status of the trd at cern as of july 2007
DESCRIPTION
Status of the TRD at CERN as of July 2007. TRD Group Physikalisches Institut Universität Heidelberg. TRD sector 08. There is 1 TRD super module installed in sector 08 since October 2006. TRD sector 08 status. This TRD super module is operational since end of March 2007. - PowerPoint PPT PresentationTRANSCRIPT
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
Status of the Status of the TRD at CERNTRD at CERN
as of July 2007as of July 2007
TRD GroupTRD GroupPhysikalisches InstitutPhysikalisches Institut
Universität HeidelbergUniversität Heidelberg
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
TRD sector 08TRD sector 08
There is There is 1 TRD super module1 TRD super module
installed in sector 08 installed in sector 08 since October 2006.since October 2006.
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
TRD sector 08 statusTRD sector 08 status
This TRD super module isThis TRD super module isoperational since end of March 2007.operational since end of March 2007.
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
What TRD prepares for in What TRD prepares for in 20072007
Services will beServices will beprepared assumingprepared assumingthe TRD detectorthe TRD detectorwill consist of 4 SMwill consist of 4 SMby end of 2007 :by end of 2007 :
• sector 00sector 00• sector 08sector 08• sector 09sector 09• sector 17sector 17
20072007 0008
0917
Next 3 SM installationNext 3 SM installationslot is scheduled for slot is scheduled for Sept/Oct 2007.Sept/Oct 2007.
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
TRD-O-MeterTRD-O-Meter
http://alice.uni-hd.de/trd-o-meterhttp://alice.uni-hd.de/trd-o-meter
The The TRD-O-Meter TRD-O-Meter
gives an gives an overview on overview on the status the status of the TRD of the TRD
infrastructure infrastructure at Point 2.at Point 2.
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
Sector 08 full cabling on C-Sector 08 full cabling on C-sideside
is 2-3 days of workis 2-3 days of work
mounting and testingmounting and testing
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
19
SP
D
17
2415
15
1911
18
0
10
8
11
0 8 9 16 17 25 33 3734
EXD4/29
EX
D5
/29
MT
R
MT
R
MT
R
MT
R
TO
F
TO
F
TO
F
TR
D
TR
D
TR
D
TP
C
Sniffers
Sniffers
T0
T0
TS
/EL
AC
O
AC
O
FM
D
TR
D
TR
D
TO
F
TO
F
TO
F
7 0
MT
R
TO
F
TO
F
SP
D
EX
D2
/29
MCH
MCH
MCH
MCH12
15 TPC
TPC
16
18 TRD
TRD
TRD
20
23 TRI
TRI
TRI24
27
EX
D3
/29
35 28
Beam
Vacuum
36
39 MCH
MCH
MCH
MCH
0 8 9 16 17 24 25 33 3734
EXD6/29
EX
D7
/29
MT
R
MT
R
MT
R
MT
R
TO
F
TO
F
TR
D
TR
D
TR
D
TP
C
SS
D
SS
D
SP
D
TR
D
TR
D
TO
F
TO
F
TO
F
HM
P
SS
D
SS
D
TS
/EL
HM
P
HM
P
PHS
SPD
TPC
TPC
TPC
TPC
PMD
PMD
TR
D
TO
F
TO
F
TR
D
TO
F
Sniffers
TP
C
TO
F
SDD
SPD
CPV
SSD
SSD
21 SSD
EXD1/29
TR
D
SD
D
TR
D
TS/EL
Vacuum
TS
/EL
V0
TS
/EL
Beam
TRI
EM
C
MT
R
TRI
TRI
TRI
TRI
MC
H
MC
H
LV
LV
CP
GP
LV
LV
LV
SP
RO
LHV
LHV
LV
LV
LV
LV
LV TR TR RO LV
LV LV
TR LV LV LV LV LV LV HV CO LV LV CO LHV LHV CO LV LV LV LV LV LV LV LV SP RO RO RO RO
SP LV CO LVLV LV LV HV GAS LVPWR SIG LV LV LV LV LV
SP
LV LV SP RO RO RO RODET DET SP SP
CP
GP
LV
LV
CTP
LV
LV
CTP
CTP
CTP
CTP
CTP
mult
mult
CT
CT
CT
LV
LV
LV
LV
TRD Racks in UX25
A
I
O
C
L3 Magnet
LV
TRD racks
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
LV power supply installationLV power supply installation
• 78/89 power bins are 78/89 power bins are installed at Point 2installed at Point 2• 26/90 Wiener power 26/90 Wiener power supplies are mountedsupplies are mounted• 09/90 Wiener power09/90 Wiener power supplies are operatingsupplies are operating
• sector 08 operatingsector 08 operating• sector 09 installedsector 09 installed• sectors 00,17 sectors 00,17 available till end Julyavailable till end July
• GTU power operatingGTU power operating• PCU commissionedPCU commissioned
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
HV power distributionHV power distribution
• 2 TRD SM can be2 TRD SM can be operated operated standalonestandalone from ISEG cratesfrom ISEG crates using patch boxes using patch boxes as temporary as temporary HVDSHVDS replacementreplacement
• new 32ch ISEG new 32ch ISEG HV modules for HV modules for 4 TRD SM will 4 TRD SM will be delivered bybe delivered by end of Augustend of August (ATLAS Calo Type)(ATLAS Calo Type)
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
LV Patch Panel for SMLV Patch Panel for SM
• mounted on themounted on the SM end capSM end cap
• connects fromconnects from LV patch panelsLV patch panels in Back-/Baby-in Back-/Baby- frame to SMframe to SM
• LV patch chordLV patch chord cabling iscabling is simplified andsimplified and quickerquicker
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
DCS network monitoring DCS network monitoring toolstools
We developed monitoring tools for status control of:We developed monitoring tools for status control of:• Wiener power suppliesWiener power supplies• Netgear switchesNetgear switches• DCS boardsDCS boards
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
Detector Control SystemDetector Control System
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
Installed at P2mid April 07
SSDSPD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC DCS
stan
dard
se
mi
speci
fic
HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV
MON
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
MONMON
MON
MON MON
BOM
RCK
MON
FEE FEE FEE FEE FEE FEE FEE FEE FEE FEE
CPU
GPS
VHVLV
LEDLIQ
GMS
LAS
THR
MOV
HAL
RAD
SFM
MON
CCO
LED
FEE
NMR
HVDHVD APD
COO
VME VME VME VME VME VME VME VME VME VME
COO COO COO COO COO COO COO VEN
GAS GAS GAS GAS GAS GAS
VME
Central effort
MON
VME
VEN
GAS
MON
VME
GAS
THR
IAS
GTU
PCU
PTU
TRG
GAS
VME
COO
VAC
DSS
TCOAPD
LVDFELLAS
CAM
MIR
SYN
GPU
SDD TRG
VEN
PVSSFSMConfigured
DVMDVM
TOR
TRU
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
11stst Cosmic TRD-Events at P2 Cosmic TRD-Events at P2
• 11stst event taken on event taken on
12 May 2007 12 May 2007
• presently 5k cosmics presently 5k cosmics
takentaken
• signal, reconstructed signal, reconstructed
clustersclusters
• TRD-chamber time-0 TRD-chamber time-0
planesplanes
LHCC referee meeting – 03/07/2007LHCC referee meeting – 03/07/2007
OutlookOutlook
Complete Services for 4 SMComplete Services for 4 SM (Jul 2007)(Jul 2007) GTU commissioning with SM-IGTU commissioning with SM-I (Jul 2007)(Jul 2007) Pre-trigger commissioningPre-trigger commissioning (Jul (Jul
2007)2007) SM-II commissioningSM-II commissioning (Aug (Aug
2007)2007) Comm. w/ CTP and trigger detectorsComm. w/ CTP and trigger detectors (Aug (Aug
2007)2007)
Cosmics data taking w/ SM-I and IICosmics data taking w/ SM-I and II (Aug 2007)(Aug 2007) in total 4 SM installedin total 4 SM installed (Oct 2007)(Oct 2007)