suny binghamton science iii program & renovationbinghamton, ny client: sucf suny binghamton value:...

2
Binghamton, NY Client: SUCF SUNY Binghamton Value: $4,900,000 Size: 16,000 SF Completion: January 2012 - Ph I December 2012 - Ph II April 2013 - Ph III Contact: Robert Langhans BU Project Coordinator (607) 777.4321 SUNY BINGHAMTON SCIENCE III PROGRAM & RENOVATION FE FE FE FE FE FE FE FE FE DN RAMP DN RAMP DN RAMP DN UP FVC Cage Wash Bottle Wash (NIC) Autoclave (NIC) Cage Wash 1SB Stair 1 BE1 Elev 1 BE2 Elev 2 B45 Elev Mach Room BE1 Receiving Storage B47 Mechanical B46 Receiving Loading Dock Specialty Animal Holding 023 Procedure / Animal Holding 024 Procedure / Animal Holding 025 Animal Treatment 027 Lab 030 Control Room 032A Radiology 032 Dark Room 032B Necropsy 029 Animal Receiving / Exam 026 Food / Bedding Storage 020 Corridor C002 Storage 019 Dirty Cage Wash 017 Euthanasia 018 Quarantine/ Animal Holding 021 Quarantine/ Animal Holding 022 Clean Cage Storage 028 Changing Room 031A Surgeon Prep 031B Clean Cage Wash 016 Clean Cage Storage 016A Wood Shop 034 Wood Shop Storage 033 Operating Room 031D Animal Prep 031C Recovery 031E LAR Office 015 Men's Locker Room 014 Women's Locker Room 013 Vet Tech Office 012 Laundry 011A Breakroom / Kitchenette 011 Elevator Machine Rm 010 Elevator Lobby 009 Corridor C001 Metal Shop 008 Shop Office / Clean Room 002 Metal Shop Storage 003 Janitorial 004 Building Operations Office / Shop 005 Med Waste Storage 006 Med Waste Office 007 Loading Dock Corridor C002 Corridor C002 Mort. Refrid. NIC Grossing Station NIC F.E.C. F.E.C. F.E.C. F.E.C. B01 Corridor EXISTING CAGEWASH MECHANICAL ANIMAL CARE OFFICE DIAGNOSTICS RESTROOM RADIOLOGY SHOP HOLDING SOCIAL CAGEPREP STORAGE SUPPORT CIRCULATION SURGERY PHASE III PHASE I & II Multi-phase programming and renovation of Science III Laboratory Animal Resources Facility at Binghamton University Extensive existing conditions assessment & space analysis Development of various design layouts based on input from user group meetings and program requirements Specialty spaces including surgery and radiology suites, holding rooms, exam rooms, labs and research spaces, cage wash operations, offices and support spaces Project includes three construction phases to ensure the uninterrupted operation of the cage wash facilities and accommodate strict research schedule

Upload: others

Post on 10-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Binghamton, NY

    Client: SUCF

    SUNY Binghamton

    Value: $4,900,000

    Size: 16,000 SF

    Completion: January 2012 - Ph I

    December 2012 - Ph II

    April 2013 - Ph III

    Contact: Robert Langhans

    BU Project Coordinator

    (607) 777.4321

    SUNY BINGHAMTON SCIENCE III PROGRAM & RENOVATION

    FE

    FE

    FE

    FE

    FE

    FE

    FE

    FE

    FE

    DN

    RAMP DN

    RAMPDN

    RAMP DN

    UP

    FVC

    Cage Wash

    Bottle Wash(NIC)

    Auto

    clav

    e(N

    IC)

    Cage Wash

    1SB

    Stair 1

    BE1

    Elev 1

    BE2

    Elev 2B45

    Elev Mach Room

    BE1

    ReceivingStorage

    B47

    Mechanical

    B46

    Receiving

    Loading Dock

    Specialty AnimalHolding

    023

    Procedure / AnimalHolding

    024

    Procedure / AnimalHolding

    025

    Animal Treatment

    027

    Lab

    030

    Control Room

    032A

    Radiology

    032

    Dark Room

    032B

    Necropsy

    029Animal Receiving /

    Exam

    026

    Food / BeddingStorage

    020

    Corridor

    C002

    Storage

    019

    Dirty Cage Wash

    017

    Euthanasia

    018

    Quarantine/ AnimalHolding

    021

    Quarantine/ AnimalHolding

    022

    Clean Cage Storage

    028

    Changing Room

    031A

    Surgeon Prep

    031B

    Clean Cage Wash

    016

    Clean Cage Storage

    016A

    Wood Shop

    034

    Wood Shop Storage

    033

    Operating Room

    031D

    Animal Prep

    031C

    Recovery

    031E

    LAR Office

    015

    Men's Locker Room

    014

    Women's LockerRoom

    013

    Vet Tech Office

    012

    Laundry

    011A

    Breakroom /Kitchenette

    011

    Elevator Machine Rm

    010

    Elevator Lobby

    009

    Corridor

    C001

    Metal Shop

    008

    Shop Office / CleanRoom

    002

    Metal Shop Storage

    003

    Janitorial

    004

    Building OperationsOffice / Shop

    005

    Med Waste Storage

    006

    Med Waste Office

    007

    Loading Dock

    Corridor

    C002

    Corridor

    C002

    Mort. Refrid.NIC

    GrossingStationNIC

    FE

    FE

    FE

    F.E.C.

    F.E.C.

    F.E.

    C.

    F.E.C.

    B01

    Corridor

    FE

    FE

    REG. MED. WASTE

    B20

    STORAGE

    B18

    ADMIN OFFICE

    B16

    UDS

    B14

    CUSTODIAL

    B12

    TECH OFFICE

    B10

    MEETING /CONFERENCE

    B04

    STORAGE

    B00S

    VIVARIUM

    B22

    STORAGE

    B23

    MACHINE SHOP

    B11 SPECIAL SERVICES

    B03

    STORAGE

    B03B

    STORAGE

    B03A

    STORAGE

    B11A

    VIVARIUM

    B32

    WOOD SHOP

    B36

    VIVARIUM

    B44B

    VIVARIUM

    B44C

    VIVARIUM

    B40A

    PREP

    B44A

    PREP

    B40

    STORAGE

    B44

    VIVARIUM

    B42

    VIVARIUM

    B35

    STORAGE

    B37

    SURGERY

    B43

    DIAGNOSTICS

    B43A

    OFFICE

    B41A

    VIVARIUM

    B41B

    VIVARIUM

    B37A

    STORAGE

    B37B

    VIVARIUM

    B35ACAGE STORAGE

    B31B

    WASH ROOM

    B37C

    WASH ROOM

    B35B

    CORRIDOR

    B00A

    PASSAGE

    B41

    PASSAGE

    B31WASH ROOM [DIRTY]

    B27

    WASH ROOM [CLEAN]

    B31A

    CAGE PREP

    B31C

    LINEN

    B31D

    LOADING DOCK

    RECEIVING

    B46

    LOADING DOCK

    ELEVATOR MACHINEROOM

    B50

    RECEIVING

    B53

    ELEVATOR MACHINEROOM

    B45

    ELEV 2

    BE2

    STAIR 1

    1SB

    CORRIDOR

    B51ELEV 1

    BE1

    RECEIVING STORAGE

    B46A

    EXISTING

    CAGEWASH

    MECHANICAL

    ANIMAL CARE

    OFFICE

    DIAGNOSTICS

    RESTROOM

    RADIOLOGY

    SHOP

    HOLDING

    SOCIAL

    CAGEPREP

    STORAGE SUPPORTCIRCULATION

    SURGERY

    PHASE IIIPHASE I & II

    •Multi-phase programming and renovation of Science III Laboratory Animal Resources Facility at Binghamton University

    •Extensive existing conditions assessment & space analysis •Development of various design layouts based on input from user

    group meetings and program requirements•Specialty spaces including surgery and radiology suites, holding

    rooms, exam rooms, labs and research spaces, cage wash operations, offices and support spaces

    •Project includes three construction phases to ensure the uninterrupted operation of the cage wash facilities and accommodate strict research schedule