Advanced Stormwater Design Webcast Series

Stormwater Wetlands Reconsidered

Photo Credit: South River Federation

Page 2: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Welcome to the Webcast

• To Ask a Question – Submit your question in the chat box located to the left of the

slides. We will answer as many as possible during Q&A.

• To Answer a Poll Question – Simply select the preferred option. For those viewing this session

alongside several colleagues, respond in a manner that represents your organization as a whole.

• We ARE Recording this Session – All comments and questions will be recorded and included in the

archives. We will notify you as soon as the recording and related resources are loaded on the web.

• We Appreciate Your Feedback – Fill out our evaluations – our funders need to hear it!

Page 3: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Speaker Info

Albert McCullough, Sustainable Science, LLC, [email protected]

Dave Hirschman, Center for Watershed Protection, [email protected]

Tom Schueler, Chesapeake Stormwater Network, [email protected]

Cecilia Lane, Chesapeake Stormwater Network, [email protected]

Page 4: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

To learn how you can have access to: Discounted Webcasts

Free One-day design workshops Intensive master stormwater design seminars

Direct On-site technical assistance Self guided web-based learning modules

Visit: www.chesapeakestormwater.net

Chesapeake Bay Stormwater Training Partnership

Page 5: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

CSN’s 2014 Webcast Series

No. Date Series Topic

10 June 12 Advanced Stormwater Design Rainwater Harvesting

11 June 26 Advanced Stormwater Design Filter Strips & Disconnections

http://chesapeakestormwater.net/events/categories/2014-webcast-series/

Page 6: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Webcast Agenda

• Evolution of the Practice

• Why a Seldom Used Practice is Poised for a Resurgence

• Constructed Wetland Myths

• New Constructed Wetland Applications

• Feasibility and Design Issues

• Construction and Maintenance

• Establishing the Wetland Plant Community

Page 7: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Poll Question #1

How many people are watching with you today?

• Just me

• 2-5 people

• 6-10 people

• > 10 people

Page 8: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Poll Question #2

Tell us a little about yourselves…who are you representing today?

• Design professional

• MS4 Phase 1

• MS4 Phase 2

• State government

• Federal government

• Other

Page 9: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Poll Question #3

Have you designed a constructed wetland in the last year ?

• Yes

• No

• No, although I did fill in a natural wetland (just kidding, we hope! )

Page 10: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Evolution of the Practice

Page 11: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Copyright 2000, Center for Watershed Protection

The First Generation of Stormwater Wetlands

Page 12: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

The Second Generation: Better diversity but still the freshwater emergent model

Page 13: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

The Third Generation: The Forested Wetland

Page 14: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

0 100 200 300 400 500 600 700 800 900 1000

Green roof

Constructed wetland

Sand filters

Submerged gravel wetlands

Wet ponds

Rainwater harvesting

Compost soil amendements

Extended detention ponds

Permeable pavement

Filter strips

Rain gardens

Dry swale

Infiltration practices

Grass swale/channel

Impervious disconnection

Bioretention

Estimated # of Practices Implemented in the Last Year

Chesapeake Bay Urban BMP Implementation Survey Aggregate Reported BMPs Lasy Year by 240+ Survey Respondents

CSN, 2014

Not a Lot of Constructed Wetlands Being Built These Days

Page 15: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Why are so few constructed wetlands being built ?

• Use discouraged since they are not classified as a ESD, LID or Runoff Reduction Practice in new state stormwater manuals

• Available land (ponds easier)

• Concerns about nuisances (mosquitoes etc) and wetland regulatory status

• Lack of understanding about “vegetation”

• Other Factors ?

Page 16: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Why they may be poised for a resurgence

• Potential for greater nutrient reduction

• Cost effective approach for meeting water quality and peak discharge together

• New design applications

• Strong retrofit potential

• Great solution in the coastal plain

• Promote habitat and ecosystem services

• Lower long-term maintenance efforts

Page 17: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Recent Research on Natural and Constructed Wetlands Informs Design

• Effect of stormwater runoff in degrading of natural wetlands (bounce)

• Most natural wetlands are forested

• While nutrient removal in constructed wetlands is variable, designers have not tried enhancing denitrification (e.g., add carbon and anoxic conditions.

• Have not really measured runoff reduction by constructed wetlands

Page 18: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Debunking Myths About Constructed Wetlands

Page 19: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Myth No. 1 Stormwater Wetlands Breed Mosquitoes

• Not generally a problem unless cattails are present

• Scatter deep pools around wetland and connect them with channels

• Dragonflies

• Other LID practices pose greater risk

Page 20: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Myth No. 2 Stormwater Wetlands Need to Be Deep

to Prevent Them From Drying Out

• Once plant community is initially established, stormwater wetlands will recover in the next growing season even after extended droughts

Page 21: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Myth No. 3 What we plant will persist over time

• Experience has shown that many of the species that are initially planted will not persist over time, due to competition, growing conditions, herbivory, and the arrival of volunteer and/or invasive species

Page 22: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Myth No. 4 Natural wetlands have a lot of standing

water

• Most wetlands found in nature have saturated soils and are only inundated seasonally or after extended wet periods

• Plant diversity declines with increasing ponding depth and water bounce

• Many of the ecological services in the wetlands are due to groundwater interactions

Page 23: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Myth No. 5 Constructed wetlands eventually

become a jurisdictional wetlands which are regulated by the Corps

• The policy for decades has been that they are considered a treatment wetland and NOT a jurisdictional wetland

• The only exception would be for “abandoned” facilities that are no longer maintained for their stormwater function

Page 24: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

New Constructed Wetland Applications

• Wooded Wetlands

• Pond Wetland Combo

• Submerged Gravel Wetlands

• Dry Pond Retrofits

• Tax Ditch Restoration

• Linear Wetland

• Regenerative Conveyance Systems

Page 25: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Wooded Wetland

Page 26: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Pond Wetland Design

Page 27: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Pond Wetland Combination

• Space-saver for denser development sites.

• Side by side pond and wetland.

• On-line pond and off-line wetland.

• Wetland has 4 to 6 cells that step down a foot of elevation each.

• Pond bleeds water into wetland during dry weather.

• Pond has 70% of total treatment volume.

Page 28: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Submerged Gravel Wetlands

Photos Courtesy of Univ. of New Hampshire Stormwater Center

Page 29: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Submerged Gravel Wetland

Photo & image: Univ. of New Hampshire Stormwater Center

Page 30: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

DRY POND CONVERSION RETROFIT

DRY POND

CONSTRUCTED WETLAND

Page 31: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Coastal Plain Tax Ditch Restoration

Page 32: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Linear Wetlands

Linear Wet Swale

Page 33: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Feasibility and Design Issues

1. Level 1 and 2 Design

2. Water Balance

3. Geometry/Flow Path

4. Maintenance Reduction

Page 34: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

1. Level 1 and 2 Wetland Design

Level 1 Level 2

Good design to provide treatment, safety, functionality

Includes design enhancements for runoff reduction and/or pollutant removal: • Size, treatment volume • Flow path/multiple cells/tree

peninsulas • Limited “bounce” above pool

Page 35: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

VA Constructed Wetland Performance Credit

35

Level 1 Level 2

Runoff Reduction = 0% TP Reduction = 50%

Runoff Reduction = 0% TP Reduction = 75%

NOTE: Many states do NOT have Level 1 and 2 designs because constructed wetlands are not considered a runoff reduction practice for volume reduction criteria.

Page 36: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Constructed Wetland Performance Credit

Maximize Performance & Optimize Sizing: Provide Runoff Reduction Upstream From

Constructed Wetland

Page 37: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Level 1 Wetland Design (VA)

• Single basin with forebay & micropool

• Some storage allowed above pool

• Surface area < 3% of contributing drainage area

• Length/Width Ration ≥ 2:1

• Emergent plant community

Page 38: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Different Levels of BMP Design

Level 1: Sizing • Treatment Volume (Tv) = Rv x A

• ≥ 50% in pool + forebay + micropool

• ≤ 50% above pool

• Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall & 1-year storm

State-Specific Sizing Methods May Apply

Page 39: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Different Levels of BMP Design

Level 2: Multi-Cell or Pond Wetland

Page 40: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Different Levels of BMP Design

Level 2: Multi-Cell or Pond Wetland

• Multiple cells or pond + wetland cells;

• Surface area > 3% of contributing DA;

• Length/Width Ratio ≥ 3:1

Page 41: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Different Levels of BMP Design

Level 2: Multi-Cell or Pond Wetland

• No ED or detention storage above pool;

• Add microtopography features;

• Emergent + wooded wetland features.

Page 42: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Minimal Water Level Fluctuation (‘bounce’) = Better Plant Community

Page 43: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

2. Water Balance Considerations

• Drought rainfall

• Rainfall/runoff that enters wetland from CDA

• Wetland surface area

• Summer ET

• Infiltration loss

• Maintain small pool of water as safety factor (e.g. 6”)

Page 44: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Water Balance Equation

Bill Hunt, NCSU:

DP = RFm * EF * WS/WL – ET – INF – RES

Where: DP = Depth of pool (inches)

RFm = Monthly rainfall during drought (inches)

EF = Fraction of rainfall entering wetland (CDA Rv)

WS/WL = Ratio of contributing DA to wetland Surface Area

ET = Summer evapotranspiration rate (inches; assume 8 inches)

INF = Monthly infiltration loss (assume 7.2 inches @ 0.01 inch/hour)

RES = Reservoir of water for a factor of safety (assume 6 inches)

Page 45: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Example Calculation

With Basic “Worst-Case” Assumptions:

DP = RFm * EF * WS/WL – ET – INF – RES

• RFm = Rainfall during drought = 0”

• EF = Fraction of rainfall entering wetland = (CDA Rv) = 10*0.45 = 4.5

• WS/WL = Ratio of DA to SA = 10 / 0.3 = 33.3 • ET = summer evapotranspiration = 8” • INF = Summer Monthly infiltration loss = 7.2” • Reservoir of water safety factor = 6”

DP = (0” * 8” * 33.3) – 8” – 7.2” – 6” = 21.2 = 22”

Minimum Pool Depth = 22 inches

• Minimum pool may be less if summer/drought groundwater/ baseflow can be documented

Page 46: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Beware of Pocket Wetlands !

Page 47: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Key Design Considerations

Wetland Without the “Wet”

Page 48: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Adjustable Weir/Flashboard

You Don’t Always Know How Water Balance Will Work Out. . .

Plan for Adaptability

Page 49: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

3. Geometry and Flow Path

Page 50: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Length to Width Ratio

Outlet

Structure

L

Inlet

Structure W

Length/Width Ratio = L/W, where:

L = Length from inlet to outlet

W = Average width

Outlet

Structure

L

Inlet

Structure W

Outlet

Structure

L

Inlet

Structure W

Length/Width Ratio = L/W, where:

L = Length from inlet to outlet

W = Average width

Page 51: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Inlet

Outlet

L/W = 3.4:1

Seek Longer Flow Path

Page 52: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Shortest Flow Path Criteria

Outlet

Structure

Curb Inlets

L

SFP

Shortest Flow Path Ratio = SFP/L

SFP = Length of shortest flow path from an inlet to outlet

L = Overall length of facility

Outlet

Structure

Curb Inlets

L

SFP

Outlet

Structure

Curb Inlets

L

SFP

Shortest Flow Path Ratio = SFP/L

SFP = Length of shortest flow path from an inlet to outlet

L = Overall length of facility

Page 53: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Virginia Wetland Geometry Criteria

L/W Ratio Shortest Flow Path Ratio

Level 1 = 2.0

Level 2 = 3.0 or multi-cell

Level 1 = 0.5

Level 2 = 0.8

Page 54: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Internal Micro-topography

Specify at least two mechanisms to create better microtopography

• Snags

• Inverted rootwads

• Gravel layers

• Cobble sand weirs

• Coir fiber logs

• Scattered pools

• Peninsulas

Page 55: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

High Marsh/Tree Peninsulas

Page 56: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall
Page 57: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Multiple Cells: forebay, wetland cells

Photo: Triangle Park Stormwater Treatment Wet Swale, Town of Rising Sun, MD

Page 58: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Photo: Triangle Park Stormwater Treatment Wet Swale, Town of Rising Sun, MD

Imbricated Rock Weir

Page 59: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

4. Maintenance Reduction Features:

• Access for maintenance

• Sediment forebay

• Safety benches

• Preventing clogging at riser/weir outlet

Page 60: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Make it Easy to Get to it !

Page 61: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Fencing and Slope Considerations

Page 62: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Don’t worry homeowners, here we come!

Place riser in the embankment instead of open water.

Page 63: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Clogging Reduction

• Low flow orifice ≥ 3” (although that alone is not sufficient)

• Internal orifice plates within pipe

• Trash racks, half-round CMP, reverse slope pipe into micro-pool

Page 64: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Pool Outflow Pipe/Drain:

Make sure the “plumbing can be accessed and is in operable condition.

Page 65: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Construction and Maintenance

Tips

Page 66: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Construction

Critical Points • Ready to Install?

– Conversion from ESC

• Secondary ESC Measures – divert flow around

wetland area

•Embankments & Outlets

•Internal berms/weirs

•Micro-topographic features

•Stabilize exposed areas

Stage 1 Inspection:

Page 67: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Construction

Critical Points • Connect drainage area • Measure & stake planting depth

zones • Planting (April – June) – order

plants months in advance – Container grown or plugs – Wetland seed mixes – Volunteers (remaining areas)

• Goose Protection • Plant wetland fringe & buffer • Check inundation zones/status

Stage 2 Inspection:

Page 68: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Construction

• Dewater

• Dredge

• Regrade to rough design elevations

Conversions From ESC Facilities

Page 69: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Construction

• Orange fence along perimeter

• Criss-cross web of white string over plants

• Keep in place until plants are big enough to not be enticing to geese

Source: City of Waynesboro, VA

After Planting: Protect Plants from Geese Predation

Page 70: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Wetland Maintenance

Page 71: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

CWP (2009)

General Performance Problems with Constructed Stormwater

Wetland (n=22)

68%

23%

18%

14%

5%

5%

5%

0%

0%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Vegetation/Habitat

Hydrology

Maintenance

Stability

Aesthetics/Placement

Consistency with Design

Grading/Elevations

Treatment Effectiveness

Structural

Performance Issues in the Field

Page 72: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Initial Maintenance

First 1 – 2 Years:

• Spot reseeding

• Watering (trees, other plants as needed)

• Reinforcement plantings

• Develop early strategy for invasives (e.g., semi-annual removal)

Page 73: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Long Term Maintenance

Routine • Monitor plant community

• Inlets, embankments, berms, spillways, slopes, etc.

Non-Routine • Invasives control (when invasive cover 15% of

wetland cell)

• Thinning/harvesting of woody growth (except wooded wetland features)

• Sediment removal from forebays, cells

Page 74: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Establishing the Wetland Plant Community

Page 75: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Establishing the Wetland Plant Community

• Wetlands are similar to us – Defined by where they

live

– Evolve to perform specific work

– Associate with those they like

– Tolerate life stresses

Page 76: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Stormwater Wetland Vegetation Success Metrics

• Should be similar to nearby natural wetland systems

• Maximize water contact with vegetation for best water quality enhancement

• Formed of species that naturally associate together

• Hydrology design behavior matched to the wetland type

Page 77: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Long, Meandering Flow Path A Worthy Goal Indeed!

Page 78: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Reference Wetland Systems

• Identifies what types of plant species & arrangements

• Provides acceptable hydrology ranges

• Information can be obtained from local wetland delineators and regional wetland plant references

Page 79: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Adjusting Water Flow and Availability

• Design should allow for easy water adjustment

• Maintenance activities include: – Clearing and repairing water control and

conveyance devices

– Removing animal structures and repair damage from tunneling

– Conveying excess water

– Installing stone edging in erosive settings

– Adjusting existing structures

Page 80: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Planting Plan for Depth Zones:

Page 81: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Depth Zones (inches):

1. -6 to -12 below normal pool

2. -6 to normal pool

3. Normal pool to +12

4. +12 to +36 above normal pool

See State Manuals for Plant Lists; Commercially-Available Natives Preferred

Page 82: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Detailed Planting Plan

Page 83: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Plant Schedule & Details

Page 84: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Sustaining Vegetation

• Maintenance activities include: – Watering or irrigating

– Controlling diseases and infestations

– Eliminating invasive species

– Removing wracks, algal mats and other litter

– Replanting and reseeding

– Using animal management techniques

Page 85: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Top 10 Causes of Vegetation Failure

• Unsuitable planting substrate

• Too wet or too dry • Salt buildup in soils • Incorrect elevations and

incorrect species • Poorly graded site • Non-viable seed or poor

seeding techniques • Burning of plants by

fertilizer • Plant float out • Herbivory • Insects & disease

Page 86: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Invasive Plants: A good offense is the best defense

• Make sure planned hydrology does not exceed the planned wetland vegetation community tolerance.

• Select plant material based on nearby natural wetlands and the proposed site conditions.

• Design the wetland planting scheme to coalesce vegetation in one year will provide resistance to invasive encroachment.

• A semiannual monitoring and maintenance plan that includes invasive removal is essential for success.

Page 87: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Wildlife Management Techniques

• Population reductions

• Use of tree guards and fences

• Animal repellents

Page 88: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

• Tree peninsulas

• Tree islands

• Wetland buffers above ED zone

Trees (Wetter is Not Better!)

Page 89: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Wetland Vegetation Worthy Life Goals

• Project sponsors should anticipate both expected and unexpected

• Design should strive for self-maintenance

• Maintenance typically required for 1 to 2 years after completion of construction until fully grown in

• Monitoring is needed to identify problems early before becoming expensive to solve

Page 90: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Questions and Comments

Page 91: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

EXISTING RETROFITS

BMP CONVERSION

DRY POND

CONSTRUCTED WETLAND

Page 92: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall
Page 93: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall
Page 94: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall
Page 95: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall
Page 96: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Info From Stormwater Plan/Report

• D.A. = 30.8 acres • Managed Turf = 15.1 acres • Impervious = 15.7 acres • CN = 80 • WQV = 55,560 cubic feet

Page 97: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Incremental Credit

BMP Conversion

• Existing ED Pond (Level 1?) – use VA RR rates

• Convert to Constructed Wetland

BMP Enhancement

• Existing ED Pond (Level 1) – use VA RR rates

• Enhance to Level 2 ED Pond w/ wetland features

Page 98: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Results

TP TN

Load From D.A. (lbs) 43.19 319.95

Existing ED Pond Efficiency (Expert Panel, Level 1)

15% 10%

Existing Load Reduction (lbs) 6.48 32.00

BMP Conversion To Constructed Wetland

Efficiency for Constructed Wetland (ST) 55% 35%

Load Reduction From Curve 18.61 87.73

Delta 12.13 55.73

BMP Enhancement: Wetland Cells, Flowpath

Load Reduction for Level 2 ED Pond 31% 24%

Load Reduction 13.39 76.79

Delta 6.91 44.79

Page 99: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

• Phosphorus Removal = 14 pounds • $ = $200K • Cost Effectiveness = $14,000/pound

Page 100: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example for

New/Redevelopment Situations

Page 101: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example

• 15 acres, 25 ¼ acre lots

• Impervious = 3.15 ac. (lots + roads)

• Managed Turf = 3.44 ac.

• Open Space = 6.59 ac.

Page 102: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example

Runoff Reduction Spreadsheet (Virginia)

• Site Treatment Volume (Tv) = 14,831 cubic feet

• TP Load = 9.32 lbs/acre/year

• TN Load = 66.66 lbs/acre/year

• VA TP Reduction to Meet 0.41 lbs/acre/year = 3.17 lbs

102

Page 103: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example

TvBMP Constructed Wetland = 13,610 cf Runoff Reduction = 0

Design Scenario 1: Just Constructed Wetland

Page 104: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example

Dry Swale #1 with additional 1.0 ac. Impervious

Design Scenario 2: Constructed Wetland with Upstream Runoff Reduction

Constructed Wetland (with additional 1.58 ac. Impervious + 3.44 ac. turf)

0.57 ac. Simple Disconnection to amended filter path

Page 105: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Design Example

Wetland TvBMP from immediate DA = 8,195 ft3

Tv remaining from upstream RR BMPs = 2,659 ft3

Wetland Design TvBMP = 10,854 ft3

Volume Reduced by upstream RR = 2,756 ft3

Scenario 2: Constructed Wetland with Upstream Runoff Reduction

Page 106: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: Virginia

• Laws, Regulations, Permits: Virginia Dept. of Environmental Quality, Stormwater: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx

• BMP Specifications: Virginia Stormwater BMP Clearinghouse, Non-Proprietary (Constructed Wetland = Specification #13): http://vwrrc.vt.edu/swc/NonProprietaryBMPs.html

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 107: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: West Virginia

• Laws, Regulations, Permits: West Virginia Dept. of Environmental Protection: http://www.dep.wv.gov/WWE/Programs/stormwater/Pages/sw_home.aspx

• BMP Specifications: West Virginia Stormwater Management & Design Guidance Manual (Constructed Wetland = Specification 4.2.11): http://www.dep.wv.gov/WWE/Programs/stormwater/MS4/Pages/StormwaterManagementDesignandGuidanceManual.aspx

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 108: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: D.C.

• Stormwater Rule: District Department of the Environment: http://ddoe.dc.gov/node/610592

• BMP Specifications: D.C. Stormwater Management Guidebook (Wetlands = Specification 3.11): http://ddoe.dc.gov/node/610622

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 109: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: Delaware

• Laws, Regulations, Permits: Department of Natural Resources & Environmental Control: http://www.dnrec.delaware.gov/swc/pages/sedimentstormwater.aspx

• BMP Specifications: Sediment & Stormwater Technical Document (Constructed Wetland = Appendix 3.06.2.12): http://www.dnrec.delaware.gov/swc/Drainage/Pages/Technical_document.aspx

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 110: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: Maryland

• Laws, Regulations, Permits: Department of the Environment: http://www.mde.maryland.gov/programs/Water/StormwaterManagementProgram/SedimentandStormwaterHome/Pages/Programs/WaterPrograms/SedimentandStormwater/home/index.aspx

• BMP Specifications: Maryland Stormwater Design Manual (Constructed Wetland = Section 3.2): http://www.mde.maryland.gov/programs/Water/StormwaterManagementProgram/MarylandStormwaterDesignManual/Pages/Programs/WaterPrograms/SedimentandStormwater/stormwater_design/index.aspx

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 111: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: Pennsylvania

• Laws, Regulations, Permits: PA Department of Environmental Protection: http://www.portal.state.pa.us/portal/server.pt/community/stormwater_management/21377

• BMP Specifications: PA Stormwater Best Management Practices Manual (Chapter 6.6.1, Constructed Wetland): http://www.portal.state.pa.us/portal/server.pt/community/best_management_practices_manual/21383

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 112: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Where To Find Design Resources: New York

• Laws, Regulations, Permits: NY Department of Environmental Conservation: http://www.dec.ny.gov/chemical/8468.html

• BMP Specifications: NY State Stormwater Management Design Manual: http://www.dec.ny.gov/chemical/29072.html

• Design Guidance for Karst, Coastal, Urban/Redevelopment: Chesapeake Stormwater Network, Technical Bulletins: http://chesapeakestormwater.net/category/publications/csn-technical-bulletins/

Page 113: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Webcast Resources • Virginia’s Stormwater Design Specification No 13: Constructed

Wetlands

• BMP Landscaping & Plant Lists (Appendix F from the WV Stormwater Manual) – Most of the different Bay State Stormwater manuals provide plant lists

• North Creek Nursery’s Landscape Plug Manual – can be purchased here: – http://www.northcreeknurseries.com/index.cfm/fuseaction/resources.li

nks/cat_id/15/index.htm

• Subsurface Gravel Wetland Design Specifications. UNH, 2009

• Stormwater BMPs in Virginia's James River Basin: An assessment of field conditions and programs. CWP, 2009

www.chesapeakestormwater.net

Page 114: Stormwater Wetlands Reconsideredchesapeakestormwater.net/wp-content/uploads/downloads/...•Detention storage can also be above pool, as long as “bounce” ≤ 12” for 1-inch rainfall

Please take a few moments to answer our 6 question survey to help us better serve your

needs in our 2014 webcast series.

We use this information to report it to assess our work, your needs and to report it to our funders

for future webcasts !

Evaluation

https://www.surveymonkey.com/s/LX3KPBX