status of the d0 calorimeter
DESCRIPTION
Status of The D0 Calorimeter. Nirmalya Parua. (For the Calorimeter Group). General Overview. 55k channel Ur/liq. Argon calorimeter Run II upgrade: replacement of electronics to accommodate faster bunch crossings 55k dual FET PreAmps 23k Switch Capacitor Arrays (SCA) on - PowerPoint PPT PresentationTRANSCRIPT
Status of The D0 Calorimeter
Nirmalya Parua(For the Calorimeter
Group)
02/11/02 Nirmalya Parua
General Overview 55k channel Ur/liq. Argon calorimeter Run II upgrade:
replacement of electronics to accommodate faster bunch crossings
55k dual FET PreAmps 23k Switch Capacitor Arrays (SCA) on 1200 BaseLineSubtraction (BLS)-boards~ 50 bad channels (~0.1%)
Preamp/Driver
Trig. sum
Filter/Shaper
x1
x8
SCA (48 deep)
SCA (48 deep)
SCA (48 deep)
SCA (48 deep)
BLSOutputBuffer
Bank 0
Bank 1
SCACalorimeter
Calibrationelectronicsreadoutchain
All Experimenters meeting
02/11/02 Nirmalya Parua
Installation & CommissioningC
om
mis
sio
n
T&
C
AD
C
Tri
gg
er
Bo
ard
Tri
gg
e B
oa
rd
AD
C
Tri
gg
er
PS
Bo
ard
s
Bo
ard
s
Bo
ard
s
PS
Bo
ard
s
Tri
gg
er
P S P S
0 11
1 10
2 9
3 8
4 7
5 6
Key: complete partially complete incomplete
BL
S
Pu
lse
r
BL
S
Pu
lse
r
PS
PS
Pre
am
p
Pre
am
p
ENDCAPSOUTH
CENTRALCALORIMETER
ENDCAPNORTH
N
Only Remaining piece is Trigger readout for ||>0.8We have occasional failure of power supplies.
02/11/02All Experimenter’s
MeetingNirmalya Parua
Finer Debugging
… .…
… .…
x8
x1
L1 SCA up
L2 SCAADC
down
Mean value
AD
C c
ou
nts
L1 SCA up
L1 SCA down
L2 SCA
R. Zitoun, Stony Brook
Most problems are traced to slower SCA chips.
More than 250 are replaced
02/11/02 Nirmalya Parua
Impedance Measurement
PreAmp-Cryostat Cable
Feedthrough
various detector capacitances
Broken cable
Paris & Orsay
A total 31 channels are not connected
02/11/02 Nirmalya Parua
• -50 ns 98.01%• -20 ns 99.69%• -10 ns 99.92%• 10 ns 99.93%• 20 ns 99.71%• 50 ns 98.23%
Sampling time vs amount sampled
Nominal sampling time varies from –6 ns to 35ns
Pedestal Values were different for Early, Nominal or Late sampling.
Corrected after putting additional CAPS on BLS boards.
••
•
M. Gao, Columbia, NY
132 ns later
Nominal
Timing Studies
132 ns early
02/11/02 Nirmalya Parua
Online Data Quality Check
Shifter’s are continuously monitoring quality of data.
When hot cells are found corresponding readout channels are suppressed.
N.Parua
02/11/02 Nirmalya Parua
Pulser CalibrationPulser signal injected here (measured in DAC
counts)
DAC/1000
Non linearity <0.3% for DAC>1000
For Lower DAC values non linearity is parametrized (same for all channels).
ADC
8 1
saturation
R. Zitoun
pulser ADC readout
pulser shaper output
S. Beauceron
02/11/02 Nirmalya Parua
W/Z candidate
Yuri Gerstein kado, zitoun Transverse mass
Invariant Mass
Chan, Zutshi
Em Cluster with track
02/11/02All Experimenter’s
MeetingNirmalya Parua
Multi jet events
2-jets event• ET
jet1~230GeV• ET
jet2~190GeV
3-jets event• ET
jet1~310GeV• ET
jet2~240GeV• ET
jet3~110GeV• ET~8GeV
A. Kupco
02/11/02 Nirmalya Parua
Jet Energy Scale
Et=27 GeV
Et=24 GeV
Energy Density for Min-bias Data
Two-jet Events
N. Parua, J. Coss, S. MuanzaIa Iashvilli
%d0%a4%d0%93%d0%9e%d0%a1%203 %20%d0%9b%d0%b5%d1%87%d0%b5%d0%b1%d0%bd%d0%be%d0%b5%20%d0%b4%d0%b5%d0%b
%d0%9f%d0%be%d0%bb%d0%be%d0%b6%d0%b5%d0%bd%d0%b8%d0%b5 %d0%9f%d0%be%d1%81%d0%bb%d1%8b%20%d0%9f%d0%be
%d0%9d%d0%b0%d0%b2%d1%87%d0%b0%d0%bb%d1%8c%d0%bd%d0%be %d0%bc%d0%b5%d1%82%d0%be%d0%b4%d0%b8%d1%87%d0