• Annual Steam System Audit / Steam Trap Testing
• Real Time Monitoring• High Pressure steam trap monitoring• Consumption Monitoring• Chiller Plant Monitoring• PRV Monitoring utilizing digital controls
Manual Steam Trap Auditing• Mosto Technologies Inc Audit over 15,000 steam traps annually
• Typically Find a 10% average annual failure rate in each facility
• Without Incentives, typically see a 6 to 12 month payback for testing and replacement of the defective steam traps
Manual System Auditing• Check for steam leaks (wasted energy)
– Steam Traps (Trap Selection)
– Bypass valves
– Safety relief valves
– Vacuum breakers
– Insulation (pipe, valves)
Methods of Loss Detection• Visual
• Infrared Temperature Readings
• Ultrasonic Listening
• Monitoring in Real‐Time on High‐Pressure
Install Last **AnnualTag Location Elev Mfr Model PSIG Cond Recommendation Date Test Loss
001 Boiler Header Drip-1 15' Sar 1-1/2" FT15 7 OK Feb-15002 Boiler Header Drip-2 15' Sar 1-1/2" FT15 7 BT Replace w/ 1-1/2 "Sarco FT15 Feb-15 6,148.56$ 003 Main Low Pressure Supply Drip 3' Sar 1" FT15 7 OK Feb-15
004 Unit Heater-8 on Ramp 8' Mep 1" 40-415 7 OK Feb-15005 Low Pressure Drip Entrance Ramp-1 30' Mep 1" 40-415 7 BT Replace w/ 1" Mepco 40-415 Feb-15 3,732.43$ 006 Low Pressure Drip Entrance Ramp-2 30' Mep 1" 40-415 7 OK Feb-15007 UH- 9 Entrance 12' Mep 1" 40-415 7 OK Feb-15
008 ACGRM PH- 1 3' Sar 1-1/2" FT15 7 OK Feb-15009 ACGRM Supply Drip 3' Sar 3/4" FT15 7 BT Replace w/ 3/4" Sarco FT15 Feb-15 1,166.46$ 010 AC5 Communcation Room Low Pressure Drip 6' Sar 3/4" FT15 7 OK Feb-15011 AC5 PH Coil 3' Sar 3/4" FT15 7 OK Feb-15012 AC5 RH Coil 7' Sar 3/4" FT15 7 BT Replace w/ 3/4" Sarco FT15 Feb-15 1,166.46$
013 Low Pressure Drip Above HWH-1 5' Mep 1-1/4" 40-515 7 OK Feb-15014 HWH-1 Drip 1' Mep 3/4" 40-215 7 BT Replace w/ 3/4" Mepco 40-215 Feb-15 1,788.43$ 015 HWH-2 Drip 1' Mep 3/4" 40-215 7 OK Feb-15016 HWH-3 Drip 1' Mep 3/4" 40-215 7 OK Feb-15017 HWH-4 Drip 1' Mep 3/4" 40-215 7 OK Feb-15018 Low Pressure Drip Behind HWH 4' Mep 3/4" 40-215 7 OK Feb-15019 Heat Exchanger Coil 3' Mep 1" 40-415 7 BT Replace w/ Mepco 1" 40-415 Feb-15 2,410.71$
020 Unit Heater 5' Mep 3/4" 40-215 7 CO Feb-15021 HWH High Zone -1 1' Mep 3/4" 40-215 7 OK Feb-15022 HWH High Zone -2 1' Mep 3/4" 40-215 7 OK Feb-15023 Stair B Low Pressure Drip 8' Mep 1/2" 1E 7 BT Replace w/ 1/2" Mepco 1E Feb-15 2,410.71$
Boiler Room
Sample Steam Trap Database
Roof MER
G1 Garage
A-1
Lobby MER
Total Mos. In Orifice *Steam *Annual *Total AnnualTraps Trap Cond PSIG Serv. Service Size Loss (#/hr) $ Loss $ Loss
1 1-1/2" FT15 BT 7 Drip 6 0.5 123 $6,148.56 $6,148.561 3/4" 40-215 BT 7 Drip 6 0.218 23 $1,788.43 $1,788.431 1" 40-415 BT 7 Drip 6 0.313 48 $3,732.43 $3,732.432 3/4" FT15 BT 7 Coil 6 0.218 15 $1,166.46 $2,332.931 1" 40-415 BT 7 Coil 6 0.313 31 $2,410.71 $2,410.711 1/2" 1E BT 7 Drip 6 0.25 31 $2,410.71 $2,410.71
$18,823.78
Losses SummarySample Steam Trap Database
Estimated Savings
Sample Savings Summary
HP Steam Trap Monitoring
• Monitor HP steam traps (15 PSIG or Higher) in real time
• Detect when the trap passes steam or becomes cold plugged
• Email alarms upon trap failure
• Allows the building to stop HP leaks quickly to minimize losses
• 1 to 2 year payback
Basic Installation
Trap Inventory
Real Time Consumption Monitoring
• Monitor and trend steam consumption is real time
• Peak Demand Management
• Analytics to Increase Efficiency
• M and V to verify project savings
Real Time Consumption Monitoring
Digital PRV Control• Monitor and Control Steam PRV systems digitally to ensure system efficiency
• 40 years used in Industrial Sector, Proven Technology
• Can upgrade valves and controls or just controls using current PRV stations
• Provides 3 to 5% permanent reduction in steam by reducing pressure based on OAT
PRV Monitoring
Chiller Plant Monitoring and Optimization
• Meter All 3 Refrigeration cycle points– Steam / Gas / Electric– Condenser BTU– Chilled Water BTU
• Define Chiller Efficiency
• Maximize Efficiency w/ building during all operating conditions