steel windows...product standards and guide specifications 1 integra series stl212hr awning, hopper,...
TRANSCRIPT
STEEL WINDOWS
Montage Hotel & Resort Beverly Hills, CA HKS Hill Glazier Studio
STEELWINDOWINSTITUTE
A STANDARD OFEXCELLENCE
OUTS
IDE
INSI
DE
1
HR-589
#6 X 1" PL-FH-SMS410 TEK/2
HR-601
HR-595R
2
HR-595R
3
HR-601
#6 X 1" PL-FH-SMS410 TEK/2
OUTS
IDE
INSI
DE
HR-589
4
HR-5
95R
HR-5
95R
#6 X 1" PL-FH-SMS410 TEK/2
5 6
HR-6
01
HR-6
01
HR-6
01
HR-5
98
7
HR-6
01
HR-5
98
HR-6
01
HR-5
988
HR-5
89
OUTSIDE
INSIDE
MUTIN
W-0014
Optional Glazing Bead
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\02 STL212HR\SERIES\WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Integra SeriesSTL212HR Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
Product Standards and Guide Specifications
1
INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed
1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows
PART 1 - GENERAL
1. DESCRIPTION A. Work included:
1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California
B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section
08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.
2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:
1. Air infiltration test a. Products must be independently lab tested
and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with
differential pressure across window unit of 1.57 / 6.24 PSF
2. Water penetration test a. Products must be independently lab tested
and meet or exceed ASTM E331. b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF
3. Field Testing a. Field testing criteria (when applicable) shall be
in accordance with AAMA 502-08. 4. Structural test
a. Meets or exceeds ASTM E330 5. Forced entry test
a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds
6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in
Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test
3. SUBMITTALS A. Shop drawings
1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.
2. Dimensioned elevations showing window opening and window sizes.
4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to the site.
5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.
PART 2 - PRODUCT AND FABRICATION 1. MATERIALS
A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections
shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.
B. Operable Hardware: 1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty
stainless steel four bar hinges with brass friction shoes.
2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless
steel pin. c. Friction and limit device: Stainless steel with
sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,
trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.
2. FABRICATION A. Fabricate steel windows in accordance with approved
shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be
cleaned by shot blasting. C. Glazing
1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to
suit the glass as specified. D. Weatherstrip
1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.
3. FACTORY FINISHING A. Pretreatment
1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.
B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and
accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.
PART 3 - EXECUTION 1. INSPECTION
A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.
2. INSTALLATION A. Install windows in openings in strict accordance with
approved shop drawings. 3. CLEANING
A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.
END OF SECTION 6.
OUTS
IDE
INSI
DE
1
HR-589
#6 X 1" PL-FH-SMS410 TEK/2
HR-601
HR-595R
2
HR-595R
3
HR-601
#6 X 1" PL-FH-SMS410 TEK/2
OUTS
IDE
INSI
DE
HR-589
4
HR-5
95R
HR-5
95R
#6 X 1" PL-FH-SMS410 TEK/2
5 6
HR-6
01
HR-6
01
HR-6
01
HR-5
98
7
HR-6
01
HR-5
98
HR-6
01
HR-5
988
HR-5
89
OUTSIDE
INSIDE
MUTIN
W-0014
Optional Glazing Bead
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\02 STL212HR\SERIES\WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Integra SeriesSTL212HR Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
OUTSIDE
INSIDE
HR-601
HR-601
HR-002
HR-002
HR-001
HR-001
HR-6
01
HR-0
02
HR-001
HR-6
01
HR-0
02
HR-6
01
HR-0
02HR
-601
HR-0
02
HR-6
01
HR-0
02
1
2
3
4
5 6
7
8
OUTSIDE
INSIDE
Optional Glazing Bead
W-0014
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\03 STL212HRV\SERIES\WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Victoria SeriesSTL212HRV Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
Product Standards and Guide Specifications
1
VICTORIA Series STL212HRV Awning, Hopper, Casement, Fixed
1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows
PART 1 - GENERAL
1. DESCRIPTION A. Work included:
1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California
B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section
08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.
2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:
1. Air infiltration test a. Products must be independently lab tested
and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with
differential pressure across window unit of 1.57 / 6.24 PSF
2. Water penetration test a. Products must be independently lab tested
and meet or exceed ASTM E331. b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF
3. Field Testing a. Field testing criteria (when applicable) shall be
in accordance with AAMA 502-08. 4. Structural test
a. Meets or exceeds ASTM E330 5. Forced entry test
a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds
6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in
Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test
3. SUBMITTALS A. Shop drawings
1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.
2. Dimensioned elevations showing window opening and window sizes.
4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to the site.
5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.
PART 2 - PRODUCT AND FABRICATION 1. MATERIALS
A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes
1. Combined weight of frame and ventilator sections shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.
B. Operable Hardware: 1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty
stainless steel four bar hinges with brass friction shoes.
2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless
steel pin. c. Friction and limit device: Stainless steel with
sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,
trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.
2. FABRICATION A. Fabricate steel windows in accordance with approved
shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be
cleaned by shot blasting. C. Glazing
1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to
suit the glass as specified. D. Weatherstrip
1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.
3. FACTORY FINISHING A. Pretreatment
1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.
B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and
accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.
PART 3 - EXECUTION 1. INSPECTION
A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.
2. INSTALLATION A. Install windows in openings in strict accordance with
approved shop drawings. 3. CLEANING
A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.
END OF SECTION 6.
OUTSIDE
INSIDE
HR-601
HR-601
HR-002
HR-002
HR-001
HR-001
HR-6
01
HR-0
02
HR-001
HR-6
01
HR-0
02
HR-6
01
HR-0
02HR
-601
HR-0
02
HR-6
01
HR-0
02
1
2
3
4
5 6
7
8
OUTSIDE
INSIDE
Optional Glazing Bead
W-0014
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\03 STL212HRV\SERIES\WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Victoria SeriesSTL212HRV Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
W8-630
WH6-629
W8-630
WH6-629
W7-640
W7-640
W7-640
W8-630
WH5-628
W8-
630
WH6
-629
W8-
630
WH6
-629
W8-630
WH5-628
W8-630
WH5-628
WT2-644
1
2
3
4
5 6
7
8
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\01 STL175HR\SERIES\WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Venetian SeriesSTL175HR Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
Product Standards and Guide Specifications
1
VENETIAN Series STL175HR Awning, Hopper, Casement, Fixed
1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows
PART 1 - GENERAL
1. DESCRIPTION A. Work included:
1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California
B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section
08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.
2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:
1. Air infiltration test a. Products must be independently lab tested
and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with
differential pressure across window unit of 1.57 / 6.24 PSF
2. Water penetration test a. Products must be independently lab tested
and meet or exceed ASTM E331. b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF
3. Field Testing a. Field testing criteria (when applicable) shall be
in accordance with AAMA 502-08. 4. Structural test
a. Meets or exceeds ASTM E330 5. Forced entry test
a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds
6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in
Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test
3. SUBMITTALS A. Shop drawings
1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.
2. Dimensioned elevations showing window opening and window sizes.
4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to the site.
5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.
PART 2 - PRODUCT AND FABRICATION
1. MATERIALS A. Heavy custom windows shall be manufactured from
solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections
shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.
B. Operable Hardware: 1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty
stainless steel four bar hinges with brass friction shoes.
2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless
steel pin. c. Friction and limit device: Stainless steel with
sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,
trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.
2. FABRICATION A. Fabricate steel windows in accordance with approved
shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be
cleaned by shot blasting. C. Glazing
1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to
suit the glass as specified. D. Weatherstrip
1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.
3. FACTORY FINISHING A. Pretreatment
1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.
B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and
accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.
PART 3 - EXECUTION 1. INSPECTION
A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.
2. INSTALLATION A. Install windows in openings in strict accordance with
approved shop drawings. 3. CLEANING
A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.
END OF SECTION
W8-630
WH6-629
W8-630
WH6-629
W7-640
W7-640
W7-640
W8-630
WH5-628
W8-
630
WH6
-629
W8-
630
WH6
-629
W8-630
WH5-628
W8-630
WH5-628
WT2-644
1
2
3
4
5 6
7
8
6
7
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
As of: 05/21/13WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\01 STL175HR\SERIES\WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Venetian SeriesSTL175HR Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
67
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
58"
58" WEEP
138"
138"
2
2
WEEP
212"
134" 4
#45 DRIP
134"
212"
3
OUTS
IDE
INSI
DE
134"
212"
16
134"
212"
16
134"
212"
16
134"
212"
16
516"
218"
516"
15
As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Milano SeriesSTL1375M Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
67
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
58"
58" WEEP
138"
138"
2
2
WEEP
212"
134" 4
#45 DRIP
134"
212"
3
OUTS
IDE
INSI
DE
134"
212"
16
134"
212"
16
134"
212"
16
134"
212"
16
516"
218"
516"
15
As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Milano SeriesSTL1375M Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
#S515 ALUMINUM SNAP-ONGLAZING BEAD
1/2" GLASS POCKET1/4" THICK GLASS SHOWN
(ALSO FOR 1/8" & 3/16")
114"
34"
#S501 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)
#S505 ALUMINUM SNAP-ONGLAZING BEAD1" GLASS POCKET
3/4" THICK GLASS SHOWN(ALSO FOR 5/8" GLASS)
1"
#S506 ALUMINUM SNAP-ONGLAZING BEAD
1 1/4" GLASS POCKET1" THICK GLASS SHOWN(ALSO FOR 7/8" & 15/16")
#S508 ALUMINUM SCREW-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)
#S503 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 5/8")
12"
34" 1"
12"
14"
34"
12"
SHEET G1SCALE: 1/2 FULL
34"
12"
12"
14"
#S516 ALUMINUM SNAP-ONGLAZING BEAD
1/2" GLASS POCKET1/4" THICK GLASS SHOWN
(ALSO FOR 1/8" & 3/16")
As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Milano SeriesSTL1375M Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
#S515 ALUMINUM SNAP-ONGLAZING BEAD
1/2" GLASS POCKET1/4" THICK GLASS SHOWN
(ALSO FOR 1/8" & 3/16")
114"
34"
#S501 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)
#S505 ALUMINUM SNAP-ONGLAZING BEAD1" GLASS POCKET
3/4" THICK GLASS SHOWN(ALSO FOR 5/8" GLASS)
1"
#S506 ALUMINUM SNAP-ONGLAZING BEAD
1 1/4" GLASS POCKET1" THICK GLASS SHOWN(ALSO FOR 7/8" & 15/16")
#S508 ALUMINUM SCREW-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)
#S503 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET
1/2" THICK GLASS SHOWN(ALSO FOR 5/8")
12"
34" 1"
12"
14"
34"
12"
SHEET G1SCALE: 1/2 FULL
34"
12"
12"
14"
#S516 ALUMINUM SNAP-ONGLAZING BEAD
1/2" GLASS POCKET1/4" THICK GLASS SHOWN
(ALSO FOR 1/8" & 3/16")
As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Milano SeriesSTL1375M Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1
67
1 1
2
65
4
8
1
4
6
3
2
3
2
3
2
3
58"
58" WEEP
138"
138"
2
2
WEEP
212"
134" 4
#45 DRIP
134"
212"
3
OUTS
IDE
INSI
DE
134"
212"
16
134"
212"
16
134"
212"
16
134"
212"
16
516"
218"
516"
15
As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf
Scale:
Function:Description:
Detail:OFSHEET
Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner
Milano SeriesSTL1375M Hot Rolled Window
Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1Product Standards and Guide Specifications
1
Milano Series STL1375M Awning, Hopper, Casement, Fixed
1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows
PART 1 - GENERAL
1. DESCRIPTION A. Work included:
1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California
B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section
08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.
2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:
1. Air infiltration test a. Products must be independently lab tested
and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with
differential pressure across window unit of 1.57 / 6.24 PSF
2. Water penetration test a. Products must be independently lab tested
and meet or exceed ASTM E331. b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF
3. Field Testing a. Field testing criteria (when applicable) shall be
in accordance with AAMA 502-08. 4. Structural test
a. Meets or exceeds ASTM E330 5. Forced entry test
a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds
6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in
Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test
3. SUBMITTALS A. Shop drawings
1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.
2. Dimensioned elevations showing window opening and window sizes.
4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to the site.
5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.
PART 2 - PRODUCT AND FABRICATION 1. MATERIALS
A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections
shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.
B. Operable Hardware: 1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty
stainless steel four bar hinges with brass friction shoes.
2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless
steel pin. c. Friction and limit device: Stainless steel with
sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,
trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.
2. FABRICATION A. Fabricate steel windows in accordance with approved
shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be
cleaned by shot blasting. C. Glazing
1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to
suit the glass as specified. D. Weatherstrip
1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.
3. FACTORY FINISHING A. Pretreatment
1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.
B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and
accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.
PART 3 - EXECUTION 1. INSPECTION
A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.
2. INSTALLATION A. Install windows in openings in strict accordance with
approved shop drawings. 3. CLEANING
A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.
END OF SECTION
Product Standards and Guide Specifications
1
VICTORIA Series STL212HRV Awning, Hopper, Casement, Fixed
1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows
PART 1 - GENERAL
1. DESCRIPTION A. Work included:
1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California
B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section
08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.
2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:
1. Air infiltration test a. Products must be independently lab tested
and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with
differential pressure across window unit of 1.57 / 6.24 PSF
2. Water penetration test a. Products must be independently lab tested
and meet or exceed ASTM E331. b. No water penetration for 15 minutes when
window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF
3. Field Testing a. Field testing criteria (when applicable) shall be
in accordance with AAMA 502-08. 4. Structural test
a. Meets or exceeds ASTM E330 5. Forced entry test
a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds
6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in
Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test
3. SUBMITTALS A. Shop drawings
1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.
2. Dimensioned elevations showing window opening and window sizes.
4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the
protection and storage of the windows after delivery to the site.
5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.
PART 2 - PRODUCT AND FABRICATION 1. MATERIALS
A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes
1. Combined weight of frame and ventilator sections shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.
B. Operable Hardware: 1. Awning, Hopper:
a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty
stainless steel four bar hinges with brass friction shoes.
2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless
steel pin. c. Friction and limit device: Stainless steel with
sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,
trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.
2. FABRICATION A. Fabricate steel windows in accordance with approved
shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be
cleaned by shot blasting. C. Glazing
1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to
suit the glass as specified. D. Weatherstrip
1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.
3. FACTORY FINISHING A. Pretreatment
1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.
B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and
accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.
PART 3 - EXECUTION 1. INSPECTION
A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.
2. INSTALLATION A. Install windows in openings in strict accordance with
approved shop drawings. 3. CLEANING
A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.
END OF SECTION 6.
Montage Hotel & Resort Beverly Hills, CA HKS Hill Glazier Studio
arcadiainc.com
Corporate Location
2301 East Vernon Avenue Vernon, CA 90058
Ph 323.269.7300 Fx 323-269-7390
Washington Location
7830 S. 196th Street Kent, Washington 98032
Ph 425-869-7300 Fx 253-395-4234
Arizona Location
2510 West Geneva DriveTempe, AZ 85282
Ph 602-437-2514 Fx 602-437-2515
New Mexico Location
4705 Mcleod Road N.E.Albuquerque, NM 87109
Ph 505-341-4222 Fx 505-341-4225
Nevada Location
1850 East Maule AvenueLas Vegas, NV 89119
Ph 702-798-7300 Fx 702-798-7305
Connecticut Location
60 Bonner StreetStamford, CT 06902
Ph 203-316-8000 Fx 203-316-8200
Hawaii Location
94-410 Uke’e Street, Bldg #AWaipahu, HI 96797
Ph 808-678-9700 Fx 808-676-8663
Northern California Location
2187 Alpine WayHayward, CA 94545
Ph 510-783-4990 Fx 510-783-1149
Sacramento Location
2324 Del Monte StreetSacramento, CA 95691
Ph 916-375-1478 Fx 916-375-1523