status and concept of international grid connection market ... · market and technical requirements...
TRANSCRIPT
![Page 1: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/1.jpg)
Status and concept of international grid connection
Market and Technical Requirements
Ronnie Belmans
Executive Director, GSGF
![Page 2: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/2.jpg)
2
Agenda
Overview of the European high voltage grid
European market overview
Planned expansions in Europe
Obstacles for expansion / super grids
An idea of European super grid: DESIGN GRID
![Page 3: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/3.jpg)
3
The Supergrid Vision in not new!
1930
1950
Today
![Page 4: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/4.jpg)
4
Synchronous zones in Europe
Connected via HVDC cables or back-to-back converters
For smaller zones (UK, Ireland, Baltic region)
Frequency stability is of major concern
Especially with decreasing inertia due to renewables
HVDC, especially VSC offers great flexibility and control
![Page 5: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/5.jpg)
5
What is the Trend in Europe? Projects of Common Interest
Many PCIs between non – synchronous zones
Many PCIs in vicinity of pumped hydro storage
Norway and Alps
Offshore hub between UK, NL, BE part of PCI list!
The development around the North Sea is the first step of the super grid.
![Page 6: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/6.jpg)
6
Average whole sale prices in Europe
Purely merchant lines are only viable between zones with high price difference
E.g. links to UK, Italy or Spain
Links from Scandinavia to rest of Europe
In Central West Europe Often price convergence on wholesale
Nevertheless, high balancing costs due to need for renewables
In 2015 roughly 1G€ for re-dispatch and other services for quality of supply in Germany
Grid expansion essential to increase social welfare and ensure security of supply!
![Page 7: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/7.jpg)
7
Price convergence in CWE
Full price convergence in CWE region (%)
2013 - 2015
17,4 %
70,7%
83,2%
65,6%
48,9%
Price convergence to at least one other CWE country (%)
2013 - 2015
Partial price convergence in CWE region (%)
2013 - 2015
69,5 %
![Page 8: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/8.jpg)
8
What is the Trend in Europe? Embedded HVDC
More and more HVDC links within the same synchronous zone
Increased power flow control
Reactive power support
Increased stability France - Spain
Germany
Sweden
UK - Westlink Belgium – Germany
![Page 9: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/9.jpg)
9
Challenges for coordinated planning Not necessarily technical…
Regulatory challenges for coordinated planning
Not aligned national frames Swedish TSO is not responsible for connection of offshore wind farms
German TSO obligation makes cooperation difficult
Not aligned renewable support schemes Integrating three national solutions where each country imports the offshore wind produced in its water is not necessarily the best design
In case of an interconnector, where does the wind go?
Capacity Remuneration Mechanisms
![Page 10: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/10.jpg)
10
Cost allocation and Regulation (1)
New developments Restructuring => Vertical coordination (VC)
EU energy policy objectives => Horizontal coordination (HC)
Efficient cost allocation solutions required both at national and European level
Transmission tariff design
Cross-border cost allocation
![Page 11: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/11.jpg)
11
Existing cross-border cost allocation solution in Europe
Relative to asset hosted Does not reflect the welfare distribution
effect 50-50 rule
Does not reflect the welfare distribution effect
Limited application Inter TSO Compensation (ICT)
Limited scope and precision Welfare distribution effects ignored
Summarizing Not suitable for PCI type projects
Other mechanisms based on Peak Demand – Installed Generation Capacity – RES Installed – TSO involvement – Distance – …
Cost allocation and Regulation (2)
![Page 12: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/12.jpg)
12
Operational Rules for HVDC GRIDS
The control strategy influences the market
How to be neutral to all market participants?
Ancillary services and operation
How to operate an overlay grid? Who is responsible?
Operational rules need to be considered in planning
But, many operational rules between AC and DC systems are not defined, yet (in red)
AC 2
DC 2 DC 1
AC 2
![Page 13: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/13.jpg)
13
The way to the future – DESIGN GRID An integrated offshore grid design for Europe
A five line grid connecting: Denmark Belgium Netherlands Germany Sweden Iceland UK Norway
Allowing integration North Sea offshore wind farms
![Page 14: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/14.jpg)
14
DESIGN GRID
DESIGN Grid will allow trade between different markets and price zones Denmark, Belgium, Netherlands, Germany, Sweden, Iceland, UK, Norway
This way, TSOs will develop new products and services, based on the possibilities offered by DESIGN GRID
The coordinated operation of the DESIGN GRID links will allow Optimal infeed of renewable energy
Reducing re-dispatch costs
Delivery of system services Frequency support
Reactive power support
Black – start capability
![Page 15: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/15.jpg)
15
How to get there?
1st STEP: Feasibility study Identify technical and regulatory show stoppers and provide solutions
Risk level: low
Time horizon: 1-3 years
2nd STEP: Detailed engineering study Subsea surveys, technical studies, legal advise, permits, etc….
Set up as a Newco -> DESIGN GRID
Acts as commissioning agent for construction
Risk level: Medium
Time horizon: ~ 3 years
![Page 16: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/16.jpg)
16
How to get there?
3rd STEP: Stepwise Construction and Operation
Different companies can build parts of the grid
TSOs, insurance companies, pension funds, manufacturers, asset holders, ….
The operation is transferred to a commercial system operator -> “DESIGN Operate” (Newco)
Revenues are passed to DESIGN GRID determined in a specific regulatory scheme
Risk level: Medium
Time horizon: 2020 - 2030
![Page 17: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/17.jpg)
17
Operation and Regulation
Operation and maintenance in the hands of DESIGN Operate
Collecting grid fees
Maintenance
Scheduling and real time operation (ISO approach, e.g. CORESO)
Payment of concession holders
Interaction with national grids is important
Although power transfer managed by DESIGN Operate, reactive power control can be given to national TSOs
Fundamental rewrite of grid codes is required to coordinate interactions
![Page 18: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/18.jpg)
18
Why are investments stalling?
TSOs are hesitant to invest in a multinational offshore grid as long as there is not a harmonized regulation
Regulators have no means to harmonize and improve regulation as long as there is no multinational offshore grid
![Page 19: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/19.jpg)
19
Financing and Regulation
Regulatory Framework determines feasibility of North Sea Grid Developments:
D: DKK, Danish Crown
E: EUR, Euro
S: SEK, Swedish Crown
I: ISK, Iceland Crown
G: GBP, British Pound
N: NOK, Norwegian Crown
How to match national operational standards, regulatory and legal framework?
![Page 20: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/20.jpg)
20
Building Blocks of a Regulatory Framework
• Coordination of national and regional transmission expansions Planning and
Design
• Ownership by New Third Party Companies (Newco)
• Impact monopoly of local TSO (parallel path) Ownership
• Distribution of the costs amongst regions: new cost allocation methods
• New tariff schemes (cfr. national regulators) Cost Allocation
• Network Codes to ensure compatibility local TSO and Newco
• Redesign of Ancillary Services
• Coordination maintenance, scheduling and dispatch of transmission assets owned by Newco
Operation
![Page 21: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/21.jpg)
21
DESIGN GRID Revenue Model
Cap & floor set based on:
CAPEX
OPEX
Cost of financing
For the benefit of the network users and the investors:
Sharing of revenues in times exceeding the cap
Helps to being prepared for the time below the floor
Guaranteed rate of return
Opex
Capex
Congestion revenues
CAP
FLOOR Payment from consumers to IC via TSO
Income received via IC operator
Payment from IC to consumers via TSO
Determine ex-ante C&F levels with a RAV model,
fixed for the whole regime
Operation 5 10 15 20 25
Pre - operation
![Page 22: Status and concept of international grid connection Market ... · Market and Technical Requirements Ronnie Belmans Executive Director, GSGF . 2 ... The Supergrid Vision in not new!](https://reader035.vdocument.in/reader035/viewer/2022081612/5f68bee4375b8a6776347f2f/html5/thumbnails/22.jpg)
Status quo and concept of international grid connection
Market and Technical Requirements
Ronnie Belmans
Executive Director, GSGF