5
STUDENT RISK ASSESSMENT Date 29/09/15 Location: Office Task being assessed: Students filming/taking photos in college General Risk assessment Student Name: Kubilay Ulukus HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN Hazard Regardless of control measures Perso ns at risk *1 Worst outcom e *2 Probabili ty *3 Risk Ratin g A-E Existing control measures taken against the risk What further control measures are required when and by whom

Upload: a2media15d

Post on 17-Feb-2017

160 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Student risk assessment

STUDENT RISK ASSESSMENT

Date 29/09/15 Location: Office Task being assessed: Students filming/taking photos in college

General Risk assessment

Student Name: Kubilay Ulukus

HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLANHazard

Regardless of control measuresPersons at risk

*1

Worst outcome

*2

Probability

*3

Risk Rating

A-E

Existing control measures taken against the risk

What further control measures are required when

and by whomTripping over chairsBumping into tablesBumping into peopleAvoid Sharp Objects(scissors, pens etc)

Sf,st Sf StSf StSf St

MinMinMinF

R R RE

EEED

Take care whilst walkingWatch your stepAvoid CollisionBeware of sharp objects

Sf+St look where they stepConcentration whilst walkingLook carefully whilst walkingKeep sharp objects away from interview.

*1Sf = staffSt = studentsCr = contractorsCl = cleanersV = visitors

D = people with disabilitiesX = young/inexperiencedL = lone workersW = women of child-bearing age

*2 This is without control measuresF = fatalMaj = major injury or permanent disabilityMin = minor injuryNR = non-reportable

*3 This is with control measures in placeFr = frequent/likely/could occur repeatedly/expectedPr = probable/not surprised/might occur oftenPs = possible/could occur sometimeR = remote/unlikely but conceivableU = unlikely/improbable such that likelihood is almost zero

Page 2: Student risk assessment

Date 29/09/15 Location: Canteen Task being assessed: Students filming/taking photos in college

General Risk assessment

Student Name: Kubilay Ulukus

HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLANHazard

Regardless of control measuresPersons at risk

*1

Worst outcome

*2

Probability

*3

Risk Rating

A-E

Existing control measures taken against the risk

What further control measures are required when

and by whomSlipping over wet surfaces

Bumping into tables

Bumping into people

Avoid Sharp Objects (Knifes, Forks)

St

St

St

St

Min

Min

Min

F

Ps

R

R

U

C

E

E

B

Make sure floor surface is firmly dry to avoid slipping

Watch your step

Avoid Collision

Beware of sharp objects

Go to an area where it is dry, and a firm surface.Concentration whilst walking

Look carefully whilst walking

Keep sharp objects away from interview.

Page 3: Student risk assessment

*1Sf = staffSt = studentsCr = contractorsCl = cleanersV = visitors

D = people with disabilitiesX = young/inexperiencedL = lone workersW = women of child-bearing age

*2 This is without control measuresF = fatalMaj = major injury or permanent disabilityMin = minor injuryNR = non-reportable