structures to be removed

Upload: mar-martillano

Post on 03-Mar-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/26/2019 Structures to Be Removed

    1/4

    Notes on the Necessary VariationsDue to the Replacement of

    Interchanges

    Table of Contents

    Notes on the Necessary Variations Due to the Replacement of Interchanges..........................1

    1 Tiaong Interchange.............................................................................................................2

    1.1 Highway Sections Affecte !y the Replacement........................................................2

    1.2 Structures Affecte !y the Replacement.....................................................................2

    1.2.1 The "NR #nerpass..............................................................................................2

    1.2.2 The R$%$ 2&'(&() at Sta. *(+((,.-..................................................................2

    1.2.- Tiaong %rige.......................................................................................................2

    1.2., #nerpass at Sta. */+-2,.102..............................................................................-

    1.2.0 Note.......................................................................................................................-

    1.- ther Austment........................................................................................................-

    2 3a4!an Interchange...........................................................................................................,

    2.1 Highway Sections Affecte of the Replacement........................................................,

    2.2 Sur5ey #pate............................................................................................................,

    2.- Structure Affecte !y the Replacement......................................................................,

    2.-.1 3a4!an %rige......................................................................................................,

  • 7/26/2019 Structures to Be Removed

    2/4

    INTERNAL DOCUMENTSOUTH LUZON TOLLWAY CORPORATION

    SLEX PHASE 2 TR4

    1 TIAONG INTERCHANGE

    The new location of the Tiaong Interchange is at Sta. *(+661.,,.

    1.1 Highway Sections Affected by the Replaceent

    The pre5ious esign affects the highway sections from stations *(+,2 to */+/2. The new

    esign will affect sections from stations (+,( to */+/2. Therefore7 the highway8s tra5ersal

    sections from stations *(+,( to */+/2 nee to !e replace

    1.! St"#ct#"es Affected by the Replaceent

    There are fi5e structures that will !e affecte !y the new esign9

    1) The "NR #nerpass7 with a!utments at stations *(+02-./** an *(+0/.1*1

    2) The 2&'(&() R$%$7 locate at Sta. *(+((,.-

    -) The 2&'2.,&2./0) R$%$7 locate at Sta. */+2

    ,) The Tiaong %rige7 locate at Sta. *(+*--.-2

    0) The unerpass locate at Sta. */+-2,.102

    1.2.1 The PNR Underpass

    The acceleration lane towars 3anila leas to the wiening of the north !oun sie of this

    #nerpass.

    Solutions propose9

    1) To ma4e shorten the acceleration lane

    2) Reesign the "NR %rige

    1.2.2 The RCBC 2x(6x6) at Sta. 86+664.30

    The acceleration lane towars 3anila leas to the wiening of the north !oun sie of this

    R$%$.

    Solution propose9

    1) To ma4e this R$%$ longer.

    1.2.- Tiaon Bride

    The access ramp going to 3anila leas to the wiening of the north !oun sie of this

    %rige

    Solutions propose9

    1) $a"iation of the access "ap%s geoet"y:2) Small 5ariation of the interchange main alignment:

    -) %rige reesign

    2

  • 7/26/2019 Structures to Be Removed

    3/4

    INTERNAL DOCUMENTSOUTH LUZON TOLLWAY CORPORATION

    SLEX PHASE 2 TR4

    1.2., Underpass at Sta. 8!+324."#2

    The access ramp towars ;ucena leas to a elongation of the #nerpass in the south !oun

    sie.

    Solutions propose91)

  • 7/26/2019 Structures to Be Removed

    4/4

    INTERNAL DOCUMENTSOUTH LUZON TOLLWAY CORPORATION

    SLEX PHASE 2 TR4

    !.! S#"+ey ,pdate

    The topographic sur5ey nees to !e e&tene accoring the last re5ision of the 3a4!an

    Interchange.

    !.& St"#ct#"e Affected by the Replaceent

    There is one structure near the new 3a4!an Interchange will affecte of the new ramp

    location7 that is the 3a4!an %rige7 which is locate at Sta. (/+,0-.6

    2.-.1 $a%&an Bride

    The eceleration lane towars 3a4!an from ;ucena is shorter compare to the pre5ious

    one. Therefore7 only two lanes are neee for the north !oun sie of this !rige

    Solutions propose9

    1) Reuce the with of the north !oun sie of the !rige

    ,