statistical process control cases and problems

19
Statistical Process Control Cases and Problems

Upload: ashish-viswanath-prakash

Post on 26-Dec-2015

320 views

Category:

Documents


7 download

DESCRIPTION

This presentation can be used for classroom discussions on application of Statistical Process Control.

TRANSCRIPT

Page 1: Statistical Process Control Cases and Problems

Statistical Process Control

Cases and Problems

Page 2: Statistical Process Control Cases and Problems

Logitech company – Problem

Day No of Defective

s

Day No of Defective

s

Day No of Defective

s

1 3 8 7 15 7

2 10 9 18 16 6

3 13 10 1 17 19

4 4 11 0 18 3

5 12 12 4 19 9

6 14 13 9 20 7

7 8 14 22

A sample of 50 disks per day is inspected

Page 3: Statistical Process Control Cases and Problems

Case Question

Production manager suspects the variation was due to substitution of an inexperienced candidate instead of regular one on 3 days during the period.

Page 4: Statistical Process Control Cases and Problems

Indigo airlines Problem

In Indigo aircraft's landing gear assembly the defects are detected as given in the table below

If the weightages given for the different classes of defects are A=10, B=5, and C=1. construct appropriate control chart for quality.

Page 5: Statistical Process Control Cases and Problems
Page 6: Statistical Process Control Cases and Problems

Plotting on a graph sheet.

Scale

Page 7: Statistical Process Control Cases and Problems

Please note:

In end semester examination, if you are asked to draw/solve a control chart problem, please use 6 sigma limits only,(do not use 3 sigma control limit (1.5 sigma + 1.5 sigma) or you will loose marks).

Even if the question tells you to draw 3 sigma control limits, please understand that you are expected to draw 6 sigma control limits( 3sigma + 3 sigma).

Page 8: Statistical Process Control Cases and Problems

Case study : Scharadin Hotels

National hotel chain started in 1957 by Milo Scharadin.

Highly reputable national hotel chain

Serve over 100 1ocations and are recognized for their customer service and quality.

They cater to both business and nonbusiness customers

Page 9: Statistical Process Control Cases and Problems

A Problem with Quality

Scharadin Hotel in San Antonio, Texas, had recently been experiencing a large number of guest complaints due to billing errors.

Guest complaints ranged from extra charges, such as meals or services that were not purchased, to confusion for not being charged at all

The hotel staff often had to calm frustrated guests who were rushing to the airport and were aggravated that they were getting charged for items they had not purchased.

Page 10: Statistical Process Control Cases and Problems

Staff meeting discussion

Larraine Scharadin, Milo Scharadin’s niece - recent business school graduate new computer system and software

Tim Coleman, head of MIS, defended the system

Tim claimed that a few hotel guests made an issue of a few random problems.

Scott Schultz, head of operations, was not so sure.

Scott said that he noticed that the number of complaints seem to have significantly increased since the new system was installed.

Page 11: Statistical Process Control Cases and Problems

Audit of 50 random bills per day over the past 30 days.

Page 12: Statistical Process Control Cases and Problems

Tim exclaimed: “Notice that the number of errors increases in the last third of the month. The computer system had been in place for the entire month so that can’t be the problem. Scott, it is probably the new employees you have on staff that are not enteringthe data properly.”

Scott quickly retaliated: “The employees are trained properly! Everyone knows the problem is the computer system!”

Page 13: Statistical Process Control Cases and Problems

Case Questions

1. Set up three-sigma control limits with the given data.

2. Is the process in control? Why?

3. Based on your analysis do you think the problem is the new computer system or something else?

4. What advice would you give to Larraine based on the information that you have?

Page 14: Statistical Process Control Cases and Problems

© 2006 Prentice Hall, Inc. S6 – 14

Patterns in Control Charts

Normal behavior. Process is “in control.”

Upper control limit

Target

Lower control limit

Figure S6.7

Page 15: Statistical Process Control Cases and Problems

© 2006 Prentice Hall, Inc. S6 – 15

Upper control limit

Target

Lower control limit

Patterns in Control Charts

One plot out above (or below). Investigate for cause. Process is “out of control.”

Figure S6.7

Page 16: Statistical Process Control Cases and Problems

© 2006 Prentice Hall, Inc. S6 – 16

Upper control limit

Target

Lower control limit

Patterns in Control Charts

Run of 5 above (or below) central line. Investigate for cause. Figure S6.7

Page 17: Statistical Process Control Cases and Problems

© 2006 Prentice Hall, Inc. S6 – 17

Upper control limit

Target

Lower control limit

Patterns in Control Charts

Erratic behavior. Investigate.

Figure S6.7

Page 18: Statistical Process Control Cases and Problems

Career in Quality

Six sigma Green Belt, Black Belt

Master black beltASQ or ISILead auditor

Page 19: Statistical Process Control Cases and Problems

Thank you