stave vessel design & construction tom kenyon may 2012
TRANSCRIPT
![Page 1: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/1.jpg)
Stave Vessel Design & Construction
Tom Kenyon
May 2012
![Page 2: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/2.jpg)
2
The Art of Segmented Wood TurningBy Malcolm Tibbetts
• 10” is too Tall - looking for about 6”
• 6/4 wood required for staves - prefer 4/4
![Page 3: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/3.jpg)
3
First Prototype
• Symmetrically scaled plan to 6” high• Simplified construction
– Eliminated veneer layers– Eliminated multi layers splines
![Page 4: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/4.jpg)
4
Revised Design
• Prototype too round• Top out of proportion to the body• Center divider too thick• Created lip for top/body joint• Second prototype looked good
![Page 5: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/5.jpg)
5
Parts
Neck
Top
Separator
Splines
Staves
Bottom
![Page 6: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/6.jpg)
6
Stave Cutting Jig Based on Replaceable Throat Sled
My Friend!
![Page 7: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/7.jpg)
7
Stave Cutting Jig
First Ten Vessels
![Page 8: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/8.jpg)
8
Dedicated Segment Cutting Sled
Designed to accommodate Bridge City Tool’s Angle Master
– Large rear fence opening– Removable segment slide
![Page 9: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/9.jpg)
9
Vessel Holding Fixture
• Used for;– Initial glue up of staves– Initial turning of the base– Final turning of the base
• Design from PBS TV show and Malcolm Tibbetts book
• Duct tape help donuts slide
![Page 10: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/10.jpg)
10
Ring Sanding Jig
• Shown previously in Show-n-Tell
• Descriptive article posted on Segmentedwoodturners.org
![Page 11: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/11.jpg)
11
Templates
• Templates cut out of 1/16” plastic on the laser
• Outside only one that proved useful
![Page 12: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/12.jpg)
12
Production
• Production of 20 broken into three groups - 10, 5, and 5– Manageable number of parts– Doable task - not overwhelming– Assessed mix after each group
• Wood combinations that worked or didn’t work• Appropriate mix• Available material
• Timeline (best recollection)– Design started late Sep, done by third week of Nov– Lots of time finding material (tops) and making prototypes, jigs,
and templates• Four weeks to the first prototype
– One to two days to prepare material - almost independent of number of vessels
– Two vessels going simultaneously– About a day for each
![Page 13: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/13.jpg)
13
Parts Preparation
![Page 14: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/14.jpg)
14
Parts Assembly and Glue up
![Page 15: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/15.jpg)
15
Top
• Top opening drilled after finishing - fits tailstock plug - helps alignment during glue up
• Inside finished with shellac
![Page 16: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/16.jpg)
16
Base/Bottom
• Lots spinning ! Slow is OK
• Watch out for those bolt ends!
• Inside bottom base cut to blend in with bottom plug, also gives reference for turning inside
![Page 17: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/17.jpg)
17
Turning Base Inside & Outside
• Trick is getting a tight fit with top
• Inside finished with shellac
![Page 18: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/18.jpg)
18
Finishing the Vessel
Last step is to make plug to center vessel’s top on the jig
![Page 19: Stave Vessel Design & Construction Tom Kenyon May 2012](https://reader035.vdocument.in/reader035/viewer/2022062408/56649e565503460f94b4e38e/html5/thumbnails/19.jpg)
19
All Done !
• Used General Finishes sealer and oil/urethane
• Buffed with brown paper sack after a week