status of run selection
DESCRIPTION
Status of Run Selection. THIS TALK IS UNDER CONSTRUCTION Using also p13.06 Post-shutdown data: Runs from 172400 to 176843(11 May) 55 pb -1 reconstructed Study presented here is a sample of this dataset. Compare with pre-shutdown data. METB (“no”CH) vs METC (withCH). - PowerPoint PPT PresentationTRANSCRIPT
CATMay-27-2003
G. Bernardi LPNHE - Paris
Status of Run Selection
THIS TALK IS UNDER CONSTRUCTION
Using also p13.06 Post-shutdown data:
Runs from 172400 to 176843 (11 May)
55 pb-1 reconstructed
Study presented here is a sample of this dataset.
Compare with pre-shutdown data
CATMay-27-2003
G. Bernardi LPNHE - Paris
METB (“no”CH) vs METC (withCH)
Pre-shutdown one entry/run.
METC-x
METB-y
METC-y
METB-y
METB is much more stable than METC. Main effect is removal of CH.
P13.04 – P13.06 data
Mean MET-x
Mean MET-y
CATMay-27-2003
G. Bernardi LPNHE - Paris
METB and SETB (mean, RMS)
Pre-shutdown one entry/run.
METC
METB
SETC
SETB
CATMay-27-2003
G. Bernardi LPNHE - Paris
METx and y, < > and RMS
Pre-shutdown one entry/run.
RMS-MET-x
<MET-x>
RMS-MET-y
<MET-y>
CATMay-27-2003
G. Bernardi LPNHE - Paris
Variables for Run Selection
Pre-shutdown one entry/run.
CATMay-27-2003
G. Bernardi LPNHE - Paris
Good Run DefinitionOnly Runs with >= 1000 events are considered. (451 runs, p13.04/05)
RUNS from 162004 to 170374
Define the average shift: MET-xy = sqrt [ (<MET-x>)2 +(<MET-y>)2]
For a GOOD RUN:
1) Require MET-xy < 3 GeV
2) Require mean scalar ET between > 80 GeV.
3) Require stable RMS of METx and y (< 11 GeV in average)
RUN SELECTION released last week.
With full statistics, use MET-xy < 5 GeV in all files of a run, and MET-xy < 3.5 GeV in average.
RMS-xy < 16 GeV in all files of a run RMS-xy < 15 GeV in average.
CATMay-27-2003
G. Bernardi LPNHE - Paris
Summary
New run selection on the way.
On the post-shutdow data, we see a slight degradation of the calo quantities, not a dramatic effect except in the range 176568 - 176591
We have about 55 pb-1 recoed / available after shutdown.
More studies needed. Next update, will be announced to the jetmet & CAT mailing lists.
.