POINT (-77.68189143.171416)

549 1664 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.84467942.740546)

834 42 2030

POINT (-76.09726643.07452)

702 715 2132

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.61959642.689957)

125 38 2138

POINT (-77.61223443.150506)

537 1666 2093

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.69016242.73246)

110 11 2138

POINT (-80.1079142.104428)

2504

POINT (-73.84467942.740546)

834 42 2030

POINT (-73.76499242.682572)

834 48 2030

Page 1170 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03X350 T005486

05X267 T006441

021028 T006372

03X390 T005644

03X392 T005611

011006 T006510

04X342 T005634

02X352 T005648

12X334 T005814

111034 D006634

35X124 T005928

02X366 T005643

22X197 T005772

21X195 D005403

05X333 T005350

30XA36 T006374

251008 T006107

Page 1171 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Academic Quad/Bulger Plaza Renovations Closed

DESIGN: Renovate Houghton Hall Active

DESIGN: Reconstruct Allen Loop Plaza and New Campus Drive Active

CONSTR: Demolish Laundry/Bakery Buildings Closed

CONSTR: Rehab Moore Hall for Central Services Closed

CONSTR: Upgrade Central Plant Active

DESIGN: Campus Wide Electrical Distribution Upgrade Closed

DESIGN: Site Infrastructure Improvements - East Campus Closed

CONSTR: Performing Arts Building Closed

CONSTR: Repair Masonry - Kehoe Administration Building and Feinberg Library Active

CONSTR: Heat Recovery - Phase II, Binns Merrill Hall Closed

CONSTR: Special Events Recreation Center Closed

CONSTR: Rehab Allied Health Building Closed

CONSTR: Baseball Field Lighting Closed

DESIGN: Electrical Distribution Upgrade Closed

CONSTR: Renovate 5th Floor Cooke & Hochstetter Ph1 Closed

DESIGN: Replace Windows & Refinish Exterior Walls - Bush Hall Closed

Page 1172 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 1173 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/26/2009 11/01/2011 4501276.00

01/30/2020 07/26/2029 77366.00

10/01/2019 04/28/2029 1289000.00

02/04/2010 08/15/2011 1735671.00

11/23/2009 08/20/2013 1487375.00

07/08/2019 05/06/2022 10426113.00

02/17/2010 04/30/2020 1938925.83

03/19/2010 03/10/2015 688880.32

03/28/2011 10/31/2016 43583616.00

04/23/2021 12/29/2023 5171429.00

01/26/2012 11/19/2013 1470599.00

02/05/2010 01/31/2015 29151631.00

01/29/2011 04/30/2015 15564720.00

06/11/2008 07/14/2010 766441.00

06/25/2009 10/01/2014 389472.39

09/14/2017 12/11/2019 11623163.00

11/30/2015 03/31/2022 264786.09

Page 1174 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

26442.00 4501276.00 0.00

0.00 60281.82 17084.18

0.00 428078.11 860921.89

0.00 1735671.00 0.00

0.00 1487375.00 0.00

0.00 8735904.00 1690209.00

116516.85 1938925.83 0.00

184689.50 688880.32 0.00

17292773.00 43583616.00 0.00

0.00 907059.00 4264370.00

1373495.00 1470599.00 0.00

3011466.00 29151631.00 0.00

4261263.00 15564630.00 90.00

0.00 766441.00 0.00

1162.98 389472.39 0.00

0.00 11623163.00 0.00

0.00 264786.09 0.00

Page 1175 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 N 0

0 N 0

0 N 0

10 N 0

16 N 0

2 N 0

22 N 1

22 N 2

7 N 0

1 N 0

2 N 0

12 N 1

12 N 0

4 N 0

0 N 0

5 N 0

0 N 0

Page 1176 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Mark Cerrone, Inc.

Wendel WD Arch, Engr, Surv. & Land Architecture

C & S Engineers, Inc.

Epic Contracting, LLC

Patrick Development, Inc.

Digesare Mechanical,Inc.

C & S Engineers, Inc.

Labella Associates, D.P.C

Northland Associates, Incorporated

Pullman SST Inc.

Testa Construction Inc.

LeChase Construction Services, LLC

Manning Squires Hennig Co. Inc

South Shore Electric

Jacobs Civil Consultants, Inc.

Savarino Companies LLC

Architecture +

Page 1177 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2368 Maryland Avenue

Centerpointe Corporate Pk 375 Essjay Road, Ste 200

499 Col. Eileen Collins Blvd.

3576 South Benzing Road

8600 Transit Road

3434 Carmen Road

499 Col. Eileen Collins Blvd.

Suite 201 300 State Street

4701 Buckley Road P.O. Box 2549

140 S. Campus Drive

12 Industrial Park Circle

205 Indigo Creek Drive

8426 Seven Springs Road PO Box 685

145 Route 109

Suite 0603 2 Penn Plaza

500 Seneca Street

297 River Street

Page 1178 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Niagara Falls NY 14305 USA

Williamsville NY 14221 USA

Syracuse NY 13212 USA

Orchard Park NY 14127 USA

East Amherst NY 14051 USA

Schenectady NY 12303 USA

Syracuse NY 13212 USA

Rochester NY 14614 USA

Liverpool NY 13220 USA

Imperial PA 15126 USA

Rochester NY 14624 USA

Rochester NY 14626 USA

Batavia NY 14020 USA

West Babylon NY 11704 USA

New York NY 10121 USA

Buffalo NY 14204 USA

Troy NY 12180 USA

Page 1179 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-79.03548343.125204)

160 169 2131

POINT (-76.13224343.113906)

690 730 2132

POINT (-78.77834542.786658)

282 956 2041

POINT (-78.69693343.001685)

304 509 2041

POINT (-73.94224442.746356)

832 72 2030

POINT (-76.13224343.113906)

690 730 2132

POINT (-80.31209240.448481)

2455

POINT (-77.7377643.130125)

549 1683 2093

POINT (-77.69216343.184897)

548 1685 2093

POINT (-78.13339143.006019)

792 489 2086

POINT (-73.35016640.706958)

1023 1035 2179

POINT (-78.8572442.877333)

300 61 2041

POINT (-73.69016242.73246)

110 11 2138

Page 1180 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

281007 T006605

081005 T006106

03X815 T004564

061000 T006136

01XA87 T006261

111036 T006366

031015 T006104

07X496 D005253

21X818 T005854

28X432 T006233

391003 T006255

261049 T006602

15X412 T005156

12X290 T005496

07XA41 T005686

23X163 D005361

10X340 T005664

Page 1181 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Crosby Hall Active

DESIGN: Replace Roof, Fine Arts Building Closed

DESIGN: Campus Capital Plan Closed

DESIGN: Reconstruct Site Electric & Steam Infrastructure at Sturges Quad Area Closed

CONSTR: Install Electrical Ductbank Closed

DESIGN: Upgrade Mechanical System for Performing Arts - Myers Hall Active

DESIGN: Upgrade Mechanical Systems for Safety at Upton Hall Closed

CONSTR: Athletic Fields Upgrade - Phase I Closed

DESIGN: Water and Gas Study Closed

CONSTR: Crosby Hall Replace Bathrooms and Elevator Closed

CONSTR: Renovate Campus Center Phase 2 - Health & Wellness Closed

DESIGN: Rehabilitate Sinclair Hall Active

CONSTR: University Hospital Vertical Expansion Mechanical Closed

CONSTR: Upgrade Electrical Distribution System - Various Buildings Closed

DESIGN: Rehabilitate OConnor Johnson Closed

CONSTR: Relocate Information Technology Center Closed

CONSTR: Site Utility Relocation - Science Engineering & Technology Closed

Page 1182 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1183 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

12/22/2020 02/04/2026 3797226.00

01/12/2016 02/09/2022 135247.08

09/02/2000 06/15/2002 280974.40

06/08/2015 12/31/2020 1641524.26

06/30/2016 08/03/2018 6448000.00

09/18/2019 12/29/2025 443967.72

05/11/2016 07/25/2023 768719.23

02/21/2007 06/30/2010 3635269.00

11/19/2012 05/09/2015 81675.00

04/08/2016 01/20/2018 4244838.00

06/14/2016 05/02/2018 1054082.00

12/08/2020 01/29/2026 2577000.00

06/28/2006 12/31/2012 29947815.00

04/09/2009 08/15/2011 2006223.00

07/19/2010 03/31/2018 1980735.11

02/26/2008 06/30/2010 1366627.00

04/07/2010 12/31/2013 1875759.00

Page 1184 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 275631.60 3521594.40

0.00 135247.08 0.00

0.00 280974.40 0.00

0.00 1641524.26 0.00

0.00 6448000.00 0.00

0.00 168604.78 275362.94

0.00 768719.23 0.00

0.00 3635269.00 0.00

0.00 81675.00 0.00

0.00 4244838.00 0.00

0.00 1054082.00 0.00

0.00 263728.07 2313271.93

330087.00 29947815.00 0.00

0.00 2006223.00 0.00

203698.04 1980735.11 0.00

0.00 1366627.00 0.00

366224.00 1875759.00 0.00

Page 1185 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

33 N 4

0 N 0

4 Y 1

15 N 2

6 N 1

0 N 0

0 N 0

5 N 0

0 N 0

4 N 0

8 N 0

65 Y 12

3 N 0

4 N 0

31 N 2

3 N 0

6 N 0

Page 1186 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

LeChase Construction Services, LLC

Hoffmann Architects, Inc.

Foit-Albert Associates, Arch,Engring & Survey,PC

RMF Engineering, Inc., P.C.

Kingsley Arms, Inc.

Mc Farland-Johnson, Inc.

M/E Engineering, P.C.

Pooler Enterprises

Cannon Design Architecture & Enginering

Javen Construction Co.

National Building & Restoration Corp.

JMZ Architects & Planners PC

North Central Mechanical Inc.

S & L Electric, Inc.

Bearsch Compeau Knudson, Architects & Engrs, P.C.

Murnane Building Contractors, Inc.

W. D. Malone Trucking & Excavating, Inc.

Page 1187 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

4225 Genesee Street Suite 200

462 Seventh Avenue

763 Main Street

Suite 300 5520 Research Park Drive

1352 NY Route 40 #1

49 Court St, Metrocenter

Suite 320 60 Lakefront Boulevard

783 Wangum Road P. O. Box 436

2170 Whitehaven Road

2575 Baird Road

1010 Tilden Avenue

190 Glen Street P. O. Box 725

100 North Michael St Suite 202 PO Box 1997

5313 State Highway 56

41 Chenango Street

P.O. Box 3048 104 Sharron Avenue

708 County Route 7

Page 1188 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14225 USA

New York NY 10018 USA

Buffalo NY 14203 USA

Baltimore MD 21228 USA

Schaghticoke NY 12154 USA

Binghamton NY 13902 USA

Buffalo NY 14202 USA

Fishers NY 14453 USA

Grand Island NY 14072 USA

Penfield NY 14526 USA

Utica NY 13501 USA

Glens Falls NY 12801 USA

St. Mary's PA 15857 USA

Colton NY 13625 USA

Binghamton NY 13901 USA

Plattsburgh NY 12901 USA

Hannibal NY 13074 USA

Page 1189 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.73008842.931775)

298 160 2041

POINT (-73.99000240.751854)

749 741 2095

POINT (-78.87135342.894814)

300 34 2041

POINT (-73.60673442.877886)

113 1401 2138

POINT (-75.91316742.098705)

968 475 2033

POINT (-78.97294343.021579)

290 526 2041

POINT (-77.46287443.110692)

540 366 2093

POINT (-75.20525943.088666)

984 1464 625

POINT (-73.6447743.309981)

824 783 2183

POINT (-78.56197941.428892)

730

POINT (-74.96727844.578792)

314 1512 2140

POINT (-75.90412542.11)

968 475 2033

POINT (-76.53388843.308935)

246 627 2135

Page 1190 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

141042 T006410

29X7A8 T005968

09X331 T005351

141000 T006178

211021 T006388

291026 T006438

06X337 T005631

15XA07 T005640

39X145 T005311

31X215 T006045

11X252 T005039

131046 T006439

09X306 T004925

24X285 T005365

081054 T006372

141056 T006359

Page 1191 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Exterior Doors- BSB and HSEB Active

CONSTR: Job Order Contracting Program - New York Closed

DESIGN: Replace VAT Flooring, Phase II Closed

DESIGN: Upgrade Electrical System UHB Active

DESIGN: Renovate Marvin Tode S&E Bldg Active

DESIGN: Rehab HVAC - Visual Arts Building Active

CONSTR: JOCs - Rochester Region Closed

DESIGN: Commissioning - IHP Addition Closed

DESIGN: Field House Closed

CONSTR: Demolish Academic Village Core Space Closed

DESIGN: Hudson Hall - General Reconstruction Closed

DESIGN: Expand and Upgrade Flax Pond Hatchery Active

DESIGN: Replace Roof, IRC, Building 06 Closed

DESIGN: Building Shell Improvements - Warner - Holmes Closed

DESIGN: Information Technology System Master Plan Active

DESIGN: Construct Infrastructure Riser BSB Active

Page 1192 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1193 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

01/16/2019 03/14/2023 780000.00

05/21/2012 08/31/2018 54405.00

06/27/2008 12/31/2017 76642.60

09/29/2015 07/01/2025 3999764.62

11/27/2017 02/15/2023 910689.00

09/24/2021 10/20/2027 64703.92

12/18/2009 01/31/2018 78167.00

03/30/2010 03/15/2015 135104.23

10/04/2007 07/31/2013 1562054.40

12/18/2013 09/04/2018 6424543.00

08/22/2005 12/30/2013 1464134.63

04/04/2019 05/04/2027 72878.00

09/01/2005 02/28/2012 75279.56

07/07/2009 04/14/2017 206476.82

09/17/2020 04/28/2029 284605.00

02/13/2019 12/02/2025 44000.00

Page 1194 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 323649.00 456351.00

0.00 54405.00 0.00

4809.22 76642.60 0.00

0.00 2766979.60 1232785.02

0.00 837336.36 73352.64

0.00 0.00 64703.92

0.00 78167.00 0.00

24925.83 135104.23 0.00

23571.08 1562054.40 0.00

0.00 6424543.00 0.00

6869.38 1450354.03 13780.60

0.00 63238.53 9639.47

0.00 42420.59 32858.97

7520.79 206476.82 0.00

0.00 186322.84 98282.16

0.00 133946.94 -89946.94

Page 1195 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 Y 0

0 N 0

0 N 0

10 N 0

24 Y 8

23 N 6

0 N 0

16 N 1

5 Y 1

7 N 0

5 Y 1

0 N 0

0 N 0

0 N 0

0 N 0

0 N 0

Page 1196 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ellana, Inc.

Corbex, Inc.

Architecture +

Lizardos Engineering Associates P.C.

Landow and Landow Architects

Genesys Engineering, P.C.

Sorensen Gross Construction Services

Genesys Engineering, P.C.

JMZ Architects & Planners PC

MPCC Corp.

Envision Architects, D.P.C.

Guth Deconzo Consulting Engineers, P.C.

Architecture +

Architecture +

C & S Companies

Lothrop Associates LLP Architects

Page 1197 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 801 32 Broadway

74-16 Grand Avenue

297 River Street

200 Old Country Road Suite 670

203 Store Hill Road

38 Maiden Lane

3407 torrey Road

38 Maiden Lane

190 Glen Street P. O. Box 725

81 Rockdale Avenue

52 James Street

242 West 30th Street

297 River Street

297 River Street

499 Col. Eileen Collins Blvd

333 Westchester Avenue

Page 1198 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10004 USA

Elmhurst NY 11373 USA

Troy NY 12180 USA

Mineola NY 11501 USA

Old Westbury NY 11568 USA

Kingston NY 12401 USA

Flint MI 48507 USA

Kingston NY 12401 USA

Glens Falls NY 12801 USA

New Rochelle NY 10801 USA

Albany NY 12207 USA

New York NY 10001 USA

Troy NY 12180 USA

Troy NY 12180 USA

Syracuse NY 13212 USA

White Plains NY 10604 USA

Page 1199 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.88686240.730363)

196 843 2137

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.63875140.739038)

62 1265 2094

POINT (-73.58158440.781211)

60 1569 2094

POINT (-74.01451641.931949)

425 79 2182

POINT (-83.73256442.976697)

438

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.79305740.905212)

960 1450 2185

POINT (-73.75023942.651717)

814 44 2030

POINT (-73.99438840.749291)

749 717 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.13224343.113906)

690 730 2132

POINT (-73.74502841.030178)

949 1437 2185

Page 1200 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

36X130 T005837

09X366 T006267

09X395 T005837

151124 T006609

131026 T006100

36X115 T005878

221009 T006104

37X032 T006082

26X7A2 T005402

01XA95 T006148

111024 T006371

04X334 T005479

12X265 D005257

29X369 T004993

12X343 T005365

06X831 T005723

14X490 T006092A

Page 1201 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate 1st Floor- North Closed

CONSTR: Replace HVAC Equipment - Hunt College Union Closed

DESIGN: Arch Plan & Interior East Closed

DESIGN: Renovate DLAR 4th Fl & Upgrade Mech New Fan Tower Active

DESIGN: Replace Fire Proofing - Grad Chem Building Closed

CONSTR: Exterior Renovations RIG Closed

DESIGN: Install Emergency Generator Systems - Various Buildings Closed

DESIGN: Construct Anaerobic Digesters Multiple Campuses Closed

CONSTR: Job Order Contracting Program - New York City Closed

DESIGN: Renovate Former Albany HS Building - Phase II Active

DESIGN: Replace HTHW Lines from Heating Plant to Manholes 12A&B Closed

DESIGN: Bowers Hall Upgrade to Sciences - Phase I Closed

CONSTR: Exterior Masonry Repairs - Campus Wide Closed

DESIGN: Rehab Central Plaza Deck and Drainage Closed

DESIGN: Replace Roofs - Maxcy & Van Housen Closed

DESIGN: Site Infrastructure Study Closed

DESIGN: Provide Additional Electrical Power-BSB Closed

Page 1202 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1203 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/01/2012 01/07/2018 55056.29

08/01/2016 08/17/2019 4411362.00

02/27/2012 01/07/2018 379940.70

01/19/2021 04/26/2026 3030000.00

02/03/2017 02/05/2024 65629.42

09/30/2011 07/30/2013 1952943.00

03/13/2017 07/25/2023 423860.27

07/09/2014 07/21/2015 258499.27

06/02/2008 01/21/2014 15397.00

07/01/2015 07/06/2025 5878395.00

11/27/2017 06/17/2025 97664.27

04/06/2009 12/31/2016 3461870.47

03/29/2007 10/26/2008 866184.00

06/22/2005 12/30/2015 2163132.25

12/16/2010 04/14/2017 245758.54

10/27/2010 12/30/2011 381020.68

09/11/2014 08/27/2021 6654.12

Page 1204 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 55056.29 0.00

0.00 4411362.00 0.00

122021.20 379940.70 0.00

0.00 90419.48 2939580.52

0.00 65629.42 0.00

1665395.00 1952943.00 0.00

0.00 423860.27 0.00

0.00 258499.27 0.00

0.00 15397.00 0.00

0.00 3295850.89 2582544.11

0.00 97664.27 0.00

464609.50 3461870.47 0.00

0.00 866184.00 0.00

187361.92 2158588.93 4543.32

22959.67 245758.54 0.00

14617.87 381020.68 0.00

0.00 6654.12 0.00

Page 1205 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

5 N 1

0 N 0

22 N 3

3 N 0

7 N 1

0 N 0

11 N 1

0 N 0

29 N 2

0 N 0

26 N 1

2 N 0

5 N 1

0 N 0

15 N 0

0 N 0

Page 1206 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ashley McGraw Architects DPC

Evans Mechanical, Inc.

Ashley McGraw Architects DPC

HOLT Architects, P.C.

Peter Gisolfi Associates

Eastern Building & Restoration, Inc.

M/E Engineering, P.C.

Arcadis of New York, Inc.

JEMCO Electrical Contractors, Inc.

CSArch Arch, Eng, Constr Management

Ramboll Americas Engineering Solutions, Inc.

Zimmer Gunsul Frasca Architects, LLP

Con Tech Building Systems

San Fanandre Justin Architects P.C.

Architecture +

C.T. Male Associates, P.C

MG Engineering DPC

Page 1207 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15th Floor 125 East Jefferson Street

314 Maple Street

15th Floor 125 East Jefferson Street

619 W. State Street

566 Warburton Avenue

2 Commerce Avenue

300 Trolley Boulevard

855 Route 146 Suite 210

271 42nd Street

40 Beaver Street

333 West Washington St PO Box 4873

Suite 200 1800 K Street

4524 State Highway 58

2nd Floor 200 Sunrise Highway

297 River Street

50 Century Hill Drive

116 West 32nd Street

Page 1208 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13202 USA

Endicott NY 13760 USA

Syracuse NY 13202 USA

Ithaca NY 14850 USA

Hastings-On-Hudson NY 10706 USA

Albany NY 12206 USA

Rochester NY 14606 USA

Clifton Park NY 12065 USA

Brooklyn NY 11433 USA

Albany NY 12207 USA

Syracuse NY 13221 USA

Washington DC 20006 USA

Gouverneur NY 13642 USA

Rockville Centre NY 11570 USA

Troy NY 12180 USA

Latham NY 12110 USA

New York NY 10001 USA

Page 1209 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-76.0700242.098418)

938 388 2033

POINT (-76.50968842.439224)

709 1786 2181

POINT (-73.8821840.995664)

974 1445 2185

POINT (-73.76984342.674904)

814 43 2030

POINT (-77.68189143.171416)

549 1664 2093

POINT (-73.78729142.864278)

1009 1190 2141

POINT (-74.01047940.652508)

894 815 2090

POINT (-73.75257842.648466)

814 44 2030

POINT (-76.15589443.049616)

687 711 2132

POINT (-75.46247944.318838)

330 1525 2140

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.75974442.773945)

834 1288 2030

POINT (-73.98964940.748897)

749 717 2095

Page 1210 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

321054 T006370

06X330 T004937

091035 T006367

11X303 T005350

09X403 T006121

09X7A2 T005395

201017 T006352

13XB61 T005283

41X029 D004972

801801 T006358

221020 T006354

07XA35 T005601

30XA80 T005856

35X103 T005337

05X296 T005270

14XA91 T005725

30XA76 T005654

Page 1211 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Repair/Replace Pedestrian Bridge at HSC Active

DESIGN: Infrastructure Improvements - Merritt Closed

DESIGN: Energy Master Plan Closed

DESIGN: Replace Low Pressure Steam with Direct Bury HTW Closed

CONSTR: Rehabilitate HVAC Mills & Willbach Dining Halls Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Repair Rooftop Greenhouses - Illick Hall Active

CONSTR: Upgrade Site Utilities, Phase I Closed

CONSTR: Exterior Restoration/Rehabilitation 33 West 42 Street Closed

DESIGN: Architectural Services - Lacey Thaler Reilly Wilson - Master Term Agreement Active

DESIGN: Replace Roofs - Orvis, Ag Science, Huntington and Pioneer Active

DESIGN: Rehab University Union North Ph 2 Closed

CONSTR: Rehab Elevators Various Buildings Closed

CONSTR: Replace McMahon Hall Building Systems Closed

DESIGN: Rehabilitate Maytum Bldg - Phase II Closed

DESIGN: Construction Manager for School of Public Health Active

CONSTR: Cooling Tower Replacement Baker Chilled Water Closed

Page 1212 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1213 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/17/2019 10/19/2026 154000.00

11/07/2007 12/31/2011 180502.77

09/07/2018 08/24/2025 248042.67

06/04/2008 10/01/2014 289230.70

01/28/2015 11/09/2016 1165564.00

04/15/2008 09/30/2014 115106.00

03/26/2018 11/01/2026 84107.00

05/08/2007 12/31/2011 11079407.00

02/23/2005 07/30/2010 5080122.00

06/30/2017 02/01/2026 5000000.00

05/18/2018 09/18/2027 443000.00

12/10/2009 05/17/2017 1231169.88

08/01/2011 07/31/2014 2710175.00

01/03/2008 05/19/2010 2956728.00

06/01/2007 05/24/2012 702469.62

10/22/2010 05/30/2021 7398718.00

03/11/2010 05/31/2012 2693364.00

Page 1214 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 91554.53 62445.47

0.00 180502.77 0.00

0.00 248042.67 0.00

15665.24 289230.70 0.00

0.00 1165564.00 0.00

0.00 115106.00 0.00

0.00 0.00 84107.00

0.00 11079407.00 0.00

0.00 5080122.00 0.00

0.00 0.00 5000000.00

0.00 438554.91 4445.09

132766.92 1231169.88 0.00

1753745.00 2710175.00 0.00

0.00 2956728.00 0.00

4558.68 702469.62 0.00

141584.67 6769796.72 628921.28

0.00 2693364.00 0.00

Page 1215 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

0 N 0

0 N 0

5 Y 1

0 Y 0

0 N 0

4 N 0

10 N 0

86 N 19

0 N 0

35 N 1

6 Y 1

7 N 0

5 N 1

20 N 1

7 N 0

Page 1216 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

M.J. Engineering and Land Surveying, P.C.

Hatch Mott Macdonald NY, Inc.

Ramboll Americas Engineering Solutions, Inc.

Jacobs Civil Consultants, Inc.

Wilkins Mechanical, Inc.

Cutting Edge Group, LLC

Bell & Spina Architects-Planners, P.C.

TR Pipe Inc.

Abax Inc.

Lacey Thaler Reilly Wilson Arch &Preservation

HBT Architects

Holt Architects, P.C.

D C B Elevator Co., Inc.

Christa Construction, LLC

M/E Engineering, P.C.

Gilbane Building Company

Pepe Construction Co., Inc.

Page 1217 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1533 Crescent Road

Suite 700 438 Main Street

333 West Washington St PO Box 4873

Suite 0603 2 Penn Plaza

6923 Herman Road

14 Walkup Cutoff Road P.O. Box 733

Suite 201, The Bindery 215 Wyoming Street

18-38 119th Street

51-09 2nd Street

4th Floor 79 North Pearl Street

2 Elton Street

217 North Aurora Street

PO Box 426

119 Victor Heights Pkwy

300 Trolley Boulevard

88 Pine Street, 27th Flr

3320 N. Benzing Road

Page 1218 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Clifton Park NY 12065 USA

Buffalo NY 14202 USA

Syracuse NY 13221 USA

New York NY 10121 USA

Syracuse NY 13209 USA

Lake George NY 12845 USA

Syracuse NY 13204 USA

College Point NY 11356 USA

Long Island City NY 11101 USA

Albany NY 12208 USA

Rochester NY 14118 USA

Ithaca NY 14850 USA

Lewiston NY 14092 USA

Victor NY 14564 USA

Rochester NY 14606 USA

New York NY 10005 USA

Orchard Park NY 14127 USA

Page 1219 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.77188842.819305)

1009 1190 2141

POINT (-76.15589443.049616)

687 711 2132

POINT (-76.29077843.104591)

685 700 2132

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.84864240.782098)

196 826 2137

POINT (-73.95870840.742658)

196 873 2095

POINT (-77.58011543.154897)

537 1665 2093

POINT (-76.49572242.44107)

709 1786 2181

POINT (-77.44463742.996293)

799 413 2133

POINT (-77.68189143.171416)

549 1664 2093

POINT (-74.0063740.705427)

749 721 2095

POINT (-78.77834942.794292)

282 956 2041

Page 1220 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

20X204 T005364

20X206 T005350

08X496 T006284

151062 D006667

071049 D006664

25X290 T006144

11X337 T006382

22X817 T005853

25X291 T005936

091000 T006258

22X7A6 T005631

26X285 T005425

13XD63 T005850

081047 D006654

35X103 T005169

09X312 T006004

261026 T006401

Page 1221 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Upgrade/Rehab Elevators - Various Bldgs Closed

DESIGN: Parking & Site Modifications, Gateway Building Closed

CONSTR: Replace Plaza Deck, Haggerty Administration & Student Union Bldgs 39 and 38 Closed

CONSTR: Renovate Silverman Hall Active

CONSTR: Renovate Bartle Library, Third floor South and Penthouse Active

CONSTR: Replace Site Infrastructure Phase III Closed

CONSTR: HTHW Generator Replacement - Phase 2 Active

DESIGN: Program Study - Pioneer Center Closed

CONSTR: Renovate Sanford Hall Closed

CONSTR: Replace Boiler - MOC Closed

CONSTR: JOCs - Rochester Region Closed

DESIGN: Rehabilitate Roadways/Walkways/ Landscaping Active

DESIGN: Student Union Rehab Active

CONSTR: Replace Roofs - Smiley Arts, College Theater, Dorsky Museum and Faculty Office Building Active

DESIGN: Replace McMahon Hall Building Systems Closed

DESIGN: Construction Manager - Rehab Physical Science II Closed

DESIGN: Replace Mechanical Systems- Lupton Hall Active

Page 1222 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1223 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

06/30/2008 07/16/2014 171596.80

10/08/2008 10/01/2014 410378.42

11/15/2016 11/15/2018 2076178.00

08/24/2021 05/16/2024 16288000.00

08/17/2021 09/11/2025 28769000.00

03/26/2015 08/24/2017 4099461.00

10/31/2017 10/17/2022 7073642.00

11/12/2013 12/14/2015 40379.80

03/13/2012 07/31/2014 11077828.00

06/20/2016 01/12/2018 378865.00

12/18/2009 01/31/2018 21025.00

01/27/2009 04/30/2016 1082702.69

08/15/2011 05/01/2022 6491814.00

06/08/2021 11/15/2023 4188000.00

09/01/2006 11/02/2012 406596.78

03/03/2014 03/05/2019 518072.26

02/28/2018 04/02/2023 1319000.00

Page 1224 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 171596.80 0.00

12703.67 410378.42 0.00

0.00 2076178.00 0.00

0.00 0.00 16288000.00

0.00 0.00 28769000.00

0.00 4099461.00 0.00

0.00 6716894.00 356748.00

0.00 40379.80 0.00

8123418.00 11077828.00 0.00

0.00 378865.00 0.00

0.00 21025.00 0.00

69869.75 1063228.98 19473.71

1231372.88 5814295.41 677518.59

0.00 0.00 4188000.00

0.00 406596.78 0.00

0.00 518072.26 0.00

0.00 815802.42 503197.58

Page 1225 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

0 N 0

4 N 0

1 N 0

5 N 1

4 N 0

0 N 0

0 N 0

10 N 0

5 Y 1

0 N 0

17 N 2

51 N 4

2 N 0

5 N 1

13 N 1

16 N 6

Page 1226 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syska Hennessy Group, Inc

Jacobs Civil Consultants, Inc.

Mid-State Industries Ltd.

Upstate Companies 1, LLC

Fahs Construction Group Inc.

Vacri Construction Corp.

All State Boiler & Construction, Inc.

Stieglitz Snyder Architecture

Bast Hatfield Construction LLC

Wilkins Mechanical, Inc.

Sorensen Gross Construction Services

Hughes Assoc, Land.Arch't DBA Hmh Site & Sports Des

Spector Group II

Greenwood Industries, Inc.

The Hall Partnership Architects, LLP

LeChase Construction Services, LLC

M/E Engineering, P.C.

Page 1227 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

14th Floor 1515 Broadway

Suite 0603 2 Penn Plaza

1105 Catalyn Street

1690 State Highway 8

2224 Pierce Creek Road

One Brick Avenue

449 Cooke Street

425 Franklin Street

1399 Vischers Ferry Road

6923 Herman Road

3407 torrey Road

2nd Floor 330 East State Street

220 Crossways Park West

640 Lincoln Street

42 East 21st Street

33 Frederick Street

433 State Street Suite 410

Page 1228 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10038 USA

New York NY 10121 USA

Schenectady NY 12303 USA

Mt. Upton NY 13809 USA

Binghamton NY 13903 USA

Binghamton NY 13901 USA

Farmington CT 6034 USA

Buffalo NY 14202 USA

Clifton Park NY 12065 USA

Syracuse NY 13209 USA

Flint MI 48507 USA

Ithaca NY 14850 USA

Woodbury NY 11797 USA

Worcester MA 1605 USA

New York NY 10010 USA

Binghamton NY 13901 USA

Schenectady NY 12305 USA

Page 1229 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.94076942.790084)

104 72 2142

POINT (-75.38238442.424467)

269 441 2037

POINT (-75.88027242.08193)

967 477 2033

POINT (-72.84438341.693111)

1041

POINT (-78.87302942.897113)

300 33 2041

POINT (-73.7374542.822924)

1002 1190 2141

POINT (-76.29077843.104591)

685 700 2132

POINT (-83.73256442.976697)

438

POINT (-73.48721540.804874)

59 1487 2094

POINT (-71.76539642.297936)

1919

POINT (-73.98829240.739319)

749 734 2095

POINT (-75.89947342.111222)

968 475 2033

POINT (-73.94162742.812671)

104 74 2142

Page 1230 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

221033 T006640

07XA26 T005489

12X316 T004929

13XB69 T005438

251018 T006103

31X7A3 T005968

09X395 T006229

11X226 D005398

02X361 T005698

01XA47 T006177

011028 T006383

31X824 T005669

02X395 T005356

031036 D006618

11X313 T005350

291028 T006355

01XA68 T005839

26X295 T005627

Page 1231 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Renovate Agricultural Science Building - Phase 1 Active

DESIGN: Central Heating plant Upgrades Closed

DESIGN: Replace U/G Fuel Oil Tanks Heating Plant Closed

DESIGN: Rehab Old Chem Classroom Bldg #02 Closed

DESIGN: Replace Boilers & Chillers, Various Buildings Active

CONSTR: Job Order Contracting Program - New York Closed

CONSTR: ADA Modifications IRC Milne Library & Morris Hall Closed

CONSTR: Saranac ADA Elevator Closed

CONSTR: Rochester Educational Opportunity Center Closed

CONSTR: Renovate Health Center Closed

DESIGN: Rehabilitate Physical Education Building Closed

DESIGN: FMP-Old Westbury Closed

DESIGN: Replace Roofs - Various Buildings Phase II Closed

CONSTR: Renovate Classroom Building Active

DESIGN: Reconstruct Roads & Parking Lots Closed

DESIGN: Replace Exterior Windows & Doors PAC & Nat Sci Active

DESIGN: Rehab Exterior Envelope, Downtown - Various Buildings Closed

DESIGN: Commissioning Agent- New Day Care Ctr. Closed

Page 1232 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1233 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

04/30/2021 06/23/2026 4512000.00

04/27/2009 01/31/2019 2040663.95

01/02/2008 01/31/2011 93000.00

02/13/2009 12/22/2014 2261562.84

09/13/2017 01/01/2023 95000.00

05/21/2012 08/31/2018 752371.00

12/15/2015 08/08/2017 418261.00

05/16/2008 08/16/2010 1171654.00

06/18/2010 11/15/2012 14702007.00

08/07/2015 02/01/2019 10533970.00

10/31/2017 03/27/2023 190835.58

07/22/2010 01/14/2012 565135.20

07/26/2010 05/29/2015 410582.27

03/02/2021 10/23/2022 2402687.00

03/09/2009 10/01/2014 395687.74

02/01/2018 01/13/2025 203547.00

02/27/2012 12/31/2018 602214.34

02/09/2012 12/31/2018 68731.97

Page 1234 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 160856.83 4351143.17

352292.68 2040663.95 0.00

0.00 80493.89 12506.11

423907.80 2261562.84 0.00

0.00 89857.82 5142.18

0.00 752371.00 0.00

0.00 418261.00 0.00

0.00 1171654.00 0.00

2193320.00 14702007.00 0.00

0.00 10533970.00 0.00

0.00 190835.58 0.00

0.00 565135.20 0.00

156901.40 410582.27 0.00

0.00 2187188.00 215499.00

10049.10 395687.74 0.00

0.00 135233.53 68313.47

247690.75 602214.34 0.00

12602.85 68731.97 0.00

Page 1235 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

32 N 2

13 N 0

0 N 0

17 N 2

0 N 0

0 N 0

4 N 0

1 N 0

15 N 2

9 N 0

22 N 2

21 N 1

0 N 0

5 N 0

0 N 0

0 Y 0

0 N 0

0 N 0

Page 1236 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ellenzweig Architects of New York, P.C.

RMF Engineering, Inc., P.C.

CHA Consulting, Inc

Ewing Cole

IBC Engineering, Pc

Corbex, Inc.

Andrew R. Mancini Associates Inc.

Murnane Building Contractors, Inc.

Christa Construction, LLC

AOW Associates, Inc.

King & King Architects, LLP

Goody Clancy & Associates, Inc.

Bell & Spina Architects-Planners, P.C.

Javen Construction Co.

Jacobs Civil Consultants, Inc.

Ismael Leyva Architects, P.C.

Architecture +

OLA Consulting Engineers, PC

Page 1237 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

10th Floor 105 Madison Avenue

Suite 300 5520 Research Park Drive

3 Winners Circle P.O. Box 5269

100 North 6th Street

Suite 219 3445 Winton Place

74-16 Grand Avenue

129 Odell Avenue

P.O. Box 3048 104 Sharron Avenue

119 Victor Heights Pkwy

30 Essex Street

358 West Jefferson Street

420 Boylston Street

Suite 201, The Bindery 215 Wyoming Street

2575 Baird Road

Suite 0603 2 Penn Plaza

13th Floor 48 West 37th Street

297 River Street

50 Broadway

Page 1238 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

New York NY 10016 USA

Baltimore MD 21228 USA

Albany NY 12205 USA

Philadelphia PA 19106 USA

Rochester NY 14623 USA

Elmhurst NY 11373 USA

Endicott NY 13760 USA

Plattsburgh NY 12901 USA

Victor NY 14564 USA

Albany NY 12206 USA

Syracuse NY 13202 USA

Boston MA 2116 USA

Syracuse NY 13204 USA

Penfield NY 14526 USA

New York NY 10121 USA

New York NY 10018 USA

Troy NY 12180 USA

Hawthorne NY 10532 USA

Page 1239 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-73.79798342.719854)

834 42 2030

POINT (-75.14971339.953775)

2602

POINT (-73.88686240.730363)

196 843 2137

POINT (-76.04917542.110866)

938 388 2033

POINT (-77.44463742.996293)

799 413 2133

POINT (-73.77972242.677542)

814 43 2030

POINT (-76.15821943.047105)

687 711 2132

POINT (-71.07265142.351364)

1918

POINT (-77.46287443.110692)

540 366 2093

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.79736141.107546)

963 1251 2185

Page 1240 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

13XB53 T005307

01XA58 T005612

311024 T006367

23X234 T006203

13XC94 D005529

02X832 T005853

21X127 T005092

041036 D006660

31X227 T005342

09X364 T005365

31X155 D005043

07XA08 D005238

121013 T006340

251023 T006360

231025 T006353

271014 T006529

14X840 T005866

07XA84 T006156

Page 1241 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: New Bio Technology Facility Closed

DESIGN: Commissioning - Water Tower and Fountain Closed

DESIGN: Study - Conditions Assessment of Emergency Generators Active

CONSTR: Replace Underground Natural Gas and Site Lighting Systems, Campus Wide Closed

CONSTR: Re-Roof Life Sciences Building Closed

DESIGN: Program Study - Drake Library Closed

CONSTR: Install Second Electrical Distribution Feeder Closed

CONSTR: Abate & Renovate 2nd Floor - Miller Building Active

DESIGN: Rehab Campus Center-H, I & K Wings Closed

DESIGN: Replace Windows - Fine Arts & Lee Hall Closed

CONSTR: Renovate Sports Facility Closed

CONSTR: Site Utilities-Replace HTW Distribution Piping To Science I & II Closed

DESIGN: Construct Addition, Renovate Bishop Hall., Bldg. No. 009C Active

DESIGN: Renovate North Hall for Admissions and UPD Assigned to Vendor

DESIGN: Update Facilities Master Plan Active

CONSTR: Reconstruct South Circle Road Active

DESIGN: Construction Manager - Various Projects 14A18 Closed

DESIGN: Construct School of Pharmacy Active

Page 1242 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Page 1243 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08/24/2007 06/15/2012 15949124.00

12/16/2011 04/13/2017 30685.23

01/15/2019 08/24/2025 38230.00

11/20/2015 11/06/2017 1748026.00

05/19/2009 09/27/2011 1000059.00

10/31/2011 12/14/2015 145066.24

11/08/2005 12/31/2010 5845296.00

06/24/2021 08/15/2023 5930000.00

07/07/2008 12/31/2017 729441.68

06/18/2010 04/14/2017 151073.86

07/11/2005 06/15/2009 1186009.00

12/20/2006 12/31/2010 918162.00

07/26/2017 09/28/2022 2835282.24

11/02/2017 09/26/2020 304196.40

08/08/2018 06/02/2025 142014.00

11/14/2019 11/01/2021 3158557.00

12/11/2013 02/01/2019 928223.94

05/27/2015 10/02/2020 1166816.00

Page 1244 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

278250.00 15894677.00 54447.00

9172.80 30685.23 0.00

0.00 21225.00 17005.00

0.00 1748026.00 0.00

0.00 1000059.00 0.00

91559.21 145066.24 0.00

0.00 5845296.00 0.00

0.00 815024.00 5114976.00

138368.81 729441.68 0.00

44503.91 151073.86 0.00

0.00 1186009.00 0.00

0.00 918162.00 0.00

0.00 1926936.31 908345.93

0.00 304196.40 0.00

0.00 133899.24 8114.76

0.00 2940304.00 218253.00

0.00 928223.94 0.00

0.00 1142560.72 24255.28

Page 1245 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

3 N 0

0 N 0

0 N 0

6 N 0

16 N 0

0 N 0

4 N 0

6 N 2

0 N 0

0 N 0

5 N 0

3 N 0

14 Y 2

0 N 0

0 Y 0

3 N 0

0 N 0

29 N 2

Page 1246 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

J. Kokolakis Contracting, Inc

Genesys Engineering, P.C.

Ramboll Americas Engineering Solutions, Inc.

Perras Excavating, Inc.

NJK Contractors, Inc.

Stieglitz Snyder Architecture

The Chappy Corporation

Fahs Construction Group Inc.

Perkins Eastman Architects, P.C.

Architecture +

Techcon Contracting Inc.

Kimble Inc. Mechanical Contractor

JMZ Architects & Planners PC

Mosaic Associates Architects

Chiang O'Brien Architects

Smith Site Development, LLC

Jacobs Project Management Co.

LeChase Construction Services LLC

Page 1247 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite A 1500 Ocean Avenue

38 Maiden Lane

333 West Washington St PO Box 4873

1909 State Highway 420

50 Bay 7th Streeet

425 Franklin Street

90 Spencer Ave

2224 Pierce Creek Road

115 Fifth Avenue - 3rd Fl

297 River Street

Suite 7 2079 Wantagh Avenue

1004 Sullivan Street

190 Glen Street P. O. Box 725

The Frear Building 2 Third Street, Suite 440

Crescent Building 217 North Aurora Street

1249 Front Street Ste. 110

Suite 0603 Two Penn Plaza

Suite 303 31 Lewis Street

Page 1248 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bohemia NY 11716 USA

Kingston NY 12401 USA

Syracuse NY 13221 USA

Massena NY 13662 USA

Brooklyn NY 11228 USA

Buffalo NY 14202 USA

Chelsea MA 2150 USA

Binghamton NY 13903 USA

New York NY 10003 USA

Troy NY 12180 USA

Wantagh NY 11793 USA

Elmira NY 14901 USA

Glens Falls NY 12801 USA

Troy NY 12180 USA

Ithaca NY 14850 USA

Binghamton NY 13905 USA

New York NY 10121 USA

Binghamton NY 13901 USA

Page 1249 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-74.01451641.931949)

425 79 2182

POINT (-76.15589443.049616)

687 711 2132

POINT (-74.87971744.885402)

319 1585 2140

POINT (-78.87302942.897113)

300 33 2041

POINT (-71.02496442.39707)

1918

POINT (-75.88027242.08193)

967 477 2033

POINT (-73.991540.738916)

749 719 2095

POINT (-73.69016242.73246)

110 11 2138

POINT (-76.80083542.106509)

485 926 2036

POINT (-73.6447743.309981)

824 783 2183

POINT (-75.89634442.156134)

966 475 2033

Page 1250 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

061021 T006101

091017 T006433

41X056 T005448

01XA94 T006440

021054 T006585

21X244 T006252

03X417 T005943

03X383 T005550

26X312 T006100

05X267 T006179

07XA48 T005955

111034 T006360A

21X207 T005371

05X309 T005841

02X344 T005884

281004 T006499

07XA37 T005819

Page 1251 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Replace Roof at Welles Hall Active

CONSTR: Rehab Roofs Various Buildings Closed

DESIGN: Rehab Building Systems Active

DESIGN: Renovate Lecture Center Phase III Active

DESIGN: Update Facility Master Plan Active

CONSTR: Water System Improvements, Phase 1B Closed

CONSTR: Replace Roof, Campus West - A Wing Closed

DESIGN: CM - Technology Building Closed

DESIGN: Rehabilitate Gymnasium, Nold Hall Closed

CONSTR: Renovate Surge For Exercise Science Closed

CONSTR: Upgrade HTHW Interconnect Zone 1&2 Closed

DESIGN: Repair Masonry Kehoe, Yokum, Angell, Myers and Feinberg. Active

DESIGN: New Secondary Electrical System - Fort Closed

CONSTR: Science Technology Building Closed

DESIGN: Renovate Lathrop & Neff Closed

CONSTR: Replace Roofs Cary, Farber and Sherman Annex Active

CONSTR: Rehab Domestic Water Distrib Systems Closed

Page 1252 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1253 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07/27/2017 10/10/2023 281700.00

05/24/2018 07/01/2020 685725.00

02/13/2009 07/19/2023 2180759.00

04/17/2020 12/12/2028 29863.00

10/20/2021 09/14/2023 192978.00

04/29/2016 06/27/2018 682309.00

03/15/2012 08/01/2013 369928.00

08/27/2009 08/24/2014 1484802.90

08/11/2015 02/05/2024 230491.74

08/21/2015 02/13/2017 741232.00

05/01/2012 12/20/2013 3006278.00

08/19/2019 11/09/2025 503608.43

07/24/2008 04/01/2013 153819.98

06/01/2011 01/15/2017 42403987.00

11/23/2011 09/26/2017 1309444.65

04/11/2019 09/28/2021 4930166.00

04/19/2011 08/15/2013 4280320.00

Page 1254 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 177161.87 104538.13

0.00 685725.00 0.00

208411.99 2125180.92 55578.08

0.00 20011.25 9851.75

0.00 0.00 192978.00

0.00 682309.00 0.00

349815.00 369928.00 0.00

420953.69 1484802.90 0.00

0.00 230491.74 0.00

0.00 741232.00 0.00

2292341.00 3006278.00 0.00

0.00 302526.04 201082.39

0.00 153266.76 553.22

14629757.00 42403987.00 0.00

486913.26 1309444.65 0.00

0.00 4402579.00 527587.00

998276.00 4280320.00 0.00

Page 1255 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0 N 0

7 N 2

12 N 1

26 N 4

0 Y 0

3 N 0

5 N 0

11 N 0

0 N 0

4 N 0

2 N 0

0 N 0

0 Y 0

6 N 0

36 N 4

2 N 0

4 N 0

Page 1256 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Bell & Spina Architects-Planners, P.C.

RSI Roofing, Inc.

Lilker Associates

Horizon Engineering Associates, LLP

JMZ Architects & Planners PC

K G Power Systems

Grove Roofing Services, Inc.

L. P. Ciminelli Construction Corp.

Peter Gisolfi Associates

Perry Construction Group

All State Construction, Inc.

Mosaic Associates Architects, DPC

Lakhani & Jordan Engineers, P.C.

The Pike Company Inc

Labella Associates, D.P.C

Jameson Roofing Co., Inc.

G. DeVincentis & Son Construction Company, Inc

Page 1257 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Suite 201, The Bindery 215 Wyoming Street

44 County Route 9

1001 Ave of the Americas

358 West Jefferson Street Suite 300

190 Glen Street P. O. Box 725

150 Laser Court

131 Reading Street

2421 Main Street

566 Warburton Avenue

1440 West 21st Street

449 Cooke Street P. O. Box 805

2 Third Street Suite 440

315 Madison Avenue 10th Floor

One Circle Street

Suite 201 300 State Street

3761 East Lake Road

7 Belden Street

Page 1258 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13204 USA

Gouverneur NY 13642 USA

New York NY 10018 USA

Syracuse NY 13204 USA

Glens Falls NY 12801 USA

Hauppauge NY 11788 USA

Buffalo NY 14220 USA

Buffalo NY 14214 USA

Hastings-On-Hudson NY 10706 USA

Erie PA 16502 USA

Farmington CT 6032 USA

Troy NY 12180 USA

New York NY 10017 USA

Rochester NY 14607 USA

Rochester NY 14614 USA

Dunkirk NY 14048 USA

Binghamton NY 13903 USA

Page 1259 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.53317744.260521)

311 1525 2140

POINT (-73.98625340.751894)

749 741 2095

POINT (-76.15821943.047105)

687 711 2132

POINT (-73.6447743.309981)

824 783 2183

POINT (-73.2642940.812147)

1014 1428 2179

POINT (-78.82783142.840927)

300 109 2041

POINT (-78.84411242.93462)

300 70 2041

POINT (-73.8821840.995664)

974 1445 2185

POINT (-80.1079142.104428)

2504

POINT (-72.84438341.693111)

1041

POINT (-73.69002842.732277)

110 11 2138

POINT (-73.97914840.752993)

749 740 2095

POINT (-75.89760742.096034)

968 477 2033

Page 1260 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

32X468 T006124

22X220 T005356

12X360 T006083

351001 T006104

05X340 T006069

01XA93 T006107

12X345 T005976

32X468 T006211

13XC96 T005784

12X339 T005612

29X346 T004948

28X422 T005799

15X482 T005606

391010 T006490

051010 T006101

24X266 T005865

09X324 T005365

26X269 T005415

Page 1261 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: New Medical & Res Trans & Bed Tower 328A1 Active

DESIGN: Replace Roof/Abate Asbestos - Allied Health Building Closed

CONSTR: Replace Roof Crumb Library Closed

DESIGN: Update/Replace HVAC Components - Harder Hall Active

CONSTR: Rehab / Upgr Elevs. Closed

DESIGN: Replace Exterior Doors - Uptown Phase 1 808BL Active

CONSTR: Rehabilitate Ice Arena Maxcy Hall Closed

CONSTR: New Medical & Res Trans & Bed Tower Active

DESIGN: CM Services - Mech Sys Upgrd Life Sci Active

DESIGN: Commissioning - Upgr HVAC/Labs Stowell Active

DESIGN: Masonry Repair and Window Replacement Various Buildings Closed

DESIGN: Construction Manager - Hayes Hall Restoration Closed

DESIGN: Commissioning DLAR Phase III Renovation Weiskotten Hall Active

CONSTR: Reconstruct Various Roadways and Parking Active

DESIGN: Rehabilitate Plaza Maytum/Reed/McEwen Active

DESIGN: Construction Manager Scheduling Services Closed

DESIGN: Replace Bugbee Hall Roof Closed

CONSTR: Water Distribution System Improvements Closed

Page 1262 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1263 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

11/28/2014 09/21/2020 13412669.24

05/20/2008 05/29/2015 82734.04

07/23/2014 01/21/2016 378260.00

02/02/2017 07/25/2023 270500.00

03/27/2014 01/28/2017 1062085.00

02/19/2015 03/31/2022 251552.00

06/29/2012 03/17/2016 8732347.00

11/02/2015 12/01/2019 465012.00

04/05/2011 03/27/2016 1278938.00

06/15/2011 04/13/2017 83205.00

07/17/2007 09/30/2011 132913.37

04/04/2011 12/31/2017 1630756.30

05/25/2012 07/23/2021 70111.00

03/22/2019 08/09/2020 1235200.00

07/14/2017 10/10/2023 736000.00

11/15/2013 06/01/2016 38079.60

05/20/2008 04/14/2017 71090.62

06/23/2008 12/01/2010 2228792.00

Page 1264 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 13398252.18 14417.06

0.00 81967.89 766.15

0.00 378260.00 0.00

0.00 860584.25 -590084.25

0.00 1062085.00 0.00

0.00 234271.16 17280.84

3135321.00 8732347.00 0.00

0.00 436495.00 28517.00

325061.67 1222602.79 56335.21

22209.95 41499.31 41705.69

0.00 132913.37 0.00

466590.65 1630756.30 0.00

0.00 10328.84 59782.16

0.00 1105990.00 129210.00

0.00 370241.85 365758.15

0.00 38079.60 0.00

0.00 71090.62 0.00

0.00 2228792.00 0.00

Page 1265 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

24 N 1

0 N 0

4 Y 2

0 N 0

6 N 0

0 N 0

3 N 0

5 N 1

11 N 3

0 N 0

0 N 0

18 N 0

0 N 0

5 N 1

0 N 0

0 N 0

0 N 0

3 N 0

Page 1266 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

LiRo Program and Construction Mgmt, P.C.

Bell & Spina Architects-Planners, P.C.

PTL Contracting Corp.

M/E Engineering, P.C.

Concept Construction Corporation

Architecture +

Bette & Cring, LLC

L & H Signs

Jacobs Project Management Co.

Genesys Engineering, P.C.

The Hall Partnership Architects, LLP

L.P. Ciminelli Construction Inc.

Genesys Engineering, P.C.

Central Paving Inc.

Bell & Spina Architects-Planners, P.C.

Turner Construction Company

Architecture +

Merrick Utility Associates, Inc.

Page 1267 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Three Aerial Way

Suite 201, The Bindery 215 Wyoming Street

27840 County Road 193

Suite 320 60 Lakefront Boulevard

2555 Transit Road

297 River Street

18438 U.S. Route 11

425 North 3rd Street

Suite 245 1305 Franklin Avenue

38 Maiden Lane

42 East 21st Street

2421 Main Street

38 Maiden Lane

4247 Acme Road

Suite 201, The Bindery 215 Wyoming Street

1 Computer Drive South

297 River Street

91 Marine Street

Page 1268 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syosset NY 11791 USA

Syracuse NY 13204 USA

Theresa NY 13691 USA

Buffalo NY 14202 USA

Elma NY 14059 USA

Troy NY 12180 USA

Watertown NY 13601 USA

Reading PA 19601 USA

Garden City NY 11530 USA

Kingston NY 12401 USA

New York NY 10010 USA

Buffalo NY 14214 USA

Kingston NY 12401 USA

Frankfort NY 13340 USA

Syracuse NY 13204 USA

Albany NY 12205 USA

Troy NY 12180 USA

Farmingdale NY 11735 USA

Page 1269 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-78.6968342.836367)

292 515 2041

POINT (-73.69016242.73246)

110 11 2138

POINT (-75.93432943.933537)

840 1466 2089

POINT (-75.93152740.342811)

726

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.98829240.739319)

749 734 2095

POINT (-78.84411242.93462)

300 70 2041

POINT (-74.01451641.931949)

425 79 2182

POINT (-75.05966943.02887)

681 552 2088

POINT (-73.81058842.719116)

834 42 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.419868 1023 1115 2179

Page 1270 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

08X436 T005813

36X114 T005365

30XA95 T006514

36X816 T005854

03X362 D005375

251004 T006103

141006 T006100

10X345 T005696

08X473 T005565

23X200 T005480

09X308 T005910

29X413 T005870

31X240 T006015

101025 D006619

09X345 T005781

801802 T006367

Page 1271 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Upgrade Electric Distribution - Phase I Closed

DESIGN: Replace Windows Plaza Building Ph 2 Closed

CONSTR: Natural Science Complex Fire Alarm Remediation Closed

DESIGN: Study for E. 54th Str. Bldgs at Global Closed

CONSTR: Replace Drainage/Turf at Coyer Field Closed

DESIGN: Mechanical Electrical Plumbing Alteration Services - Delhi Closed

DESIGN: Space Programming Study- BSB Closed

CONSTR: Rehab of Elevators at Various Buildings Closed

DESIGN: New Science Building Active

CONSTR: Convocation, Athletic Recreation Center Closed

CONSTR: Rehabilitation of Fitzelle Hall, Bldg. No. 26 Closed

DESIGN: Construction Management Services- Exter Rehabilitation Dining & Phys Ed Bldgs Active

CONSTR: Cogeneration Improvements Closed

CONSTR: Replace/Reconstruct Terracotta - Sheldon Hall Active

CONSTR: Upgrade Central Heating Plant - Phase IIIA Closed

DESIGN: Engineering Services - O'Brien & Gere Engineers - Master Term Agreement Active

Page 1272 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Page 1273 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/28/2011 08/16/2014 4651590.00

05/20/2009 04/14/2017 289081.33

07/26/2019 06/22/2021 2046796.00

07/03/2012 05/09/2015 73336.00

02/27/2008 08/25/2009 1211209.00

06/10/2015 01/01/2023 323675.44

09/20/2016 02/05/2024 100568.94

06/29/2010 08/19/2012 989637.00

10/01/2009 12/31/2018 4211266.00

03/18/2009 05/31/2014 22723430.00

01/20/2012 11/05/2016 26455664.00

05/16/2012 10/01/2018 549097.00

05/01/2013 02/15/2015 514430.00

03/02/2021 03/21/2025 12400000.00

02/07/2011 09/13/2012 1969104.00

07/26/2017 08/24/2025 5000000.00

Page 1274 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

885360.00 4651590.00 0.00

2091.91 289081.33 0.00

0.00 2046796.00 0.00

67835.80 73336.00 0.00

0.00 1211209.00 0.00

0.00 323675.44 0.00

0.00 100568.94 0.00

0.00 989636.70 0.30

1106018.23 3796512.27 414753.73

176337.00 22723430.00 0.00

6404541.00 26455664.00 0.00

0.00 745227.42 -196130.42

0.00 514430.00 0.00

0.00 892984.00 11507016.00

38251.00 1969104.00 0.00

0.00 0.00 5000000.00

Page 1275 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

6 N 0

0 N 0

1 N 0

0 N 0

9 N 0

0 N 0

0 N 0

2 N 0

53 N 0

7 N 0

9 N 0

0 Y 0

10 N 0

2 N 0

4 N 0

62 N 10

Page 1276 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

M. Scher & Son Inc.

Architecture +

CIR Electrical Construction Corp.

Cannon Design Architecture & Enginering

Anastasi Trucking, Inc.

IBC Engineering, Pc

Peter Gisolfi Associates

Downey-Goodlein Elevator Corp.

Zimmer Gunsul Frasca Architects, LLP

Northland Associates, Incorporated

Christa Construction, LLC

The McKissack Group, Inc DBA McKissack & McKissack

Boilermatic Welding Industries, Inc.

PAC & Associates of Oswego, Inc.

All State Construction, Inc.

Ramboll Americas Engineering Solutions, Inc.

Page 1277 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

1 Prospect Avenue

297 River Street

400 Ingham Avenue

2170 Whitehaven Road

4430 Walden Avenue

Suite 219 3445 Winton Place

566 Warburton Avenue

10 Pixley Industrial Pkwy

Suite 200 1800 K Street

4701 Buckley Road P.O. Box 2549

119 Victor Heights Pkwy

20th Floor. 1001 Avenue of the Americas

17 Peconic Avenue

11-G Fourth Avenue

449 Cooke Street P. O. Box 805

333 West Washington St PO Box 4873

Page 1278 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Albany NY 12206 USA

Troy NY 12180 USA

Buffalo NY 14218 USA

Grand Island NY 14072 USA

Lancaster NY 14086 USA

Rochester NY 14623 USA

Hastings-On-Hudson NY 10706 USA

Rochester NY 14624 USA

Washington DC 20006 USA

Liverpool NY 13220 USA

Victor NY 14564 USA

New York NY 10018 USA

Medford NY 11763 USA

Oswego NY 13126 USA

Farmington CT 6032 USA

Syracuse NY 13221 USA

Page 1279 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

40.71458)

POINT (-73.77261842.673362)

814 43 2030

POINT (-73.69016242.73246)

110 11 2138

POINT (-78.8406942.816118)

287 107 2041

POINT (-78.97294343.021579)

290 526 2041

POINT (-78.60321642.926816)

286 532 2041

POINT (-73.8821840.995664)

974 1445 2185

POINT (-77.71049243.141014)

549 1683 2093

POINT (-77.44463742.996293)

799 413 2133

POINT (-72.96754440.817776)

1022 1313 2179

POINT (-76.53084443.451426)

240 667 2135

POINT (-72.84438341.693111)

1041

POINT (-76.15589443.049616)

687 711 2132

Page 1280 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

07XA58 T005791

14X466 T004819

15XA19 T006036

241033 T006438

30XA13 T005670

40X004 D005078

03X375 T005562

39X140 T005194

08X7C1 T005956

24X268 T005351

07XA73 T005834

07XA23 T005701

141058 T006532

061014 T006437

03X387 T005709

31X229 T006169

12X261 T005210

80X700 D006665

Page 1281 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

DESIGN: Rehabilitate Science IV ph 1 Closed

DESIGN: Renovate and Expand Basic Science Building Closed

CONSTR: New Academic Building Closed

DESIGN: Renovate Bouck Hall - Bookstore & Related Student Life Active

CONSTR: Replace Roofs - Various Buildings Closed

CONSTR: Reconstruct 2 Union Avenue Closed

DESIGN: Construction Manager - Science Phase II Closed

DESIGN: Commissioning Services - Auxiliary Services Student Center Closed

CONSTR: Job Order Contracting Program - Albany Closed

DESIGN: Library Upgrades Interior, Exterior, Elevator and Mechanical Systems Closed

DESIGN: Flood Rehabilitation UDC Closed

CONSTR: New HV Substation Closed

CONSTR: Demolish Admin Trailers Closed

DESIGN: Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls Active

DESIGN: Commissioning Agent, Renovate Science 15 Phase II Closed

CONSTR: Renovation of Library/Academic Space - Stage 2 Active

DESIGN: Upgrade Underground Site Infrastructure,Site Improvements Closed

CONSTR: JOCS Construction- Syracuse Region Active

Page 1282 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1283 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

03/18/2011 05/13/2021 1460535.53

03/13/2003 01/30/2014 1869306.08

11/06/2013 04/15/2018 32964407.00

03/23/2020 10/20/2027 21400.00

04/07/2010 11/12/2013 4797882.00

10/14/2005 12/31/2010 10256470.00

12/07/2009 11/29/2014 1743145.09

04/24/2008 12/31/2013 65805.57

04/18/2012 11/20/2018 494897.00

07/14/2008 12/31/2017 440072.51

11/10/2011 03/15/2016 248548.91

06/25/2010 06/29/2012 4688333.00

12/06/2019 05/26/2021 937128.00

12/12/2018 10/25/2027 21065.00

09/23/2010 12/15/2022 419610.58

04/27/2015 12/31/2020 10043416.00

12/18/2006 02/07/2012 727522.98

08/18/2021 10/22/2022 2000000.00

Page 1284 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

351527.30 1460535.53 0.00

0.00 1869306.08 0.00

0.00 32964407.00 0.00

0.00 4230.00 17170.00

463427.00 4797882.00 0.00

0.00 10256470.00 0.00

157982.10 1743145.09 0.00

252.60 62907.95 2897.62

0.00 494897.00 0.00

5219.76 440072.51 0.00

210353.39 436433.26 -187884.35

0.00 4688333.00 0.00

0.00 937128.00 0.00

0.00 19333.87 1731.13

8252.03 419610.58 0.00

0.00 9946817.00 96599.00

0.00 727522.98 0.00

0.00 0.00 2000000.00

Page 1285 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

46 N 3

5 Y 1

4 N 0

0 N 0

3 N 0

7 N 0

9 N 0

0 N 0

0 Y 0

0 N 0

0 N 0

6 N 0

1 Y 0

0 N 0

13 N 0

10 N 0

5 N 1

1 N 0

Page 1286 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Ashley McGraw Architects DPC

David Smotrich & Partners Architects/Planners

Bette & Cring, LLC

Genesys Engineering, P.C.

Jameson Roofing Co., Inc.

Zandri Construction Corp.

Lend Lease Construction Inc

SmartEdge

Cutting Edge Group, LLC

Architecture +

CSArch Arch, Eng, Constr Management

Nelcorp Electrical Contracting Corporation

Russo Development Enterprises Inc.

C.J. Brown Energy & Engineering, P.C.

Horizon Engineering Associates, LLP

Fratello Construction Corp

Greenman-Pedersen, Inc

Upstate Companies 1, LLC

Page 1287 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

15th Floor 125 East Jefferson Street

Suite 704 443 Park Avenue South

18438 U.S. Route 11

38 Maiden Lane

3761 East Lake Road

98 Niver St. P.O. Box 190

Suite 850 One North Wacher Drive

4 Peuquet Parkway

14 Walkup Cutoff Road P.O. Box 733

297 River Street

40 Beaver Street

35 North Kelly Avenue

67 East Avenue

Suite 204 4245 Union Road

358 West Jefferson Street Suite 300

134 Milbar Boulevard

Suite 207 400 Rella Boulevard

1690 State Highway 8

Page 1288 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Syracuse NY 13202 USA

New York NY 10016 USA

Watertown NY 13601 USA

Kingston NY 12401 USA

Dunkirk NY 14048 USA

Cohoes NY 12047 USA

Chicago IL 60606 USA

Tonawanda NY 14150 USA

Lake George NY 12845 USA

Troy NY 12180 USA

Albany NY 12207 USA

Endwell NY 13760 USA

Lawrence NY 11559 USA

Buffalo NY 14225 USA

Syracuse NY 13204 USA

Farmingdale NY 11735 USA

Montebello NY 10901 USA

Mt. Upton NY 13809 USA

Page 1289 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

POINT (-75.93432943.933537)

840 1466 2089

POINT (-74.01451641.931949)

425 79 2182

POINT (-73.69772542.759227)

835 1176 2030

POINT (-78.86566943.01577)

280 8 2041

POINT (-73.64807743.386894)

818 128 2183

POINT (-73.69016242.73246)

110 11 2138

POINT (-73.75257842.648466)

814 44 2030

POINT (-76.02526642.109078)

938 388 2033

POINT (-73.7416840.634423)

62 1563 2094

POINT (-76.15821943.047105)

687 711 2132

POINT (-73.41703540.750059)

1023 1115 2179

POINT (-75.382384 269 441 2037

Page 1290 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

021011 T006426

13XD12 T005820

23X200 T005557

311005 T006222

13X7A5 T005968

Page 1291 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

CONSTR: Renovate Exterior Facade & Perimeter Heating System at Allen Hall Closed

DESIGN: Commissioning - New Computer Science Closed

CONSTR: Convocation, Athletic Recreation Center - Ice Rink Closed

CONSTR: Job Order Contracting: NYC Region Closed

CONSTR: Job Order Contracting Program - New York Closed

Page 1292 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Best Value

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Design and Construction/Maintenance Authority Contract - Competitive Bid

Page 1293 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

05/02/2018 06/08/2021 7058440.00

05/23/2011 06/02/2016 83388.39

08/13/2009 05/31/2014 7960473.00

02/29/2016 04/30/2019 666956.00

05/21/2012 08/31/2018 236050.00

Page 1294 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

0.00 7058440.00 0.00

4921.82 83388.39 0.00

110925.00 7960473.00 0.00

0.00 666956.00 0.00

0.00 236050.00 0.00

Page 1295 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

2 N 1

12 N 0

3 N 0

0 N 0

0 N 0

Page 1296 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Savarino Companies LLC

Horizon Engineering Associates, LLP

Northland Associates, Incorporated

Volmar Construction, Inc

Corbex, Inc.

Page 1297 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

500 Seneca Street

800 Veterans Memorial Highway, Suite 310

4701 Buckley Road P.O. Box 2549

4400 Second Avenue

74-16 Grand Avenue

Page 1298 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

Buffalo NY 14204 USA

Hauppauge NY 11788 USA

Liverpool NY 13220 USA

Brooklyn NY 11232 USA

Elmhurst NY 11373 USA

Page 1299 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995

42.424467)

POINT (-78.8572442.877333)

300 61 2041

POINT (-73.20607540.821625)

1019 1428 2179

POINT (-74.01363540.652263)

894 899 2090

POINT (-73.88686240.730363)

196 843 2137

Page 1300 of 1300 01/02/2022

State University Construction Fund (SUCF) Contracts: Beginning 1995