status of the support activities wg 6: reference version and implementation wg coordinator: ulrich...

23
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

Upload: nora-barker

Post on 03-Jan-2016

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

Status of the Support Activities

WG 6: Reference Version and Implementation

WG Coordinator: Ulrich Schättler

Page 2: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 2

Contents

• Source Code Administration

• COSMO Web Page

• Documentation

• COSMO Newsletter

• COSMO Technical Reports

Page 3: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 3

Source Code Administration

• Starting point last autumn: – COSMO-Model 4.2 and INT2LM 1.7officially distributed– COSMO-Model 4.5 and INT2LM 1.8 as development

versions

• Plans for the year 2008/09:– Consolidate last development versions– Include COSMO-ART– Include 2-moment microphysics– Prepare the COSMO-Model for an easy use of test-cases– Prepare the COSMO-Model for OASIS coupling– Include optimizations by NEC and IBM– Hybrid parallelization

Page 4: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 4

INT2LM COSMO-ModelNew Reference Atmosphere done done

COSMO-ART, PollenInterpolation of Pollen still missing

done

New External Parameters doneUse of new parameters still missing

Optimizations by NEC, IBM –NEC: nearly done

IBM: still missing

2-Moment Microphysics –

Easy Use of Test Cases –

OASIS coupling –

Hybrid Parallelization

Summary of Software Status

Source Code Administration

Page 5: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 5

Source Code Administration

• INT2LM 1.9 (03.09.09)– Implementation of new reference atmosphere

– Modifications in the initialization of perturbed pressure

– Reading additional external parameters

– Modifications for the vertical interpolation in case of llm2lm

– Alternative interpolation of soil humidity

– Alternative treatment of IFS humidity

Page 6: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 6

Source Code Administration

• COSMO-Model 4.8: (13.02.09)

– New reference atmosphere

– Implemented stable integration of the Coriolis terms by calculating their tendencies in every RK substep

– Included (optional) computation of „old“ 2m temperature; can be chosen by itype_diag_t2m

– Splitted computation of dynamical and convective gusts (vmax_10m still is the sum of both)

– Included several options for computing dynamical gusts with itype_diag_gusts

Page 7: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 7

Source Code Administration

• COSMO-Model 4.9: (15.07.09)

– Implementation of COSMO-ART• This is an initial release which most probably needs further testing• Introduced ifdefs for a clean splitting of this component (-DCOSMOART, -DPOLLEN); please note: lmorg.F90 lmorg.f90)

• Source Code is not distributed with the COSMO-Software, but only by KIT (the Karlsruhe Institute of Technology)

– Changes in the dynamics• More accurate (and expensive) discretization of metric terms for the

Runge-Kutta scheme

• Implemented option for using potential temperature as advected variable

• Introduced itype_lbc_qrsg to control the treatment of humidity variables at the boundary zones

Page 8: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 8

Source Code Administration

• COSMO-Model 4.10: (10.09.09)

– Changes in the TKE scheme (as reported by Matthias)

• New switch limpltkediff to run implicit vertical diffusion

• New switch itype_sher to run corrections for windshear productions

• New switch ltkesso to run separate horizontal shear mode due to SSO

– New sea ice component (by Jan-Peter Schulz)• This is still under testing

Page 9: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 9

Source Code Administration

• Actions in the next weeks– Testing of the new versions of INT2LM and the

COSMO-Model– Distribution of the new versions to all partners– Preparation of new external parameter data sets

with additional fields– Every COSMO partner updates its operational

implementation– Every COSMO partner takes care of the update

of the corresponding COSMO web pages!

Page 10: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 10

• Some routines have been (partly) reorganized for better vectorization (e.g. synthetic satellite images, radiation on a coarser grid)

• Implemented 3D versions for diffusion and advection operators. This had negative effects on the IBM (destruction of cache re-use), therefore it is implemented with an ifdef NECSX (default: FALSE)

• In some routines, a loop collapsing has been implemented „by hand“ (using above ifdef)

Timings for a 12 hour COSMO-DE forecast (should take about 11 minutes on as few processors as possible)

NEC SX-9

112 PE

IBM pwr6

1616 PE

Time to Optimization

4.2 14951.5 720.5

4.4 2021.8 659.1 3 days

4.8 1024.2 678.5 3 weeks

4.9 634.2 679.8 3 months

Source Code Administration

Vector Optimizations:

The COSMO-Model still is a performance portable model!

Page 11: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

DWD Plans for the near future

Page 12: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 12

COSMO-EU

Grid spacing: 7 km

Layers: 40

Forecast range:

78 h at 00 and 12 UTC

48 h at 06 and 18 UTC

1 grid element: 49 km2

COSMO-DE

Grid spacing: 2.8 km

Layers: 50

Forecast range:

21 h at 00, 03, 06, 09,

12, 15, 18, 21 UTC

1 grid element: 8 km2

Global model GME

Grid spacing: 40 km

Layers: 40

Forecast range:

174 h at 00 and 12 UTC

48 h at 06 and 18 UTC

1 grid element: 1384 km2

Model System at DWD

Page 13: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 13

• Grid spacing reduced from 40 to 30 km.• Number of layers increased from 40 to 60.• Number of gridpoints increased from 14.7 to 39.3 Mill.• Time step decreased from 133.33 s to 100.00 s.• Cost of model increased by a factor of more than four.• Uppermost model layer moved from 10 hPa to 5 hPa.

• Prognostic precipitation without advection of rain (qr) and snow (qs).

• Tiedtke convection scheme replaced by Bechtold scheme.

• Variational soil moisture assimilation scheme (SMA).

GME 30 km / 60 Levels

Page 14: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 14

• GME data volume to be transferred will increase by a factor of at least 2.7 = (60/40) *(256/192)2.

• Including rain (qr) and snow (qs) in the initial and lateral boundary data will increase the factor to about 3.3.

• This might imply an increase of the Internet connection bandwidth at the NMHS receiving GME data!

• The improved quality of GME will lead to an improved quality of the COSMO-Model forecasts, especially for near surface weather conditions.

Impact on Users of GME Data

Page 15: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

COSMO Web Page

Page 16: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 16

• My place in COSMO Web “chain”My place in COSMO Web “chain”

Status of COSMO WEB

PP leaders

WG coordinators

others

Cosmin Barbu Theodore Andreadis

E-mails E-mails, FTP

Documentation

Scientific papers

Suggestions

HTML code COSMO Web Server

(Next Slides: Courtesy of Cosmin Barbu)

Page 17: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 17

• Common overview Common overview

What pages can be found on the web?What pages can be found on the web?

www.cosmo-model.org

General information about COSMO (structure,

meetings, events, co-operations)

Documentation about COSMO model and

model related

Information about COSMO tasks (PP projects,

Work Group activities)

User support (training, software)

Links to specific activities

Status of COSMO WEB

Page 18: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 18

• WWork from last yearork from last year

What pages has TO BE UPDATED?

PP & WG pages (continuous work) + add newweb pages for the new PPs that will come The minutes of different meetings The operational setups and namelist pages(for example: Romanian case…) COSMO News Letter No. 10 Presentations of User Seminar , CLM training andworkshops planned for 2010 Update COSMO collaborations and COSMO model description web pages

What pages has TO BE UPDATED?

PP & WG pages (continuous work) + add newweb pages for the new PPs that will come The minutes of different meetings The operational setups and namelist pages(for example: Romanian case…) COSMO News Letter No. 10 Presentations of User Seminar , CLM training andworkshops planned for 2010 Update COSMO collaborations and COSMO model description web pages

• WWork fork foror nextnext year year

Status of COSMO WEB

Page 19: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

Model DocumentationCOSMO Newsletter

COSMO Technical Reports

Page 20: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 20

Model Documentation

• Dynamics and Numerics, Physics, Assimilation: – no updates have been done (at least none have been

reported)

• User Guides for INT2LM, COSMO-Model: – Updates for the new / changed Namelist variables

• Documenting the procedures for INT2LM has started because of the Interoperability Programme

Page 21: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 21

COSMO Newsletter

• COSMO Newsletter No. 9 has been published in December 2008

Page 22: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 22

COSMO Technical Report

• TR No. 12: Adriano Raspanti: Final Report on Priority Project

VERSUS (Verification System Unified Survey)

• TR No. 13:Chiara Marsigli: Final Report on Priority Project

SREPS (Short Range Ensemble Prediction System)

Page 23: Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler

07.-11.09.2009 11th COSMO General Meeting - Offenbach, Germany 23

THE END