status and future evolutioncci.esa.int/sites/default/files/01_cci_collocation6_intro v1.pdf · by...

13
ESA Climate Change Initiative Status and Future Evolution CCI 6th Collocation meeting Maurice Borgeaud 29 September 2015, ESRIN

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

ESA Climate Change Initiative Status and Future Evolution

CCI 6th Collocation meeting Maurice Borgeaud

29 September 2015, ESRIN

Page 2: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

CCI Collocation Meeting

Goals:

•  Improve exploitation and promotion of CCI data (COP-21 prep, breakout sessions on Data Portal/Toolbox and Exploitation)

•  Consolidate CCI Achievements - presentations on Wednesday morning

•  Determine which ECVs are operational and ready for Copernicus Climate Change services

•  Determine what R&D is still required for the ECVs (and feed this info to GCOS)

•  Look ahead to how the CCI may evolve, with new ECVs and new data (Sentinels)

Page 3: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

CCI Master Schedule

Phase 1 Phase 2

Page 4: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

CCI Progress and Achievements

By the end of Phase 2, all CCI Projects will have achieved: •  Algorithm improvements (GCOS ECV product accuracy and

stability requirements) •  Standardised global multi-mission ECV time series •  Development of ECV product uncertainty estimates •  Validation of ECVs •  Climate user assessment of ECV fitness-for-purpose •  Development of sustainable data processing systems •  Implementation of open access to all data products and

reports •  Strong international cooperation with relevant agencies,

scientific and user groups •  There has also been progress on common cross-ECV

challenges through programme-wide cooperation •  Where feasible, all projects will adapt algorithms to use new

Sentinel data, as these become available. •  Finally, Visualisation Tool is fully functioning and the app will

be available on iTunes store by end 2015.

Page 5: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

CCI Presence 2015

§  June Le Bourget §  June C3S Workshop §  July Our Common Future Under

Climate Change §  July IGARSS (Milan Italy) §  September Collocation meeting §  November COP-21 (two events)

§  November CCI+ Programme Proposal -  CCI Achievements presented to delegates in

September

§  Materials -  The CCI Visualisation Tool (always updated version) -  A new set of News Letters -  Updated Fact Sheets (in English and in French)

Page 6: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

Programme Extension CCI +

§  In the current context (role of ESA, of EUMETSAT and of Services developed by EC)

-  The role of ESA is to focus on Research and Development

§  The main strategic line consists in: -  Propose new ECV. -  Propose projects using many ECVs.

§  Take into account CSAB recommendations

§  Take into account requests from delegations

Page 7: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

Implemented by the CCI

Page 8: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

Proposed within CCI Extension

Page 9: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

§  Extra products from existing CCI ECVs, e.g.: -  Sea ice drift -  Cloud heights from O2A and O2-O2 band -  Aerosol absorption properties -  Ocean colour in highly-productive coastal Case-2 -  Improved accuracies and improved error estimation

§  Adaptation of CCI processing chains to new Sentinel data

-  New instrument capabilities e.g. new spectral bands, higher resolution, different observing geometry

-  Time series consistency between different instruments e.g. ATSR-1, ATSR-2, AATSR, SLSTR

§  Cross-ECV Exploitation, e.g.: -  Ice-sheet mass balance, Global Water Cycle, ... -  Fluxes (air/sea, land/sea, energy, water, gases, aerosols) -  Permafrost -  International LAI/FAPAR reconciliation -  Hiatus, El Nino, ...

Other R&D Activities in CCI+

Page 10: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

CCI+ Schedule

Phase 1 Phase 2 CMIN16

Page 11: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation
Page 12: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation
Page 13: Status and Future Evolutioncci.esa.int/sites/default/files/01_CCI_Collocation6_intro v1.pdf · By the end of Phase 2, all CCI Projects will have achieved: ... • Finally, Visualisation

Thank you