styx catchment water quality targets · title: styx catchment water quality targets author:...

2
FITZROY REGION Styx catchment water quality targets Catchment profile Under the Reef 2050 Water Quality Improvement Plan, water quality targets have been set for each catchment that drains to the Great Barrier Reef. These targets (given over the page) consider land use and pollutant loads from each catchment. The Styx catchment covers 3013 km 2 (2% of the Fitzroy region). Rainfall averages 835 mm a year, which results in river discharges to the coast of about 851 GL each year. The Styx is the northernmost catchment on the coastal fringe of the Fitzroy region. The catchment is bordered by coastal mountain ranges in the west, from which emerge the upper reaches of a number of the small waterways, which drain the catchment area. The main waterway is Styx River in the south, along with St Lawrence and Waverley creeks further north. The catchment area is dominated by grazing, with small areas of conservation and forestry land uses. 20 40 60 80 100 Grazing Water Nature conservation Forestry Other Dryland cropping Urban 0% Land uses in the Styx catchment The main land uses are grazing (80%), water (12%), and nature conservation (5%). [ Ý Z ! ! ! ! ! ! Fitzroy Sub-catchment Isaac Sub-catchment Mackenzie Sub-catchment Long Island Reef Lake Shoals Boomerang Shoals Holt Shoal Park Shoal Long Island (No 1) Quail Island Mangrove Island (No 1) Mangrove Island (No 2) Long Island (No 3) Mangrove Island (No 5) Marble Island Tynemouth Island Wild Duck Island Aquila Island Rosewood Island Akens Island Gull Cay North Point Cays Escape Cay Morning Cay Snake Cays Fitzroy Catchment Plane Creek Catchment Shoalwater Catchment NORTHPOINT ISLES NORTHUMBERLAND ISLANDS F L A T I S L E S DUKE ISLANDS B r o a d S o u n d Sand Bank Bay Shoalwater Bay West Bight St Lawrence Marlborough Carmila H u tC k C att le C r e e k P a l m C k C o n n o rs R i v e r S t y x Ri v e r R ol f C r e e k Ma c k e nzi e Riv e r M a r l b o r o u gh C re e k T o o l oom b a h Cr e e k C o nn o r s R i v e r H er b er t C k L o t u s C r e e k I s aa c R iv e r S t y x C a t c h m e n t 0 6 12 18 24 30 Kilometres Landuse Nature conservation Forestry Grazing Irrigated cropping Dryland cropping Sugarcane Horticulture Banana Dairy Urban and other intensive uses Mining Stream/water inc. dams Other Legend Mangrove Seagrass [ Ý Z Dams and weirs Catchment Highways Secondary roads

Upload: lamhanh

Post on 20-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

FITZROY REGIONStyx catchment water quality targets

Catchment profileUnder the Reef 2050 Water Quality Improvement Plan, water quality targets have been set for each catchment that drains to the Great Barrier Reef. These targets (given over the page) consider land use and pollutant loads from each catchment.

The Styx catchment covers 3013 km2 (2% of the Fitzroy region). Rainfall averages 835 mm a year, which results in river discharges to the coast of about 851 GL each year.

The Styx is the northernmost catchment on the coastal fringe of the Fitzroy region. The catchment is bordered by coastal mountain ranges in the west, from which emerge the upper reaches of a number of the small waterways, which drain the catchment area. The main waterway is Styx River in the south, along with St Lawrence and Waverley creeks further north. The catchment area is dominated by grazing, with small areas of conservation and forestry land uses.

20 40 60 80 100

Grazing Water Natureconservation

Forestry

OtherDryland cropping

Urban

0%

Land uses in the Styx catchmentThe main land uses are grazing (80%), water (12%), and nature conservation (5%).

[

Ý

Z !!

!!

!!

F i t z r o y S u b - c a t c h m e n t

I s a a c S u b - c a t c h m e n t

M a c k e n z i e S u b - c a t c h m e n t

LongIslandReef

Lake Shoals

BoomerangShoals

HoltShoal Park Shoal

LongIsland(No 1) Quail

Island

MangroveIsland (No 1)

MangroveIsland (No 2)

LongIsland(No 3)

MangroveIsland(No 5)

Marble Island

TynemouthIsland

WildDuckIsland

Aquila Island

RosewoodIsland

AkensIsland

GullCay

NorthPointCays

Escape Cay

MorningCay

SnakeCays

F i t z r o y C a t c h m e n t

Plane CreekCatchment

S h o a l w a t e r C a t c h m e n t

NORTHPOINTISLES

NORTHUMBERLAND ISLANDS

F L A TI S L E S

D U K EI S L A N D S

B r o a d S o u n d

Sand BankBay

Shoalwater Bay

WestBight

St Lawrence

Marlborough

Carmila

Hut Ck

Cattle CreekPalm Ck

Connors

River

Sty x

River

Rolf Creek

Mackenzie River

Mar

lbor

ough

Cre ek

Tooloombah Cr

eek

Conno

rs

River

Herbert Ck

L otus C r e

ek

Isaac R iver

S t y x C a t c h m e n t

0 6 12 18 24 30

Kilometres

S:\OGBR\d170612 GBR catchments map\GBR catchments map_A4P_v03.mxd31 July 2017

Page 25 of 35

LanduseNature conservationForestryGrazingIrrigated croppingDryland croppingSugarcaneHorticultureBananaDairyUrban and other intensive usesMiningStream/water inc. damsOther

Legend

MangroveSeagrass

[

Ý

Z Dams and weirs

CatchmentHighwaysSecondary roads

reefplan.qld.gov.au

2025 water quality targets and priorities

End-of-catchment anthropogenic load reductions required from 2013 baseline

Pesticides

Dissolved inorganic nitrogen (DIN)

Fine sediment Particulate phosphorus (PP)

Particulate nitrogen (PN)

maintain current load

maintain current load

maintain current load

maintain current load

To protect at least

99% of aquatic species at the end of catchment

The 2025 targets aim to reduce the amounts of fine sediments, nutrients (nitrogen and phosphorus) and pesticides flowing to the reef. Each target for sediment and nutrients is expressed as: (a) the percentage load reduction required compared with the 2013 estimated load of each pollutant from the catchment; and (b) the load reductions required in tonnes. Progress made since 2013 will count towards these targets. Previously reported progress between 2009 and 2013 has already been accounted for when setting the targets. The pesticide target aims to ensure that concentrations of pesticides at the end of each catchment are low enough that 99% of aquatic species are protected. The targets are ecologically relevant for the Great Barrier Reef, and are necessary to ensure that broadscale land uses have no detrimental effect on the reef’s health and resilience.

A high percentage reduction target may not necessarily mean it is the highest priority. The priorities (ranked by colour) reflect the relative risk assessment priorities for water quality improvement, based on an independent report, the 2017 Scientific Consensus Statement. The priorities reflect scientific assessment of the likely risks of pollutants damaging coastal and marine ecosystems.

Water quality relative priority

Very high

High

Moderate

Low

Minimal

Not assessed

The Styx catchment has minimal anthropogenic pollutant loads. The aim is to maintain current water quality so that there are no increases in sediment or nutrient loads.

Tim Marsden