330
SU OETC-G LTANAT The G Vers APRIL Docume GCRP- Apr TE OF O Grid Cod sion 2.0 L - 201 nt Referenc ril-2010 (V OMAN de 0 10 ce Version 2. 0)

Upload: duongcong

Post on 11-Apr-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

SU

OETC-G

LTANAT

The GVers

APRIL

Docume

GCRP- Apr

TE OF O

Grid Codsion 2.0

L - 201

nt Referenc

ril-2010 (V

 OMAN 

de 0

10

ce

Version 2.0)

Page 2: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Preface

This docuTransmisElectricityrelation tchanges The GridSystem. who havespecifies Terms anGrid Codsections. The Grid

ctricity Transmis

e

ument is thession and Dy Transmissto the plannto OETC's T

d Code appHowever, in

e acceded twhich Perso

nd expressioe entitled "A

Code conta

ssion Compan

e Grid CodeDispatch Licsion Companing, develoTransmissionlies to all endividual pato the Grid on it appliesons used in tAbbreviation

ains the followGeneral CData TransAlerts SumPlanning CConnectioOperating − OC1 De− OC2 Op− OC3 Op− OC4 De− OC5 N

Report− OC6 Saf− OC7 Co− OC8 Nu− OC9 OpScheduling

− SDC− SDC− SDC

Ancillary SMetering aAbbreviatio

y

The G

e referred tocence grantany SAOC (opment, Conn System.

entities that arts of the GCode as a to. the Grid Cods and Defin

wing constitonditions; sfer Code;

mmary CodeCode; n ConditionsCodes; mand Forec

perational Plaperating Margmand ContrNotice of Oting; fety Coordinntingency Pmbering and

perational Teg and Dispat

C1 GeneratioC2 GeneratioC3 FrequencServices Codand Data Excons and Def

The G

Grid Cod

o in the Sected by the (“OETC”) unnnection to,

are connecrid Code mawhole. Eac

de are defineitions" or, in

uent parts;

;

s Code;

casting; anning; gin; rol; Operations

nation; Planning; d Nomenclatests & Site Intch Codes;

on and Desaon and Desacy Control; de; change Codfinitions;

Grid Code - Ve

e

ctor Law [(ARegulatory

nder that LaOperation

cted to and/ay be applicch constitue

ed either in t some case

& Incidents

ture of HV Pnvestigations

alination Schalination Disp

de;

rsion 2.0

Issued

Articles 22 &Authority t

aw. It conand mainte

/or use the able to only

ent part of th

the relevant s, in individu

s, & Signifi

Plant; s;

heduling; patch;

d April 201

& 23)] and thto the Omatains rules nance of an

Transmissioy some partiehe Grid Cod

section of thual Grid Cod

cant Incide

10

he an in

nd

on es de

he de

ent

Page 3: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

This Grid(includingDistributiobe party parties mConnectioNothing iother genthis Grid Rial. Howeverremedy tagreemethe [title opreclude Sector LaEach parparties toGood Ind

ctricity Transmis

d Code shallg OETC, on System Oto it as will

may have on Agreemen this Grid Cneral Law riCode. Eac

, nothing in hat may exint between of Sector Lathe Regula

aw or any Licrty to this Go the Grid Cdustry Practic

ssion Compan

not constituLicensed GOperators a other partiecontractual

ents), to eacCode shall eght or remech party's lia

this Grid Cist between or any duty

aw] or pursutory Authoricence grant

Grid Code shCode shall at

ce.

y

ute a contracGenerators, nd RAEC wes Connecte

obligationsh other to co

entitle any paedy of whatsability to eac

ode (includiany two paarising und

ant to that Lty from takied there undhall at all timt all times p

The G

ct between aLicensed

when conneced to the Ts, created omply with tharty to it or asoever kind ch other par

ng this pararties to this

der the termsLaw. In partng such enfder as it seemes deal witerform all of

Grid Code - Ve

any of the pGenerators

cted to the Transmissionby separat

he Grid Codany other pe

and howsoerty shall be

agraph) shaGrid Code

s of any Licticular, nothiforcement a

es fit. th all other f their obliga

rsion 2.0

parties to it. s/DesalinatoTransmissionn System. Ste documene. rson to any ever arisinglimited to o

ll affect anyunder any sence granteng in this G

action in rela

parties in gations in acc

All Licenseeors, Licensen System) wome of thes

nts (includin

contractual in respect

one (1) Oma

y legal right such separaed pursuant rid Code shaation to it, th

ood faith. Acordance wi

es ed

will se ng

or of

ani

or ate

to all he

All ith

Page 4: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.1 GC.2 GC.3 GC.4 GC.5 GC.6

GC.7 GC.8 GC.9 GC.10 GC.11 GC.12 GC.13 GC.14 GC.15

ctricity Transmis

IntroductioObjective Scope of Grid CodeGrid CodeDerogatioGC.6.1 UnforeseeHierarchyIllegality aTime of ECode NotCode DispCode ConInterim TrInterpretaAppendix

ssion Compan

G

on ..................................Grid Code ae Review Pae Revisions .ons ..............Requests foen Circumsta ..................

and Partial InEffectivenesstices ............putes ..........nfidentiality .ransitional Pation ............

A Constitu

y

General

CON

...................

...................and General anel ...................................................

or Derogationances ............................

nvalidity .......s ...........................................................................

Provisions .......................ution Of The

Conditi

NTENTS

...................

...................Conditions

...................

...................

...................n ............................................................................................................................................................................................

e Grid Code

Th

ons

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................Review Pan

e Grid Code - V

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................nel ...............

Version 2.0

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

.................. 1

. 4

. 4

. 4

. 4

. 5

. 5

. 6

. 7

. 7

. 7

. 7

. 7

. 8

. 9

. 9

. 9 11

Page 5: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.1 The indivto that inapplicatioGrid Cod

GC.2 The objec To en

togeth To pr

relate

GC.3 The Gene

GC.4 OETC shbody, con to gen to rev

Reguto tim

to discircum

to revand mexistinreleva

to precom

Issueinterp

The Gridwhich dedevelopmThe Pane a cha a pers a pers a pers 2 per

total R

ctricity Transmis

Introduvidual sectiondividual seon, which nee to work to

Objectictives of thensure, insofher for the brovide a set oed issues as

Scope oeral Conditio

Grid Cohall establishnstituted; nerally revieview and dislatory Autho

me; scuss what cmstances review existingmake recomng Oman Eant to OETCpublish recommendations guidance i

pretation whed Code Revefines its scment of the Gel shall consairman and uson appointeson appointeson appointersons represRegistered C

ssion Compan

G

uction ns of the Grction of the

eed to be ingether. Such

ve General Cofar as it is benefit of OEof principlesapproved b

of Grid Cons apply to

ode Revieh and maint

ew, discuss ascuss suggeority or any U

changes areferred to it bg Oman ElemmendationsElectrical StC’s Transmisommendatios has occurrn relation toen asked to iew Panel s

cope, MembGrid Code assist of; up to 2 persoed by the Reed by PWP; ed by PAEWsenting all PCapacity in e

y

General

rid Code cone Grid Codecluded in thh provisions

onditions arepossible, th

ETC and all Us governing ty the Regula

Code and OETC and

ew Panelain the Grid

and developestions for aUser may wi

e necessaryby OETC; ectrical Stans to the Reandards or

ssion Systemons and ered through o the Grid by a User.

shall be govership, duties approved b

ons appointeegulatory Au

W; Power Produexcess of 10

Conditi

ntain the rulee. There aree Grid Code

s are include

e as followsat the varioUsers; and the status anatory Author

General to all Parties

d Code Revi

the Grid Coamendmentssh to submit

y to the Grid

dards relevaegulatory Aproposals

m; ensure thaMembers; aCode and i

verned by aes, and ruleby the Regu

ed by OETCuthority;

ucers that ea00 MW;

Th

ons

es and prove also provie to allow thd in these G

ous sections

nd developmrity.

Conditios to the Grid

iew Panel, w

ode and its ims to the Gridt to OETC fo

Code arisin

ant to OETCAuthority con

for new Om

at User cand ts implemen

a constitutioes of condulatory Autho

;

ach have Pr

e Grid Code - V

visions relatinsions of a

he various sGeneral Cond

s of the Gri

ment of the G

ns d Code.

which shall b

mplementatid Code whicor considera

ng out of an

C’s Transmincerning moman Electric

consultation

ntation, perf

n (given asuct, operatioority.

roduction Fa

Version 2.0

ng specificamore generections of thditions.

id Code wo

Grid Code an

be a standin

ion; ch OETC, th

ation from tim

ny unforesee

ssion Systeodifications cal Standard

upon suc

formance an

Appendix Aon and furth

acilities with

lly ral he

ork

nd

ng

he me

en

em to ds

ch

nd

A) er

a

Page 6: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

2 perProdu

1 pers 1 pers 1 pers 1 pers

GC.5 All revisioapplicatiothe Reguthe ChairUsers, anno less thReview PFollowingapply to Review Palso notifReview Pthe ReguThe Regrepresentso, whethHaving bChairmantaking effamendedsuch date

GC.6 If a User it shall, wshall makas reason with r

mainl with r

ConnWhen a Uand techngranted aRegulatoand PWPIf OETC ftime, thecomplian

ctricity Transmis

rsons repreuction Facilitson represeson represeson represeson represe

Grid Coons to the Gon to the Reulatory Authorman for connd the Reguhan 20 Busi

Panel. g review of athe Regula

Panel recomfy each UsePanel and Uulatory Authoulatory Authtations and her in the forbeen so diren shall notifyfect, and the

d accordingle as directed

Derogafinds that it

without delayke such reasnably practicreference toy as a result

reference to ect to the TrUser believenical considean extendedry Authority

P with a copyfinds that it i

en it shall mce as soon a

ssion Compan

esenting all ties with a tonting each Lnting Internanting Internanting RAEC

ode RevisGrid Code m

egulatory Auority or OETnsideration.

ulatory Authoiness Days

a proposed atory Authormendation. r of the propsers so that

ority regardinhority shall cshall determ

rm proposedected by they each User e revision sy) from (andd by the Reg

ations is, or will be

y, report suchsonable effocable. Non-co Plant Connt of a revisioPlant which

ransmission es either thaerations) to

d period to r a request fy of such apis, or will be,make such as reasonab

y

Power Prootal RegisterLicensed Disally Interconational Interc.

sions must be revthority by th

TC shall be The Chairm

ority of all prin advance

revision by ity for revis The Chairmposed revisit each User ng the propoconsider themine whethed or in an ame Regulatoryof the revisihall take effd including)

gulatory Auth

e, unable to h non-comp

orts as are recompliance mnected to thon to the Gridh is Connecte

System is bat it would berequire it to

remedy suchfor derogatioplication. , unable to creasonable

bly practicab

oducers thatred Capacitystributor; nected Particonnected P

viewed by thhe Chairman

brought befman will advroposed reviof the next

the Grid Coion of the G

man, in applyion and othemay consid

osed revision proposed r

er the propomended formy Authority on at least 1fect (and th) the date shority.

comply withliance to OEequired to remay result;e Transmissd Code; anded, approve

being soughte unreasonaremedy suc

h non-complon from suc

comply with efforts as

ble.

Th

t each haviy of 100 MW

ies; Parties; and

he Grid Codn. All proposfore the Gridvise the Gridisions to thescheduled m

ode Review Grid Code bying to the Rer views expder making rn. revision, othosed revisionm.

that the rev10 Business is Grid Codpecified in s

h any provisiETC and theemedy such

sion Systemd ed to Connect.

able (includinch non-compliance, it shach provision

any provisioare require

e Grid Code - V

ing CentrallW or less;

de Review Psed revisiond Code Revd Code Reve Grid Code meeting of t

Panel, the based on thRegulatory Apressed by trepresentatio

er views, ann should be

vision shall Days prior te shall be dsuch notifica

on of the Gr Regulatory non-compli

m and is cau

ct or for whic

ng on the grpliance or thaall promptly and shall p

on of the Grided to remed

Version 2.0

y Dispatche

Panel prior ns from Userview Panel bview Panel, a

with notice the Grid Cod

Chairman whe Grid CodAuthority, shathe Grid Codons directly

nd any furth made and,

be made, thto the revisiodeemed to bation or oth

rid Code, theAuthority an

iance as soo

used solely

ch approval

rounds of coat it should bsubmit to th

provide OET

d Code at andy such no

ed

to rs, by all of de

will de all de to

er if

he on be er

en nd on

or

to

ost be he TC

ny n-

Page 7: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

In the caparagrap

GC.6.1 A reques

(a

(b

(c

(d(e

On receisuch a rederogatioderogatio Have Impos

In its conthe relevathe requeDerogatio

(a

(b

(c(d(e

To the exand/or thapplicablecomply wOETC sh

(a

(b

The Regexisting dchange in

ctricity Transmis

se where Oh GC.6.1 to

Requt for derogat

a) The refernon-com

b) The detathe natur

c) The provcomply;

d) The rease) The date

complianpt of any reequest. Provon are reasoon would, or

a material ase unreason

nsideration oant User andest. ons from anya) The refer

derogatiob) The deta

the natucomplian

c) The identd) The rease) The datextent of anye User (as te provision o

with any alterhall; a) Keep a re

of the perelevant p

b) On requeUser.

gulatory Authderogations,n circumstan

ssion Compan

OETC requesthe Regulat

uests for Detion from anrence numbepliance or pr

ail of the Plare and extenvision of the

on for the noe by whichce is possib

equest for dvided that tonable, the is likely to;

adverse impnable costs oof a derogatid/or OETC t

y provision orence numbeon applies; ail of the Plare and extece provisiontification of ton for the no by which th

y derogationhe case maof the Grid Crnative provi

egister of alrson and Usprovision of est from any

hority may and any de

nce has occu

y

sts derogatiotory Authorit

erogationy provision oer and the dredicted nonant in respet of non-come Grid Code

on-complianh compliancble). erogation, the RegulatoRegulatory A

act on the seon the Operaion request to obtain cla

of the Grid Cer and the d

ant in respecent to whic

ns; the provisionon-complian

he derogationn granted in y be) shall bCode and shisions identif

l derogationser in respecthe Grid Co

y User, provi

initiate at therogations unurred.

on, OETC sty.

of the Grid Cdate of the Gn-compliancect of which

mpliance; e with whic

nce; and ce could be

he Regulatoory AuthorityAuthority sh

ecurity and/oation of the Tby a User, t

arification of

Code shall codate of the G

ct of which ach the dero

n with which nce requiringn shall expiraccordance

be relieved fhall not be lified in the de

s which havct of whom tde and the pde a copy o

he request nder conside

Th

shall submit

Code shall coGrid Code pre was identifderogation i

h the User

e achieved

ory Authorityy considers hall grant su

or stability oTotal Systemthe Regulatothe request

ontain; Grid Code pr

a derogationogation app

the derogatg derogationre. e with this pfrom any oblable for failuerogation.

ve been granthe derogatiperiod of thef such regist

of OETC oeration wher

e Grid Code - V

the informat

ontain; rovision agafied; is sought an

is, or will b

(if remedy

y shall promthat the gr

uch derogatio

of the Total Sm or on otheory Authorityt or to discus

rovision aga

n applies anlies includin

tion applies; ; and

paragraph Gigation to coure to so co

nted, identifyon has been

e derogationter of deroga

r Users a rre a relevan

Version 2.0

tion set out

inst which th

nd, if relevan

be, unable

of the no

mptly considounds for thon unless th

System; or er Users. y may contass changes

inst which th

nd, if relevanng alternativ

GC.6.1, OETomply with thmply but sha

ying the namn granted, th; and ations to suc

review of ant and mater

in

he

nt,

to

on-

er he he

act to

he

nt, ve

TC he all

me he

ch

ny ial

Page 8: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.7 If circumsto the exeffort to rReview PIf OETC ensure thexpresseThereaftesuch dete

GC.8 In the evcontract,

(a

(b

GC.9 If any profor any reIf part of provisionsuch min

(a(b

but withoshall prePanel.

GC.10 This GridAgreeme

GC.11 Any noticsigned bydeliveredaddress, ConditionOETC shfacsimile,User in re

ctricity Transmis

Unforesstances arisxtent reasonreach agreemPanel for conand affected

hat it meets ed by the Useer, OETC sherminations

Hierarcvent of any i

agreement, a) If the con

comes inthe Grid has agreyears fro

b) In all othCode exp

Illegalitovision of theason, the vaa provision would remaimum modif

a) necessarb) most closout affecting pare a prop

Time ofd Code shall ent comes in

Code Nce to be givy or on beha by hand afacsimile n

ns. hall maintain, e-mail and espect of an

ssion Compan

seen Circse which thenably practicment as to wnsideration. d Users areits License

ers. hall refer theto the Grid C

chy rreconcilablor arrangem

ntract agreento force, it sCode or in

eed to compm the date uer cases, th

pressly prov

ty and Pae Grid Codealidity of all of the Grid

ain valid if pafication as mry to make itsely achievethe meanin

posal to corr

f Effectivhave effect

to effect.

Notices ven under thalf of a Persoat, or sent bnumber or e

n a list of conpostal addry other Use

y

cumstanc provisions

cable in the what should

e not able toconditions w

e matter relCode Review

e conflict bement betweeement or arrshall, unlessthe contract

ply with the upon which the provisionides otherwi

artial Invae should be remaining pCode is fou

art of the womay be; t valid and efes the result ng or validityrect the def

eness t, as regards

he Grid Codon duly authby post, or e-mail addre

ntact detailsresses for alr as soon as

ces of the Grid Ccircumstancbe done an

o agree, OEwherever pr

lating to thew Panel with

etween the en OETC anrangement es and to the t agreementGrid Code,

this Grid Cos of the Griise.

alidity found to berovisions of und to be unording were d

ffective; andof the origin

y of any othefault for con

s a new Use

de shall be horised to dofacsimile traess last est

for itself anl Users. OE

s practicable

Th

Code have nces, consultd submit a p

TC will takeractical takin

e unforeseenh a proposal

provisions od a User;

exists at the extent (1) s

t or arrangeprevail ove

de is first in d Code sha

e unlawful orthe Grid Co

nlawful or indeleted, the

d nal wording,er provision sideration b

er, at the tim

in writing ao so by the pansmission ablished pu

nd all Users ETC shall proe after receiv

e Grid Code - V

not foreseent all affectedproposal to t

e any action ng into acco

n circumstanfor conside

of the Grid C

date this Gspecifically pment or (2)

er this Grid effect; and

all prevail un

r wholly or pode shall not nvalid but the

provision sh

of the Grid by the Grid

e at which it

and shall beparty giving tor e-mail to

ursuant to th

containing tovide these

ving a reques

Version 2.0

n, OETC shad Users in athe Grid Cod

necessary ount the view

nces and anration.

Code and an

Grid Code firprovided for

that the UsCode for tw

nless the Gr

partially invalbe affected

e rest of suchall apply wi

Code. OETCode Revie

ts Connectio

e duly given the notice ano the relevahese Gener

the telephondetails to anst.

all an de

to ws

ny

ny

rst in

ser wo

rid

lid . ch ith

TC ew

on

if nd

ant ral

ne, ny

Page 9: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Both OEpreviouslAny noticreceived; if sen if sen

unles if sen

mail, any dDay u

GC.12 If any disCode, eitgood faithIf the parnotice un

(a

(b

(c

If the disshall servConciliatishall govexpress pAny arbit

(a(b(c

ctricity Transmis

TC and all y supplied ace required t by hand, a

nt by post, fss otherwise nt by facsimione hour af

day shall be unless the co

Code Dspute arises ther party mh. rties fail to reder the prev

a) Either pabe referreno such present in

b) If either procure tmeet withwritten noor

c) If the pdirectors/matter tosees fit. it sees fit

determineRefer the

pute is refeve a writtenion and Arbvern such aprovisions ofration condu

a) in the cityb) in Englishc) by a pan

be not feappoint aif there isAuthority

ssion Compan

Users shaland OETC shto be given

at the time offrom and toproven; or le, subject t

fter being sedeemed to

ontrary is sh

Disputes between Us

may by notic

esolve any dvious paragrarty shall be ed to a meetdirectors aren Oman; party exercthat the releh senior exeotice of refe

parties fail /senior exec

o the RegulaAll parties sthe Regulat

e the disputedispute for drred by the n notice on bitration of tarbitration saf the Grid Coucted in accoy of Muscat h; and

nel comprisinewer than than arbitrator s an even nu's appointee

y

l be entitledhall keep theby this Grid

f delivery; o any addres

to confirmatient, providedhave been r

hown to be th

sers or betwce to the oth

dispute by suraph then; entitled by wting of Meme present in

cises its righevant seniorecutives of rral to attem

to resolvecutives undeatory Authorshall be bountory Authorit

e itself; or determinatioRegulatory the parties

the Internatiave to the ode. ordance within Oman;

ng an odd nhree arbitratand (iii) the

umber of pare shall act as

d to amend e list up to dd Code sha

ss within O

ion of uninted that any trareceived at he case.

ween OETC her seek to

uch negotiat

written noticebers of the b

n Oman, the

ht under ther executivesthe other p

mpt to reach

e any disper the sub-clarity for deternd by any dety may;

on by arbitratAuthority to to the dispional Chambextent that

h the preced

number of ators (ii) eac Regulatory rties to the ds chairman o

Th

in any resate accordin

all be deeme

man, 4 Bus

errupted tranansmission 8:00 hours o

and any Usresolve the

tions within

e to the otheboards of dir most senio

e sub-clauses consider tharty within 1agreement o

pute which ause 12(a), rmination asecision of th

tion. o arbitration,pute to thatber of Comthe same a

ding paragra

rbitrators prch of the pa

Authority shdispute (in wof the panel)

e Grid Code - V

pect their cngly. ed to have b

siness Days

nsmission resent after 14on the follow

ser in relatiodispute by

14 days of t

er to require rectors of th

or executive

e 12(a) eache matter in14 days of on the matte

has beeneither party the Regulae Regulatory

the Regula effect and merce (the are inconsis

ph shall be c

ovided that arties to the hall appoint

which case, th) or two arbit

Version 2.0

contact deta

been given

after postin

eport, or by 4:00 hours owing Busines

on to this Grnegotiation

the giving of

the dispute e parties or,of each par

ch party shan dispute anreceipt of ther in questio

n referred may refer th

atory Authoriy Authority.

atory Authorithe Rules "ICC Rules

stent with th

conducted;

(i) there shadispute shaone arbitrathe Regulatotrators if the

ils

or

ng

e-on ss

rid in

f a

to , if rty

all nd he on;

to he ity If

ity of

s") he

all all tor ory re

Page 10: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Where thparticularmay not band obtaiThe Reguit in accoparties oAuthority Any arbit

GC.13 Several psupplied shall be aand with with the R

GC.14 It is knowawarded event maAs soon necessarabove. Wshall appwith a viethe impleRegulato

GC.15 In this Gr refere

Code the si any o refere

parag code,

form p refere

contraor replicencdecis

ctricity Transmis

is an uneAuthority

he Grid Codr matter shobe referred tined. ulatory Auth

ordance withor not, shall

or by any aral award sh

Code Cparts of the by Users to

at liberty to the PWP.

Regulatory A

Interim wn (as at thefor the desi

ay give rise tas practica

ry or expediWhilst the ruply to these pew to agreeiementation ory Authority.

Interprerid Code, unences to "thi, including angular includ

one gender inences to Cographs, claus, paragraph part of and sence to anyact, agreemplaced from ce as amendion or arrang

ssion Compan

even numbeshall nomin

de provides ould be refeto arbitration

ority shall ha paragraph l be consolrbitrator to w

hall be final a

Confident Grid Code

o OETC. Ushare all daIn all cases,

Authority.

Transitioe date that gn, construco the need f

able, OETC ient in order

ules for chanproposals fong the neceof any chan.

etation less the conis Grid Code

any scheduledes the plurncludes the ode sectionsses or schedand schedushall neither

y law, regulaent or othertime to time

ded, modifiegement prom

y

er of parties nate one of itthat any dis

erred to an en unless and

ave the righGC12(c) ablidated and which the Reand binding

iality specify the

nless otherwata with Use, OETC is a

onal Provthis Grid Coction and cofor changes will proposer to take ac

nges to the Gor changes Oessary changnge which is

ntext otherwie" or "the Ges or other dal and vice vothers;

s, paragraphdules of this le headings affect nor b

ation made r legal docume. In particued or replacemulgated or

to the disputs appointeespute or diffexpert for re

d until such e

t to require tbove and are

determinedegulatory Auon the partie

e extent of cwise specificrs likely to b

at liberty, and

visions ode is first eommissioningto the Grid Ce changes tccount of theGrid Code dOETC, PWPges. No sucs necessary

se requires;rid Code" a

documents aversa;

hs, clauses Grid Code;are for conv

be used in thunder any lment shall bular, any refeed from timeestablished

Th

ute are (in wes to act as cference of thesolution, suexpert determ

that all dispue related, whd together ethority has res.

confidentialitcally stated be affected bd may be re

established) g of a new lCode. to the Grid e relevant cescribed els

P, and all Usch Person sy or expedie

re reference

attached to a

or schedule

venience of e constructiolaw, standabe to that iteerence to ane to time anunder that L

e Grid Code - V

which case thchairman of he parties inuch differenmination has

utes which ahether betweeither by threferred any

ty, which apin the Grid

by the matteequired, to s

that a controad dispatc

Code whichcircumstancesewhere in tsers shall cohall be entitent and app

e to the whoany part of th

es are to C

reference onon of this Grrd, seconda

em as amenny licence snd to any ruLicence;

Version 2.0

he Regulatothe panel).

n relation to nce or dispus been soug

are referred een the sam

he Regulatodispute.

pplies to daCode, OET

ers concerneshare the da

ract has beeh centre. Th

h it considees referred his Grid Codo-operate fuled to preve

proved by th

ole of the Grhe Grid Code

Code section

nly and do nrid Code;

ary legislatioded, modifiehall be to thle, documen

ory a

ute ght

to me ory

ata TC ed ata

en his

ers to de lly

ent he

rid e;

ns,

not

on, ed hat nt,

Page 11: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

referethe apto sucapproany pmade

all refGregoon su

whereshall

refereagencbodie

the willustrwords

Termmeanthe m

ctricity Transmis

ences to thepproval or coch conditionoval may be proper order,e or issued uferences to orian calend

uch date at 0e a word or be construeences to "pecies, commi

es as well aswords "includ

ation or ems; and s and expre

nings in this meanings asc

ssion Compan

e consent oronsent of ths as may beamended, m

, instruction under it;

specific dadar and all r00:00 hours; expression d accordingerson" or "pttees, depar

s to individuade", "includin

mphasis and

essions defiGrid Code. cribed to the

y

r approval ofe Regulatorye determinedmodified, suor requirem

tes or perioeferences to

is defined inly;

persons" incrtments, minals with a seng" and "in p

shall not li

ned in the In particular

em in that Se

f the Regulay Authority id by the Re

upplementedent or decis

ods of time o specific da

n this Grid C

clude individnistries and oparate legal particular" shmit or preju

[insert title r, the followiector Law.

Th

atory Authorn writing, whgulatory Aut

d or replacedsion of the R

shall be caates shall be

Code, cognat

duals, firms, other incorppersonality

hall be consudice the ge

of Sector Laing words an

e Grid Code - V

rity shall be hich may bethority, as thd from time tegulatory Au

lculated acce to the day

te words and

companiesporate and u

or not; strued as beenerality of a

aw] shall hand expressio

Version 2.0

references given subje

hat consent to time and uthority give

cording to thy commencin

d expression

s, governmenincorporate

eing by way any foregoin

ave the samons shall hav

to ect or to

en,

he ng

ns

ent ed

of ng

me ve

Page 12: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Appen

1. 1.1 Th

C

"CCo

"Cm

"GTr

"L"Mgr

"Pw

"Sas

"Spr

"Oof

"Tth

1.2 Exan

1.3 Wco

1.4 Hco

1.5 UC

2. P2.1 Th

su(a(b

(c

(d

ctricity Transmis

dix A Co

Definitions he followingonstitution;

Chairman" onstitution to

Constitutionay be amen

Grid Code" ransmission

Licence" ha

Member" mroups referre

Panel" meanith the Grid C

Secretary" ms such;

Sector Law"rivatisations

OETC" meaf a Transmis

Transmissioe Sector Law

xcept as othnd expressio

Words importontext requir

eadings anonstruction o

nless otherwonstitution.

rincipal objhe Panel hauch other oba) to generab) to review

OETC, thconsidera

c) to discusunforesee

d) to reviewSystem

ssion Compan

onstitutio

and Interprg words an

means theo act as the

n" means thended from tim

means the Licence;

as the meani

means a persed to in Clau

ns the Grid Code (sectio

means the p

" means Suand regulat

ns the Omassion Licence

on Licence"w;

herwise provons used he

ting the singres. Words i

d titles shaof the words

wise stated,

jects as been estabjectives as tally review, dw and discuhe Regulatoation from timss what chaen circumsta

w existing Oand make

y

on Of The

retation nd expressio

e person achairperson

e constitutiome to time w

Grid Code

ng given it in

son appointuse 3 on the

Code Revieon GC.4) an

person appo

ltani Decreeion of the ele

an Electricitye;

" means a L

vided hereinrein shall ha

gular only amporting the

all not be ta and expres

any referen

ablished by Othe Regulatodiscuss and uss suggestory Authorityme to time;anges are nances referrman Electricrecommend

Grid Cod

ons shall h

appointed bn of the Pane

n and rules with the appro

e drawn up

n the Sector

ted to act asPanel;

w Panel estd governed

ointed by OE

e No. [ /2003ectricity sect

y Transmissio

Licence to tr

and unlessave the mea

also include e masculine

aken into cssions used h

nce to a Clau

OETC to furory Authoritydevelop the

tions for amy or any Us

necessary tored to it by Ocal Standard

dations to t

Th

de Review

ave the fol

y OETC uel;

of the Paneoval of the R

pursuant to

r Law;

s a represe

tablished by by this Cons

ETC pursuan

3] promulgattor in Oman

on Company

ransmit elect

s the contextnings given

the plural aonly also in

onsiderationherein.

use is a refe

rther the objey may stipulae Grid Code mendments ser may wis

o the Grid OETC; ds relevant he Regulato

e Grid Code - V

w Panel

lowing mea

under Claus

el as set out Regulatory A

o Condition

ntative of th

the OETC istitution;

nt to Clause

ting the law ;

y in its capa

tricity grante

t otherwise ato them in th

and vice verclude the fe

n in the inte

erence to a

ectives set oate from timeand its impleto the Gridh to submit

Code arisin

to OETC’s ory Authorit

Version 2.0

anings in th

se 6 of th

herein and aAuthority;

3 of OETC

he persons

in accordanc

7 and name

governing th

acity as hold

ed pursuant

admits, wordhe Grid Cod

rsa where thminine.

erpretation

Clause of th

out below ane to time; ementation;

d Code whict to OETC f

ng out of an

Transmissioty concernin

his

his

as

C's

or

ce

ed

he

er

to

ds e.

he

or

his

nd

ch for

ny

on ng

Page 13: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(e

(f)

(g

(h

3. M3.1 Th

(a(b(c(d(e

(f)

(g(h(i)(j)

3.2 Eaatto(intorelethtorethMan

3.3 N3.4 Af

(a

ctricity Transmis

modificatElectrical

e) to determTransmis

) to approvSystem;

g) to publisrecomme

h) issue guiand inter

Membership he Panel sh

a) the Chairb) a person c) a person d) a person e) 2 person

with a tot) 2 person

Productiog) 1 person h) 1 person ) 1 person ) 1 person ach person t any time a

o agree on nsofar as heo encourageelevant persoeast 21 Businhe Panel, aso make suchelevant pershe Regulato

Members on ny person so

o person othfter the Pane

a) each MePanel hemeeting closest a

ssion Compan

tions to exisl Standards mine whichssion Systemve equipmen

sh recommeendations hadance in repretation whand Appoi

all compriserman and upappointed bappointed bappointed bs representital Registeres represention Facilities representinrepresentinrepresentinrepresentinappointed any of the pea represent

e is reasonae appointmons as to theness Days p

s the case mh appointmeon or groupry Authoritybehalf of thao appointed

her than an el has been

ember shall ld on the firsis held on sfter that day

y

sting Oman relevant to O

h contractorm; nt that may b

endations aas occurred tlation to the

hen asked tontment

e; p to 2 personby the Regulby PWP; by PAEW; ing all Poweed Capacity ng all Powewith a total g each Liceg Internally g Internationg RAEC.

as specified ersons or grotative to actbly able) theent or, as eir prospectprior to the n

may be) the nt and the R

p of personsy and the Cat person or by it.

individual shestablishedretire automst Business such day, a

y) but shall b

Electrical StOETC’s Tranrs should

be used on

and ensure through Mem

e Grid Code o by a User.

ns appointedlatory Autho

er Producersin excess of

er ProducersRegistered Cnsed DistribInterconnecnal Interconn

at Clause 3.oups identifiet as their M

e person(s) oappropriat

tive Membernext meetingChairman s

Regulatory As has decideChairman acr group of pe

hall be appo for one yea

matically at Day in the m

at the meetibe eligible for

Th

tandards or nsmission Sbe approve

or form part

that User mbers; andand its impl

d by OETC;rity;

s that each hf 100 MW; s that each hCapacity of utor;

cted Parties; nected Parti

.1 shall be aed at Clause

Member, theor group(s) ute, unanimor. If no suchg of the Pan

shall requestAuthority shaed upon an ccordingly, tersons, and

inted a Memar; the beginninmonth of Feng which isr re-appointm

e Grid Code - V

proposals foystem;

ed to work

t of OETC’s

consultation

lementation,

have Produc

have Central100 MW or l

es; and

a Member ofes 3.1(a) to e Chairman unable to agous agreemh agreementnel (or the fit the Regulaall have the appointmento appoint ato remove (i

mber or his a

ng of the mbruary each

s held on thment.

Version 2.0

or new Oma

k on OETC

Transmissio

n upon suc

, performanc

ction Facilitie

lly Dispatcheless;

f the Panel. (j) are unabshall conta

gree and seement betweet is reached rst meeting

atory Authoriright, until th

nt and notifiea Member if appropriat

alternate.

meeting of thh year (or if nhe date fallin

an

C’s

on

ch

ce

es

ed

If ble act ek en at of ity he ed or

te)

he no ng

Page 14: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(b

(c

(d

(e

4. A4.1 Ea

ac(aMan

4.2 If shwoanwpranthap

4.3 Evhaascaofth

4.4 Ananan

4.5 Reun

5. R5.1 Th

evsh

ctricity Transmis

b) Each persuch growish to rein his pla

c) The releappointmrelevant notificatioto be givDays in a

d) If only oappointmunanimouwith effenotificatioshall gov

e) These prappoint mthan one

Alternates ach Membect as his alteas the case ember or Cnd delivered

his appointohall be entitleorking groupnd vote as ahich the Meresent and and duties of e purpose o

pply as if he

very person ave one votes alternate, ase may be)f any resolute contrary, b

n alternate Mn alternate Mny reason toeferences innless the co

Representatihe Chairmavery meetinghall permit)

ssion Compan

rson or grououp of persoe-appoint thce. vant person

ment to the meeting of

on for re-appven if no noadvance of thone notificat

ment of a neus), the per

ect from theons are not ern the apporovisions shamore than on

Member is

r (and the Cernate and r

may be) shairman sha to the Secre

or so requesed to receiveps of which ha Member omber or Chaat any such

his appointof the proceewere a Mem

acting as ae for each Min addition t). Execution tion of the Pbe as effecti

Member or CMember or

o be a Membn this Constintext otherwion and votn and eachg of the Panshall be ent

y

p of personsons) may, bhe retiring M

n(s) must dChairman the Panel

pointment intification is he relevant tion is rece

ew person arson named e beginning unanimous,ointment of tall apply eqne Member,involved.

Chairman) semove (at h

so appointedall be effecteetary or tend

sts, an alterne notice of ahis appointoor Chairmanairman (as thmeeting to

tor as a Memedings at thember or Cha

n alternate Member or Cto his own vby an altern

Panel shall, ve as execu

Chairman (aChairman (a

ber or Chairmitution to a M

wise requiresing other Memnel. One adtitled to atte

s entitled to ay notice in ember or to

deliver suchat least 21 or group(s)

n respect of delivered tomeeting of teived for thas a Membe in the notifof the rele

the provisiothe Memberually to pers with any ne

shall have thhis discretiond. Any appoed by noticedered at a m

nate Membeall meetings or is a Membn (as the cahe case mayexercise anmber or Chae meeting thirman (as th

Member or CChairman (asvote if he is nate Membeunless the n

ution by his a

as the case as the caseman (as the Member or Cs, include his

mber shall bedviser (or sund any mee

Th

appoint a Mwriting to th

o appoint a n

h notificationBusiness

) entitled toan existing M

o the Chairmhe Panel.

he re-appoiner (or if all nfications(s) wevant meetinons of Clausr. sons or grouecessary cha

he power to n) any alternointment or e in writing emeeting of th

er or Chairmof the Pane

ber. He shallase may be)y be) appoind dischargeairman (as the provisionshe case may

Chairman (as the case malso a Mem

er or Chairmnotice of hisappointor.

may be) she may be) if

case may bChairman (as duly appoin

e entitled touch greater eting of the

e Grid Code - V

ember (or a he Chairmanew person

ns for re-apDays in ad

o appoint a Member sha

man at least

ntment of anotificationswill becomeng of the Pse 3.2 of thi

ups of persoanges to ref

appoint anynate Membe

removal ofexecuted by e Panel.

man (as the el or of sub-cl also be ent) at any sucnting him is ne all the functhe case mas of this Con

y be).

as the case may be) for wmber or Chaman (as the s appointme

all ipso factohis appoint

e). as the case mnted alternat

o attend andnumber as Panel with e

Version 2.0

person withn, indicate ias a Memb

ppointment dvance of th

Member. all be deemet 21 Busines

a Member received a

e the MembPanel. If this Appendix

ons entitled flect that mo

y individual r or Chairmaf an alternathe appoint

case may bcommittees titled to attench meeting not personactions, poweay be) and fnstitution sha

may be) shawhom he ac

airman (as thcase may bnt provides

o cease to btor ceases f

may be) shate.

d be heard the Chairmaeach Memb

hin its er

or he A

ed ss

or re er he A

to ore

to an ate tor

e) or nd at lly

ers for all

all cts he e) to

be for

all,

at an er

Page 15: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

aniss

5.2 Eaof

6. Th6.1 U

O6.2 O6.3 Th

thpunothm

6.4 Thenanon

7. Th7.1 O

thbuth

7.2 Thin

7.3 Thsuanre

7.4 If reap

8. M8.1 Su

m(a

ctricity Transmis

nd shall be esue. ach Membef an equality he Chairmapon retiremETC shall a

OETC may athe Chairman

he Chairmanursuant to Cor any other

he time appomay appoint o

he Chairmanntitled to casnd Chairmane vote as M

he SecretarETC shall h

he Panel as iut shall not b

he right to sphe Secretary particular, t

i) attendii) mainta

and suiii) mainta

of persiv) keep m

he Secretaryub-clauses 7nd/or the Reequested to d

the office easonably abppoint a new

Meetings ubject alway

meetings shaa) the Pan

FebruaChairmevent s

ssion Compan

entitled to s

r (including tof votes, th

an ent or remoppoint a pert any time ren shall presn is unable

Clause 4.1 ofperson app

ointed for holone of their nn, or the perst one vote.n, he shall b

Member.

ry have power it may deembe a Membepeak at, but, y's duties shto; d to the requain a registeuch alternateain a registesons describminutes of ay shall make7.2(ii) and (iiegulatory Ado so. of a Membble) the grou

w Member as

ys to the dll operate asnel shall mee

ary and as neman at such timshall meet no

y

peak at any

the Chairmae Chairman

oval by OETrson to act aemove the Cside at every

to be presef this Append

pointed to aclding the menumber to brson appoint Where a Mbe entitled t

to appoint am necessary.er by virtue ounless a Me

hall be to atte

isition of meer of nameses as may ber of names bed in sub-call meetings.e available thi) above, to

Authority for

ber is vacateup or persos provided in

irection of Os follows: et on the first Mcessary for thmes as may bot less than 4

y meeting bu

an) shall be shall have a

TC of the fas ChairmanChairman froy meeting ofent at a medix A to act

ct as Chairmeeting, the Me Chairman ted to act as

Member is acto cast one

and dismiss . The Secretonly of beingember, no rigend to the d

eetings and ts and addree appointedand addres

clauses 3.1(a

he register oLicensed Dinspection

ed the Secn whom then Clause 3 o

OETC and

Monday in thehe transactionbe determine4 times each

Th

ut shall not b

entitled to ca second or

irst and eac. m office. f the Panel eeting, he mas Chairmaan is presen

Members preof the meet

s Chairman cting in the vote as Ch

a Secretarytary may, bug Secretary. ght to cast aay to day op

to serve all rsses of Mem from time toses of perso

a) to (j) of thi

of names andistributors, Dwithin a rea

cretary shall e Member reof this Appen

the Regula

e months of Mn of businessd by the Reg

h year; If the

e Grid Code - V

be entitled to

ast one votecasting vote

ch successi

at which hemay appointn. If neither nt within halfesent appointing. by the Chaicapacity of airman, in a

y and such ut need not b

The Secretaa vote at anyperation of th

requisite notmbers and o time; ons in each is Appendix

d addressesDistribution Sasonable pe

notify (insoepresented andix A.

tory Authori

May, August, s whenever coulatory Authofirst Monday

Version 2.0

o vote on an

e. In the evee.

ve Chairma

e is present.t an alternathe Chairmaf an hour aftted by OETC

rman shall bboth Memb

addition to h

other staff fbe, a Membeary shall hav

y meeting. he Panel an

ices; the Chairma

of the groupA; and

s referred to System Useeriod of bein

ofar as he and they sha

ity, the Pan

November anonvened by thority, and in ay of that mon

ny

ent

an,

If ate an ter C,

be er

his

for er, ve

nd,

an

ps

in ers ng

is all

nel

nd he ny

nth

Page 16: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(b

(c

(d

(e

(f)

9. G9.1 Al

imshwthsc

9.2 FoapCoReviere

9.3 Thfum

9.4 If Credeno

10. R10.1 A 10.2 A

beco

10.3 A al

ctricity Transmis

happenthe Pan

b) notwithwhenenotice

c) unlessnotice

d) the qu7 of th

e) if withinot preThe renotwith

) subjecnot (of

i) vacanii) any dethe accide

of a mGrid Code Re

ll proposed mplementatiohould be broill advise the

he Grid Codecheduled meollowing revppropriate, aode based egulatory Auews expres

epresentationhe Regulato

urther represmade and, if s

the Panel ishairman sha

evision takineemed to beotification or

Resolutions resolution oresolution in

een passedounterparts mmeeting of l in one plac

ssion Compan

ns to be a holnel. hstanding thever appropr

in writing tos agreed by

shall be givorum of Mee Members;in an hour oesent, the me-adjourned hstanding thct to sub-parf themselvescies amongsefects in theental omissio

meeting by a evisions revisions to

on. All revisought before e Panel, Usee with noticeeeting of theview of a apply to theon the Pa

uthority, shased by the ns directly to

ory Authoritysentations anso, whether s directed byall notify eacg effect, ane amended other such

of the Panel n writing sig at a meetmay producethe Panel m

ce but who a

y

liday, then alt

he right of riate, the Ch

o do so by twall Member

en to all Members requi; of the time ameeting shameeting sha

here being feragraphs (d)s) invalidate st the Panel appointmenon to give noperson entit

the Grid Cosions proposthe Panel b

ers, and the e of no less Panel. proposed

e Regulatoryanel recommall also notifPanel and

o the Regulay shall consind shall detein the form p

y the Regulach User of thd the revisioaccordingly)date as dire

shall be pasned by all Mting of the e written resmay consist are able (dire

ternate date w

the Chairmhairman shalwo or more Mrs, not less mbers of all ired for the P

appointed forll stand adjoall be deem

ewer than se) and (e) aboproceedings; nt of Membeotice of a Mtled to receiv

ode must besed by Userby the Chairm

Regulatory s than 20 Bu

revision byy Authority

mendation. fy each UseUsers so th

atory Authorider the propermine wheproposed ortory Authorit

he revision aon shall take) from (and

ected by the

ssed by a simMembers sha

Panel duly solutions.

of a confereectly or by te

Th

will be commu

man to call ll call a mee

Members; than 14 Bumeetings of

Panel meetin

r a meeting ourned for a

med quorate even Membeove the follos of the Pan

ers; or eeting to, orve notice.

e reviewed brs, the Reguman for consAuthority of

usiness Day

y the Paneto approve The Chair

er of the prohat each Usity regardingposed revisither the pro

r in an amenty that the reat least 10 Be effect (andincluding) thRegulatory A

mple majoritall be as valid

convened

ence betweeelephonic co

e Grid Code - V

unicated by th

a meeting ting when re

siness Daysf the Panel; ngs shall no

of the Paneat least 2 Buand its proc

ers present; owing circumel;

r the non-rec

by the Paneulatory Authosideration. Tf all proposeys in advanc

l, the Chathe revisio

rman, in apoposed revisser may cong the proposion, other vi

oposed revisded form.

evision shall Business Dayd the Grid Che date speAuthority.

ty of votes cad and effectand held.

en Membersommunicatio

Version 2.0

he Chairman

of the Panequested by

s prior writte

ot be less tha

el a quorum usiness Dayceedings valand

mstances sha

ceipt of notic

el prior to theority or OETThe Chairmaed revisions ce of the ne

irman will, n of the Gr

pplying to thsion and othnsider makined revision.ews, and anion should b

be made, thys prior to thCode shall becified in suc

ast. ive as if it haOne or mo

s who are non) to speak

of

nel y a

en

an

is ys. lid

all

ce

eir TC an to

ext

if rid he er ng

ny be

he he be ch

ad ore

not to

Page 17: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

ea"m

11. M11.1 Th

eath

11.2 Eaoffadith

11.3 If reCtycethm

12. G12.1 Th

Ges

13. S13.1 Th

pewdethfo

13.2 Thtom

13.3 Reun

14. R14.1 Th

(a

(b

(c

ctricity Transmis

ach of the omeeting" sha

Minutes he Secretaryach Member

he relevant mach Membef each meet

ails to do ssapproval o

he Panel at tthe Secreta

evised minutlause 11.2

ypographical ertain aspeche minutes u

meeting of theGuidance fro

he Panel marid Code astablish subc

ub-committhe Panel maersons as iritten terms etermine. Tat the minut

or considerathe Panel ma

o time. Suchmay determin

esolutions onless approv

Removal of Mhe office of a

a) he res

b) he bec

c) he berelatin

ssion Compan

others and toall be constru

y shall circur as soon as

meeting has r shall notifyting within 1so will be dof the minutehe meeting t

ary receives tes as soon

of this Apnature and

cts of the minupon which te Panel, as tom the Paneay at any timand its impcommittees

tees and woay establisht considers of reference

The meetingstes of such mtion before thay further esh working grne for the puof sub-commved by resol

Members ana Member s

signs his offic

comes bank

comes of ug to mental

y

o be heard ued accordin

ulate copies s practicablebeen held.

y the Secret5 Business

deemed to es aforesaidto which theany commeas practicabpendix A, i

d indicating, nutes. The Sthere is disathe first itemel me, and from

plementationand working

orking grouh such sub-c

desirable. e and shall bs of sub-commeetings cahe next follostablish worroups may crpose. mittees andution of the

nd Chairmahall be vacace by notice

rupt or comp

unsound minhealth; or

by each of ngly.

of the minu (and in any

ary of his apDays of rechave appro

d will not affe minutes relents on the mble following incorporating

where necSecretary shagreement, i

m for discuss

m time to tim, performan

g groups to c

ups committees Each sub-c

be subject tommittees shan be presenowing meetinrking groupsconsist of M

d working gPanel.

an and vacaated if;

delivered to

pounds with

nd or a pat

Th

the others s

utes of eachy event within

pproval or dceipt of the oved the mect the validlate. minutes, thethe expiry o

g those cocessary, thathall then inconto the ageion, and, if p

me, issue gnce and intcarry out suc

from time tocommittee so such procall so far asnted to the Mng of the Pans to advise itMembers an

roups shall

ation of offic

o the Secreta

his creditors

tient for any

e Grid Code - V

simultaneou

h meeting ofn 15 Busines

isapproval ominutes. A

minutes. Thedity of decis

e Secretary of the periodmments wht Members orporate thonda for the possible, res

uidance in rterpretation,ch work.

o time consshall be sucedures as ths possible beMembers in nel. t on any ma

nd/or others

not have b

ce

ary;

s generally;

y purpose o

Version 2.0

sly. The wo

f the Panel ss Days) aft

of the minuteMember wh

e approval ions taken b

shall circulad referred to hich are of disagree wi

ose aspects next followin

solution.

relation to th, and it ma

sisting of sucbject to suche Panel mae arranged ssufficient tim

atter from timas the Pan

binding effe

of any statu

ord

to ter

es ho or by

ate in a

ith of

ng

he ay

ch ch ay so

me

me nel

ect

ute

Page 18: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(d

14.2 FucaCMonmanWpew

15. M15.1 In

Paob

15.2 Ina heofa

15.3 Th

15.4 ThHofu

16. G16.1 Ea

alsu

17. C17.1 Ea

re

ctricity Transmis

d) he or hPanel accept

urther, any pase may behairman, as

Member or thnly have the

may be, that ny Member

Whenever anersons entitlriting within

Members on n the exercisanel shall hbjects of the

n the exercisMember, a

e is for the tf representatMember of the Panel, ea

i) shall believcommcomm

ii) may inon thelawyerconse

he Panel showever, Me

unctions of th

Group represach Membel notices se

uch Member

onfidentialiach Membe

easonably be

ssion Compan

his alternatewithout subtable to the

person or pee, pursuant s the case he Chairmane right to remit or they hor the Cha

ny individual led to appoiseven days

the panel'se of its poweave due regPanel set o

se of its powMember shaime being ation shall at the Panel seach Memberbe entitled ed by it o

municated omunicated or n relation to e opinion or r, or experquences of hall enjoy nmbers shall he Grid Code

sentatives' r shall from

ent to such r.

ity er shall keee expected t

y

e fails to attebmitting an eChairman.

ersons entitlto Clause 3may be, fro

n, as the casmove from oave appoint

airman, as th Member ornt that Memof the chan

s responsibers and the gard for the out in Clausewers and theall representppointed puall times be

et out in Claur and the Seto rely upo

or him to or signed b

signed; andany act, maadvice of, o

rt in any so acting.

no status, imnot be pers

e Review Pa

addressestime to timeaddress sha

ep confidento understan

end more thaexplanation

ed to appoin3 may at anom office ase may be, office the Mted, and willhe case mar the Chairm

mber or the Cge taking eff

bilities and pperformanceneed to pro

e 2 of this Ap performanct the interest

ursuant to Cle subordinateuse 15.1 of tcretary;

on any combe genuine

by the perd atter or thing or any informother field,

mmunity or sonally liableanel.

e communicall be consi

ntial all infond to be conf

Th

an three conto the Chair

nt a Membeny time rem

and appoint in its place.ember or th have no rig

ay be, appoman changesChairman shfect.

protectionse of its dutieomote the appendix A. ce of its dutits of that peause 3, prove to the obligthis Append

munication e and corrrson by w

contemplatemation from and shall

privilege of e in respect

cate his addrdered as ha

ormation, whfidential.

e Grid Code - V

nsecutive mrman which

er or the Chamove that M

another pe A person o

he Chairmanght to removinted by ans, the perso

hall notify the

es and respoattainment of

es and resprson or persvided that sugations of thix A.

or documenrect and tohom it pu

ed by this Co, any chartel not be li

the Sultanaof the perfo

ress to the Saving been

hich that M

Version 2.0

eetings of this reasonab

airman, as thember or th

erson to be or persons wn, as the casve from officother perso

on or group e Secretary

onsibilities, thf the princip

ponsibilities asons by whouch obligatiohe Member a

nt reasonabo have beerports to b

onstitution aered engineeiable for th

ate of Omarmance of th

Secretary anduly given

Member mig

he bly

he he

a will se ce

on. of in

he pal

as om on as

bly en be

act er, he

an. he

nd to

ght

Page 19: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

The Grid Code

Table of Contents

Preface

General Conditions

Data Transfer Code

Alerts Summary Code

Planning Code

Connection Conditions Code

Operating Codes

OC1 Demand Forecasting

OC2 Operational Planning

OC3 Operating Margin

OC4 Demand Control

OC5 Notice of Operations & Incidents, and Significant Incident Reporting

OC6 Safety Coordination

OC7 Contingency Planning

OC8 Numbering and Nomenclature of HV Apparatus and Plant

OC9 Tests and Site Investigations

Scheduling and Dispatch Codes

SDC1 Generation and Desalination Scheduling

SDC2 Generation and Desalination Dispatch

SDC3 Frequency Control

Ancillary Services Code

Metering and Data Exchange Code (MDEC)

Abbreviations and Definitions

Page 20: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Preface

This docuTransmisElectricityrelation tchanges The GridSystem. who havespecifies Terms anGrid Codsections. The Grid

ctricity Transmis

e

ument is thession and Dy Transmissto the plannto OETC's T

d Code appHowever, in

e acceded twhich Perso

nd expressioe entitled "A

Code conta

ssion Compan

e Grid CodeDispatch Licsion Companing, develoTransmissionlies to all endividual pato the Grid on it appliesons used in tAbbreviation

ains the followGeneral CData TransAlerts SumPlanning CConnectioOperating − OC1 De− OC2 Op− OC3 Op− OC4 De− OC5 N

Report− OC6 Saf− OC7 Co− OC8 Nu− OC9 OpScheduling

− SDC− SDC− SDC

Ancillary SMetering aAbbreviatio

y

The G

e referred tocence grantany SAOC (opment, Conn System.

entities that arts of the GCode as a to. the Grid Cods and Defin

wing constitonditions; sfer Code;

mmary CodeCode; n ConditionsCodes; mand Forec

perational Plaperating Margmand ContrNotice of Oting; fety Coordinntingency Pmbering and

perational Teg and Dispat

C1 GeneratioC2 GeneratioC3 FrequencServices Codand Data Excons and Def

The G

Grid Cod

o in the Sected by the (“OETC”) unnnection to,

are connecrid Code mawhole. Eac

de are defineitions" or, in

uent parts;

;

s Code;

casting; anning; gin; rol; Operations

nation; Planning; d Nomenclatests & Site Intch Codes;

on and Desaon and Desacy Control; de; change Codfinitions;

Grid Code - Ve

e

ctor Law [(ARegulatory

nder that LaOperation

cted to and/ay be applicch constitue

ed either in t some case

& Incidents

ture of HV Pnvestigations

alination Schalination Disp

de;

rsion 2.0

Issued

Articles 22 &Authority t

aw. It conand mainte

/or use the able to only

ent part of th

the relevant s, in individu

s, & Signifi

Plant; s;

heduling; patch;

d April 201

& 23)] and thto the Omatains rules nance of an

Transmissioy some partiehe Grid Cod

section of thual Grid Cod

cant Incide

10

he an in

nd

on es de

he de

ent

Page 21: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

This Grid(includingDistributiobe party parties mConnectioNothing iother genthis Grid Rial. Howeverremedy tagreemethe [title opreclude Sector LaEach parparties toGood Ind

ctricity Transmis

d Code shallg OETC, on System Oto it as will

may have on Agreemen this Grid Cneral Law riCode. Eac

, nothing in hat may exint between of Sector Lathe Regula

aw or any Licrty to this Go the Grid Cdustry Practic

ssion Compan

not constituLicensed GOperators a other partiecontractual

ents), to eacCode shall eght or remech party's lia

this Grid Cist between or any duty

aw] or pursutory Authoricence grant

Grid Code shCode shall at

ce.

y

ute a contracGenerators, nd RAEC wes Connecte

obligationsh other to co

entitle any paedy of whatsability to eac

ode (includiany two paarising und

ant to that Lty from takied there undhall at all timt all times p

The G

ct between aLicensed

when conneced to the Ts, created omply with tharty to it or asoever kind ch other par

ng this pararties to this

der the termsLaw. In partng such enfder as it seemes deal witerform all of

Grid Code - Ve

any of the pGenerators

cted to the Transmissionby separat

he Grid Codany other pe

and howsoerty shall be

agraph) shaGrid Code

s of any Licticular, nothiforcement a

es fit. th all other f their obliga

rsion 2.0

parties to it. s/DesalinatoTransmissionn System. Ste documene. rson to any ever arisinglimited to o

ll affect anyunder any sence granteng in this G

action in rela

parties in gations in acc

All Licenseeors, Licensen System) wome of thes

nts (includin

contractual in respect

one (1) Oma

y legal right such separaed pursuant rid Code shaation to it, th

ood faith. Acordance wi

es ed

will se ng

or of

ani

or ate

to all he

All ith

Page 22: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.1 GC.2 GC.3 GC.4 GC.5 GC.6

GC.7 GC.8 GC.9 GC.10 GC.11 GC.12 GC.13 GC.14 GC.15

ctricity Transmis

IntroductioObjective Scope of Grid CodeGrid CodeDerogatioGC.6.1 UnforeseeHierarchyIllegality aTime of ECode NotCode DispCode ConInterim TrInterpretaAppendix

ssion Compan

G

on ..................................Grid Code ae Review Pae Revisions .ons ..............Requests foen Circumsta ..................

and Partial InEffectivenesstices ............putes ..........nfidentiality .ransitional Pation ............

A Constitu

y

General

CON

...................

...................and General anel ...................................................

or Derogationances ............................

nvalidity .......s ...........................................................................

Provisions .......................ution Of The

Conditi

NTENTS

...................

...................Conditions

...................

...................

...................n ............................................................................................................................................................................................

e Grid Code

Th

ons

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................Review Pan

e Grid Code - V

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................nel ...............

Version 2.0

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

.................. 1

. 4

. 4

. 4

. 4

. 5

. 5

. 6

. 7

. 7

. 7

. 7

. 7

. 8

. 9

. 9

. 9 11

Page 23: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.1 The indivto that inapplicatioGrid Cod

GC.2 The objec To en

togeth To pr

relate

GC.3 The Gene

GC.4 OETC shbody, con to gen to rev

Reguto tim

to discircum

to revand mexistinreleva

to precom

Issueinterp

The Gridwhich dedevelopmThe Pane a cha a pers a pers a pers 2 per

total R

ctricity Transmis

Introduvidual sectiondividual seon, which nee to work to

Objectictives of thensure, insofher for the brovide a set oed issues as

Scope oeral Conditio

Grid Cohall establishnstituted; nerally revieview and dislatory Autho

me; scuss what cmstances review existingmake recomng Oman Eant to OETCpublish recommendations guidance i

pretation whed Code Revefines its scment of the Gel shall consairman and uson appointeson appointeson appointersons represRegistered C

ssion Compan

G

uction ns of the Grction of the

eed to be ingether. Such

ve General Cofar as it is benefit of OEof principlesapproved b

of Grid Cons apply to

ode Revieh and maint

ew, discuss ascuss suggeority or any U

changes areferred to it bg Oman ElemmendationsElectrical StC’s Transmisommendatios has occurrn relation toen asked to iew Panel s

cope, MembGrid Code assist of; up to 2 persoed by the Reed by PWP; ed by PAEWsenting all PCapacity in e

y

General

rid Code cone Grid Codecluded in thh provisions

onditions arepossible, th

ETC and all Us governing ty the Regula

Code and OETC and

ew Panelain the Grid

and developestions for aUser may wi

e necessaryby OETC; ectrical Stans to the Reandards or

ssion Systemons and ered through o the Grid by a User.

shall be govership, duties approved b

ons appointeegulatory Au

W; Power Produexcess of 10

Conditi

ntain the rulee. There aree Grid Code

s are include

e as followsat the varioUsers; and the status anatory Author

General to all Parties

d Code Revi

the Grid Coamendmentssh to submit

y to the Grid

dards relevaegulatory Aproposals

m; ensure thaMembers; aCode and i

verned by aes, and ruleby the Regu

ed by OETCuthority;

ucers that ea00 MW;

Th

ons

es and prove also provie to allow thd in these G

ous sections

nd developmrity.

Conditios to the Grid

iew Panel, w

ode and its ims to the Gridt to OETC fo

Code arisin

ant to OETCAuthority con

for new Om

at User cand ts implemen

a constitutioes of condulatory Autho

;

ach have Pr

e Grid Code - V

visions relatinsions of a

he various sGeneral Cond

s of the Gri

ment of the G

ns d Code.

which shall b

mplementatid Code whicor considera

ng out of an

C’s Transmincerning moman Electric

consultation

ntation, perf

n (given asuct, operatioority.

roduction Fa

Version 2.0

ng specificamore generections of thditions.

id Code wo

Grid Code an

be a standin

ion; ch OETC, th

ation from tim

ny unforesee

ssion Systeodifications cal Standard

upon suc

formance an

Appendix Aon and furth

acilities with

lly ral he

ork

nd

ng

he me

en

em to ds

ch

nd

A) er

a

Page 24: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

2 perProdu

1 pers 1 pers 1 pers 1 pers

GC.5 All revisioapplicatiothe Reguthe ChairUsers, anno less thReview PFollowingapply to Review Palso notifReview Pthe ReguThe Regrepresentso, whethHaving bChairmantaking effamendedsuch date

GC.6 If a User it shall, wshall makas reason with r

mainl with r

ConnWhen a Uand techngranted aRegulatoand PWPIf OETC ftime, thecomplian

ctricity Transmis

rsons repreuction Facilitson represeson represeson represeson represe

Grid Coons to the Gon to the Reulatory Authorman for connd the Reguhan 20 Busi

Panel. g review of athe Regula

Panel recomfy each UsePanel and Uulatory Authoulatory Authtations and her in the forbeen so diren shall notifyfect, and the

d accordingle as directed

Derogafinds that it

without delayke such reasnably practicreference toy as a result

reference to ect to the TrUser believenical considean extendedry Authority

P with a copyfinds that it i

en it shall mce as soon a

ssion Compan

esenting all ties with a tonting each Lnting Internanting Internanting RAEC

ode RevisGrid Code m

egulatory Auority or OETnsideration.

ulatory Authoiness Days

a proposed atory Authormendation. r of the propsers so that

ority regardinhority shall cshall determ

rm proposedected by they each User e revision sy) from (andd by the Reg

ations is, or will be

y, report suchsonable effocable. Non-co Plant Connt of a revisioPlant which

ransmission es either thaerations) to

d period to r a request fy of such apis, or will be,make such as reasonab

y

Power Prootal RegisterLicensed Disally Interconational Interc.

sions must be revthority by th

TC shall be The Chairm

ority of all prin advance

revision by ity for revis The Chairmposed revisit each User ng the propoconsider themine whethed or in an ame Regulatoryof the revisihall take effd including)

gulatory Auth

e, unable to h non-comp

orts as are recompliance mnected to thon to the Gridh is Connecte

System is bat it would berequire it to

remedy suchfor derogatioplication. , unable to creasonable

bly practicab

oducers thatred Capacitystributor; nected Particonnected P

viewed by thhe Chairman

brought befman will advroposed reviof the next

the Grid Coion of the G

man, in applyion and othemay consid

osed revision proposed r

er the propomended formy Authority on at least 1fect (and th) the date shority.

comply withliance to OEequired to remay result;e Transmissd Code; anded, approve

being soughte unreasonaremedy suc

h non-complon from suc

comply with efforts as

ble.

Th

t each haviy of 100 MW

ies; Parties; and

he Grid Codn. All proposfore the Gridvise the Gridisions to thescheduled m

ode Review Grid Code bying to the Rer views expder making rn. revision, othosed revisionm.

that the rev10 Business is Grid Codpecified in s

h any provisiETC and theemedy such

sion Systemd ed to Connect.

able (includinch non-compliance, it shach provision

any provisioare require

e Grid Code - V

ing CentrallW or less;

de Review Psed revisiond Code Revd Code Reve Grid Code meeting of t

Panel, the based on thRegulatory Apressed by trepresentatio

er views, ann should be

vision shall Days prior te shall be dsuch notifica

on of the Gr Regulatory non-compli

m and is cau

ct or for whic

ng on the grpliance or thaall promptly and shall p

on of the Grided to remed

Version 2.0

y Dispatche

Panel prior ns from Userview Panel bview Panel, a

with notice the Grid Cod

Chairman whe Grid CodAuthority, shathe Grid Codons directly

nd any furth made and,

be made, thto the revisiodeemed to bation or oth

rid Code, theAuthority an

iance as soo

used solely

ch approval

rounds of coat it should bsubmit to th

provide OET

d Code at andy such no

ed

to rs, by all of de

will de all de to

er if

he on be er

en nd on

or

to

ost be he TC

ny n-

Page 25: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

In the caparagrap

GC.6.1 A reques

(a

(b

(c

(d(e

On receisuch a rederogatioderogatio Have Impos

In its conthe relevathe requeDerogatio

(a

(b

(c(d(e

To the exand/or thapplicablecomply wOETC sh

(a

(b

The Regexisting dchange in

ctricity Transmis

se where Oh GC.6.1 to

Requt for derogat

a) The refernon-com

b) The detathe natur

c) The provcomply;

d) The rease) The date

complianpt of any reequest. Provon are reasoon would, or

a material ase unreason

nsideration oant User andest. ons from anya) The refer

derogatiob) The deta

the natucomplian

c) The identd) The rease) The datextent of anye User (as te provision o

with any alterhall; a) Keep a re

of the perelevant p

b) On requeUser.

gulatory Authderogations,n circumstan

ssion Compan

OETC requesthe Regulat

uests for Detion from anrence numbepliance or pr

ail of the Plare and extenvision of the

on for the noe by whichce is possib

equest for dvided that tonable, the is likely to;

adverse impnable costs oof a derogatid/or OETC t

y provision orence numbeon applies; ail of the Plare and extece provisiontification of ton for the no by which th

y derogationhe case maof the Grid Crnative provi

egister of alrson and Usprovision of est from any

hority may and any de

nce has occu

y

sts derogatiotory Authorit

erogationy provision oer and the dredicted nonant in respet of non-come Grid Code

on-complianh compliancble). erogation, the RegulatoRegulatory A

act on the seon the Operaion request to obtain cla

of the Grid Cer and the d

ant in respecent to whic

ns; the provisionon-complian

he derogationn granted in y be) shall bCode and shisions identif

l derogationser in respecthe Grid Co

y User, provi

initiate at therogations unurred.

on, OETC sty.

of the Grid Cdate of the Gn-compliancect of which

mpliance; e with whic

nce; and ce could be

he Regulatoory AuthorityAuthority sh

ecurity and/oation of the Tby a User, t

arification of

Code shall codate of the G

ct of which ach the dero

n with which nce requiringn shall expiraccordance

be relieved fhall not be lified in the de

s which havct of whom tde and the pde a copy o

he request nder conside

Th

shall submit

Code shall coGrid Code pre was identifderogation i

h the User

e achieved

ory Authorityy considers hall grant su

or stability oTotal Systemthe Regulatothe request

ontain; Grid Code pr

a derogationogation app

the derogatg derogationre. e with this pfrom any oblable for failuerogation.

ve been granthe derogatiperiod of thef such regist

of OETC oeration wher

e Grid Code - V

the informat

ontain; rovision agafied; is sought an

is, or will b

(if remedy

y shall promthat the gr

uch derogatio

of the Total Sm or on otheory Authorityt or to discus

rovision aga

n applies anlies includin

tion applies; ; and

paragraph Gigation to coure to so co

nted, identifyon has been

e derogationter of deroga

r Users a rre a relevan

Version 2.0

tion set out

inst which th

nd, if relevan

be, unable

of the no

mptly considounds for thon unless th

System; or er Users. y may contass changes

inst which th

nd, if relevanng alternativ

GC.6.1, OETomply with thmply but sha

ying the namn granted, th; and ations to suc

review of ant and mater

in

he

nt,

to

on-

er he he

act to

he

nt, ve

TC he all

me he

ch

ny ial

Page 26: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

GC.7 If circumsto the exeffort to rReview PIf OETC ensure thexpresseThereaftesuch dete

GC.8 In the evcontract,

(a

(b

GC.9 If any profor any reIf part of provisionsuch min

(a(b

but withoshall prePanel.

GC.10 This GridAgreeme

GC.11 Any noticsigned bydeliveredaddress, ConditionOETC shfacsimile,User in re

ctricity Transmis

Unforesstances arisxtent reasonreach agreemPanel for conand affected

hat it meets ed by the Useer, OETC sherminations

Hierarcvent of any i

agreement, a) If the con

comes inthe Grid has agreyears fro

b) In all othCode exp

Illegalitovision of theason, the vaa provision would remaimum modif

a) necessarb) most closout affecting pare a prop

Time ofd Code shall ent comes in

Code Nce to be givy or on beha by hand afacsimile n

ns. hall maintain, e-mail and espect of an

ssion Compan

seen Circse which thenably practicment as to wnsideration. d Users areits License

ers. hall refer theto the Grid C

chy rreconcilablor arrangem

ntract agreento force, it sCode or in

eed to compm the date uer cases, th

pressly prov

ty and Pae Grid Codealidity of all of the Grid

ain valid if pafication as mry to make itsely achievethe meanin

posal to corr

f Effectivhave effect

to effect.

Notices ven under thalf of a Persoat, or sent bnumber or e

n a list of conpostal addry other Use

y

cumstanc provisions

cable in the what should

e not able toconditions w

e matter relCode Review

e conflict bement betweeement or arrshall, unlessthe contract

ply with the upon which the provisionides otherwi

artial Invae should be remaining pCode is fou

art of the womay be; t valid and efes the result ng or validityrect the def

eness t, as regards

he Grid Codon duly authby post, or e-mail addre

ntact detailsresses for alr as soon as

ces of the Grid Ccircumstancbe done an

o agree, OEwherever pr

lating to thew Panel with

etween the en OETC anrangement es and to the t agreementGrid Code,

this Grid Cos of the Griise.

alidity found to berovisions of und to be unording were d

ffective; andof the origin

y of any othefault for con

s a new Use

de shall be horised to dofacsimile traess last est

for itself anl Users. OE

s practicable

Th

Code have nces, consultd submit a p

TC will takeractical takin

e unforeseenh a proposal

provisions od a User;

exists at the extent (1) s

t or arrangeprevail ove

de is first in d Code sha

e unlawful orthe Grid Co

nlawful or indeleted, the

d nal wording,er provision sideration b

er, at the tim

in writing ao so by the pansmission ablished pu

nd all Users ETC shall proe after receiv

e Grid Code - V

not foreseent all affectedproposal to t

e any action ng into acco

n circumstanfor conside

of the Grid C

date this Gspecifically pment or (2)

er this Grid effect; and

all prevail un

r wholly or pode shall not nvalid but the

provision sh

of the Grid by the Grid

e at which it

and shall beparty giving tor e-mail to

ursuant to th

containing tovide these

ving a reques

Version 2.0

n, OETC shad Users in athe Grid Cod

necessary ount the view

nces and anration.

Code and an

Grid Code firprovided for

that the UsCode for tw

nless the Gr

partially invalbe affected

e rest of suchall apply wi

Code. OETCode Revie

ts Connectio

e duly given the notice ano the relevahese Gener

the telephondetails to anst.

all an de

to ws

ny

ny

rst in

ser wo

rid

lid . ch ith

TC ew

on

if nd

ant ral

ne, ny

Page 27: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Both OEpreviouslAny noticreceived; if sen if sen

unles if sen

mail, any dDay u

GC.12 If any disCode, eitgood faithIf the parnotice un

(a

(b

(c

If the disshall servConciliatishall govexpress pAny arbit

(a(b(c

ctricity Transmis

TC and all y supplied ace required t by hand, a

nt by post, fss otherwise nt by facsimione hour af

day shall be unless the co

Code Dspute arises ther party mh. rties fail to reder the prev

a) Either pabe referreno such present in

b) If either procure tmeet withwritten noor

c) If the pdirectors/matter tosees fit. it sees fit

determineRefer the

pute is refeve a writtenion and Arbvern such aprovisions ofration condu

a) in the cityb) in Englishc) by a pan

be not feappoint aif there isAuthority

ssion Compan

Users shaland OETC shto be given

at the time offrom and toproven; or le, subject t

fter being sedeemed to

ontrary is sh

Disputes between Us

may by notic

esolve any dvious paragrarty shall be ed to a meetdirectors aren Oman; party exercthat the releh senior exeotice of refe

parties fail /senior exec

o the RegulaAll parties sthe Regulat

e the disputedispute for drred by the n notice on bitration of tarbitration saf the Grid Coucted in accoy of Muscat h; and

nel comprisinewer than than arbitrator s an even nu's appointee

y

l be entitledhall keep theby this Grid

f delivery; o any addres

to confirmatient, providedhave been r

hown to be th

sers or betwce to the oth

dispute by suraph then; entitled by wting of Meme present in

cises its righevant seniorecutives of rral to attem

to resolvecutives undeatory Authorshall be bountory Authorit

e itself; or determinatioRegulatory the parties

the Internatiave to the ode. ordance within Oman;

ng an odd nhree arbitratand (iii) the

umber of pare shall act as

d to amend e list up to dd Code sha

ss within O

ion of uninted that any trareceived at he case.

ween OETC her seek to

uch negotiat

written noticebers of the b

n Oman, the

ht under ther executivesthe other p

mpt to reach

e any disper the sub-clarity for deternd by any dety may;

on by arbitratAuthority to to the dispional Chambextent that

h the preced

number of ators (ii) eac Regulatory rties to the ds chairman o

Th

in any resate accordin

all be deeme

man, 4 Bus

errupted tranansmission 8:00 hours o

and any Usresolve the

tions within

e to the otheboards of dir most senio

e sub-clauses consider tharty within 1agreement o

pute which ause 12(a), rmination asecision of th

tion. o arbitration,pute to thatber of Comthe same a

ding paragra

rbitrators prch of the pa

Authority shdispute (in wof the panel)

e Grid Code - V

pect their cngly. ed to have b

siness Days

nsmission resent after 14on the follow

ser in relatiodispute by

14 days of t

er to require rectors of th

or executive

e 12(a) eache matter in14 days of on the matte

has beeneither party the Regulae Regulatory

the Regula effect and merce (the are inconsis

ph shall be c

ovided that arties to the hall appoint

which case, th) or two arbit

Version 2.0

contact deta

been given

after postin

eport, or by 4:00 hours owing Busines

on to this Grnegotiation

the giving of

the dispute e parties or,of each par

ch party shan dispute anreceipt of ther in questio

n referred may refer th

atory Authoriy Authority.

atory Authorithe Rules "ICC Rules

stent with th

conducted;

(i) there shadispute shaone arbitrathe Regulatotrators if the

ils

or

ng

e-on ss

rid in

f a

to , if rty

all nd he on;

to he ity If

ity of

s") he

all all tor ory re

Page 28: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Where thparticularmay not band obtaiThe Reguit in accoparties oAuthority Any arbit

GC.13 Several psupplied shall be aand with with the R

GC.14 It is knowawarded event maAs soon necessarabove. Wshall appwith a viethe impleRegulato

GC.15 In this Gr refere

Code the si any o refere

parag code,

form p refere

contraor replicencdecis

ctricity Transmis

is an uneAuthority

he Grid Codr matter shobe referred tined. ulatory Auth

ordance withor not, shall

or by any aral award sh

Code Cparts of the by Users to

at liberty to the PWP.

Regulatory A

Interim wn (as at thefor the desi

ay give rise tas practica

ry or expediWhilst the ruply to these pew to agreeiementation ory Authority.

Interprerid Code, unences to "thi, including angular includ

one gender inences to Cographs, claus, paragraph part of and sence to anyact, agreemplaced from ce as amendion or arrang

ssion Compan

even numbeshall nomin

de provides ould be refeto arbitration

ority shall ha paragraph l be consolrbitrator to w

hall be final a

Confident Grid Code

o OETC. Ushare all daIn all cases,

Authority.

Transitioe date that gn, construco the need f

able, OETC ient in order

ules for chanproposals fong the neceof any chan.

etation less the conis Grid Code

any scheduledes the plurncludes the ode sectionsses or schedand schedushall neither

y law, regulaent or othertime to time

ded, modifiegement prom

y

er of parties nate one of itthat any dis

erred to an en unless and

ave the righGC12(c) ablidated and which the Reand binding

iality specify the

nless otherwata with Use, OETC is a

onal Provthis Grid Coction and cofor changes will proposer to take ac

nges to the Gor changes Oessary changnge which is

ntext otherwie" or "the Ges or other dal and vice vothers;

s, paragraphdules of this le headings affect nor b

ation made r legal docume. In particued or replacemulgated or

to the disputs appointeespute or diffexpert for re

d until such e

t to require tbove and are

determinedegulatory Auon the partie

e extent of cwise specificrs likely to b

at liberty, and

visions ode is first eommissioningto the Grid Ce changes tccount of theGrid Code dOETC, PWPges. No sucs necessary

se requires;rid Code" a

documents aversa;

hs, clauses Grid Code;are for conv

be used in thunder any lment shall bular, any refeed from timeestablished

Th

ute are (in wes to act as cference of thesolution, suexpert determ

that all dispue related, whd together ethority has res.

confidentialitcally stated be affected bd may be re

established) g of a new lCode. to the Grid e relevant cescribed els

P, and all Usch Person sy or expedie

re reference

attached to a

or schedule

venience of e constructiolaw, standabe to that iteerence to ane to time anunder that L

e Grid Code - V

which case thchairman of he parties inuch differenmination has

utes which ahether betweeither by threferred any

ty, which apin the Grid

by the matteequired, to s

that a controad dispatc

Code whichcircumstancesewhere in tsers shall cohall be entitent and app

e to the whoany part of th

es are to C

reference onon of this Grrd, seconda

em as amenny licence snd to any ruLicence;

Version 2.0

he Regulatothe panel).

n relation to nce or dispus been soug

are referred een the sam

he Regulatodispute.

pplies to daCode, OET

ers concerneshare the da

ract has beeh centre. Th

h it considees referred his Grid Codo-operate fuled to preve

proved by th

ole of the Grhe Grid Code

Code section

nly and do nrid Code;

ary legislatioded, modifiehall be to thle, documen

ory a

ute ght

to me ory

ata TC ed ata

en his

ers to de lly

ent he

rid e;

ns,

not

on, ed hat nt,

Page 29: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

referethe apto sucapproany pmade

all refGregoon su

whereshall

refereagencbodie

the willustrwords

Termmeanthe m

ctricity Transmis

ences to thepproval or coch conditionoval may be proper order,e or issued uferences to orian calend

uch date at 0e a word or be construeences to "pecies, commi

es as well aswords "includ

ation or ems; and s and expre

nings in this meanings asc

ssion Compan

e consent oronsent of ths as may beamended, m

, instruction under it;

specific dadar and all r00:00 hours; expression d accordingerson" or "pttees, depar

s to individuade", "includin

mphasis and

essions defiGrid Code. cribed to the

y

r approval ofe Regulatorye determinedmodified, suor requirem

tes or perioeferences to

is defined inly;

persons" incrtments, minals with a seng" and "in p

shall not li

ned in the In particular

em in that Se

f the Regulay Authority id by the Re

upplementedent or decis

ods of time o specific da

n this Grid C

clude individnistries and oparate legal particular" shmit or preju

[insert title r, the followiector Law.

Th

atory Authorn writing, whgulatory Aut

d or replacedsion of the R

shall be caates shall be

Code, cognat

duals, firms, other incorppersonality

hall be consudice the ge

of Sector Laing words an

e Grid Code - V

rity shall be hich may bethority, as thd from time tegulatory Au

lculated acce to the day

te words and

companiesporate and u

or not; strued as beenerality of a

aw] shall hand expressio

Version 2.0

references given subje

hat consent to time and uthority give

cording to thy commencin

d expression

s, governmenincorporate

eing by way any foregoin

ave the samons shall hav

to ect or to

en,

he ng

ns

ent ed

of ng

me ve

Page 30: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Appen

1. 1.1 Th

C

"CCo

"Cm

"GTr

"L"Mgr

"Pw

"Sas

"Spr

"Oof

"Tth

1.2 Exan

1.3 Wco

1.4 Hco

1.5 UC

2. P2.1 Th

su(a(b

(c

(d

ctricity Transmis

dix A Co

Definitions he followingonstitution;

Chairman" onstitution to

Constitutionay be amen

Grid Code" ransmission

Licence" ha

Member" mroups referre

Panel" meanith the Grid C

Secretary" ms such;

Sector Law"rivatisations

OETC" meaf a Transmis

Transmissioe Sector Law

xcept as othnd expressio

Words importontext requir

eadings anonstruction o

nless otherwonstitution.

rincipal objhe Panel hauch other oba) to generab) to review

OETC, thconsidera

c) to discusunforesee

d) to reviewSystem

ssion Compan

onstitutio

and Interprg words an

means theo act as the

n" means thended from tim

means the Licence;

as the meani

means a persed to in Clau

ns the Grid Code (sectio

means the p

" means Suand regulat

ns the Omassion Licence

on Licence"w;

herwise provons used he

ting the singres. Words i

d titles shaof the words

wise stated,

jects as been estabjectives as tally review, dw and discuhe Regulatoation from timss what chaen circumsta

w existing Oand make

y

on Of The

retation nd expressio

e person achairperson

e constitutiome to time w

Grid Code

ng given it in

son appointuse 3 on the

Code Revieon GC.4) an

person appo

ltani Decreeion of the ele

an Electricitye;

" means a L

vided hereinrein shall ha

gular only amporting the

all not be ta and expres

any referen

ablished by Othe Regulatodiscuss and uss suggestory Authorityme to time;anges are nances referrman Electricrecommend

Grid Cod

ons shall h

appointed bn of the Pane

n and rules with the appro

e drawn up

n the Sector

ted to act asPanel;

w Panel estd governed

ointed by OE

e No. [ /2003ectricity sect

y Transmissio

Licence to tr

and unlessave the mea

also include e masculine

aken into cssions used h

nce to a Clau

OETC to furory Authoritydevelop the

tions for amy or any Us

necessary tored to it by Ocal Standard

dations to t

Th

de Review

ave the fol

y OETC uel;

of the Paneoval of the R

pursuant to

r Law;

s a represe

tablished by by this Cons

ETC pursuan

3] promulgattor in Oman

on Company

ransmit elect

s the contextnings given

the plural aonly also in

onsiderationherein.

use is a refe

rther the objey may stipulae Grid Code mendments ser may wis

o the Grid OETC; ds relevant he Regulato

e Grid Code - V

w Panel

lowing mea

under Claus

el as set out Regulatory A

o Condition

ntative of th

the OETC istitution;

nt to Clause

ting the law ;

y in its capa

tricity grante

t otherwise ato them in th

and vice verclude the fe

n in the inte

erence to a

ectives set oate from timeand its impleto the Gridh to submit

Code arisin

to OETC’s ory Authorit

Version 2.0

anings in th

se 6 of th

herein and aAuthority;

3 of OETC

he persons

in accordanc

7 and name

governing th

acity as hold

ed pursuant

admits, wordhe Grid Cod

rsa where thminine.

erpretation

Clause of th

out below ane to time; ementation;

d Code whict to OETC f

ng out of an

Transmissioty concernin

his

his

as

C's

or

ce

ed

he

er

to

ds e.

he

or

his

nd

ch for

ny

on ng

Page 31: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(e

(f)

(g

(h

3. M3.1 Th

(a(b(c(d(e

(f)

(g(h(i)(j)

3.2 Eaatto(intorelethtorethMan

3.3 N3.4 Af

(a

ctricity Transmis

modificatElectrical

e) to determTransmis

) to approvSystem;

g) to publisrecomme

h) issue guiand inter

Membership he Panel sh

a) the Chairb) a person c) a person d) a person e) 2 person

with a tot) 2 person

Productiog) 1 person h) 1 person ) 1 person ) 1 person ach person t any time a

o agree on nsofar as heo encourageelevant persoeast 21 Businhe Panel, aso make suchelevant pershe Regulato

Members on ny person so

o person othfter the Pane

a) each MePanel hemeeting closest a

ssion Compan

tions to exisl Standards mine whichssion Systemve equipmen

sh recommeendations hadance in repretation whand Appoi

all compriserman and upappointed bappointed bappointed bs representital Registeres represention Facilities representinrepresentinrepresentinrepresentinappointed any of the pea represent

e is reasonae appointmons as to theness Days p

s the case mh appointmeon or groupry Authoritybehalf of thao appointed

her than an el has been

ember shall ld on the firsis held on sfter that day

y

sting Oman relevant to O

h contractorm; nt that may b

endations aas occurred tlation to the

hen asked tontment

e; p to 2 personby the Regulby PWP; by PAEW; ing all Poweed Capacity ng all Powewith a total g each Liceg Internally g Internationg RAEC.

as specified ersons or grotative to actbly able) theent or, as eir prospectprior to the n

may be) the nt and the R

p of personsy and the Cat person or by it.

individual shestablishedretire automst Business such day, a

y) but shall b

Electrical StOETC’s Tranrs should

be used on

and ensure through Mem

e Grid Code o by a User.

ns appointedlatory Autho

er Producersin excess of

er ProducersRegistered Cnsed DistribInterconnecnal Interconn

at Clause 3.oups identifiet as their M

e person(s) oappropriat

tive Membernext meetingChairman s

Regulatory As has decideChairman acr group of pe

hall be appo for one yea

matically at Day in the m

at the meetibe eligible for

Th

tandards or nsmission Sbe approve

or form part

that User mbers; andand its impl

d by OETC;rity;

s that each hf 100 MW; s that each hCapacity of utor;

cted Parties; nected Parti

.1 shall be aed at Clause

Member, theor group(s) ute, unanimor. If no suchg of the Pan

shall requestAuthority shaed upon an ccordingly, tersons, and

inted a Memar; the beginninmonth of Feng which isr re-appointm

e Grid Code - V

proposals foystem;

ed to work

t of OETC’s

consultation

lementation,

have Produc

have Central100 MW or l

es; and

a Member ofes 3.1(a) to e Chairman unable to agous agreemh agreementnel (or the fit the Regulaall have the appointmento appoint ato remove (i

mber or his a

ng of the mbruary each

s held on thment.

Version 2.0

or new Oma

k on OETC

Transmissio

n upon suc

, performanc

ction Facilitie

lly Dispatcheless;

f the Panel. (j) are unabshall conta

gree and seement betweet is reached rst meeting

atory Authoriright, until th

nt and notifiea Member if appropriat

alternate.

meeting of thh year (or if nhe date fallin

an

C’s

on

ch

ce

es

ed

If ble act ek en at of ity he ed or

te)

he no ng

Page 32: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(b

(c

(d

(e

4. A4.1 Ea

ac(aMan

4.2 If shwoanwpranthap

4.3 Evhaascaofth

4.4 Ananan

4.5 Reun

5. R5.1 Th

evsh

ctricity Transmis

b) Each persuch growish to rein his pla

c) The releappointmrelevant notificatioto be givDays in a

d) If only oappointmunanimouwith effenotificatioshall gov

e) These prappoint mthan one

Alternates ach Membect as his alteas the case ember or Cnd delivered

his appointohall be entitleorking groupnd vote as ahich the Meresent and and duties of e purpose o

pply as if he

very person ave one votes alternate, ase may be)f any resolute contrary, b

n alternate Mn alternate Mny reason toeferences innless the co

Representatihe Chairmavery meetinghall permit)

ssion Compan

rson or grououp of persoe-appoint thce. vant person

ment to the meeting of

on for re-appven if no noadvance of thone notificat

ment of a neus), the per

ect from theons are not ern the apporovisions shamore than on

Member is

r (and the Cernate and r

may be) shairman sha to the Secre

or so requesed to receiveps of which ha Member omber or Chaat any such

his appointof the proceewere a Mem

acting as ae for each Min addition t). Execution tion of the Pbe as effecti

Member or CMember or

o be a Membn this Constintext otherwion and votn and eachg of the Panshall be ent

y

p of personsons) may, bhe retiring M

n(s) must dChairman the Panel

pointment intification is he relevant tion is rece

ew person arson named e beginning unanimous,ointment of tall apply eqne Member,involved.

Chairman) semove (at h

so appointedall be effecteetary or tend

sts, an alterne notice of ahis appointoor Chairmanairman (as thmeeting to

tor as a Memedings at thember or Cha

n alternate Member or Cto his own vby an altern

Panel shall, ve as execu

Chairman (aChairman (a

ber or Chairmitution to a M

wise requiresing other Memnel. One adtitled to atte

s entitled to ay notice in ember or to

deliver suchat least 21 or group(s)

n respect of delivered tomeeting of teived for thas a Membe in the notifof the rele

the provisiothe Memberually to pers with any ne

shall have thhis discretiond. Any appoed by noticedered at a m

nate Membeall meetings or is a Membn (as the cahe case mayexercise anmber or Chae meeting thirman (as th

Member or CChairman (asvote if he is nate Membeunless the n

ution by his a

as the case as the caseman (as the Member or Cs, include his

mber shall bedviser (or sund any mee

Th

appoint a Mwriting to th

o appoint a n

h notificationBusiness

) entitled toan existing M

o the Chairmhe Panel.

he re-appoiner (or if all nfications(s) wevant meetinons of Clausr. sons or grouecessary cha

he power to n) any alternointment or e in writing emeeting of th

er or Chairmof the Pane

ber. He shallase may be)y be) appoind dischargeairman (as the provisionshe case may

Chairman (as the case malso a Mem

er or Chairmnotice of hisappointor.

may be) she may be) if

case may bChairman (as duly appoin

e entitled touch greater eting of the

e Grid Code - V

ember (or a he Chairmanew person

ns for re-apDays in ad

o appoint a Member sha

man at least

ntment of anotificationswill becomeng of the Pse 3.2 of thi

ups of persoanges to ref

appoint anynate Membe

removal ofexecuted by e Panel.

man (as the el or of sub-cl also be ent) at any sucnting him is ne all the functhe case mas of this Con

y be).

as the case may be) for wmber or Chaman (as the s appointme

all ipso factohis appoint

e). as the case mnted alternat

o attend andnumber as Panel with e

Version 2.0

person withn, indicate ias a Memb

ppointment dvance of th

Member. all be deemet 21 Busines

a Member received a

e the MembPanel. If this Appendix

ons entitled flect that mo

y individual r or Chairmaf an alternathe appoint

case may bcommittees titled to attench meeting not personactions, poweay be) and fnstitution sha

may be) shawhom he ac

airman (as thcase may bnt provides

o cease to btor ceases f

may be) shate.

d be heard the Chairmaeach Memb

hin its er

or he A

ed ss

or re er he A

to ore

to an ate tor

e) or nd at lly

ers for all

all cts he e) to

be for

all,

at an er

Page 33: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

aniss

5.2 Eaof

6. Th6.1 U

O6.2 O6.3 Th

thpunothm

6.4 Thenanon

7. Th7.1 O

thbuth

7.2 Thin

7.3 Thsuanre

7.4 If reap

8. M8.1 Su

m(a

ctricity Transmis

nd shall be esue. ach Membef an equality he Chairmapon retiremETC shall a

OETC may athe Chairman

he Chairmanursuant to Cor any other

he time appomay appoint o

he Chairmanntitled to casnd Chairmane vote as M

he SecretarETC shall h

he Panel as iut shall not b

he right to sphe Secretary particular, t

i) attendii) mainta

and suiii) mainta

of persiv) keep m

he Secretaryub-clauses 7nd/or the Reequested to d

the office easonably abppoint a new

Meetings ubject alway

meetings shaa) the Pan

FebruaChairmevent s

ssion Compan

entitled to s

r (including tof votes, th

an ent or remoppoint a pert any time ren shall presn is unable

Clause 4.1 ofperson app

ointed for holone of their nn, or the perst one vote.n, he shall b

Member.

ry have power it may deembe a Membepeak at, but, y's duties shto; d to the requain a registeuch alternateain a registesons describminutes of ay shall make7.2(ii) and (iiegulatory Ado so. of a Membble) the grou

w Member as

ys to the dll operate asnel shall mee

ary and as neman at such timshall meet no

y

peak at any

the Chairmae Chairman

oval by OETrson to act aemove the Cside at every

to be presef this Append

pointed to aclding the menumber to brson appoint Where a Mbe entitled t

to appoint am necessary.er by virtue ounless a Me

hall be to atte

isition of meer of nameses as may ber of names bed in sub-call meetings.e available thi) above, to

Authority for

ber is vacateup or persos provided in

irection of Os follows: et on the first Mcessary for thmes as may bot less than 4

y meeting bu

an) shall be shall have a

TC of the fas ChairmanChairman froy meeting ofent at a medix A to act

ct as Chairmeeting, the Me Chairman ted to act as

Member is acto cast one

and dismiss . The Secretonly of beingember, no rigend to the d

eetings and ts and addree appointedand addres

clauses 3.1(a

he register oLicensed Dinspection

ed the Secn whom then Clause 3 o

OETC and

Monday in thehe transactionbe determine4 times each

Th

ut shall not b

entitled to ca second or

irst and eac. m office. f the Panel eeting, he mas Chairmaan is presen

Members preof the meet

s Chairman cting in the vote as Ch

a Secretarytary may, bug Secretary. ght to cast aay to day op

to serve all rsses of Mem from time toses of perso

a) to (j) of thi

of names andistributors, Dwithin a rea

cretary shall e Member reof this Appen

the Regula

e months of Mn of businessd by the Reg

h year; If the

e Grid Code - V

be entitled to

ast one votecasting vote

ch successi

at which hemay appointn. If neither nt within halfesent appointing. by the Chaicapacity of airman, in a

y and such ut need not b

The Secretaa vote at anyperation of th

requisite notmbers and o time; ons in each is Appendix

d addressesDistribution Sasonable pe

notify (insoepresented andix A.

tory Authori

May, August, s whenever coulatory Authofirst Monday

Version 2.0

o vote on an

e. In the evee.

ve Chairma

e is present.t an alternathe Chairmaf an hour aftted by OETC

rman shall bboth Memb

addition to h

other staff fbe, a Membeary shall hav

y meeting. he Panel an

ices; the Chairma

of the groupA; and

s referred to System Useeriod of bein

ofar as he and they sha

ity, the Pan

November anonvened by thority, and in ay of that mon

ny

ent

an,

If ate an ter C,

be er

his

for er, ve

nd,

an

ps

in ers ng

is all

nel

nd he ny

nth

Page 34: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(b

(c

(d

(e

(f)

9. G9.1 Al

imshwthsc

9.2 FoapCoReviere

9.3 Thfum

9.4 If Credeno

10. R10.1 A 10.2 A

beco

10.3 A al

ctricity Transmis

happenthe Pan

b) notwithwhenenotice

c) unlessnotice

d) the qu7 of th

e) if withinot preThe renotwith

) subjecnot (of

i) vacanii) any dethe accide

of a mGrid Code Re

ll proposed mplementatiohould be broill advise the

he Grid Codecheduled meollowing revppropriate, aode based egulatory Auews expres

epresentationhe Regulato

urther represmade and, if s

the Panel ishairman sha

evision takineemed to beotification or

Resolutions resolution oresolution in

een passedounterparts mmeeting of l in one plac

ssion Compan

ns to be a holnel. hstanding thever appropr

in writing tos agreed by

shall be givorum of Mee Members;in an hour oesent, the me-adjourned hstanding thct to sub-parf themselvescies amongsefects in theental omissio

meeting by a evisions revisions to

on. All revisought before e Panel, Usee with noticeeeting of theview of a apply to theon the Pa

uthority, shased by the ns directly to

ory Authoritysentations anso, whether s directed byall notify eacg effect, ane amended other such

of the Panel n writing sig at a meetmay producethe Panel m

ce but who a

y

liday, then alt

he right of riate, the Ch

o do so by twall Member

en to all Members requi; of the time ameeting shameeting sha

here being feragraphs (d)s) invalidate st the Panel appointmenon to give noperson entit

the Grid Cosions proposthe Panel b

ers, and the e of no less Panel. proposed

e Regulatoryanel recommall also notifPanel and

o the Regulay shall consind shall detein the form p

y the Regulach User of thd the revisioaccordingly)date as dire

shall be pasned by all Mting of the e written resmay consist are able (dire

ternate date w

the Chairmhairman shalwo or more Mrs, not less mbers of all ired for the P

appointed forll stand adjoall be deem

ewer than se) and (e) aboproceedings; nt of Membeotice of a Mtled to receiv

ode must besed by Userby the Chairm

Regulatory s than 20 Bu

revision byy Authority

mendation. fy each UseUsers so th

atory Authorider the propermine wheproposed ortory Authorit

he revision aon shall take) from (and

ected by the

ssed by a simMembers sha

Panel duly solutions.

of a confereectly or by te

Th

will be commu

man to call ll call a mee

Members; than 14 Bumeetings of

Panel meetin

r a meeting ourned for a

med quorate even Membeove the follos of the Pan

ers; or eeting to, orve notice.

e reviewed brs, the Reguman for consAuthority of

usiness Day

y the Paneto approve The Chair

er of the prohat each Usity regardingposed revisither the pro

r in an amenty that the reat least 10 Be effect (andincluding) thRegulatory A

mple majoritall be as valid

convened

ence betweeelephonic co

e Grid Code - V

unicated by th

a meeting ting when re

siness Daysf the Panel; ngs shall no

of the Paneat least 2 Buand its proc

ers present; owing circumel;

r the non-rec

by the Paneulatory Authosideration. Tf all proposeys in advanc

l, the Chathe revisio

rman, in apoposed revisser may cong the proposion, other vi

oposed revisded form.

evision shall Business Dayd the Grid Che date speAuthority.

ty of votes cad and effectand held.

en Membersommunicatio

Version 2.0

he Chairman

of the Panequested by

s prior writte

ot be less tha

el a quorum usiness Dayceedings valand

mstances sha

ceipt of notic

el prior to theority or OETThe Chairmaed revisions ce of the ne

irman will, n of the Gr

pplying to thsion and othnsider makined revision.ews, and anion should b

be made, thys prior to thCode shall becified in suc

ast. ive as if it haOne or mo

s who are non) to speak

of

nel y a

en

an

is ys. lid

all

ce

eir TC an to

ext

if rid he er ng

ny be

he he be ch

ad ore

not to

Page 35: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

ea"m

11. M11.1 Th

eath

11.2 Eaoffadith

11.3 If reCtycethm

12. G12.1 Th

Ges

13. S13.1 Th

pewdethfo

13.2 Thtom

13.3 Reun

14. R14.1 Th

(a

(b

(c

ctricity Transmis

ach of the omeeting" sha

Minutes he Secretaryach Member

he relevant mach Membef each meet

ails to do ssapproval o

he Panel at tthe Secreta

evised minutlause 11.2

ypographical ertain aspeche minutes u

meeting of theGuidance fro

he Panel marid Code astablish subc

ub-committhe Panel maersons as iritten terms etermine. Tat the minut

or considerathe Panel ma

o time. Suchmay determin

esolutions onless approv

Removal of Mhe office of a

a) he res

b) he bec

c) he berelatin

ssion Compan

others and toall be constru

y shall circur as soon as

meeting has r shall notifyting within 1so will be dof the minutehe meeting t

ary receives tes as soon

of this Apnature and

cts of the minupon which te Panel, as tom the Paneay at any timand its impcommittees

tees and woay establisht considers of reference

The meetingstes of such mtion before thay further esh working grne for the puof sub-commved by resol

Members ana Member s

signs his offic

comes bank

comes of ug to mental

y

o be heard ued accordin

ulate copies s practicablebeen held.

y the Secret5 Business

deemed to es aforesaidto which theany commeas practicabpendix A, i

d indicating, nutes. The Sthere is disathe first itemel me, and from

plementationand working

orking grouh such sub-c

desirable. e and shall bs of sub-commeetings cahe next follostablish worroups may crpose. mittees andution of the

nd Chairmahall be vacace by notice

rupt or comp

unsound minhealth; or

by each of ngly.

of the minu (and in any

ary of his apDays of rechave appro

d will not affe minutes relents on the mble following incorporating

where necSecretary shagreement, i

m for discuss

m time to tim, performan

g groups to c

ups committees Each sub-c

be subject tommittees shan be presenowing meetinrking groupsconsist of M

d working gPanel.

an and vacaated if;

delivered to

pounds with

nd or a pat

Th

the others s

utes of eachy event within

pproval or dceipt of the oved the mect the validlate. minutes, thethe expiry o

g those cocessary, thathall then inconto the ageion, and, if p

me, issue gnce and intcarry out suc

from time tocommittee so such procall so far asnted to the Mng of the Pans to advise itMembers an

roups shall

ation of offic

o the Secreta

his creditors

tient for any

e Grid Code - V

simultaneou

h meeting ofn 15 Busines

isapproval ominutes. A

minutes. Thedity of decis

e Secretary of the periodmments wht Members orporate thonda for the possible, res

uidance in rterpretation,ch work.

o time consshall be sucedures as ths possible beMembers in nel. t on any ma

nd/or others

not have b

ce

ary;

s generally;

y purpose o

Version 2.0

sly. The wo

f the Panel ss Days) aft

of the minuteMember wh

e approval ions taken b

shall circulad referred to hich are of disagree wi

ose aspects next followin

solution.

relation to th, and it ma

sisting of sucbject to suche Panel mae arranged ssufficient tim

atter from timas the Pan

binding effe

of any statu

ord

to ter

es ho or by

ate in a

ith of

ng

he ay

ch ch ay so

me

me nel

ect

ute

Page 36: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

(d

14.2 FucaCMonmanWpew

15. M15.1 In

Paob

15.2 Ina heofa

15.3 Th

15.4 ThHofu

16. G16.1 Ea

alsu

17. C17.1 Ea

re

ctricity Transmis

d) he or hPanel accept

urther, any pase may behairman, as

Member or thnly have the

may be, that ny Member

Whenever anersons entitlriting within

Members on n the exercisanel shall hbjects of the

n the exercisMember, a

e is for the tf representatMember of the Panel, ea

i) shall believcommcomm

ii) may inon thelawyerconse

he Panel showever, Me

unctions of th

Group represach Membel notices se

uch Member

onfidentialiach Membe

easonably be

ssion Compan

his alternatewithout subtable to the

person or pee, pursuant s the case he Chairmane right to remit or they hor the Cha

ny individual led to appoiseven days

the panel'se of its poweave due regPanel set o

se of its powMember shaime being ation shall at the Panel seach Memberbe entitled ed by it o

municated omunicated or n relation to e opinion or r, or experquences of hall enjoy nmbers shall he Grid Code

sentatives' r shall from

ent to such r.

ity er shall keee expected t

y

e fails to attebmitting an eChairman.

ersons entitlto Clause 3may be, fro

n, as the casmove from oave appoint

airman, as th Member ornt that Memof the chan

s responsibers and the gard for the out in Clausewers and theall representppointed puall times be

et out in Claur and the Seto rely upo

or him to or signed b

signed; andany act, maadvice of, o

rt in any so acting.

no status, imnot be pers

e Review Pa

addressestime to timeaddress sha

ep confidento understan

end more thaexplanation

ed to appoin3 may at anom office ase may be, office the Mted, and willhe case mar the Chairm

mber or the Cge taking eff

bilities and pperformanceneed to pro

e 2 of this Ap performanct the interest

ursuant to Cle subordinateuse 15.1 of tcretary;

on any combe genuine

by the perd atter or thing or any informother field,

mmunity or sonally liableanel.

e communicall be consi

ntial all infond to be conf

Th

an three conto the Chair

nt a Membeny time rem

and appoint in its place.ember or th have no rig

ay be, appoman changesChairman shfect.

protectionse of its dutieomote the appendix A. ce of its dutits of that peause 3, prove to the obligthis Append

munication e and corrrson by w

contemplatemation from and shall

privilege of e in respect

cate his addrdered as ha

ormation, whfidential.

e Grid Code - V

nsecutive mrman which

er or the Chamove that M

another pe A person o

he Chairmanght to removinted by ans, the perso

hall notify the

es and respoattainment of

es and resprson or persvided that sugations of thix A.

or documenrect and tohom it pu

ed by this Co, any chartel not be li

the Sultanaof the perfo

ress to the Saving been

hich that M

Version 2.0

eetings of this reasonab

airman, as thember or th

erson to be or persons wn, as the casve from officother perso

on or group e Secretary

onsibilities, thf the princip

ponsibilities asons by whouch obligatiohe Member a

nt reasonabo have beerports to b

onstitution aered engineeiable for th

ate of Omarmance of th

Secretary anduly given

Member mig

he bly

he he

a will se ce

on. of in

he pal

as om on as

bly en be

act er, he

an. he

nd to

ght

Page 37: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

DT

DT

DT

DT

DT

DT

n Electricity Tr

1 f 30

TC.1Introduc

TC.2Objectiv

TC.3Scope .

TC.4Data ca

TC.5Proced

DTC

DTC

DTC

DTC

TC.6Grid Co

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

ransmission C

D

ction ...........

ve ...............

...................

ategories .....

ures and res

C.5.1. Res

C.5.2. Meth

C.5.3. Cha

C.5.4. Data

ode data exc

edule A: Ge

edule B: Ge

edule C: Sc

edule D: Ge

edule E: Ge

edule F: Use

edule G: Lo

edule H: Us

edule I: Con

edule J: Dem

edule K: Fa

edule L: Dat

edule M: Me

Company

Data Tra

CON

...................

...................

...................

...................

sponsibilities

ponsibility fo

hods of subm

nges to Use

a not supplie

changed bet

enset And De

eneration/Op

heduling An

eneration Sc

enset Outage

er System d

ad characte

ser Demand

nnection Poi

mand Contro

ult infeed da

ta supplied b

etering Data

ansfer C

NTENTS

...................

...................

...................

...................

s .................

or submissio

mitting data

ers' data ......

ed ...............

tween OETC

esalination U

perational Pla

nd Despatch

chedule data

e data .........

data .............

ristics data .

profiles and

nt data .......

ol data ........

ata ..............

by OETC to

..................

The Grid Cod

B D

ode

...................

...................

...................

...................

...................

on and updat

...................

...................

...................

C and Users

Unit technica

anning data

data ...........

a ..................

...................

...................

...................

Active Ener

...................

...................

...................

Users ........

...................

de - Version 2.

D t T f C

Issued A

...................

...................

...................

...................

...................

ting of data .

...................

...................

...................

...................

al data .........

...................

...................

...................

...................

...................

...................

rgy data ......

...................

...................

...................

...................

...................

.0

C d V i 2

April 2010

...................

...................

...................

...................

...................

.............. 3

.............. 3

.............. 3

.............. 3

...................

.............. 7

............ 12

............ 14

............ 16

............ 17

............ 19

............ 23

............ 24

............ 25

............ 26

............ 27

............ 28

............ 29

0

2 2 2 3 3

5

Page 38: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Dat

DTCThe Dby theIn thethe pThe speciupda

DTCThe o

toca

toca

toC

DTCIn ad

P L L D In In P P

n Electricity Tr

2 f 30

ta Trans

C.1 IntroData Transfee Grid Codee event of inrovisions in relevant secifies the proting and rec

C.2 Objeobjectives of

o list and coategory of Uo list requireategory of Uo provide an

Code.

C.3 Scopdition to OE

Power Produicensed Disticensed Sup

Directly Connnternational nternally Inte

PWP; and PAEW.

ransmission C

fer Code

oduction er Code pro

e to provide tconsistencieindividual section of the ocedures, ticording of tem

ective f the DTC ar

ollate all reUser to OETCements in reUser under thn overview o

pe TC, the DTC

cers; tributors; ppliers; nected ConsInterconnec

erconnected

Company

e

ovides a unifto OETC anes between tections of thGrid Code

ming, and rmporary or p

re as follows

quirements C under the espect of alhe Grid Codeof the data

C applies to;

sumers; cted Parties

Parties;

fied listing od that OETCthis DTC ane Grid Code, under whirouting for tpermanent c

s;

in respect Grid Code;l the data toe; and requirement

;

The Grid Cod

B D

of all data thC is requiredd other sect

e shall prevach any itemthe supply

changes to th

of data to b

o be provide

ts of certain

de - Version 2.

D t T f C

at Users ared to provide ttions of the Gail. m of data is

of that datahat data.

be provided

ed by OETC

n sections of

.0

C d V i 2

e required to Users. Grid Code

required, a and the

d by each

C to each

f the Grid

0

Page 39: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 3

DTCThe D

SreT

Dre

Se

ODsuS

MM

DTCDTCUsersthe p

DTCThe dformawith providgiven

Data submbe suor utietc aavailabasis

DTCAll Uregist

DTCUsersindiviby a OETCa Use

n Electricity Tr

3 f 30

C.4 DataDTC groups

Standard Plaequired for

Transmission

Detailed Plaequired of ca

System datanable Users

Operational Despatch Coub-categoris

SDC, and;

Metering anMetering data

C.5 Proc.5.1. Res shall recorovisions of

.5.2. Medata scheduats for submOETC, all dded in acco

n.

submitted mitting each submitted via ilising a datafter obtaininable, subjects may be sub

.5.3. ChUsers must tered with O

.5.4. Das and OETCdual sectionsection of thC will adviseer's Plant in

ransmission C

a categordata into a

anning Datathe purpos

n System;

nning Dataarry out deta

a: is that dats to conduct

data: is datode (SDC) osed accordin

nd Data Exca.

cedures aesponsibilitrd, exchangrelevant sec

ethods of sules to the Dmission of ddata provideordance wit

to OETC schedule of a computer

a transfer mng the prior t to OETC’s bmitted by fa

hanges to Unotify OETC

OETC in acco

ata not supC are obligedns of the Gridhe Grid Code a User in wthe event th

Company

ries number of c

a: is that dase of deter

: is that datailed stability

ta listed in Atheir own st

ta related toof the Grid ng to the rele

change Co

and respoty for subm

ge and recorctions of the

submitting dDTC are stru

ata to OETCed by Usersh the DTC

must includata. The d

r link if such media, such

written consprior agreem

ax.

Users' dataC promptly ordance with

plied d to provide d Code. If a e, OETC shwriting of anyhat a User ha

categories;

ta listed in Armining any

a listed in Ay studies as

Appendix D udies as nec

o Operating Code. Withevant Opera

ode data: is

onsibilitiemission and

rd data liste Grid Code.

data ctured, wheC and from s to OETC a

schedule f

de the namdata is prefea data link eas floppy d

sent from Oment, data to

of any chah the relevan

data as set User fails toall use its by estimated as not provid

The Grid Cod

B D

Appendix B y requireme

Appendix C tnecessary;

to the Planncessary;

Code (OC)in the DTC,ating Code,

s that data

es updating od in the DT

ere possible,OETC to U

and by OETformats whe

me of the rred in electexists betweiskette, magETC. If eleco be provide

ange to an nt section of

out in and ino supply OETest estimatedata it inten

ded the requ

de - Version 2.

D t T f C

to the Plannents to rein

to the Plann

ning Code re

) and Sched, Operationanamely OC

listed in Ap

of data C in accord

to serve asUsers. UnlesTC to Usersere such for

User repretronic formateen a User agnetic tape, ctronic meaned to OETC

item of daf the Grid Co

n accordancTC with data

e of the requnds to use cuired data.

.0

C d V i 2

ning Code nforce the

ning Code

equired to

duling and al Data is 1, OC2 or

ppendix E

ance with

s standard ss agreed s shall be rmats are

esentative t and may

and OETC CD ROM

ns are not on a daily

ata that is ode.

ce with the a required uired data. oncerning

0

Page 40: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 4

If OEwhomprovidadvisbeing

OETCdata Plantappro

Correpost e

n Electricity Tr

4 f 30

ETC fails to m that data ded by OET

se OETC in wg supplied.

C and User supplied pre

t or upon sucopriate.

ections to esevent, where

ransmission C

provide datought to ha

TC when, inwriting of an

estimates oeviously for ch other info

stimates of e the data a

Company

ta required ave been sun that User'sy estimated

of data not the same P

ormation as

data not suffects Opera

by a sectioupplied will s view, it is

data it inten

supplied wiPlant or upoOETC or a U

upplied shallating Parame

The Grid Cod

B D

n of the Gruse an estinecessary t

nds to use in

ill, in each con corresponUser, as the

be made beters,

de - Version 2.

D t T f C

rid Code, thmate of theto do so. An the event o

case, be banding data f

e case may b

by OETC or

.0

C d V i 2

e User to e data not A User will of data not

ased upon for similar be, deems

r the User

0

Page 41: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 5

DTCTableSche

Table

Sche

A

B

C

D

E

F

G

H

I

J

K

L

M

n Electricity Tr

5 f 30

C.6 Gride 6.1 provideedule, PWP i

e 6.1:

edule Data

A GensDesatechn

B GenePlann

C ScheDesp

D Genedata.

E GensDesaOuta

F User

G Loaddata

H User& Ac

Conn

J Dem

K Fault

L OET

M Mete

ransmission C

d Code daes details ofis the recipie

a type

set And alination Unit nical data.

eration/Operaning data.

eduling And patch data.

eration Sched.

set and alination Unit age data

r System data

d characteristi

r Demand proctive Energy d

nection Point

and Control d

t infeed data.

C data to Use

ering data

Company

ata exchaf Schedules ent of the da

Com

GensProdOpe

ational GensrequPlan

Opefor S

dule Dataof th

Gensequidata

a. ElecPlanTran

ics The Loadconte

ofiles data. Data

data. DataDem

data. Data

DatacontTran

ers All re

All re

anged betA to N of th

ata in Schedu

mprising

set, Desalinaduction Facilitrating Parame

set Operatingired for Operaning.

rating ParameScheduling an

a required for e Generation

set and Produpment Outag.

trical paramet Connected

nsmission Sys

estimated pads in respect oent, sensitivit

a related to De

a related to Demand transfer

a related Dem

a related to shribution to OE

nsmission Sys

elevant data

elevant data

The Grid Cod

B D

tween OEhe DTC. OEules A to E a

tion Unit and y fixed eters.

g Parameters ational

eters requirednd Despatch.

the preparati Schedule.

uction Facilitye planning

eters relating tto OETC

stem

arameters of of harmonic y etc.

emand profile

emand and capability.

mand Control.

hort circuit ETC stem.

de - Version 2.

D t T f C

ETC and ETC is a partand G and I

User

PP

PP

d PP

on PP

y PP

to PP, LDDCCOCP

LD, DCOCP

es. LD, DCOCP

PP, LDDCCOCP

LD, LSDCCOCP

LD, DCOCP

PP, LDDCCOCP

PP, LDDCCOCP

.0

C d V i 2

Users ty to each

r Grid Cosectio

PCSDC

OC 2SDC

SDC

OC 1 &SDC1

OC 2

D, ,

P PC

CC, P PC

CC, P

PCOC1

D, ,

P

PCOC

S, ,

P OC

CC, P PC

D, ,

P

PCOC1, 2

D, ,

P MDE

0

ode on

C1

2 C1

C1

& 2 & 2

2

1

1

1

& 6

EC

Page 42: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 6

Key

PWP

PP

LD

LS

DCC

OCP

Abbr MDEOC PC BPC CPC DSDC

Note

1

n Electricity Tr

6 f 30

to Users

User

P Power a

Power P

Licensed

Licensed

C Directly

P Other CSystem

reviations u

C M Op

B PlC PlD Pl

Sc

s:

The dAgreemore

ransmission C

and Water Pr

Producers wi

d Distributor

d Suppliers

Connected C

Connected Pexcluding P

used in all s

etering and perating Codanning Codeanning Codeanning Codecheduling an

data marked ement (to fadetailed stud

Company

rocurer

ith Generatin

rs

Consumers

Parties: UseP, LD, LS, a

schedules:

Data Exchades e - Appendixe - Appendixe - Appendixnd Dispatch

with "+" is racilitate an edies).

ng and Desa

ers Connecand DCC

nge Code

x B Standardx C Detailedx D System Codes

required withearly assess

The Grid Cod

B D

alination Pla

cted to the

d Planning Dd Planning DData

h an applicasment by O

de - Version 2.

D t T f C

nt

Transmiss

Data Data

ation for a COETC of the

.0

C d V i 2

ion

onnection e need for

0

Page 43: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 7

Sche

The CDGSyste

Prod

Ref. Da

1. ProdDemand athrough Tsupplied t1.1 1 Maxi

occu1.2 2 Dem

OET1.3 3 Dem

OET2. CDG

Demand stransformRated MW

Provi(in te

Unit 1

Unit 2

etc

n Electricity Tr

7 f 30

edule A: G

following densets, Direem and/or w

uction Faci

ata descripti

uction Faciassociated w

Transmissionthrough Genmum Demr; and at theC Demand; and at the C Demand; enset Dema

supplied throer when CD

W output

de details ofrms of geog

1

2

ransmission C

enset And

details are ectly Conne

with existing,

ility name:

ion

ility Demanwith the Prodn System ornset unit tran

mand that

e time of

time of min

and

ough unit DGenset is a

f point of Cographical and

Company

d Desalinat

required frocted, or to or proposed

Unit

d: duction Facr in additionnsformer; could MW

Mvapeak MW

Mvaimum MW

MvaUnit

t MWMva

onnection to d electrical lo

tion Unit te

om each Ube Directly

d Embedded

ts Grid Code

ility supplied to Demand

ar

PC C+

ar

PC C

ar

PC C

s Grid Code

ar

PC C+

the Transmocation and

The Grid Cod

B D

echnical da

User with eConnected,

d CDGensets

Genset/

FY0 FY

d d

+

U1 U2

+

ission SysteSystem volt

de - Version 2.

D t T f C

ata

existing or to the Trans.

DesalinatioFacility (

Y1 FY2

2 U3

em of each Ctage) (PC B

.0

C d V i 2

proposed nsmission

.

on Unit/ ProPF) data

FY3 FY

U4 U5

CDGenset B +}

0

oduction

4 FY5

PF

Page 44: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 8

3. CDGGeneral 3.1 2 Type

TurbGens

3.2 1 Rate3.3 4 Regi

3.4 8 Rate

3.5 9 Rate

3.6 5 SysteEmb

3.7 7 Minim3.8 6 Activ

of Re3.9 3 Expe3.10 Gene

stato3.11 Shor

3.12 Gens(alter

3.13 Rateand Mterm

3.14 Fieldsatur120%110%100%90% 80% 70% 60% 50%

4. Impe4.1 1 Direc

react4.2 2 Direc

4.3 3 Direcreact

n Electricity Tr

8 f 30

enset perfo

e of CDGensine Genset, set, Cogene

ed terminal vstered Capa

ed Active Pow

ed VA;

em constrainedded CDGmum Generave Power obtegistered Caected runninerator Perforor terminals; rt circuit ratio

set inertia cornator plus p

ed field curreMvar output inal voltage;

d current operation curve % rated term% rated term% rated term

rated terminrated terminrated terminrated terminrated termin

edances ct axis synchtance; ct axis transi

ct axis sub-trtance;

ransmission C

ormance an

set (e.g. SteaGas Turbineration, etc);

voltage; acity;

wer;

ned CapacitGensets only

ation; tained in exc

apacity; g regime(s);rmance Cha

o;

onstant; prime moverent at rated M

and at rated

en circuit test certifica

minal voltageminal voltageminal voltagenal voltage; nal voltage; nal voltage; nal voltage; nal voltage;

hronous

ient reactanc

ransient;

Company

Unit

d paramete

am e

kV MW

MW

MVA

y (for );

MW

MWcess MW

; art at Cha

r); MWMVA

MW d

A

ate); ; ; ;

A A A A A A A A A % MVA

ce; % MVA% MVA

ts Grid Code

ers: PC C

PC B PC B

SDC 1 PC

B/C+ A PC B/

C + PC B

PC B/C PC B

PC B art

PC B/C+

s/ A

PC B

PC C

PC C

on

A PC C

on A

PC B

on A

PC C

The Grid Cod

B D

U1

+

C

+

+

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 45: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 9

4.4 4 Quadreact

4.5 5 Quadreact

4.6 6 Stato

4.7 7 Armaresis

5. Time5.1 1 Direc

time 5.2 2 Direc

trans5.3 3 Quad

trans5.4 4 Stato6. Gene6.1 1 Rate6.2 2 Rate6.3 3 Wind6.4 4 Vecto6.5 5 Posit

6.6 6 Posit

6.7 7 Zero

6.8 8 Tap c6.9 9 Tap c6.10 Tap c

(i.e. o7. Excit7.1 1 Excit

static

n Electricity Tr

9 f 30

drature axis tance; drature axis tance; or leakage re

ature windinstance; e constantsct axis short-constant;

ct axis short-sient time codrature axis sient time coor time consterator transed VA; ed voltage rading arrangeor group; tive sequenc

- @ - @ - @

tive sequenc- @ - @ - @

phase sequ

changer ranchanger stechanger typon-load or otation contrter category c);

ransmission C

synchronou

sub-transien

eactance;

g direct-curr

: -circuit trans

-circuit sub-onstant;

short-circuitonstant; tant;

sformer:

atio; ement;

ce resistance@ maximum

@ minimum t

@ nominal ta

ce reactance@ maximum

@ minimum t

@ nominal ta

uence reacta

nge; p size; e; ff-circuit);

rol system p(e.g. rotatin

Company

Unit

us % MVA

nt % MVA% MVA

rent % MVA

sient s

s

t sub- s

s

MVA

e; tap;

ap;

p;

% MVA% MVA% MVA

e; tap;

ap;

p;

% MVA% MVA% MVA

ance; % MVA±%±%On/Off

parametersg or Text

ts Grid Code

on A

PC C

on A

PC C

on A

PC C

on A

PC C

PC C

PC C

PC C

PC C

A PC B PC C+PC CPC C

on A on

A on

A

PC B/ PC C PC B/

on A on

A on

A

PC B/C+ PC C PC B/C+

on A

PC C

PC CPC CPC C

: t PC C

The Grid Cod

B D

U1

+ +

/C

/C

+

+

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 46: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

7.2 2 DetadescshowindivPSS

7.3 3 Rate7.4 4 Gene7.5 5 Excit

posit7.6 6 Excit

nega7.7 7 Powe

7.8 8 Detadescshowindiv

7.9 9 Detadescshowindiv

8. GoveGovernor showing telements;9. PrimPrime moshowing telements 10. PrimPrime moshowing telements 11. DesaRegistereDesalinat

n Electricity Tr

10 f 30

ails of excitatcribed in blocwing transferidual elemenif fitted);

ed field voltagerator no-loatation systemtive ceiling vtation systemative ceiling ver system st

ails of over excribed in blocwing transferidual elemen

ails of under cribed in blocwing transferidual elemenernor paramsystem bloc

transfer func; e mover pa

over system transfer funcand controlle mover pa

over system transfer funcand controll

alination Uned Capacity; ion Unit aux

ransmission C

tion system ck diagram r functions onts (includin

ge; ad field voltam on-load; voltage; m no-load voltage; tabiliser fitted

xcitation limck diagram; r functions onts; excitation lim

ck diagram r functions onts;

meters (All Gck diagram ction of indiv

arameters (Sblock diagra

ction of indivlers;

arameters (Gblock diagra

ction of indivlers;

nit paramete

xiliary Power

Company

Unit

f g

Dia-gram

V age; V

V

V

d? Yes/No

iter

f

Dia-gram

miter

f

Dia-gram

Gensets):

idual Dia-gram

Steam Turbam idual

Dia-gram

Gas Turbineam idual

Dia-gram

ers: MIgp

r; MW

ts Grid Code

-m

PC C

PC CPC CPC C

PC C

PC C

-m

PC C

-m

PC C

-m

PC C

ines Gense-m

PC C

es Genset):-m

PC C

pd

The Grid Cod

B D

U1

+

et):

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 47: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

12. GensDetails reGensets; 12.1 Rate

wee(CDFac

12.2 Rateover(CDFac

12.3 BlocSyn

12.4 RateMW

12.5 Reg12.6 Load

still Sup

NoteAgreestudie

n Electricity Tr

11 f 30

set flexibilitquired with

e of loading ekend (72 hoGenset andility); e of loading rnight (8 houGenset andility); ck load followchronising;e of De-load

W; gulating rangd rejection cSynchronise

pply Load;

: The data ement (to faes).

ransmission C

ty performarespect to

following a our) shut- do Production

following anur) shut- dow Production

wing

ding from Ra

ge; capability whed and able

marked witacilitate an e

Company

Unit

nce:

own MW/Min

n wn

MW/Min

MW

ated MW/MinMW

hile to

MW

th "+" is reqearly assessm

ts Grid Code

/

PC C

/

PC C

PC C

/ PC C

PC C PC C

quired with ment by OE

The Grid Cod

B D

U1

an applicatETC of the n

de - Version 2.

D t T f C

U2 U3

ion for a Ceed for mor

.0

C d V i 2

U4 U

onnection e detailed

0

U5 PF

Page 48: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

ProdThe fDesa

1. 1.1

1.2

1.3

1.4

1.5

1.6

1.7

n Electricity Tr

12 f 30

edule B: G

uction Facifollowing de

alination Unit

Data desc

Steam TuMinimum nsynchronisconditionsHot start; Warm starCold start;

Minimum tsynchronisCDGensetFacility; Minimum bon synchroMaximum from synchfollowing cHot start; Warm starCold start;Maximum rate; Minimum isynchronisCDGensetMaximum OperationaHot; Warm; Cold;

ransmission C

eneration/

ility name: tails are reqt.

cription

rbine Gensnotice requirse under foll;

rt;

time betweesing differents at a Produ

block Load ronising; CDGenset l

hronising unconditions;

rt; CDGenset d

interval betwsing and synt (off Load tiallowable stal Year from

Company

/Operation

quired from e

sets: red to owing

en t uction

requirement

loading ratesnder

de-loading

ween de- nchronising ame); tarts per

m;

al Plannin

each User in

Units

Min Min Min

Min

MW

s Min /MW

MW/ Min

a Min

No. No. No.

The Grid Cod

B D

g data

n respect of

Data category

) OC2 ) SDC1 ) ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1

de - Version 2.

D t T f C

f each CDGe

CDGenseUnit and Facility (PU1

U2

U3

.0

C d V i 2

. enset and

et, DesalinaProductionPF) data

U4

U5

U6

0

tion n

PF

Page 49: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. 2.1

2.2

2.3

2.4

2.5

2.6

2.7

n Electricity Tr

13 f 30

Data desc

Gas TurbiMinimum nsynchronisMinimum tsynchronisCDGensetFacility; Minimum bon synchroMaximum from synchFast start; Slow startMaximum Rate; Minimum isynchronisa Genset; Maximum OperationaHot; Warm; Cold;

ransmission C

cription

ine Gensetsnotice requirse; time betweesing differents at a Produ

block Load ronising; Genset Loa

hronising for

; Genset De-

interval betwsing and Syn

allowable stal Year from

Company

s: red to

en t uction

requirement

ading Rates r;

-loading

ween De-nchronising

tarts per m;

Units

Min

Min

Min

Min /MW Min /MW Min

No. No. No.

The Grid Cod

B D

Data category

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1 ) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 )

de - Version 2.

D t T f C

CDGenseUnit and Facility (PU1

U2

U3

.0

C d V i 2

et, DesalinaProductionPF) data

U4

U5

U6

0

tion n

PF

Page 50: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

Prod

The f

1. Ge1.1

1.2

1.3

1.4

1.5

1.6

n Electricity Tr

14 f 30

edule C: Sc

uction Faci

following det

Data desc

enset DeclaCDGensetUnit AvailaRegisteredStart time; Available wStart Time

CDGensetStart time; End time;

DesalinatioStart time; End time;

CDGensetUnit initial Time requSynchroniTime requMaximum Desalinatioabove decAny changResponseResponse

ransmission C

cheduling

ility name:

tails are requ

cription

ration Avait and/or Desability Noticed Capacity;

water Capace;

t unavailabil

on Unit unav

t and/or Desconditions; ired for Notise; ired for startGeneration on increase clared Availages to Prima and Second characteris

Company

And Desp

uired from e

lability Notisalination e;

city;

ity;

vailability;

salination

ce to

t-up; and/or in output

ability; ary dary tics;

patch data

ach User in

Units

ice; MW MW date/ time m3/h date/ time

date/ time date/ time date/ time date/ time hrs hrs

The Grid Cod

B D

respect of e

Data category

SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1

SDC 1 SDC 1

SDC 1 SDC 1 SDC 1

SDC 1

de - Version 2.

D t T f C

each CDGen

CDGenseUnit an

FaciliU1

U2

U3

.0

C d V i 2

.

nset.

et, Desalinand Productiity (PF) data

U4

U5

U6

0

tion on a PF

Page 51: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. Sc2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8 2.9 2.10

2.11 2.12

2.13

2.14

2.15

n Electricity Tr

15 f 30

Data desc

cheduling ACDGensetStart date; End date; Active Pow

CDGensetHot time inOff-load timDesalinatiointervals; Hot time inOff-load timGenset Deintervals; Desalinatiointervals; CDGensetMinimum GMinimum sDesalinatioMinimum pMaximum Genset twGenset miGenset SyGenerationGenset SyGenset LobreakpointGenset DebreakpointGenset Lothe range GenerationGenset Dethe range to Minimum

ransmission C

cription

And Despatct inflexibility ;

wer;

t synchronisnterval; me interval; on Unit start

nterval; me interval; e-synchronis

on Unit shut

t basic data;Generation; shutdown; on Unit basiproduction; production;

wo shifting liminimum on tiynchronisingn; ynchronisingoading Ratests; e-loading Rats;

oading Ratesfrom Minimun to Availabe-loading Rafrom Availabm Generatio

Company

ch parametedescription;

sing intervals

t-up

sing

tdown

;

c data;

mitation; me;

g

g groups; s with

ates with

s covering um le Capacity;

ates coveringble Capacityon;

Units

ers:

Text date/ time date/ time MW

s; hrs hrs hrs hrs

hrs hrs MW hrs m3/h m3/h hrs MW

MW/ min MW/ min MW/ min

g y

MW/ min

The Grid Cod

B D

Data category

SDC 1 SDC 1 SDC 1

SDC 1 SDC 1 SDC 1 SDC 1

SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1

SDC 1

SDC 1

SDC 1

de - Version 2.

D t T f C

CDGenseUnit an

FaciliU1

U2

U3

.0

C d V i 2

et, Desalinand Productiity (PF) data

U4

U5

U6

0

tion on a PF

Page 52: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

Prod

The f

D

Prog

GDOabwS

Cont

DGuu

Post

DRtC

DRtCd

n Electricity Tr

16 f 30

edule D: G

uction Faci

following det

Data descri

ramming p

Generation SDesalinationOperation ofan hourly anbasis for theweeks aheaSaturday;

trol Phase:

Details of anGeneration Sunder Progrunexpired pa

Control Ph

Details of hoReactive Pothe TransmiCDGensets;

Details of hoReactive Pothe TransmiCDGensets day;

ransmission C

eneration

ility name:

tails are requ

iption

hase:

Schedule ann Schedule ff Production

nd Connectioe period of 1 ad by 10:00 h

ny differenceSchedule su

ramming Phaart of the pe

hase:

ourly Active ower output sssion System;

ourly Active ower output sssion Systemduring the p

Company

Schedule

uired from e

nd for Facility on

on Point to 8

hours each

es to ubmitted ase for the

eriod;

Power and sent out to m by its

Power and sent out to m by its previous

data

ach User in

Units Dc

MW

O

MW

S

S

MW

MVAr

O

MW

MVAr

O

The Grid Cod

B D

respect of e

Data category

OC2

SDC 1

SDC 2

OC1

OC1

de - Version 2.

D t T f C

each CDGen

CDGeProduction

d

U1

U2

U3

U4

.0

C d V i 2

.

nset.

enset and n Facility (Pdata

U4

U5

U6

P

0

PF)

PF

Page 53: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sch

Prod

The f

1. Pr1.1

1.2

1.3

1.4

1.5

1.6

1.7

n Electricity Tr

17 f 30

hedule E: G

uction Faci

following det

Data descr

rovisional OCDGensets

Active Poweresult of OuRemaining Genset; Duration of

Start date astart dates aFlexible OuOutage; Flexible OuPeriod for w

be defedays in

Period for wbe advadays in

OETC issuOutage SchAgreement Outage Sch

ransmission C

Genset Out

ility name:

tails are requ

ription

Outage Progs concerned;

er not Availautage; Active Powe

Outage;

and time or aand times; tage or Infle

tage; which the Ouerred (not lelength);

which the Ouanced (not lelength);

ue Proposehedule to Us

on Proposhedule;

Company

tage data

uired from e

gramme: ;

able as a

er of the

a range of

exible

utage could ess than 30

utage could ess than 10

ed System sers; sed System

ach User in

Units

ID

MW

MW

Weeks

Date hrs Flexible/ Inflexible Days Days

Text

The Grid Cod

B D

respect of e

Time covered Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to Year 2 to

Year 2 to

Year 2 to

de - Version 2.

D t T f C

each CDGen

Update time

3 End of January

3 End of January

3 End of January

3 End of January

3 End of January

3 End of January

3

3

End of January End of January

3 End of July

3 End of Septemb

.0

C d V i 2

.

nset.

Data catego OC2

OC2

OC2

OC2

OC2

OC2

OC2 OC2

OC2

ber OC2

0

ory

Page 54: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. Fi2.1

2.2

2.3

2.4

2.5

2.6

2.7

3. Sh3.1

3.2

3.3

3.4

3.5

n Electricity Tr

18 f 30

nal OutageGensets co

Active Powresult of OuRemaining Genset; Duration of

Start date astart dates aFlexible OuOutage; Flexible OuPeriod for w

be defedays in

Period for wbe advadays in

OETC issuProgrammeOETC isProgramme

hort Term PGensets co

Active Powresult of OuRemaining Genset; Duration of

Start date astart dates a

ransmission C

Programmncerned;

wer not Avautage;

Active Pow

Outage;

and time or and Times; tage or Infle

tage; which the Ouerred (not lelength);

which the Ouanced (not lelength);

ue draft Fine to Users; sue Fina

e to Users; Planned Outncerned;

wer not Avautage;

Active Pow

Outage;

and time or aand times;

Company

me:

ilable as a

wer of the

a range of

exible

utage could ess than 30

utage could ess than 10

nal Outage

l Outage

tage:

ilable as a

wer of the

a range of

MW

MW

Weeks

Date hrs Flexible/ Inflexible Days Days

Text

ID

MW

MW

Weeks

Date hrs

The Grid Cod

B D

Year 2 to

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2 Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 0

Year 0

Year 0

Year 0

Year 0

de - Version 2.

D t T f C

3 End of

January 2 End of

January 2 End of

January 2 End of

January 2 End of

January 2 End of

January

2

2

End of January End of January

2 End of June

2 End of Sept 7 Days before 7 Days before 7 Days before 7 Days before 7 Days before

.0

C d V i 2

OC2

OC2

OC2

OC2

OC2

OC2

OC2 OC2

OC2

OC2

OC2

OC2

OC2

OC2

OC2

0

Page 55: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

The conta

1. Si

2. ReFor athe UFactoCons2.1 2.2 2.3 2.4 2.5

2.6

3. Sw

For discoConnProdu3.1 3.2 3.3

3.4

3.5

n Electricity Tr

19 f 30

edule F: Us

following caining the Co

Data desc

ingle line diSingle linproposed together wparty Emb

eactive comall reactive cUser Systemor correctionsumer Plant,

Type of eqCapacitiveInductive rOperating Details of operating Point of Cof electrica

witchgear:

all switchgonnectors anected to thuction Facilit

Rated voltOperating Rated shoSingle phaThree phaRated loadSingle phaThree phaRated peaSingle phaThree pha

ransmission C

ser System

current and onnection Po

cription

iagram: e diagram

HV equiwith equipmbedded withimpensation compensatio at 11 kV an

n equipment the followin

quipment (e.e rating; rating; range; any automa

characteristonnection toal location a

gear (i.e. nd isolatorse Connectioties; tage; voltage;

ort-circuit brease; ase; d breaking case; ase; ak short-circuase; ase;

Company

m data

forecast doint are requ

showing apment and

ment ratings n its User Syequipment

on equipmennd above, ott associated

ng details; g. fixed or v

atic control ics to be deto the User Snd System v

circuit bres) on all con Point inc

eaking curren

current;

uit making c

details that uired from ea

all existing d Connect and any tystem; t: nt Connectether than Pod directly wit

variable);

logic to enatermined; System in tevoltage;

eakers, swcircuits Direcluding those

nt;

urrent;

The Grid Cod

B D

relate to tach User on

Units

and ions third

Drawi

d to

ower th a

Text MVArMVArMVAr

able Text aDiagra

erms Text

witch ectly e at

kV kV kA kA kA kA kA kA

de - Version 2.

D t T f C

the Connecn its User Sy

Daca

ing PCPC

PCr PCr PCr PCand/or ams

PC

PC

PCPC PCPC PCPC PCPC

.0

C d V i 2

ction Site stem.

ata ategory

C B C C

C B C B C B C B C B

C B

C B C B

C B C B

C B C B

C B C B

0

Page 56: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

4. UsCircuFor aUser detaiPoint4.1 4.2 4.3

4.4

5. In

5.1

5.2

5.3

5.4

5.5

5.6

5.7

n Electricity Tr

20 f 30

Data desc

ser HV Conuit Parameteall Systems a

System to tls are requirt;

Rated voltOperating Positive phResistanceReactanceSusceptanZero phasResistanceReactanceSusceptan

terconnect

For transfoSystem anis requiredRated Pow

Rated volt(i.e. primaWinding a

Vector gro

Positive se@ maximu@ minimu@ nominaPositive se@ maximu@ minimu@ nominaZero phas

ransmission C

cription

nnecting Sysrs (for all cir

at 11 kV andhe Transmisred relating t

tage; voltage;

hase sequene; e; nce; e sequencee; e; nce; ing transfo

ormers betwnd the User Sd; wer;

tage ratio; ry/secondarrrangement;

oup;

equence resum tap; m tap;

al tap; equence reaum tap; m tap;

al tap; e sequence

Company

stem data:rcuits); d above Conssion Systemto that HV C

nce;

;

rmers:

ween the TraSystem, the

ry/tertiary); ;

sistance;

actance;

reactance;

nnecting the m, the followonnection

nsmission following da

The Grid Cod

B D

Units

wing

kV kV % on % on % on % on % on % on

ata

MVA

% on % on % on % on % on % on % on

de - Version 2.

D t T f C

Daca

PCPC

100 100 100

PCPCPC

100 100 100

PCPCPC

PCPCPCPCPCPCPCPC

MVA MVA MVA

PCPCPC

MVA MVA MVA

PCPCPC

MVA PC

.0

C d V i 2

ata ategory

C B C B

C B C B C B

C B C B C B

C B C C C B C C C B C C C B C C

C C C C C C

C C C C C C C C

0

Page 57: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

5.8

5.9

5.10

5.11 6. HV

Followconne6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 7. UsFollowwhichcircui7.1

7.2

7.3

7.4

7.5

n Electricity Tr

21 f 30

Data desc

Tap chang

Tap chang

Tap chang

ImpedanceV motor dri

wing details ected to the

Rated VA;Rated ActiFull Load cMeans of sStarting cuMotor torqDrive torquMotor plus

ser Protectiwing details h can trip, init breaker or

A full descall relays abe installeA full descinstalled otime delayA full descall relays abe installeProductionassociatedFor Gensebreaker atclearance Genset zoThe most electrical fDirectly Co

ransmission C

cription

ger type (e.g

ger range;

ger step size

e value (if noves:

are requiredUser Syste ive Power; current; starting; urrent; que/speed chue/speed chs drive inertiaion data: relates onlyter-trip or clo

r any OETC cription incluand Protectiod on the Use

cription of ann the User S

ys; cription incluand Protectiod on the Ge

n Facility trad connectionet having or t the Genset times for ele

one; probable faufaults on anyonnected to

Company

g. on-load or

e;

ot directly ea

d for each Hm;

haracteristicharacteristicsa constant;

y to protectioose any Concircuit breakding estimaton systems er System;

ny auto-recloSystem, inclu

ding estimaton systems

enset, Gensensformer anns; intended to terminal voectrical fault

ult clearancey part of the the Transm

off-load);

arthed);

HV motor driv

s; s;

on equipmennnection Poiker; ted settings,installed or t

ose facilities uding type a

ted settings,installed or t

et transformend their

have a circultage, s within the

e time for User Systemission Syste

The Grid Cod

B D

Units

On/Of

ve

MVAMW kA TextkA

nt nt

, for to

Text

and Text

, for to er,

Text

uit ms

m em;

ms

de - Version 2.

D t T f C

Daca

ff PCPCPCPCPCPCPC

PCPCPCPCPCPCPCPC

PC

PC

PC

PC

PC

.0

C d V i 2

ata ategory C B C C C B C C C B C C C C

C C C C C C C C C C C C C C C C

C C

C C

C C

C C

C C

0

Page 58: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

8. TrWhensubmfollow8.1

8.2

8.3

8.4

8.5

n Electricity Tr

22 f 30

Data desc

ransient oven requested

mit data withws (undertak

Busbar laygeometry tany assoctransformeinsulators;Physical acables, tracompensabusbar or the purposSpecificatilines and cinsulation Characteribusbar anconnectedThe followtransforme three

to be densit

ransmission C

cription

er-voltage ad by OETC,h respect tking insulatioyout, includintogether wit

ciated curreners, wall bus

and electricaansformers, ator equipmeby lines or cse of calculaion details ocables to thelevels; istics of oved at the term

d at the busbwing Genset er data is reqor five limb specified, anty at nomina

Company

assessment, each Usero the Conn

on co-ordinang dimensioh electrical p

nt transformeshings, and s

l parametersreactors and

ent Connectecables to thaating surge imf connected

e busbar inc

r-voltage promination of libar; or Productioquired; cores or singnd operating

al voltage;

t data: r is requirednection Sitetion studies)ns and parameters oers, voltage support

s of lines, d shunt ed at that

at busbar (fompedances)directly or bluding basic

otection at thnes and cab

on Facility

gle phase ung peak flux

The Grid Cod

B D

Units

d to

e as );

of Diagra

r );

Text

by c

Text

he bles

Text

nits

Text

de - Version 2.

D t T f C

Daca

am PC

PC

PC

PC

PC

.0

C d V i 2

ata ategory

C C

C C

C C

C C

C C

0

Page 59: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The fConn

Data

1 Detahaveabno

2 Senin voTranConPowVolt Freq

3 PhaTranMaxAve

4 MaximpoSyst

5 DetaDemMWCou

n Electricity Tr

23 f 30

edule G: Lo

following infnections for e

a description

ails of individe fluctuatingormal charasitivity of Deoltage and frnsmission Synnection Poinwer); age sensitiv

quency sens

ase unbalancnsmission Syximum; rage;

ximum harmoosed on the tem;

ails of loads mand fluctua

W at a Point oupling;

ransmission C

oad charac

formation is each Conne

n

dual loads wg, pulsing or cteristics;

emand to varequency onystem at thent Demand (

vity;

sitivity;

ce impose oystem;

onic contentTransmissio

which may ations greateof Common

Company

cteristics d

required froection Point;

U

which other

riations n the e peak (Active

MMMM

n the

%%

t on

%

cause er than 1

data

om each Us

Units

MW/kV MVAr/kV MW/Hz MVAr/Hz

% %

%

The Grid Cod

B D

ser regardin

Data f

FY0

FY1

de - Version 2.

D t T f C

ng existing a

for future yea

FY2

FY3

.0

C d V i 2

and future

ars

caFY4

FY5

PC

PC

PC

PC

PC

0

Data

ategory

C B

C B

C B

C B

C B

Page 60: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sch

The fthe T

Data

ForeprofiUserall CLicenConnEmb

00:001:002:003:004:005:006:007:008:009:010:011:012:013:014:015:016:017:018:019:020:021:022:023:0

n Electricity Tr

24 f 30

hedule H: U

following infTransmission

a descriptio

ecast daily Dles in respecr System (suonnection Pnsed Distribunection Poin

bedded Cons

0 – 01:00 0 – 02:00 0 – 03:00 0 – 04:00 0 – 05:00 0 – 06:00 0 – 07:00 0 – 08:00 0 – 09:00 0 – 10:00 0 – 11:00 0 – 12:00 0 – 13:00 0 – 14:00 0 – 15:00 0 – 16:00 0 – 17:00 0 – 18:00 0 – 19:00 0 – 20:00 0 – 21:00: 0 – 22:00 0 – 23:00 0 – 24:00

ransmission C

User Dema

formation is n System wit

on

emand ct of each ummated ovePoints for a utor and at t

nt for Non sumers);

Company

nd profiles

required froth Demand.

FY0

F

er

the

1. DayDemmaxCon

2. Day(MWDem

3. DayDemCon

s and Activ

om each Us

FY1

FY2

F3

y of User mamand (MW) aximum Demanditions; y of peak OEW) at annual mand Condity of minimummand (MW) anditions;

The Grid Cod

B D

ve Energy

ser who is D

Y3

FY4

FY5

ximum at annual and

ETC Demandmaximum

tions; m OETC at Average

de - Version 2.

D t T f C

data

Directly Con

Y5

Updatetime

d

End oJanuary

.0

C d V i 2

nnected to

e Datacategor

of y

PC B OC1

0

ry

Page 61: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The fthe T

Data

1. Foreca

1.1 AnnuDemDem

1.2 Userhour maxiCond

1.3 Userhour avera

2. Deman

Where a UDemandsalternativethe followprovided;

2.1 NamConn

2.2 Dem

2.3 Tranmanu

2.4 Time

n Electricity Tr

25 f 30

edule I: Co

following infTransmission

description

ast Demand

ual peak houand at annuand conditio

r Demand atDemand at mum Dema

ditions;

r Demand atOETC Dem

age conditio

nd Transfer

User Demans may be fede Connectio

wing details s

e of the altenection Poin

and transfer

sfer arrangeual or autom

e to effect tra

ransmission C

onnection P

formation is n System wit

d and Powe

ur User ual maximumons;

t OETC peakannual nd

t minimum mand at ons;

Capability:

nd or group od by n Point(s),

should be

ernative nt(s);

rred;

ement (e.g. matic);

ansfer;

Company

Point data

required froth Demand.

Units

er Factor rel

m MW

Power Factor

k MW

Power Factor

MW

Power Factor

of

MW

MVAr

hours

om each Us

FY0

FY1

lated to eac

The Grid Cod

B D

ser who is D

FY2

FY3

ch Connecti

de - Version 2.

D t T f C

Directly Con

FY4

FY5

U

t

ion Point:

EJ

EJ

EJ

.0

C d V i 2

nnected to

Update

time

Da

ca

End of January

PC

O

End of January

PC

O

End of January

PC

O

PC

PC

PC

PC

0

ata

ategory

C B

C1

C B

C1

C B

C1

C B

C B

C B

C B

Page 62: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The f

1.ProLicenCons

DemaDemahourl

1.1

1.2

2. CDistri

2.1

2.2

3. Po

Demacalenany CConn3.1

3.2

n Electricity Tr

26 f 30

edule J: De

following info

Data descr

ogramming nsed Distribusumers)

and Control and change y and Conne

Demand pro

Duration of Control hrs;

Control Phabutors & Dir

Demand Coresult in a DMW or morehour on anywhich is plahours;

Any changeDemand CoOETC prior

ost Control

and reductiondar day of 1Connection Pnection PointActive Powe

Duration;

ransmission C

emand Con

ormation is r

ription

Phase: (aputors & Direc

which may of 1 MW or

ection Point

ofile MW;

proposed D;

ase: (applicrectly Conne

ontrol which Demand chae averaged y Connectionanned after 1

es to plannedontrol notifier to 10:00 ho

Phase:

on achieved 1 MW or moPoint, on an t basis; er profiles;

Company

ntrol data

required from

U

plicable to ctly Connect

result in a more on anbasis;

W1

Demand W1

cable to Licected Consu

may nge of 1 over any n Point 10:00

M

d d to

ours;

h

on previousre averagedhourly and

M

h

m each User

Units Tco

ted

Weeks to 8

Weeks to 8

censed umers)

MW Now

7 D

hours Now

7 D

s d over

MW PreDay

hours PreDay

The Grid Cod

B D

r;

Time overed

U

10Sa

10Sa

w to

Days

Im

w to

Days

Im

evious y

06Da

evious y

06Da

de - Version 2.

D t T f C

Update time

0:00 aturday

O

0:00 aturday

O

mmediate O

mmediate O

6:00 aily

O

6:00 aily

O

.0

C d V i 2

Data category

OC1

OC1

OC1

OC1

OC1

OC1

0

Page 63: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The TransCDG

ShortConn

Name

Da

1 Sycirc

2 ZeimpfroconinfeReRe

3 Poins

n Electricity Tr

27 f 30

edule K: Fa

following insmission Syenset(s) and

t circuit Infnection Point

e of Connec

ata descripti

mmetrical thcuit current i

At instant After sub-t

current csubstant

ro sequencepedance valm the Connensistent witheed above; sistance (R)actance (X)

sitive sequestance of fau

ransmission C

ault infeed

nformation isystem via d/or motor lo

feed to OEt

ction Point:

ion

hree-phase snfeed; of fault; transient faucontribution tially decayee source ues as seenection Point

h the maximu

); ;

ence X/R ratiult;

Company

d data

s required a Connecti

oads.

TC Transm

:

Units

short

ult has

ed;

kA kA

n

um

% on% on

io at

from each ion Point a

mission Syst

s FY0

n 100 n 100

The Grid Cod

B D

User who and the Us

tem from a

FY1

FY2

de - Version 2.

D t T f C

is Connecteser System

a User Sys

.

FY3

FY4

.0

C d V i 2

ed to the contains

tem at a

FY5

Datacateg

PC B

PC B

PC B

0

a gory

B

B

B

Page 64: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

OETCTrans

Name

1. O 1.1 1.2

2. Ne2.1

2.2

2.2.1

2.2.2

2.2.3

2.2.4

2.2.52.2.63 4.1

4.2

n Electricity Tr

28 f 30

edule L: Da

C will providsmission Sy

e of Connec

Data des

peration DiOETC wilthe currenyears;

TheannTheave

etwork DataTransmiss

Netw

Pos

CDGRela

Followingsource at

Symmetriof fault fro

SymmetriTransmisscontributio

Zero sequConnectio

Pre-fault vwere calc

Positive s Appropria

Names ofProvisionaexpected Years 2 aDraft Finato be withPlanned O

ransmission C

ata supplie

de Users andstem.

ction Point:

cription

agram: ll notify eachnt calendar y

e date and ual maximu

e date and trage conditioa: sion Systemwork topologequipment;

sitive, negativtransformersGenset electay and prote network dathe HV poincal three-ph

om the Transcal three-phsion Systemon has subsuence sourcon Point, convoltage mag

culated; sequence X/ate interconnf Safety Cooal Outage prto be withdr

and 3 for Plaal Outage prodrawn from

Outages;

Company

ed by OETC

d potential U

:

h User no layear and for

time of annm Demand ctime of annons;

m data; includgy and rating

ve and zero s, etc; trical and me

ection data;ta as an equ

nt of Connechase short cismission Sy

hase short cim after the sustantially dece resistancensistent withgnitude at wh

R ratio at thenection transordinators; rogramme srawn from senned Outagogramme shservice duri

C to Users

Users the fo

ater than ther each of the

nual peak oconditions;ual minimum

ding gs of princip

sequence d

echanical pa

uivalent 220ction to the Urcuit current

ystem; rcuit current

ub-transient cayed; e and reactah the maximuhich the max

e instant of fsformer data

howing the Cervice duringes;

howing the Cing each we

The Grid Cod

B D

s

llowing data

e end of Oce following 5

of OETC De

m OETC De

al items of

data of lines,

arameters

kV and 132kUser Systemt infeed at th

t from the fault current

nce values aum infeed beximum fault c

fault PC; ;

CDGensets g each week

CDGensets eek of year 1

de - Version 2.

D t T f C

a related to t

.

ctober, for calendar

emand at

emand at

, cables,

kV m;

he instant

t

at the elow; currents

k of

expected for

.0

C d V i 2

the OETC

Data category OCB

OC1

OC1

PC D

PC D

PC D

PC D

PC D

PC D PC D OC6 OC2

OC2

0

Page 65: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The Mdata

Timinthat c

AbbrMO

PO

1

1.1

1.2

1.3

1.4

1.5

2

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

n Electricity Tr

29 f 30

edule M: M

Metering Rerelating to M

ng: All datcauses a cha

reviations: Meter Ow

Plant Own

Data

Connectiodetails forMetering

Location a

Participant

Site identif

Meter Own

Loss compActual Met

Main and C

Meter seria

Metering in

Meter type

Instrument

Instrument

Test and cresults andand Measu

Asset man

CalibrationMeter insta

ransmission C

Metering Da

egistration SMetering Sys

a shall be sange to the d

wner

ner

on and Meter both DelivPoint:

and referenc

t details at th

fication nom

ner;

pensation catering Point

Check Mete

al numbers;

nstallation id

es and mode

t transforme

t transforme

calibration prd reference urement Tra

nagement pl

n tables, wheallation accu

Company

ata

System formsstems define

submitted prdata.

ering Point very Point a

e details;

he Connecti

menclature;

alculation deand Delivery

r installation

dentification

els;

er serial num

er ratios;

rogramme dtest certifica

ansformers;

an and testi

ere applied turacy;

s the Meteried by the Me

romptly afte

reference and Actual

on Point;

etails where y Point diffe

n details;

name;

mbers;

details; test ates for Mete

ng schedule

to achieve

The Grid Cod

B D

ing databaseetering and D

r Connectio

Respp

PO

PO

PO

PO

r; PO

MO

MO

MO

PO

PO

ers MO

e; MO

MO

de - Version 2.

D t T f C

e and holdsData Exchan

on or any ot

ponsible party c

M

M

M

M

M

M

M

M

M

M

M

M

M

.0

C d V i 2

s Metering nge Code.

ther event

Data category

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

0

Page 66: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 3

2.9

2.10

3

3.1

3.2

3.3

3.4

3.5

4

4.1

4.2

4.3

4.4

n Electricity Tr

30 f 30

Meter sum

Data regis

Data comcommuni

Telephone

Communicnumbers;

Communic

Data conv

User ident

Data validagreed be

Algorithm;

Data comp

Processingphase-ang

Check Me

ransmission C

mmation sche

ster coding d

municationcation syst

e number for

cation equip

cation protoc

version detai

tifications an

dation and setween affec

parison tech

g and alarmgle limits);

tering comp

Company

eme values

details;

n details (whems are us

r access to d

ment type a

col details or

ls;

nd access rig

substitutioncted parties

nique;

s (i.e. voltag

ensation de

and multiplie

hen ed):

data;

nd serial

r references

ghts;

n processess, including

ge source lim

tails;

The Grid Cod

B D

ers; MO

PO

MO

PO

MO

MO

s; MO

MO

MO

s g:

MO

MO

mits, MO

MO

de - Version 2.

D t T f C

M

M

M

M

M

M

M

M

M

M

M

.0

C d V i 2

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

0

Page 67: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

DT

DT

DT

DT

DT

DT

n Electricity Tr

1 f 30

TC.1Introduc

TC.2Objectiv

TC.3Scope .

TC.4Data ca

TC.5Proced

DTC

DTC

DTC

DTC

TC.6Grid Co

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

Sch

ransmission C

D

ction ...........

ve ...............

...................

ategories .....

ures and res

C.5.1. Res

C.5.2. Meth

C.5.3. Cha

C.5.4. Data

ode data exc

edule A: Ge

edule B: Ge

edule C: Sc

edule D: Ge

edule E: Ge

edule F: Use

edule G: Lo

edule H: Us

edule I: Con

edule J: Dem

edule K: Fa

edule L: Dat

edule M: Me

Company

Data Tra

CON

...................

...................

...................

...................

sponsibilities

ponsibility fo

hods of subm

nges to Use

a not supplie

changed bet

enset And De

eneration/Op

heduling An

eneration Sc

enset Outage

er System d

ad characte

ser Demand

nnection Poi

mand Contro

ult infeed da

ta supplied b

etering Data

ansfer C

NTENTS

...................

...................

...................

...................

s .................

or submissio

mitting data

ers' data ......

ed ...............

tween OETC

esalination U

perational Pla

nd Despatch

chedule data

e data .........

data .............

ristics data .

profiles and

nt data .......

ol data ........

ata ..............

by OETC to

..................

The Grid Cod

B D

ode

...................

...................

...................

...................

...................

on and updat

...................

...................

...................

C and Users

Unit technica

anning data

data ...........

a ..................

...................

...................

...................

Active Ener

...................

...................

...................

Users ........

...................

de - Version 2.

D t T f C

Issued A

...................

...................

...................

...................

...................

ting of data .

...................

...................

...................

...................

al data .........

...................

...................

...................

...................

...................

...................

rgy data ......

...................

...................

...................

...................

...................

.0

C d V i 2

April 2010

...................

...................

...................

...................

...................

.............. 3

.............. 3

.............. 3

.............. 3

...................

.............. 7

............ 12

............ 14

............ 16

............ 17

............ 19

............ 23

............ 24

............ 25

............ 26

............ 27

............ 28

............ 29

0

2 2 2 3 3

5

Page 68: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Dat

DTCThe Dby theIn thethe pThe speciupda

DTCThe o

toca

toca

toC

DTCIn ad

P L L D In In P P

n Electricity Tr

2 f 30

ta Trans

C.1 IntroData Transfee Grid Codee event of inrovisions in relevant secifies the proting and rec

C.2 Objeobjectives of

o list and coategory of Uo list requireategory of Uo provide an

Code.

C.3 Scopdition to OE

Power Produicensed Disticensed Sup

Directly Connnternational nternally Inte

PWP; and PAEW.

ransmission C

fer Code

oduction er Code pro

e to provide tconsistencieindividual section of the ocedures, ticording of tem

ective f the DTC ar

ollate all reUser to OETCements in reUser under thn overview o

pe TC, the DTC

cers; tributors; ppliers; nected ConsInterconnec

erconnected

Company

e

ovides a unifto OETC anes between tections of thGrid Code

ming, and rmporary or p

re as follows

quirements C under the espect of alhe Grid Codeof the data

C applies to;

sumers; cted Parties

Parties;

fied listing od that OETCthis DTC ane Grid Code, under whirouting for tpermanent c

s;

in respect Grid Code;l the data toe; and requirement

;

The Grid Cod

B D

of all data thC is requiredd other sect

e shall prevach any itemthe supply

changes to th

of data to b

o be provide

ts of certain

de - Version 2.

D t T f C

at Users ared to provide ttions of the Gail. m of data is

of that datahat data.

be provided

ed by OETC

n sections of

.0

C d V i 2

e required to Users. Grid Code

required, a and the

d by each

C to each

f the Grid

0

Page 69: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 3

DTCThe D

SreT

Dre

Se

ODsuS

MM

DTCDTCUsersthe p

DTCThe dformawith providgiven

Data submbe suor utietc aavailabasis

DTCAll Uregist

DTCUsersindiviby a OETCa Use

n Electricity Tr

3 f 30

C.4 DataDTC groups

Standard Plaequired for

Transmission

Detailed Plaequired of ca

System datanable Users

Operational Despatch Coub-categoris

SDC, and;

Metering anMetering data

C.5 Proc.5.1. Res shall recorovisions of

.5.2. Medata scheduats for submOETC, all dded in acco

n.

submitted mitting each submitted via ilising a datafter obtaininable, subjects may be sub

.5.3. ChUsers must tered with O

.5.4. Das and OETCdual sectionsection of thC will adviseer's Plant in

ransmission C

a categordata into a

anning Datathe purpos

n System;

nning Dataarry out deta

a: is that dats to conduct

data: is datode (SDC) osed accordin

nd Data Exca.

cedures aesponsibilitrd, exchangrelevant sec

ethods of sules to the Dmission of ddata provideordance wit

to OETC schedule of a computer

a transfer mng the prior t to OETC’s bmitted by fa

hanges to Unotify OETC

OETC in acco

ata not supC are obligedns of the Gridhe Grid Code a User in wthe event th

Company

ries number of c

a: is that dase of deter

: is that datailed stability

ta listed in Atheir own st

ta related toof the Grid ng to the rele

change Co

and respoty for subm

ge and recorctions of the

submitting dDTC are stru

ata to OETCed by Usersh the DTC

must includata. The d

r link if such media, such

written consprior agreem

ax.

Users' dataC promptly ordance with

plied d to provide d Code. If a e, OETC shwriting of anyhat a User ha

categories;

ta listed in Armining any

a listed in Ay studies as

Appendix D udies as nec

o Operating Code. Withevant Opera

ode data: is

onsibilitiemission and

rd data liste Grid Code.

data ctured, wheC and from s to OETC a

schedule f

de the namdata is prefea data link eas floppy d

sent from Oment, data to

of any chah the relevan

data as set User fails toall use its by estimated as not provid

The Grid Cod

B D

Appendix B y requireme

Appendix C tnecessary;

to the Planncessary;

Code (OC)in the DTC,ating Code,

s that data

es updating od in the DT

ere possible,OETC to U

and by OETformats whe

me of the rred in electexists betweiskette, magETC. If eleco be provide

ange to an nt section of

out in and ino supply OETest estimatedata it inten

ded the requ

de - Version 2.

D t T f C

to the Plannents to rein

to the Plann

ning Code re

) and Sched, Operationanamely OC

listed in Ap

of data C in accord

to serve asUsers. UnlesTC to Usersere such for

User repretronic formateen a User agnetic tape, ctronic meaned to OETC

item of daf the Grid Co

n accordancTC with data

e of the requnds to use cuired data.

.0

C d V i 2

ning Code nforce the

ning Code

equired to

duling and al Data is 1, OC2 or

ppendix E

ance with

s standard ss agreed s shall be rmats are

esentative t and may

and OETC CD ROM

ns are not on a daily

ata that is ode.

ce with the a required uired data. oncerning

0

Page 70: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 4

If OEwhomprovidadvisbeing

OETCdata Plantappro

Correpost e

n Electricity Tr

4 f 30

ETC fails to m that data ded by OET

se OETC in wg supplied.

C and User supplied pre

t or upon sucopriate.

ections to esevent, where

ransmission C

provide datought to ha

TC when, inwriting of an

estimates oeviously for ch other info

stimates of e the data a

Company

ta required ave been sun that User'sy estimated

of data not the same P

ormation as

data not suffects Opera

by a sectioupplied will s view, it is

data it inten

supplied wiPlant or upoOETC or a U

upplied shallating Parame

The Grid Cod

B D

n of the Gruse an estinecessary t

nds to use in

ill, in each con corresponUser, as the

be made beters,

de - Version 2.

D t T f C

rid Code, thmate of theto do so. An the event o

case, be banding data f

e case may b

by OETC or

.0

C d V i 2

e User to e data not A User will of data not

ased upon for similar be, deems

r the User

0

Page 71: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 5

DTCTableSche

Table

Sche

A

B

C

D

E

F

G

H

I

J

K

L

M

n Electricity Tr

5 f 30

C.6 Gride 6.1 provideedule, PWP i

e 6.1:

edule Data

A GensDesatechn

B GenePlann

C ScheDesp

D Genedata.

E GensDesaOuta

F User

G Loaddata

H User& Ac

Conn

J Dem

K Fault

L OET

M Mete

ransmission C

d Code daes details ofis the recipie

a type

set And alination Unit nical data.

eration/Operaning data.

eduling And patch data.

eration Sched.

set and alination Unit age data

r System data

d characteristi

r Demand proctive Energy d

nection Point

and Control d

t infeed data.

C data to Use

ering data

Company

ata exchaf Schedules ent of the da

Com

GensProdOpe

ational GensrequPlan

Opefor S

dule Dataof th

Gensequidata

a. ElecPlanTran

ics The Loadconte

ofiles data. Data

data. DataDem

data. Data

DatacontTran

ers All re

All re

anged betA to N of th

ata in Schedu

mprising

set, Desalinaduction Facilitrating Parame

set Operatingired for Operaning.

rating ParameScheduling an

a required for e Generation

set and Produpment Outag.

trical paramet Connected

nsmission Sys

estimated pads in respect oent, sensitivit

a related to De

a related to Demand transfer

a related Dem

a related to shribution to OE

nsmission Sys

elevant data

elevant data

The Grid Cod

B D

tween OEhe DTC. OEules A to E a

tion Unit and y fixed eters.

g Parameters ational

eters requirednd Despatch.

the preparati Schedule.

uction Facilitye planning

eters relating tto OETC

stem

arameters of of harmonic y etc.

emand profile

emand and capability.

mand Control.

hort circuit ETC stem.

de - Version 2.

D t T f C

ETC and ETC is a partand G and I

User

PP

PP

d PP

on PP

y PP

to PP, LDDCCOCP

LD, DCOCP

es. LD, DCOCP

PP, LDDCCOCP

LD, LSDCCOCP

LD, DCOCP

PP, LDDCCOCP

PP, LDDCCOCP

.0

C d V i 2

Users ty to each

r Grid Cosectio

PCSDC

OC 2SDC

SDC

OC 1 &SDC1

OC 2

D, ,

P PC

CC, P PC

CC, P

PCOC1

D, ,

P

PCOC

S, ,

P OC

CC, P PC

D, ,

P

PCOC1, 2

D, ,

P MDE

0

ode on

C1

2 C1

C1

& 2 & 2

2

1

1

1

& 6

EC

Page 72: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 6

Key

PWP

PP

LD

LS

DCC

OCP

Abbr MDEOC PC BPC CPC DSDC

Note

1

n Electricity Tr

6 f 30

to Users

User

P Power a

Power P

Licensed

Licensed

C Directly

P Other CSystem

reviations u

C M Op

B PlC PlD Pl

Sc

s:

The dAgreemore

ransmission C

and Water Pr

Producers wi

d Distributor

d Suppliers

Connected C

Connected Pexcluding P

used in all s

etering and perating Codanning Codeanning Codeanning Codecheduling an

data marked ement (to fadetailed stud

Company

rocurer

ith Generatin

rs

Consumers

Parties: UseP, LD, LS, a

schedules:

Data Exchades e - Appendixe - Appendixe - Appendixnd Dispatch

with "+" is racilitate an edies).

ng and Desa

ers Connecand DCC

nge Code

x B Standardx C Detailedx D System Codes

required withearly assess

The Grid Cod

B D

alination Pla

cted to the

d Planning Dd Planning DData

h an applicasment by O

de - Version 2.

D t T f C

nt

Transmiss

Data Data

ation for a COETC of the

.0

C d V i 2

ion

onnection e need for

0

Page 73: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 7

Sche

The CDGSyste

Prod

Ref. Da

1. ProdDemand athrough Tsupplied t1.1 1 Maxi

occu1.2 2 Dem

OET1.3 3 Dem

OET2. CDG

Demand stransformRated MW

Provi(in te

Unit 1

Unit 2

etc

n Electricity Tr

7 f 30

edule A: G

following densets, Direem and/or w

uction Faci

ata descripti

uction Faciassociated w

Transmissionthrough Genmum Demr; and at theC Demand; and at the C Demand; enset Dema

supplied throer when CD

W output

de details ofrms of geog

1

2

ransmission C

enset And

details are ectly Conne

with existing,

ility name:

ion

ility Demanwith the Prodn System ornset unit tran

mand that

e time of

time of min

and

ough unit DGenset is a

f point of Cographical and

Company

d Desalinat

required frocted, or to or proposed

Unit

d: duction Facr in additionnsformer; could MW

Mvapeak MW

Mvaimum MW

MvaUnit

t MWMva

onnection to d electrical lo

tion Unit te

om each Ube Directly

d Embedded

ts Grid Code

ility supplied to Demand

ar

PC C+

ar

PC C

ar

PC C

s Grid Code

ar

PC C+

the Transmocation and

The Grid Cod

B D

echnical da

User with eConnected,

d CDGensets

Genset/

FY0 FY

d d

+

U1 U2

+

ission SysteSystem volt

de - Version 2.

D t T f C

ata

existing or to the Trans.

DesalinatioFacility (

Y1 FY2

2 U3

em of each Ctage) (PC B

.0

C d V i 2

proposed nsmission

.

on Unit/ ProPF) data

FY3 FY

U4 U5

CDGenset B +}

0

oduction

4 FY5

PF

Page 74: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 8

3. CDGGeneral 3.1 2 Type

TurbGens

3.2 1 Rate3.3 4 Regi

3.4 8 Rate

3.5 9 Rate

3.6 5 SysteEmb

3.7 7 Minim3.8 6 Activ

of Re3.9 3 Expe3.10 Gene

stato3.11 Shor

3.12 Gens(alter

3.13 Rateand Mterm

3.14 Fieldsatur120%110%100%90% 80% 70% 60% 50%

4. Impe4.1 1 Direc

react4.2 2 Direc

4.3 3 Direcreact

n Electricity Tr

8 f 30

enset perfo

e of CDGensine Genset, set, Cogene

ed terminal vstered Capa

ed Active Pow

ed VA;

em constrainedded CDGmum Generave Power obtegistered Caected runninerator Perforor terminals; rt circuit ratio

set inertia cornator plus p

ed field curreMvar output inal voltage;

d current operation curve % rated term% rated term% rated term

rated terminrated terminrated terminrated terminrated termin

edances ct axis synchtance; ct axis transi

ct axis sub-trtance;

ransmission C

ormance an

set (e.g. SteaGas Turbineration, etc);

voltage; acity;

wer;

ned CapacitGensets only

ation; tained in exc

apacity; g regime(s);rmance Cha

o;

onstant; prime moverent at rated M

and at rated

en circuit test certifica

minal voltageminal voltageminal voltagenal voltage; nal voltage; nal voltage; nal voltage; nal voltage;

hronous

ient reactanc

ransient;

Company

Unit

d paramete

am e

kV MW

MW

MVA

y (for );

MW

MWcess MW

; art at Cha

r); MWMVA

MW d

A

ate); ; ; ;

A A A A A A A A A % MVA

ce; % MVA% MVA

ts Grid Code

ers: PC C

PC B PC B

SDC 1 PC

B/C+ A PC B/

C + PC B

PC B/C PC B

PC B art

PC B/C+

s/ A

PC B

PC C

PC C

on

A PC C

on A

PC B

on A

PC C

The Grid Cod

B D

U1

+

C

+

+

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 75: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 9

4.4 4 Quadreact

4.5 5 Quadreact

4.6 6 Stato

4.7 7 Armaresis

5. Time5.1 1 Direc

time 5.2 2 Direc

trans5.3 3 Quad

trans5.4 4 Stato6. Gene6.1 1 Rate6.2 2 Rate6.3 3 Wind6.4 4 Vecto6.5 5 Posit

6.6 6 Posit

6.7 7 Zero

6.8 8 Tap c6.9 9 Tap c6.10 Tap c

(i.e. o7. Excit7.1 1 Excit

static

n Electricity Tr

9 f 30

drature axis tance; drature axis tance; or leakage re

ature windinstance; e constantsct axis short-constant;

ct axis short-sient time codrature axis sient time coor time consterator transed VA; ed voltage rading arrangeor group; tive sequenc

- @ - @ - @

tive sequenc- @ - @ - @

phase sequ

changer ranchanger stechanger typon-load or otation contrter category c);

ransmission C

synchronou

sub-transien

eactance;

g direct-curr

: -circuit trans

-circuit sub-onstant;

short-circuitonstant; tant;

sformer:

atio; ement;

ce resistance@ maximum

@ minimum t

@ nominal ta

ce reactance@ maximum

@ minimum t

@ nominal ta

uence reacta

nge; p size; e; ff-circuit);

rol system p(e.g. rotatin

Company

Unit

us % MVA

nt % MVA% MVA

rent % MVA

sient s

s

t sub- s

s

MVA

e; tap;

ap;

p;

% MVA% MVA% MVA

e; tap;

ap;

p;

% MVA% MVA% MVA

ance; % MVA±%±%On/Off

parametersg or Text

ts Grid Code

on A

PC C

on A

PC C

on A

PC C

on A

PC C

PC C

PC C

PC C

PC C

A PC B PC C+PC CPC C

on A on

A on

A

PC B/ PC C PC B/

on A on

A on

A

PC B/C+ PC C PC B/C+

on A

PC C

PC CPC CPC C

: t PC C

The Grid Cod

B D

U1

+ +

/C

/C

+

+

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 76: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

7.2 2 DetadescshowindivPSS

7.3 3 Rate7.4 4 Gene7.5 5 Excit

posit7.6 6 Excit

nega7.7 7 Powe

7.8 8 Detadescshowindiv

7.9 9 Detadescshowindiv

8. GoveGovernor showing telements;9. PrimPrime moshowing telements 10. PrimPrime moshowing telements 11. DesaRegistereDesalinat

n Electricity Tr

10 f 30

ails of excitatcribed in blocwing transferidual elemenif fitted);

ed field voltagerator no-loatation systemtive ceiling vtation systemative ceiling ver system st

ails of over excribed in blocwing transferidual elemen

ails of under cribed in blocwing transferidual elemenernor paramsystem bloc

transfer func; e mover pa

over system transfer funcand controlle mover pa

over system transfer funcand controll

alination Uned Capacity; ion Unit aux

ransmission C

tion system ck diagram r functions onts (includin

ge; ad field voltam on-load; voltage; m no-load voltage; tabiliser fitted

xcitation limck diagram; r functions onts; excitation lim

ck diagram r functions onts;

meters (All Gck diagram ction of indiv

arameters (Sblock diagra

ction of indivlers;

arameters (Gblock diagra

ction of indivlers;

nit paramete

xiliary Power

Company

Unit

f g

Dia-gram

V age; V

V

V

d? Yes/No

iter

f

Dia-gram

miter

f

Dia-gram

Gensets):

idual Dia-gram

Steam Turbam idual

Dia-gram

Gas Turbineam idual

Dia-gram

ers: MIgp

r; MW

ts Grid Code

-m

PC C

PC CPC CPC C

PC C

PC C

-m

PC C

-m

PC C

-m

PC C

ines Gense-m

PC C

es Genset):-m

PC C

pd

The Grid Cod

B D

U1

+

et):

de - Version 2.

D t T f C

U2 U3

.0

C d V i 2

U4 U

0

U5 PF

Page 77: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

12. GensDetails reGensets; 12.1 Rate

wee(CDFac

12.2 Rateover(CDFac

12.3 BlocSyn

12.4 RateMW

12.5 Reg12.6 Load

still Sup

NoteAgreestudie

n Electricity Tr

11 f 30

set flexibilitquired with

e of loading ekend (72 hoGenset andility); e of loading rnight (8 houGenset andility); ck load followchronising;e of De-load

W; gulating rangd rejection cSynchronise

pply Load;

: The data ement (to faes).

ransmission C

ty performarespect to

following a our) shut- do Production

following anur) shut- dow Production

wing

ding from Ra

ge; capability whed and able

marked witacilitate an e

Company

Unit

nce:

own MW/Min

n wn

MW/Min

MW

ated MW/MinMW

hile to

MW

th "+" is reqearly assessm

ts Grid Code

/

PC C

/

PC C

PC C

/ PC C

PC C PC C

quired with ment by OE

The Grid Cod

B D

U1

an applicatETC of the n

de - Version 2.

D t T f C

U2 U3

ion for a Ceed for mor

.0

C d V i 2

U4 U

onnection e detailed

0

U5 PF

Page 78: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

ProdThe fDesa

1. 1.1

1.2

1.3

1.4

1.5

1.6

1.7

n Electricity Tr

12 f 30

edule B: G

uction Facifollowing de

alination Unit

Data desc

Steam TuMinimum nsynchronisconditionsHot start; Warm starCold start;

Minimum tsynchronisCDGensetFacility; Minimum bon synchroMaximum from synchfollowing cHot start; Warm starCold start;Maximum rate; Minimum isynchronisCDGensetMaximum OperationaHot; Warm; Cold;

ransmission C

eneration/

ility name: tails are reqt.

cription

rbine Gensnotice requirse under foll;

rt;

time betweesing differents at a Produ

block Load ronising; CDGenset l

hronising unconditions;

rt; CDGenset d

interval betwsing and synt (off Load tiallowable stal Year from

Company

/Operation

quired from e

sets: red to owing

en t uction

requirement

loading ratesnder

de-loading

ween de- nchronising ame); tarts per

m;

al Plannin

each User in

Units

Min Min Min

Min

MW

s Min /MW

MW/ Min

a Min

No. No. No.

The Grid Cod

B D

g data

n respect of

Data category

) OC2 ) SDC1 ) ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1

de - Version 2.

D t T f C

f each CDGe

CDGenseUnit and Facility (PU1

U2

U3

.0

C d V i 2

. enset and

et, DesalinaProductionPF) data

U4

U5

U6

0

tion n

PF

Page 79: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. 2.1

2.2

2.3

2.4

2.5

2.6

2.7

n Electricity Tr

13 f 30

Data desc

Gas TurbiMinimum nsynchronisMinimum tsynchronisCDGensetFacility; Minimum bon synchroMaximum from synchFast start; Slow startMaximum Rate; Minimum isynchronisa Genset; Maximum OperationaHot; Warm; Cold;

ransmission C

cription

ine Gensetsnotice requirse; time betweesing differents at a Produ

block Load ronising; Genset Loa

hronising for

; Genset De-

interval betwsing and Syn

allowable stal Year from

Company

s: red to

en t uction

requirement

ading Rates r;

-loading

ween De-nchronising

tarts per m;

Units

Min

Min

Min

Min /MW Min /MW Min

No. No. No.

The Grid Cod

B D

Data category

) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 ) OC2 ) SDC1 ) OC2 ) SDC1 ) OC2 ) SDC1

) OC2 ) SDC1 )

de - Version 2.

D t T f C

CDGenseUnit and Facility (PU1

U2

U3

.0

C d V i 2

et, DesalinaProductionPF) data

U4

U5

U6

0

tion n

PF

Page 80: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

Prod

The f

1. Ge1.1

1.2

1.3

1.4

1.5

1.6

n Electricity Tr

14 f 30

edule C: Sc

uction Faci

following det

Data desc

enset DeclaCDGensetUnit AvailaRegisteredStart time; Available wStart Time

CDGensetStart time; End time;

DesalinatioStart time; End time;

CDGensetUnit initial Time requSynchroniTime requMaximum Desalinatioabove decAny changResponseResponse

ransmission C

cheduling

ility name:

tails are requ

cription

ration Avait and/or Desability Noticed Capacity;

water Capace;

t unavailabil

on Unit unav

t and/or Desconditions; ired for Notise; ired for startGeneration on increase clared Availages to Prima and Second characteris

Company

And Desp

uired from e

lability Notisalination e;

city;

ity;

vailability;

salination

ce to

t-up; and/or in output

ability; ary dary tics;

patch data

ach User in

Units

ice; MW MW date/ time m3/h date/ time

date/ time date/ time date/ time date/ time hrs hrs

The Grid Cod

B D

respect of e

Data category

SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1

SDC 1 SDC 1

SDC 1 SDC 1 SDC 1

SDC 1

de - Version 2.

D t T f C

each CDGen

CDGenseUnit an

FaciliU1

U2

U3

.0

C d V i 2

.

nset.

et, Desalinand Productiity (PF) data

U4

U5

U6

0

tion on a PF

Page 81: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. Sc2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8 2.9 2.10

2.11 2.12

2.13

2.14

2.15

n Electricity Tr

15 f 30

Data desc

cheduling ACDGensetStart date; End date; Active Pow

CDGensetHot time inOff-load timDesalinatiointervals; Hot time inOff-load timGenset Deintervals; Desalinatiointervals; CDGensetMinimum GMinimum sDesalinatioMinimum pMaximum Genset twGenset miGenset SyGenerationGenset SyGenset LobreakpointGenset DebreakpointGenset Lothe range GenerationGenset Dethe range to Minimum

ransmission C

cription

And Despatct inflexibility ;

wer;

t synchronisnterval; me interval; on Unit start

nterval; me interval; e-synchronis

on Unit shut

t basic data;Generation; shutdown; on Unit basiproduction; production;

wo shifting liminimum on tiynchronisingn; ynchronisingoading Ratests; e-loading Rats;

oading Ratesfrom Minimun to Availabe-loading Rafrom Availabm Generatio

Company

ch parametedescription;

sing intervals

t-up

sing

tdown

;

c data;

mitation; me;

g

g groups; s with

ates with

s covering um le Capacity;

ates coveringble Capacityon;

Units

ers:

Text date/ time date/ time MW

s; hrs hrs hrs hrs

hrs hrs MW hrs m3/h m3/h hrs MW

MW/ min MW/ min MW/ min

g y

MW/ min

The Grid Cod

B D

Data category

SDC 1 SDC 1 SDC 1

SDC 1 SDC 1 SDC 1 SDC 1

SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1 SDC 1

SDC 1

SDC 1

SDC 1

de - Version 2.

D t T f C

CDGenseUnit an

FaciliU1

U2

U3

.0

C d V i 2

et, Desalinand Productiity (PF) data

U4

U5

U6

0

tion on a PF

Page 82: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

Prod

The f

D

Prog

GDOabwS

Cont

DGuu

Post

DRtC

DRtCd

n Electricity Tr

16 f 30

edule D: G

uction Faci

following det

Data descri

ramming p

Generation SDesalinationOperation ofan hourly anbasis for theweeks aheaSaturday;

trol Phase:

Details of anGeneration Sunder Progrunexpired pa

Control Ph

Details of hoReactive Pothe TransmiCDGensets;

Details of hoReactive Pothe TransmiCDGensets day;

ransmission C

eneration

ility name:

tails are requ

iption

hase:

Schedule ann Schedule ff Production

nd Connectioe period of 1 ad by 10:00 h

ny differenceSchedule su

ramming Phaart of the pe

hase:

ourly Active ower output sssion System;

ourly Active ower output sssion Systemduring the p

Company

Schedule

uired from e

nd for Facility on

on Point to 8

hours each

es to ubmitted ase for the

eriod;

Power and sent out to m by its

Power and sent out to m by its previous

data

ach User in

Units Dc

MW

O

MW

S

S

MW

MVAr

O

MW

MVAr

O

The Grid Cod

B D

respect of e

Data category

OC2

SDC 1

SDC 2

OC1

OC1

de - Version 2.

D t T f C

each CDGen

CDGeProduction

d

U1

U2

U3

U4

.0

C d V i 2

.

nset.

enset and n Facility (Pdata

U4

U5

U6

P

0

PF)

PF

Page 83: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sch

Prod

The f

1. Pr1.1

1.2

1.3

1.4

1.5

1.6

1.7

n Electricity Tr

17 f 30

hedule E: G

uction Faci

following det

Data descr

rovisional OCDGensets

Active Poweresult of OuRemaining Genset; Duration of

Start date astart dates aFlexible OuOutage; Flexible OuPeriod for w

be defedays in

Period for wbe advadays in

OETC issuOutage SchAgreement Outage Sch

ransmission C

Genset Out

ility name:

tails are requ

ription

Outage Progs concerned;

er not Availautage; Active Powe

Outage;

and time or aand times; tage or Infle

tage; which the Ouerred (not lelength);

which the Ouanced (not lelength);

ue Proposehedule to Us

on Proposhedule;

Company

tage data

uired from e

gramme: ;

able as a

er of the

a range of

exible

utage could ess than 30

utage could ess than 10

ed System sers; sed System

ach User in

Units

ID

MW

MW

Weeks

Date hrs Flexible/ Inflexible Days Days

Text

The Grid Cod

B D

respect of e

Time covered Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to

Year 2 to Year 2 to

Year 2 to

Year 2 to

de - Version 2.

D t T f C

each CDGen

Update time

3 End of January

3 End of January

3 End of January

3 End of January

3 End of January

3 End of January

3

3

End of January End of January

3 End of July

3 End of Septemb

.0

C d V i 2

.

nset.

Data catego OC2

OC2

OC2

OC2

OC2

OC2

OC2 OC2

OC2

ber OC2

0

ory

Page 84: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

2. Fi2.1

2.2

2.3

2.4

2.5

2.6

2.7

3. Sh3.1

3.2

3.3

3.4

3.5

n Electricity Tr

18 f 30

nal OutageGensets co

Active Powresult of OuRemaining Genset; Duration of

Start date astart dates aFlexible OuOutage; Flexible OuPeriod for w

be defedays in

Period for wbe advadays in

OETC issuProgrammeOETC isProgramme

hort Term PGensets co

Active Powresult of OuRemaining Genset; Duration of

Start date astart dates a

ransmission C

Programmncerned;

wer not Avautage;

Active Pow

Outage;

and time or and Times; tage or Infle

tage; which the Ouerred (not lelength);

which the Ouanced (not lelength);

ue draft Fine to Users; sue Fina

e to Users; Planned Outncerned;

wer not Avautage;

Active Pow

Outage;

and time or aand times;

Company

me:

ilable as a

wer of the

a range of

exible

utage could ess than 30

utage could ess than 10

nal Outage

l Outage

tage:

ilable as a

wer of the

a range of

MW

MW

Weeks

Date hrs Flexible/ Inflexible Days Days

Text

ID

MW

MW

Weeks

Date hrs

The Grid Cod

B D

Year 2 to

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 1 to 2 Year 1 to 2

Year 1 to 2

Year 1 to 2

Year 0

Year 0

Year 0

Year 0

Year 0

de - Version 2.

D t T f C

3 End of

January 2 End of

January 2 End of

January 2 End of

January 2 End of

January 2 End of

January

2

2

End of January End of January

2 End of June

2 End of Sept 7 Days before 7 Days before 7 Days before 7 Days before 7 Days before

.0

C d V i 2

OC2

OC2

OC2

OC2

OC2

OC2

OC2 OC2

OC2

OC2

OC2

OC2

OC2

OC2

OC2

0

Page 85: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Sche

The conta

1. Si

2. ReFor athe UFactoCons2.1 2.2 2.3 2.4 2.5

2.6

3. Sw

For discoConnProdu3.1 3.2 3.3

3.4

3.5

n Electricity Tr

19 f 30

edule F: Us

following caining the Co

Data desc

ingle line diSingle linproposed together wparty Emb

eactive comall reactive cUser Systemor correctionsumer Plant,

Type of eqCapacitiveInductive rOperating Details of operating Point of Cof electrica

witchgear:

all switchgonnectors anected to thuction Facilit

Rated voltOperating Rated shoSingle phaThree phaRated loadSingle phaThree phaRated peaSingle phaThree pha

ransmission C

ser System

current and onnection Po

cription

iagram: e diagram

HV equiwith equipmbedded withimpensation compensatio at 11 kV an

n equipment the followin

quipment (e.e rating; rating; range; any automa

characteristonnection toal location a

gear (i.e. nd isolatorse Connectioties; tage; voltage;

ort-circuit brease; ase; d breaking case; ase; ak short-circuase; ase;

Company

m data

forecast doint are requ

showing apment and

ment ratings n its User Syequipment

on equipmennd above, ott associated

ng details; g. fixed or v

atic control ics to be deto the User Snd System v

circuit bres) on all con Point inc

eaking curren

current;

uit making c

details that uired from ea

all existing d Connect and any tystem; t: nt Connectether than Pod directly wit

variable);

logic to enatermined; System in tevoltage;

eakers, swcircuits Direcluding those

nt;

urrent;

The Grid Cod

B D

relate to tach User on

Units

and ions third

Drawi

d to

ower th a

Text MVArMVArMVAr

able Text aDiagra

erms Text

witch ectly e at

kV kV kA kA kA kA kA kA

de - Version 2.

D t T f C

the Connecn its User Sy

Daca

ing PCPC

PCr PCr PCr PCand/or ams

PC

PC

PCPC PCPC PCPC PCPC

.0

C d V i 2

ction Site stem.

ata ategory

C B C C

C B C B C B C B C B

C B

C B C B

C B C B

C B C B

C B C B

0

Page 86: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

4. UsCircuFor aUser detaiPoint4.1 4.2 4.3

4.4

5. In

5.1

5.2

5.3

5.4

5.5

5.6

5.7

n Electricity Tr

20 f 30

Data desc

ser HV Conuit Parameteall Systems a

System to tls are requirt;

Rated voltOperating Positive phResistanceReactanceSusceptanZero phasResistanceReactanceSusceptan

terconnect

For transfoSystem anis requiredRated Pow

Rated volt(i.e. primaWinding a

Vector gro

Positive se@ maximu@ minimu@ nominaPositive se@ maximu@ minimu@ nominaZero phas

ransmission C

cription

nnecting Sysrs (for all cir

at 11 kV andhe Transmisred relating t

tage; voltage;

hase sequene; e; nce; e sequencee; e; nce; ing transfo

ormers betwnd the User Sd; wer;

tage ratio; ry/secondarrrangement;

oup;

equence resum tap; m tap;

al tap; equence reaum tap; m tap;

al tap; e sequence

Company

stem data:rcuits); d above Conssion Systemto that HV C

nce;

;

rmers:

ween the TraSystem, the

ry/tertiary); ;

sistance;

actance;

reactance;

nnecting the m, the followonnection

nsmission following da

The Grid Cod

B D

Units

wing

kV kV % on % on % on % on % on % on

ata

MVA

% on % on % on % on % on % on % on

de - Version 2.

D t T f C

Daca

PCPC

100 100 100

PCPCPC

100 100 100

PCPCPC

PCPCPCPCPCPCPCPC

MVA MVA MVA

PCPCPC

MVA MVA MVA

PCPCPC

MVA PC

.0

C d V i 2

ata ategory

C B C B

C B C B C B

C B C B C B

C B C C C B C C C B C C C B C C

C C C C C C

C C C C C C C C

0

Page 87: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

5.8

5.9

5.10

5.11 6. HV

Followconne6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 7. UsFollowwhichcircui7.1

7.2

7.3

7.4

7.5

n Electricity Tr

21 f 30

Data desc

Tap chang

Tap chang

Tap chang

ImpedanceV motor dri

wing details ected to the

Rated VA;Rated ActiFull Load cMeans of sStarting cuMotor torqDrive torquMotor plus

ser Protectiwing details h can trip, init breaker or

A full descall relays abe installeA full descinstalled otime delayA full descall relays abe installeProductionassociatedFor Gensebreaker atclearance Genset zoThe most electrical fDirectly Co

ransmission C

cription

ger type (e.g

ger range;

ger step size

e value (if noves:

are requiredUser Syste ive Power; current; starting; urrent; que/speed chue/speed chs drive inertiaion data: relates onlyter-trip or clo

r any OETC cription incluand Protectiod on the Use

cription of ann the User S

ys; cription incluand Protectiod on the Ge

n Facility trad connectionet having or t the Genset times for ele

one; probable faufaults on anyonnected to

Company

g. on-load or

e;

ot directly ea

d for each Hm;

haracteristicharacteristicsa constant;

y to protectioose any Concircuit breakding estimaton systems er System;

ny auto-recloSystem, inclu

ding estimaton systems

enset, Gensensformer anns; intended to terminal voectrical fault

ult clearancey part of the the Transm

off-load);

arthed);

HV motor driv

s; s;

on equipmennnection Poiker; ted settings,installed or t

ose facilities uding type a

ted settings,installed or t

et transformend their

have a circultage, s within the

e time for User Systemission Syste

The Grid Cod

B D

Units

On/Of

ve

MVAMW kA TextkA

nt nt

, for to

Text

and Text

, for to er,

Text

uit ms

m em;

ms

de - Version 2.

D t T f C

Daca

ff PCPCPCPCPCPCPC

PCPCPCPCPCPCPCPC

PC

PC

PC

PC

PC

.0

C d V i 2

ata ategory C B C C C B C C C B C C C C

C C C C C C C C C C C C C C C C

C C

C C

C C

C C

C C

0

Page 88: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

8. TrWhensubmfollow8.1

8.2

8.3

8.4

8.5

n Electricity Tr

22 f 30

Data desc

ransient oven requested

mit data withws (undertak

Busbar laygeometry tany assoctransformeinsulators;Physical acables, tracompensabusbar or the purposSpecificatilines and cinsulation Characteribusbar anconnectedThe followtransforme three

to be densit

ransmission C

cription

er-voltage ad by OETC,h respect tking insulatioyout, includintogether wit

ciated curreners, wall bus

and electricaansformers, ator equipmeby lines or cse of calculaion details ocables to thelevels; istics of oved at the term

d at the busbwing Genset er data is reqor five limb specified, anty at nomina

Company

assessment, each Usero the Conn

on co-ordinang dimensioh electrical p

nt transformeshings, and s

l parametersreactors and

ent Connectecables to thaating surge imf connected

e busbar inc

r-voltage promination of libar; or Productioquired; cores or singnd operating

al voltage;

t data: r is requirednection Sitetion studies)ns and parameters oers, voltage support

s of lines, d shunt ed at that

at busbar (fompedances)directly or bluding basic

otection at thnes and cab

on Facility

gle phase ung peak flux

The Grid Cod

B D

Units

d to

e as );

of Diagra

r );

Text

by c

Text

he bles

Text

nits

Text

de - Version 2.

D t T f C

Daca

am PC

PC

PC

PC

PC

.0

C d V i 2

ata ategory

C C

C C

C C

C C

C C

0

Page 89: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The fConn

Data

1 Detahaveabno

2 Senin voTranConPowVolt Freq

3 PhaTranMaxAve

4 MaximpoSyst

5 DetaDemMWCou

n Electricity Tr

23 f 30

edule G: Lo

following infnections for e

a description

ails of individe fluctuatingormal charasitivity of Deoltage and frnsmission Synnection Poinwer); age sensitiv

quency sens

ase unbalancnsmission Syximum; rage;

ximum harmoosed on the tem;

ails of loads mand fluctua

W at a Point oupling;

ransmission C

oad charac

formation is each Conne

n

dual loads wg, pulsing or cteristics;

emand to varequency onystem at thent Demand (

vity;

sitivity;

ce impose oystem;

onic contentTransmissio

which may ations greateof Common

Company

cteristics d

required froection Point;

U

which other

riations n the e peak (Active

MMMM

n the

%%

t on

%

cause er than 1

data

om each Us

Units

MW/kV MVAr/kV MW/Hz MVAr/Hz

% %

%

The Grid Cod

B D

ser regardin

Data f

FY0

FY1

de - Version 2.

D t T f C

ng existing a

for future yea

FY2

FY3

.0

C d V i 2

and future

ars

caFY4

FY5

PC

PC

PC

PC

PC

0

Data

ategory

C B

C B

C B

C B

C B

Page 90: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sch

The fthe T

Data

ForeprofiUserall CLicenConnEmb

00:001:002:003:004:005:006:007:008:009:010:011:012:013:014:015:016:017:018:019:020:021:022:023:0

n Electricity Tr

24 f 30

hedule H: U

following infTransmission

a descriptio

ecast daily Dles in respecr System (suonnection Pnsed Distribunection Poin

bedded Cons

0 – 01:00 0 – 02:00 0 – 03:00 0 – 04:00 0 – 05:00 0 – 06:00 0 – 07:00 0 – 08:00 0 – 09:00 0 – 10:00 0 – 11:00 0 – 12:00 0 – 13:00 0 – 14:00 0 – 15:00 0 – 16:00 0 – 17:00 0 – 18:00 0 – 19:00 0 – 20:00 0 – 21:00: 0 – 22:00 0 – 23:00 0 – 24:00

ransmission C

User Dema

formation is n System wit

on

emand ct of each ummated ovePoints for a utor and at t

nt for Non sumers);

Company

nd profiles

required froth Demand.

FY0

F

er

the

1. DayDemmaxCon

2. Day(MWDem

3. DayDemCon

s and Activ

om each Us

FY1

FY2

F3

y of User mamand (MW) aximum Demanditions; y of peak OEW) at annual mand Condity of minimummand (MW) anditions;

The Grid Cod

B D

ve Energy

ser who is D

Y3

FY4

FY5

ximum at annual and

ETC Demandmaximum

tions; m OETC at Average

de - Version 2.

D t T f C

data

Directly Con

Y5

Updatetime

d

End oJanuary

.0

C d V i 2

nnected to

e Datacategor

of y

PC B OC1

0

ry

Page 91: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The fthe T

Data

1. Foreca

1.1 AnnuDemDem

1.2 Userhour maxiCond

1.3 Userhour avera

2. Deman

Where a UDemandsalternativethe followprovided;

2.1 NamConn

2.2 Dem

2.3 Tranmanu

2.4 Time

n Electricity Tr

25 f 30

edule I: Co

following infTransmission

description

ast Demand

ual peak houand at annuand conditio

r Demand atDemand at mum Dema

ditions;

r Demand atOETC Dem

age conditio

nd Transfer

User Demans may be fede Connectio

wing details s

e of the altenection Poin

and transfer

sfer arrangeual or autom

e to effect tra

ransmission C

onnection P

formation is n System wit

d and Powe

ur User ual maximumons;

t OETC peakannual nd

t minimum mand at ons;

Capability:

nd or group od by n Point(s),

should be

ernative nt(s);

rred;

ement (e.g. matic);

ansfer;

Company

Point data

required froth Demand.

Units

er Factor rel

m MW

Power Factor

k MW

Power Factor

MW

Power Factor

of

MW

MVAr

hours

om each Us

FY0

FY1

lated to eac

The Grid Cod

B D

ser who is D

FY2

FY3

ch Connecti

de - Version 2.

D t T f C

Directly Con

FY4

FY5

U

t

ion Point:

EJ

EJ

EJ

.0

C d V i 2

nnected to

Update

time

Da

ca

End of January

PC

O

End of January

PC

O

End of January

PC

O

PC

PC

PC

PC

0

ata

ategory

C B

C1

C B

C1

C B

C1

C B

C B

C B

C B

Page 92: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The f

1.ProLicenCons

DemaDemahourl

1.1

1.2

2. CDistri

2.1

2.2

3. Po

Demacalenany CConn3.1

3.2

n Electricity Tr

26 f 30

edule J: De

following info

Data descr

ogramming nsed Distribusumers)

and Control and change y and Conne

Demand pro

Duration of Control hrs;

Control Phabutors & Dir

Demand Coresult in a DMW or morehour on anywhich is plahours;

Any changeDemand CoOETC prior

ost Control

and reductiondar day of 1Connection Pnection PointActive Powe

Duration;

ransmission C

emand Con

ormation is r

ription

Phase: (aputors & Direc

which may of 1 MW or

ection Point

ofile MW;

proposed D;

ase: (applicrectly Conne

ontrol which Demand chae averaged y Connectionanned after 1

es to plannedontrol notifier to 10:00 ho

Phase:

on achieved 1 MW or moPoint, on an t basis; er profiles;

Company

ntrol data

required from

U

plicable to ctly Connect

result in a more on anbasis;

W1

Demand W1

cable to Licected Consu

may nge of 1 over any n Point 10:00

M

d d to

ours;

h

on previousre averagedhourly and

M

h

m each User

Units Tco

ted

Weeks to 8

Weeks to 8

censed umers)

MW Now

7 D

hours Now

7 D

s d over

MW PreDay

hours PreDay

The Grid Cod

B D

r;

Time overed

U

10Sa

10Sa

w to

Days

Im

w to

Days

Im

evious y

06Da

evious y

06Da

de - Version 2.

D t T f C

Update time

0:00 aturday

O

0:00 aturday

O

mmediate O

mmediate O

6:00 aily

O

6:00 aily

O

.0

C d V i 2

Data category

OC1

OC1

OC1

OC1

OC1

OC1

0

Page 93: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The TransCDG

ShortConn

Name

Da

1 Sycirc

2 ZeimpfroconinfeReRe

3 Poins

n Electricity Tr

27 f 30

edule K: Fa

following insmission Syenset(s) and

t circuit Infnection Point

e of Connec

ata descripti

mmetrical thcuit current i

At instant After sub-t

current csubstant

ro sequencepedance valm the Connensistent witheed above; sistance (R)actance (X)

sitive sequestance of fau

ransmission C

ault infeed

nformation isystem via d/or motor lo

feed to OEt

ction Point:

ion

hree-phase snfeed; of fault; transient faucontribution tially decayee source ues as seenection Point

h the maximu

); ;

ence X/R ratiult;

Company

d data

s required a Connecti

oads.

TC Transm

:

Units

short

ult has

ed;

kA kA

n

um

% on% on

io at

from each ion Point a

mission Syst

s FY0

n 100 n 100

The Grid Cod

B D

User who and the Us

tem from a

FY1

FY2

de - Version 2.

D t T f C

is Connecteser System

a User Sys

.

FY3

FY4

.0

C d V i 2

ed to the contains

tem at a

FY5

Datacateg

PC B

PC B

PC B

0

a gory

B

B

B

Page 94: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

OETCTrans

Name

1. O 1.1 1.2

2. Ne2.1

2.2

2.2.1

2.2.2

2.2.3

2.2.4

2.2.52.2.63 4.1

4.2

n Electricity Tr

28 f 30

edule L: Da

C will providsmission Sy

e of Connec

Data des

peration DiOETC wilthe currenyears;

TheannTheave

etwork DataTransmiss

Netw

Pos

CDGRela

Followingsource at

Symmetriof fault fro

SymmetriTransmisscontributio

Zero sequConnectio

Pre-fault vwere calc

Positive s Appropria

Names ofProvisionaexpected Years 2 aDraft Finato be withPlanned O

ransmission C

ata supplie

de Users andstem.

ction Point:

cription

agram: ll notify eachnt calendar y

e date and ual maximu

e date and trage conditioa: sion Systemwork topologequipment;

sitive, negativtransformersGenset electay and prote network dathe HV poincal three-ph

om the Transcal three-phsion Systemon has subsuence sourcon Point, convoltage mag

culated; sequence X/ate interconnf Safety Cooal Outage prto be withdr

and 3 for Plaal Outage prodrawn from

Outages;

Company

ed by OETC

d potential U

:

h User no layear and for

time of annm Demand ctime of annons;

m data; includgy and rating

ve and zero s, etc; trical and me

ection data;ta as an equ

nt of Connechase short cismission Sy

hase short cim after the sustantially dece resistancensistent withgnitude at wh

R ratio at thenection transordinators; rogramme srawn from senned Outagogramme shservice duri

C to Users

Users the fo

ater than ther each of the

nual peak oconditions;ual minimum

ding gs of princip

sequence d

echanical pa

uivalent 220ction to the Urcuit current

ystem; rcuit current

ub-transient cayed; e and reactah the maximuhich the max

e instant of fsformer data

howing the Cervice duringes;

howing the Cing each we

The Grid Cod

B D

s

llowing data

e end of Oce following 5

of OETC De

m OETC De

al items of

data of lines,

arameters

kV and 132kUser Systemt infeed at th

t from the fault current

nce values aum infeed beximum fault c

fault PC; ;

CDGensets g each week

CDGensets eek of year 1

de - Version 2.

D t T f C

a related to t

.

ctober, for calendar

emand at

emand at

, cables,

kV m;

he instant

t

at the elow; currents

k of

expected for

.0

C d V i 2

the OETC

Data category OCB

OC1

OC1

PC D

PC D

PC D

PC D

PC D

PC D PC D OC6 OC2

OC2

0

Page 95: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Sche

The Mdata

Timinthat c

AbbrMO

PO

1

1.1

1.2

1.3

1.4

1.5

2

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

n Electricity Tr

29 f 30

edule M: M

Metering Rerelating to M

ng: All datcauses a cha

reviations: Meter Ow

Plant Own

Data

Connectiodetails forMetering

Location a

Participant

Site identif

Meter Own

Loss compActual Met

Main and C

Meter seria

Metering in

Meter type

Instrument

Instrument

Test and cresults andand Measu

Asset man

CalibrationMeter insta

ransmission C

Metering Da

egistration SMetering Sys

a shall be sange to the d

wner

ner

on and Meter both DelivPoint:

and referenc

t details at th

fication nom

ner;

pensation catering Point

Check Mete

al numbers;

nstallation id

es and mode

t transforme

t transforme

calibration prd reference urement Tra

nagement pl

n tables, wheallation accu

Company

ata

System formsstems define

submitted prdata.

ering Point very Point a

e details;

he Connecti

menclature;

alculation deand Delivery

r installation

dentification

els;

er serial num

er ratios;

rogramme dtest certifica

ansformers;

an and testi

ere applied turacy;

s the Meteried by the Me

romptly afte

reference and Actual

on Point;

etails where y Point diffe

n details;

name;

mbers;

details; test ates for Mete

ng schedule

to achieve

The Grid Cod

B D

ing databaseetering and D

r Connectio

Respp

PO

PO

PO

PO

r; PO

MO

MO

MO

PO

PO

ers MO

e; MO

MO

de - Version 2.

D t T f C

e and holdsData Exchan

on or any ot

ponsible party c

M

M

M

M

M

M

M

M

M

M

M

M

M

.0

C d V i 2

s Metering nge Code.

ther event

Data category

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

0

Page 96: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 3

2.9

2.10

3

3.1

3.2

3.3

3.4

3.5

4

4.1

4.2

4.3

4.4

n Electricity Tr

30 f 30

Meter sum

Data regis

Data comcommuni

Telephone

Communicnumbers;

Communic

Data conv

User ident

Data validagreed be

Algorithm;

Data comp

Processingphase-ang

Check Me

ransmission C

mmation sche

ster coding d

municationcation syst

e number for

cation equip

cation protoc

version detai

tifications an

dation and setween affec

parison tech

g and alarmgle limits);

tering comp

Company

eme values

details;

n details (whems are us

r access to d

ment type a

col details or

ls;

nd access rig

substitutioncted parties

nique;

s (i.e. voltag

ensation de

and multiplie

hen ed):

data;

nd serial

r references

ghts;

n processess, including

ge source lim

tails;

The Grid Cod

B D

ers; MO

PO

MO

PO

MO

MO

s; MO

MO

MO

s g:

MO

MO

mits, MO

MO

de - Version 2.

D t T f C

M

M

M

M

M

M

M

M

M

M

M

.0

C d V i 2

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

MDEC

0

Page 97: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

AleAleAleAle

n Electricity

1 f 8

erts.1 erts.2 erts.3 erts.4

Transmissio

Al

IntroductioObjectivesScope .....Alert categTable 1 Table 2 Table 3 Table 4

on Company

lerts Sum

CON

on ................s .....................................

gories ..........General AleAlert WarninDemand CoSpecial instr

y

mmary C

NTENTS

...................

...................

...................

...................erts ..............ngs .............ontrol Warninructions ......

The Gr

C Al

Code

...................

...................

...................

...................

...................

...................ngs ................................

rid Code - Ve

t S C

Issued A

...................

...................

...................

...................

...................

...................

...................

...................

ersion 2.0

C d i 2

April 2010

.............. 2

.............. 2

.............. 2

.............. 2

...................

...................

...................

...................

0

3 5 6 8

Page 98: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 2

Aler

The Awarntake instruaction

This sectiowarnsectiopreva

The requithe in

Aler

The o

toO

toU

AlerIn ad

P

L

L

D

In

In

P

AlerThis Emercoursin the

n Electricity

2 f 8

rts.1 Intro

Alerts Summings containto warn or

uctions to Usn.

Alerts Codeons of the Ging and Alerons of the Gail.

relevant secred, specifie

nstruction of

rts.2 Obje

objectives of

o list the waOperation of

o identify thUsers on rece

rts.3 Scopdition to OE

Power Produ

icensed Dist

icensed Sup

Directly Conn

nternational

nternally Inte

PWP (for info

rts.4 AlertAlerts Code

rgency Condse of plannine individual s

Transmissio

Al

oduction

mary Code (Aned in the G

Alert Userssers concer

e is a summGrid Code shrt. In the eve

Grid Code th

ction of the es the procethat warning

ectives

f the Alerts C

arnings and the Total Sy

e potential eipt of such

pe TC, the Aler

cers;

tributors;

ppliers;

nected Cons

Interconnec

erconnected

ormation).

t categore is concernditions. It dong and opersections of th

on Company

lerts Sum

Alerts Code)rid Code. T

s in abnormrning immed

mary of the hould be conent of inconse provisions

Grid Code,dures, timing or Alert.

Code are as

Alerts that ystem in abn

responses warnings an

rts Code app

sumers;

cted Parties;

Parties; and

ries ned only wies not refer rating the Tohe Grid Cod

y

mmary C

) provides a The Alerts C

mal or Emerdiate action o

requiremennsulted on tsistencies bes in individua

, under whicg, possible a

follows;

may be issunormal situat

and actionsnd Alerts.

plies to;

d

th instructioto or includ

otal System de.

The Gr

C Al

Code

unified referCode lists ac

gency Condor preparatio

nts of the Ghe detailed

etween this Aal sections o

ch any warnactions and

ued by OETtions; and

s that may

ons associate instructionor Despatch

rid Code - Ve

t S C

rence of all Actions that Oditions and on for possi

Grid Code. requirementAlerts Code of the Grid C

ning or Alerform of instr

TC to enable

need to be

ted with abns given in thh. These are

ersion 2.0

C d i 2

Alerts and OETC may

describes ible future

Individual ts of each and other

Code shall

rt may be ruction for

e the safe

taken by

normal or he normal e detailed

0

Page 99: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 3

Tabl

OETCrise t

Grid

1

2

n Electricity

3 f 8

e 1 G

C shall issuto a signific

Code Refer

Circum

Whenever Oof any factoa significaunusual ope

The followinrise to an A

1. Outaunitssecu

2. Outaequipsystecircucompwho

3. Outamay of thethe rsendappli

4. Condagree

5. The limits

6. Impo7. Majo8. Accid

Transmissio

eneral Ale

ue an Alertcant Disturb

rence OC5

mstances of

OETC becoors likely to gant Disturerating cond

ng conditionAlert;

age of any which causrity or violate

ages or rispment, whicem load mstances tpanies shouare likely to ages or riskshave substae plant or syelevant distr alert to cable) and

dition whereed standardVoltage or

s; ortant eventsor testing; dents.

on Company

rts

t whenever bance or un

f issue

mes aware give rise to bance or

ditions.

s are those

transmissionse either sube (n-1) critersks associach may have

or systethe relevanuld send ale

be affecteds associatedantial impactystem operaribution or gOETC, PAother users e the Oper;

r Frequency

s (e.g., Natio

y

it becomesnusual oper

Recipi

All Users wadversely significant unusual opconditions

that as a m

n componenbstantial redria to a suppated with e substantiam operatit distributio

ert to OETC

d with generat on the gen

ations. In sucgeneration cAEW Water

who are likerating Marg

y going out

onal Day cele

The Gr

C Al

s aware of rating condi

ients of Ale

who may be affected by Disturbance

perating .

inimum may

nts or geneduction in syply point.;

66kV or al impact onons. In

on or geneand other

ation plant, wneration capach circumstaompanies s

Departmeely to be affegin is below

tside opera

ebrations);

rid Code - Ve

t S C

any factorsitions.

ert Acti

the e or

Acknrecefacsagremea

TakeneceprepconsoverrequsafeSysteven

Represuaccothe pdow

y give

ration ystem

33kV n total

such ration users

which ability ances hould nt (if ected w the

ational

ersion 2.0

C d i 2

s likely to g

ion to be taby Users

nowledge eipt of Alert bsimile or otheeed electronans.

e any essary paratory stepsistent with rall System uirements to eguard their tems for the nt.

port any ulting eventsordance withprocedures

wn in Code O

0

give

ken

by er ic

ps

in h set

OC5.

Page 100: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 4

3

n Electricity

4 f 8

An Alert sha

“This is an A

A Disturban

The likely e

The Disturb

This Alert sthe Alert is

Transmissio

all take the f

Alert timed a

nce caused b

ffect of the D

bance is likel

shall be connot renewed

on Company

following form

at (xx:xx) ho

by ……… is

Disturbance

ly to last (zz

nsidered to bd within 2 ho

y

m;

urs;

s probable a

is (…….);

:zz) hrs;

be automatiours of the tim

The Gr

C Al

t (yy:yy) hou

ically canceme of issue.

rid Code - Ve

t S C

urs;

lled if ”

ersion 2.0

C d i 2 0

Page 101: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 5

Tabl

OETCShut

Grid

1

2

n Electricity

5 f 8

e 2 A

C will issuedown, a Pa

Code Refer

Circu

In the eventTotal SysteSystem ShuSeparation.

The form of

“This is hours;

There isShutdow

A SysteProcedu

Standby

Transmissio

lert Warnin

e an Alert wrtial System

rence OC7

umstances

t of Incidentsm Shutdownutdown or a

f the Alert W

an Alert time

s a (Partial Swn) at (aaaam Normalisa

ure is being y for further

on Company

ngs

warning In tm Shutdown

of issue

s, such as an, a Partial System

Warning will b

ed at (xx:xx)

System aa); ation; implementeinstructions”

y

the event on or a Syste

ReciA

All Use

be;

)

d; ”.

The Gr

C Al

of Incidentsem Separati

ipients of Alert

ers

rid Code - Ve

t S C

s, such as aion.

Action t

AcknowleAlert by faother agremeans.

Each UseOETC’s induring an restoration

Users shaits personwith, and trained to implemenNormalisaProcedureOETC.

ersion 2.0

C d i 2

a Total Sys

to be taken Users

dge receipt acsimile or eed electron

er shall follownstructions Incident and

n process.

all ensure thanel are famiadequately be able to t the System

ation es prepared

0

tem

by

of

ic

w

d

at iliar

m

by

Page 102: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 6

Tabl

Grid

1

1.1

1.2

1.3

1.4

n Electricity

6 f 8

e 3 De

Code Refer

Circ

Demand Co

When OETCinstruction rManual Demfollowing 30

A Demand will automatby OETC wissue.

The form ofImminent W

“This is Warning

This waname ofsubstati

PrepareDemandwithin th

Do not sinstructe

Standby

Transmissio

emand Co

All Warning

rence OC4

umstances

ontrol Immi

C expects torequiring Emmand Shedd0 minutes.

Control Immtically lapse

within 2 hours

f a Demand Warning will b

Demand Cog timed at (xrning applief Users and ions affectede for Emerged Shedding ohe next 30 mshed Demaned; y for further

on Company

ntrol Warn

gs in this ta

of issue

inent Warni

o issue an mergency ding within th

minent Warniif not reissu

s of the time

Control be;

ontrol Imminxx:xx) hours;s to (includearea/

d); ency Manualof (XX) MW

minutes; nd until

instructions”

y

nings

able will be

R

ing

he

Licen

DirecCons

Usering ued e of

ent

e

l

”.

The Gr

C Al

issued only

Recipients oWarning

nsed Distribu

ctly Connectesumers, and

rs.

rid Code - Ve

t S C

y by OETC

of Acti

utors,

ed

Acknreceby faotheelec

PrepimplinstrEmeDemwith30 m

ersion 2.0

C d i 2

ion to be taby Users

nowledge eipt of warninacsimile or er agreed ctronic mean

pare to ement

ruction requiergency Manmand Sheddin the follow

minutes.

0

ken

ng

ns.

iring nual ing

wing

Page 103: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 7

Table

2

2.1

2.2

2.3

2.4

2.5

n Electricity

7 f 8

e 3 (continu

Circ

Demand Co

When OETCEmergencyor Planned the day ahe

A Demand issued by 1ahead.

A Demand specify the Demand Shthe part of twhich it mayDemand redrequired an

The form ofWarning wil

“This is Warning

This waname ofsubstati(EmergeSheddinDemand

The amwill be (duration

Do not sinstructe

Transmissio

ued)

umstances

ontrol Red W

C expects toy Manual De

Rota Demaead.

Control Red6:00 hours o

Control Redperiod durin

hedding maythe Transmisy apply, the duction that d any other

f a Demand ll be;

Demand Cog timed at (xrning applief Users and ions affectedency Manuang or Planned Shedding)ount of Demspecify amo

n of demandshed Demaned “.

on Company

of issue

Warning

o instruct mand Sheddnd Shedding

d Warning wion the day

d Warning wing which y be requiredssion Systempercentage may be matters.

Control Red

ontrol Red xx:xx) hrs; s to (includearea/

d) to implemal Demand ed Rota tomorrow;

mand to be sount and d to be shed)nd until

y

R

ding g on

Licen

DirecCons

Users

PoweCDGbe affinstru

ill be

ill

d, m to of

d

e

ent

hed

);

The Gr

C Al

Recipients oWarning

nsed Distribu

ctly Connectesumers,

s, and

er Producersensets that ffected by suuctions.

rid Code - Ve

t S C

of Acti

utors,

ed

s with may

uch

Acknreceby faotheelec

PrepimplinstrEmeDemdurinahea

ersion 2.0

C d i 2

ion to be taby Users

nowledge eipt of warninacsimile or er agreed ctronic mean

pare to ement

ruction requiergency Manmand Sheddng the day ad.

0

ken

ng

ns

iring nual ing

Page 104: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 8

Tabl

OETCthe pDesa

Grid

1

2

n Electricity

8 f 8

e 4 Sp

C may issueperiod begialination Sc

Code Refer

Circ

OETC may instructionsDay at any beginning imof the GeneDesalinationissue speciaUsers at earelation to reDemand Co

Special inst

• Requirereductiorestorat

• Instructitransfer Points;

• InstructiIntertrip

Transmissio

pecial inst

e special ininning imm

chedule.

rence SDC2

umstances

issue a list o in respect otime during mmediately eration Schen Schedule. al instruction

ach Control Cequired actioontrol.

tructions ma

ements for Don, de-energion;

ions to effecbetween Co

ions to switcScheme.

on Company

ructions

nstructions mediately af

2

of issue

of special of a Schedulthe period after the issdule and OETC will

ns directly toCentre in ons and

y include;

Demand gisation or

ct a Demandonnection

ch in a Dema

y

in respect ofter the iss

Rspec

le

ue

o the

Licen

Users

DirecCons

InternIntercPartie

and

The Gr

C Al

of a Scheduue of the G

Recipients ocial instruct

nsed Distribu

s

ctly Connectesumers

nally connected es.

rid Code - Ve

t S C

ule Day at aGeneration

of tions

Acti

utors

ed

Noteacknreceinstrfacsagremea

Prepimplinstr

ersion 2.0

C d i 2

any time durSchedule

ion to be taby Users

e and nowledge eipt of speciaructions by simile or otheeed electronans.

pare to ement as

ructed.

0

ring and

ken

al

er ic

Page 105: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 1 f

Planning

PC.1PC.2PC.3PC.4

PC.5

PC.6PC.7AppeAppeAppeAppe

ctricity Transmis

21

Code

1 Introduct2 Objective3 Scope 3 4 Planning

PC.4.1 PPC.4.2 DPC.4.3 DPC.4.4 SPC.4.5 T

5 ApplicatioPC.5.1 APC.5.2 C

6 Data Con7 Planningendix A Tendix B Sendix C Dendix D T

ssion Compan

tion e

ProceduresPlanning OveData requiremData Timing System Data

he Five Yeaons for Conn

Application foComplex Connfidentiality Standards ransmission

Standard PlaDetailed Plan

ransmission

y

Plann

CON

s erviewments

ar Statementnectionor Connectionnections

n Planning Pnning Data

nning Datan System Da

ing Cod

NTENTS

t

on

Procedures

ata

The Grid Co

D

de

ode - Version 2

Pl i C

Issue

.0

d V i 2

ed April 201

112

2 0

10

2

2 2

3 3 3 4 4 5 6 6 6 7 7 8

11 16 21

Page 106: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 2 f

Plann

PC.1 This Coddata to developmfacilitate the TotaConnectiocarried osufficient

• any n• detail

potenOperationefficient SSecurity aCodes O

PC.2 The objePWP and• the ex

any pTransSyste

• any pTransobliga

• the suset do

• the suCapa

ctricity Transmis

21

ing Cod

Introductde sets out

be exchanment of the TUsers in the

al System inons to New

out annuallylead times t

necessary plaed engineer

ntial Users ofnal planningSystem is coand reliabilitC2 and OC3

Objectiveectives of thed Users to enxchange of proposed desmission Syem; proposed desmission Syations as defupply of infoown in their upply of infocity to meet

ssion Compan

de

tion the roles an

nged and tTransmissione planning ancludes reiCapacity an, covering tto facilitate;

anning or coring design/cf the Total Sg to optimisovered in thety issues are3.

e e Planning nable; information

evelopment ystem, or th

evelopment ystem to be fined in the Tormation to aLicences anrmation to aforecast De

y

nd responsibhe procedun System, thand developnforcementsnd to new suthe succeed

onsent work;construction

System. se plant ande Operating e covered in

Code are to

and interactof User Sys

hat may im

by a Usercarried out

Transmissioallow PWP

nd the Sectoallow PWP toemand and t

bilities of Oures to be he preparatioment of thes/extensionsupply reque

ding five Op

; and n work to be

d equipmenCode OC2,

n the Connec

o define the

tion betweenstems that pact on the

r that may t in a mannon Licence; and OETC r Law; ando meet its Lithe Generat

The Grid Co

D

ETC, PWP followed b

on of the Fivir own Syste

s to the Trsts. The pla

perational Y

completed

nt Outages Operationalction Condit

e roles and

n OETC, PWare to be De performan

impact on ner that will

to undertake

cence requition Security

ode - Version 2

Pl i C

and Users between pave Year Statems. The deransmission anning proceears and sh

by OETC a

to ensure a Planning. ions and in

responsibilit

WP and UseDirectly Connce of the

the performallow OETC

e their plann

rements to py Planning S

.0

d V i 2

regarding tharties for thtement and evelopment

System anesses shall bhould provid

nd existing

a secure an

the Operatin

ties of OETC

ers concerninnected to thTransmissio

mance of thC to meet i

ning duties a

plan adequatandard.

2 0

he he to of

nd be de

or

nd

ng

C,

ng he on

he its

as

ate

Page 107: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 3 f

PC.3 SIn additio• Powe• Licen• Licen• Direc• Intern• Intern• RAEC

PC.4

PC.4.1 Developmfor a num

(a) a(b) t

C(c) t

oAccording

(a) aT

(b) or

(c) oC

OETC’s setting ouUsers to

Appendix

PC.4.2 PC.4.2.1

For the pData and

PC.4.2.2

StandardDistributoLoad flo

ctricity Transmis

21

Scope on to OETC aer Producerssed Distribused Supplietly Connecte

national Internally InterconC if Connect

Planning

Planning Oment of the Tmber of reaso

a developmethe introducConnection the cumulatione or moregly, the reinf

at a substaTransmissio

on transmisremainder o

on transmisConnection Licence requt for each assess the o

x A shows an

Data requiPlanning

purposes of d Detailed Pl

Standard

d Planning Dors and basw and sho

ssion Compan

and PWP, ths; utors; ers; ed Consumerconnected nnected Parted to the To

g Procedu

Overview Transmissioons including

ent on a Usection of a Site betweeive effect of

e Users. forcement o

ation at a Con System;

ssion lines f the Transm

ssion lines Site.

quires it to of the five sopportunities

n information

irements Data

the Planninanning Data

Planning D

Data covers sic Genset dort circuit s

y

he Planning

ers; Parties; rties; and otal System.

ures

n System, ing, but not lim

er System alnew Connen a User Sya number o

r extension o

Connection

or other famission Syst

or other Pl

produce ansucceeding s for Connec

n flow chart

g Code, data.

Data

basic Demadata from Pstudies to

Code applie

nvolving its rmited to;

lready Connection Site ystem and thof such deve

of the Trans

Site where

acilities whictem; and

ant at or b

n annual staOperationalcting to and

and timetab

ta is conside

and data froPower Produ

determine

The Grid Co

D

es to the follo

reinforcemen

nected to theor the mo

he Transmisslopments re

smission Sys

e User's Pla

ch join that

between loc

atement (Thl Years, guidusing the Tr

ble for the pla

ered in two

om Licenseducers that aany require

ode - Version 2

Pl i C

owing Users

nt or extensi

e Transmissiodification osion System

eferred to in

stem may inv

ant is Conn

Connection

cations remo

he Five Yeadance to PWransmission

anning proce

parts, Stand

d Suppliers llows OETC

ements to

.0

d V i 2

s;

ion, may aris

on System;f an existin

m; and (a) and (b) b

volve work;

nected to th

n Site to th

ote from th

ar StatemenWP and oth System.

ess.

dard Plannin

and LicenseC to carry oreinforce th

2 0

se

ng

by

he

he

hat

nt) er

ng

ed out he

Page 108: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 4 f

TransmisThese da

PC.4.2.3

Detailed out as ne

PC.4.2.4

When eva

a) PAt the timacceptedconsiderewithin thePreliminaunless thOETC to

b) COnce thedevelopmdata requbecome COETC reapplicatioSystem w

c) CWhen anvalidated

PC.4.3 To enablethe StandThese daeach of Operation

Where, fsome of thas beendetail the

By end Ofor Total

PC.4.4 STo enablprovide sOETC wi

ctricity Transmis

21

ssion Systemata requirem

Detailed P

Planning Daecessary. Th

Planning

aluating pro

reliminary Pme the User by the app

ed as Prelime scope of thary Project he Detailed P

carry out ad

ommitted Pe offer for

ment alreadyuired by OECommitted P

elating to thons by any Uwill be under

onnected Pny estimated actual value

Data Timine the Five Ydard Planninata should b

the five sunal Years als

rom the datthe data) to

n no changee changes to

October of eaSystem for t

System Dale Users to

short circuit ill make ava

ssion Compan

m and allowents are giv

Planning Da

ata covers ahese data req

Data Qualit

posed Conn

Project Planr applies for

plicant User, minary Projehe provisionsPlanning DaPlanning Dadditional deta

Project Plana Connectioy submitted

ETC which mProject Plane Transmis

User will be rtaken.

Planning Dad values asses. These da

ng Year Statemeng Data and be submitteducceeding Oso). The tim

te of one sube submitte

e from the do data.

ach Operatiothe five succ

ata assess the

infeeds undailable to any

y

w preliminaren in Appen

ata

additional daquirements a

ty Levels

nections, dat

nning Datar a Connectthe data re

ct Planning s relating to ata will normata is requireailed system

nning Dataon Agreemeas Prelimin

may be all onning Data. Tssion System

considered

ata sumed for pata are then

ent to be prethe Detailed

d before theOperational

metable is sh

ubmission toed, a User mdata (or in s

onal Year Pceeding Ope

eir Systemser maximumy User on re

ry assessmendix B.

ata to allow dare given in

ta is conside

tion Agreemelating to the

Data. Thesconfidentialmally only ced in advanc

m studies.

ent is accenary Project or part of theThese data,m will form

and agains

planning pur termed Con

epared, eachd Planning De end of Sep

Years (andhown in Appe

o another, thmay submit some of the

PWP shall prerational Yea

s in relation m Capacity cequest, the s

The Grid Co

D

ent of the n

detailed stabAppendix C

ered at three

ent but befoe proposed Ue data will bity in the Cocontain the ce of the no

pted, the dPlanning D

e data conta together wthe backgrot which plan

rposes are cnnected Plan

h User is reqData as listedptember eacd in certainendix A.

here is no ca written stadata) subm

rovide OETCars.

to short ciconditions fosystem data

ode - Version 2

Pl i C

need for sta

bility studiesC.

e levels;

ore an offerUser develobe treated a

onnection AgStandard P

ormal timesc

data relatingData, and thained in Apith the otheround agains

nning of the

confirmed onning Data.

quired to sud in Appendch year and n instances

change in thatement stat

mitted previo

C with a fore

ircuit currenor each Cona as listed in

.0

d V i 2

ability studie

s to be carrie

r is made anopment will bas confidentigreement. Planning Dacale to enab

g to the Use subsequependix C, wr data held bst which neTransmissio

r replaced b

bmit to OETdices B and C

should covs, the curre

he data (or ting that theusly and on

ecast Deman

nts OETC wnection Poin

n Appendix D

2 0

es.

ed

nd be ial

ata ble

er ent will by ew on

by

TC C.

ver ent

in re

nly

nd

will nt. D.

Page 109: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 5 f

The datasucceedi

PC.4.5 TOETC sstatemenrespect oflows andtransmiss

(a) irC

(b) aT

(c) i(d) i(e) i(f) s

AThe Five

ctricity Transmis

21

a will be avng years.

The Five Yhall, in acc

nt, on an annof each of thd Loading sion node, to

information requirementCapacity; a commentaTransmissioinformation oinformation rinformation csuch other Authority. Year Statem

ssion Compan

vailable at

Year Statemcordance wnual basis, ihe five succon each paogether with

on the stats of Trans

ary prepareon System mon what conrelating to pcontained inmatters as

ment will be

y

the end of

ment with the Train a form apceeding Opeart of the T;

atus of Transmission Ca

ed by OETCmost suited tonstraints are rogress mad

n Appendix Dshall be sp

produced an

December

ansmission pproved by terational YeTransmission

nsmission Capacity, incl

C indicating o new Conneforeseen;

de with curreD1; and pecified in d

nd issued by

The Grid Co

D

each year

and Despathe Regulato

ears, circuit n System a

Capacity anuding (a) n

its views aections, incl

ent investme

directions is

y the end of

ode - Version 2

Pl i C

and will c

atch Licenseory AuthorityCapacity, fo

and fault lev

nd the anticnew Load

as to thoseuding for ne

ents;

ssued by th

March each

.0

d V i 2

cover the tw

e, prepare y, showing, orecast powvels for eac

cipated futuand (b) ne

e parts of thew Capacity;

he Regulato

h year.

2 0

wo

a in

wer ch

re ew

he

ory

Page 110: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 6 f

PC.5 AOETC wConnectioreinforcemThis PlanUsers anfor Conne• OETC• OETC• publis

PC.5.1 AUsers wismake an • a des

TransTrans

• the re• the deAppendixConnectioan adequAny offeraccept wautomaticdevelopmWithin 4 User shaAppendix

PC.5.2 CThe magvary accomay be nnormally the TransWhere Oindicate tstudies nnecessarThe Regallowed o

ctricity Transmis

21

Applicatiwill provide on of new Cment) for ea

nning Code ad prospectivecting to, anC’s Five YeaC’s annual reshed Transm

Applicatioshing to estaapplication scription (tesmission Syssmission Syselevant Stanesired compx A – A3 sumon. OETC w

uately complr of a Conneithin the percally lapses.

ment and binweeks of ac

all supply thex C.

Complex Cnitude and ording to thenecessary fo

required) tosmission SysOETC judgeto the User necessary. Ury to proceeulatory Auth

on applicatio

ssion Compan

ions for Cto PWP by

Capacity togach Connectapplies to alve Users of tnd using, thear Statementeport; and mission Use

n for Connablish a newto OETC for

ermed the Ustem or the stem; dard Plannin

pletion date ommarises th

will make an eted applica

ection Agreeriod stated in. Acceptanc

nds both partcceptance oe Detailed P

Connectioncomplexity oe nature, loc

or OETC to co evaluate mstem. s that suchthe areas th

User shall sd and confirhority may con from eithe

y

Connectioy the end gether with ion option l proposed dthe Transmi

e Transmissit;

of System C

nection w Connectionr a ConnectiUser develomodification

ng Data listeof the proposhe time scaloffer of a Co

ation by a Usement made n the offer the of the offeties to the tef the offer, olanning Data

ns of any Transcation and tcarry out addmore fully th

h additional hat require mtate whetherm that the consent to aer OETC or t

on of March destimate co

developmentssion Systemon System,

Charges.

n Site or moon Agreemeopment) of n relating to

ed in Appendsed User dees for the aonnection Aser. by OETC w

hat will be ater commits terms of the oor such longa pertaining

smission Sytiming of theditional, mor

he impact of

more detaimore detaileer or not it wUser is prepa timescale the User.

The Grid Co

D

details of sosts of Conn

ts on User Sm will be abthrough;

odify an existent. The app

the Plant tUser Plant

dix B; and evelopment.ctions relati

Agreement w

will state that least 14 wethe OETC woffer. ger period th to the User

ystem extense proposed re extensivef the propos

iled analysised analysis awishes OETpared to paylonger than

ode - Version 2

Pl i C

uitable locanection (inclu

Systems. le to assess

ting Connecplication shalto be Connalready Con

ng to an apwithin 9 week

at the applicaeeks, after w

works relating

hat OETC mr developme

sion or reinfUser develo

e system studsed User de

s is requireand the cos

TC to underty for this adn the 14 we

.0

d V i 2

ations for thuding Syste

s opportunitie

ction Site shall include; nected to thnnected to th

plication for ks of receivin

ant User muwhich the offg to that Us

may agree, thent as listed

forcement wopment anddies (than avelopment o

ed, OETC wt of additiontake the wodditional woreeks norma

2 0

he em

es

all

he he

r a ng

ust fer er

he in

will it re on

will nal ork rk. lly

Page 111: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 7 f

PC.6 Committeheld by Onew appTransmisto the ext• is obl• is obl

data i• is oblAll other d

PC.7 In the pTransmisTransmis

ctricity Transmis

21

Data Coned Project POETC relatinplications byssion Systemtent that OEiged to use iged to use is relevant toiged to use data will be

Planninglanning and

ssion Securssion License

ssion Compan

nfidentiallanning Datang to the Try any Userm will be undTC; it in the prepit when conso that other ait for OETC treated as c

g Standard developmrity Standare.

y

ity a and Conneansmission r will be codertaken. Ac

paration of thsidering andapplication; operational

confidential.

rds ment of the rds as dete

ected PlannSystem, wilonsidered accordingly, d

he Five Yeard/or advisingand planning pu

Transmissiermined in

The Grid Co

D

ing Data, togll form the band againstdata will not

r Statement;g on applicat

rposes.

on System,accordance

ode - Version 2

Pl i C

gether with tbackground t which plabe treated a

; tions by othe

, OETC she with Con

.0

d V i 2

the other daagainst whic

anning of thas confidenti

er Users if th

hall apply thndition 28

2 0

ata ch he ial

he

he of

Page 112: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

AA

N

Oman Electricity Tra

Page 8 of 21

Appendix A A.1 Transm

Note: The flow cData will b

Licensed DemanLicens

Licensed Demand ato OETC

App

OETC icircuit inUsers a

ansmission Compa

Transmissimission Plannin

hart is a summae submitted for

Suppliers submitnd forecasts to ed Distributors

Distributors submand Energy foreca

in accordance wendices B & C

ssues short nfeed data to as required.

any

ion Planningng Flow Chart

ary only and refeeach of the nex

t

mit asts

with

The

g Procedures

erence should bxt five Operation

Power Producersrequired planning

accordance wAppendices B

OETC carries ou

Grid Code - Versio

D - Planning

s

be made to the nal Years

s submit g data in with

B & C

ut system studiesYears

OETC prepareissues Five Y

Statemen

on 2.0

Code Version 2.

Planning Code

s for next 5 Opera

es and Year nt

All other Users required planning

accordance wAppendices B

0

for full details

P

ational

submit g data in with

B & C

PWP runs Demanmodel and pro

forecast

PWP provideforecast of To

Dema

OETC issuedata to Us

reques

nd forecast oduces ts

es to OETC otal System and

es system sers as sted.

Page 113: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

A

Y

B

B

B

B

Oman Electricity Tra

Page 9 of 21

A.2 TIMETA

Year 0

By end Septemb

By end October

By end Decemb

By end March

ansmission Compa

ABLE FOR MA

(Note that follo

Data to b

ber Each Use

PWP prov

ber OETC prothem to as

OETC wil

OETC pro

OETC to Connectio

OETC to prequiremereinforcem

any

AIN ACTIONS F

owing data are

e provided for

er to provide dat

vide to OETC fo

ovides to Usersssess their netw

l make available

ovides the Five Y

provide to PWPon (including Sy

provide to PWPents from consment of the netw

The

OR TRANSMIS

summaries only

Operational Y

ta to OETC as li

orecast of Total

s short circuit infworks in relation

e to any User, o

Year Statement

P details of suitystem reinforcem

P a statement onsiderations of pwork.

Grid Code - Versio

D - Planning

SSION PLANNI

y and reference

Years 1, 2, 3, 4 &

isted in Append

System demand

feeds at each Cn to short circuit

on request, the S

t to PWP, Powe

table locations ment) for each C

n the adequacy power flows a

on 2.0

Code Version 2.

NG & FIVE YEA

should be mad

& 5

ices B & C of th

d for each of the

Connection Poincurrents.

System data as

er Producers an

for Connection Connection optio

of the OETC nend voltage con

0

AR STATEMEN

de to Planning C

he Planning Cod

e five Operation

nt under maxim

listed in Appen

d makes availa

of new Capacion

etwork to meet tntrol. The state

NT

Code for full deta

de.

nal Years.

mum Capacity co

ndix D.

ble to potential

ity together with

the System Demement will det

ails.)

onditions to ena

Power Produce

h estimate costs

mand and Capatail any needs

able

ers

s of

acity for

Page 114: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

A

Oman Electricity Tra

Page 10 of 21

A.3 TIMESC

T

S

O

A

D

ansmission Compa

CALE CHART

Time intervals

Start T = 0

Offer T + 9 w

Accept T + 14

Data Accep

any

FOR APPLICA

weeks

4 weeks (minimu

pt time + 4 week

The

TIONS FOR CO

Ac

UsCo

OE

um) Us

ks Usdev

Grid Code - Versio

D - Planning

ONNECTION

ction

er applies for neonnection

ETC to make an

er must accept

er shall supply tvelopment as lis

on 2.0

Code Version 2.

ew Connection

offer of a Conn

offer or offer lap

the Detailed Plasted in Appendi

0

or modification

nection Agreeme

pses

anning Data perx C

to an existing

ent

rtaining to the UUser

Page 115: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 11

AppendB.1

B.1.1

Each Usprovide OOperatio• each

requi• each

requi• each

ConnThe datathe User

B.1.2

(i)

Forecastover all Cprovided

(a)

(b)

(c)

(ii)

Forecastsubdivide• Resid• Comm• Indus• Agric• Hotel• Gove• any o• User

B.1.3

ForecastPoint sha

ctricity Transmi

f 21

dix B StaDemand an

Introduc

ser that is DOETC with nal Years byLicensed D

rements on Directly C

rements; anPower Pro

nected to thea provided s

to take acco

User Tot

System Dem

t hourly DemConnection for; the day of m(Active Pow

the day, thaPower) on t

the day, thaPower) on t

System Act

t annual Aced into the fodential; mercial; strial; culture and Fls and Touris

ernment; other identifiaSystem loss

Connect

t Demand (Aall be provide

ission Compan

andard Plnd Active En

ction

Directly Connthe Deman

y; Distributor/Liits Distributi

Connected Cnd oducer in ree Transmissihould be thaount of the o

tal System

mand (Activ

mand (ActivPoints from

maximum Dwer) that cou

at will be sphe Transmis

at will be sphe Transmis

tive Energy

ctive Energyollowing cate

Fisheries; sm;

able categorses.

tion Point D

Active Powered for;

ny

anning Danergy Data

nected to thnd data. Da

censed Supon System;

Consumer i

elation to thion System.at remainingoutput profile

Demand (A

ve Power)

e Power) (Mm the Transm

Demand on eld be impose

ecified by Ossion System

pecified by Ossion System

y

y (MWh) foregories of C

ries of Cons

Demand (Ac

r) and Powe

ata

he Transmisata shall be

pplier in rela

n relation t

e Demand

g after any de of all Embe

Active Powe

MW) profilesmission Sys

each User Sed on the Tr

OETC, of them; and

OETC, of them.

r each UserConsumer;

umers; and

ctive and Re

er Factor (or

The Grid Co

D

sion Systeme supplied f

ation to Dem

to its Dem

of each Pro

deductions cedded non-C

er) and Activ

s for each Utem for eac

System givinransmission

e forecast m

e forecast m

r System sh

eactive Pow

Reactive Po

ode - Version 2

Pl i C

m and has Dfor each of

mand and A

and and A

oduction Fa

considered aCDGensets

ve Energy

User Systemch User Sys

ng the valueSystem;

maximum De

minimum De

hall be prov

wer)

ower) at eac

2.0

d V i 2

Demand shathe next fiv

Active Energ

Active Energ

acility Direct

appropriate b

m (summatetem) shall b

es of Deman

emand (Activ

emand (Activ

vided and b

ch Connectio

2 0

all ve

gy

gy

tly

by

ed be

nd

ve

ve

be

on

Page 116: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 12

(a)

(b)

(c)

The abov• one s

Systeand

• sepaSystesectio

The abov• be th

accou• includ

equip• be ba

B.1.4

The follorequeste

• detaitypicacause

• the sfrequ

• the aimpos

• the mthe T

• detaiConn

B.2

B.2.1

Each Poto be Dilarge EmCDGensEach Poprovide t

ctricity Transmi

f 21

the day thatbe imposed the day, thaTransmissiothe day, thaPower) on thve Demand set of Demem via a bu

rate sets of em via busbons. ve Demand hat remaininunt of the oude the net Upment; and ased on ave

General

owing informd by OETC;

ls of any indal range of e flicker in th

sensitivity ofency at the verage and se on the Tr

maximum haTransmissionls of all Loa

nection Point

Genset Dat

Introduc

wer Producerectly Conn

mbedded CDet as specifi

ower Produche following

ission Compan

t in the Useron the Tran

at will be spon System; aat will be sphe Transmisdata shall beand data wsbar arrang

Demand daar arrangem

data shall; ng after anyutput of all EUser System

rage conditio

Demand Da

mation will b

dividual Loadomestic, c

he System; f the DemanConnection maximum p

ransmission armonic contn System; anads which mt.

ta

ction

er or potentected, to thDGensets, sed in B.2.2 a

cer or poten information

ny

rs opinion, mnsmission Syecified by Oand ecified by O

ssion Systeme in the form

where the Uement whic

ta where thements which

y deductionEmbedded nom reactive D

ons.

ata

be required

ds which hacommercial

nd (Active aPoint at the

phase unbalaSystem; tent which tnd may cause

tial Power Phe Transmisshall providand B.2.3. ntial Power n only for eac

maximum Deystem;

OETC, of the

OETC, of them. m of; User System

h is not nor

e User Systeare, or are e

s considereon CDGense

Demand but

only infreq

ave characteor industrial

and Reactive time of the ance which t

he User wo

Demand flu

Producer withssion Systeme OETC an

Producer wch Genset;

The Grid Co

D

emand at the

e forecast m

e forecast m

m is Connecrmally opera

em is Conneexpected to

ed appropriaets; exclude an

uently and

eristics signil Loads, inc

e Power) topeak Demathe User wo

uld expect i

uctuations g

h CDGensetm and/or witnd PWP wit

with small E

ode - Version 2

Pl i C

e Connectio

maximum De

minimum De

cted to the ated in sepa

ected to the be, operate

ate by the

ny reactive c

shall be pr

ficantly diffecluding Load

variation innd;

ould expect i

ts Demand

greater than

ts Directly Cth existing, th data rela

Embedded G

2.0

d V i 2

on Point cou

emand on th

emand (Activ

Transmissiorate section

Transmissioed in separat

User to tak

compensatio

rovided whe

erent from thds which ma

n voltage an

ts Demand t

to impose o

1MW at th

Connected, oor proposed

ating to eac

Gensets sha

2 0

ld

he

ve

on s;

on te

ke

on

en

he ay

nd

to

on

he

or d, ch

all

Page 117: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 13

• Regis• Availa• NameData sha

B.2.2

The folloFacility; • Regis

show

• heat • Availa• Syste

the E• Minim• Active

Capa• Gene• type o• expec• Minim• Minim• time

B.2.3

The follofacilitate to these The Conelectrical

For all C

• rated• rated• direct• excite• Powe• short• inertia

ctricity Transmi

f 21

stered Capaable Capacie plate data

all be supplie

Product

owing data i

stered Capawing changes

Outpu heat r

rate versus able Capaciem constrainEmbedded Cmum Generae Power ca

acity; erator Perforof CDGensected running

mum time thamum Shutdobetween sta

Rated Pa

wing informan early assdata should nection Poinl location an

DGensets;

MVA; MW; t axis transieer category, er system sta circuit ratioa constant (

ission Compan

acity (MW); ty (MW) on for all equip

ed for each o

ion Facility

tems are re

acity (MW) us in; ut versus hearate versus aambient air ty (MW) on ned Capacity

CDGenset duation (MW); pable of bei

rmance Chaet, eg steamg regime(s) aat Genset m

own Time; anart up of diffe

arameters D

ation is requsessment bybe sent to O

nt to the Trad System vo

ent reactancfor example

abiliser fitted; and alternator pl

ny

a monthly bpment. of the next fi

Performan

equired with

under refere

at rate; ambient air tpressure; a monthly by (MW) i.e.

ue to the Dis

ing obtained

rt at the CDG turbine, gasat each Prod

must be Synhnd erent CDGen

Data

uired also wy OETC of tOETC as paansmission Soltage, supp

ce; e whether rod or not;

us prime mo

asis; and

ve Operatio

nce Data

respect to

ence conditi

temperature

asis; any known

stribution Sys

d from CDG

Genset statos turbine , coduction Facihcronised to

nsets at eac

ith an applicthe need forrt of the planSystem exported by dia

tating excite

over) MWse

The Grid Co

D

nal Years.

each CDGe

ions suppor

;

constraint pstem to whic

ensets in ex

or terminals;ogeneration lity; the Transm

h Production

cation for a Cr more detailnning proces

pressed in tegrams.

er or static ex

c/MVA.

ode - Version 2

Pl i C

enset at eac

rted by corre

placed on thch it is Conn

xcess of the

; (specify by

mission Syste

n Facility.

Connection Aled studies. ss. erms of geog

xciter;

2.0

d V i 2

ch Productio

ection curve

e Capacity oected;

eir Registere

type), etc.;

em;

Agreement tAny change

graphical an

2 0

on

es

of

ed

to es

nd

Page 118: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 14

For each

• rated• positi• type o• tap ra

B.3

B.3.1

Each UsConnectiTransmisAll data m

B.3.2

Each UsConnecti

B.3.3

The folloConnecteequipme• type o• rating• opera

chara• the C

voltag• total

B.3.4

All Usersto their Sinfeed toaccordanThe datawith all Gshould enThe follow• symm• symm

contr• the z

from • the p

ctricity Transmi

f 21

h Generator t

MVA; ive sequencof tap changange and ste

User Syste

Introduc

ser shall prion Site andssion Systemmust include

Single L

ser shall proions togethe

Reactive

owing informed to the Unt associateof equipmeng or operatinating characacteristics toConnection ge; and harmonic dis

Short Ci

s, other thanSystems shao the Transnce with Gooa should be Gensets Synnsure that thwing data sh

metrical threemetrical threribution has sero sequencthe Connectositive sequ

ission Compan

transformer;

ce reactanceger; and ep size.

m Data

ction

rovide OETd/or which mm. e the effect o

Line Diagram

ovide OETC er with equip

e Compensa

mation shaUser Systemed directly wint (e.g. fixedng range in Mcteristics or o be determinPoint to the

stortion at th

rcuit Contr

n Power Proall provide tosmission Sysod Industry P

provided fochronised a

he System Chall be provie-phase shoee-phase ssubstantiallyce source retion Point, c

uence X/R ra

ny

;

e (at maximu

C with datamay have an

of any third p

m

with a singment ratings

ation Equip

ll be providm at 11kV aith Consume or variable,

Mvar; details of anned; e User Syst

he Connectio

ibution to T

ducers, thato OETC sufstem. The Practice. or the condiand all HV mConnections ded;

ort circuit curhort circuit

y delayed); esistance anonsistent wi

atio at an ins

um and nomi

a of its Usn Operation

party Connec

gle line diags and nomen

pment

ded for all and above, er Plant; capacitive o

ny automati

tem in term

on Point.

Transmissio

t have Gensfficient data User is req

tion of maxmotors Conne

reflect credi

rrent infeed current af

nd reactanceth the maxim

stant of fault.

The Grid Co

D

inal tap);

ser System nal Effect on

cted to its U

gram showinnclature for s

reactive cother than

or inductive)

c control log

ms of electric

on System

set(s) and/orfor OETC t

quired to pro

imum infeedected to thatible System

at the instanfter the su

e values of tmum infeed .

ode - Version 2

Pl i C

which relan the perform

ser System.

ng all HV eqsuch equipm

compensatioPower Fact

);

gic that ena

cal location

r motor Loadto model theovide data

d from that t User Systeoperating a

nt of fault; b-transient

the User Sysabove; and

2.0

d V i 2

ating to eacmance of th

quipment anment.

on equipmetor correctio

able operatin

and Syste

ds Connectee short circucalculated

User Systeem. The Userrangements

fault curre

stem as see

2 0

ch he

nd

nt on

ng

m

ed uit in

m er s.

nt

en

Page 119: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 15

B.3.5

Where ththe Userthese cas• the a• the D

each • the a

to eff

B.3.6

The folloswitch dincluding• rated• opera• rated• rated• rated• rated

B.3.7

Name pla

B.3.8

The follow• rated• opera• positi• zero • circuiFor unde

• cable• cond• numb

B.3.9

The folloand the U• trans• windi• tap c

ctricity Transmi

f 21

Demand

he Demand r may requeses the follolternative Co

Demand whicalternative C

arrangementfect transfer.

Switchg

owing informdisconnectorg those at Pr voltage (kV

ating voltage current (A) short-circui Load-break peak short-

Name Pl

ate data for

Circuit P

wing data sh voltage (kV

ating voltageive phase sephase sequit rating (A).

erground cab

e size (mm) auctor size(mber of cables

Intercon

wing data shUser Systemformer ratingng arrangemhanging faci

ission Compan

d Transfer C

from one Usest OETC toowing informonnection Poch may be trConnection s for transfe

ear

mation must rs and isolaroduction FaV); e (kV); ); t breaking c

king current,-circuit maki

late Data

all equipmen

Parameters

hall be proviV); e (kV); equence resence resista

ble or overhe

and length mm) and lengs/conductors

nnecting Tra

hall be provim; g and impedment and veilities and ta

ny

Capability

ser could be take this ination must boint(s); ransferred uPoint (to the

er (e.g. manu

be provideators) on acilities;

urrent, 3-ph 3-phase (kAng current, 3

nt.

(for all circ

ded for each

sistance, reaance, reactan

ead line;

gth; and s per phase.

ansformers

ided for eac

dance voltagctor group; apping range

e supplied fronto account be supplied;

nder the lose nearest 1Mual or autom

ed for all swll circuits C

ase (kA) andA) and 1-pha3-phase (kA

cuits)

h circuit;

ctance and nce and sus

h transforme

ge; and

e.

The Grid Co

D

om more thain designing

ss of the mosMW/1Mvar); matic) togeth

witchgear (inConnected t

d 1-phase (kase (kA); an) and 1-phas

susceptancesceptance; a

er between t

ode - Version 2

Pl i C

an one Conng the Conne

st critical circand

her with the

ncluding circto the Conn

kA); d se (kA).

e; and

the Transmi

2.0

d V i 2

nection Poinection Site.

cuit from or t

time require

cuit breakernection Poi

ssion Syste

2 0

nt, In

to

ed

rs, nt

m

Page 120: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 16

AppendSome offacilitate will be redata itemunless thmust be

C.1

Each Poto be Dilarge EmCDGensAll Gense

C.1.1

For eachsupplied providedWhere thtransformProducerFacility o• the m• the D• the D

C.1.2

The folloCDGens

d) G

1

2

3

4

5

6

7

8

9

1

ctricity Transmi

f 21

dix C Def the data itan prelimina

equired (befoms have beehe values, kcopied to PW

Genset Dat

wer Producerectly Connmbedded Get et data shall

Demand

h CDGenset through th

. he Productiomer and whr User Syst

of; maximum DeDemand at thDemand at th

Synchro

owing CDGet;

Genset Para

. rated

. rated

. rated

. Maxim

. Minim

. short

. direct

. direct

. direct

0. direct

ission Compan

etailed Platems below ary assessmore an offer n repeated hnown or estWP.

ta

er or potentected, to th

Gensets, sha

l be provided

d

which has ahis transform

on Facility hhich is supptem, the Po

emand that che time of thhe time of m

onous Mach

Genset and

ameters

terminal volt

MVA;

MW;

mum Genera

mum Generat

circuit ratio;

axis synchr

axis transie

axis sub-tra

axis transie

ny

anning Dawill have b

ment by OETof terms for

here for comtimated, hav

tial Power Phe Transmisall provide

d at referenc

an associatemer when t

as Demandplied from eower Produc

could be impe peak Deminimum Dem

hine and As

Production

ts (kV);

ation MW;

tion MW;

ronous react

ent reactance

ansient react

ent time cons

ata been providTC to determr a Connecti

mpleteness ave changed.

Producer withssion System

OETC and

ce site condi

ed Genset trthe CDGens

in addition either the Tcer shall su

posed on themand on themand on the

ssociated Co

n Facility d

tance;

e;

tance;

stant;

The Grid Co

D

ded previousmine whetherion Agreemeand the data Data provi

h CDGensetm and/or witd PWP with

itions.

ransformer, set is at C

to that suppTransmissionupply foreca

e Transmissi TransmissioTransmissio

ontrol Syste

data should

ode - Version 2

Pl i C

sly under Ar detailed staent can be m

a need not beided under t

ts Directly Cth existing, h data rela

the value ofCapacity out

plied througn System oasts for eac

ion System; on System; on System.

em Data

be suppli

2.0

d V i 2

ppendix B tability studiemade). Those resubmittethis Append

Connected, oor proposed

ating to eac

f the Demantput shall b

h the Genseor the Powech Productio

and

ed for eac

2 0

to es se ed ix

or d, ch

nd be

et er on

ch

Page 121: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 17

1

1

1

14

1

1

1

1

1

2

e) G• rated• rated• windi• positi• zero • tap c• tap c

f) EExcitationshowing details of• rated• CDG• excita• excita• over-• unde

C.1.3

a) GGovernoof chang• Filter• conve

ctricity Transmi

f 21

1. direct

2. quadr

3. quadr

4. quadr

5. stator

6. stator

7. armat

8. Gense

9. rated voltag

0. field cranginmanu

Genset Tran MVA; voltage rating arrangemive sequencphase sequhanger ranghanger type

Excitation Cn system (ingains, time

f; field voltageenset no-loaation systemation system-excitation limr-excitation

Governo

Governor Par system trae etc of indiv

rs; erters; and

ission Compan

axis sub-tra

rature axis sy

rature axis s

rature axis s

r time consta

r leakage rea

ture winding

et inertia con

field currentge; and

current (ampng from 50%facturers tes

sformer Pa

o; ment and vece resistanceence reacta

ge and step s: on load or

ontrol Systncluding pow constants,

e; ad field volta

m positive cem negative cemiter; and limiter.

or and Asso

arameters –nsfer functiovidual eleme

ny

ansient time

ynchronous

ub-transient

ub-transient

ant;

actance;

direct-curre

nstant (MWs

t (amps) at r

ps) open circ% to 120% ost certificates

arameters

ctor group;e and reactance; size; and off circuit.

tem Paramewer system s

limits, rates

age; eiling voltageeiling voltag

ociated Prim

– All Genseton block diagents includin

constant;

reactance;

t reactance;

t time consta

ent resistanc

sec/MVA);

rated MW a

cuit stator cuof rated valus.

nce (at max

eters stabiliser if fs of change

e; e;

me Mover P

ts gram showin

ng details of;

The Grid Co

D

ant;

ce;

nd Mvar out

urve for CDue in 10% s

x, min and no

fitted) transfeetc of indiv

arameters

ng gains, tim

ode - Version 2

Pl i C

tput and at r

Genset termsteps as der

ominal tap);

er function bvidual eleme

me constants

2.0

d V i 2

rated termin

minal voltagerived from th

block diagraents includin

s, limits, rate

2 0

al

es he

m ng

es

Page 122: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 18

• overa

b) PPrime mrates of terms of • Boile• HP tu• HP tu• HP st• HP st• LP tu• LP tu

c) PPrime mrates of c• inlet g• comp• fuel v• comb• powe

C.1.4

The follow• rate o• rate o• block• rate o• regul• Load• minim• Minim

C.2

C.2.1

Each UsConnectiUser SysConnecti

ctricity Transmi

f 21

all average g

Prime Moverover systemchange etcthe electricars;

urbine; urbine poweteam extractteam extract

urbine;and urbine power

Prime Moverover systemchange etc oguide vanespressor; valve; bustion chamer turbine.

Product

wing data shof Loading frof Loading frk Load followof Deloadingating range; rejection ca

mum time thamum Shut D

User Syste

Introduc

ser, whetherion Point or stem associon Points.

ission Compan

gain (MW/Hz

rs Parametem transfer fuc of individual CDGenset

r fraction;; tion range (etion valves;

r fraction.

r Parameterm transfer fuof individual s;

mber; and

ion Facility

hall be provirom Cold shrom Warm s

wing synchrog from norma; apability whilat Genset mown Time

m Data

ction

r Connectedseeking suc

ciated with t

ny

z).

ers – Steamunction blockal elementst rated MW i

expressed in

rs – Gas Tuunction blockelements an

Flexibility

ded for eachutdown (CD

shutdown (Conising; al rated MW

le still Synchmust be Synh

d Directly toch a Direct Cthe Connect

m Turbines Gk diagram ss and controincluding de

n terms of th

rbines Genk diagram snd controller

Performanc

h CDGensetDGenset and

DGenset an

W;

hronised andhcronised to

o the TransmConnection,tion Site co

The Grid Co

D

Gensets howing gainollers with ptails of;

he boiler rate

nsets howing gainrs including d

ce

t and Produc Production

nd Productio

d able to supthe Transm

mission Sys shall provid

ontaining the

ode - Version 2

Pl i C

ns, time conparameters

ed output);

ns, time condetails of;

ction FacilityFacility); n Facility);

pply Load; mission Syste

stem througde OETC wie existing a

2.0

d V i 2

nstants, limitexpressed

nstants, limit

y;

em; and

h an existinth data on i

and propose

2 0

s, in

s,

ng ts

ed

Page 123: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 19

C.2.2

Each UsarrangemConnectiThe sing• busba• electr

simila• phas• Earth• switc• CTs a• opera• numb

C.2.3

For thosefor each • rated• rated• rated• full Lo• mean• moto• drive • moto

C.2.4

The followTransmis• rated• rated• windi• positi• zero • tap c• tap c• Earth• Trans

ctricity Transmi

f 21

User Sys

ser shall proment(s) of ion Points. le line diagraar layout(s);rical circuitrar equipmening arrangem

hing arrangehing facilitieand VTs; ating voltagebering and n

HV Moto

e Users’ SysHV motor; voltage kV; MVA; MW; oad current ns of startingr torque/spetorque/speer plus drive

Intercon

wing data shssion System MVA; voltage rating arrangemive sequencsequence rehanger ranghanger type

hing methodsformer cool

ission Compan

stem Layou

ovide a singall Load c

am shall inc

ry (ie overhnt); ments; ments; s;

es; and nomenclature

or Drives

stems that c

A; g and magnieed characteed characterinertia const

nnection Tra

hall be provim;

o; ment and vece resistanceeactance; ge and step s: on Load or: direct, resisling arrange

ny

ut

gle line diagurrent carry

lude;

head lines,

e.

contain HV m

tude of stareristic; ristic; and tant.

ansformers

ded for each

ctor group;e and reacta

size; r off Load; stance or rements.

gram showiying Plant

undergroun

motors, the

rting current;

h transforme

nce (max, m

actance; and

The Grid Co

D

ing both therelating to

nd cables,

User shall p

;

er Connectin

min and nom

d

ode - Version 2

Pl i C

e existing aexisting a

power trans

provide the f

ng the User S

minal tap);

2.0

d V i 2

and proposend propose

sformers an

following dat

System to th

2 0

ed ed

nd

ta

he

Page 124: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 20

C.3

OETC wtransient purpose.Connecti• busba

any ainsula

• physicompthis in

• speciinclud

• characable

• for econstdens

• any oanaly

C.4

The folloclose any• a full

relays• a full

Syste• a full

systetrans

• for thtermizone

• the mSyste

ctricity Transmi

f 21

Transient O

will need to overvoltage

When requion Sites; ar layout incassociated cators; ical and elepensator equnformation isification detading insulatioacteristics ofes connectedeach CDGentruction, i.e.ity at nominaother informysis.

User Protec

owing informy circuit brea descriptions installed ol descriptionem, includingl description

ems installedformers andhose CDGenal voltage, ; and

most probabem Directly C

ission Compan

Over-voltage

undertake e assessmeuested by OE

cluding dimecurrent trans

ectrical parauipment Cons required foails of all Plaon levels; f overvoltaged at the busbnset or Pro, three or fival voltage; a

mation that O

ction Data

mation is reqaker at a Co, including er to be insta

n of any aug type, time n, including d, or to be ind their assocensets havin

the clearan

ble fault cleaConnected t

ny

e Assessm

insulation cnts. OETC ETC, each U

ensions andsformers, vo

ameters of lnnected at tor the purposant Connect

e protection bar; oduction Facve limb coreand OETC may

quired for allnnection Poestimated o

alled on the Uuto-reclose fdelays and actual or e

nstalled on Gciated Conneng (or intennce times for

arance timeo the Transm

ent Data

o-ordinationmay reques

User shall pr

geometry tooltage transf

lines, cablesthat busbar se of calculated Directly

at the busb

cility transfoes or single

reasonably

l Protection oint or any Or actual settUser Systemfacility instainitiating fun

estimated seGensets, Geections; nded to havr electrical fa

es for electrimission Sys

The Grid Co

D

studies anst additionalrovide the fo

ogether withformers, wa

s, transformor by lines

ating surge imor by lines a

ar and at the

ormer, dataphase units

request for

equipment OETC circuit

tings, for allm; alled or to bnctions; ettings, for aenset transfo

ve) a circuitaults within t

ical faults otem.

ode - Version 2

Pl i C

nd may neel data from U

ollowing data

h electrical pall bushings,

mers, reactoor cables tompedances;and cables

e terminatio

concerning, and operat

the purpos

that can tripbreaker; l Protection

be installed

all relays anormers, Prod

t breaker atthe CDGens

on each par

2.0

d V i 2

ed to conduUsers for tha for specifie

parameters o, and suppo

rs and shuo that busba; to the busba

n of lines an

g transformeting peak flu

es of syste

p, inter-trip o

systems an

on the Use

nd Protectioduction facili

t the Genseset Protectio

t of the Use

2 0

ct is

ed

of ort

nt ar;

ar

nd

er ux

m

or

nd

er

on ty

et on

er

Page 125: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 21

AppendD.1

For modfull listing

D.2

To thosecalculatiowith GooConnecti• symm

instan• symm

basedcontr

• the zconsi

• the p• the p• appro• Any o

ctricity Transmi

f 21

dix D TraSystem Mo

elling purpog of submitte

Short Circu

e Users who ons, OETC wod Industry Pion to the Usmetrical threent of fault bametrical thred on transie

ribution has szero sequenistent with thre-fault voltaositive sequopriate intercother data re

ission Compan

ansmissioodel

oses, OETC,ed and regist

uit Calculati

need to mowill provide tPractice, as ser System. e-phase sho

ased on sub-ee-phase shent impedansubstantially

nce source he maximumage magnituuence X/R raconnection tequested as

ny

on System

, on requesttered data re

ions

odel the Tranthe followingan equivale

ort circuit cur-transient imhort circuit nce of CDGy decayed; resistance a

m infeed; de at which

atio at the instransformer considered

m Data

t, will providelating to the

nsmission Sg System daent 220 kV

rrent infeed mpedance of

current infeensets, i.e.,

and reactan

the maximustant of faultdata, as reqreasonable

The Grid Co

D

de Users ane Transmiss

ystem for thta. It will be or 132 kV s

from the TraCDGensets

eed from th after the s

nce values a

um fault currt; uested; .

ode - Version 2

Pl i C

d potential sion System.

he purpose ocalculated i

source at the

ansmission Ss; he Transmisub-transient

at the Conn

ents were ca

2.0

d V i 2

Users, with .

of short circun accordance HV point o

System at th

ssion Systet fault curre

nection Poin

alculated;

2 0

a

uit ce of

he

m nt

nt,

Page 126: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

CC.1 CC.2 CC.3 CC.4 CC.5 CC.6

CC.7

ectricity Tran

IntroductionObjective ...Scope ........Procedure .Connection Technical, dCC.6.1 TCC.6.2 PCC.6.3 CCC.6.4 CCC.6.5 SSite related CC.7.1 RCC.7.2 CCC.7.3 OCC.7.4 SCC.7.5 ACC.7.6 MCC.7.7 S

nsmission C

Conn

n ..............................................................................................design and oTransmissioPlant relatingCDGenset reCommunicatSystem monconditions .

ResponsibiliConnection Operation anSite CommoAccess........MaintenanceSite operatio

Company

ection C

CON

...................

...................

...................

...................

...................operational cn System peg to User/OEequirementstions equipm

nitoring ...........................ties for SafeSite Schedund Gas (SF6

on Drawings...................

e standards .onal procedu

Conditio

NTENTS

...................

...................

...................

...................

...................criteria ........erformance cETC Connecs .................ment ..................................................

ety ...............ules .............6 ] Zone Diag..................

...................

...................ures ............

The Grid C

ons Code

...................

...................

...................

...................

...................

...................characteristiction Site ......................................................................................................................grams .....................................................................................

Code - Versi

e

Issue

...................

...................

...................

...................

...................

...................ics ...................................................................................................................................................................................................................................................

on 2.0

ed April 201

...................

...................

...................

...................

...................

...................

...................

...................

...................

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

.................. 1

10

. 2

. 2

. 2

. 2

. 3

. 3

. 3

. 4

. 8 10 11 11 11 12 12 13 14 14 14

Page 127: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

Conne

CC.1 IThe Concriteria thTransmismust be Transmisto enableIf a UsederogatioEach Usethe Transtake prec

CC.2 O The objetechnicalSystem aenable Odiscrimina

CC.3 SThe Conn Powe Poten

Syste Powe Licen Licen Direc PWP Intern Intern RAEC

CC.4 PThe ECATransmiscertain cothe right t

ectricity Tran

ection C

Introductnection Con

hat must be ssion System

complied wssion Systeme OETC to coer considerson from the Rer will have smission Syscedence.

Objective

ctive of the , design andand to a UsOETC to coatory way.

Scope nection Coner Producersntial Power em; er Producerssed Distribused Supplietly Connecte(in its role in

nally Interconnational InterC if Connect

ProcedurA/ECUOSAsssion Systemonditions to to become o

nsmission C

Conditio

tion nditions Cod

complied wm, and the with by OEm and Usersomply with it

s that it is Regulatory Aa ECA/ECUstem. Where

e

Connectiond operationaer's Systemomply with

ditions Codes Directly Co

Producers

s with large Eutors; ers; ed Consumen procuring nnected Parrconnected ted to the To

re s contain prm or, in the c

be compliedoperational.

Company

ns Code

de specifies with by User

minimum teETC. These s’ Plant Direts Licence. unable to m

Authority. UOSA with Oe there is an

n Conditionsal criteria the

m are similarthe Secto

e applies to onnected to t

seeking to

Embedded C

ers; New Capacirties; Parties; and

otal System.

rovisions recase of Embd with by Us

e

the minimurs Connectedechnical, decriteria are

ctly Connec meet any o

OETC that isny possible c

s Code is toe basic rulesr for all User Law and

OETC and tthe Transmiso be Direct

CDGensets;

ity);

d

elating to thbedded CDGsers prior to

The Grid C

um technicad or seeking

esign and oe required fcted to the T

of the cond

s specific to conflict, thes

o ensure thas for Conners of an equ

its Licenc

to Users, incssion Systemtly Connect

he procedurGensets, inclo OETC noti

Code - Versi

l, design ang to be Con

operational cfor the prot

Transmission

itions, they

that User’s Cse Connectio

at by specifyction to the uivalent catee obligation

cluding; m; ted to the

re for Connlude provisioifying the Us

on 2.0

nd operationnnected to thcriteria, whictection of thn System, an

should see

Connection on Condition

ying minimuTransmissio

egory and wns in a no

Transmissio

nection to thons relating ser that it ha

nal he ch he nd

ek

to ns

um on will on-

on

he to as

Page 128: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

CC.5 CThe provECA/ECUand repoSafety RuPrior to tsubmitted(a) up

puup

(b) de(c) co

w(d) in

th(e) an(f) th

si(g) a (h) a

mcoU

(i) a Sc

(j) in(k) M

CC.6 T

CC.6.1 OETC shdesign aConnectio

CCDuring nSystem sDuring ex50.1Hz uUnder Di48.00 Hz

ectricity Tran

Connectivisions relatUOSA with aorts relating ules, commithe Compled by the Usepdated Planurposes conpdated estimetails of the opies of all hich shall beformation to

he provisionsn Operation

he proposedmilar to, thelist of Safetylist of the

management onfirmation tser; list of ma

chedules onformation to

Metering Syst

Technica

Transmhall ensure nd operatioon Site with

C.6.1.1 Freormal operashall be 50.xceptional stnless Disturisturbed con.

nsmission C

ion ing to Conna User and to complian

ssioning protion Date u

er; nning Codenfirmed or, wmates for theProtection aSafety Rule

e used at theo enable OEs set out in ADiagram for name of th name of any Coordinatoe telephone

representathat they are

nagers whon behalf of tho enable OETtem Registra

al, design

ission Systhat the Tr

onal criteria a User.

equency deating condit00 Hz and teady state rbed circumsnditions, Sys

Company

necting to thinclude pro

nce with theogrammes, Onder the EC

e data with where practe future and arrangementes and Locae OETC/Use

ETC to prepaAppendix A;r all HV Plan

he User site ny OETC siteors; e numbers atives nomine fully autho

o have beehe User; TC to prepaation Data.

n and ope

stem perforansmission in relation

eviations tions, the nowill be contconditions,

stances prevstem Freque

he Transmisovisions relate relevant COperation DiCA/ECUOSA

any estimical, replaceby updated ts and settinal Safety Iner interface;are Site Res

nt on the Use(which shal

e or of any o

for joint nated for thorised to ma

en duly aut

re Site Com

erational

rmance chSystem co

to the part

ominal Systtrolled normFrequency dvail. ency could r

The Grid C

ssion Systemting to the s

Connection iagrams andA, the follow

ated valuesed by validaforecasts fogs;

nstructions a

sponsibility S

er side of thell not be the

other User si

System Inche purposeke binding d

thorised to

mmon Drawin

criteria

haracteristomplies with

of the Tran

tem Frequemally betweedeviations w

rise transien

Code - Versi

m are contasubmission oConditions f

d approval towing informa

s assumed ted actual vr items such

applicable a

Schedules o

e Connectioe same as, ote);

cidents at can be c

decisions on

sign Site

ngs; and

ics h the follownsmission S

ncy of the en 49.95Hz will not excee

ntly to 51.50

on 2.0

ained in eacof informatiofor that Use

o Connect. ation is to b

for planninvalues and bh as Demand

t Users’ site

n the basis

n Point; or confusing

which seniontacted an

n behalf of th

Responsibili

wing technicaSystem at th

Transmissioand 50.05Hed 49.90Hz

0 Hz or fall

ch on er,

be

ng by d;

es

of

gly

or nd he

ity

al, he

on Hz.

to

to

Page 129: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

CC(a) Th

C10

(b) ThCno

During scollapse t

CCAll Plant each Covoltage w

CC.6.1.3The max132kV, fr(unless ano individ

CC.6.1.3Under Plaphase voconditionUnder Pl2.0% areECA/ECU

CC.6.1.4Voltage fSystem avoltage lethan stepa risk to t

CC.6.1.5 The level61000-3-of 0.6 Un

CC.6.2 The followensure th

ectricity Tran

C.6.1.2 Volhe voltage onnection S0.0% and a he voltage onnection Sominal valueome Systemtransiently to

C.6.1.3 VolConnected tnnection Sit

waveform in

.1 Harmoimum total lrom all sourcabnormal condual harmon

.2 Phaseanned Outagoltage on ths prevail. anned Outa

e permitted fUOSA.

4 Voltage fluctuations at the Connevel for stepp changes mthe Transmis

Flicker Sevl of voltage f7, with a Fli

nit.

Plant rewing requirehat its Plant c

nsmission C

ltage variaton the 220

Site with a Umaximum voon the 66k

Sites with Ue unless abnm Disturbano zero at the

ltage wavefto the Transte, should brespect of h

onic distortevels of harces under bnditions previc greater th

e unbalancege conditionhe Transmis

age conditionfor phase un

fluctuationsarising fromection Point

p changes thmay be allowe

ssion System

verity: fluctuations acker Severit

elating to Uements applycomply with

Company

ions kV and 132

User will remoltage of +1

kV, 33kV anUsers will nonormal condinces such ae point of fau

form qualitymission Sysbe capable armonic con

tion rmonic distooth normal, vail) shall no

han 1.5.0%.

e ns, the maximssion System

ns infrequennbalance, su

s m a fluctuatint to the Tranat may occued up to a lem or to the S

at a Connecty (Short Te

User/OETC y to Plant atthese cond

2kV parts omain within 0.0%.

nd 11kV sidormally remitions prevaias where shult until the fa

y stem, and th

of withstanntent and ph

ortion on thePlanned Ou

ot exceed a

mum negativm should re

nt short duraubject to the

ng Load Dirensmission Sur repetitivelevel of 3.0% System of an

ction Point sherm) of 0.8 U

Connectiot User/OETCitions.

The Grid C

of the Transthe limits of

des of Transmain within t

l. hort circuits ault is cleare

at part of theding the fo

hase unbalan

e Transmissiutage and Ftotal harmon

ve phase seemain below

ation peaks e prior agree

ectly ConneSystem shally. Any largeprovided th

ny User.

hall be withiUnit and Flic

on Site C Connection

Code - Versi

smission Sysf a minimum

smission trathe limits +/

occur, the ed.

e Transmissllowing distonce.

ion System Forced Outagnic distortion

quence comw 1.0% unle

with a maxiement of OE

ected to the l not exceed

e voltage excat this does

n the limits dcker Severity

n Points. Ea

on 2.0

stem at eacm voltage of

ansformers /-6.0% of th

voltage ma

sion System ortions of th

at 220kV ange conditionn of 2.0% wi

mponent of thess abnorm

mum value ETC under th

Transmissiod 1.0% of thcursions othnot constitu

defined in IEy (Long Term

ach User mu

ch f -

at he

ay

at he

nd ns, ith

he mal

of he

on he er

ute

EC m)

ust

Page 130: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele CC.6.2.The desTransmiswith the Distributiovoltage cvoltage. Tconditionearth. All User Pthe follow(a) Sa(b) O

byim

(c) thth

(d) naIn the eveunder CCissue to tReview Pshould beWhere OPlant withand/or staUser shaprovide rspecificatthe Grid CPower Ptransformtransformliaise withAll Usersoutside thlimits therectify theIt is recoSystem in(a) lo(b) ov(c) ov(d) an(e) au

Users ma

ectricity Tran

1 Gensign of Conssion SystemLicence reqon System

could fall tranThe voltage s referred to

Plant associwing standarafety Rules;

Omani Electry and amen

mposed undehe standardshe Internationational standent that any C.6 is amendthe Grid CodPanel shall me taken, if anETC determh the Transandards to a

all comply wreasonable etions and/or Code Review

Producers smers if requemers Connech OETC on ts shall ensurhe limits of n the Users e situation. ommended tncluding Pro

oad unbalancver/under vover/under Frny combinatutomatic rec

ay consult O

nsmission C

neral requirnnections bm Operator oquirements o

Operator. Unsiently to zrise would

o here are th

iated with thds, as applic ical Standarnded by theer the Sectos and recomnal Electrotedards and costandard or

ded, OETC,de Review pmake a recony, regarding

mines that in mission Sysapply to the

with the additevidence asstandards.

w Panel for shall provideested by Octed to the Tthe design sre that the P0.95 lagginshall take a

that Users totection agaice (negativeoltage requency tion of (b) anclosing (eithe

OETC with re

Company

rements etween anyor Licensed of the LicensUnder fault ero on one olast only for

hose existing

he Connectiocable. (in the

rds, which ae Grid Coder Law;

mmendationsechnical Comodes which ar specificatio after havingpanel for coommendatiog compliancorder to ens

stem, there design of a tional requirs necessaryIf a User is review e on-load ETC. Dem

Transmissionspecification Power Factog and 0.95ll necessary

take precautinst;

e sequence)

nd (c) that mer single or t

espect to Pro

y CDGenseDistribution sed Transmconditions

or more phar the time thag when the t

on to the Trae following o

are such nate Review Pa

s of the Intermmission; anare accepted

on with whichg consulted nsideration.

on to the Ree. sure safe anis a requireUser’s Plan

rements. Ony to demonsstill not satis

tap-changinmand Users n System if for the perfo

or of Demanleading. If t

y steps to ad

tions agains

protection

ay result in othree phase)

otection ade

The Grid C

et and the System Op

mission Systethe rated F

ases or rise tat the fault ctype of fault

ansmission order of prec

ional standaanel from ti

rnational Stand d internationh a User’s Pwith the affeFollowing t

egulatory Au

nd co-ordinament for sut, OETC sha

n request frostrate the nesfied, the Us

ng (OLTC)shall providrequested b

ormance of td at the Cothe Power F

dd reactive c

st Disturban

overfluxing)

quacy.

Code - Versi

System ofperator shall em OperatoFrequency cto 140.0% pconditions eis single or

System shacedence);

ards as mayme to time

andards Org

nally. Plant is requiected Usershe review, tuthority as t

ated Operatiopplemental all notify theom the Usereed for the ser may refe

facilities fode OLTC faby OETC. Athe tap-channnection PoFactor falls compensatio

ces on the

on 2.0

f a Licensebe consiste

or or Licensecomponent phase-to-earexist. The fautwo phase-t

all comply wi

y be approveor which a

ganisation an

ired to comps will bring ththe Grid Codo what actio

on of a Userspecification

e User and thr, OETC shasupplement

er the issue

or all Gensacilities for aAll Users shanging facilityoint never faoutside thesn capability

Transmissio

ed ent ed of

rth ult to-

ith

ed re

nd

ply he de on

r’s ns he all tal to

set all all . lls se to

on

Page 131: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

CC

CC.6.2.2Each Cona circuit bPoint as d

CC.6.2.2Protectiominimumthe impac

CC.6.2.2The faultequipmenTransmisinceptionConnecteSlower fato writtenmay be requiremein accord2.0%. The PowMain ProProtectiodamage.

CC.6.2.2(a) PThe requ(i.e. the pof the circ(b) CWhen a Cbreaker iprovided operationbreakers to initiatethe fault c(c) LoThe Powand initia(d) PoWhere Syfor Powe

ectricity Tran

C.6.2.2 Pow

.1 Short nnection betbreaker capdetermined

.2 Gensen of CDGen

m requiremenct on the Tra

.3 Fault t clearance nt Directly ssion System to the circed to the 132ault clearancn agreementagreed in aents, in OETance with th

wer Producerotection systns shall be

.4 Protecrotection of

uirements foprimary condcuit breaker ircuit-breakeCDGenset iss provided bby the Pow

n of a Protewithin the fa

e tripping of current withioss of Excita

wer Producete a CDGenole-Slipping ystem requir Producers

nsmission C

wer Produc

t circuit levetween a CDable of interby OETC.

et and Prodnset and thents given beansmission S

clearance ttimes for faConnected

m Directly Ccuit breaker 2kV or 220 kce times mayt by OETC. accordance TC’s view, phe ECA/ECU

rs shall provtems. OETCcoordinated

ction requirinterconnectr the provisiductors fromto the Conn

er fail Protecs Connectedby the Powewer Produceection systeault current iall the necen the next 2

ation rs must pro

nset trip. Protection

rements dictto fit pole-sl

Company

cer/OETC Co

els Genset andrrupting the

duction Faceir Connectielow. These System of fa

times aults clearedd to the TConnected tarc extincti

kV Systemsy be specifieSlower faulwith the te

permit. The UOSA shall b

vide Back-UC shall also

so as to pr

rements ting Connecion of Prote

m the currennection Pointction d to the Traner Producer er or OETCem, of a fainterruption

essary electr200 ms.

vide Protec

tate, OETC lipping Prote

onnection P

d the Transmmaximum s

ility Protectons to the Tare necessa

aults on circu

d by Main Transmissionto the Poweion, shall no

ed for faults lt clearance erms of theprobability tbe exceeded

Up Protectionprovide Bac

rovide discri

ctions ction equipm

nt transformet) shall be sp

smission Syor OETC, c

C on this cirilure to intetime, the cirrically adjace

tion to dete

shall specifyection to the

The Grid C

Points

mission Systeshort circuit c

tion arrangeTransmissioary to reducuits owned b

Protection on System er Producerot be longe

on the Trantimes for fa

e ECA/ECUOthat the faultd by any give

n to cover tck-Up Protemination an

ment for inteer accommopecified in th

ystem at 220circuit breakrcuit breakeerrupt fault cuit breakerent circuit-b

ct loss of e

y in the ECAir CDGenset

Code - Versi

em must becurrent at th

ements on System mce to a practby Power Pro

on the Powand for fa

rs’ equipmeer than 120

smission Syaults ProducOSA but ont clearance en fault mus

he possible ection and thd protect eq

erconnectingodation on thhe ECA/ECU

0kV or 132kVker fail Proter. In the evcurrent by

r fail Protectireakers so a

excitation on

A/ECUOSA ats.

on 2.0

e controlled bhe Connectio

must meet thtical minimuoducers.

er Produceraults on th

ent, from faums for Pla

ystem, subjection Facilitienly if Systetimes derive

st be less tha

failure of thhese Back-Uquipment fro

g Connectionhe circuit sid

UOSA.

V and a circuection shall bvent, followin

these circuon is requireas to interru

a CDGens

a requireme

by on

he um

rs’ he ult

ant

ect es

em ed an

he Up om

ns de

uit be ng uit-ed upt

set

ent

Page 132: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele (e) WNo busbpower sualtered by(f) RProtectiowith the E

CC

CC.6.2.3ProtectioConsume

CC.6.2.3The fault and Direcfor faultsDirectly CextinctionThe timesPlant ConSlower fafaults on Distributoterms of fault cleagiven fauThe LiceProtectioprovide Bspecified so as to Distributothan 300Connecte

CC.6.2.3Where a provide Ofaults or User Profaults onrequireme

CC.6.2.3Where auSystem, requireme

ectricity Tran

Work on Protear Protectio

upplies or DCy Power Proelay Settingn and relay ECA/ECUOS

C.6.2.3 LicConn

.1 Protecn of Distriers must me

.2 Fault clearance ti

ctly Connect on the TraConnected n, shall be ses specified innected to thault clearanthe Transm

ors’ and Direthe ECA/EC

arance timeslt must be leensed Distrn to cover Back-Up Profor the Liceprovide dis

ors or Direcms for faultsed with the T

.3 Fault OETC circu

OETC with tSystem ab

otection shaln the User ents specifie

.4 Automutomatic rec

automatic ents specifie

nsmission C

ection Equipon, circuit-brC tripping as

oducer persos settings shaSA to ensure

censed Disnection Poin

ction arrangibution Syset the minim

clearance times for faulted Consum

ansmission SConsumers et out in eacn accordanche 132kV orce times m

mission Systectly ConnecCUOSA but s stated in acess than 2.0ributors or the possibleotection, whnsed Distribscriminationtly Connects on the LicTransmission

disconnectuit breaker isthe means onormalities ll also provid

System. Ted in the EC

matic switchclosure of O

switching ed in the EC

Company

pment reaker fail Pssociated wonnel in the a

all be coordine effective d

stributors ants

gements stems of Lmum requirem

times lts on the Sy

mers’ equipmSystem Direequipment,

ch ECA/ECUce with the Er 220 kV Sys

may be specem. Slower

cted Consumonly if Systeccordance w%. Directly C

e failure of hich shall rebutors’ or Dir. The Back-ed Consum

censed Distrn System at

tion facilities not provideof tripping aon the Trande signals t

These trippiCA/ECUOSA

hing equipmETC circuit equipment

CA/ECUOSA

Protection rewith the CDG

absence of a

nated acrossisconnection

and Direct

Licensed Diments referr

ystem of a Lment Connecectly Conne, from fault

UOSA. ECA/ECUOSstems. cified in acc

fault clearamers’ Plant mem requirem

with the ECA

Connected Cthe Main P

esult in a farectly Conne-Up Protect

mers shall haributors’ or D220kV or 13

es ed at the Useall the User nsmission Sto trip the ang facilities

A.

ment breakers is shall be

A.

The Grid C

elays, AC oGenset itself)a representa

s the Connen of faulty Pl

tly Connec

istributors ared to below

icensed Distcted to the Tcted to the inception to

SA shall not

cordance witance times fomay be agrements permitA/ECUOSA s

Consumers Protection syault clearancected Consuion to be pave fault cleDirectly Con32kV,

er Connectiocircuit break

System. In tppropriate Os shall be

required folprovided in

Code - Versi

or DC wirin) may be woative of OET

ection Point ilant.

cted Cons

and Directly.

tribution SysTransmission

Licensed Do the circui

be longer th

th the ECA/or faults on ed in accordt. The probashall be exc

shall provystems. OETce time slowmers’ Back-

provided by earance timenected Con

on voltage, tkers necessthese circumOETC circuiin accorda

llowing faultn accordan

on 2.0

g (other thaorked upon

TC.

in accordanc

sumers/OET

y Connecte

stem Operatn System, anDistributors’ t breaker a

han 120ms f

/ECUOSA fthe License

dance with thability that thceeded by an

vide Back-UTC shall alswer than th-Up Protectiothe License

es not slowsumers’ Pla

the User musary to isolamstances, tht breakers fnce with th

s on the Usnce with th

an or

ce

TC

ed

tor nd or

arc

for

for ed he he ny

Up so

hat on ed

wer ant

ust ate he for he

ser he

Page 133: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele CC.6.2.3Protectiowith the E

CC.6.2.3Where Owiring (otDirectly CDistributoof OETC.

CC.6.2.3At nomintransformconnecte

CC.6.2.3As requirthat shallspecifies split into requireme

CC.6.3 This secteach Pow

CCAll CDGe(MW) at leading athan 0.5.output wioutput ocwith FreqSystem FThe Activto the ToperatingAvailableCC.6.1.2It is an eCapabilitystrategicathe ECA/

ectricity Tran

.5 Relayn and relay ECA/ECUOS

.6 Work OETC owns ther than poConnected ors’ or Direct.

.7 Neutral System v

mers and traed with the st

.8 Frequred under thl facilitate athe mannerdiscrete M

ents relating

CDGenstion sets ouwer Produce

C.6.3.1 Plaensets must

any point bat the CDGe. A CDGensithin the Sysccurring in thquency. CDGFrequencies ve Power ouransmission

g range. Thee within the .

essential reqy. This shaally located /ECUOSA w

nsmission C

y settings settings shaSA to ensure

on Protectithe busbar wer suppliesConsumerstly Connecte

ral earthing voltages of 1ansformer batar point suit

uency sensihe Operatingutomatic unr in which D

MW blocks g to under-fre

set requireut the techner must ensu

ant performabe capable

between theensets’ termset must bestem Frequehe FrequencGensets muswithin the ra

utput under sn System she Reactive range of Tr

quirement thall be achiev

Production whether or no

Company

all be coordine effective d

ion equipmat the Con

s or DC tripp’ Plant) maed Consume

32kV and aanks Connetable for Con

itive relaysg Code, eacnder-frequenDemand subwith associequency rela

ements ical and des

ure are comp

ance requirof contribut

e limits 0.80inals. The s

e capable oency range 4cy range 49.st remain syange 48.00Hsteady statehould not bPower outpuransmission

at the Transved by agreFacilities. F

ot a Black St

nated acrossisconnection

ment nnection Poiping associa

ay be workeers’ personn

above the higected to thennection to e

ch Licensed ncy de-energbject to undeated under-ays are liste

sign criteria plied with in

rements ing to Prima

0 Power Fashort circuit f continuous49.50 to 50..50 to 48.00ynchronised Hz to 51.50He conditions be affected ut under steSystem vo

smission Syeeing a Bla

For each Protart Capabilit

The Grid C

s the Connen of faulty Pl

nt, no busbated with theed upon or nel in the abs

gher voltagee Transmissiearth.

Distributor sgisation of Der-frequency-frequency d in Append

and perforrelation to it

ary Control bctor laggingratio of CDGsly supplyin50Hz. Any d

0Hz should nto the Tran

Hz. of any CDGby voltage

eady state cltages within

ystem must ack Start Caoduction Facty is required

Code - Versi

ection Point ilant.

bar Protectioe Licensed D

altered by sence of a r

e windings oion System

shall make Demand. Gry de-energisrelay setting

dix E.

mance requs CDGenset

by supplying g and 0.95 Gensets shag its rated decrease of not be moresmission Sy

Genset Direct changes i

conditions sn the range

incorporate apability at cility OETC d.

on 2.0

in accordanc

on, AC or DDistributors’

the Licenserepresentativ

of three phasmust be st

arrangemenrid Code OCation shall bgs. Technic

uirements thts.

Active PowPower Factall be not lesActive PowActive Pow than pro-raystem at Tot

tly Connecten the normhould be fu

es specified

a Black Staa number shall state

ce

DC or ed ve

se tar

nts C4 be cal

hat

wer tor ss

wer wer ata tal

ed mal

lly in

art of in

Page 134: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

CCEach CDPower acECA/ECUThe capaPWPA orEach CDpoint by c

CC.6.3.2Each Gecontrol pwith rotatSuperimptransient The Turinterconnthe TurbiGas TurbUnder allGenset onegative The Turbturbine tethe PPA /Where a Consumebelow 52operatingAll Steamand operAll Gas Trelated sp

CC.6.3.2A continuto providerange of tControl pconditionThe AVRThe specare neceECA/ECUand Dispa

ectricity Tran

C.6.3.2 ConDGenset musccording to iUOSA. ability for cor the ECA/EC

DGenset mucontinuous m

.1 Turbinnset must brinciple shational speed posed load performanc

rbine Speednected Operaine Speed Cbines Gensel System oposcillations effect on Ge

bine Speed emperature l/PWPA or thCDGenset

ers, the Tur2.00Hz unlesg level when m Turbine Geated to the r

Turbine Genpeed droop

.2 Automuous Automae constant tethe Genset.

performances the dampi

R shall have ncific requiremessary for UOSA. Operatch Code.

nsmission C

ntrol arrangst be capabts Primary R

ontributing tCUOSA. OE

ust be capamodulation o

ne control sbe fitted withll be in suchaccording tocontrol loope of the Turbd Controlleation modes

Controller shts and 5.0%

perating conwith freque

enset oscillaController alimiting conthe Connectiobecomes isobine Speed ss this causit is possible

ensets mustrequirementsnsets must bcharacterist

matic Voltagatic Voltage erminal volta

of the voltang coefficienno negative ments for AV

System reration of suc

Company

gements ble of contribResponse ca

o SecondarETC shall deble of supp

of Reactive P

system h a fast actinh a way thao a proportiops shall havbine Speed

er shall bes. Under all hall be abov

% for Steam Tditions, the

encies belowation dampinand any othtrol, etc.) shaon Conditionolated from Controller m

ses the CDGe that it mayt be fitted ws of IEC 600

be fitted withic of betwee

ge RegulatoRegulator (

age of the G

age control nt shall be aimpact on G

VR facilities,easons, shch control fac

buting to Prapabilities a

ry Responseetermine the porting voltaPower suppl

ng Turbine at the CDGeonal droop cve no negatControl.

e sufficientlyOperation c

ve 0.25 for sTurbines GeCDGenset

w 2 Hz, theg. er superimpall contributens Code. the rest of tmust also bGenset to oy trip after a ith a Turbine

0. h a Turbine Sen 3.0% and

or (AVR) acting

Genset witho

loop shall bbove 0.25 fo

Genset oscill, including pall be specilities shall

The Grid C

imary Respos set out in

e shall be arequired page regulatiolied.

Speed Contenset Activecharacteristictive impact

y damped conditions, tspeed droopensets. speed shall e Turbine C

posed controe to the Prim

the Total Sybe able to cooperate belotime. e Speed Co

Speed Cont5.0%.

g on the excout instability

be such that or the entire lation dampi

power systemecified in tbe in accord

Code - Versi

onse by supthe PPA or

as set out inrticipation.

on at the in

troller. The te Power outc. on the stea

for both he damping

p settings ab

not exceedController s

ol loop (loadmary Contro

ystem but is ontrol Syste

ow its desig

ntroller whic

troller capab

citation systey over the en

under isolaoperating ra

ing. m stabilisersthe PPA/PWdance with th

on 2.0

pplying ActivPWPA or th

n the PPA

nterconnectio

turbine speeput shall va

ady state an

isolated an coefficient

bove 3.0% f

d 106.0%. Fshall have n

d control, gal as set out

still supplyinem Frequencned minimu

ch is designe

ble of a pow

em is requirentire operatin

ated operatinange.

s where thesWPA or thhe Schedulin

ve he

or

on

ed ary

nd

nd of

for

For no

as in

ng cy

um

ed

wer

ed ng

ng

se he ng

Page 135: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele CC.6.3.2The standexceed 2

CCEach CDsequenceProtectio

CCAt nominaof a CDG

CCThe Systto operatrelays anFrequencPower Pshould Fexcursionfor reaso

CC.6.4 In order tand OETset down

CCControl tspeak to emergencother eleroutine coOETC sequipmenthe OETCcontained

CCOETC shequipmenActive Poalarms toaccordanActive PoindicationOETC onon eachsimultane

ectricity Tran

.3 Dispadard deviati

2.5 percent o

C.6.3.3 NegDGenset she loading inn on the Tra

C.6.3.4 Neual System vo

Genset must

C.6.3.5 Freem Frequente within th

nd/or rate-ofcy range, unroducers shrequency exns occur, it ins of safety

Commuto ensure co

TC must, if r below.

C.6.4.1 Contelephony is

one anothecy operating

ectronic meontrol calls, hall install nt is not capC control ted in the ECA

C.6.4.2 Ophall provide nt at each Cower and Ro the OET

nce with the ower and Rns from Genn an individuh fuel, fromeously must

nsmission C

atch inaccuron of Load

of the Dispat

gative phashall be requncurred by cansmission S

utral earthinoltages of 13be star conn

equency senncy could risis Frequencf-change-of-fder the ECA

hall be respxcursions ouis up to the of Plant and

unications ontrol of therequired by

ntrol telephs the methoer for the pug conditionsans). Contrpriority contcontrol tele

pable of provelephony. DA/ECUOSA.

erational Msupervisory

Connection SReactive Pow

C SCADA terms of the

Reactive Pownsets and Gual Genset bm CDGense

be provided

Company

racies error at steatch Instructio

se sequenceuired to wiclearance oSystem or D

ng 32kV and abnected with

nsitive relayse to 51.50Hcy range unfrequency reA/ECUOSA.onsible for utside the raPower Prod

d/or Persons

equipmente TransmissOETC, be e

hony od by whichurposes of s (all commrol telephonrol calls andephony at viding the reetails of an

etering y control andSite. The Uswer measureOutstation

e ECA/ECUOwer measureGenset transbasis. In addets that cad.

ady state Loons.

e loadingsithstand, wi

of a close-uistribution S

bove the higthe star poin

ys Hz or fall to 4nless OETCelays which

protecting aange 51.5Hzducers to des.

t ion System,established

a User opcontrol of th

munications bny provides d emergency

the User lequired facilid relating to

d data acquer shall provement outpuinterface e

OSA. ements, circsformer tap dition, meas

an continuo

The Grid C

oad over a 6

ithout trippip phase-to-ystem in wh

her voltage nt suitable fo

47.5Hz and C has agree

shall trip su

all their CDGz to 47.5Hz ecide whethe

, telecommuin accordan

perator and he Total Sysbeing confirsecure poi

y control callocation whties or is otho the contro

uisition (SCAvide such vouts and Plaquipment a

cuit breaker positions m

sured or derously fire o

Code - Versi

60-minute pe

ng, the nephase fault

hich it is Emb

windings of or Connectio

CDGenset md to any fruch CDGens

Gensets agaever occur.

er to discon

unications bence with the

OETC contstem in botrmed either int-to-point s. ere the Usherwise incool telephony

ADA) Outstaoltage, curreant status inas required

and disconmust each brived Active on more th

on 2.0

eriod must n

egative phas, by Back-Ubedded.

a transformon to earth.

must continuequency-levset within th

ainst damag. Should sucnect his Pla

etween Userequiremen

trol engineeh normal anby fax or b

telephony f

ser telephonompatible wiy required a

ation interfacnt, frequencdications anby OETC

nnector statue provided Power outp

han one fu

not

se Up

er

ue vel his

ge ch

ant

ers nts

ers nd by for

ny ith re

ce cy, nd in

us to

put uel

Page 136: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele The geneout in ApMetering

CCEach Use(a) in(b) in

an(c) inEach UstelephonePrior to Ctelephonechanges.

CCOETC shenable th

CC.6.5 Some momonitor tTo allow from thetransformequipmen

CC.7 SIn the commiss

CC.7.1 Any UserRules (Elany futureOETC enUntil receEdition, isA User mwhen woRules pronotify theOETC mworking oprovide foOETC, inOETC Sa

ectricity Tran

eral requirempendix D. System req

C.6.4.3 Facer and OETC the case of the case ond the case ofer shall, prie number orConnection e number o

C.6.4.4 Bushall provide he Power Pro

System onitoring eqhe System dthe monitor

e secondarymers. They nt being dea

Site relatabsence oioning, contr

Responr entering alectrical ande revisions ontering and weipt of suchssued 1989

may apply to orking on itsovide for a lee User, in wray apply to on its Plant or a level ofn writing, thaafety Rules w

nsmission C

ments for con

uirements s

csimile macC shall provif Power Prodof OETC and

f Directly Coor to Conne

r numbers, ato the Syst

or numbers

sbar voltagto each Powoducers to s

monitorinquipment is dynamic perring of indiviy windings shall be pro

alt with in the

ted condif agreemerol, Operatio

sibilities foand working d Mechanicaof these ruleworking on h notice, theand amendeOETC for p

s Plant on Oevel of safetiting, that thea User for

on that Usef safety comat OETC mawill apply.

Company

nnection of s

hall be prov

chines de a facsim

ducers, at ead Licensed

nnected Conection to th

and shall nottem of the Uof its facsim

e wer Produce

synchronise

g installed on

rformance. Fdual CDGenof CDGen

ovided by te PPA/PWPA

itions nt between

on and maint

or Safety on its Plan

al) Second Ees) unless otits Plant on e “MEW Saed in 1995” wpermission toOETC sites. ty commense User may permission

er sites. If thmmensurate way use its ow

such signals

ided in acco

ile machine ach ProductDistributors,

nsumers at te System otify OETC ofUser Plant mile machin

er with voltathe CDGens

n the TransFurther suchnset, OETC nset circuit the User wiA.

n the partitenance res

t on a OETEdition issueherwise agrea User site

afety Rules will apply. o work accoIf OETC is

urate with thuse its own to work acce User is ofwith that of wn Safety R

The Grid C

s to the OET

ordance with

or machinesion Facility;, at the resp

the Control Cof the User f any changeOETC shall

ne or machi

age signals sets to the T

mission Sysh equipment

requires vocurrent tra

th the insta

ies to the ponsibilities

TC site will wed 1989 andeed in writinshall work t(Electrical a

ording to thats of the opinhat of the OESafety Rule

cording to Of the opinionthat User S

Rules. Until r

Code - Versi

TC SCADA s

MDEC.

s;

pective Cont

Centre. Plant notify

es. l notify eachnes and sh

at a ConneTransmission

stem to enawill be insta

oltage and cansformers allation of th

contrary, follow owne

work to the d amended ing. to the User and Mechan

t Users ownnion that theETC Safety

es. OETC Safetyn that OETCafety Rules,

receipt of su

on 2.0

system are s

trol Centre(s

y OETC of i

h User of thhall notify an

ection Point n System.

able OETC alled in futurcurrent signa

and voltaghe monitorin

constructioership.

“MEW Safen 1995”, (an

Safety Rulenical) Secon

n Safety Rulee User SafeRules, it sha

y Rules wheC Safety Rule, it shall notich notice, th

set

s);

its

he ny

to

to re. als ge ng

on,

ety nd

es. nd

es ety all

en es ify he

Page 137: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele CC.7.2 A set ofownershicontrol anThe respResponsthe operaAppendixAppendix

CC.7.3

CCAn OperaPoint exiOperationincorporaAt those SF6 gas-delineatenomenclaThe Operecord of HV Plant

CCAn SF6 GPoint exisutilised. Tnomencla

CCIn the casfor all HVwith an OThe UserUser Opefor the co

CCIn the caDiagram produce composit

CC.7.3.4When OEexisting nprior to ththat OETnomencla

ectricity Tran

Connecf Connectiops at the Cond maintenaponsibilities ibility Schedational interfax A sets dowx A provides

Operatio

C.7.3.1 Opation Diagraists using, wn Diagram sate numberinConnection

-insulated Hed by a cature used sration Diagr

f the layout aand related

C.7.3.2 GasGas Zone Dia

sts where SThey shall uature used s

C.7.3.3 Prese of a UserV Plant on thOperation Diar shall then eration Diagomplete Con

C.7.3.4 Prease of a OEfor all HV Pand distribu

te Operation

.1 ChangETC has denumbering ohe installatio

TC site, incorature or the

nsmission C

ction Site Son Site schonnection Sance.

for safety,dule to informace. wn the requa format to

on and Ga

eration Diagam shall be where approshall include ng, nomencl Sites where

HV Plant is hain dottedshall conformram (and theand circuit in Plant.

s (SF6] Zonagram shall

SF6 gas-insuse, where a

shall conform

eparation ofr site, the Ushe User sideagram for alprepare, proram and the

nnection Site

eparation ofETC site, thlant on the U

ute, using th Diagram fo

ges to Operecided that ior nomenclaon or changrporating thechanges, as

Company

Schedulesedules shaite, the Con

, control am site staff

irements forbe used in t

s (SF6 ] Zo

grams prepared fo

opriate, the all HV Plan

lature and lae SF6 gas-in

installed, td line whicm to that use list of technterconnecti

e Diagramsbe preparedlated switchppropriate, t

m to that use

f Operation ser shall pree of the Conl HV Plant ooduce and de OETC Opee.

f Operation he User shaUser side of

he informatior the comple

ration and Gt wishes to

ature of its Hge, send to ee new OETCs the case m

all be prepanection Poin

nd maintenand OETC o

r Connectionthe preparat

one Diagram

or each Congraphical s

nt and the Coabelling, as nsulated methose itemsch intersectsed on the hnical detailsons, ratings

s d for each Chgear and/orthe graphica

ed in the rele

and Gas (Spare and sunnection Po

on the OETCdistribute, useration Diag

and Gas (Sall prepare f the Connecon submittedete Connect

Gas (SF6] Zoinstall new

HV Plant at aeach such UC HV Plant t

may be.

The Grid C

ared identifynts and the

nance shall of agreed re

n Site Schetion of Site R

ms

nnection Sitsymbols shoonnections tset out in th

etal encloseds must be ts SF6 gasrelevant Cos) is intendeand numbe

onnection Sr other SF6 gal symbols sevant Conne

SF6] Zone Dbmit to OETint and OET

C side of the sing the inforam, a comp

SF6] Zone Dand submit

ction Point. Od on the Usion Site.

one DiagramHV Plant oa OETC siteUser a revisto be installe

Code - Versi

ying the eqresponsibilit

be includeesponsibilitie

dules. The Responsibilit

te at which own in Appto all externahe Operatingd switchgeadepicted w

s-zone bounnection Sit

ed to provideering and no

Site at which gas-insulate

shown in Appection Site an

iagrams forTC, an OperaTC shall proConnection

ormation subposite Opera

iagrams fort to OETC OETC shall ser Operatio

ms r it wishes te, OETC shased Operatioed and its n

on 2.0

quipment anties for safet

ed in a Sies for Plant

attachment ty Schedules

a Connectiopendix B. Thal circuits ang Code OC r and/or othithin an arendaries. Thte and circue an accura

omenclature

a Connectioed HV Plant pendix B. Thnd circuit.

r User Sitesation Diagra

ovide the Us Point.

bmitted on thation Diagra

r OETC Sitean Operatiothen prepar

on Diagram,

to change thall one mon

on Diagram umbering an

nd ty,

ite at

to s.

on he nd 8. er ea he uit. ate

of

on is

he

s am ser

he am

es on re,

a

he nth of

nd

Page 138: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele When a Uexisting nprior to thsite incoror the cha

CCThe comOperationSite. If a shall be hthe User,

CC.7.4 Site ComConnectioresponsibECA/ECUrelevant p

CCIn the caDrawingsThe UseOETC, S

CCIn the caDrawingsOETC shUser, Site

CC.7.4.2When a UDrawings(a) if

th(b) if

thdiD

If the Useach parteach part

CC.7.4.2When OEDrawings(a) if

th

ectricity Tran

User has denumbering ohe installatiorporating theanges as the

C.7.3.5 Valmposite Oper

n Diagram fodispute aris

held at the C to endeavo

Site Commmon Drawon Site layobilities for UOSA that wparties,

C.7.4.1 Prease of a Uss for the OETr shall thenite Common

C.7.4.2 Prease of a OEs for the Usehall then pree Common D

.1 User cUser becoms at a Conneit is a User

he complete it is a OETC

he User sidestribute, usrawings for er change cty to amendty shall so a

.2 OETCETC becomes at a Conneit is a OETC

he complete

nsmission C

ecided that ior nomenclaton or change new User He case may

lidity ration Diagror all operatses as to thConnection Sour to resolve

mmon Drawings shall out drawingcommon s

will also requ

eparation ofser site, OETC side of thn prepare, pn Drawings f

eparation ofETC site, ther side of theepare, prodDrawings for

changes to es aware th

ection Site it site prepareConnection C site prepae of the Coning the infothe completecan be deal its copy of tmend.

C changes toes aware thection Site it C site preparConnection

Company

it wishes to ture of its HVe, send to OHV Plant to be.

ram preparetional and pe accuracy Site, as sooe the matter

wings be prepare

gs and electservices drauire common

f Site CommETC shall phe Connectioproduce andfor the comp

f Site Commhe User shae Connectionuce and disr the comple

Site Commhat it is nece

shall; e, produce aSite; and

are and submnnection Poormation sue Connectiot with by it the Site Com

o Site Commat it is neceshall;

re, produce aSite; and

install new V Plant at itsOETC a revbe installed

ed by OETClanning activof the compn as reason

rs in dispute.

d for each trical layout awings. Thn Protection/

mon Drawinprepare andon Point. d distribute, plete Connec

mon Drawinall prepare n Point. stribute, usinete Connecti

mon Drawingessary to cha

and distribut

mit to OETCoint and OEbmitted in

on Site. notifying OEmmon Draw

mon Drawinssary to cha

and distribut

The Grid C

HV Plant, os User site,

vised Operatand its num

C or the Usvities associposite Operanably practic.

Connectiondrawings a

hese items /control draw

ngs for a Us submit to

using the ction Site.

ngs for a OEand submit

ng the inforion Site.

gs ange any as

e revised Si

C revised SiTC shall theby the Use

ETC in writinings then th

ngs ange any as

te revised S

Code - Versi

or it wishes tthe User shtion Diagram

mbering and

ser shall be iated with thation Diagraable, betwee

n Site and and they wi

will form wings to be a

ser Site the User, S

information

ETC Site to OETC S

rmation sub

spect of the

ite Common

te Commonen prepare,

er, revised S

ng of the che User shall

spect of the

ite Common

on 2.0

to change thall one mon

m of that Usnomenclatu

the definitivhe Connectioam, a meetinen OETC an

shall includill identify th

part of thavailable to a

Site Commo

submitted b

Site Commo

mitted by th

Site Commo

n Drawings f

n Drawings fproduce an

Site Commo

hange and fl so notify an

Site Commo

n Drawings f

he nth ser re

ve on ng nd

de he he all

on

by

on

he

on

for

for nd on

for nd

on

for

Page 139: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele (b) if

thdiD

If the OEeach pareach part

CCThe Site OETC, asand planaccuracyreasonabdispute.

CC.7.5 The provset out inwhere a granted to

CC.7.6 It is a reqfor whichOETC PlaOETC shsuch PlanIt is a repurposesany of thetest resul

CC.7.7 OETC anSafety Pwork/test

ectricity Tran

it is a User he OETC sidstribute, usrawings for TC change

rty to amendty shall so a

C.7.4.3 ValCommon D

s the case mning activiti

y of the Sitebly practicab

Access visions relatin each ECAOETC site co individuals

Maintenquirement thah it is intendant or persohall have thnt at any timequirement s for which ite User Planlts and main

Site opend Users witPrecautions ting to be ca

nsmission C

site preparede of the Consing the infthe completecan be deal

d its copy ofmend.

lidity Drawings fomay be, shaes associat

e Common Dble, between

ng to accesA/ECUOSA wcontains exps holding ap

nance stanat all User Ped and to e

onnel on the e right to in

me. that all OE

t is intendedt or personntenance rec

erational pth an interfaand carry

rried out and

Company

e and subminnection Poformation se Connectiolt with by it nf the Site Co

or the compall be the defted with theDrawings, a OETC and

ss to OETC with OETC posed HV cpropriate au

dards Plant on OETensure that iOETC site.

nspect the t

ETC Plant od and to ensnel on the Ucords relating

roceduresace with OET

out operad for the Ope

it to the Useoint and the Uubmitted in

on Site. notifying the ommon Draw

plete Connefinitive Site C

e Connectiona meeting s

the User, to

sites by Usand each U

conductors, uuthorisation.

TC sites is mit does not

est results a

on User siteure that it doser site. Useg to such Pla

s TC, must mtional dutieeration of Pl

The Grid C

er revised SiUser shall th by OETC

User in writwings then O

ection Site pCommon Drn Site. If a hall be heldo endeavour

ers, and to User. In addunaccompan

maintained apose a thre

and mainten

es is maintaoes not posers shall havant, at any ti

ake availabes as may lant Connect

Code - Versi

ite Commonhen prepare, revised S

ting of the chOETC shall

prepared byrawings for adispute aris

d at the siter to resolve

User sites bdition to thosnied access

dequately foat to the sa

nance recor

ained adeque a threat tove the right ime.

le staff to tabe require

ted to the To

on 2.0

n Drawings f, produce an

Site Commo

hange and fso notify an

y the User all operationses as to the, as soon athe matters

by OETC, ase provision shall only b

or the purposafety of any

rds relating

uately for tho the safety to inspect th

ake necessaed to enabotal System.

for nd on

for nd

or nal he as in

are ns, be

se of

to

he of he

ary ble .

Page 140: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

Appen

A.1 PAt all Cowith the SUsers. (a) C

(i)(ii(ii(iv(v

(b) S(i)(ii

(c) S(d) S

(i)(ii(ii(iv(v(v(v

Each set consultatunder theUser shainformatioEach set ConnectioEach Site

i) ii)

iii) iv) v) vi) vii)

ectricity Tran

dix A Pripre

Principles mplexes theSite ECA/EC

onnection S) Connectio) Ownershii) Connectiov) Site Respv) Operationite Capacity ) Actual Me) Electrical ite services;ite specific t) Special te) Protectioni) Operationv) Control tev) Special eqvi) System mvii) Other site

of Connecttion with othe ECA/ECUOall, in accoon to OETC of Connect

on Sites on e Responsib

Plant ownSafety (ap

(Safety OperationResponsibMaintenanResponsibAccess.

nsmission C

inciples eparation

e following CCUOSAs or

Site details aon Site locatp of assets; on Points; ponsibility Scnal Diagram.

and tariff Metering PointDelivery Po echnical con

echnical faciln requiremennal Metering;elephony; quipment req

monitoring inpe services.

tion Site Schher Users anOSA for thatrdance withto enable it

tion Site Schthat Comple

bility Schedunership; pplicable SaCoordinator

ns (applicablbility for statnce and faulbility for site

Company

and basn of Conn

Connection Swith such v

nd equipmeion;

chedule; and etering;

t; and int.

nditions; incllities; nts; ;

quirements;puts; and

hedules for and be agreet Connectionh the timingto prepare t

hedules shaex. le, (a) (iv) ab

afety Rules ar), or such ote operationatutory inspeclt investigatiosecurity; an

sic procnection S

Site Scheduvariations as

nt, including

d

luding

a Connectiod at least 2n Site (whichg requiremethe Site Resll be subdiv

bove, shall d

and Control ther Person al procedurections; on;

nd

The Grid C

edure toSite Sched

ules shall bes may be ag

g;

on Site shall weeks prioh may form ents of the sponsibility Sided to take

detail for eac

Person or who is respo

es and contro

Code - Versi

o be usedules

e drawn up ireed betwee

be preparedor to the Com

part of a CoECA/ECUO

Schedule. e account of

ch item of Pl

other respoonsible for sol engineer)

on 2.0

ed in th

n accordancen OETC an

d by OETC mpletion Daomplex). EacOSA, provid

any separa

ant;

nsible Persosafety); ;

he

ce nd

in ate ch de

ate

on

Page 141: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele The Site AppendixConnectioEvery panumber. Followinginvolved fThe Conresponsibby the mconfirmattwo weekSite Schimplemen

A.2 AWhen a Unecessartaking effWhere a prepare aeffect. The reviswhere thimplemenWhen a becomesreflect anthe User,

i) ii)

iii) OETC shevent witThe Connand User

A.3 REach Uselist of maof the Usto that Usituated.

ectricity Tran

Responsibilx unless oton Site, line

age of each

g preparationfor confirmanection Siteble for the armanager notion of its acks prior to ithedule, accontation.

AlterationsUser identifiry, it must infect. User has in

a revised Co

sed Connecthe alterationntation. User identif

s aware thatn emergency as the casewhat changwhether thpermanentlythe distribut

hall prepare hin seven dnection Siters as soon a

Responsiber shall, prionagers who

ser and OETUser the nam

nsmission C

ity Scheduletherwise ags and cablesConnection

n of a set of tion of its ac

e Schedulesrea in whichminated in ccuracy. Onts implemenompanied b

s to existined on a Co

nform OETC

nformed OEonnection Si

tion Site Schn(s) has/hav

fied on a Ct an alteratioy situation foe may be, imes are nece

he Connecty; and tion of the rethe revised ays of it bei Schedules s possible a

ble manageor to the Com have been

TC shall, priome of the m

Company

e shall be prgreed in wrs emanatingn Site Sched

Connectionccuracy. s shall be s the Compleaccordance

nce signed, ntation date, by a note

ng Site Resnnection Sit

C immediatel

ETC of a chate Schedule

hedule shall ve been m

Connection Son to the Cor example, mmediately aessary to theion Site S

evised ConnConnectionng informedshall be con

after it has be

ers mpletion Datduly authori

or to the Commanager res

repared in acriting with Og from the Codule shall b

n Site Sched

igned on beex is situatede with A.3 oOETC shall to each Usindicating t

sponsibilitte Schedule ly and in an

ange, or OEe not less tha

be signed aade, the n

Site ScheduConnection S

the User shand shall disc Connectionchedules a

ection Site S Site Sched

d of or knowinfirmed by Ueen prepare

te under eacised to sign mpletion Datsponsible fo

The Grid C

ccordance wOETC and onnection S

bear the dat

ules, OETC

ehalf of OETd and on behof this Appel distribute tser that is a he issue n

y Schedulebecomes a

y event 8 w

ETC proposean 8 weeks

and accompaew issue n

ule, or OETSite Scheduall notify OEcuss;

n Site Schedare to be

Schedules. ules as sooing the neceUsers and sd and sent t

ch ECA/ECUConnection te under eac

or the area

Code - Versi

with the attacshall inclu

ite. te of issue a

shall send i

TC by the rhalf of each endix, by wtwo copies, party on th

umber and

es aware that aweeks prior t

es a changeprior to the c

anied by a nnumber and

TC, as the cle is require

ETC, or OET

dules; modified te

n as possibessary requisigned on beto Users for

UOSA, SuppSite Schedu

ch ECA/ECUin which the

on 2.0

chment to thde, for eac

and the issu

it to the Use

representativUser involve

way of writtenot less tha

he Connectio the date

n alteration o any chang

e, OETC shachange takin

note indicatind the date

case may bed urgently TC shall noti

emporarily

le, and in anred alteratio

ehalf of OETconfirmation

ply to OETCules on behaUOSA, Suppe Complex

his ch

ue

ers

ve ed en an on of

is ge

all ng

ng of

be, to ify

or

ny on. TC n.

C a alf ply is

Page 142: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

CC

E

SSb

1

2

3

4

Oman Electricity

Connection SitCompany: …

Item of Equipment

EqO

Signed on behSigned on behby way of writte

1 PAEW Safety R2 At all interfaces3 Access applies 4 Access to the O

y Transmission

te:. …………………………………uipment Owner

Safe

.

alf of the OETCalf of each Usen confirmation o

Rules were formes OETC and the U to authorised su

OETC compound

Company

Pr

……………………………………ety Rules1 Sa

ord

C er involved of its accuracy.

erly referred to as User must co-ordbcontractors of this with the OETC

The

Attachoforma for

f…………………………………………

fety Co-dinator2

OpeProc

the MEW Safetyinate activities buhe OETC and theC’s approval, exer

e Grid Code - Ve

1-17

hment to ApSite Responfor Connection………………… …………………

rational cedures

CResp

y Rules, as changut the OETC authe User also. rcised by the site

ersion 2.0

ppendix A nsibility Sch

n Point

Control ponsibility

Pa

MFau

ged from time to thorized Person ha

security officer.

hedule

arty Responsible for Statutory Inspections,

Maintenance and ult Investigations

Dat

ime in accordancas overall respons

Security Responsibility

te

ce with the Grid Csibility.

y Access3 4

.

Code.

Comment

Page 143: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

P 18

Appen

ectricity Tran

f 22

dix B Sy

nsmission C

ymbols fo

x

M

A

VT

Bus 1Bus 2

Company

or Operat

Circuit B

Circuit B

Isolator

Earth S

Double

2 Windi

Earthing

Surge A

Capacit

A. C. G

Motor

Fuse

Automa

Cable

Overhe

Current

Voltage

2

C t

ion Diagr

Breaker

Breaker

r

Switch

Busbar with

ing Transfor

g Resistanc

Arrester

tor

enerator

atic Reclose

ead Line

t Transforme

e Transforme

The Grid C

ti C diti

rams

h Selection

rmer

e

Switch

er

er

Code - Versi

C d V

on 2.0

i 2 0

Page 144: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

P 19

Appen

C.1 Basi)

ii)

iii)

iv)

v)

vi)

C.2 Plan1.2.3.4.5.6.7.8.9.1011121314151617181920

ectricity Tran

f 22

dix C Pla

ic principleWhere praOperationshall reprConnectioWhere moinformatioThe Operwhether associatedProvision together wOperationbe agreedThe Operappropriatsome HV

nt to be sh. Busba. Circuit. Discon. Switch. Bypas. Earthi. Mainte. Overh. Overh0. Cable 1. Capac2. Power3. Gense4. Gener5. Gense6. Station7. Static 8. Series9. Series0. System

nsmission C

ant to be

es acticable, all

n Diagram. Present as con Site. ore than one

on on more tration Diagracommission

d switchbay shall be m

with provision Diagrams sd with OETCration Diagrate, detail thaPlant is num

own on Opars; t breakers; nnectors (isoh disconnectss facilities; ng switchesenance earth

head line enthead line trap

and cable scitor voltage r line carrier ets; rator transfoet unit transfn transformeVAr compen

s or shunt cas or shunt rem transform

Company

included

l the HV PlaProvided theclosely as p

e Operationhan one Opam must shoned or deshall be lab

made on thn for details shall be pre

C. am should at applies tombered indiv

peration D

olators); tors (Switchi

; hs; tries; ps; sealing ends

transformerline matchin

rmers; formers; ers; nsators; apacitors; eactors; ers including

C t

d on Oper

nt on any Coe clarity of thpossible the

Diagram iseration Diagow accurateecommissionbelled "sparee Operationof revisions

epared in A4

normally beo individual pvidually per p

iagram

ing isolators

s; rs (CVTs); ng units (LM

g tertiary win

The Grid C

ti C diti

ration Dia

onnection She diagram ie geographi

s unavoidablgram must bely the currened. Wheree bay". n Diagram s and dates.4 format or s

e drawn singphases shallphase.

s);

MUs);

ndings;

Code - Versi

C d V

agrams

ite shall be ss not impairical arrange

le, duplicatioe avoided. nt status of e decommi

for signifyin

such other fo

gle line. Hol be shown.

on 2.0

i 2 0

shown on onred, the layoement on th

on of identic

the Plant e.issioned, th

ng approval

ormat as ma

wever, wheFor exampl

ne out he

cal

.g. he

ls,

ay

re le,

Page 145: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

P 20

21222324252627282930

ectricity Tran

f 22

1. Earthi2. Voltag3. Surge4. Neutra5. Fault t6. Phase7. Arc su8. Wall b9. Shorti0. SF6 ga

nsmission C

ng and auxige transform arrestors/dial earthing athrowing deve shifting tranuppression cbushings; ng and dischas zones.

Company

liary transforers (VTs) aniverters;

arrangementvices; nsformers (q

coils;

harge switch

C t

rmers; nd current tr

ts on HV Pla

quadrature b

hes; and

The Grid C

ti C diti

ransformers

ant;

boosters);

Code - Versi

C d V

(CTs);

on 2.0

i 2 0

Page 146: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

P 21

Appen

D.1 IntroThis Appsystem O

D.2 GenIn all casexceed tConditionEquipme

D.2.1 DigDigital inpthe OETwhereas

D.2.2 SinSingle poavailable(contact c

D.2.3 DoDouble pfor each states co

D.2.4 EneEnergy mOutstatioof MWh othe input

D.2.5 AnAnalogueequipmenbe in the unidirectinecessar

D.2.6 CoAll commequipmencurrent ointerposin

ectricity Tran

f 22

dix D SC

oduction pendix sets Outstation in

neral requirses signals sthose definens Power Snt and Syste

gital inputs puts cover bC Outstatiothe input cir

ngle points oint inputs . The off (coclosed or 1)

uble pointspoints are usplant item. Onsidered inv

ergy Meter meter input n equipmenor Mvarh. Thmust be ope

alogue inpue inputs font must all bform of 4-20onal and biry to produce

mmand outmand outputsnt switch bo

of 1 amp. Allng relays on

nsmission C

CADA Ou

out the tecterms of ele

rements shall be arraed in IEC 8Supply and ems - Specif

both single an equipmenrcuitry of the

must be uontact open state the ala

s sed to indicaOnly the "10valid. The "1

inputs pulses for t must opera

he contact men.

uts r connectiobe electricall0mA (or othei-directional e the correct

tputs s for connec

oth the 0 vol outputs sh the plant to

Company

tstation i

chnical requectrical chara

anged such 870-2-1: "TeElectromagnfication for In

and double nt. The initia Outstation

sed for alaor 0) state

arm conditio

ate primary 0" and "01" s0" state is c

connection ate for a min

must open ag

on to analoly isolated wer range to bmeasured

t input signa

ction to comlts and -48 all electrica

o be operated

C t

interfacin

irements foacteristics.

that the levelecontrol Enetic Compnterfaces (E

points for coating switchis common t

arms and wis considere

on.

plant states states are coonsidered to

to pulse conimum of 10gain for a mi

ogue input with a two wbe agreed bvalues. Sig

als.

mmand outpvolts for a plly isolated wd.

The Grid C

ti C diti

ng

r connection

vel of electriquipment aatibility" andlectrical Cha

onnection to contacts sto the negati

where singleed to be the

by the use onsidered vao be the norm

ounting inpu00ms to indicnimum of 10

modules oire connectio

between the nal converte

ut modules period of 2.5with a two w

Code - Versi

C d V

ns to the O

cal interfereand Systemsd IEC870-3aracteristics)

o digital inpushall be freeive 48 volt p

e contact ine normal sta

of complemalid with the mal or close

t modules ocate a prede00ms. The n

n the OETon required.User and Oers shall be

on the OET5 seconds awire connect

on 2.0

i 2 0

OETC SCAD

ence does ns - Operatin: "Telecontr)".

ut modules oe of potentiapotential.

ndications ate and the o

mentary inpu"00" and "1

ed state.

on the OETetermined floormal state

TC Outstatio. Signals sha

OETC) for boe provided a

TC Outstatioat a maximution to contr

DA

not ng rol

on al,

re on

uts 1"

TC ow of

on all

oth as

on um rol

Page 147: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Ele

P 22

Appen

E.1 EThe undeECA/ECU52.0Hz afollowing automaticECA/ECU

i) ii)

iii)

iv) v) vi)

E.2 UThe voltasupply pothe same

i)

ii)

E.3 SThe trippconsidera

i)

ii)

ectricity Tran

f 22

dix E TetheFre

E.1 Under-er-frequencyUOSA. Undand be suita

general pac installationUOSA;

FrequencyMeasurem7 cycles;Operatingsetting; Voltage loFacility staOutput co

Under-freqage supply toint concerne as that of th

the use ofwith the supply bescheme; othe use provided tnever derDistributio

Scheme reping facility ations;

Dependabnot harm the effectoverall reshedding shedding control shOutages: that the areduced u

nsmission C

chnical re automequency

-frequencyy relays to ber-frequency

able for opearameters ons is given a

y settings: 4ment period:

g time: Betw

ock-out: 20 toages: Five s

ontacts: Two

quency relato the unde

ned so that the primary Sf a secure sTransmissioing obtainedor of the subthat this suprived from

on System.

equirementshould be

bility: Failurethe overall ot of reducingeasonable m

scheme is 9point shouldall not be reUnder-frequ

amount of Dunacceptably

Company

requiremmatic de-

y relays be used shay relays shration from on the reqas an indica

46.00 – 52.00 Within a m

ween 100 a

o 90% of nostages of Fre

output cont

ay voltage r-frequency the FrequenSystem. Thisupply obtainon Systemd where nec

bstation 240pply is alwaa standby

ts e engineere

e to trip at aoperation of g the amou

minimum req96%, i.e., thd be less th

educed by muency DemaDemand undy during equ

C t

ents for -energisa

ll be in accohall have a

a nominal Auirements o

ation to the

0Hz in stepsinimum sett

and 160ms

ominal voltagequency opetacts per sta

suppliesrelays shalcy of the un

s requires eined from vol

interconneccessary via a

0V phase-toys derived asupply CDG

ed in accor

any one parthe schement of Dema

quirement fohe average phan 4%. Thuore than 4%

and sheddingder control uipment outa

The Grid C

ti C diti

under-freation of

ordance withfrequency

AC input ofof approvedprovisions t

s of 0.01Hz;ings selecta

dependent

ge; eration; andge.

l be derivednder-frequenther; ltage transfoction transfoa suitable au

o-neutral seat the supplGenset or f

rdance with

rticular Deme. However, and under loor the depeprobability ous the Dema

% due to relag schemes is as specif

age or mainte

Code - Versi

C d V

equency Supplie

h the requiresetting rangf 63.5, 110 d Frequenchat may be

able settings

on measur

d from the Sncy relays in

ormers direcormer(s) coutomatic volt

elected auxy point conc

from anothe

h the follow

mand sheddimany failureow frequencendability of of failure of eand under loay failure; anshall be engfied by OETenance cond

on 2.0

i 2 0

relays fos at low

ements of thge of 46.0 or 240V. Th

cy Relays fincluded in

range of 3

rement perio

System at thnput voltage

ctly associateoncerned, thtage selectio

xiliary supplcerned and

er part of th

wing reliabili

ng point shaes would havcy control. A

the Demaneach Demanow Frequencd gineered sucTC and is nditions.

or w

he to

he for

a

to

od

he is

ed he on

ly, is

he

ity

all ve An nd nd cy

ch not

Page 148: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC1.1 OC1.2 OC1.3 OC1.4

OC1.5

ctricity Transmis

ating Co

IntroductioObjective Scope ....Data requOC1.4.1 OC1.4.2 OC1.4.3 OC1.4.4 OETC for

ssion Compan

de OC1

on .................................

...................uired by OET

OperationaProgrammControl PhPost Contr

recasts ........

y

– Dema

CON

...................

...................

...................TC ...............al Planning Ping Phase ...ase .............

rol Phase ........................

and Fore

NTENTS

...................

...................

...................

...................Phase .....................................................................................

The Grid Co

ecasting

...................

...................

...................

...................

...................

...................

...................

...................

...................

ode - Version 2

g Issue

...................

...................

...................

...................

...................

...................

...................

...................

...................

2.0

ed April 201

...................

...................

...................

...................

...................

...................

...................

...................

...................

10

. 2

. 2

. 3

. 3

. 3

. 4

. 4

. 5

. 5

Page 149: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC1.1 IOC1 outlboth ActivtimescaleDemand The demspecifical

the OReac

the PDema

the CSyste

OC1 alsotimescaleControl P

OC1.2 OThe objec to sp

Activetimesin the

to des to des

foreca

ctricity Transmis

ating Co

Introductlines the obve Demand es within whto OETC, a

mand forecaslly;

Operational tive Demandrogramminand on the T

Control Phasem for the da

o deals wites consistenPhase.

Objectivectives of OCecify the ree Demand scales. These Programmiscribe informscribe certaasts of both

ssion Compan

de OC1

tion ligations on and Reactiv

hich Users sand the timests referred

Planning Pd on the Trag Phase req

Transmissionse requires ay ahead.

th the provt with the O

e C1 are as foll

quirement fand Reactiv

se forecasts ng Phase, a

mation to be in factors toActive Dem

y

– Dema

OETC and ve Demand shall provideescales withi to in OC1

Phase requirnsmission Squires weekn System fordaily foreca

ision of Deperational P

lows; for OETC anve Demandare used by

and the Contprovided by

o be taken inand and Re

and Fore

Users regaon the Tran

e forecasts oin which OE are require

res annual fSystem for ekly forecasts r the period sts of Dema

emand ContPlanning Pha

nd Users tod on the Try OETC for trol Phase;

y Users to Onto account active Dema

The Grid Co

ecasting

arding the prnsmission Syof both ActivETC shall pred for certa

forecasts of ach of the sof both Acti1 to 8 weeks

and Control d

trol data (aase, the Prog

o provide unransmission

Operationa

ETC in the pby OETC aand on the T

ode - Version 2

g

reparation oystem. OCve Demand rovide forecaain operation

both Active ucceeding 5ve Demand s ahead; anddata on the

as describedgramming P

nbiased foreSystem wi

l Planning p

post Control nd Users wh

Transmission

2.0

of forecasts 1 sets out thand Reactiv

asts to Usernal purpose

Demand an5 years;

and Reactivd Transmissio

d in OC4) hase, and th

ecasts of bothin specifie

purposes, an

Phase; andhen preparinn System.

of he ve rs. es,

nd

ve

on

in he

oth ed nd

d ng

Page 150: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC1.3 SIn additio Licen Powe Direc Intern Intern PWP RAEC

OC1.4 D

OC1.4.1 O

No later forecast i

the dathe T

the daon the

By the eninformatio

each ConnActivespecifreflec

each ConnActivecateg

1 There wil

M

ctricity Transmis

Scope on to OETC, sed Distribu

er Producerstly Connecte

national Internally Intercon; and C if Connect

Data requ

Operationa

than the eninformation l

ate and timeransmissionate and timee Transmiss

nd of Januaron listed bel

Licensed Dected Conse Power Defied by OET

ct annual maLicensed D

ected Conse Demand gories of Con− reside− comm− indust− agricu− hotels− govern

l be a need forMaximum Dem

ssion Compan

OC1 appliesutors; s; ed Consumerconnected nnected Par

ted to the To

uired by O

l Planning P

nd of Octobelisted below

e of the fore System at a

e of the foresion System

ry of each yeow for each

Distributor (umer (at theemand for tTC as the daximum DemDistributor (sumer (at therequiremen

nsumer; ential; mercial; trial; ulture and fis and tourismnment; and

r OETC to devemand and Avera

y

s to the follo

ers; Parties; rties;

otal System.

OETC

Phase

er each yeafor each of

ecast annuaannual maxicast annual at average

ear, each Uof the succe

(summed ove Connectiohe day of tday of forec

mand conditiosummated oe Connectio

nts for Ave

sheries; m;

elop forecast mage Conditions

owing Users;

ar, OETC shthe following

l peak Activimum Demaminimum A

minimum De

ser shall proeeding 5 Op

ver all Bulkn Point), shthat User’s cast annual ons; over all Bulon Point), shrage Condi

methodologies s

The Grid Co

;

hall notify eag 5 Operatio

e Demand and condition

Active Demanemand cond

ovide to OETperational Ye

k Supply Poall provide fmaximum Dpeak Dema

lk Supply Phall provide tions subdi

based on norm

ode - Version 2

ach User in onal Years;

and Reactivns1; and nd and Rea

ditions1.

TC in writingears;

oints) and forecast proDemand andand. These

Points) and forecasts ovided into

malised deman

2.0

writing of th

e Demand o

ctive Deman

g, the foreca

each Directofiles of hourd for the dae forecasts

each Directof their annu

the followin

nds, e.g. Avera

he

on

nd

ast

tly rly ay to

tly ual ng

ge

Page 151: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

each ConsDemaavera

individmaxim

IndiviCond

User foreprovided forecast r

In circumoperated provided

OETC wiReactive

OC1.4.2 P

The Useforecaststhe period Licen

Reacuse ohourly

each Powe

OETC wiPower aProgramm

OC1.4.3 C

In accorConsumethat may Supply P

OETC wDemand studies. 15:00hou

ctricity Transmis

− any otLicensed Dumer (at theand for the age conditiondual Bulk Smum Demandual Bulk Sitions at the

ecasts of boto OETC i

requirement

mstances whin separateto OETC.

ll use the inDemand on

Programmi

rs identifieds of Demandd of 1 to 8 wsed Distributive Power a

of Demand Cy basis at eaDirectly Con

er and Reactill use the inand Reactivming Phase

Control Pha

rdance wither shall notifresult in a Doint of the fo

ill use the and React OETC sha

urs each day

ssion Compan

ther identifiaistributor (su

e Connectionday specifi

ns; Supply Poinnd conditionsSupply Poinspecified ho

oth Active Dn accordancs.

hen the buse sections, se

formation sun the Transm

ng Phase

d below shad for Active weeks aheadutors shall at each BulkControl whicach Bulk Supnnected Contive Power anformation sve Power .

ase

h SDC1 eafy OETC byDemand Chollowing day

information ive Demandall issue to

y.

y

able categoriummed oven Point), shaed by OET

nt Demand s for the ann

nt Demand our at the an

emand and ce with OC

bar arrangeeparate sets

upplied to it mission Syste

all provide OPower and

d; supply hou

k Supply Poich may resupply Point; ansumer shalat a Connectsupplied to iton the Tra

ach Licensey 10:00hourange of 1 M

y.

supplied tod on the To all Users

es of Consur all Bulk Suall provide foC as the d

(Active Ponual peak ho(Active Pow

nnual minimu

Reactive DC1 must refl

ement at a Bs of forecast

to prepare fem for use in

OETC in wrReactive Po

urly profiles nt and the a

ult in a Demand l supply hoution Point. t in preparinansmission

ed Distributs each day

MW or more

o it when prTransmission

the foreca

The Grid Co

umers. upply Pointsorecasts of tay of foreca

ower) and Pour at the Buwer) and Pum OETC D

Demand on tect the Use

Bulk Supplyt information

forecasts of n the Operat

riting by 10:ower on the

of Demandamount and dand change

urly MW prof

ng its forecaSystem fo

tor, User, aof any Demaveraged o

reparing its n System foasts used in

ode - Version 2

s) and Directhe profile ofast minimum

Power Factulk Supply P

Power FactoDemand.

the Transmier’s best es

y Point is exn for each se

both Activetional Plann

00 hours eTransmissio

d for Activeduration of t

e of 1 MW o

files of Dem

asts of Demaor the purp

and Directlmand Controver any hou

forecasts oor use in Cn the Contr

2.0

tly Connectef hourly Activm Demand

tor at annuoint; and

or at Averag

ssion Systestimates of i

xpected to bection shall b

Demand aning Phase.

ach Saturdaon System f

e Power anheir propose

or more on a

and for Activ

and for Activposes of th

y Connecteol procedure

ur on any Bu

of both ActivControl Phasrol Phase b

ed ve at

ual

ge

em its

be be

nd

ay for

nd ed an

ve

ve he

ed es ulk

ve se by

Page 152: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC1.4.4 P

The Useinformatio

each the pthe usPoint

each relatio

each outpuday.

OC1.5 OOETC is Transmisrequired of Active of Active Requirem

When pTransmistake acco

histor Trans weath the in Gene Dema

of wh other

2 Users are

Code Re

ctricity Transmis

Post Contro

rs identifiedon regarding

Licensed Drevious day se of Deman. Directly Co

on to its DemPower Prod

ut sent out to

OETC forresponsible

ssion Systemby the termDemand usDemand pr

ments).

reparing fossion Systemount of the fo

ric Demand dsmission Sysher forecastsncidence of meration Schedand Control ich OETC hinformation

e only requiredeview panel will

ssion Compan

ol Phase

below will g Active Pow

istributor shshowing th

nd Control o

onnected Comand and Acducer shall o the Transm

recasts e for the forem used for s of its Transed in the Orepared and

orecasts of m to be usedollowing;

data stem losses s and the cumajor eventsdule and Deof 1 MW or as been infosupplied by

d to supply the l then need to r

y

provide OEwer data and

all supply he amount a

of 1 MW or m

onsumer shctive Energysupply deta

mission Sys

ecasts of boplanning a

nsmission anOperational P

published b

both Activd in the Plan

urrent and hiss or activitiesesalination Smore propo

ormed y Users.

data in 1.4.4 ureview this par

ETC in writind Reactive P

ourly MW pnd duration

more averag

hall supply My requiremenails of hourlystem by its G

oth Active Deand operationd Dispatch Planning Phby the PWP

ve Demandnning Phase

storic weaths which are

Schedule sed to be ex

until OETC canagraph.

The Grid Co

ng by 10:00Power data fo

rofiles for eaof Demanded over any

MW profilesnts, y Active PowGensets duri

emand and onal purpos

Licence to ase are con

P (in its State

d and Reae and the Co

her conditionknown to OE

xercised by

n obtain it from

ode - Version 2

0 hours eacor the previo

ach Bulk Sud reduction ay hour on an

s for the pre

wer and Reing the prev

Reactive Dees. Howevensure that

nsistent with ement of Fu

active Demontrol Phase

s ETC in adva

Licensed Di

m the SCADA s

2.0

ch day certaous day;2

upply Point fachieved froy Bulk Supp

evious day

eactive Powvious calend

emand on thver, OETC the forecasthe forecas

uture Capaci

mand on the, OETC sha

ance

stributors an

system, The G

ain

for om ply

in

wer ar

he is

sts sts ity

he all

nd

rid

Page 153: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

Ope

OC

OC

OC

OC

OC

OC

OC

Ap

Apfro

Ap

Ap

n Electricity

1 f 22

erating C

C2.1 Introd

C2.2 Objec

C2.3 Scope

C2.4 Proce

C2.5 Plann

OC2.5

OC2.5

OC2.5

OC2.5

OC2.5

OC2.5

C2.6 Plann

OC2.6

OC2.6

OC2.6

OC2.6

C2.7 Data

pendix A pendix B m Power Pr

pendix C pendix D

Transmissio

Code OC

duction ........

ctive ............

e .................

edures .........

ning of CDGe

5.1 Plannin

5.2 Plannin

5.3 Plannin

5.4 Forced

5.5 Releas

5.6 Return

ning of Trans

6.1 Plannin

6.2 Plannin

6.3 Operat

6.4 Progra

requirement

Timetable

Format fooducers ......

Operating

Typical Ge

on Company

C2 – Op

CON

...................

...................

...................

...................

enset Outag

ng for Opera

ng for Opera

ng for Opera

d Outages ...

se of CDGen

n to service a

smission Sys

ng for Opera

ng for Opera

tional Year 0

amming Pha

ts .................

For Main Ac

r Submissio...................

Parameters

enerator Perf

y

perationa

NTENTS

...................

...................

...................

...................

ges ..............

ational Year

ational Year

ational Year

...................

nsets ..........

and overruns

stem Outage

ational Year

ational Year

0 through to

se ..............

...................

ctions: OC2

on of Propo...................

..................

formance C

The

F OC2 O

al Plann

...................

...................

...................

...................

...................

2 ................

1 ................

0 ................

...................

...................

s .................

es ...............

2 ................

1 ................

the Program

...................

...................

– Operation

osed Station...................

...................

hart ............

e Grid Code

ti l Pl

ning Issued A

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

mming Phas

...................

...................

nal Planning .

n Outage S...................

...................

...................

- Version 2.

i V i 2

April 2010

.............. 2

.............. 2

.............. 2

.............. 2

.............. 3

.............. 3

.............. 4

.............. 6

.............. 9

.............. 9

............ 10

............ 10

............ 11

............ 11 e ......... 12 ............ 12 ............ 12 ............ 14 Schedules ............ 19 ............ 21 ............ 22

.0

0

Page 154: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 2

Ope

OC2Oper

p

pm

CodeCapaprocepartspossi

The condOETCTrans

OC2The oand desaOutagorderaccor

OC2In ad

P

L

D

In

In

P

R

OC2The pthe dtimeta

n Electricity

2 f 22

erating C

2.1 Introdrating Code O

rovision of d

rocedures rmaintenance

e OC2 coveacity with foedures coor of the Transible, the Tra

Code sets ouct the OpeC in the psmission Sy

2.2 Objecobjective of approves Olination requges in order to ensurerdance with

2.3 Scopedition to OE

Power Produ

icensed Dist

Directly Conn

nternational

nternally Inte

PAEW; and

RAEC if Conn

2.4 Proceprocedures ata needs toable for the

Transmissio

Code OC

uction OC2, Opera

data by User

relating to thof Plant on

ers planningorecast Demdinate Outasmission Synsmission S

out the dataerational Plalanning andstem.

tive this code is

Outages of uirements, T

er to minimise that forecthe Transm

e TC and PW

cers;

tributors;

nected Cons

Interconnec

erconnected

nected to the

dures in this code o be provideOperational

on Company

C2 – Op

ational Plann

rs to OETC f

he coordinatthe Transm

g proceduremand plus Oages of CDGystem and ofSecurity Stan

a required banning procd coordinati

s to ensure,CDGensets

Transmissiose the overcast Demanission Secur

P, OC2 app

sumers;

cted Parties;

Parties;

e Total Syst

cover detaied to OETC Planning pr

y

perationa

ning is conce

for Operation

tion of Outaission Syste

es through vOperating MGensets andf the Distribundards.

by OETC frocess, and thon of Outa

as far as ps, taking inn System Orall costs of nd plus thrity Standard

lies to;

em.

ls of the datto allow co-

rocess is pre

The

F OC2 O

al Plann

erned with th

nal Planning

ages for conem.

various timeargin on thd Outages oution System

om Power Phe procedureages of CD

possible, thanto accountOutages andf Total Systee Operatingds.

ta required a-ordination oesented in A

e Grid Code

ti l Pl

ning

he;

g purposes

nstruction, r

escales for e Total Sysof and cons

m to achieve

Producers ines to be ad

DGensets an

at OETC co-t Demand d Distributioem Operatiog Margin i

and the timeof Outages. AAppendix A.

- Version 2.

i V i 2

repair and

matching stem. The straints on , so far as

n order to dopted by nd of the

-ordinates forecasts, n System on and in s met in

e at which An overall

.0

0

Page 155: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 3

OC2The p

OETCOutagAppe

OC2

(i) EachScheinform

((

(((

(

In relsuch as anreasoOutagattendefer

(ii) For emay appro

D

O

th

T

T

T

n Electricity

3 f 22

2.5 Plannprocedure se

C will indicage Schedule

endix B.

.5.1 Plann

By the e Power Pro

edule for Omation in rel

(a) identity o(b) MW con

and that(c) required(d) preferred(e) whether

that the Outage declared

(f) If it is a F• the

OET• the

OETation to subevidence a

n Inflexible onable satisge shall bedant Flexib

rral.

Betweeeach week obe required opriate;

Demand fore

OETC estima

he Operating

Transmission

Transmission

Transmission

Transmissio

ing of CDet out below

te to each Pes should b

ning for Op

end of Januoducer will pOperational

ation to eac

of the CDGencerned (ie Mt which will, nd duration of d start date

r the OutagePower Pro

unless prudd as a FlexibFlexible Outperiod for w

TC, which peperiod for w

TC, which peb-paragraph s it may reaOutage anfaction that

e deemed tole Outage

n the end of Operationafrom CDGe

casts

ate of Deman

g Margin as

n System an

n System an

n System los

on Company

DGenset Ow is to be follo

Production Fbe submitted

perational

uary provide to OYear 2 in h proposed

ensets conceMW which wnot withstanOutage and start tim

e is a Flexiboducer mustent operatin

ble Outage tage, if; which the Oeriod shall nwhich the Oeriod shall b(e) above, t

asonably reqd, if the Pothe Outage

o have beeperiod of 1

of January aal Year 2, Onsets, taking

nd Control

set by OETC

d Distributio

d Distributio

sses

y

Outagesowed in eac

Facility criterd. The forma

Year 2

OETC and Pwriting, w

Planned Ou

erned will not be Avding the Ou

me or range ble Outage ot not declareng practice w

Outage coulnot be less thOutage couldbe not less ththe Power Pquire in ordeower Produce is requireden submitted0 days for

and the endETC will foreg into accou

C

on System co

on System O

The

F OC2 O

ch Operation

ia on which at of the su

PWP a Propwhich will cutage;

vailable as atage, still be

of start dateor an Inflexie an Outag

would not pe

ld be deferrhan 30 days d be advanchan 10 days

Producer muer to substacer fails to d to be an Id as a Flex

advanceme

of July ecast the mant insofar as

onstraints

Outages

e Grid Code

ti l Pl

nal Year.

the Proposebmission is

posed Statiocontain the

a result of the Available,)

es and start tble Outage,

ge to be an ermit the Out

red at the rin length;

ced at the rin length.

st provide Oantiate the d

establish toInflexible Ouxible Outageent and 30

aximum Caps OETC may

- Version 2.

i V i 2

ed Station shown in

on Outage following

he Outage

times , provided

Inflexible tage to be

request of

request of

OETC with eclaration o OETC’s utage, the e with an

days for

pacity that y consider

.0

0

Page 156: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 4

Durininforminform

OETC(ii) thdeve

(iii) OETCdiscuand CDGOperby waSche

The Statiobeenrelatito fac

In adnot o

toF

toO

(iv) WherScheProdu

OETCand jUsersand O

In thethe PaffectRegu

OC2The PSysteOper

n Electricity

4 f 22

ng this periodmation to semation as is

C will on thehe Proposedlop a Propos

By the eC will, havi

ussed it with User in wrensets that

rational Yearay of amend

edule submitt

Proposed Son Outage moved to cng to the prcilitate propo

dition, wheretherwise be

o re-designalexible Outa

o exclude a Outage Sche

By the ere a Power

edule, it mayucer or User

C may needoint meetings that notify OETC will gi

e event of thProposed Syted party, if

ulatory Autho

.5.2 PlannProposed Syem Outage rational Year

Transmissio

d OETC maeek clarificareasonable.

e basis of (i)d Station Osed System

end of July ng taken inUsers and P

riting with tmay be po

r 2 for a Pladment to, or ted by the P

System OutaSchedules aco-ordinate roper Operatosed Inflexib

e in the opinmet, OETC

ate an Inflexage

Flexible Ouedule.

end of AuguProducer, a contact OEr will then dis

d to convenegs of the paOETC of obve due and

he above disystem Outaf dissatisfiedority without

ning for Opystem OutaSchedule w

r 1.

on Company

ay, as approption of infor.

) the maximuOutage Sche

Outage Sch

nto accountPWP, if appthe Proposeotentially wianned Outagconfirmation

Power Produ

age Scheduas Flexible all Outage ption of the T

ble Outages.

nion of OETC may reques

xible Outage

utage or an

ust a User or PWETC to explascuss the pr

e meetings arties to resobjections mareasonable

scussions noage Scheduld, may raiseprejudice to

perational ge Schedule

when on the

y

priate, contarmation rece

um Generatedules and hedule.

t the informropriate, proed System thdrawn fro

ge and shown of, the sugcers.

ule may havOutages an

proposals reTransmission

C the Transmst Users;

e proposed

Inflexible Ou

WP objects in its concerroblem and s

with PWP, olve the proay request tconsideratio

ot producing le by the ee the issue

o the OETC d

Year 1 e will form te first of Ap

The

F OC2 O

act each Useeived or suc

ting Capacity(iii) the tota

mation notifieovide PWP, e

Outage Scom service dwing the Flexggested Prop

ve deviationsnd Inflexibleeceived by On System. O

mission Sec

by the Pow

utage from t

to the Proprns. OETC, seek to reso

other Poweblem. PWP,hat such a mon to such re

agreement,nd of Septeas a point

decision.

he basis forril; Operatio

e Grid Code

ti l Pl

er which hasch additiona

y required eal Available

ed to it aneach Powerchedule shoduring eachxible Outageposed Statio

s from the e Outages mOETC, or foOETC will giv

curity Standa

wer Produce

the Propose

osed SystemPWP, and th

olve it.

r Producers, Power Promeeting be equest.

OETC will dember. How

of principle

r developingonal Year 2

- Version 2.

i V i 2

s supplied al relevant

each week Capacity

d, having r Producer owing the h week of e periods, on Outage

Proposed may have or reasons ve priority

ards could

er to be a

ed System

m Outage hat Power

s or Users oducers or convened

determine wever, the e with the

g the Final becomes

.0

0

Page 157: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 5

(i) EachOutagOutag

The Fchangresposuffic

The Feach

((

(((

The PrequiPoweis reqsubmfor ad

(ii) OETCthe fo

D

O

th

T

T

T

OETCOutagwithdOutagconfir

n Electricity

5 f 22

By the e Power Prodge Schedulge Schedule

Final Stationges to the Pond to chancient evidenc

Final Stationproposed P

(a) identity o(b) MW con

and that(c) whether(d) start dat(e) if it is a F

the OET

the OET

Power Prodre in order

er Producer quired to be

mitted as a Fdvancement

By the eC will have ollowing fact

Demand fore

OETC estima

he Operating

Transmission

Transmission

Transmission

C will providge Schedul

drawn from ge and shrmation of, t

Transmissio

end of Januducer shall pe in writinge).

n Outage ScProposed Synged circumce of such ch

n Outage ScPlanned Outa

of the CDGencerned (ie Mt which will, nr the Outagete and start tFlexible Outperiod for w

TC, which pe

period for wTC, which pe

ucer must pto substantfails to esta

e an InflexibFlexible Outat and 30 day

end of Juneconsidered

tors insofar a

casts

ate of Deman

g Margin as

n System an

n System an

n System los

de to PWP,e in writingservice durowing Flexhe Final Sta

on Company

uary provide OET

g (showing

chedule provstem Outag

mstances. hanged circu

chedule will cage;

ensets conceMW which wnot withstan is a Flexibletime age; which the Oeriod shall be

which the Oeriod shall be

provide OETtiate the decablish to OETble Outage, age with an ys for deferm

e the Final S

as OETC ma

nd Control

set by OETC

d Distributio

d Distributio

sses

each Powe, showing tring each w

xible Outageation Outage

y

TC and PWPany amend

vided by thee Schedule The Powerumstances.

contain the f

erned will not be Avding the Oue Outage or

Outage coulde not less th

utage coulde not less th

TC with suchclaration as TC’s reasonthe Outageattendant F

ment.

Station Outaay consider

C

on System co

on System O

er Producerthe CDGensweek of Ope periods,

e Schedule s

The

F OC2 O

P with its suments to th

e Power Proif the Power

r Producer

following info

vailable as atage, still bean Inflexible

d be deferran 30 days

d be advancan 10 days

h evidence an Inflexibl

nable satisfae shall be deFlexible Outa

ge Scheduleappropriate;

onstraints

Outages

r and User sets which erational Yeby way of

submitted by

e Grid Code

ti l Pl

ggested Finhe Proposed

oducer will rer Producer hwill have to

ormation in

a result of the Available,) e Outage

red at the rin length

ced at the rin length.

as it may rele Outage a

action that theemed to h

age period o

e taking into;

a draft Finait is proposear 1 for af amendmey the Power

- Version 2.

i V i 2

nal Station d System

eflect only has had to o provide

relation to

he Outage

request of

request of

easonably and, if the he Outage have been of 10 days

o account

al System sed to be a Planned ent to, or Producer.

.0

0

Page 158: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 6

The dSche

Fmre

a

In adnot owritte

thSex

thS

(iii) WherScheProdu

OETCand jUsersand O

In thethe PaffectRegu

(iv) OETCfactoMargwith a

OETCSche

(

(

OC2ThrouOperany mOutagDemaappro

n Electricity

6 f 22

draft Final Sedule as follo

lexible Outamoved to coeasons relat

Flexible Ou

dition, whereotherwise been notice req

hat a FlexiblSystem Outa

xcluded from

hat an InflexSchedule, be

By the ere a Power

edule, it mayucer or User

C may needoint meetings that notify OETC will gi

e event of thProposed Syted party, if

ulatory Autho

By the eC will have rs set out inin to be meany issues a

C shall issueedule showin

(a) the CDGOperatio

(b) the Flex

.5.3 Plannughout eacrational Yearmovement oges and theand and takopriate the fa

Transmissio

System Outaows;

ages (and -ordinate aling to the O

utage may ha

e in the opine met, OETquest;

e Outage orage Schedum the Final S

xible Outage re-designat

end of July r Producer, contact OEr will then dis

d to convenegs of the paOETC of obve due and

he above disystem Outaf dissatisfiedority without

end of Septconsidered

subsection t, and in pa

agreed with P

e to each Pong

Gensets thaonal Year 1 fxible Outage

ning for Oph Operationr OETC will of Planned Oe requiremeing into accoactors speci

on Company

age Schedu

associated l Outage prperation of t

ave been re-

nion of OETCTC may, by

r an Inflexiblule or is newSystem Outa

ge which wated as a Flex

a User or ETC to explascuss the pr

e meetings arties to resobjections mareasonable

scussions noage Scheduld, may raiseprejudice to

tember the Final SOC2.5.2 (ii)rticular durinPower Produ

ower Produc

at will be wfor a Planneperiods.

perational nal Year anmonitor the Outages, th

ent for Operount the follofied in subse

y

ule may diffe

Flexible Ouroposals recthe Transmis

-designated

C the Transmgiving to th

le Outage wwly requestage Schedul

as shown inxible Outage

PWP objecin its concerroblem and s

with PWP, olve the proay request tconsideratio

ot producing le by the ee the issue

o the OETC d

System Outa) (including tng the perioucers in sub

cer, User an

ithdrawn froed Outage, a

Year 0 nd from enOperating Me incidence

rating Marginowing factorection OC2.5

The

F OC2 O

er from the

utage perioceived by Ossion System

as an Inflex

mission Seche Power P

which was shted by the le; or

n the Propoe, or that its

cts to the Frns. OETC, seek to reso

other Poweblem. PWP,hat such a mon to such re

agreement,nd of Septeas a point

decision.

age Scheduthe requirem

od of Minimubsection OC2

nd PWP the

om service and

nd of JanuaMargin contie of Outagesn including rs insofar as5.1 (ii), nam

e Grid Code

ti l Pl

Final Statio

ods) may haOETC or genm; or

xible Outage

curity StandaProducer an

hown in the Power Prod

osed Systemstart date be

Final SystemPWP, and th

olve it.

r Producers, Power Promeeting be equest.

OETC will dember. How

of principle

ule in the ligment for the um Demand2.5.2 (iii).

Final System

during each

ary of the nuously in ts other thanat times of

s OETC mayely;

- Version 2.

i V i 2

on Outage

ave been nerally for

e.

ards could d PWP a

Proposed ducer be

m Outage e moved.

m Outage hat Power

s or Users oducers or convened

determine wever, the e with the

ght of the Operating ) together

m Outage

h week of

preceding he light of n Planned

Minimum y consider

.0

0

Page 159: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 7

D

O

th

S

T

T

(i) In thePWPFlexibPowethat n

(ii) In the

a p

a P

a

OETCstart

If thePowewill ta

If the

(iii) A PowritinwhichProgrProduParamFlexibconseProgrOutag

(iv) At anShortdate.

id

n Electricity

7 f 22

Demand fore

OETC estima

he Operating

System and D

Transmission

Transmission

Flexiblee case of a

P written notible Outage er Producer notice.

Amendme cases of;

Flexible Oueriod

Flexible OuPeriod at less

n Inflexible O

C may, upondate or start

e Power Proer Producer ake the Outa

re is no agre

CDGensower Producng and PWPh there is ramme, remuction Facmeters) be pble Outage ent to such ramme shalge according

Short Nny time in Ot Notice Out The reques

dentity of the

Transmissio

casts;

ate of Deman

g Margin as

Distribution S

n System an

n System los

e Outage moa Flexible Oice of not leto be advawill take tha

ments to Pl

utage which

utage whichs than seven

Outage whic

n giving a Pt time of a P

oducer agreagree to so

age in accord

eement, then

set substitucer may, on at any timea Flexible

main in servility (havingpermitted to

has been substitutionl be amendegly.

otice OutagOperational Ytage, by givist notice mus

e CDGenset(

on Company

nd Control;

set by OETC

System cons

d Distributio

sses.

ovements utage, OETss than 7 danced or def

at Outage in

anned Outa

OETC wou

h OETC won days notice

ch OETC wo

Power Produlanned Outa

es to such ome other addance with O

n the Outage

ution n reasonablee during Ope

Outage, aice and thag substantibe taken ouPlanned. O

n and, if OEed and the

ges Year 0, a Png not less st contain th

(s)concerne

y

C;

straints;

on System O

TC may, upoays require ferred withinaccordance

ages

uld like to m

uld like to me

ould like to m

cer and PWage be adva

advancemedvancementOETC’s requ

e will not be

e grounds, erational Yeaas specifiedt one of theially the sut of serviceOETC shallTC does coPower Prod

Power Produthan 48 houe following i

d;

The

F OC2 O

Outages; and

on giving a the start da

n the Flexibe with the rev

move outside

move within

move.

WP written nonced or defe

nt or deferrt or deferraluirements.

taken by th

by notice suar 0, requesd in the Fe other CDGsame Capae during the l not unreaonsent, the ducer shall b

ucer may reurs notice benformation;

e Grid Code

ti l Pl

d

Power Prodate or start tile Outage pvised timing

e the Flexibl

n the Flexibl

otice, requeserred.

ral, or OETC, the Power

e Power Pro

ubmitted to t that a CDGinal SystemGensets at acity and period for w

asonably wiFinal System

be entitled to

equest from efore the ea

- Version 2.

i V i 2

ducer and me of the

period the set out in

le Outage

le Outage

st that the

C and the Producer

oducer.

OETC in Genset for m Outage the same Operating

which such thhold its m Outage o take the

OETC, a rliest start

.0

0

Page 160: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 8

fuO

th

tha

fuby

On rerequein the

aS

pin

re

If OEby the

If OEProduthe dmust

If OEOutag

If, insuccethird SummOutag

th

thD

Any sbe be

n Electricity

8 f 22

ull details oOperating Pa

he expected

he estimatednd/or the Pla

ull details of y the proble

eceipt of a rest and shale case of an

cceptance oShort Notice

roposals forndicating alte

ejection of th

ETC has acce Power Pro

ETC has indiucer must ddiscussions.

be taken by

ETC refusesge may not

respect oessive occasrequest. Homer Period, ge not to be

he Transmis

here would Demand and

such deferraeyond the en

Transmissio

f the problearameters an

date and st

d date and ant is expec

any restrictim associate

request notil having discEmbedded

of the requesOutage;

r the advancernative star

he request.

cepted the reoducer in acc

cated an altiscuss the aIf agreeme

y the Power

s the requesbe taken by

f a particusions, which

owever, OETbe deferred deferred;

sion Securit

otherwise the Operati

al shall be fond of the mo

on Company

em and thend the equip

art time of th

time on whcted to return

ons or risk oed with the S

ce for a Shcussed the CDGenset)

st, confirming

cement or dert time and d

equest, the Scordance wi

ernative staalternative aent is reacheProducer in

st or if agreethe Power P

lar CDGensh were not leTC may requd if, in OETC

ty Standards

be insufficing Margin.

or so long asonth following

y

e effect of tment which

he Short Not

hich the CDn to commer

of trip of a CShort Notice

ort Notice Oposition with, reply in wri

g the reques

eferment of duration; or

Short Noticeith OETC’s r

rt time and/ond any otheed, then theaccordance

ement is noProducer.

set, OETC ess than 7 dauire that suc

C’s reasonab

s might not b

ent Genera

s the above g the end of

The

F OC2 O

he Short Nis affected;

tice Outage;

Genset andrcial Operatio

DGenset anOutage.

Outage, OETh the Power ting indicatin

sted start tim

the Short No

e Outage, if requirements

or duration, er options whe Short Note with OETC

ot reached t

has rejecteays apart, Och Outage, ifble opinion, w

be met; or

ating Capac

circumstancf the Summe

e Grid Code

ti l Pl

Notice Outag

;

d/or Desalinaon; and

nd/or the Pla

TC shall conProducer (a

ng;

me and durat

otice Outage

taken, musts.

OETC and thich may artice Outage

C’s requireme

hen the Sho

ed requestsOETC may no

f it is to be dwere the Sh

city to meet

ces exist, buer Period.

- Version 2.

i V i 2

ge on the

ation Unit

nt caused

nsider the and Users

tion of the

e if taken,

t be taken

the Power ise during , if taken, ents.

ort Notice

s on two ot reject a during the ort Notice

t forecast

t shall not

.0

0

Page 161: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 9

In theOETCone dshall

th

fu

m

th

OC2In theshall Poweto ha

A Pocommany uThe CDGand i

OC2PoweaccorPlann

CDGwithoout b

OETC

thbO

th

th

OETCOutagaccoropinio

th

thM

OETCas the

n Electricity

9 f 22

e event thatC shall by nday after thecontain the

he identity an

ull details of

maximum allo

he start date

.5.4 Forcee event that immediately

er Producer’ve been rep

ower Produmencement updates to Power Proenset is repn accordanc

.5.5 Releaer Producersrdance withning Code.

ensets musout OETC’s felow.

C’s formal p

he identity ofe Available

Outage, still b

he duration o

he start date

C may withge or a Shordance withon (were suc

he Transmis

here would bMargin.

C may requie above circ

Transmissio

t a Short Nnotice in write details of tfollowing inf

nd Capacity

the problem

owed duratio

e and start tim

ed Outagea CDGensey inform OEs best estim

paired and re

cer shall foof the Outainformation ducer shall

paired and rece with Good

ase of CDGs may only h Outage

t not be withformal perm

ermission sh

f the CDGenas a result

be Available

of the Outag

e and start tim

hold its perrt Notice Ou

h this Operch Outage n

sion Securit

be insufficien

ire the Powecumstances

on Company

otice Outagting and copthe Short Noformation;

of the CDG

m;

on of the Ou

me.

s et suffers a FETC (copied

mate of the destored to its

ollowing a Fge, provide as OETC m use all reestored to itd Industry Pr

Gensets undertake

programmes

hdrawn for amission for s

hall specify;

nset and Caof the Outa

, if any);

ge; and

me.

rmission for utage where ational Plan

not to be def

ty Standards

nt Capacity

er Producer exist.

y

ge is schedupy to PWP otice Outage

enset(s) con

utage; and

Forced Outad to PWP) ate and time

s full level of

Forced OutOETC with

may reasonaeasonable es full level oractice.

Planned Ous produced

a Planned Ouch release

pacity conceage and tha

the releasesuch Outag

nning Codeferred);

s could not b

to meet fore

to continue

The

F OC2 O

uled pursuaconfirm the

e have been

ncerned;

age, the releby written ne by which tf availability.

tage and wwritten noti

ably requireendeavours of availability

utages with d pursuant

Outage or a according t

erned (i.e. Cat which will

e of a CDGge has previoe where, in

be met; or

ecast Dema

to defer suc

e Grid Code

ti l Pl

nt to this sudetails ther

n settled. Su

evant Power notice and ghe CDGens

within 24houce of inform

e, all copiedto ensure

y as soon as

OETC agreto this O

Short Noticto the proce

Capacity whicl, notwithsta

Genset for aously been p

OETC’s re

nd and the

ch Outage fo

- Version 2.

i V i 2

ubsection, reof within uch notice

Producer giving the et is likely

urs of the mation and

to PWP. that the

s possible

eement in perational

ce Outage edures set

ch will not anding the

a Planned planned in easonable

Operating

or so long

.0

0

Page 162: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

OC2In relOutagand P

((((

Wherthe Pexpecnatur

In theto selater

In theservicperioservicCDG

A Poeach Syste

Beformust CDGAvailaday p

If at CDGof thecase and Produhave Sche

OC2The p

Transfrom requi

Transtake

n Electricity

10 f 22

.5.6 Returation to a Plge period orPWP either t

(a) earlier th(b) at the tim(c) later tha(d) upon retre a CDGenPower Producted to be Aral gas and o

e case of a rrvice must bthan 7 days

e case of a rce must be d and shallce and the enset will re

wer ProducePlanned O

em Outage S

re returning inform OE

enset is retuability Noticprior to the S

any time denset will noe Outage in of Outages PWP immeucer’s best been maint

eduling and D

2.6 Plannprocedures s

smission Syconstructio

rements and

smission Syinto account

Transmissio

rn to servilanned Outar the Inflexibthat its CDG

han expecteme and datean expected;turn, if it is enset is not eucer shall s

Available. Inon fuel oil, th

return from abe given as before the e

return from agiven not la state the rPower Prod

eturn to servi

er must useOutage of thSchedule (or

from any OTC and PWurning to se

ce in accordSchedule Da

during an Oot be Availathe Final Syother than Pdiately in westimate of tained, repaDispatch Co

ing of Traset out below

ystem Outagon or replacd the Propos

stem Outagt Transmissi

on Company

ce and oveage, not laterble Outage pGenset is retu

d; e expected; and xpected to b

expected to state the Ac the case of

he Availabilit

a Planned Ofar as possiexpiry of the

a Planned Oter than 7 dreason for tducer’s best ice.

e all reasonahe its CDGer as moved i

Outage otherWP, as far rvice. The Pance with th

ay on which t

Outage the able by the eystem OutagPlanned Out

writing statinthe date an

aired or restde.

ansmissiw are to be f

es required cement wosed System

es required on System O

y

erruns r than 7 day

period, the Purning to ser

be fully Availbe fully Ava

ctive Power f a CDGensety must be s

Outage earlieible in advan

e Planned Ou

Outage later ays before tthe delay inestimate of

able endeavensets, the in accordanc

r than a Plain advance

Power Produhe Schedulithe CDGens

Power Proexpiry of thege Programmtages, the Pg the reaso

nd time by wored to be A

on Systefollowed in e

in Operatiorks and wiOutage Sch

in OperationOutages req

The

F OC2 O

s before theower Producrvice;

lable. ailable uponlevel at wh

et that is captated for eac

er than expence of returnutage period

than expectthe expiry of

n the return f the date a

ours to ensuOutage as ce with this c

nned Outagas reasona

ucer must, ining and Disset is to retur

oducer becoe period speme or as oth

Power Produon for the dwhich the CAvailable in

em Outageach Operat

nal Year 2 will take duehedule.

nal Years 1 aquired as a r

e Grid Code

ti l Pl

e expiry of thcer must no

n its return thich the CDGpable of firinch fuel.

ected, noticen but in any d.

ted, notice of the Planneof the CDG

and time at

ure that, in rincluded in code) is follo

ge, a Power ably possibln addition, ppatch Codern to service

omes awarecified for theherwise notifcer shall no

delay and thCDGenset wi

accordance

ges ional Year.

will be thosee account o

and 0 will, inesult of main

- Version 2.

i V i 2

he Flexible tify OETC

o service, Genset is

ng both on

e of return event not

of return to ed Outage Genset to which the

respect of the Final

owed.

Producer le that its provide an 1 on the

e.

e that its e duration fied in the tify OETC he Power ill actually e with the

e resulting of known

n addition, ntenance.

.0

0

Page 163: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

OC2OETCresultrequi

(i) OETCOutagof theplan datesindicaon thTrans

OC2The TransOperTransrequi

(i) OETCand wpotenTrans

(ii) WhersubseOC2.OETCprobl

In thethe rSepteof pri

(iii) OETC

OETCthoseparticTransintertmeasof thStand

n Electricity

11 f 22

.6.1 PlannC shall plan t of constrements and

By the eC will havege Plan cove complete pwhich may os and end date to PWP he Schedulsmission Sy

.6.2 Plannplan produ

smission Syrational Yeasmission Syred as a res

By the eC will updatewill inform Pntial restrictsmission Sy

By the ere a User oection OC2.5.1 (iv) will aC, the Userem and see

e event of threquirementsember. Hownciple with t

By the eC will issue t

C will notifye aspects ocular, proposmission Syripping, em

sures includie Transmisdards.

Transmissio

ning for OpTransmissio

ruction or d the Propos

end of July drawn up

vering the peplan, and wioperationallydates of releand Power

ling and Dstem to be m

ning for Opuced pursu

ystem Outagar 2 becomystem Outagsult of mainte

end of July e the draft T

PWP in writinions that mstem.

end of Auguobjects to t6.2 (i) abovapply, name

r and any otk to resolve

he above diss of the Tr

wever, the affthe Regulato

end of Septthe final Tra

y PWP in wrf the plan wosed start ystem. OET

mergency swing restrictiossion System

on Company

perational on System Oreplacemen

sed System

for OETC eriod Operatll notify eachy affect suchevant OutagProducers w

Dispatch of maintained w

perational uant to suge Plan for Oes Operatio

ge Plan and enance work

Transmissionng of the commay affect i

ust he proposedve, equivaleely: the Userther affectedit.

scussions noransmission fected party,ory Authority

tember nsmission S

riting of thewhich may dates and

TC will alswitching, em

ons on the Sm to be m

y

Year 2 Outages reqnt works tOutage Sch

internal useional Year 2h User in wrh User incluges of the Twhere a neeCDGensets

within the Tra

Year 1 bsection OOperational onal Year 1shall, in add

k.

n System Oumplete plan it and of a

d restrictionnt provisionr shall contad party inclu

ot producing System O, if dissatisfie

y without pre

System Outa

complete poperationall

end datesso indicate mergency Dcheduling ofaintained w

The

F OC2 O

quired in Optaking due hedule.

e, a draft T2. OETC willriting of thosding, in part

Transmissioned may exiss to allow ansmission

OC2.6.1 willYear 1 whe

1. OETC shdition, take

utage Plan foand will info

any general

ns or impacs to those

act OETC touding PWP

agreement,Outage Scheed, may rais

ejudice to the

age Plan for

plan and ealy affect sucs of releva

where a Demand maf CDGensets

within the T

e Grid Code

ti l Pl

perational Yeaccount o

Transmission notify PWP

se aspects oticular, propon System. Ost to place re

the securitSecurity Sta

l become en on the firhall update into account

or Operationorm each Us

implication

ct notified toset out in s explain its will then di

OETC will dedule by thse the issue e OETC dec

Operational

ach User in ch User incant Outageneed existsanagement s to allow th

Transmission

- Version 2.

i V i 2

ear 2 as a of known

n System P in writing of the draft osed start OETC will estrictions ty of the andards.

the draft rst of April

the draft t Outages

nal Year 1 ser of any s for the

o it under subsection concerns. scuss the

determine he end of as a point ision.

Year 1.

writing of cluding, in es of the s to use or other

e security n Security

.0

0

Page 164: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

OC2The subsethe fi

OC2

(i) OETCperio

OETCthoseparticOutagemerrestriSyste

Whenmanupartieaccor

(ii) Eachcopieand a

OC2EachOper

th

th

The (copiebeen

OETCand nOperand D

In theProduthe Owhich

The sepashall

n Electricity

12 f 22

.6.3 OperTransmissio

ection OC2.rst of April O

.6.4 Prog

By 11:0C shall updad beginning

C will notifye aspects ocular proposges. OETrgency switcctions on th

em to be ma

n during the ual Demand es and prerdance with

During t User and

ed to PWP iactions deter

2.7 Data r Power Prod

rational Year

he Generato

he Operating

submissionsed to PWP) provided or

C shall use not for Scherating ParamDispatch Co

e case of a Cucer must s

Operating Pah fuel it appl

Generator rately showiinclude the

Transmissio

rational Yeon System 6.2 (iii) shal

Operational Y

ramming P

0 hours eacate the Trans

on the Frida

y PWP in wrof the plan sed start da

TC will alsoching, emerghe Dispatch aintained with

Programmishedding, a

eliminary mthe procedu

the ProgramOETC will f there is anrmined and

requiremeducer shall sr in respect o

or Performan

g Parameter

s shall be in. The data sr specified u

the Operateduling and

meters that Pdes.

CDGenset wsubmit to OEarameters inies.

Performancing output adetails show

on Company

ar 0 througOutage P

ll become thYear 1 beco

Phase

ch Wednesdsmission Syay.

riting of thethat may o

ates and eno indicate wgency Demaof CDGensehin the Tran

ng Phase, Oadvance warmanual Demures of OC4.

mming Phasinform each

ny unavoidanotified und

ents submit in wrof each CDG

nce Chart; an

rs to be appl

n the formashall be reconder a PPA.

ing ParameDispatch. T

Power Produ

which is capaETC (copied respect of e

ce Charts t the Gense

wn in Append

y

gh to the Plan for Ophe final planmes Operat

day ystem Outag

complete poperationallynd dates ofwhere a nend managemets to allow smission Se

OETC becomrning shall bmand shed.6.

se h other imm

able requiremer this subse

riting to OETGenset;

nd

ied from the

at indicated onfirmed an.

ters for OpeThese data

ucers will sub

able of firingd to PWP), each fuel, ea

must be et terminals dix D.

The

F OC2 O

Programmierational Y

n for Operatiional Year 0

e Plan for th

plan and eay affect sucf relevant Teed exists ment or othethe security

ecurity Stand

me aware of be given to thding progra

mediately anment to depection.

TC by the en

e beginning o

in Appendixnnually even

erational Plawill howeve

bmit/update

g on two diffeby separateach clearly m

submitted funder refere

e Grid Code

ti l Pl

ing Phase ear 1 issuonal Year 0

0.

he following

ach User in ch User incTransmissionto use inte

er measuresy of the Trandards.

the possiblehe potentiallammes pre

nd confirm ipart from the

nd of January

of January o

x C and Ap where it ha

anning purper, form the within the S

erent fuels, te written notmarked to in

for each Cence conditio

- Version 2.

i V i 2

ed under 0 when on

one-week

writing of cluding in n System ertripping,

s including nsmission

e need for y affected

epared in

in writing, e Outages

y for each

onwards.

ppendix D as already

oses only basis for

Scheduling

the Power tifications, ndicate for

CDGenset ons. They

.0

0

Page 165: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P

The formuambieCDG

For eProduUnitsand D

n Electricity

13 f 22

Generator ulas to enaent temperaenset from r

each Producucers shall s

s and CDGeDesalinated

Transmissio

Performancble OETC t

atures and freference co

ction Facilitysubmit in wr

ensets that cwater outpu

on Company

ce Chart shto assess tfor other paonditions.

y with both riting to OETcould be runuts.

y

hall be supthe variationarameters th

DesalinatioTC and PWPnning for an

The

F OC2 O

pported by n in performat could aff

on Units andP the combinny given com

e Grid Code

ti l Pl

correction cmance over fect the outp

d CDGensenation of Dembination of

- Version 2.

i V i 2

curves or expected

put of the

ts, Power esalination f Capacity

.0

0

Page 166: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

A

I

P

EwP

O

O

Oeaw

ParPO

O

Oman Electricity

Page 14 of 22

Appendix A

In Operational

Planning for O

Each Power Prowill provide OETPWP in writing w

OETC will provi

OETC will prepa

OETC will provieach Power Proand Other Userswriting with -

PWP, Power Prand Other Usersraise any objectProposed SysteOutage Schedu

OETC will deter

y Transmission

Timetable (Note:

year 0

perational Yea

oducer TC and with -

PropStatSchOp Y

de - Foreof O

are and send to

de PWP, oducer s in

roducers s will tions to em le

rmine -

Company

For Main ActThe following a

January

ar 2

posed tion Outage edule for Yr 2 (1)

ecast of maximuOp Yr 2 (2)

o PWP and affec

T

F - OC2 O

tions: OC2 –are summaries o

(Mo

Feb Mar A

um Capacity req

cted Users draft

The Grid Code -

Operational Planni

– Operationaonly and referen

onths refer to mo

Apr May J

quired from eac

t Transmission S

- Version 2.0

ng Version 2.0

al Planning nce should be m

onth end)

un Ju

ch Genset for ea

System Outage

Proposed Outage Scfor each wOp Yr 2

made to OC2 for

ly

ach week

e plan

System chedule

week of

Any be raresoOET

r full details.)

Aug

objections to aised and

olved with TC

Se

Proposed SysteSchedule No.1

pt

em Outage

Page 167: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

In O

Pla

EacwillPW

OEPWProUse

PWandraisDraOu

OEconissu

Oman Electricity

Page 15 of 22

Operational ye

anning for Ope

ch Power Produ provide OETC

WP in writing wit

ETC will provide WP, each Poweroducer and Otheers in writing wi

WP, Power Prodd Other Users wse any objectionaft Final Systemtage Schedule

ETC, after nsiderations, wilue schedule -

y Transmission

ear 0 Jan

rational Year 1

ucer &

h -

Final SOutageScheduOp Yr

r er th -

ucers will ns to

m

ll

Company

nuary Feb

1 - Proposed Sy

Station e ule for 1 (3)

T

F - OC2 O

b Mar Apr

ystem Outage S

The Grid Code -

Operational Planni

May

chedule No.1 fo

Draft FiOutage for eachOp Yr 1

- Version 2.0

ng Version 2.0

Jun

orms basis for O

nal System Schedule

h week of (2)(4)

ArwO

July

OP 1 planning

Any objections traised and resolwith OETC (as iOC2.5.1)

Au

to be lved n

ug

FinaOuta

Sept

l System age Schedu

Page 168: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

In O

Pla

OE

PWwillto DSys

OEconissu

AO

O

Oman Electricity

Page 16 of 22

Operational ye

anning for Ope

ETC will update

WP and Other Us raise any objecDraft Transmissstem Outage Pl

ETC, after nsiderations, wilue plan

Abbreviations:Op Yr 1 – O

Op Yr 2 – O

y Transmission

ear 0 Jan

rational Year 1

draft Transmiss

sers ctions sion an

ll

Operational Yea

Operational Yea

Company

nuary Feb

1 - Transmissio

sion System Ou

ar 1

ar 2

T

F - OC2 O

b Mar Apr

on System Outa

tage plan

The Grid Code -

Operational Planni

May

age plan

- Version 2.0

ng Version 2.0

Jun July

Send to PWP aaffected Users

Au

and

Any objeto be rairesolvedOETC

ug

ections sed and

d with

FinaTranSystePlan

Sept

l smission em Outage

Page 169: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

NT

Oman Electricity

Page 17 of 22

Notes: The following no

1 Data include

2 OETC

3 The Fionly if

y Transmission

otes are summa

from Power e

forecast will be

inal Station OutPower Produce

Company

aries only of act

Producers w

e based on

tage Schedule per has had to res

T

F - OC2 O

ions and referen

will Identity of C

MW Availab

Required du

Preferred st

Flexible/Infl

If flexible, sc

Proposed ti

Demands fo

OETC estim

Operating M

Transmissio

Transmissio

Transmissio

Forecast im

produced by Pospond to chang

The Grid Code -

Operational Planni

nce should be m

CDGenset/Desa

ble/not Available

uration of outag

tart date/time or

exible outage

cope for change

ming of Winter

orecasts

mate of Demand

Margins as set b

on & Distribution

on & Distribution

on System losse

mports/exports fr

ower Producersed circumstanc

- Version 2.0

ng Version 2.0

made to OC2 fo

alination Unit

e

e

r range

e

downtime

d Management

by OETC

n System const

n System outag

es

rom Internally/In

s will reflect chaces for which suf

or full details

raints

es

nternational Con

anges to Proposfficient evidence

nnected Parties

sed Station Oute must be provid

tage Schedule ded

Page 170: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

Oman Electricity

Page 18 of 22

4 Draft Fmay dSched

In addOETCcould to PWwritten

y Transmission

Final System Odiffer from Finalule due to;

dition, where in, the Licensenot be met OE

WP and the Pon request that;

Company

Outage Schedull Station Outag

n the opinion oe requirement

ETC may providower Producer

T

F - OC2 O

le ge

Flexible out

A flexible ou

Timing of a

of ts

de a

A flexible oSystem Out

An inflexibleas flexible o

The Grid Code -

Operational Planni

tages may have

utage may have

Winter outage

or an inflexible tage Schedule.

e outage in the or its start date m

- Version 2.0

ng Version 2.0

e moved to coor

e been re-design

may have chan

outage origina

Proposed Systmoved.

rdinate all outag

nated as an infle

ged

lly shown may

tem Outage Sch

e proposals

exible outage

be excluded f

hedule may be

from the Final

re-designated

Page 171: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

O

P

ATFP

C

Oman Electricity

Page 19 of 22

Appendix B To OETC CONTFROM: PROPOSED ST

CDGenset No

RegCa

1

2

3

4

5

6

7

8

9

10

y Transmission

Format forTROL CENTRE

TATION OUTAG

gistered apacity MW

UnavaCap

M

Company

r SubmissionE

GE SCHEDULE

ailable pacity MW

Outag

T

F - OC2 O

n of ProposeFax NoPRODU

E FOR

e duration Prera

The Grid Code -

Operational Planni

ed Station Ouo: UCTION FACIL

YE

eferred start datange of start dat

- Version 2.0

ng Version 2.0

utage SchedCopy to

LITYEAR Date sen

e or tes

Flexiboutage o

ules from PoPPW F

nt:

ble or not

If out

defe

ower ProducFax No

tage flexible. Percould be

erred a

cers

riod outage

advanced

Page 172: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio
Page 173: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 2

AppThe f

Regisshow

For e

(

(

(

(

(((

((((

n Electricity

21 f 22

pendix C following par

stered Capawing changes

Output ve

Output an

Output an

each CDGen

(a) the minModule

(b) the minModule

(c) the minexpresseTurbine

(d) maximufor the fo• Hot

• War

• Cold

(e) maximu(f) minimum(g) maximu

for the fo• Hot

• War

• Cold

(h) Primary (i) Seconda(j) Tertiary (k) Tertiary

Transmissio

Operatinrameters are

acity under s in;

ersus heat ra

nd heat rate

nd heat rate

nset;

imum noticefrom a condimum time in a Product

nimum CDGed as a blocGenset; m CDGenseollowing con;

rm; and

d;

m CDGensem time off loam CDGenseollowing con;

rm;

d;

Response, ary ResponsReserve, TiReserve, Ti

on Company

g Paramee required fo

reference

ate;

versus amb

versus amb

e required dition of De-s

between sytion Facility;

Genset Activck Load in th

et, or CCGTnditions;

et, or in the cad; et, or in the cnditions;

MW in 5 Sese, MW in 30me to reachme to reach

y

eters or each CDG

conditions

bient air temp

bient air pres

to synchronsynchronisatynchronising

ve Powerhe case of a

T Module, lo

case of a CC

case of a CC

conds; 0 Seconds;h Available Ch Available C

The

F OC2 O

Genset

supported

perature; an

ssure;

nise the CDtion; g different C

requirementa Gas Turbin

ading rates

CGT Module

CGT Module

Capacity fromCapacity from

e Grid Code

ti l Pl

by correctio

d

DGenset or

CDGensets

ts on syncne Genset o

from synch

e, deloading

e, time to Sy

m minimum lm 80% of Ca

- Version 2.

i V i 2

on curves

a CCGT

or CCGT

chronising, r a Steam

ronisation

rates;

ynchronise

load; apacity;

.0

0

Page 174: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

P 2

App

0.

200

Theostab

n Electricity

22 f 22

pendix D

8

0.85

0.9 0

*

0

oretical ility limit

Transmissio

Typical G

0.95

Practical Stabilit

100 Leading

on Company

Generator

MW

200

100

300

T

VAR

ty limit

0 MVAR

y

Performa

Turbine Limit

Manual R

R Limit Line

The

F OC2 O

ance Char

0.95 0.

Restrictive Line

100

Praccalc4% loadat npropat in

*

Lagging

e Grid Code

ti l Pl

rt

9 0.85

0.8

0.

200

PoweFacto

ctical stability limculated allowing amargin at full

d, a 12% margin o load and portional marginsntermediate loads

- Version 2.

i V i 2

75

0.7

Rot

Hea

300

er ors

mit a

s s.

.0

0

tor

ating

Page 175: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P

Ope

OC

OC

OC

OC

OC

OC

OC

n Electricity Tr

1 f 4

erating C

C3.1 Introd

C3.2 Objec

C3.3 Scope

C3.4 Opera

OC3.4

C3.5 Opera

OC3.5

OC3.5

C3.6 Instru

C3.7 Data

ransmission C

Code OC

duction ........

ctive ............

e .................

ating Margin

4.1 Operat

ating Margin

5.1 Contin

5.2 Operat

uction of Ope

requirement

Company

C3 – Op

CON

...................

...................

...................

n constituent

ting Reserve

n determinati

gency Rese

ting Reserve

erating Marg

ts .................

perating

NTENTS

...................

...................

...................

ts ................

e .................

ion ..............

erve .............

e .................

gin ...............

...................

The Grid C

F OC3 O

Margin

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

Code - Version

ti M i

Issued A

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

n 2.0

V i 2 0

April 2010

.............. 2

.............. 2

.............. 2

.............. 2

.............. 3

.............. 3

.............. 3

.............. 3

.............. 4

.............. 4

Page 176: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 2

Ope

OC3OperOper

The Oby DDemadue t

OC3The timesgove

OC3In ad

P U

OC3The O

Contifrom providheld A

Operreal tSyncagain

n Electricity Tr

2 f 4

erating C

3.1 Introdrating Code rating Margin

Operating Memand Conand. It is reqto an imbala

3.2 Objecobjectives

scales that mrn the issue

3.3 Scopedition to OE

Power ProduUsers offering

3.4 OperaOperating M

ingency Res24 hours aded by CDGAvailable to

rating Resertime and ishronised wit

nst uncertain

ransmission C

Code OC

uction OC3, Operan that OETC

Margin is thentrol) availabquired to limnce between

tive are to state

make up the of Dispatch

e TC, OC3 ap

cers; and g Demand C

ating MargMargin compr

serve is thehead down

Gensets thatSynchronise

ve is to prov provided bthin minutes

nties in Avail

Company

C3 – Op

ating margin C may use in

e amount of ble over and

mit and then n total Gene

e clearly thOperating M

Instructions

pplies to;

Control as an

gin constrises Conting

e margin of to real time

t are not reqe within a de

vide spare Gby CDGenses. Contingeability of CD

perating

sets out the the Control

reserve (prod above thacorrect Freq

eration Capa

he types of Margin, and s for reserve

n Ancillary S

tituentsgency Rese

Generation e over and aquired to be efined times

Generation Cets that arency Reserve

DGensets an

The Grid C

F OC3 O

Margin

e types of re Phase.

ovided by Pat required tquency deviaacity output a

f reserve prto describe

e.

Service.

rve plus Ope

Capacity reabove the foSynchronisecale.

Capacity fore either Syne and Operand in Deman

Code - Version

ti M i

serves mak

roduction Fato meet the ations that mand Demand

rovided ovethe factors

erating Rese

equired in torecast Demed but which

r Frequency nchronised oating Reservnd forecasts.

n 2.0

V i 2 0

ing up the

acilities or expected

may occur d.

er various which will

erve.

the period mand. It is h must be

control in or can be ve provide

Page 177: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 3

OC3OperCDGrespothe FGeneOperand Lprovid

i.) The aDema

The iof thewill b

ii.) The aDema

The iof thewill bseconFrequ

iii.) The EmerprovisPPA

OC3

OC3OETCto 24limite

h n D

OC3OETCTertiaSystereleva

n Electricity Tr

3 f 4

.4.1 Operrating Reseensets or fond in real tFrequency oeration Caprating ReserLoad in the eding respon

Primary Reautomatic inand for Activ

ncrease or de relevant Pe fully Availa

Secondaryautomatic inand for Activ

ncrease or de relevant Pbe fully Avainds, any aduency Sensi

Tertiary Recomponent rgency Instrsion of Activor Connecti

3.5 Opera

.5.1 ContC shall dete4 hours aheed to the follo

istorical Avaotified Risk o

Demand fore

.5.2 OperC shall deteary Reserveem security. ant factors,

ransmission C

rating Reseerve is therom a redutime Operat

of the Total acity or m

rve also incluevent of lowse in three p

esponse. ncrease in Ave Power in

decrease in PPA or Connable within 5

y Responsencrease in Ave Power in

decrease in PPA or Connilable by 30dditional Actitive Mode.

eserve of the Ope

ructions to ve Power mon Agreeme

ating Marg

ingency Rrmine the am

ead, taking dowing;

ailability and of Trips to thcasting unce

rating Reseermine the ae that must b

The OETCincluding bu

Company

erve additional ction in Deion to contrSystem to aismatch beudes CDGe

w Frequencyphases;

Active Powerresponse to

Active Pownection Agre5 seconds fro

e Active Power

response to

Active Pownection Agre0 seconds frtive Power

erating ReseSynchronisust be in ac

ent.

gin deter

eserve mount of Codue conside

reliability pehe reliability ertainties.

erve amount of Pbe AvailableC Operating ut not limited

Generationmand. Opeibute to conan acceptabtween Gennsets that m. The Opera

r output of ao a fall in the

er must be ieement. Theom the time

r output of ao a fall in the

er must be ieement. Therom the timeshould be

erve that wose and/or Dccordance w

rmination

ontingency Reration of re

erformance oof individua

rimary Respe to it from CReserve po to the follow

The Grid C

F OC3 O

n Capacity rating Rese

ntaining and ble level in teration Cap

may be instrating Reserv

a CDGenset Frequency

in accordancese will prov

of the Frequ

a CDGenset Frequency

in accordancese will prove of the Fremade Availa

ould be AvaDispatch othwith the prov

n

Reserve requelevant facto

of individual l CDGensets

ponse, SecoCDGensets alicy will takewing;

Code - Version

ti M i

from Synerve must b

correcting ahe event ofpacity and ructed to Syve must be c

t or a decreaof the Total

ce with the pide that the uency fall.

t or a decreaof the Total

ce with the pide that the

equency fallable by Op

ailable as aher CDGensvisions of the

uired for eacors, includin

CDGensetss

ondary Respat any time

e due consid

n 2.0

V i 2 0

chronised be able to any fall in f a loss of

Demand. ynchronise capable of

ase in the System.

provisions response

ase in the System.

provisions response . After 30 eration in

a result of sets. The e relevant

ch hour up ng but not

s

ponse and to ensure

deration of

Page 178: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

P 4

thIntr

thd

th si th a

C a

OETCaltera

OC3As pawhichContiPowe

OETCReseunde

OC3The ConndurinProduare rSche

n Electricity Tr

4 f 4

he magnitudnternational ransmission he predictedetermined th

he extent to ignificant evhe cost of prmbient wea

CDGenset angreements i

C shall keeations to it as

3.6 Instruart of Schedh they are ingency Reser Producers

C may issueerve in the cr OC3.7.

3.7 Data rrequirement

nection Cong applicatioucers to OErequired to

eduling and D

ransmission C

e and numbInterconne

feeders withd Frequencyhrough simuwhich Demaents that ma

roviding Opeather conditind/or Transmn place with

ep records s determined

ction of Ouling, OETCobliged to

serve and Os and Users

e Dispatch Incase of eac

requiremets for Operaditions Cod

on for a CoETC by 1st J

be notifiedDispatch Co

Company

ber of the larections, Inthin the Transy drop followulation using and Control ay justify proerating Reseions, insofamission Systh Internationa

of the Opd by the abo

OperatingC will instruct

make theiOperating Re

shall make

nstructions, ch CDGense

ents ating Parame (CC, clau

onnection aJanuary eacd to OETC des.

rgest Active ternal Intersmission Sywing loss oa dynamic mcan be imple

ovision of aderve at any pr as they mtem reliabilityal Interconne

perating Reove and any

g Margint Power Pror Gensets eserve with their Gense

or instruct Uet or Users’

eters for Opuse 5). Thisnd thereafte

ch year. Anyas part of

The Grid C

F OC3 O

Power infeerconnections

ystem; of the largesmodel of theemented; ditional Ope

point in time;may affect (y; and ected Partie

eserve policother factor

ducers and Available tothe require

ts so Availab

Users, to reqPlant, up t

perating Mas data shaller must bey short-term f the daily

Code - Version

ti M i

eds from CDs and ove

st infeed ase Total Syste

erating Rese

(directly or

es.

cy and of srs.

Users of theo contributed levels of ble.

quire use of o the levels

argin are givl be provide

e provided bchanges toreporting u

n 2.0

V i 2 0

DGensets, er single

s may be em;

erve;

indirectly)

significant

e extent to e towards response.

Operating s reported

ven in the ed initially by Power

o this data under the

Page 179: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 1 f 1

Opera

Operating

OC4.1 OC4.2 OC4.3 OC4.4 OC4.5 OC4.6 OC4.7 OC4.8

ctricity Transmis

11

ating Co

g Code OC4

IntroductioScope Objective Methods oProceduresWarning syPost eventScheduling

ssion Compan

de OC4

4 – Demand

n

f Demand Cs for implemystem t reporting g and Dispat

y

– Dema

CON

Control

Controlmenting Dem

tch during D

and Con

NTENTS

mand Control

Demand Con

The Grid Cod

F OC

ntrol

l

trol

de - Version 2.0

C4 D d C

Issue

0

t l V i 2

ed April 201

2 0

10

2 2 2 2 3 7 7 8 9

Page 180: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 2 f 1

Opera

OC4.1 IOperatingimplemenallow OEor where OC4 dea Cons Plann

by OE Cons De-en

relays Proce Dema

OC4.2 SIn additio Powe Licen Licen Direct Intern Intern PWP RAEC

OC4.3 OThe objec to ide

imple to cla

the dimple

OC4 reqequitablysecuring

ctricity Transmis

11

ating Co

Introductg Code OCnting such mTC to secursevere opels with the foumer Deman

ned manual dETC; umer Demannergisation os to preserveedures for issand Control I

Scope on to OETC, er Producerssed Distributsed Suppliertly Connecte

national Internally Intercon

(for informatC if Connecte

Objectivectives of OC4entify differementation; a

arify the obligdevelopmenmentation ofuires OETC

y and that DeSystem sec

ssion Compan

de OC4

tion C4 is concemeasures. Tre a reductiorating difficuollowing aspnd managemde-energisat

nd managemof Demand e Total Systesuing and coImminent Wa

OC4 applies; tors; rs;

ed Consumerconnected Pnnected Parttion exchanged to the Tot

e 4 are as folloent methodsand gations of Ot of procef Demand Co

C to ensureemand Cont

curity have b

y

– Dema

rned with DThe term “Deon in Demanulties pose a pects of Demment initiatedtion or emerg

ment initiatedby automat

em security;omplying witharnings and

s to;

rs; Parties; ties; ge); and tal System.

ows; s of Deman

OETC, Usersedures, andontrol.

e that all patrol is used een exhaus

and Con

Demand Coemand Cond in situationthreat to the

mand Controd by OETC;gency manu

d by Licensetic Demand

h Demand CRed warning

nd Control

s and Directd exchange

arties affectas a last rested.

The Grid Cod

F OC

ntrol

ontrol measutrol” in OC4ns of insuffice stability of l;

al de-energi

d Distributorshedding e

Control instrugs.

and the pro

tly Connectee of inform

ted by Demsort and onl

de - Version 2.0

C4 D d C

ures and p4 refers to mcient Generathe Total Sy

sation of De

rs; equipment a

uctions; and

ocedures go

ed Consumemation, requ

mand Controy after all ot

0

t l V i 2

rocedures fmeasures thation Capaciystem.

mand initiate

and automat

overning the

ers as regarduired for th

ol are treatether means

2 0

for hat ity

ed

tic

eir

ds he

ed of

Page 181: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 3 f 1

OC4.4 MDemand Cons Emer Plann De-en

The obligmeans ofenergisate.g., hosp

(i) C

Directly agreemeagreeme Direct

period Direct

numbDirectly Cthe Transde-energConsumeagreemeConsumeOC4. Hofor a redu

(ii) E

OETC mmanuallyOETC shthat estaenergisedIn circummanuallyEach LiceOETC in

(a) eiSmO

ctricity Transmis

11

Methods Control is imumer Dema

rgency Manuned Rota Denergisation ogations of Of Demand Ction shall papitals, etc.

Consumer D

Connected nts with Onts may protly Connecteds of the yeatly Connecte

ber of occasioConnected Csmission Syised.

ers who arents with a Lers and Liceowever, Liceuction of Dem

Emergency

may implemey de-energisehall issue sublish the prd at a particu

mstances whey de-energiseensed Distriaccordanceeach Licensinstruction fSystem undmust be posOETC;

ssion Compan

of Demamplemented nd Side Man

ual Demand emand Shedof Demand bOETC, UserControl are say due atten

Demand Sid

ConsumerOETC to pr

vide for; ed Consumear; and ed Consumeons in a yea

Consumers wystem at tim

e not Directlicensed Supensed Suppensed Suppmand of 1MW

y Manual De

ent Emergene to License

uch instructiorinciples of tular point in ere thermal e Licensed Dibutor shall

e with the folsed Distributfrom OETCer Emergen

ssible to man

y

and Contrin a number

nagement agShedding;ding; and by automaticrs and Direcset out belontion to the

de Managem

r’s may enrovide Dem

er’s reducing

r’s reducing r. with DSM ag

mes when ot

ly Connectepplier. As Opliers such aliers must nW or more.

emand Shed

ncy Manual ed Distributoons in accothe amountstime or at spor stability c

Distributors, implement alowing arrantor shall ma

C to manuacy Conditionnually de-en

rol r of ways, ingreements;

c under-frequctly Connecw. All plansneed to pr

ment agree

nter into Dmand reduct

Demand at

their Deman

greements wther Consum

ed to the TrOETC is not agreements notify OETC

dding

Demand Sors, Users, rdance with s and locatpecified FreqconsiderationDirectly Con

an instructiongements; ke arrangem

ally de-energns irrespectinergise a pro

The Grid Cod

F OC

cluding;

uency relayscted Consums and implemrotect certain

ments

Demand Sidtion service

certain time

nd at OETC’

with OETC mmers and Us

ransmission a party to Dare not subof all DSM

hedding by and Directlyplans prepa

ions of Demquency levens require it nnected Con

on to manua

ments that agise Consuve of Freque

oportion of D

de - Version 2.0

C4 D d C

s. mers in resmentation ofn classes o

de Managees. The ter

s of the day

s instruction

may remain sers have b

System maDSM agreembject to the agreements

issuing an y Connectedared in para

mand to be ls. to do so OE

nsumers andlly de-energ

allow it to comers on itency within

Demand as d

0

t l V i 2

pect of thesf Demand df Consumer

ement (DSMrms of DS

and at certa

for an agree

Connected een manua

ay have DSments betwee

provisions s that provid

instruction d Consumeragraph OC4manually d

ETC may itsed Users. gise issued b

omply with as Distributio30 minutes.

determined b

2 0

se e-rs,

M) SM

ain

ed

to lly

SM en of

de

to rs. 4.5 e-

elf

by

an on It by

Page 182: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 4 f 1

(b) emam

(c) oaepb

(d) eeC

OETmanuinstrustatuOETduratIf OEmay DemTo efrom

(a) etCtO

(b) eOebg

(c) oonm

ctricity Transmis

11

each Licensmanual de-eachieved asmay relate toonce manuaccordance energise theprocess of reby OETC; aneach Licenseach calendConnection its total an the perce

de-energof total D

confirm ththe first 5

C will notifyual de-energuction. In cutory instructC to be prtion of the dETC determ

itself manuand Controlnsure DirectOETC requ

each Directlto comply wConditions ithe manual OETC;

each DirectOETC with energisationby OETC. Tgroups of Co

once a manuor User at thnot re-energmust begin w

ssion Compan

sed Distribuenergisation

s soon as poo an individual de-energwith an ins

e manually de-energisatind sed Distributdar year, inPoint basis, nnual maximentage valuegised within Demand mushat a minimu5 minutes foly a Licensegisation of thircumstancetion has beerolonged, Oe-energisatiines that Em

ually de-ene requiremently Connecte

uiring manua

y Connectedwith an instru

rrespective ode-energis

ly Connecteregard to m

n must be acThe instruconnection Po

ual de-energhe instructiogise until OEwithin 2 min

y

utor shall imn without deossible after ual Connectigisation hasstruction fromde-energisedon must beg

tor shall pron respect owith the foll

mum Demande of the totaltimescales o

st disconectaum of 20% ollowing instru

ed Distributohe events ones of protracen given an

OETC will non. mergency M

ergise and rnt under Emeed Consumeal de-energis

d Consumeruction from Oof Frequencations to in

ed Consumemanual de-echieved as stion may reoints;

gisation has on of OETC,ETC instructutes of the in

mplement telay, and ththe instructiion Point ans been appm OETC, thd Demand ungin within 2 m

ovide OETCof the nextlowing informd; annual maxof 5, 10, 15, able; and of total Demuction from Oor who was n the Transmcted shortagd when a re

notify the Li

Manual Demre-energise ergency Coners and othesation;

r and User sOETC to macy within 30 ndividual Co

er and Userenergisation soon as poselate to an

been applie the Directlyts it to do sonstruction be

The Grid Cod

F OC

he instructiohe manualon is given d/or groups plied by a hat Licensedntil OETC inminutes of th

C in writing bt following mation as se

ximum Dem20, 25, and

mand can be OETC.

issued withmission Syse of Generaeduction in icensed Dis

mand Shedda Licensed

nditions. er Users can

shall make aanually de-en

minutes. It monnection P

r shall implewithout de

sible after thindividual

ed by a Direcy Connectedo and the peing given b

de - Version 2.0

C4 D d C

ons of OETde-energisaby OETC. Tof ConnectiLicensed

d Distributornstructs it to he instructio

by the end Operational

et out in App

and that can 30 minutes

manually de

h an instructem that nec

ation CapaciDemand is

stributor of

ing is inade Distributor

n implement

arrangementnergise undemust be pos

Points, as d

ement the ilay, and thehe instructioConnection

ctly Connectd Consumerprocess of reby OETC; an

0

t l V i 2

TC regardination must bThe instructioon Points; Distributor

r shall not rdo so and th

on being give

of October l Year, on

pendix A;

n be manua, at least 40

e-energised

ction requirincessitated thity or whereenvisaged bthe expecte

equate, OETas part of

an instructio

ts that allower Emergencssible to appetermined b

nstructions e manual d

on being givePoint and/

ted Consumr or User shae-energisationd

2 0

ng be on

in re-he en

in a

lly %

in

ng he a by ed

TC a

on

w it cy

ply by

of e-en /or

er all on

Page 183: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 5 f 1

(d) eeC

OETC winstructionecessitaor whereenvisageUser of th

If OETC itself manpart of a

(iii) P

In the evbalance, manual dOETC shDirectly Censure thof Consube re-eneOETC shOETC’s oof the tota

ctricity Transmis

11

each Directlend of OctoConnection its total an the perce

de-energ

ill notify a Dn requiring

ated the inste a statutord by OETC he expected

determines nually de-enDemand Co

Planned Ro

vent of a seither for th

de-energisathall developConnected hat Availablemers can be

ergised and hall amend opinion, opeal amount of

ssion Compan

y Connecteber in each Point basis, nnual maximentage valuegised within t

Directly Conmanual de-eruction. In cry instructioto be prolo duration of

that Emergnergise andontrol require

ota Demand

ustained pee Transmission of Demap Demand Consumers e power is se de-energisanother groany Planne

erational conf Demand th

y

d Consumecalendar yewith the foll

mum Demande of the totaltimescales o

nnected Coenergisationcircumstance

on has beennged, OETCthe de-ener

gency Manua re-energise

ement under

d Shedding

eriod of shosion Systemand will be imshedding roand other

shared amonsed for perioup of Consued Rota De

nsiderations hat shall be d

r and User ear, in respelowing informd; annual max

of 5, 15, and

nsumer or n of the evenes of protracn given anC will notify rgisation.

al Demand e Directly Cr Emergency

ortfall in the as a whole

mplemented otas in conUsers. Pla

ng affected pds of up to 1

umers de-enemand Sherequire it to

de-energised

The Grid Cod

F OC

shall providect of the nexmation as se

ximum Demd 30 minutes

User who hnts on the Tcted shortagd when a the Directly

Shedding isConnected Cy Conditions

e Generationor for signifon a rota basultation wi

anned Rota parties on a1 hour, after ergised.

edding prior o do so. OETd at differen

de - Version 2.0

C4 D d C

e OETC in xt Operation

et out in App

and that can.

has been isTransmissionge of Generareduction inConnected

s inadequateConsumers as.

n Capacity ficant parts oasis. th LicensedDemand S

n equitable which their

to implemeTC shall nott times.

0

t l V i 2

writing by thnal Year, onpendix A;

n be manua

ssued with an System thation Capacin Demand Consumer

e, OETC maand Users a

and Demanof the System

d Distributorhedding shabasis; groupsupplies sha

entation if, tify each Us

2 0

he a

lly

an hat ity is or

ay as

nd m,

rs, all ps all

in er

Page 184: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 6 f 1

(iv) D

Automaticnormally situation,the planTransmisfailed to sEach Licemaximumarrangemproportiodeterminefalling FrenergisedEach Lice

(a) tf

(b) tbffa

(c) tbS

(d) weltebsu

(e) oLea

(f) febw

Each Diapproximde-energ

ctricity Transmis

11

De-energisa

c Demand used to ad and generaned conting

ssion Systemstabilise or hensed Distri

m Demand ments shall ns of Deme the proporequency ad. ensed Distrib

the Demandfrequency dethe numberblocks, shalfollowing disfor each diarrangementhe arrangemblock will eSystem acrowhere condenergisationlarge proportime, OETC energisationbeen de-enesubsequent under-frequeonce an autLicensed Denergise untamounts of Dfollowing thenergisationbe achievedwithin 2 minirectly Con

mately 40% oised by au

ssion Compan

ation of Dem

de-energisadress short-ally followinggency valuem when othhold the Freqbutor shall mto be de-eallow auto

mand being ortion of Demnd agree w

butor shall c

d of each e-energisatio, location, sl be specifie

scussion withscrete MW

nts covering ments cover

ensure a reoss all Connitions are s

n, and the surtion of the tmay instruc

n manually, ergised autofall in Frequ

ency Demantomatic undeistributor ontil OETC insDemand so e recovery

n of Demandd as soon autes of the inected Co

of its annual utomatic un

y

mand by au

ation throug-term imbalag the trippine. It is a er actions, quency withimake arrangenergised b

omatic de-ede-energis

mand that iswith License

comply with t

Licensed Don will be spsize and theed by OETCh Licensed D

block annall Licensedring all Licenasonably uection Pointuch that, foubsequent Ftotal Demanct a Licensedand restoreomatically. Tuency will agnd de-energier Frequencn whose Distructs that Linstructed; aof Freque

d. Re-energias possiblenstruction bensumer anmaximum D

nder-frequen

utomatic un

gh under-freances in the

ng of an ammethod of

such as thein required O

gements to aby automatnergisation ed at eachs required ted Distribut

the following

Distributor tplit into discre associatedC by the enDistributors.ually, and

d Distributorsnsed Distribuniform de-ets; ollowing autoFrequency rend so de-ened Distributor

e an equivalThe purposegain be conisation; cy Demand istribution SLicensed Disand ncy, OETCisation of Deand the pro

eing given bd User shDemand (suncy relays.

The Grid Cod

F OC

der-frequen

equency relae Generatioount of Genf safeguarde use of theOperating Limallow approxic under-freto occur i

h level of to be de-enors those f

g;

hat is subjrete MW blocd under-freqnd of Octobe OETC will prepare a

s; utors in resp

energisation

omatic undeecovery, it isergised withr to implemeent amount e of such atained by th

de-energisaSystem it hastributor to d

C will issue emand by Locess of re

by OETC. hall make ubject to disc

These ar

de - Version 2.0

C4 D d C

ncy relays

ay Demandon Capacity neration Capding the stae Operating mits.

ximately 40%equency reln stages wFrequency. ergised at efeeders tha

ect to autocks; quency setter in each creview the aschedule o

pect of eachwithin eac

er-frequencys not possiblin a reasona

ent additionaof the Dem

action is to ehe Operation

ation has takas occurreddo so and th

instructionsicensed Dis-energisatio

arrangemecussion withrrangements

0

t l V i 2

d shedding and Deman

pacity beyonability of thMargin, hav

% of its annulays. Theswith specifie

OETC shaeach stage t will be d

omatic unde

ings of thescalendar yearrangemen

of the agree

h discrete MWh Distributio

Demand dle to restoreable period

al Demand dmand that haensure that n of automat

ken place, thd, will not ren only in th

s for the rtributors mun must beg

nts to allo OETC) to bs shall allo

2 0

is nd nd he ve

ual se ed all of e-

er-

se ar

nts ed

W on

e-e a

of e-ad a

tic

he re-he

re-ust gin

ow be ow

Page 185: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 7 f 1

automaticDemand proportioand agreenergisedThe Demunder-fresize and by the enConsumeannually ConsumeLicensedestimate de-energminutes aLicensedestimate Demand Usually vday.

OC4.5 POETC shcontainedproposedmeasuresOETC’s pequitableWhen drashall consWhere aConnecteshall, afteLicensedthe requir

OC4.6 WOETC shimplemenwill state is imminethey deemdetermineOETC iss

ctricity Transmis

11

c de-energisbeing de-e

n of Demanee with Dired.

mand of eacequency de-e

the associand of Octobers and Useand prepare

ers and User Distributorsof the Demisation as and written c Distributorsof the time de-energisa

verbal inform

Procedurhall prepared in OC4. Td by OETC. s OETC shaplans to ma

e manner. awing up itssult with all p

agreement ced Consumeer consulting Distributor,rement to m

Warning hall issue antation of Dewhether Em

ent Recipiem necessaryed by OETCsues notifica

ssion Compan

sation to ocenergised ad that is req

ectly Connec

ch Directly Cenergisation

ated under-frber in each ers. OETC e a schedulers. s, Directly Co

mand reductiosoon as prconfirmations, Directly Coat which De

ation. The mation is ex

res for im procedures

The Grid CoIn drawing

all demonstraintain the s

s proposals parties to thcannot be er, or User og with the R Directly Coaintain the s

system advance waemand Cont

mergency Maents of Demy in view of C and will reation of thei

y

ccur in a nat each levquired to be cted Consum

Connected Cn will be splitrequency secalendar yewill review

e of the agre

onnected Coon that occuractical. Usu within 1 dayonnected Coemand was estimate sh

xpected with

mplements for the imde Review up procedurate that Detability of th

for the implee Grid Codeachieved w

on the impleRegulatory Aonnected Costability and

arnings as strol measureanual Dema

mand Controlthe warning

emain in forir cancellatio

number of svel of Freqde-energise

mers and U

Consumer at into discretettings of eaear following

the arrangeeed arrangem

onsumers aurred under ually verbaly. onsumers arestored foll

hall be provhin 10 minut

ting Demamplementatio

Panel shall ures for the

emand Conthe Transmis

ementation e including thwith a partimentation o

Authority, deonsumer, or security of t

soon as it es. A Demand Sheddingl warnings sg. All Demanrce from theon, amendm

The Grid Cod

F OC

stages with quency. OEed at each sUsers those

nd User thate MW blockch blocks, w

g discussionements for ments cover

nd Users shautomatic u

information

nd Users shlowing an auided to OETtes and writ

and Contn of the Dereview and

e implementarol will be usion System

of Demand he PWP. icular Licen

of a Demandetermine the

User concethe Transmis

considers aand Control g or Plannedshall take sund Control we stated timement or re-is

de - Version 2.0

C4 D d C

specified pTC shall d

stage of fallifeeders tha

at is subjectks. The numwill be specifn with Direct

each discreing all Direc

hall provide Ounder-frequen is expect

hall provide Outomatic undTC as soontten confirm

trol emand Cont approve thation of De

used as the m, and will b

Control me

nsed Distribd Control mee least-worsterned takingssion System

an Alert wiwarning issu

d Rota Demauch preparatwarnings wile of commessue. The e

0

t l V i 2

proportions determine thng Frequencat will be d

t to automatmber, locatiofied by OETtly Connecteete MW bloctly Connecte

OETC with aency Demanted within 1

OETC with ader-frequenc

n as practicaation within

trol measurehe proceduremand Contrlast option

be used in a

asures OET

butor, Directeasure, OETt case for th

g into accoum.

ll require thued by OETand Sheddintory action, al be of a for

encement unexception is

2 0

of he cy e-

tic on, TC ed ck ed

an nd 10

an cy al. 1

es es rol in

an

TC

tly TC he

unt

he TC ng as rm ntil

a

Page 186: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 8 f 1

Demand by OETC

Followingimplemen

If a LicenDemand necessarproperly situation OETC as

(i) D

OETC wConnecteEmergen

A Demanissued wShedding

A Deman2 hours o

(ii) R

OETC wLicensedinstructioRota DemProducer

A Demanbe requirDemand

(iii) F

The form

OC4.7 PDemand Followingwriting (oOETC’s sufficient the notificde-energamount o

ctricity Transmis

11

Control ImmC.

g the issue nted unless

nsed DistribControl me

ry measuresassessed. with OETC

s soon as po

Demand Co

will issue a ed Consumcy Manual D

nd Control Imwhen OETC g within the f

nd Control Imof the time of

Red Warnin

will issue a Distributorns on the damand Shedrs with CDGe

nd Control Red and the preduction th

Form of wa

of warnings

Post eveControl inst

g the issue oor by electroinstruction. in real time

cation shall isation occu

of Demand re

ssion Compan

minent Warn

of a DemanOETC so iss

butor or Inteeasures to ps provided tIn such situprior to the i

ossible

ontrol Immin

Demand Coers and Us

Demand She

mminent Waexpects to

following 30

mminent Waf issue.

ng

Demand Cors, Directly ay ahead co

dding. A Deensets that m

Red Warningpart of the That OETC ma

rnings

s is given in

nt reporttructions ma

of a Demandonic media Telephone

e. This has tinclude an e

urred. For reestored and

y

ing that will

nd Control wsues an inst

rnally Intercpreserve thehe impact u

uations a Licmplementat

nent Warnin

ontrol Imminsers who medding.

rning need nissue an inminutes.

arning will au

ontrol Red Connected

oncerning Emmand Contmay be affec

g will specifyransmissionay require a

Appendix B

ing ay be eitherd Control ins

as agreed e communicto be confirmestimate of testorations the time at

automaticall

warning, no truction.

connected Pe integrity oupon the intecensed Distrtion of Dema

ng

nent Warninmay subseq

not be precenstruction re

utomatically

Warning byd Consumemergency Mrol Red Wacted by such

y the period n System to wnd any othe

.

r to de-energstruction by O

in writing wcation, whichmed in writinthe Demandthe notificatwhich the re

The Grid Cod

F OC

ly lapse afte

Demand C

Party consideof its Systemegrity of theributor shalland Control

ng to Licensquently rece

eded by any equiring Eme

lapse if not

y 16:00 houers and U

Manual Demaarning will ah instruction

during whicwhich it mayr matters.

gise DemanOETC, recipwith OETC) h has to be ng within 1 dd reduction ation shall inestoration wa

de - Version 2.0

C4 D d C

er 2 hours un

ontrol meas

ers it necesm, it may ime Total Syst endeavor tmeasures a

sed Distribueive instruct

other warniergency Ma

reissued by

urs on the dsers who and Sheddinalso be issus.

ch Demand sy apply, the

nd or to restpients shall n

that they crecorded in

day. For de-and the timeclude an esas achieved

0

t l V i 2

nless renewe

sures shall b

ssary to appmplement thtem has beeto discuss thnd shall noti

utors, Directtion requirin

ng and will bnual Deman

y OETC with

day ahead may receiv

ng or Planneued to Pow

shedding mapercentage

tore Demannotify OETC complied win log book, -energisatione at which thstimate of th.

2 0

ed

be

ply he en he ify

tly ng

be nd

hin

to ve ed

wer

ay of

nd. in ith is

ns he he

Page 187: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 9 f 1

All Usersand/or reControl in

OC4.8 SDuring Dcease an

ctricity Transmis

11

s shall providestoration acnstruction an

ScheduliDemand Con

d will not be

ssion Compan

ded further dctually achiend should be

ng and Dntrol, Schedue re-impleme

y

details to OEeved. This ree completed

Dispatch duling and Dented until O

ETC of the teporting shawithin 24 ho

during Deispatch in a

OETC so dec

The Grid Cod

F OC

imings, amoall be implemours of the e

emand Caccordance wcides.

de - Version 2.0

C4 D d C

ount of Demmented for eevents.

ontrol with the Me

0

t l V i 2

and reductioeach Deman

rit Order ma

2 0

on nd

ay

Page 188: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 10 f

Append

ConnectPoint

(Name

Notes:

ctricity Transmis

f 11

dix A Emsu

tion t e)

Annmaxi

MW

Data tyear.

ssion Compan

mergency mmary sh

nual mum W

5

to be provid

y

Manual heet

% of Gro

10

ded annually

Demand

oup Demand(Cumula

Minut

15

y by the en

The Grid Cod

F OC

d Shedd

d De-energiative) tes

20 2

nd of Octob

de - Version 2.0

C4 D d C

ding/De-en

isation

25 30

er to cover

0

t l V i 2

nergisatio

Remark

the followin

2 0

on

ks

ng

Page 189: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

P 11 f

Append Demand The form

Demand

The form

ctricity Transmis

f 11

dix B Fo

Control Im of a Deman• This is De• This warn• Prepare f

minutes;• Do not sh• Standby f

Control Re

of a Deman

• This is De• This warn

implemenShedding

• The amouto be she

• Do not sh

ssion Compan

rm of war

minent Warnd Control Imemand Contning applies for Emergen

hed Demandfor further ins

ed Warning

nd Control R

emand Contning applies nt (Emergencg) tomorrow; unt of Dema

ed); hed Demand

y

rnings

rning mminent Warol Imminentto (include n

ncy Manual D

d until instrucstructions.

Red Warning

rol Red Warto (include ncy Manual D

nd to be she

d until instruc

arning will bet Warning tim

name of UseDemand She

cted;

will be;

rning timed aname of UseDemand She

ed will be (sp

cted.

The Grid Cod

F OC

e; med at (xx.xxrs and area/ edding of (X

at (xx.xx) hours and area/ dding or Pla

pecify amoun

de - Version 2.0

C4 D d C

x) hours; substations

XX) MW with

urs; substations

anned Rota D

nt and durati

0

t l V i 2

affected); in the next 3

affected) to Demand

ion of deman

2 0

30

nd

Page 190: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Operaand S

OC5.1 OC5.2 OC5.3 OC5.4

OC5.5

OC5.6

OC5.7 OC5.8 OC5.9 OC5.10Append

OETC

ctricity Transmi

ating Coignifica

IntroductioObjectiveScope Notice of OC5.4.1 OC5.4.2 OC5.4.3 OC5.4.4 NotificatioOC5.5.1 OC5.5.2 OC5.5.3 OC5.5.4 SignificanOC5.6.2 OC5.6.3 OC5.6.4 EvaluatioAlerts Operation

0 Loss ofdix A Sig

ssion Compan

ode OC5 nt Incide

on

Operations OperationsOperationsForm of noTiming ......

on of IncidenIncidents oIncidents oForm of noTiming ......

nt Incident reWritten repWritten repForm of ful

n of Significa

nal Logs f Communicagnificant Inci

y

– Noticent Rep

CON

s on the Trans on a User otice of Oper...................

ntson the Transon a User Syotification ........................

eportingporting of Sigporting of Sigll Significantant Incidents

ationident Report

The

e of Opeorting

NTENTS

nsmission SSystem ......rations ...........................

smission Sysystem ...............................................

gnificant Incgnificant Inct Incident reps

t

Grid Code - V

erations

System .................................................................

stem .....................................................................

idents by OEidents by Usport .............

Version 2.0

s and Inc

Issue

...................

...................

...................

...................

...................

...................

...................

...................

ETC to Usersers to OETC...................

cidents,

ed April 201

...................

...................

...................

...................

...................

...................

...................

...................

rs ................C ...................................

1

10

2 2 3 3

. 3

. 3

. 3

. 4 4

. 4

. 4

. 4

. 5 5

. 6

. 7

. 7 7 7 9 9

10

Page 191: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC5.1 Operatingrequires Systems System. OETC mout the prequires O a pre

Incide a full

IncideIn additiothe circuby the Gr

OC5.2 The objec to sp

Opera to en

of suactionUser’

to spSignif

to proto ass

ctricity Transmi

ating Co

Introdug Code OC5OETC and Uthat have

ay determinprocedures fOETC or a U

eliminary wrent as a Signwritten Sign

ent as a Signon, OC5 conlation of Sigrid Code Rev

Objectictives of OCpecify the oations and Insure noticesch notices tns required s System; ecify the arficant Incideovide for thesess the effe

ssion Compan

ode OC5

uction 5, Notice of Users to issuor may ha

e that an Infor reportingUser to prepitten Significnificant Incidnificant Incidnificant Incid

ntains requiregnificant Inciview Panel.

ve C5 are; obligations ncidents on s of Operatioto fully asseto maintain

rangementsnt; and review of aectiveness o

y

5 – Noticand S

Operations ue notices ove implicati

cident shall g and subsepare; cant Incidendent; and dent report wdent. ements goveident reports

on OETC their respecons and Incess the likely

the security

s for reportin

ll Significantof policies ad

The

ce of OpSignifica

and Incidenof all Operations for the

be classifieequent asses

nt report wit

within 3 Bus

erning the cs, and their

and Users ctive Systemidents providy implicationy and stabil

ng Incidents

t Incident redopted in acc

Grid Code - V

perationant Incid

nts, and Signions and Inc

e Transmiss

d as a Signssment of S

thin 1 day o

siness Days

content of Sisubsequent

regarding ms;

de sufficientns and risksity of the Tr

that OETC

ports by the cordance wi

Version 2.0

ns and Indent Rep

nificant Incidcidents on thsion System

ificant IncideSignificant In

of OETC de

of OETC de

gnificant Inct assessmen

the issue o

t detail to als and take transmission

C has determ

Grid Code th this Grid

ncidentsporting

dent reportinheir respectivm or a User

ent. OC5 sencidents. OC

etermining a

etermining a

cident reportnt and revie

of notices

low recipienthe necessa System or

mined to be

Review PanCode.

s,

g, ve r’s

ets C5

an

an

ts, ew

of

nts ary

a

a

nel

Page 192: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC5.3 In additio Powe Licen Direc Intern Intern PWP RAEC

OC5.4 OETC anhave hadinformatioelectronicEnglish laWithout l where

Syste where

a haz where where in rela

OC5.4.1 O

In the caOperationwill be, is

OC5.4.2 O

In the casEffect onUser, OE

OC5.4.3 F

All operanotificatiowhere praThe apprrespond tIncident o

ctricity Transmi

Scope on to OETC, er and Watersed Distribu

ctly Connectenally Interconnational Inte(copy recip

C if Connect

Notice nd Users shad or may havon is requec means asanguage. imiting the ree an Operaem, or Plant;e Plant is exzard to Persoe there is ane there is incation to majo

Operations

ase of an Onal Effect ons, or has bee

Operations

se of an Ope the Transm

ETC will notif

Form of not

ational notions may be actical. ropriate partto any questor Operation

ssion Compan

OC5 applier Producers;

utors; ed Consumennected Parrconnected ient of Signifted to the To

of Operaall issue notve implicatio

ested in writ agreed wit

equirementsational Instru; xpected to bons; n expectationcreased riskor testing, co

on the Tran

Operation on the Systemen affected.

on a User S

eration on thmission Systfy any other

tice of Oper

fications mmade by te

ty (as descrtions asked)

n.

y

s to; ;

ers; rties; Parties; ficant Incide

otal System.

tions tices concernons for the Tting throughth OETC in

s of OC5.4, nuction to be

be operated

n of abnormak of inadverteommissionin

nsmission S

n the Transm of anothe

System

he System oem, the UseUsers whos

rations

ust be maelephone bu

ribed in OC5) of any Ope

The

ent reports);

ning OperatTransmissionhout this Cowriting may

notifications issued ma

in excess of

al operating ent Operationg and maint

System

smission Syr User, OET

of a User thaer will notify se Systems w

ade promptt must be co

5.4.1 and Oeration that h

Grid Code - V

and

ions on thein System orode, facsimiy be used. A

shall be issay have an

f its rated ca

conditions;on of Protecttenance.

ystem that wTC will notify

at will have oOETC. Fo

will be, are,

ly. Notificatonfirmed in

OC5.4.2) willhas arisen in

Version 2.0

r respective r a User’s Syile transmisAll writing s

ued for the feffect on a

apability and

ion; and

will have ory the User w

or has had allowing notifor have bee

tions and rwriting with

issue a nondependentl

Systems thystem. Whe

ssion or othhall be in th

following; nother User

d may prese

r has had awhose Syste

an Operationfication by then affected.

responses in 30 minute

tification (any of any oth

at re er he

rs’

ent

an em

nal he

to es

nd er

Page 193: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec The notific descr provid

and a includ

The recipthe notific

OC5.4.4 T

A notificashall be gthe implic

OC5.5 OETC anhad or minformatioelectronicEnglish laWithout following where

to Pe the ac adver break break increa

OC5.5.1 I

In the caOperationis, or has

OC5.5.2 I

In the caOperationnotificatiohave bee

OC5.5.3 F

Incident may be practical.

ctricity Transmi

cation will; ribe the Opede sufficientassess the imde the namepient of a nocation will, in

Timing

ation will be given in suffcations and

Notificand Users shmay have imon is requec means asanguage. limiting the ; e Plant has rsons; ctivation of arse weather kdown of, faukdown of or fased risk of

Incidents o

ase of an Innal Effect ons been affect

Incidents o

ase of an Inal Effect oon by the Uen affected.

Form of not

notificationsmade by te

ssion Compan

eration (but ist detail to enmplications, e of the Persotification mansofar as it is

given as faficient time arisks arising

ation of Inall issue notmplications ested in writ agreed wit

requiremen

been Opera

any alarm orconditions bults on or temfaults on coninadvertent

n the Trans

ncident on tn the Systemted.

n a User Sy

Incident on on the Tran

User, OETC

tification

s must be iselephone bu

y

s not requirenable the reand risks aron reporting

ay ask quests able, answ

ar in advancas will reaso from the Op

ncidentstifications offor the Trating throughth OETC in

nts of OC5.5

ated in exce

r indication obeing experimporary chantrol, commuOperation o

smission Sy

the Transmim of a User,

ystem

the Systemnsmission Swill notify a

ssued promput must be

The

ed to state itsecipient of thrising; and g the Operattions to clari

wer any ques

ce as possibonably allow peration.

f Incidents onsmission Shout this Cowriting may

5, Incident

ss of its rate

of any abnorenced; anges in the unication an

of Protection

ystem

ission SysteOETC will n

m of a UseSystem, theany other Us

ptly. Notificaconfirmed

Grid Code - V

s cause); he notificatio

ion on behaify the notificstions raised

ble. Notificathe recipien

on their respSystem or aode, facsimiy be used. A

notifications

ed capability

rmal operatin

capabilities nd Metering e.

em, which hnotify the Us

er, which hae User will sers whose

ations and rin writing w

Version 2.0

on to reason

lf of OETC ocation and thd.

ation of futurnt to conside

ective Systea User’s Syile transmisAll writing s

s shall be is

y and presen

ng condition

of Plant; equipment; a

has had or ser whose S

as had or mnotify OETSystems w

responses towithin 30 m

nably consid

or the User.he provider

re Operationer and asses

ems that havystem. Whession or othhall be in th

ssued for th

nted a haza

;

and

may have aystem will b

may have aTC. Followinwill be, are,

o notificationminutes whe

er

of

ns ss

ve re er he

he

rd

an be,

an ng or

ns re

Page 194: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec The apprany respoIncident oThe notif descr be of

asses includ

The recipthe notific

OC5.5.4 T

An Inciderecipient

OC5.6 OETC mSignificanthat suchreporting other eleacknowleparty and Without lthe follow manu

result Any m

trippin voltag frequ Syste overlo

and breec

the puNot withswhere, inSystem.T

ctricity Transmi

ropriate partonse to queor Operationication will; ribe the Incidsufficient de

ss the implicde the namepient of a nocation will, in

Timing

ent notificatto consider

Significmay determinnt Incident. h a determin

are to be foctronic mea

edge receiptd the acknow

imiting this gwing; ual or automted in interrumultiple trippng has not rege excursionency excurs

em instabilityoading (i.e.,

ches of Safeublic or to Ostanding then its view, thTiming of Sig

ssion Compan

ty (as descrstions asked

n.

dent (but is netail to enabcations, and e of the indivotification mansofar as it is

tion will be and assess

cant Incidne that an OETC shallation has beollowed. OEns or by com of the notifi

wledging par

general desc

matic trippinuption of supping or repeesulted in a ns outside nosions outsidey;

loading in e

ety Rules or OETC or Usee above, OEhat incident gnificant Inci

y

ribed in OC5d) of any Inc

not required ble the recipirisks arising

vidual reportiay ask quests able, answ

given as sothe implicat

dent repoIncident repl promptly neen made anETC shall communicationication in wrty shall reco

cription, Sign

ng of Systepply to consuated trippingloss of demormal operae normal ope

excess of th

procedureser employeesETC may dhas had a sident reporti

The

5.5.1 and Ocident that h

to state its cent of the no

g; and ng the Incidtions to clari

wer any ques

oon after thtions and ris

orting ported by it notify all potnd that proconfirm such n on recorde

writing within ord the comm

nificant Incid

m circuits, umers g of System and or gene

ating limits; erating limits

he rated Cap

s that resultes or their repeclare any significant imng

Grid Code - V

OC5.5.2) willhas arisen in

cause); otification to

ent on behaify the notificstions raised

he Incident ks arising fro

or a User tentially affeedures govenotice withi

ed telephone2 hours of r

munication in

dents will inc

and Plant w

Circuits, aneration

s;

pacity) of Sy

ed in dangepresentativeincident to

mpact on the

Version 2.0

issue a nondependently

o reasonably

alf of OETC ocation and thd.

as possibleom the Incid

shall be clected Users erning Signifn 2 hours be. All affectereceipt. Bothn logbook.

clude, as a m

where such

nd plant eve

ystem circui

r or injury tos. be a Signif

e normal op

tification (any of any oth

y consider an

or the User.he provider

e to allow thdent.

lassified as by telephon

ficant Incideby facsimile ed Users shah the notifyin

minimum all

h tripping ha

n where suc

ts, and Plan

o members

ficant Incideperation of th

nd er

nd

of

he

a ne

ent or all ng

of

as

ch

nt;

of

ent he

Page 195: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec (i) P

OETC anwithin 1 Incident tThe prelispecified

(ii) F

OETC anBusinessto be a S Explanatparty. Th OETC

Repowithin

OETCprelim

OETand ndays.

OETCIncide

Howe(prelimsignif

OC5.6.2 W

In the cadetermineIncident rto other a if the

prepaor to The SIncide

if the a writSysterequir

ctricity Transmi

Preliminary

nd / or the noDay of OE

to be a Signiminary writtin Appendix

Full report

nd / or the nos Days of OEignificant Inc

ion: The pree following nC shall deciort and notifyn 1 day. C shall conminary SignifC shall dec

notify accord

C shall consent Report ever, a partminary or fficant.

Written rep

ase of an Ined by OETCreport to theaffected Usee User is a aring a writtea Licensed

Significant Inents under thUser is a Potten report t

em or to arements for

ssion Compan

y report

otified User ETC or the ificant Incideten Significax A.

otified User ETC or the Ucident

eliminary & notes providde which py according

sider all prficant Incideide which p

dingly. All pa

sider all repo

ty which didfinal) to OE

orting of Si

ncident that C to be a Sige User and ters but;

Licensed Den report to a

Supplier of ncident repohe Distributioower Producto PWP or t Licensed reporting Sig

y

must producUser receiv

ent. ant Incident

must producUser receivin

final reportsed as clarificarty (partiesly. All partie

reliminary rent Report. arty (partiesrties shall se

orts and, if n

d not receivETC, if they

ignificant In

has been rgnificant Incthe Regulato

Distributor, ita Power ProConsumersrt may be uson Code; ancer, it may uto another PDistributor gnificant Inc

The

ce a preliminving notifica

report shal

ce a full writtng notificatio

s may havecation: s) shall prodes shall sen

eports and,

s) shall prodend their Fin

necessary, i

ve any notiy wish to re

ncidents by

reported by cident, OETCory Authority

t may use toducer with as Connectedsed in connend use the informPower ProduConnected

cidents on its

Grid Code - V

nary written ation that O

ll cover in o

ten Significaon that OET

e to be prod

duce Prelimnd their prel

if necessa

duce Final Snal reports to

ssue a cons

ification maeport anyth

OETC to U

OETC to aC will providy. The User

the informaa CDGensetd to its Licenection with th

mation contaucer with a to its Syst

s System.

Version 2.0

Significant IETC has d

outline terms

ant Incident rC determine

duced by m

minary Signifiminary repo

ry, issue a

Significant Ino OETC with

solidated Fin

y also sending which t

sers

User, and e a full writtshall not pa

tion containt Connectednsed Distribuhe reporting

ained thereiGenset Contem in acc

ncident repoetermined a

s the matte

report withined an Incide

more than on

ficant Incideorts to OET

consolidate

cident Repohin 3 busines

nal Significa

d their repothey consid

subsequentten Significaass the repo

ned therein to its Systeution System of Significa

n in preparinnnected to i

cordance wi

ort an

ers

3 nt

ne

ent TC

ed

ort ss

ant

ort er

tly ant ort

in em m.

ant

ng its th

Page 196: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec OC5.6.3 W

In the cadetermineSignificanbut may relation tAuthority

OC5.6.4 F

A full SigOETC, PconfirmatSignificanmatters s

OC5.7 OETC sheach repoEach moproduce aindex of Sof the Sigany lack modify thThe Gridmodificat

OC5.8 Wheneveor to unuadverselyThe Alertdisturban State A dist The li The d This A

beforThe followAlert;

1. Ousu

2. Ou

ctricity Transmi

Written rep

ase of an Ined by OETnt Incident ruse the in

to the Sign.

Form of ful

gnificant IncPWP and thtion of the Snt Incident. Tspecified in A

Evaluathall maintainort to determ

onth or othea summary Significant Ingnificant Incof complian

he Grid Code Code Revitions to the G

Alerts er OETC becusual Operay affected byt will indicat

nce and durament “This iturbance cauikely effect odisturbance Alert shall be that time.”wing conditio

utage of anbstantial red

utages or r

ssion Compan

orting of Si

ncident that TC to be a report to OEformation cificant Incid

l Significan

cident reporte RegulatorSignificant IThe SignificAppendix A.

tion of Sin an indexemine whetheer period to report of Signcident repo

cidents addence with the e. ew Panel shGrid Code a

comes awarating conditiy such disturte the likely ation of the As an Alert timused by (……of the disturbis likely to labe considere ons are thos

ny transmissduction in syrisks assoc

y

ignificant In

has been rSignificant

ETC. OETC ontained thent and in

nt Incident r

t prepared ry Authority.ncident not

cant Incident

ignificantd record of

er there has bbe agreed

gnificant Incorts since thd to the indeGrid Code

hall make rerising form it

re of any facions, OETCrbances or ureason for t

Alert period. med at (xx:x……), is probance is ( …ast (zz:zz) hoed cancelled

se that as a

sion compoystem securiciated with

The

ncidents by

reported by Incident, thwill not paserein in prethe prepar

report

by OETC o. The full Sification togt report shal

t Incidentall Significa

been any lacwith the Gridents. The e last summex. The sumand to any a

ecommendats review of

ctors likely toC shall sendunusual Opethe disturbaAn Alert sha

xx) hours; bable at (yy

……. ); ours; d automatic

minimum sh

onents or gty or violate 66kV or 3

Grid Code - V

Users to O

a User to Ohe User shass this reporeparing a reation of a

or a User shignificant Inether with fll cover in th

ts ant Incident ck of compliarid Code Rereport shall

mary report tmmary shall areas where

tions at anySignificant I

o give rise tod an Alert toerating condince, the sevall take the f

y:yy) hours;

ally in 2 ho

hould be con

eneration u(n-1) criteria

33kV equip

Version 2.0

OETC

OETC, and all provide rt to other aeport to anoreport to th

hall be sentcident repofull details rhe necessar

reports andance with theview Panelcomprise adogether withdraw specif

e there may

y time includncident repo

o an Emergeo all Users itions. verity and dfollowing for

urs time un

nsidered to g

units which a to a supplyment, whic

subsequenta full writte

affected Useother User

he Regulato

t to the Usert will conta

relating to thry detail thos

d shall reviehe Grid Codel, OETC shadditions to thh commentafic attention

be a need

ding proposeorts.

ncy Conditiowho may b

uration of thm;

less renewe

give rise to a

cause eithy point.

ch may hav

tly en ers

in ory

er, ain he se

ew e. all he ary to to

ed

on be

he

ed

an

er

ve

Page 197: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

sutheus

3. OontheWa

4. Co5. Th6. Im7. Ma8. Ac

The Alerpractical.All partieresulting

ctricity Transmi

bstantial ime relevant di

sers who areOutages or risn the generae relevant dater Departmondition whehe voltage or

mportant evenajor testing; ccidents; rt may be d

es receivingevents in ac

ssion Compan

pact on totaistribution or

e likely to be sks associat

ation capabilistribution o

ment (if applere the Operr Frequency nts (e.g., Na

delivered by

the Alert sccordance w

y

al system lor generation affected

ted with genity of the pla

or generationicable) and

rating Margingoing outsid

ational Day c

y telephone

shall acknowith the proce

The

ad or systemcompanies

neration planant or systen companies other users

n is below thde operationcelebrations)

but must b

owledge receedures set d

Grid Code - V

m operationshould send

nt, which mam operations should sens who are likehe agreed stanal limits; );

be confirme

eipt in writidown in this

Version 2.0

s. In such cd alert to OE

y have subsns. In such cnd alert to Oely to be affeandard;

ed in writing

ng and shaCode OC5.

circumstanceETC and oth

stantial impacircumstanceOETC, PAEWected

g as soon a

all report an

es er

act es W

as

ny

Page 198: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC5.9 Each CoOperationreportingmatters rEach Ope each each

inform each

other each each

instru every the is

separ the nu

the O the is the nu

OC5.10Normal cfacsimile OETC shnormal ctelephoneshall namUser. OETC withe new p

ctricity Transmi

Operationtrol Centren and/or Inc. The Operelevant to therational Logday shall coentry shall r

mation; entry shall informationentry shall rentry shall

uction refers;y instruction,solation of Prately recordumber and l

Operational Lssuing of Safumbers of in

0 Loss ofcommunicatio

or other elehall prepare ommunicatioe service, mmes of conta

ill review anplan to all Us

ssion Compan

ional Loge of each Uident issued

rational Log he Operationg shall recor

ommence onrecord the n

record the n; record the tim

record the ; etc shall bePlant and thded; ocation of te

Log or in a lofety Permits ndividual Saf

f Commuons between

ectronic meaan emerge

on routes, amobile telephacts and alt

nd update thsers.

y

gs User shall md and receiveshall record

n of the Tranrd as a minimn a new pageame of the P

name of the

me at which substation

e entered onhe connectio

emporary eaog under the

and their clefety Permits

unicationn operationans. ncy commu

a priority ranhones, etc. isternative con

he emergenc

The

maintain aned and all red all acknownsmission Symum the folle that will bePerson givin

e Person rec

the instructname and

a new line;on and disc

arths and thee control of thearance shashall be rec

al sites shall

nications planked order os agreed in ntact details

cy communi

Grid Code - V

Operationaelevant aspe

wledgementsystem. lowing informe dated; ng the instru

ceiving the i

ion was givePlant label

connections

eir removal she Safety Coall each be scorded.

be by teleph

an whereby of alternativeconsultation

s for each o

cations plan

Version 2.0

al Log of eaects of Signif of notices a

mation;

ction, report

instruction, r

en/received; or number

of main ea

shall be recooordinator; separately re

hone with co

in the evene routes e.gn with all Usoperational g

n each year

ach notice ficant Incideand any oth

t, or any oth

report, or an

to which th

arths shall b

orded either

ecorded; and

onfirmation b

nt of failure . the Nation

sers. The plagroup of eac

and circula

of ent er

er

ny

he

be

in

d

by

of nal an ch

ate

Page 199: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

AppendInformatiocase maaccordan1. Time 2. Locat3. Plant

nome4. Desc5. Dema6. Gens7. Gens

Signif8. Gens9. Estim

Availa10. Any o

ctricity Transmi

dix A Sigon, if applica

ay be) that nce with OC5

and date of tion;

directly inenclature; ription of Sigand (in MW)set – changeset – Frequeficant Incide

set – Mvar pemated (or acability; and other relevan

ssion Compan

gnificant Iable to the Sshall be inc5. f Significant

volved (not

gnificant Inci) and/or Gene in Availabilency responnt); erformance ctual) time a

nt material.

y

Incident RSignificant Included in a

Incident;

t merely af

ident includinset output (ity; se (MW cor

(change in oand date of

The

Report ncident and ta written Sig

ffected by

ng probablein MW) inter

rrection vers

output subsef return to s

Grid Code - V

to the relevagnificant Inc

the event)

e causes andrrupted and

sus time ach

equent to theservice and/

Version 2.0

ant User (or cident report

including n

d any damagduration of i

hieved subs

e Significant/or return to

OETC, as tht prepared

numbers an

ge to Plant;nterruption;

equent to th

t Incident); o pre-Incide

he in

nd

he

ent

Page 200: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC7.1 OC7.2 OC7.3 OC7.4 OC7.5 OC7.6

OC7.7

ctricity Transmi

ating Co

IntroductioObjectiveScope Terms System NSystem N

OC7.6.1 OC7.6.2 OC7.6.3 System In

OC7.7.1 OC7.7.2

ssion Compan

ode OC7

on

NormalisationNormalisation

User respoBlack Start Re-Synchro

ncident procSystem IncSystem Ale

y

– Conti

CON

n strategyn Procedurensibilitiesprocedure

onisation proeduresident comm

erts/Warning

T

ngency

NTENTS

es

ocedures

unicationss

The Grid Code -

Plannin

- Version 2.0

ng Issueed April 201

2 2 2 3 3 4 4 4 5 5 6 7

10

Page 201: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC7.1 OperatingimplemenShutdowA Total Selectricitysituationsthe impleSystem to

OC7.2 OThe objec to req

Syste to re

Proce to pro

Norm to pro

and U to en

Systedetail

OC7.3 SIn additio Powe Licen Direc Intern Intern

ctricity Transmi

ating Co

Introductg Code OCnted in Emen and in res

System Shuty Supply ands. It is also ementation o normal op

Objectivectives of OCquire OETC em Shutdowequire OETedures coveovide for th

malisation Proovide for theUsers when nsure OETCem Normalisls of the proc

Scope on to OETC, er Producerssed Distribu

ctly Connectenational Intenally Intercon

ssion Compan

ode OC7

tion C7, Contingeergency Conponse to othtdown or Pad it is imperaimportant thof the proceerating cond

e C7 are;

to develop n or Partial SC to produring Total Sy

he cooperatocedures; e developmedealing with

C and User sation Procecedures.

OC7 applies; utors; ed Consumerconnected nnected Par

y

– Conti

ency Planninnditions suchher major Syrtial Systemative that OEhat Users areedures, throditions.

a general reSystem Shuuce and mystem Shutdion of User

ent and imp a System Inpersonnel w

edures, are a

s to;

ers; Parties; andrties.

T

ngency

ng, requiresh as a Total ystem Incide Shutdown c

ETC has arrae aware of though which

estoration stutdown; maintain comdowns and Prs with the

plementationncident; andwho will be adequately t

d

The Grid Code -

Plannin

s OETC to dSystem Sh

ents. can have wiangements he procedurOETC can

trategy to ad

mprehensivePartial Systeformation a

n of commud

involved witrained and

- Version 2.0

ng

develop a sutdown or P

idespread imin place to dres, and coo

return the

dopt in the e

e System m Shutdown

and executio

nications be

ith the implefamiliar with

strategy to bPartial Syste

mplications fdeal with sucoperate fully

Transmissio

event of Tot

Normalisations; on of Syste

etween OET

ementation h the releva

be em

for ch in

on

tal

on

em

TC

of ant

Page 202: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC7.4 TFor the p Incid

Signifinform

PoweDemaonly c

Systerestor

Systeand U

OC7.5 SOETC shConditionSystem Ifollows; restor

time, and T

re-synsynch

to prmanadecisIncide

The Sysfollowing notific

ShutdProce

identisingle

step Trans

The SysInstructioIncident. OETC wiParties dservices w

ctricity Transmi

Terms purposes of tent Centreficant Incide

mation betweer Island meand, disconncontain a sinem Normaliration of the em IncidentUsers to ens

System Nhall developns such as Tncidents. T

ration of thetaking into a

Transmissionnchronisatiohronism withrovide for eagement repions on behent. tem Norma; cation by Odown existsedures; ification of se Productionby step inte

smission Sysstem Normaons necessit

ill consult wuring the prwherever pr

ssion Compan

this section oe means a ent to provideen OETC aeans a grounected from ngle Productisation StraSystem follo

t Communisure secure c

Normalisap a System Total SystemThe overall

e Transmissiaccount Pron System op

on of parts h each othereffective copresentativesalf of OETC

alisation Stra

OETC to Uss and that

separate gron Facility) togegration of tstem to normalisation Strtated by the

ith Internatioeparation ofracticable.

y

of the Grid Ccentre esta

de a focal poand senior mup of Produc

any other ption Facility)ategy meansowing a majcations procommunicat

ation straNormalisat

m Shutdownobjectives o

ion System oduction Facperational co

of the Tra; and mmunicatios of OETC a

C or a User t

ategy will p

sers that a OETC int

oups of Progether with cthese Powemal operatinrategy will e System c

onal Interconf the System

T

Code, the terablished asoint for com

managementction Facilitiepower sourc; s the strategjor Incident;

ocedures aretions during

ategy tion Strategyn or a Partiaof the System

and associacilities’ capabonstraints; nsmission S

n routes aand Users, to communic

provide for

Total Systtends to im

oduction Faccomplementer Islands ing conditionsalso provid

conditions p

nnected Parm Normalisat

The Grid Code -

rm; s determined

mmunication t representates together we or the Tot

gy setting o

e procedureSystem Inci

y to be impal System Sm Normalisa

ated Demandbilities, inclu

System whi

nd arrangewho are au

cate with ea

the detailed

tem Shutdomplement a

cilities (a grtary local Dento larger sus. de for the revailing at

rties and wittion Procedu

- Version 2.0

d by OETCand the distives of relevwith completal System.

ut the proce

s agreed bedents.

plemented ihutdown anation Strateg

d in the shouding Embed

ch have be

ments to ethorised to ch other dur

d implemen

wn or a Pa System

roup may oemand; and ub-Systems

issue of athe time o

th Internal Inures and inc

C following semination vant Users;

ementary loc(A group ma

edures for th

etween OET

n Emergencd other majgy shall be a

ortest possibdded Gense

ecome out

enable senimake bindinring a Syste

ntation of th

artial SysteNormalisatio

only contain

to return th

any Dispatcf the Syste

nterconnectecorporate the

a of

cal ay

he

TC

cy or as

ble ets

of

or ng

em

he

em on

a

he

ch em

ed eir

Page 203: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC7.6 SIn the evShutdownotify Usnotify UsProcedurThe SysconsultatThe SystReview PThe Syst proce

Incide a dec the o

an InSystebetwe

The comSystem Sto be sufTransmis

OC7.6.1 U

Each Usprocess, It shall breasonaband are obligation

OC7.6.2 B

The procBlack Stathat the inOETC ma a Pro

EmbeGene

a LiceDema

a ProSupp

Black Sta

ctricity Transmi

System Nvent of Emern of the Trasers that it sers at the re to be implstem Normation with othetem NormaliPanel. em Normalis

edures to eent; cision on theperational recident Centr

em but will been OETC a

mplexities anShutdown offficiently flexssion System

User respo

ser shall fosubject to s

be the respbly be expec

adequatelyns so as to b

Black Start

cedure for a art situation.nstructions aay issue instoduction Faedded Geneeration; ensed Distriand; and oduction Facly is made a

art instructio

ssion Compan

Normalisargency Condansmission Sintends to time of a

lemented foralisation Proer Users as sation Proce

sation Proceestablish an

e location of esponsibilitiere will not he the focal p

and senior mnd uncertainf the Transmxible so as tm operationa

nsibilities

ollow OETCafety of pers

ponsibility ofcted to be invy trained abe able to im

procedure

Black Start. Users shaare to operatructions to;

acility with Berator with

butor or to a

cility relatingavailable to itns shall be i

y

ation Proditions suchSystem OETimplement SSystem In

r that Systemocedures wiappropriate edures shal

edures shall n Incident C

an Incident Ces and requave any respoint for com

management nties of recomission Systeto accommoal possibilitie

’s instructiosonnel, OETf the User volved in Synd experien

mplement the

t situation wll abide by Ote within the

Black Start Black Star

a Directly Co

g to comment. mplemented

T

ocedures as a Total TC shall issSystem Nor

ncident of tm Incident. ill be develin accordanl be subject

provide for;Centre imm

Centre; and uirements of sponsibility fommunication

representatovery from aem require todate the fues.

ons during TC and the U

to ensure tystem Normanced in thee procedures

will be that sOETC instrue Operating P

capability ort capability

onnected Co

ncement of

d in accorda

The Grid Code -

System Shuue an Alert rmalisation he particula

oped and nce with Goot to periodic

mediately fol

an Incident

or the Opera and the distives of releva Total Syshe System Nll range of p

a System User’s Plant.that any of alisation Proeir standings notified by

specified by uctions durinParameters

or to a Licerelating to

onsumer rel

Generation

nce with the

- Version 2.0

utdown or Pas set out Procedures

ar System

maintained od Industry Preview by t

llowing a m

t Centre, noation of the

ssemination vant Users. tem ShutdoNormalisatioprevailing C

Incident an its personn

ocedures areg instruction

OETC.

OETC at thng a Black Sof each CDG

ensed Distribo the comm

ating to the

when an ex

e following p

Partial Systein OC7.7.2 . OETC shaNormalisatio

by OETC Practice. he Grid Cod

major Syste

ting that sucTransmissioof informatio

own or Partion ProcedureCDGenset an

nd restoratio

nel who mae familiar witns and oth

he time of thStart provideGenset.

butor with amencement

restoration

xternal pow

rocedures;

em to all on

in

de

em

ch on on

ial es nd

on

ay th, er

he ed

an of

of

er

Page 204: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

a Pro

withinwill co

followinstrumay that PIsland

if durOperaOETCconfigorder

OETCParamaccorCDGe

as patheir and enot re

OETCachiesub-Sof the

Certain BprocedurdevelopeOETC shTransmisAll notifictelephonerequestedas agreed

OC7.6.3 R

Where ththe Transto regulaSynchronplace. OETC sSynchron

OC7.7 SOC5 - O

ctricity Transmi

oduction Facn two hours onfirm to OE

wing such cucting a Liceinstruct the Production Fd; ring this Deating ParamC and OETCgure the Trar to alleviate C accepts thmeters is onrdingly to aenset if it beart of the BlaDistribution

expand thesee-SynchronisC will instrueve larger suSystems to fe TransmissiBlack Start ares shall be ed in accordahall inform Ussion Systemcations muse but must d in writing d with OETC

Re-Synchro

here is neithesmission Syate Generanised. OETC

hall issue nisation and

System IOperational E

ssion Compan

cility with Bof an instru

ETC when stconfirmationnsed Distribstart-up and

Facility and

emand restometers becauC will, wheransmission the problem

hat the decisne for the Pa decision elieves it is nack Start strSystem whie islands. Lise to the Tra

uct a relevanub-Systems,form an integion System tand Systemreviewed by

ance with thUsers of them resumed nst be made

be confirmthroughout

C in writing m

onisation pr

er a Total Syystem are ouation outputC will inform

whatever rto return the

ncident pEvent Repor

y

Black Start cuction from Otart-up of a Cn, OETC wbutor to Cond Synchronitheir loadin

oration proceuse of Demare possible, System or w

m being expesion to keep Power Produ

of Power ecessary to

rategy, Licench have beccensed Dist

ansmission Snt User, wh and subseqgrated Systeto normal op

m restorationy OETC andis code. e end of a normal Oper promptly.

med within this code, f

may be used

rocedures

ystem Shutdut of Synchrt or Demam the relev

revised Dese Transmiss

procedurerting, Comm

T

capability wiOETC to initCDGenset h

will endeavonect appropsation of the

ng with app

ess any CDand conditioeither instru

will instruct erienced by ta CDGense

ucer concernProducer todo so for sa

nsed Distribcome islandtributors will System withohere possiblquently mayem. This shoperating conn proceduresd updated o

Black Start ration. Notifications2 hours wh

facsimile trad. All writing

down nor a Pronism with nd to enab

vant Users

spatch Instrsion System

es unication an

The Grid Code -

ill start-up atiate start-upas been com

our to stabpriate Demane remainingropriate Dem

DGenset canons, the Powuct Demanda User to rethe Power P

et operating oned. OETCo change Gafety reasonutors with Eed, may in linform OETout OETC ae, to interco

y instruct theould eventuditions. s already exor incorporat

situation an

s and respohere practicnsmission oshall be in t

Partial Systeeach other, ble the sewhen re-Sy

ruction are to normal O

nd Liaison se

- Version 2.0

as soon as p. The Prodmpleted; ilise that Cnd, followingg Available Cmand to cre

nnot keep wwer Produced to be altere-configure

Producer; outside its s

C will acceptGeneration s;

Embedded Giaison with O

TC of their acgreement; aonnect Pow

e interconneally provide

xist within Mted into othe

nd the time

onses may cal. Where ior other electhe English l

em ShutdowOETC will iparate part

ynchronisatio

required toOperation.

ets out the p

possible anuction Facili

CDGenset bg which OETCDGensets eate a Pow

within its saer shall inforred or will rits System

afe Operatin and responoutput on

Gensets withOETC sustactions and wand wer Islands ction of thesfor the retu

MHEW. Sucer procedure

at which th

be made binformation ctronic meananguage.

wn but parts instruct Usets to be ron has take

o enable r

procedures f

nd ity

by TC at er

afe rm re-in

ng nd

a

hin ain will

to se rn

ch es

he

by is

ns

of ers re-en

re-

for

Page 205: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

the exchaevents thOperationmore sevIncidentsSystem IOETC shSystem shandling In certaicoordinatOETC anOETC wirelevant Uthe respooperationThe IncidresponsibcommunimanagemAn Incideis a focalnormal cUsers wilOETC wiwill informIn certainDistributionot involv

OC7.7.1 S

OETC anwhich, seauthorisecontactedThe lists User Corelevant pNotificatiowriting wAll commwith regasuch a ce

ctricity Transmi

ange of infohat have ann or an Incivere Incide

s. ncidents arehall establisshall be conSystem Incin circumstate the respond User operill inform UsUsers to imponsibilities anal and contrdent Centre bility for theication andment represeent Centre d point for coommunicatioll continue toill decide whm all relevann rare situaon System. ve OETC dir

System Inc

nd all Usersenior managed to make d day or nighof telephon

nnects to thparties (in wons and resithin 2 hours

munications bard to OETCentre has be

ssion Compan

rmation andn impact ondent. OETCnts such as

e unpredictash procedurensidered a idents. ances, OETonse to a Syrational conters promptlyplement Sysand functionrol arrangemestablished

e Operation d the dissentatives of oes not imp

ommunicatioon channelso be used. hen conditiont Users . ations, Licen

The procedrectly. OETC

ident comm

s will maintagement repr

binding deht. ne contact nhe Transmis

writing) whensponses wills where pracbetween the

C’s role in theen establish

y

d follow up rn the Trans

C will define s a Partial

ble both withes for deterSystem Inc

TC may reqystem Incidetrol arrangemy that an Incstem Incidenns of the Incments. d in accordaof the Tran

semination relevant Usely a specially

ons related tos for operatio

ns no longe

nsed Distribdures for thisC shall howe

munications

ain lists of teresentatives

ecisions on

numbers shassion Systeever the info be made n

ctical. e senior manhe System Ihed.

T

reporting betsmission Sycertain IncSystem Sh

h respect to rmining whe

cident and a

quire an Incent and to avments. cident Centrent communiccident Cent

ance with Onsmission Sy

of informaers. y built centreo the Systemonal control

er justify the

butors may s are includ

ever be kept

s

elephone cos nominated

behalf of O

all be providm and musormation chanormally by

nagement rencident sha

The Grid Code -

tween OETCystem. An eidents as Shutdown wil

timing and en an Incidealso establis

cident Centvoid placing

e is to be escations procere and the

ETC’s instruystem but w

ation betwe

e for dealingm Incident. D communica

need to use

declare a Sed in the Diinformed pro

ontact numb for this pu

OETC or th

ded in writinst be up-daanges. telephone b

epresentativll be made

- Version 2.0

C and Usersevent may ignificant Incl be define

the resultingent on the sh outline p

tre to be efurther stres

stablished aedures. OETrelationship

uctions will will be the feen OETC

g with SystemDuring a Sysation betwee

e the Inciden

System Inciistribution Comptly of su

bers at whicurpose and he relevant

g prior to thated and cir

but must be

ves of the revia the Incid

s in relation be either acidents; othd as Syste

g implicationTransmissiorocedures f

established ss on existin

nd request aTC will speci

with existin

not have anfocal point f

and seni

m Incidents;stem Incidenen OETC an

nt Centre an

dent on theCode and mauch Incidents

ch, or througwho are fuUser can b

he time that rculated to a

e confirmed

elevant partiedent Centre

to an er

em

ns. on for

to ng

all ify ng

ny for or

; it nt, nd

nd

eir ay s.

gh lly be

a all

in

es if

Page 206: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC7.7.2 S

In the eShutdowThe form “This There A Sys Stand

ctricity Transmi

System Ale

event of Sysn or a Syste of the Alert is an Alert t

e is a (Partiastem Normadby for furthe

ssion Compan

erts/Warning

stem Incideem separatio

Warning wiimed at (xx:x

al System Shlisation Procer instruction

y

gs

ents, such aon, OETC will be; xx) hours; hutdown) at cedure is bens”.

T

as Total Syll issue prom

(aaaaa); ing impleme

The Grid Code -

ystem Shutmptly an Aler

ented;

- Version 2.0

tdown, a Prt warning to

artial Systeo all Users.

m

Page 207: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC6.1 OC6.2 OC6.3 OC6.4 OC6.5 OC6.6

ctricity Transm

ating Co

IntroductioObjective Scope ....Terms ....The SafetSafety at

mission Comp

de OC6

on .................................

...................

...................ty Rules ......the interface

pany

– Safety

CON

...................

...................

...................

...................

...................e..................

y Coord

NTENT

...................

...................

...................

...................

...................

...................

The Grid C

dination

...................

...................

...................

...................

...................

...................

Code - Version

Issue

...................

...................

...................

...................

...................

...................

n 2.0

ed April 201

...................

...................

...................

...................

...................

...................

10

. 2

. 2

. 2

. 2

. 3

. 3

Page 208: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC6.1 IOC6 requoperate conditionPlant andat an Inte

In the evother sec

OC6.2 OThe objecthat is Dir

OC6.3 SIn additio

Powe PAEW Licen Direc Intern Intern RAEC all co PWP

OC6.4 TThe follow

"IsolatioPlant is s

(a) a

(b) a

S

"Earthingearth by with Safe

ctricity Transm

ting Cod

Introductuires OETC in accordans for persond for personerface.

vent of a conction of the G

Objectivective of OC6rectly Conne

Scope on to OETC,

er ProducersW; sed Distributly Connecte

nally Interconnational InterC if Connectntractors/ag.

Terms wing terms s

n" means thsituated by ean Isolating be maintaineby OETC; oan adequatein accordancSafety Rules

g" means a an Earthing

ety Rules ap

mission Comp

de OC6 –

tion (and its age

nce with annel workingnel who ma

nflict betweeGrid Code, O

e 6 is to allow ected to the

OC6 applies

s;

utors; ed Consumennected Parrconnected ted to the Toents working

shall have th

he disconneither of the fDevice ma

ed and/or ser e physical sece with Safes a Caution

way of provg Device whproved by O

pany

– Safety

ents), PWP pproved Sag on or in clay have to w

en this OperOC6 shall tak

work and/orTransmissio

s to;

ers; rties; Parties;

otal System;g on the Tra

he meaning a

ction of Planfollowing; intained in aecured by a

eparation whety Rules apNotice must

viding a connhich is maintOETC.

Coordin

(and its ageafety Rules,lose proximi

work or use T

rating Code ke preceden

r testing on ton System to

ansmission S

ascribed to t

nt from the r

an isolating method that

hich must beproved by Ot be placed a

nection betwtained and/o

The Grid C

nation

ents) and Us, in order ity to TransmTransmissio

OC6 - Safence.

the Transmiso be carried

System; and

them below

remainder of

position. Tht accords wi

e in accordaOETC. If it is at the point o

ween conducor secured i

Code - Version

sers (and thto ensure mission Sys

on System e

ety Coordina

ssion Systemout safely.

for the purp

f the System

he isolating th Safety Ru

ance with, anrequired by

of separation

ctors and gein position i

n 2.0

heir agents) safe workin

stem electricelectrical Pla

ation and an

m or HV Pla

oses of OC6

m in which th

position muules approve

nd maintainethe approve

n.

eneral mass n accordanc

to ng cal ant

ny

ant

6;

hat

ust ed

ed ed

of ce

Page 209: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC6.5 TSafety prPlant aredetailed i

MEW1995.

Safety prelectrical OETC shimplicatio accid issue

User; repor any o

OETC shconsidereSafety Rusupport tits consid

OC6.6 SAll UsersSafety Ruof safety Safety Ruprocedure

All Usersare deemOperation

OETC inScheduleScheduleDesignatecircuits th

OETC shshall inclu

detailSafet

proce identi

ctricity Transm

The Saferocedures foe governed n;

W Safety Rul. rocedures wPlant to ens

hall review tons arising frents on OETs arising fro ts from OET

other relevanhall prepare ed as part oules, the imphe Safety R

deration and

Safety at s Connectingules. OETC

as the OEules OETC es to be und

s Connectingmed by the rnal Instructio

n consultatioe (referred te shall detailed Operato

hat cross the

hall issue oude, but are

ed switchingy Rules) to b

edures for cofication of o

mission Comp

ty Rules or personneby OETC’s

es (Electrica

will normallysure that it cthe Safety Rrom but not TC or User som differenc

TC personnent matter.

a report ofof the reviewplementation

Rules. The rereview.

the interg to the Trashall ensureTC Safety may require

dertaken acc

g to the Trarelevant Useons. The app

on with Useto in Connel the demarcrs carrying

e User’s site

perational pnot limited t

g sequencebe followed fontrol and Operational b

pany

el working oSafety Rul

al and Mech

y involve swcannot be maRules everylimited to; sites at the inces between

el concerning

f each review. The reportn of the Safeeport shall b

rface ansmission Se the User SRules. If OEe, following ccording to O

nsmission Ser to be comprovals mus

ers shall deection Condcation of resour work oat any point

procedures fto;

s (which mefor operationperations; oundaries; a

n or in closes (and any

hanical) Sec

witching out ade live befo

y twelve mo

nterface; n the Safety

g the applica

ew and sumt can make ety Rules, orbe presented

System musSafety RulesETC is dissconsultationETC Safety

System mustmpetent to cast be in writin

evelop for editions, claussponsibility for testing at t.

for each Us

eet as a minal, fault and

and

The Grid C

se proximity y future rev

cond Edition

and suitabore and durinnths. The re

Rules of O

ation of the S

marise in threcommendr amendmend to the Grid

st provide Os provide for atisfied with with the UsRules.

t approve Darry out the ng and copie

each User sse CC.7.2).or the safetythe User’s

ser site. The

nimum, the d emergency

Code - Version

to Transmivisions of th

n, issued 19

bly isolating ng work on teview shall

OETC and a

Safety Rules

he report redations for cnts to codesd Code Rev

OETC with aat least the

h any aspecser, all relev

Designated Oprocedures

es must be s

site a Site The Site y of OETC pConnection

e operationa

requiremeny switching;

n 2.0

ssion Systeese rules) a

989, amende

and earthinthat Plant. consider an

ny interfacin

s; and

elevant evenhanges to th

s of practice view Panel f

copy of thesame degre

ct of a Uservant work an

Operators thin the agree

sent to OETC

ResponsibiliResponsibilipersonnel ann Site and o

al procedure

nts of OETC

em as

ed

ng

ny

ng

nts he to

for

eir ee r’s nd

hat ed C.

ity ity nd on

es

C’s

Page 210: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

the idtheir opera

OETC anmatters twork or te

In the evoperationsafety.

Adequatesafely at

Where neinterface interface.

ctricity Transm

dentity of OEagents) wh

ational purpond each Ushat may be esting at or n

ent of a monal effect at a

e means of Ithe interface

ecessary adto allow w

.

mission Comp

ETC represeho are authoses or durinser will coorelevant for

near to Inter

dification or a User site,

Isolation shae or either si

dequate facilork to be c

pany

entatives (orhorised to ang emergencperate in dr ensuring orface equipm

change in oOETC and t

all be provideide of the int

ities for eartcarried out s

r its agents)attend the Tcies. eveloping p

overall site sment.

operational the User sha

ed at the intterface by O

thing Plant ssafely at th

The Grid C

), PWP (or iTransmissio

procedures afety and, in

practices, wall review the

terface to allOETC and ea

shall be prove interface

Code - Version

its agents) aon site and/

and agreemn particular,

which has or e adequacy

ow work to ach User.

vided at eithor on eithe

n 2.0

and Users (/or facility f

ments on ansafety durin

may have aof overall si

be carried o

her side of ther side of th

or for

ny ng

an ite

out

he he

Page 211: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC8.1 OC8.2 OC8.3 OC8.4 OC8.5 OC8.6

ctricity Transmis

ating Co

IntrodObjecScopTermGeneProceOC8.OC8.OC8.OC8.OC8.

ssion Compan

de OC8

duction ........ctive ............e ................

ms ................eral requiremedure ..........6.1 OETC6.2 User H6.3 User H6.4 Chang6.5 Labell

y

– NumbPlant

CON

...................

...................

...................

...................ment .............

...................C HV Plant oHV Plant onHV Plant onges to existiling .............

bering a

NTENTS

...................

...................

...................

...................

...................

...................on a User Sit OETC Sites a OETC insng numberin...................

The Grid Code

nd Nom

...................

...................

...................

...................

...................

...................te ................s .................stallation on ng or nomen...................

e - Version 2.0

menclatu

Issue

...................

...................

...................

...................

...................

...................

...................

...................a User Site

nclature ..........................

0

ure of HV

ed April 201

...................

...................

...................

...................

...................

...................

...................

.....................................

...................

...................

V

10

. 2

. 2

. 2

. 2

. 3

. 3

. 3

. 4

. 4

. 4

. 5

Page 212: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC8.1 IOperatingthe requir OETC OETC User

OC8 requdifferent f

OC8.2 OThe objec to pro

HV Pconfu

to redidenti

OC8.3 SIn additio Powe Licen Direc Intern Intern RAEC

OC8.4 TFor the p User

agree OETC

agree

ctricity Transmis

ating Co

Introductg Code OC8rements for C HV Plant oC HV Plant oHV Plant onuires the nufrom the num

Objectivectives of OCovide for the

Plant to ensuused with OEduce the risfication of H

Scope on to OETC, er Producerssed Distributly Connecte

nally Interconnational InterC if Connect

Terms urposes of tSite mean

ement) by a C Site meaement) by O

ssion Compan

ode OC8

tion 8 - Numberithe numberi

on OETC Siton User’s Sitn OETC Sitembering andmbering and

e C8 are as folle applicationure that UseETC Plant; ask of incide

HV Plant.

OC8 appliess; utors; ed Consumennected Parrconnected ted to the To

this section ons a site owUser in whic

ans a site oETC in whic

y

8 – NumHigh

ing and noming and nomtes; tes; and s. d nomenclatd nomenclatu

lows; n of consister’s Plant at

and ents and ev

s to the follo

ers; rties; Parties; and

otal System

of the Grid Cwned (or och there is aowned (or och there may

mberingVoltage

menclature omenclature of

ture of Usersure of HV Pl

ent and dista Connectio

vents attribu

owing Users;

d

Code, the terccupied pu Connection

occupied puy be a Conne

The Grid Code

g and Ne Plant

of High Voltaf;

s’ HV Plant ant used by

tinct numberon Point or a

utable to hu

;

rm; rsuant to a

n Point; andursuant to aection Point.

e - Version 2.0

Nomenc

age (HV) Pl

to be distingOETC.

ring and noa Supply Po

man error

a lease, lice

a lease, lice.

0

lature o

ant - sets o

guishable an

menclature oint cannot b

regarding th

ence or oth

ence or oth

of

out

nd

of be

he

er

er

Page 213: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

OC8.5 GWhere thother elethe EnglisAll User’nomenclaOETC forTo company Plannumberinor Supply

OC8.6 PThe numDiagram Diagram Operation

OC8.6.1OETC HVOETC’s NWhen OEnumberinproposedThe notifi an Op OETC the pr

The relevnotificatio receip that n

nome that if

nomethe UPlant

The relevnumberinalready oUser Site

ctricity Transmis

General rhroughout thctronic meash language’s Plant at ature that isr its HV Planly with the re

nt with numng and nomey Point.

Procedurbering and nprepared foare set dow

n Diagram s

OETC HVV Plant on UNumbering aETC is to insng and nomd installationication will bperation DiaC’s numberinroposed datevant User won, confirminpt of the notinone of the enclature prof any of the

enclature as Users HV Pla

at the relevavant User shng or nomenon that Usere.

ssion Compan

requiremhis code inf

ans as agreee.

a Connects different ant at that Coequirements

mbering or nenclature of

re nomenclaturor each OEwn in the Coshall be upda

V Plant on User Sites sand Nomencstall HV Planenclature to.

be made in wgram incorpng and nomee of installat

will respond ng; ification; Users HV P

oposed or asUsers HV Pthat propos

ant at the reant site.

hall not instanclature thar Site or wh

y

ent formation is ed with OET

tion Point ond distinct fnnection Pos of OC8, Usnomenclatur

the Plant of

re of each iteETC Site or onnection Cated for ever

a User Sitshall have nclature Policynt on a Useo be adopte

writing to theporating the nenclature to tion of the Hin writing to

Plant at the s used by OEPlant at the sed or used

elevant site w

all or permit at could be ich OETC h

requested TC in writing

or a Supplyfrom the nu

oint or Supplysers shall noe that couldf OETC or a

em of HV PlaUser Site.

Conditions Cry change to

te numbering ay. r Site, OETC

ed for that H

e relevant Usnew OETC Hbe adoptedV Plant. o OETC wit

relevant UseETC; and relevant Us

d by OETC, will be chang

the installatconfused w

has notified

The Grid Code

in writing, fg may be us

y Point shaumbering any Point. ot install, nod reasonabany other Us

ant shall be The require

Code and tho Plant or its

and nomencl

C shall notifyHV Plant at

ser and will cHV Plant to for that HV

thin one mo

er Site has

er Site has the number

ged before i

ion of any Hwith OETC H

to that Use

e - Version 2.0

facsimile trased. All writi

all have nund nomencla

r permit the ly be confuser at a Con

included in ements for at code reqlabelling.

lature in acc

y the relevaleast six m

consist of; be installed;Plant; and

onth of the

the same nu

the same nuring and noinstallation o

HV Plant at aHV Plant wr will be ins

0

ansmission ng shall be

umbering anature used b

installation used with thnnection Poi

the Operatioan Operatiouires that th

cordance wi

nt User of thonths prior

;

receipt of th

umbering an

umbering anmenclature of OETC’s H

a site that hawhich is eithstalled on th

or in

nd by

of he int

on on he

ith

he to

he

nd

nd of

HV

as er

hat

Page 214: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec OC8.6.2User HV OETC’s NWhen a Ua OETC notify OE an Op the de the pr the pr

OETC wiand state wheth if the

give dHV P

Users wNomenclatheir HV P

OC8.6.3Where USite, the Numberin

OC8.6.4Where OOETC HV For O

Nomeneces

For Unomechangthe re

If the − O−

In all casexisting n

ctricity Transmis

2 User HV Plant on O

Numbering aUser is to insSite or ado

ETC in writingperation Diaetails of the roposed numroposed dateill respond i

e; her OETC acnumbering a

details of thelant.

will be proviature PolicyPlant on OE

3 User HV ser HV PlanUser HV Pl

ng and Nom

4 ChangesETC has deV Plant on aOETC HV enclature Possary amendUser HV Plaenclature thage being neeceipt of the User object

OETC and theIf agreemebe used; aIf the disaargumentsconsideratdisagreem

ses OETC’snumbering o

ssion Compan

Plant on OETC Sites sand Nomencstall HV Planpt new numg at least sixgram incorpHV Plant;

mbering ande of its instan writing to

ccepts the Uand nomence numbering

ided upon y in order to ETC Sites.

Plant on ant, such as ant shall usenclature Po

s to existinecided that it User Site oPlant on a

olicy shall apdments to thant on an Oat the User seded and thnotification,

ts to the chae User shall

ent cannot band agreement cs and prestion. OETC’s

ment is resolvs notificationr nomenclat

y

OETC Sitesshall have nclature Policynt on a OET

mbering and x months priporating the n

nomenclatuallation.

the User w

User proposeclature propog and nomen

request witassist them

a OETC inscircuit break

se numberinolicy.

ng numbert needs to ch

or of User HVa User Sitepply to such hose provisioOETC Site, O

shall adopt fhe User will confirming nges propos consult proe reached, O

concerns a sent them s Numberinved. n shall indicture.

s numbering ay

TC Site, or wnomenclatuor to proposnew User HV

ure to be ado

within one m

ed numberinosed by the nclature whic

th details oin planning

stallation okers, form pg and nome

ring or nomhange the exV Plant on a e, the provchanges of

ons to reflectOETC will nfor that HV respond in receipt and sed by OETCmptly to reaOETC’s Num

point of pto the Gr

ng and Nom

ate the reas

The Grid Code

and nomencl

wishes to repure for such sed installatiV Plant to be

opted for tha

onth of the

ng and nomeUser are no

ch the User

of OETC’s the number

on a User Spart of a OEenclature in

menclaturexisting numbOETC Site;

visions of Onumbering

t that a chanotify the UsPlant at leawriting to Oacceptance C; ch agreemembering and

principle, therid Code R

menclature P

son for the

e - Version 2.0

lature in acc

place existingHV Plant, t

on to provide installed;

at HV Plant;

receipt of th

enclature; anot acceptableshall adopt

current Nuring and nom

Site TC installatiaccordance

e bering or no OETC’s Nuor nomencla

nge is being ser of the nust six month

OETC within of the chan

ent; d Nomenclat

e User mayReview PaPolicy will a

proposed c

0

cordance wi

g HV Plant othe User shae;

and

he notificatio

nd e, OETC shafor the User

umbering anmenclature f

ion on a Use with OETC

omenclature

umbering anature with anmade; and

umbering anhs prior to thone month ges; and

ure Policy w

y set out thnel for the

apply until th

change to th

ith

on all

on

all r’s

nd for

er C’s

of

nd ny

nd he of

will

he eir he

he

Page 215: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec OC8.6.5All HV Pland nomeOETC anHV PlantWhere thchanged,their own

ctricity Transmis

5 Labellinglant shall beenclature. nd Users are. here is a re, OETC and Plant by the

ssion Compan

g e provided w

e each respo

equirement Users shall

e required d

y

with clear an

onsible for th

for the nu each be resate.

d unambigu

he provision

mbering ansponsible fo

The Grid Code

uous labelling

and erection

d nomenclar providing a

e - Version 2.0

g showing t

n of labelling

ature of HVand erecting

0

he numberin

g on their ow

V Plant to bg the labels o

ng

wn

be on

Page 216: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC9.1 OC9.2 OC9.3 OC9.4 OC9.5 OC9.6

OC9.7

OC9.8 OC9.9

ctricity Transmi

ating Co

IntrodObjecScopeTermsCategAutho

OC9.6.1 OC9.6.2 OC9.6.3

OperaOC9.7.1 OC9.7.2 OC9.7.3 OC9.7.4

Site InOther

ssion Compan

ode OC9

uction .........tive .............

e ..................s ..................ories of testrisation and

Test requeTest PanelPost test re

ational tests .OperationaOperationaOperationaOther oper

nvestigation tests ..........

y

– OperaInves

CON

...................

...................

...................

...................ts .................test proced

ests ..............l ..................eporting req...................

al tests requal tests requal tests at Prrational teststests ..............................

ational Tstigation

NTENTS

...................

...................

...................

...................

...................ures .................................................uirements .....................ired by OETired by Userroduction Fas .......................................................

The Grid Co

Tests anns

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................TC ...............rs ................

acilities .................................................................

ode - Version 2

nd Site

Issue

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

2.0

ed April 201

............. 2

............. 2

............. 2

............. 2

............. 3

............. 3

............. 3

............. 4

............. 5

............. 5

............. 6

............. 6

............. 6

............. 7

............. 7

............. 7

10

Page 217: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Opera

OC9.1 Operatingby OETCinvolving OC9 stipTests or S

OC9.2 The objec are a are c

and to do no do no are p

arranA furtherfault findi

OC9.3 In additio Powe Licen Direc Intern Intern PWP

OC9.4 For the p “Site

procechara

“Testaspec

“TestconduDocu

ctricity Transmi

ating Co

Introdug Code OC9C, PWP anPlant that isulates that pSite Investig

Objectictives of OCuthorized by

carried out ino minimise c

ot threaten thot threaten throperly evalgements.

r objective ong.

Scope on to OETC, er Producerssed Distribu

ctly Connectenally Interconnational Inte(with regard

Terms purposes of t Investigat

edures at Pacteristics of t Documencts for the mt Panel” muct of an Oment; and

ssion Compan

ode OC9

uction 9 sets out thd Users wis Connectedprior authorisgations.

ve C9 are to ensy OETC andn a coordinacosts to OEThe safety of he security ouated on co

of OC9 is to

OC9 applies; utors; ed Consumennected Parrconnected d to tests ca

this section otion Tests” Production Ff Plant; nt” means tmanagement means a paOperational

y

– OperaInves

he authorizashing to co

d to or part osation from

sure that Op are carriedated manneTC, PWP, anpersonnel o

or stability ofompletion an

o allow suffic

s to;

ers; rties; Parties; andrried out und

of the Grid Care tests

Facilities an

the documeand implem

nel establisTest or Sit

ational Tstigation

ation requireonduct Operof the TransmOETC is req

perational Teout in accorr to avoid und affected U

or the generaf the Transmd, where ap

cient tests t

d der PPAs/PW

Code, the terconducted nd User sit

ent preparedmentation of shed to prepte Investiga

The Grid Co

Tests anns

ed and the prational Tesmission Systquired befor

ests and Siterdance with unnecessaryUsers; al public;

mission Systeppropriate, su

o be condu

WPAs)

rm; in relation ttes or to m

d by the Tea test; pare a deta

ation and to

ode - Version 2

nd Site

procedures tsts or Site tem. re conductin

e Investigatioappropriate

y risk or dam

em; and ubject to cer

cted to ena

to Plant anmonitor and

est Panel s

ailed prograo prepare a

2.0

to be followeInvestigation

g Operation

ons; procedures

mage to Pla

rtain reportin

able predictiv

d operationd assess th

setting out a

amme for tha formal Te

ed ns

nal

; ant

ng

ve

nal he

all

he est

Page 218: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

“TestTest o

OC9.5 OC 9 app Oper

− − −

Site I−

Othe−

− −

OC9.6 OC9.6.1Prior autInvestigaPWP or Test Reqproposed a brie the pr the re

with deter

an indelay

an ind

ctricity Transmi

t Request” or Site Inves

Categoplies to the forational test

required brequestedrequestedProductiopurposes

Investigatioin relationsites; andto monitoprovide or

r tests: required, verificatioConnectioDesalinatirequired, requiremerequired, other testSystem.

Author Test reqthorisation f

ation or otherUsers seekquest to OEd test. A Tesef descriptionreferred timeeason for thlicence conmining the pdication of a

yed (reasonadication of a

ssion Compan

means a dostigation.

ories of teollowing catts: by OETC; d by a User; d by PWP orn Facilities specified in

on tests: n to Plant an r and assesr has contrac

in certain n by inspeon Conditioion Units an

in certainents can be in certain cirts and mea

isation anuests from OETC r test. ing to conduETC giving st Request sn of the prope or times fohe proposednditions, stapriority to be any potentiaable detail ofany Dispatch

y

ocument set

ests egories of te

and r a Power Pwith the rea PPA/PWP

nd operation

ss the characcted to prov

circumstancction) to as

ons are bed User’s Pla circumstamet; rcumstancesasurements

nd test p

is required

uct an Operat least 8

shall includeposed test; or the test and test indicatatutory regugiven to the

al adverse ef such adver Instructions

tting out the

ests;

Producer to cequirementsPA..

nal procedur

cteristics of ide certain A

ces, (whethscertain wheing complant; nces, to a

s, at the requthat may

rocedure

d before co

rational Tesweeks mini a detailed t

nd the potenting whetheulations, or e test; effects if therse affects tos required to

The Grid Co

detailed pro

commission s of a PPA

res at Produ

Plant for whAncillary Ser

her by meaether Operaied with i

assess whe

uest of a Ushave an O

es

onducting an

t or Site Invmum noticeest proposa

tial durationr the test is

Safety Ru

e Test is cano be provideo facilitate th

ode - Version 2

oposal for a

or test the cA or PWPA

uction Facilit

hich a User rvices.

ans of a foating Paramn respect

ether Oper

er; and perational E

n Operation

vestigation se before thel including;

; s required foules. This w

ncelled at sed); e test; and

2.0

n Operation

compliance or for oth

ties and Us

is required

ormal test meters and/

of Genset

rating Marg

Effect on th

nal Test, Si

shall submit e date of th

or compliancwill assist

hort notice

nal

of er

er

to

or or ts,

gin

he

te

a he

ce in

or

Page 219: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

detailOETC shshall with appro reque

of the reject

OETC sh the im the im the im the ef

If OETC aIf OETC Test Reqthe informautomaticIf OETC Request in relatioproposal proposal Request.OETC shgrounds reasonabOETC shwithout thinformatio

OC9.6.2If a Testdecides tnumber owith affecThe Charepresen OETC PWP

from a all dir

The dutie

ctricity Transmi

ls of any opehall evaluatehin 2 weeks ove the Test est any addite Test Requet the Test Rehall considermpact of the mpact of the mpact of the ffect of the rapproves a Trequests ad

quest OETC mation is nocally lapse.does not apapplication an to Producrequired toin accorda

hall not withfor doing s

ble grounds hall not dische consent oon to be com

2 Test Pant Request isthat a Test of Test Panected User reirman of a Ttation; C shall haveshall have a

a PPA or PWrectly affectees and respo

ssion Compan

erational swie all Test Reeither; Request;

tional informest; or equest applir the followinrequested trequested trequested t

requested teTest Requesdditional infoshall stipula

ot provided

pprove a Teand consult ction Faciliti

o secure appance with g

hhold approvso. If a Usit can refer tclose any inof the User wmmercially s

nel s approved,Panel is re

el members presentationTest Panel

a representa representaWPA; and ed Users shaonsibilities of

y

itching requiequests sub

mation from t

cation. ng factors whest on Transest on Transest on otherst on the cost, it will infoormation froate the time in the times

est Request,with the Tes

ies subject proval for thguidance pr

val of a Tesser is not sthe matter tonformation rwho submittensitive or o

OETC shaequired, the

shall be kepn. shall be ap

tative on all ative on all T

all be represf the Test Pa

ired to facilitmitted to it.

the test prop

hen evaluatinsmission Syssmission Sysr Users; andntinuity and

orm the test m the test pwithin which

scale indicat

, it will set dst proposer to a PPA/P

he Test. Therovided by

st Request usatisfied thao the Regulareceived as ted the Test otherwise po

all decide if test propos

pt to the min

pointed by t

Test PanelsTest Panels

sented on theanel are as f

The Grid Co

tate to test.On receipt

poser require

ng a Test Restem stabilitstem econom

quality of elproposer acproposer to h the informated by OETC

down its rea(and the PW

PWPA) on ae Test propOETC and

unless it conat a Test Ratory Authori

part of a TRequest if i

otentially sen

a Test Paser shall connimum numb

the test pro

s; that are con

e Test Panefollows;

ode - Version 2

of a Test Re

ed to evalua

equest; ty and securmics;

ectricity Supccordingly.

evaluate thation shall bC the Test R

asons for rejWP if the proany changesposer may ud submit a

nsiders it haRequest wasty for determTest Requeit reasonably

nsitive.

nel is requinvene a Tesber of person

poser. As

ncerned with

el.

2.0

equest OET

ate the impa

rity;

pply.

e impact of e provided. Request sha

jecting a Teoposed Test s to the Te

update a Terevised Te

as reasonabs rejected omination. st applicatioy believes th

red. If OETst Panel. Thns compatib

regards oth

h tests arisin

TC

act

a If all

est is

est est est

ble on

on he

TC he ble

er

ng

Page 220: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

to predate facilita

to ide to ens

inform to sch to pre

The Testthe start Documendate of thThe test Documenhave fullyRegulatoNeither Oconsent oto be com

OC9.6.3At the coa written Operationcases anPPA/PWThe TestOETC oconsideresubmissioThe Testthe Test to the TeapplicablThe Test

OC9.7 OETC shWhere Ooriginally the Test OETC shOperationIf the Tesor during

ctricity Transmi

epare a detaof the test, ate the test;

entify the detsure that all

mation; hedule the reepare a Testt Document sdate of the

nt to the Chahe Test.

shall procent. If a memy discussed

ory Authority.OETC nor thof the persommercially s

3 Post tesonclusion of

report on tnal Test. Th

nd to the PWPA. t Report sha

or the test ed the confon. Report sharelates, toge

est proposere. Panel shall

Operatihall cooperatOETC consid

estimated, is in relatio

hall, where nal Test at ast proposer wg the Test,

ssion Compan

ailed prograand any D

tailed managaffected pa

esources reqt Document shall be coptest. Mem

airman of the

eed only on mber of the T

the issues . he PWP shan who submensitive or o

t reportingan Operatiothe test thathe report shWP where a

all not be suproposer u

fidentiality is

ll include a dether with thr, OETC, PW

be disbande

ional testte with the imders the impOETC may

on to a PPAit considers

any time. wishes to cathe Test pr

y

mme for theispatch requ

gement requrties are pro

quired to cothat shall inc

pied to all members of the e Test Pane

the conditiTest Panel iswithin the T

all disclose imitted the infotherwise po

g requiremonal Test or t shall be avhall be copie Power Pro

ubmitted to aunless OETssues arisin

detailed deshe results, cWP where re

ed after the

ts mplementatiopact of an Oat any time

A/PWPA) to s it necessa

ancel an Operoposer (an

e conduct ofuirements a

uirements of operly inform

nduct the teclude all theembers of thTest Panel

el no later th

on that the s not satisfie

Test Panel, t

information formation if iotentially sen

ents Site Investigvailable withed to OETCducer condu

any other pTC and theg, and sha

scription of thconclusions elevant, and

final test rep

on of all OpeOperational e contact the

discuss a rary to do so

erational Tend the PWP

The Grid Co

f the test, innd operatio

the test; med of and h

st; and elements lis

he Test Pane may providan 1 week b

Test Paneed with the they may ma

provided to it reasonablynsitive.

gation the tehin 4 weeksC and the Ructed the te

erson who ie test propll have una

he completeand recomm

d operationa

port has bee

erational TesTest to be

e Test proporevised Teso, cancel, in

est before coP where the

ode - Version 2

cluding the nal switchin

ave access

sted above. el at least 2 de commentbefore the sc

l has approtest proceedake represe

a Test Pany believes th

est proposer of the conc

Regulatory Aest or a test

is not a repposer havinganimously ap

d Test, the Pmendations aally affected

en approved

sts. significantly

oser (and thet procedurenterrupt, or

ommencemee Test is in

2.0

start and enng required

to all releva

weeks befots on the Techeduled sta

oved the Teding and the

entation to th

el without thhe informatio

shall prepaclusion of th

Authority in aarose from

resentative g reasonabpproved suc

Plant to whicas they relaUsers, whe

.

y greater thae PWP whe or schedulpostpone a

ent of the Terelation to

nd to

ant

re est art

est ey he

he on

re he all a

of bly ch

ch te re

an re e. an

est a

Page 221: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

PPA/PWwithin 1 hconfirmat

OC9.7.1OETC, aOperationto acquireconditionOETC wiTests to tWhere Osuch a teweeks noUsers to a brie the pr the sc

Affected impact ofof receipt

OC9.7.2Operationmaintain comply wEach Uselimit the eUsers sh9.6.1.

OC9.7.3The PWPof OC 9proposal the ScheWhere adeclared required Howeverreview thPower PDispatch On notificPWP ma

ctricity Transmi

PA) must nhour by facstion must ha

Operatioas operator nal Tests in e informatios. ill endeavouthe minimum

OETC intendest will or motice and prassess any

ef descriptionrobable effecheduled timUsers may f the Operatt of OETC’s

2 Operation of Users’ and develo

with statutoryer shall endeffects of suchall submit a

3 OperatioP or User sh.6.1. OETCwithin the pduling and D

an OperationOperating

for the Oper, OETC shahe DispatchProducer an

Instructionscation of rejy enter into

ssion Compan

notify OETCsimile or otheave been agr

onal tests rof the Tranorder to man in respect

r to keep them necessaryds to carry omay have anrovide sufficirisks to thei

n of the Opects of the Op

me and duratcontact OE

tional Test onotice of the

onal tests rPlant in ac

op operationy or other indeavour to limch Operationa Test Requ

onal tests ahall submit a C will incorpprogrammingDispatch Codnal Test reqParameters

rational Testall contact th Instructiond PWP sha

s without undjection of thdiscussions

y

immediateer electronicreed in writin

required bynsmission Syaintain and dt of Transmis

e frequency y. out an Opern operationaient informar Systems.

erational Tesperational Ttion of the OTC to reque

on their Syste test.

required byccordance wnal procedudustry obligamit the frequnal Tests onuest to OET

at ProductTest Reque

porate any g phase of Odes SDC1 aquires a Di

s, then OETt. e Power Pros containedall confirm due delay. he proposeds with OETC

ly and the c means. Theng with OET

y OETC ystem, may

develop operssion System

of occurren

rational Testal effect on ation to the aThe informa

st; est; and

Operational Test additionatems and sh

y Users with Good Iures, develoations and couency of occn the TransmTC in accor

ion Facilitiest to OETCrequirement

Operational Pand SDC2. spatch Instr

TC may so

oducer and d in the formtheir accep

Dispatch Inas to an alt

The Grid Co

notice muste form and a

TC.

y from time rational procm behaviour

nce, scope, a

t and in OETa User’s Syaffected Useation provide

Test. al time or infhall respond

Industry Praop and meaontracts, andcurrence of

mission Systerdance with

ies C in accordan

ts identifiedPlanning OC

ruction that Dispatch th

PWP 2 daysmal Operati

ptance or re

nstructions, ternative sch

ode - Version 2

t be confirmany change

to time neecedures, to tr under abno

and impact o

TC’s reasonystem, OETCers to enableed by OETC

formation to to OETC w

actice requirasure Plant d to train staOperationalem. the require

nce with the in the Ope

C2 and in acc

is outside he Genset f

s before the onal Test p

ejection of t

the Power hedule for th

2.0

med in writinto the form

ed to condurain staff, anormal Syste

of Operation

nable opinioC shall give e the affecteshall include

o consider thwithin 2 week

res testing performanc

aff. l Tests and

ements of O

requiremenerational Tecordance wi

the currentfor the perio

test date anproposal. Ththe propose

Producer anhe Operation

ng of

uct nd

em

nal

on, 8

ed e;

he ks

to ce,

to

OC

nts est th

tly od

nd he ed

nd nal

Page 222: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Test, or malternativOETC shof OETC The Opeparticularthe Operathe Contr

OC9.7.4Any OpeDispatch OETC wiInstructioprogrammand SDCthe proceWhere adeclared required OETC shof OETC The Opeparticularthe Operathe Contr

OC9.8 OETC magreemeinformatiorequiremagreemeOETC orUser’s sitUser sitecomplianagreeme

OC9.9 OETC anexists (wTesting (involve aor observ

ctricity Transmi

may requestve time. hall inform o

those Usersrational Tesrly close comational Test rol Centre, if

4 Other operational TeInstructions

ill, subject toons and opeming phase

C2. OETC shedures set oan Operation

Operating for the Oper

hall inform othose Usersrational Tesrly close comational Test rol Centre, if

Site Invay, if it reasnt by the Uon relevant ents under nts betweenr PWP mayte in order t

e insofar as ce with a Pnts.

Other tend/or PWP ith appropria(including tettendance b

ve such tests

ssion Compan

t a different

ther Users os will or may

st shall procemmunicationis complex

f necessary.

perational test proposas and operato any amenderational swof Operatio

hall issue Diut in code Snal Test reqParameters

rational Testther Users os will or may

st shall procemmunicationis complex

f necessary.

vestigatiosonably consser, requesto Users’ the PPA,

n Users and , having givto investigatthe conditioPA, PWPA,

ests can, at any ate test procests carried by PWP, OEs.

y

Operational

of the schedy be affectedeed in accorn between thor time cons

tests al accompantional switchdments it m

witching instronal Planningspatch InstrDC2. quires a Di

s, then OETt. of the schedy be affectedeed in accorn between thor time cons

on tests siders that tht PWP to caPlant and/oPWPA, G

OETC or PWven reasonate any equipon of that eq the Grid C

time, requecedures) thesout under aTC or their r

l Test or ma

duled time and by the test.rdance with he control ensuming, OET

nying a Tehing instructi

may require tructions reqg OC2 and ructions for O

spatch InstrTC may so

duled time and by the test.rdance with he control ensuming, OET

here may bearry out a Sor apparaturid Code, WP. able notice, pment or opequipment or ode, a Conn

est a test. Wse will form a PWP, PWrepresentativ

The Grid Co

ay request th

nd nature of. normal oper

ngineer and TC shall pro

est Requestons are reqo be made, uired to facin accordan

Operational

ruction that Dispatch th

nd nature of. normal oper

ngineer and TC shall pro

e an issue oSite Investigs design, OConnection

send a reprerational prooperational

nection Agre

Where a PWthe basis of PA or any rves at User

ode - Version 2

he Operation

f the test, if

rational practhe test ma

ovide additio

t shall indiuired to faciincorporate

cilitate the tence with the Tests in acc

is outside he Genset f

f the test, if

rational practhe test ma

ovide additio

of non-complation to acq

Operation oAgreement

resentative ocedure appl procedure eement, or o

WP, PWPA othe test.

relevant agrsites in orde

2.0

nal Test at a

in the opinio

ctices but winager. Whenal support

cate whethlitate the tes

e the Dispatcest within thcodes SDC

cordance wi

the currentfor the perio

in the opinio

ctices but winager. Whenal support

liance with aquire or verior Connectiots and oth

or agent to plicable to this relevant

other releva

or Agreeme

reement) maer to carry o

an

on

th re at

er st. ch he C1 th

tly od

on

th re at

an ify on er

a he to

ant

ent

ay out

Page 223: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Where reoperationrequired Where aaccommoopinion tha risk topersonne

ctricity Transmi

equired a tenal switchingor permitted

a test is reodate the the test woul

o the safe ael and the ge

ssion Compan

est shall beg instructiond by the Gridequired at sest in the d not comprand secure eneral public

y

e carried ouns issued byd Code. short noticerequested tromise the s

operation c.

t in accorday OETC or b

e, OETC shtimescale psecurity and of Plant, or

The Grid Co

ance with Dby such alte

hall use rearovided thastability of tr compromi

ode - Version 2

Dispatch Insernative proc

asonable eat in OETC’the Total Syse the safe

2.0

structions ancedures as

ndeavours s reasonabstem, or posety of relate

nd is

to ble se ed

Page 224: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 1 of 2

SchedDesal

SDC1.

SDC1.2

SDC1.3

SDC1.4

S

S

S

S

S

S

S

S

Append

Append

Append

Append

ctricity Transmi

21

duling aination

1. Int

2. Ob

3. Sc

4. Pr

SDC1.4.1. SDC1.4.2. SDC1.4.3. SDC1.4.4. SDC1.4.5. SDC1.4.6. SDC1.4.7. SDC1.4.8. C

dix A. Ti

dix B. Da

dix C. Pr

dix D. Re

ission Compan

nd DispSchedu

troduction

bjective

cope

rocedures

Data provide

Distribution

Directly Con

Data provide

Data provide

Data provide

Data provide

Compilation

mescale dia

aily Status F

ro-Forma for

equirements

ny

patch Coling

CO

ed to OETC

and User Sy

nnected Con

ed to OETC

ed to OETC

ed to OETC

ed to OETC

of the Gene

agram for ma

Form

r Demand an

s for voltage

The Grid

ode SDC

ONTENTS

and PWP b

ystem data p

nsumer data

by Internally

by Internatio

by PAEW

by PWP

eration Sche

ain actions fr

nd Import/Ex

control & Re

d Code - Versio

C1 - Gen

S

by Power Pro

provided to O

provided to

y Interconne

onal Interco

edule and De

rom Schedu

xport profiles

eactive Pow

on 2.0

G

eration

oducers

OETC

OETC

ected Parties

nnected Par

esalination S

ling and Dis

s

wer reserves

- SDC1 Versi

and

Issued Ap

s

rties

Schedule

spatch Code

on 2.0

pril 2010

2 2 3 3 3 4 5 5 6 6 6 6

1 8 11 16 19

Page 225: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 2 of 2

SchedDesal

SDC1.The scheof DemaSystem rcost of eCDGens

SDC1 seDesalina

the scopie

the sTrans

the ethe p

the isand D

the isof prSche

excha

subm

data

SDC1.2The obje

to spGene

to spprepa

to spDesaUnits

ctricity Transmi

21

duling aination

1. Introdeduling of Cand on the relative to thach CDGenets and Des

ets out the tion Schedu

submission oed to PWP fo

submission osmission Sy

exchange of roduction of

ssue by OETDesalination

ssue by OETrobable outpedule Day;

ange of Sch

mission of De

exchange w

2. Objecctives of SD

pecify the deration Sche

pecify the daration of the

pecify the talination Schs throughout

ission Compan

nd DispSchedu

duction CDGensets a

Total Systehe locationsset, the Des

salination Un

following prule;

of a Daily Sor CDGense

of System dstem to whic

information f a Generatio

TC to PWP o Schedule;

TC to Powerput requirem

eduling data

emand Cont

with PAEW.

ctive DC1 are as fo

data to be edule and De

data exchane Generation

timetable fohedule and the Schedu

ny

patch Coling

and Desalinaem, the locas of Demandsalination renits

rocedures to

Status Formets and Desa

data to OETch CDGense

on relevanton Schedule

on the day b

r Producers oments from

a with Intern

rol data; and

ollows;

provided byesalination S

ge betweenn Schedule

or the prepaprobable oule Day.

The Grid

ode SDC

ation Units dation of Prod centres suquirements

o facilitate p

m (and revisalination Uni

TC by Usersets are Conn

t contracts ae and Desali

before the ne

on the day bCDGenset

ational Inter

d

y Power ProSchedule;

n OETC, PWand Desalin

aration andutput require

d Code - Versio

C1 - Gen

depends on oduction Facupplied fromof PAEW, a

production o

sions) by Pots;

s with a Sysnected;

and data betnation Sche

ext Schedule

before the nes and Desa

rconnected P

oducers to

WP, and otation Sched

issue of tements from

on 2.0

G

eration

the expectecilities Conn the Total S

and the flexib

of a Genera

ower Produ

tem Directl

tween PWP dule by OET

e Day of a G

ext Schedulealination Un

Parties;

enable OE

ther Partiesdule; and

the Generam CDGenset

- SDC1 Versi

and

ed level andnected to thSystem, the bility of Oper

ation Sched

ucers to OE

y Connecte

and OETC TC;

Generation S

e Day of stanits through

ETC to prep

necessary

tion Scheduts and Desa

on 2.0

d pattern he Total running

ration of

ule and

TC and

d to the

to allow

chedule

tements hout the

pare the

for the

ule and alination

Page 226: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 3 of 2

SDC1.3In additio

Powe

Licen

Direc

Intern

Intern

PAEW

RAEC

SDC1.4A timetab

Where inwritten acommun

SDC1.4All declar

(i) By 10:00the Availin the DaAvailabili

Such Ava

(ii) By 10:00any revisthose subset out in

The OpeSchedule

(iii) By 10:00Desalina

detaiCDG

any te

the d

(iv) If at any any chanto any O

ctricity Transmi

21

3. Scopeon to OETC

er Producers

nsed Distribu

ctly Connecte

nally Interco

national Inte

W; and

C if Connect

4. Proceble for the m

nformation inapproval facication shall

.1. Data prrations made

Availability0 hours eachability of eac

aily Status Fity of the eac

ailability Not

Operating P0 hours eachsions to thebmitted unde

n Appendix B

erating Parae Day. In so

Other relev0 hours eation Units de

ls of any spenset and/o

emporary ch

ata to be pro

Redeclarattime after th

nge to any oOperating Pa

ission Compan

e and PWP, S

s;

utors;

ed Consume

nnected Par

rconnected

ted to the To

dures main actions

n this code iscsimile tran be in the En

rovided to e to OETC s

y Notice h day, eachch of its CDorm set out ch CDGense

tice will repla

Parametersh day, each

e Operating er a previouB to this SDC

meters shalfar as not re

vant Scheduch day, eaeclared Avai

pecial factorr Desalinatio

hanges and

ovided in SD

ions he submissioof the valuesrameters be

ny

SDC1 applie

ers;

rties;

Parties;

otal System.

stipulated in

s required tosmission ornglish langu

OETC andshould be at

Power ProGensets andin Appendix

et or Desalin

ace any prev

s Power ProParameterss declaratioC1.

l reasonablyevised, the p

uling and Dch Power Pilable shall n

rs which maon Unit;

their possib

DC1.4.1 (i), (

on of the Das in its Availefore the end

The Grid

s to the follo

n this code is

o be providedr other elecage.

d PWP by Pt site Referen

ducer shall d Desalinatix B to this Snation Unit to

viously subm

ducer shall s of each ofn. The data

y reflect thepreviously su

ispatch datProducer innotify OETC

ay have a m

le duration,

(ii) and (iii) s

ily Status Foability Noticd of the rele

d Code - Versio

owing Users

s provided in

d in writing, ctronic mea

Power Pronce Conditio

notify OETCon Units by

SDC1. The Ao apply for th

mitted Availa

notify OETCf its CDGenshall be sub

e operating cubmitted Op

ta n respect of

in writing (c

material effe

to the Opera

shall form the

orm the Powe or Operat

evant Sched

on 2.0

G

;

n Appendix A

subject to Oans may be

ducers ons.

C in writing means of a

Availability Nhe following

ability Notice

C in writing sets and D

bmitted in the

characteristierating Para

f each of itcopied to PW

ect on the lik

ating Param

e Daily Statu

wer Producering Paramet

dule Day, it s

- SDC1 Versi

A.

OETC giving e used. All

(copied to Pn Availabilityotice shall sSchedule D

.

(copied to Pesalination e Daily Statu

cs expectedameters will

ts CDGenseWP) of the fo

kely output

eters; and

us Form.

r becomes aters that shashall prompt

on 2.0

its prior written

PWP) of y Notice state the Day.

PWP) of Units to us Form

d on the apply.

ets and llowing;

of such

aware of all apply tly notify

Page 227: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 4 of 2

OETC inonly and

(v) Failure to

OETCand n

If no and DPowePWP

If no who s

SDC1.4(i) By 10:00System tfollowing

ConsGeneconteresult

The rwhich

The form

CDGoperafor ea

adjusCDG

(ii) Failure to

OETCis the

If in aOETC

ctricity Transmi

21

n writing (cothe time sub

Failure to so submit a D

C shall endenot received

Daily StatusDispatch, user Producer.

P, on a form e

Daily Statusshall notify t

.2. DistribData provid

0 hours eacto which CD in respect o

straints on iteration Scheext, constrait of the User

requirementsh OETC may

m of the subm

enset outpuating range, ach hour of t

sted in eacensets to pr

Failure to so submit the

C shall endee case the da

any event thC will send i

ission Compan

pied to PWbmitted.

submit Daily Status F

eavour to co. If this is the

s Form is recse the data p OETC will entitled “Dai

s Form is rehe Regulato

ution and ded ch day, eacDGensets arof the next S

ts System, wedule and Dnts include r's System; a

s for maintay take into a

mission given

ut (Active Pat the low v

the Schedule

ch case forrovide outpu

submit data listed i

eavour to coata shall be

e data is notn writing the

ny

P) by subm

Form in acco

ontact the Pe case the D

ceived by 12provided in thsend in writly Status Fo

eceived on tory Authority

User Syste

ch User withre Connecte

Schedule Da

which OETCDesalination any restrictiand

ining voltageaccount for T

n in Append

Power and voltage side e Day; and

r Active Pot at the Con

in (i) shall re

ontact the Usresent imme

t received bye data so use

The Grid

mitting a Dail

ordance with

ower ProduDaily Status

2:00 hours Ohe previous ing the data

orm – OETC

two or morey for persiste

em data pr

h a Systemed, will submy;

C may needSchedule o

ons on the

e within presTotal System

ix B, Table 1

Reactive Poof the Gene

ower by thenection Poin

esult in the fo

ser to see if ediately; and

y 12:00 houed to the Us

d Code - Versio

ly Status Fo

h SDC1.4.1

cer to see ifForm shall b

OETC shall, day’s Daily

a so used to Assumed D

e consecutivent offences.

rovided to

m Directly Cmit to OETC

d to take intor OperatioOperation o

scribed limitsm security rea

1, will be;

ower), in eaerator transf

e correctionnts.

ollowing;

f the data wad

rs OETC shser within 5 m

on 2.0

G

orm showing

shall result i

f a Daily Stabe resent im

for the purpStatus Formthe Power

Data” within 5

ve days, OE

OETC

Connected toC in writing

to account fn of the Toof Embedde

s and Reactasons.

ach case aformer for id

n factors ap

as sent and

all use the laminutes.

- SDC1 Versi

g the chang

in the follow

atus Form wmediately;

poses of Schm received frProducer, co5 minutes; a

TC shall ale

o the Transconfirmation

for derivationotal System.d CDGense

ive Power re

a fixed valueentified CDG

pplicable fo

not received

atest data p

on 2.0

ged data

wing;

was sent

heduling rom that opied to

and

ert PWP

smission n of the

n of the . In this

ets, as a

eserves,

e or an Gensets

or those

d. If this

rovided.

Page 228: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 5 of 2

SDC1.4By 10:00than 1 Mprofile byform give

(i) Failure to

OETCis the

If in acorreUser

(ii) If at any aware of under thinotify OE

SDC1.4(i) By 10:00to the Tosubmit to

ConsGenethis ca res

The rwhich

The form

CDGoperafor ea

adjusCDG

By 10:00to the ToOETC infollowing

(ii) Failure to

OETCand n

If in aOETC

ctricity Transmi

21

.3. Directly0 hours eacMW will suby Connectioen in Append

Failure to so submit the

C shall endee case the da

any event theesponding da

within 5 min

Redeclarattime betwee

f any changes SDC1.4.3

ETC in writin

.4. Data prData provid

0 hours eachotal System o OETC in w

straints on iteration Schecontext, consult of the Us

requirementsh OETC may

m of the subm

enset outpuating range, ach hour of t

sted in eacensets to pr

0 hours eachotal System

n writing its Schedule D

Failure to so submit the

C shall endenot received

any event thC will send i

ission Compan

y Connecth day each mit to OETCn Point for tdix C, Table

submit data listed i

eavour to coata shall be

e data is notay of the prnutes.

ions en the 10:00e to the infor that shall ag.

rovided to ded h day, each to which C

writing confirm

ts System, wedule and Destraints incluser's System

s for maintay take into a

mission given

ut (Active Pat the low v

the Schedule

ch case for rovide outpu

h day, each m to which G

best estimaDay.

submit data listed i

eavour to co. If this is the

e data is notn writing the

ny

ed ConsumDirectly Co

C in writingthe following1.

in SDC1.4.3

ontact the Usresent imme

t received byrevious wee

0 hours and trmation submpply before

OETC by

Internally InCDGensets tmation of the

which OETCesalination Sude any rest

m; and

ining voltageaccount for T

n in Append

Power and voltage side e Day; and

Active Powt at the Con

Internally InGensets notate of its ho

in SDC1.4.4

ntact the Inte case the d

t received bye data so use

The Grid

mer data ponnected Co the Consu

g Schedule

3 shall result

ser to see if ediately; and

y 12:00 hourek. OETC w

the expiry ofmitted underthe end of t

Internally I

nterconnectehat may be e following in

C may needSchedule ortrictions on t

e within presTransmission

ix B, Table 2

Reactive Poof the Gene

wer by thenection Poin

nterconnectet dispatchedourly net De

4 (i) shall res

ernally Interdata shall be

y 12:00 houed to the Us

d Code - Versio

provided toonsumer withmer's best Day. The da

in the follow

f the data wad

rs OETC shawill send in w

f the next Scr SDC1.4.3 he relevant

Interconne

ed Party withDispatched

n respect of

d to take intr Operation othe Operatio

scribed limitsn System se

2, will be;

ower), in eaerator transf

conversionnts.

ed Party withd by OETC, emand profi

sult in the fol

rconnected P resent imm

rs OETC shser within 5 m

on 2.0

G

o OETC h a maximuestimate of ata should b

wing;

as sent and

all use the dwriting the d

chedule Dayor under a pSchedule D

ected Parti

h a System d by OETC

the next Sc

to account fof the Trans

on of Embed

s and Reactcurity reaso

ach case aformer for id

n factors ap

h a System are Conne

le by Conne

lowing;

Party to see ediately; and

all use the laminutes.

- SDC1 Versi

um Demand its hourly D

be submitted

not received

data provideddata so used

y the User bprevious sub

Day, it shall p

es

Directly Coare Connechedule Day;

for derivationsmission Sysdded CDGen

ive Power rens.

a fixed valueentified CDG

pplicable fo

Directly Cocted, will suection Point

if the data wd

atest data p

on 2.0

greater Demand d on the

d. If this

d for the d to the

becomes bmission promptly

nnected cted, will ;

n of the stem. In nsets as

eserves,

e or an Gensets

or those

nnected ubmit to t for the

was sent

rovided.

Page 229: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 6 of 2

SDC1.4By 10:00Active Ponext Sch

In the evtransfers

SDC1.4By 10:00

The teach

SDC1.4PWP shScheduleand a Porequired Generatiadditionaof its stat

SDC1.4(i) For the folist CDGfrom releOperatinregardingThe two

The ftherethe T

The accouand c

ctricity Transmi

21

.5. Data pr0 hours eacower and Redule Day a

vent that ag shall be adj

.6. Data pr0 hours each

total requireProduction

.7. Data prhall submit e and Desaower Produc

by OETC on Schedule

al informationtutory obliga

.8. CompilProductionollowing Schensets and

evant agreemg Parameteg Operating schedules to

first schedule were no TrTotal System

second schunt the inheconstraints o

ission Compan

rovided to ch day, OET

Reactive Powat the Conne

greement hajusted to 0 M

rovided to h day the PA

ement for DFacility that

rovided to to OETC inlination Schcer. PWP sh

and that ite and Desaln on a relev

ations, its Tra

lation of thn of scheduhedule Day,Desalination

ments and gers suppliedReserve, Fr

o be compile

le will be theransmission

m or because

edule will berent physicaon the Total

ny

OETC by TC and thewer transfersection Point a

as not been MW and 0 M

OETC by AEW will sub

esalinated whas Desalin

OETC by n writing deedule from

hall provide st would wisination Sche

vant agreemeansmission a

he Generatles OETC will cn Units in dguidance ond by the Porequency coed by OETC

e 'UnconstraSystem con

e of Outages

be the 'Consal limitationsSystem and

The Grid

Internatione Internations and any rand both con

obtained bMvar until agr

PAEW bmit to OETC

water produnation Units.

PWP etails relevaeach PWPAsuch clarificash OETC toedule. OETCent requiredand Dispatc

tion Sched

compile twoescending o

n such relevaower Producontrol, AncillaC are as follo

ained Schednstraints, eiths on the Tran

strained Schs of the Tra

d Connected

d Code - Versio

nal Interconal Interconnequired voltnfirm the da

by the start reements are

C in writing t

ction for the

ant to the A, PPA or oation and guo take into C may requed by OETC toh Licence, a

dule and De

Merit Orderorder of incrant agreemecers, the reary Servicesws;

dule', which her through nsmission Sy

hedule’ whicnsmission S Production

on 2.0

G

nnected Pnected Parttage limits fota in writing.

of the next e reached.

he following

e following S

preparation other agreemuidance that

account west, and PWo comply wi

and the Grid

esalination

r schedules.remental cosents provideequirementss, and other f

will be cominherent ph

ystem;

ch will be cSystem and Facilities fo

- SDC1 Versi

arties ies shall agor each hou.

Schedule D

information

Schedule D

of the Gement betweet it considers

when preparP shall provth the requirCode.

n Schedule

. Each schedst using infoed by the PW of the Grifactors listed

piled assumysical limita

compiled takall known O

r the Schedu

on 2.0

gree the ur of the

Day, the

;

ay from

neration en PWP s will be ring the

vide, any rements

e

dule will ormation WP, the d Code d below.

ming that tions on

king into Outages ule Day.

Page 230: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 7 of 2

OETC sconsidera

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

(i)

(j)

(k)

(l)

(m)

(n)

(o)

(p)

(q)

(r)

OETC shhours ea

OETC shConstrainby 16:00

The Proinformatiits CDGe

Provisionrequirem

ctricity Transmi

21

shall produation of the f

forecast De

forecast req

declared CD

declared CD

declared Op

declared CD

Licensed Di

output of Em

System Ope

Transmissio

System Fre

Operating M

Transmissio

Transmissio

relevant info

relevant info

Ancillary Se

other factors

hall provide ch day. The

hall issue Prned Scheduhours on th

ovisional Ruon relating t

ensets, the p

nal Running ments from P

ission Compan

ce the Gefollowing fac

mand for ele

quirements fo

DGenset Act

DGenset Anc

perating Par

DGenset infl

istributor Sys

mbedded CD

erating Rese

on System s

quency cont

Margin;

on System c

on System lo

ormation on

ormation on

ervice require

s as may be

copies of te schedules w

rovisional Ruule to each Pe day prece

unning Ordeto the CDGeplanned load

Orders are ower Produc

ny

eneration Sctors;

ectricity and

or Desalinat

tive Power c

cillary Servic

rameters;

exibilities;

stem constra

DGensets;

erve requirem

tability issue

trol;

constraints to

osses;

Internationa

other Users

ements; and

e reasonably

the Unconstwill be made

unning OrdePower Produeding the rele

ers issued enset(s) of thding pattern f

indicative oncers and are

The Grid

Schedule a

the geograp

tion producti

capabilities;

ce capabilitie

aints;

ments;

es;

ogether with

al Interconne

s;

d

y considered

trained and e available to

ers for each ucer for eacevant Sched

to each Phat Power Pfor the Sche

nly, and are e not Dispatc

d Code - Versio

and Desalin

phical distrib

on;

es;

relevant sta

ections;

by OETC to

Constrainedo other User

hour of the ch of its CDGdule Day.

Power ProdProducer onlyedule Day.

provided asch Instructio

on 2.0

G

nation Sche

bution of fore

andards and

o be relevan

d Schedulesrs following r

Schedule DGensets and

ucer by Oy and shall i

s a guide to tons.

- SDC1 Versi

edules takin

ecast deman

other const

nt.

s to PWP brequests to

Day based ud Desalinatio

OETC shall indicate, for

the expected

on 2.0

ng due

nd;

traints;

by 15:00 OETC.

upon the on Units

contain each of

d output

Page 231: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 8 of 21 G - SDC1 Version 2.0

Appendix A. Timescale diagram for main actions from Scheduling and Dispatch Code 1 (Note that following are summaries only and reference should be made to Scheduling and Dispatch Codes for full details.)

Operating day 1 Data to be provided for Operating day 0

By 10:00 hours By 12:00 hours By 15:00 hours By 16:00 hours

All Power Producers notify OETC in writing (copied to PWP) (see note 1)

Availability Notice (SDC1 Appendix B, Table 1 & 2)

Any revisions to Operating Parameters (SDC1 Appendix B, Table 1 & 2)

Details of any special factors likely to affect output of Gensets (SDC1 Appendix B, Table 3)

Any temporary changes and duration to registered data (SDC1 Appendix B, Table 3)

Users with Systems Connected to OETC to which Gensets are Connected notify OETC in writing (see note 1)

Constraints in Users System that OETC may need to consider in preparing schedule

Voltage & MVAr reserve requirements (SDC1 Appendix D, Table 1)

Any temporary changes to registered Demand management data

Directly Connected Consumers with Max Demand > 1MW notify OETC in writing (see note 1)

Page 232: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 9 of 21 G - SDC1 Version 2.0

Operating day 1 Data to be provided for Operating day 0

By 10:00 hours By 12:00 hours By 15:00 hours By 16:00 hours

Best estimate of hourly demand profile (SDC1 Appendix C, Table 1)

Internally Interconnected Parties and International Interconnected Parties notify OETC in writing (see note 1)

Best estimate of hourly imports/exports to OETC System (SDC1 Appendix C, Table 2 & 3)

Constraints on its System that OETC may need to consider

Requirements for voltage control and Mvar reserves (SDC1 Appendix D, Table 2 & 3)

Any other information agreed with OETC

PAEW notify OETC in writing (see note 1)

Total requirement for Desalinated water production from each Production Facility

OETC actions

If any party does not submit data, OETC will use the latest data submitted.

Page 233: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 10 of 21 G - SDC1 Version 2.0

Operating day 1 Data to be provided for Operating day 0

By 10:00 hours By 12:00 hours By 15:00 hours By 16:00 hours

OETC produces the Generation Schedule and Desalination Schedule for day 0 by 15.00 hours after considering -

Forecast demand and geographic demand distribution

Declared Genset MW capabilities

Declared Water production capabilities

Declared Genset Ancillary Service capabilities

Declared Operating Parameters

Other relevant data

OETC issues provisional running orders for each Genset & Desalination Unit by 16.00 hours (see note 2)

Information only provided to relevant Power Producers

Notes 1 If at any time after submission of the Daily Status form, all parties shall promptly inform OETC of any changes to values submitted

2 Provisional running orders are indicative only and are not dispatch instructions.

Page 234: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 11 of 21 G - SDC1 Version 2.0

Appendix B. Daily Status Form (SEE NOTES ON SHEET 5)

Sheet 1 of 5

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: PRODUCTION FACILITY Date-Schedule day:

Today’s date: Time sent:

TABLE 1 CDGensets

Temperature basis of availability declaration 0C

Genset

No Registered Capacity

MW

Availability Notice

MW

Changes to Operating Parameters

(Use code from sheet 4 followed by new value)

Code Revised value

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Page 235: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 12 of 21 G - SDC1 Version 2.0

Sheet 2 of 5

TABLE 2 Desalination Units

Desal Unit No

Registered Capacity Cu mtr/hr

Availability

Cu meters/hr

Changes to Operating Parameters

(Use code from sheet 4 followed by new value)

Code Revised value

1

2

3

4

5

6

7

8

9

10

Page 236: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 13 of 21 G - SDC1 Version 2.0

Sheet 3 of 5

TABLE 3 Detail any special factors or temporary changes that may affect CDGenset or Desalination Unit outputs.

Date-Schedule Day:

CDGenset/ Desal Unit no.

Description of special factor/temporary change Expected duration

Hours/Mins

Page 237: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 14 of 21 G - SDC1 Version 2.0

Sheet 4 of 5 TABLE 4

Genset Operating Parameter codes

Item Performance item Units Code

1 Minimum Generation MW MG

At full load

2 Maximum lagging Mvar Mvar Flvarlag

3 Maximum leading Mvar Mvar Flvarlead

At minimum load

4 Maximum lagging Mvar Mvar Mlvarlag

5 Maximum leading Mvar Mvar Mlvarlead

6 Maximum emergency Generation MW MEG

7 Minimum on-time Hours/mins Minon

8 Minimum off-time Hours/mins Minoff

9 Notice to synchronise/start up Hours/mins NSS

10 Synchronising block load MW SBL

11 Time between starting/ synchronising Gensets Hours/mins TbeSynch

12 Time between stopping/ Desynchronising Gensets

Hours/mins TbeStop

13 Maximum water production Cu mtr/hr Max Prod

14 Minimum water production Cu mtr/hr MinProd

15 Change to Ancillary Service Capability ■ ASC

16 Governor not in frequency mode ■ NFM

17 Change to Primary Response characteristics ■ PrimResp

18 Change to Secondary Response characteristics ■ SecResp

19 Change to Tertiary Reserve characteristics ■ TertResp

20 Abnormal loading rate ■ ALR

21 Special factor ■ SF

22 Temporary change ■ TC

23 Risk of Trip ■ RoT

24 Restriction of gas supplies ■ GasRes

Note ■ These data should be entered in sheet 1 but detailed in sheet 2

All other data should be entered and data given in sheet 1

Page 238: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 15 of 21 G - SDC1 Version 2.0

Sheet 5 of 5 General notes Power Producers when making the daily submissions of Availability to OETC and PWP will address the following factors. Most regular issues will be covered by responses in Table 1 using heading codes from Table 4. All other issues will be tabulated on a CDGenset/ Desalination Unit basis in Table 3.

1. CDGenset basic data;

2. Minimum Generation;

3. Maximum Generation and/or Desalination Unit increase in output above declared Availability;

4. CDGenset minimum on time;

5. Minimum shutdown time;

6. CDGenset and/or Desalinating Unit inflexibility (inflexibility description, start date and time, end date and time, MW, m3/h);

7. CDGenset Synchronising intervals (hot time interval, off-load time interval);

8. CDGenset Synchronising output MW;

9. Desalinating Unit startup intervals (hot time interval, off load time interval);

10. CDGenset Desynchronising intervals;

11. Desalinating Unit shut-down intervals;

12. Desalination Unit basic data;

13. Minimum water production;

14. Maximum water production;

15. Constraints on CDGenset output for range of associated Desalination Unit outputs;

16. CDGenset two shifting limitation;

17. CDGenset Synchronising groups;

18. CDGenset run up rates with MW breakpoints;

19. CDGenset run-down rates with MW breakpoints;

20. CDGenset loading rates covering the range from Minimum Generation to declared Registered Capacity; and

21. CDGenset de-loading rates covering the range from declared Registered Capacity to Minimum Generation.

Page 239: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 16 of 21 G - SDC1 Version 2.0

Appendix C. Pro-Forma for Demand and Import/Export profiles

Table 1 Data to be completed by Users including Directly Connected Consumers

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: USER NAME Date-Schedule day:

Today’s date: Time sent:

Time Hours Demand MW (1) Time Demand MW (1)

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note (1) Transfers from Oman Transmission System are +ve

Transfers to Oman Transmission System are -ve

Page 240: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 17 of 21 G - SDC1 Version 2.0

Pro-Forma for Demand and Import/Export Profiles

Table 2 Data to be completed by Internally Interconnected Parties

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: NAME OF PARTY Date-Schedule day:

Today’s date: Time sent:

Time Hours Transfer MW (1) Time Transfer MW (1)

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note (1) Transfers from Oman Transmission System are +ve

Transfers to Oman Transmission System are –ve

Page 241: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 18 of 21 G - SDC1 Version 2.0

Pro-Forma for Demand and Import/Export Profiles

Table 3 Data to be completed by International Interconnected Parties

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: NAME OF PARTY Date-Schedule day:

Today’s date: Time sent:

Time Hours Transfer MW (1) Time Transfer MW (1)

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note (1) Transfers from Oman Transmission System are +ve

Transfers to Oman Transmission System are –ve

Page 242: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 19 of 21 G - SDC1 Version 2.0

Appendix D. Requirements for voltage control & Reactive Power reserves

Table 1 Data to be completed by Users with Systems Connected to OETC

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: USER NAME Date-Schedule day:

Today’s date: Time sent:

This table should only be completed where requirements are necessary, otherwise a nil return should be shown. A separate form should be used for each Connection Point.

Connection Point

Voltage limits

Time Hours

Voltage target

Mvar Time Hours

Voltage target

Mvar

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note: Mvar + ve lagging; - ve leading

Page 243: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 20 of 21 G - SDC1 Version 2.0

Requirements for voltage control & Reactive Power reserves

Table 2 Data to be completed by Internally Interconnected Parties

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: NAME OF PARTY Date-Schedule day:

Today’s date: Time sent:

This table should only be completed where requirements are necessary, otherwise a nil return should be shown. A separate form should be used for each Connection Point.

Connection point

Voltage limits

Time Hours

Voltage target

Mvar Time Hours

Voltage target

Mvar

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note: Mvar + ve lagging; - ve leading

Page 244: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Electricity Transmission Company The Grid Code - Version 2.0

Page 21 of 21 G - SDC1 Version 2.0

Requirements for voltage control & Reactive Power reserves

Table 3 Data to be completed by International Interconnected Parties

To OETC CONTROL CENTRE Copy to PWP

Fax No: Fax No

FROM: NAME OF PARTY Date-Schedule day:

Today’s date: Time sent:

This table should only be completed where requirements are necessary, otherwise a nil return should be shown. A separate form should be used for each Connection Point.

Connection point

Voltage limits

Time Hours

Voltage target

Mvar Time Hours

Voltage target

Mvar

01:00 13:00

02:00 14:00

03:00 15:00

04:00 16:00

05:00 17:00

06:00 18:00

07:00 19:00

08:00 20:00

09:00 21:00

10:00 22:00

11:00 23:00

12:00 24:00

Note: Mvar + ve lagging; - ve leading

Page 245: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 1 of 1

SchedDesal

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

SDC2.

Appen

ctricity Transmi

0

duling aination

1 Introd

2 Objec

3 Scope

4 Proce

SDC2

SDC2

SDC2

SDC2

5 Action

6 Synch

7 Instru

8 Reque

9 Instru

10 Comm

dix A. Dis

ission Compan

nd DispDispatc

uction

ctive

e

edures

2.4.1 Data

2.4.2 Dispa

2.4.3 Gene

2.4.4 Addit

n required fro

hronisation/D

ctions follow

est for Oper

ctions to Us

munications

spatch Instru

ny

patch Coch

CO

atch Instruct

eration Sync

ional instruc

om the Pow

De-synchron

wing Operatin

ation under

ers

with Users

uctions

The Grid

ode SDC

ONTENTS

ions to Powe

hronising an

ctions to CDG

er Producer

nisation

ng Paramete

Risk of Trip

d Code - Versio

C2 - Gen

S

er Producer

nd De-synch

Gensets

r

er changes

on 2.0

G-

eration

s

hronising tim

G - SDC2 Vers

and

Issued Apr

2 2 2 3 3 3

es 3 4 6 6 6 6 7 7 8

ion 2.0

ril 2010

Page 246: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 2 of 1

SchedDesal

SDCSDC2 se

In the ormaintaintaking ac

re-o

issue

man

issue

exch

SDCThe obje

meeoq

enaba

SDCIn additio

Pow

Use

Dire

Inter

Anci

Inter

RAE

PWP

ctricity Transmi

0

duling aination

C2.1 Intets out the p

der to meeting the secu

ccount of ope

ptimise Gen

e instruction

nage power f

e instruction

hange inform

C2.2 Obective of SDC

et Demand operational quality of ele

ble OETC toand Dispatch

C2.3 Scon to OETC,

wer Producer

rs;

ctly Connec

rnational Inte

illary Service

rnally Interco

EC if Connec

P (for inform

ission Compan

nd DispDispatc

troductioprocedures f

Demand aturity and querational con

neration Sche

ns to CDGen

flows with In

ns to Users w

mation with P

bjective C2 is to clar

and Desaliconstraints

ectricity Supp

o comply wh Licence, a

cope SDC2 appli

rs with CDG

cted Consum

erconnected

e Providers;

onnected Pa

cted to the T

mation).

ny

patch Coch

on for the issue

t minimum cuality of elecnstraints, OE

edules and

nsets and De

nternational I

with respect

PWP.

rify procedur

nated watewhilst maintply; and

ith its statutand the Grid

ies to;

ensets and

mers;

d Parties;

arties;

Total System

The Grid

ode SDC

e of Dispatch

cost and witctricity SuppETC needs t

Desalination

esalination U

Interconnect

to Ancillary

res for the is

r requiremetaining the

tory obligatioCode.

Desalination

m; and

d Code - Versio

C2 - Gen

h Instruction

h an approply and provito;

n Schedules

Units;

ted Parties;

Services; an

ssue of Disp

ents at miniintegrity of T

ons, the req

n Units;

on 2.0

G-

eration

s by OETC

priate marginision of Des

as required

nd

patch Instruc

imum cost, Total System

quirements o

G - SDC2 Vers

and

n of reservesalinated wa

;

ctions by OE

taking accm security a

of its Trans

ion 2.0

e, whilst ater and

ETC to;

count of and the

mission

Page 247: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 3 of 1

SDCWhere inprior writcommun

The form

SDC2.4OETC sh

the C

the d

otheO

The Opethe Gene

In the evCDGens

SDC2.4Dispatchbeginningrespect o

A DispatCDGensOperatiothe outpu

A Dispatcconfirmerespectiv

A Dispatin respecreason fbecause time and

For a Discapability

In the evmust be

SDC2.4OETC sCDGens

If the PowIf the estthis will cSynchron

ctricity Transmi

0

C2.4 Prnformation intten approvaication shall

mat for issuin

.1 Data hall, when a

Constrained

declared Ava

er relevant dOETC.

erating Parameration Sche

vent that twet that will g

.2 Dispatch Instructionsg immediateof that Sched

tch Instructioet, a changn or an instrut of a Desa

ch Instructiod in writing

ve logs.

ch Instructioct of that CDfor non-acce

the Dispatcperiod to w

spatch Instry and Opera

vent that annotified with

.3 Generatshall determet.

wer Producetimate of theconstitute a nising time is

ission Compan

roceduresn this Code al facsimile be in the En

g Dispatch I

ssessing wh

Schedule;

ailability (Da

data in resp

meters usededule and De

wo or more ive the high

h Instructios relating toely after the dule Day.

on given byge in the Reruction to prolination Unit

on given by Owithin 5 m

on must be eDGenset by teptance mach Instructiohich the Dis

ruction to beational Param

n unforeseenout delay by

ion Synchmine the re

er is unable e Synchronis

redeclaratios early by m

ny

s is required

transmissionnglish langu

Instructions

hich CDGen

aily Status Fo

pect of each

d in the Dispesalination S

CDGensetsest reductio

ons to Pow the Schedu issue of th

y OETC maeactive Powovide an An.

OETC to a Pminutes. Eac

either formatelephone, oay only be on is not in apatch Instru

e valid, it mumeters as pr

n problem ay telephone.

ronising aquired timin

to meet the sing time is lon of availab

more than one

The Grid

to be provin or other eage.

is given in A

nsets and De

orm) of each

CDGenset

patch phaseSchedule as

have equivn in overall T

wer Producule Day shae Generatio

ay require awer output oncillary Servi

Power Produch party sha

ally acknowleor a reason gon safety gaccordance ction relates

ust observe roperly decla

arises in car

nd De-synng of Sync

Synchronisiater than thebility by the e minute, OE

d Code - Versio

ided in writielectronic m

Appendix A.

esalination U

h CDGenset

and Desali

e shall be thdescribed in

valent costsTotal System

cers all be issuedon Schedule

change in of a CDGence by a spe

ucer shall beall enter all

edged immegiven immedgrounds (relwith the Da

s.

the limits oared to OETC

rrying out th

nchronisingchronising a

ing time, it me instructed CDGenset

ETC shall ke

on 2.0

G-

ng, subject eans may b

Units to Disp

t and Desalin

ination Unit,

ose used byn SDC1.4.

s, OETC wilm costs.

d at any time and Desali

the Active set, a chancific CDGen

e given by teDispatch In

ediately by thdiately for noating to Peily Status Fo

of AvailabilityC in accorda

he Dispatch

g times and Desync

must inform Otime by moras defined

eep a record

G - SDC2 Vers

to OETC gibe used. All

patch, review

nation Unit;

, as determ

y OETC to c

l first Dispa

e during theination Sche

Power outpge to the m

nset, or a ch

lephone andnstructions i

he Power Pon-acceptanersons or Porm relevan

y, Ancillary ance with SD

Instruction,

chronising o

OETC immere than 10 min SDC1.4.1

d and inform

ion 2.0

iving its written

w;

and

ined by

compile

atch the

e period edule in

put of a mode of ange in

d will be into the

roducer ce. The lant) or

nt to the

Service DC1.

, OETC

of each

ediately. minutes, 1. If the PWP.

Page 248: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 4 of 1

When OEwith the OETC to

SDC2.4Additiona

ReserveTo ensurdetails ofnotificatiooutput.

ReactiveTo ensurare main

a). RthGEOthWma

OvoR

b). TTofCtoof

InPin

UPco

UvoGO

ctricity Transmi

0

ETC issues data subm indicate the

.4 Additional instruction

re that an af the reserveon of the tim

e Power re that a sattained, Disp

Reactive Pohe Transmis

Generator traEmbedded COETC and thhe correspon

Where a CDGmust achieve

greed with O

on load ta

adjusting

Once this haoltage again

Reactive Pow

Target voltaTransmission

f the GenerConnection Po a specific tf ± 0.5 kV (o

on loa

adjust

n relation toProducer wilndication.

Under normaPower Produonsultation w

Under certainoltage until o

Generator traOETC.

ission Compan

a Dispatch Iitted on Da

e error. OET

nal instructns to CDGen

adequate Ope (in the catemescale in w

tisfactory Sypatch Instruc

wer outputssion Systemansformer (

CDGensets).e Power Pro

nding LV indGenset is ine that outpuOETC) by eit

ap changing

the CDGens

as been achn without priower output w

age levels. n System at rator transfoPoint in the ctarget voltagor such otherad tap chang

ting the CDG

o each CDGl discuss a

al operating ucer will nwith, and wit

n circumstanotherwise inansformer or

ny

Instruction foily Status F

TC will take im

tions to CDnsets may in

perating Maegories set owhich that re

ystem voltagctions may in

t. The Reacm at the CDor at the D In relation oducer will ddication. structed to at within a tother;

on the Gen

set stator te

hieved, the or consultati

will be allowe

Target voltathe CDGen

ormer (or oncase of Embge, the Power figure as mging on the G

Genset stato

Genset, wheand agree e

conditions, not tap agath the agree

nces the Ponstructed andr adjusting C

The Grid

or a CDGenForm, the Pmmediate st

DGensets clude the fo

rgin is mainout in OC3) eserve may

ge profile annclude, in rel

tive Power Genset's Co

Distribution Nto each CD

discuss and

a specific Reolerance of ±

erator transf

rminal voltag

Power Prodion with and

ed to vary wit

age levels tnset's Connen the Distribbedded CDGer Producer

may be agreeGenerator tra

or terminal vo

ere there is equivalent v

once this taain or adjument of, OE

ower Producd this will beCDGenset s

d Code - Versio

set to a PowPower Produteps to amen

llowing;

ntained, Dispto be carriedbe transfer

nd that sufficlation to Rea

output from onnection PoNetwork CoDGenset, whagree equiv

eactive Pow± 5 Mvar (o

former; or

ge.

ducer will no the agreemth Transmiss

to be achieection Point,bution SysteGensets). Wmust achiev

ed with OETansformer; o

oltage.

no HV indvoltage leve

arget voltageust terminal ETC.

cer may be e achieved bstator termin

on 2.0

G-

wer Produceucer must imnd the Dispa

patch Instrud on each Crable into inc

cient Reactiactive Powe

the individuoint namely nnection Po

here there isvalent Reacti

wer output, thor such othe

ot tap againment of OETC

sion System

ved by the namely the

em at the DWhere a CDG

ve that targeTC) by eitheror

ication, OETels for the

e level has voltage a

instructed toby on load taal voltage w

G - SDC2 Vers

r not in accommediately atch Instruct

ctions may CDGenset, in

creased CD

ve Power rer;

ual CDGensthe HV side

oint in the cs no HV indive Power le

he Power Per figure as

n or adjust tC, on the ba

m conditions.

CDGenset e High VoltaDistribution NGenset is inset within a tor;

TC and thecorrespond

been achievgain withou

o maintain aap changing

without refer

ion 2.0

ordance contact ion.

include ncluding DGenset

eserves

set onto e of the case of dication, evels for

roducer may be

terminal asis that

on the age side Network structed

olerance

Power ding LV

ved the ut prior

a target g on the rence to

Page 249: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 5 of 1

VCvatr

c). MsuinPco

d). McoaPuP

In ad

• Oochtha

• TwinR

• TcoRaSPOcog

• Asha

• Oteu

• WSfogIn

• WRbim0

ctricity Transmi

0

Voltages on Connection Palue unless ransiently to

Maximum Ruch as low

nstructed AcProducer shoonstrained b

Maximum Ronditions, sbsorption at

Power Produnless constr

Plant). ddition;

OETC may isn or within bhanges subhese instruct

failure to m

The issue of will be made nclude instruReactive Pow

The excitatioonstant term

Reactive Powlways be dis

System voltagPower respoOperation unomply with rounds (rela

A Dispatch Inhall be achies OETC ma

On receiving erminal voltanless there

Where a DSynchronisedor Reactive iven. In the

nstruction to

Where a DisReactive Pow

eing achievemplicit in the

Mvar by the

ission Compan

the 220kV Point with a

abnormal c zero at the

Reactive Pow System vctive Powerould take apby plant operReactive P

such as higt instructed ucer should rained by Op

ssue Dispatcboundaries omitted in thetions within eet the term

Dispatch Inwith due reguction for rewer capability

n system, uminal voltagwer output csabled, unlege, a Power

onse that isless instructstability limi

ating to Pers

nstruction reeved not laty instruct;

a new Dispage adjustmis a new Dis

ispatch Insd and a DispPower conse absence Synchronis

spatch Instrwer, compaed. In the ab

e instruction e time of De-

ny

and 132kVUser will n

conditions ppoint of fau

ower outputvoltage, an r output ("m

ppropriate acrational limitPower absh System vActive Powetake appropperating Par

ch Instructioof the Genere Daily Statthe agreed

ms of the PPA

nstructions fgard to any reduction in y;

unless otherwe mode of

control modess agreed or Producer ms produced ted otherwists or unlessons or Plant

elating to Reter than 2 m

patch Instrucment shall bspatch Instru

truction to patch Instrucsistent with tof a Dispate, the React

ruction to Datible with sbsence of a to De-synch-synchronisa

The Grid

V parts of tormally rem

prevail. Undelt until the fa

t ("maximuinstruction

maximum ections to mats or safety gsorption ("voltage, an er output ("mpriate actionrameter limit

ons for Activrator Performtus Form. Antimes shall bA;

for Active Poresulting chaActive Pow

wise agreedOperation w

e or constanotherwise witmust not take

as a resue by OETC

s constrainet);

eactive Powinutes after

ction for Actbe carried ouction for Re

Synchronisction for Actthe CDGenstch Instructtive Power o

De-synchronshutdown, m

separate Dihronise that ation.

d Code - Versio

the OETC Tmain within t

er fault conault is cleare

m excitatioto maximu

excitation") maximise Reacgrounds (rela"minimuminstruction

minimum exs to maximits or safety g

ve Power anmance Chartny failure ofbe reported

ower at the ange in Reawer Generat

d with OETCwith Var limnt Power Fath OETC. In e any action lt of constaor unless imd by Opera

wer will be imthe instruct

tive Power, out to changeactive Powe

se is giventive Power iset relevant ion for Rea

output shall b

nise is givemay be giveispatch InstrReactive Po

on 2.0

G-

Transmissiothe limits ±1nditions, volted

on") Under m Reactivemay be givctive Power ating to Pers

excitationto maximum

xcitation") maise Reactivegrounds (rel

nd Reactive t as modifiedf a Power Pby OETC in

CDGenset’sctive Power tion to enab

C, must be omiters in seractor output

the event oto override

ant terminalmmediate act

ting Parame

mplementedion time, or

no tap change the Reacer;

n, or whereis given, a DOperating P

active Powebe 0 Mvar; a

en, a Dispaen prior to ruction for Rower output

G - SDC2 Vers

n System a0% of the ntage may c

certain cone Power ouven, and a r Generationsons or Plan") Under m Reactive ay be givene Power abslating to Per

Power at and by any tem

Producer to an writing to P

s Connectiocapability a

ble an incre

operated onrvice. Any ccontrol modf any changautomatic Rl voltage mtion is neceseter limits o

d without desuch longer

nging or CDctive Power

e a CDGeDispatch InsParameters er with a Dand

atch InstructDe-synchron

Reactive Powshall be red

ion 2.0

at each nominal collapse

nditions, utput at

Power n unless nt).

certain Power

n, and a sorption rsons or

ny point mporary achieve PWP as

on Point and may ease in

nly in its constant de must e in the

Reactive mode of ssary to r safety

lay and r period

DGenset r output

nset is struction may be

Dispatch

tion for nisation

wer, it is uced to

Page 250: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 6 of 1

SDC 2.OETC m

AncillaryWhen another thaservices

Tests An instru

SDC2.5Each Po

the Pow

Dispatch

Each Po

rate in ac

To prese

Emergen

Producer

Producer

prejudice

SDCPower PInstructiooccurs apurely on

SDCIf OETCOperatinOperatioAvailabiliapplicablthe Poweconfirme

SDCA PowerUnits at dependeof the CD

ctricity Transmi

0

.4.5 Freqay instruct a

y Services n agreementan those covmay be issu

uction may b

5 Actionower Produc

wer Produce

Code regar

wer Produce

ccordance w

erve Transm

ncy Instructio

r and may re

r will use r

e to the safet

C2.6 Syroducers wi

on from OETutomatically

n safety grou

C2.7 Ins fails to issg Parameten of such City and/or Ole Availabiliter Producerd in writing)

C2.8 Rer Producer mthe Productnt on the ev

DGenset.

ission Compan

uency Sea change to

t exists betwvered in this ued.

e issued to c

n requirecer will comp

r has given

rding non-ac

er must utili

with the Oper

mission Sys

ons. Such E

equire an ac

reasonable

ty of the Pla

ynchronisll only SyncTC. De-syncy as a resultunds.

structionsue a new er change thCDGenset an

perating Paty and/or Opr will use reof its intend

equest fomay request tion Facilitie

valuation by

ny

ensitive Mor from the F

ween OETC Grid Code,

carry out tes

ed from thply with all D

n notice to

cceptance of

se the relev

rating Param

stem integr

Emergency In

ction or respo

endeavours

nt or Person

sation/Dechronise or Dchronisation t of CDGens

ns followiDispatch In

hen the relend/or Desalinrameters un

perating Paraeasonable eded action an

or OperatiOETC agre

es to be opeOETC of the

The Grid

Mode Frequency S

or PWP andDispatch In

sts as requir

he PowerDispatch Ins

OETC und

f Dispatch In

vant run-up o

meters.

ity under E

nstructions w

onse that is

s to achiev

ns.

e-synchroDe-synchron

may take pset or Trans

ng Operanstruction wvant Power nation Unit t

ntil OETC issameters. Pr

endeavours nd timing.

ion undeeement for oerated undee risk to the

d Code - Versio

Sensitive Mo

d a User for structions re

ed under OC

r Producestructions co

er the prov

nstructions.

or run-down

Emergency

will be issue

outside Ope

ve these Em

onisationnise CDGensplace withoumission pro

ating Parawithin 15 mir Producer sto bring its Osues a new ior to makinto advise O

r Risk of one of the Cer Risk of Tr

Total Syste

on 2.0

G-

ode for each

provision ofelating to the

C9.

er orrectly give

visions of th

n rate and lo

Conditions

d by OETC

erating Para

mergency In

n sets in resp

ut OETC's ptection oper

ameter cinutes of beshall be entOperation wDispatch In

ng such a chOETC (by te

Trip CDGensets arip. OETC's m arising fro

G - SDC2 Vers

CDGenset.

f Ancillary See provision o

en by OETC

he Scheduli

oading or de

OETC may

direct to the

ameters. The

nstructions

onse to a Dprior agreemrations or it

hanges eing notifieditled to chan

within the apnstruction wihange in Opelephone an

and/or Desaagreement

om the poten

ion 2.0

ervices, of these

C unless

ng and

eloading

y issue

e Power

e Power

without

Dispatch ment if it

is done

d of an nge the plicable thin the eration, nd then

alination will be

ntial trip

Page 251: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 7 of 1

SDCInstructiorespect oof the GeUsers at include;

a req

an in

an in

SDCOETC shInstructiowriting w

Each Usan unforebe notifieInstructio

Each parlogs.

ctricity Transmi

0

C2.9 Insons to Usersof that Scheeneration Sceach Contr

quirement fo

nstruction to

nstruction to

C2.10 Cohall issue Dons in writin

within 2 minut

er must comeseen probleed by telephon. OETC sh

rty shall ente

ission Compan

structions relating todule Day at

chedule and rol Centre in

or Demand r

effect a Loa

switch in a

ommunicispatch Instg within 5 mtes of receip

mply without em arising thhone withouthall confirm t

er all Dispat

ny

ns to User the Schedut any time dDesalination relation to s

reduction, de

ad transfer b

Demand Int

cations wtructions to minutes. All pt.

delay with hat preventst delay and the notificati

ch Instructio

The Grid

rs ule Day shauring the pen Schedule.special actio

e-energisatio

between Con

tertrip Schem

ith UsersUsers by teUsers must

all Dispatchs the carrying

not later thon in writing

on sent and

d Code - Versio

all be issuederiod beginn OETC will ions and Dem

on or restora

nnection Poi

me.

s elephone. OEt acknowled

Instructionsg out of a Dian 5 minute

g within 5 mi

received an

on 2.0

G-

d as a list oing immediassue instrucmand Contro

ation;

ints; and

ETC shall cdge all Dispa

s received bispatch Instres after recenutes of rec

nd all events

G - SDC2 Vers

f special acately after thctions directlol. instructio

confirm all Datch Instruc

by it. In the eruction, OETeipt of the Deipt.

s into the res

ion 2.0

ctions in he issue y to the

ons may

Dispatch ctions in

event of TC must Dispatch

spective

Page 252: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Page 8

App

1 OETCOETC

DispaOETC

In all logs b

A Dis

a)b)

c)d)

e)

f). All GSet Land where

2 Any fform;

If theto be

If the

3 Whento Sy

The i

Electricity Tra

8 of 10

pendix A.

Format oC shall give C shall confi

atch InstructC in writing w

cases, all Dby the sende

spatch Instru

. an exchan

. the specapplies;

. the outpu

. if the statime will b

. where speor Generconcernedthe issue

eneration SLoading Ratein accordaever possibl

A Dispatfax, e-mail, o

“This is O

“Operator

e time of the achieved is

"Genset I

start time is

" Genset

CDGensn issuing insynchronise d

instruction w

“Genset 1

nsmission Com

.

of DispatcDispatch In

irm the Disp

tions shall bewithin 5 min

Dispatch Inser and by the

uction shall i

nge of operaific CDGens

t to which it rt time is dibe included; ecific Generration Set d, a specifictime of the iet Run-Up Tes/ Generatnce with Ole, be kept s

tch Instrucor telephone

Operator A. T

r Z at Produc

instruction s 25MW, the

to 25MW, in

s 1415 hours

1 to 25MW,

set Synchrostructions, Oeclared to O

will follow th

1 Synchronis

mpany

Dispatch

h Instructinstructions toatch Instruct

e acknowledutes of rece

tructions ane receiver.

nclude the fo

ator names; set and/or

is instructedfferent from

ration Set RuLoading Ra

c target time/instruction.Times/ Geneion Set Delo

Operating Psimple, draw

ction to ince Dispatch In

To whom am

ction Facility

is 14:00 hourelevant par

nstruction tim

s, the instruc

start at 14:1

onising OETC will alwOETC by the

e form;

se at 16:00 h

The

h Instruc

on o Power Protion in writin

dged by the ipt.

d events sh

ollowing info

Desalination

d; m the time th

un-Up Time/ate/ Genera/rate;

eration Set Roading RateParameters ing as neces

crease or dnstruction or

m I speaking?

y X”

urs, the CDGrt of the inst

med at 14:0

ction will foll

15, hours, ins

ways have e Power Prod

hours, instru

e Grid Code - V

ctions

oducers andg within 5 m

recipient an

hall be entere

ormation;

n Unit to w

he instructio

/ Generationation Set D

Run-Down Ts will be assEach Disp

ssary from th

decrease or acknowledg

?”

Genset is Geruction woul

0 hours"

ow the form

struction tim

due regard ducer.

uction timed

Version 2.0

d Users by tminutes

d confirmati

ed into the r

which the i

on is issued

n Set Run-DDe-loading

Times and Gsumed to beatch Instruche following

output gement will

enset 1 and ld be.

m;

med at 14:00

for the time

at 13:00 ho

G- G - SDC2

telephone.

on sent to

respective

instruction

, the start

Down Time Rate are

Generation e constant ction will, formats.

follow the

the output

hours"

of Notice

urs.”

Version 2.0

Page 253: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Page 9

Unlesthe C

OETCthat t

If it sbe cashall follow

“G

4 The i

If the

“Gen

Both Param

Unlesbe br

5 To emaintwill b

a)

b)

c)

d)

e)

f)

6 All DTarge

CDGset o

FrequDispa

7 Tertiawith t

Electricity Tra

9 of 10

ss a loadingCDGensets a

C will issuethe CDGens

hould be neancelled befbe given by

w the form;

Genset I can

CDGensnstruction w

“Genset 1

instruction

set 1 Shutdo

of the abometers.

ss a separarought to 0 M

Voltage ensure adeqtained undee utilised.

increase/d

Maximum

Maximum

Increase (x])

Achieve conditions

Maintain aadjust CD

Frequenispatch Instret Frequenc

ensets are rut in the rele

uency controatch Instruct

Tertiary ary Reservethe Dispatch

nsmission Com

g programmeare to be br

a further Dset has Syn

ecessary for fore the Gey telephone

ncel Synchro

set De-Synwill follow the

1 Shutdown

De-Synchro

own at 14:00

ove instruct

te Reactive Mvar (at the

control insquate Systeer normal an

decrease Re

m Mvar outpu

m Reactive P

Generator tr

a target vos;

a target voltDGenset term

ncy controructions will cy when the

required to oevant PPA/P

ol instructiotion for Activ

Reserve will be spec

h Instruction

mpany

e is also giverought to Mi

Dispatch Insnchronised.

a Dispatch enset or CCand will be

onising instru

chronisinge form;

instruction t

nising time i

0 hours, inst

tions assum

Power Disppoint of sync

struction em voltage nd fault cond

eactive Pow

ut (or "maxim

Power absorp

ransformer t

oltage of (Y

tage of (YYkminal voltage

ol be deemed

CDGenset

operate in FrPWPA.

ns may be ve Power out

cifically instras an additi

The

en at the sanimum Gen

struction wh

Instruction fCGT Module

confirmed in

uction, instru

g

imed at 13:0

is for 14:00 h

truction time

me a run-do

patch Instrucchronism) p

profiles andditions a ran

wer to (XX )M

mum excitati

ption (or "mi

tap position

YYkV) and t

kV) until othee) as necess

d to refer tois in the Fre

requency Se

issued in ctput.

ructed as reional item in

e Grid Code - V

ame time it neration and

en the Pow

for a CDGenis Synchro

n writing with

uction timed

00 hours.”

hours, it will

ed at 13:00 h

own rate at

ction is giverior to De-sy

d Reactive nge of voltag

Mvar export o

on");

nimum excit

by (one) tap

then allow

erwise instrusary.

o target ouquency Sen

ensitive Mod

onjunction w

quired and w the form, fo

Version 2.0

will be assud 0 Mvar out

wer Produce

nset to Synconised, the ihin 5 minute

at 14:00 ho

follow the f

hours.”

t declared

en, the CDGynchronisatio

Power resege control in

or import;

tation");

p or go to ta

to vary wit

ucted. Tap c

tput at the nsitive Mode

de in the com

with or sepa

will normallyor example;

G- G - SDC2

umed that tput.

er reports

hronise to instruction es and will

urs.”

form;

Operating

Genset will on.

erves are nstructions

ap position

h System

change (or

instructed e.

mbinations

arate from

y be given

Version 2.0

Page 254: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Page 1

“G

8 The i

“I

9 All su

"This

It ma

“Tin

Electricity Tra

10 of 10

Genset I to 4

Black Stnstruction w

nitiate Black

Emergenuch instructio

s is an Emer

y be in a pr

This is an Enstruction tim

nsmission Com

40MW and 5

tart will normally f

k Start proce

ncy instrucons will be p

rgency Instr

e-arranged

Emergency med at 20:00

mpany

5MW Tertiar

follow the fo

edure, instru

ction prefixed with

uction".

format and

Instruction. 0 hours.”

The

ry Reserve, i

orm.

ction timed a

the words;

d normally w

Reduce ou

e Grid Code - V

instruction ti

at 19:00 hou

would follow

utput to (X)

Version 2.0

med at 14:0

urs.”

the form;

MW in (Y)

G- G - SDC2

00 hours.”

) minutes,

Version 2.0

Page 255: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman El

Page 1 of5

Sched

SDC3.1 SDC3.2 SDC3.3 SDC3.4

SDC3.5 SDC3.6 SDC3.7 SDC3.8

SDC3.9

ectricity Tra

5

duling a

IntroductioObjectiveScope ....ResponseSDC3.4.1SDC3.4.2SDC3.4.3SDC3.4.4Low FreqActions toActions toAction to SDC3.8.1SDC3.8.2Electric tim

nsmission C

nd Disp

on ............... .....................................e from CDGe1 Capability2 Frequenc3 OETC Di4 Low Frequency initiat

o be undertao be undertabe undertak

1 Actions d2 Actions dme ..............

Company

patch Co

CON

...................

...................

...................ensets ........y .................cy Sensitive ispatch Instrquency initiated responseaken by Interaken by Interken during suduring sustaiduring sustai...................

ode SDC

NTENTS

...................

...................

...................

...................

...................Mode ........

ructions ......ated response from Usersrnational Internally Intercoustained abnined low Freined high Fr...................

The Gr

C3 - Freq

...................

...................

...................

...................

...................

...................

...................se from Genss .................erconnectedonnected Panormal Freqequency conequency con...................

rid Code - Ve

quency CIssue

...................

...................

...................

...................

...................

...................

...................sets................................

d Parties ......arties ...........uency condditions ........nditions ..........................

ersion 2.0

G - SDC3 V

Control ed April 201

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................itions ...................................................................

Version 2.0

0

2 2 2 2 2 2 3 3 3 3 4 4 4 4 5

Page 256: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman El

Page 2 of5

Sched

SDC3.To maintmust be allow OEand the EThese pr Gens Dema Dispa

SDC3 is

SDC3.2The objemaintain possible)

SDC3.3In additio Powe Users Licen Direc Intern Intern RAEC PWP

SDC3.4

SDC3.4Each CDprovide rwith in ac

SDC3.4FrequencGenset wpermits Responsin the Acassists rePower oPersons

ectricity Tra

5

duling a

1 Introdutain the secumaintained w

ETC to meetElectric Timerocedures insets operatinand Control;atch of Genscomplemen

2 Objectective of SC

the security) to maintain

3 Scopeon to OETC er Producerss;

nsed Distribuctly Connectenally Interconational InteC if Connect

P (for informa

4 Respo

.1 CapabiliDGenset muresponse to ccordance w

.2 Frequency Sensitivewill change the Genset

se and/or Sective Power ecovery to T

output of a or Plant) or

nsmission C

nd Disp

uction urity and quawithin specift its License e within specclude;

ng in a Frequ; and sets. tary to SDC

tive D3 is to clay and qualityn the Electric

and PWP, Ss;

utors; ed Consumennected Parrconnected ted to the Toation).

onse from

ity ust at all timchanges to

with the requ

ncy Sensitie Mode is thautomaticalt to operate

econdary Reoutput of a

Target FrequCDGenset to ensure th

Company

patch Co

ality of electfied limits. Srequiremen

cified limits.

uency Sensi

1 and SDC2

rify the Freqy of electricic Time in acc

SDC3 applie

ers; rties; Parties;

otal System;

m CDGens

mes have th System Freirements of

ve Mode e generic dely in respone in accordsponse. A PCDGenset

uency. The omust be ca

he integrity o

ode SDC

ricity SupplySCD3 describnt to maintain

tive Mode;

2.

quency contity Supply frcordance wit

s to;

and

sets

he capabilityequency. Tha relevant P

escription wnse to changdance with Power Produinduced by

only exceptioarried out onof the Gener

The Gr

C3 - Freq

y, the Frequebes Frequenn the Freque

rol procedurrom the Totath the limits

y to operatehis will be prPWPA or PP

hereby the Ages in Syste

an instructucer must noa change in

ons are when safety groating Plant.

rid Code - Ve

quency C

ency of the ncy control pency of the

res requiredal System aspecified in

e automaticarovided for a

PA.

Active Poweem Frequention to provot counterman System Frre a changeounds (relat

ersion 2.0

G - SDC3 V

Control

Total Systemprocedures tTotal System

d by OETC tand (as far a

this code.

ally so as tand complie

er output of cy. This alsvide Primarand a changrequency thae in the Activting to eithe

Version 2.0

m to m

to as

to ed

a so ry

ge at ve er

Page 257: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman El

Page 3 of5

SDC3.4OETC wthe requiMode areOETC wiThe Freqpoints be50.10Hz.fall to 48

SDC3.4If Frequmaintaineprovided the powethat assisCDGensThereaftethe Plantthey are If the Fretake actioto disconOETC inPlant hel

SDC3.5LicensedOC4 – Devent of The situa Plann

initiat De-e

relays

SDC3.6

OETC shabnormaadjacent be to maplace to a

ectricity Tra

5

.3 OETC Dill issue Dispirements of e required toill give 15 mquency of thetween 49.9. Under tran.00Hz.

.4 Low Freuency falls ed. CDGensthat the Sy

er increase osts recoveryets shall remer, CDGenst but should Available to

equency of thon to protec

nnect CDGenn certain circd as Tertiary

5 Low Frd Suppliers Demand Con

low Frequenations coverened manualted by OETCnergisation s to preserv

6 ActionsParties

hall agree wal Frequency

Systems shaintain their Sassist this.

nsmission C

ispatch Inspatch InstrucFrequency

o operate takinutes noticee Total Syst5Hz and 50

nsient disturb

equency inbelow Tar

sets that haystem Frequof a CDGen

y to Target Fmain Conne

sets may bebe kept run assist Totalhe Total Sysct their Genensets from thcumstances y Reserve to

requency and Directly

ntrol that setsncy. ed in OC4 rel de-energisC; and of Demand e Total Syst

s to be uns with Internatiy that couldhall endeavoSystems in O

Company

structionsctions to regcontrol. Gen

king into acce of variationtem shall be.05Hz. Normbed conditio

itiated resprget Frequeave provideduency is abonset inducedrequency.

ected to the de-energise

nning to suppl System recstem falls beerating Planthe Transmismay issue

o be synchro

initiatedy Connectes out the pro

elevant to acsation or em

by automattem security

ndertake

ional Intercod occur dueour to providOperation. S

ulate the Frenerating Placount the Tan of Target Fe nominally 5mal control dons, System

ponse fromency, outpud Primary Rove 47.5Hz. d by a chang

Total Systeed from theply local Decovery promelow 47.5Hz,t and in suchssion System

Emergencyonised and G

responsed Consumeocedures tha

ction in the emergency m

tic Demand .

n by Inte

onnected Pae to events e mutual su

Suitable auto

The Gr

equency of tant operatingrget Freque

Frequency. 50.00 Hz witdeviations w

Frequency

m Gensetst from the

Response shA Power Pr

ge in Freque

em at Freque Total Systemand whereptly. , Power Prodh circumstanm does not ay InstructionGenerate ou

se from Uers shall folat may be in

event of low manual de-e

shedding e

rnational

arties plans on either Spport but the

omatic relayi

rid Code - Ve

the Total Syg in Frequenncy notified

th System Fill not exceecould rise t

CDGensehall not be roducer musency of the T

uencies dowem to ensurever possible

ducers will bnces the reqapply. s to CDGentput.

sers low the req

nstructed by

Frequency ienergisation

equipment a

l Intercon

of action in System. Whe over-ridingng may nee

ersion 2.0

G - SDC3 V

ystem to meency Sensitivby OETC.

Frequency seed 49.90Hz to 51.50Hz o

t should bde-energisest not reducTotal System

wn to 47.5Hzre integrity oe and so tha

be required tquirement no

nsets and fo

quirements oOETC in th

include; of Deman

nd automat

nnected

the event oere possible

g priority shaed to be put i

Version 2.0

et ve

et to or

be ed ce m

z. of at

to ot

or

of he

nd

ic

of e, all in

Page 258: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman El

Page 4 of5

SDC3.7Par

OETC shabnormaPlant owMode anOETC mParty redThe oveSystems automatiOETC wthe optimrelaying and costOETC wi

SDC3.8

SDC3.8OETC shInstructiomaximisecontrol. OETC sConsumeGeneratipoint ran Cons Cons Plann

initiat

SDC3.8CDGensprovided MinimumPower PrequiremIn the evCDGensCDGenswith Disp

ectricity Tra

5

7 Actionsrties hall agree w

al Frequencywned by the

d respond pay also agre

duces Demaer-riding prio

in Operatioc relaying mill discuss ea

mum solutiosystem unlets fall to theill determine

8 Action Freque

.1 Actions hall issue inons will be e CDGenset

shall also iers to instituon output ange. The inst

sumer Demasumer Demaned manualted by OETC

.2 Actions ets that hathat the Sy

m GenerationProducer is

ment to makevent of the Fet action hasets to bring

patch Instruc

nsmission C

s to be un

with Internay occurring oInternally In

positively to aee Demand and on instruority of Inteon and be amay have toach situationn for that s

ess the sole e other parte and implem

to be undency cond

during susnstructions tgiven to Pot output whil

ssue instruute pre-arrannd so restoretructions maand Control iand Control il de-energisC, possibly in

during susave providedstem Frequen. If the Fre

required te all reasonarequency of s taken placthe Frequen

ctions to retu

Company

ndertake

ally Interconnon the Totanterconnecteattempts to cControl arra

uction from Oernally Interable to assiso be put in pn with the resituation. OE

beneficiary ty. If OETC

ment the req

dertakenditions

stained lowto minimise ower Producst maintainin

ctions to Lnged Demane the Frequey include; nitiated by Lnitiated by O

sation or emncluding rota

stained higd negative ency is beloequency of to take acti

able efforts tof the Total Syce, OETC shncy of the Tourn the Frequ

n by Inte

nected Partl System. Ted Party to correct the F

angements wOETC or by arconnected st OETC in place to assespective paETC will imis the otherand the ot

uired relayin

during s

w Frequenthe duratio

cers to synng some res

Licensed Dnd Control toency of the T

Licensed DisOETC; andmergency ma Demand s

gh FrequenPrimary Re

ow 51.50 Hz the Total Syion to proteo avoid trippystem becom

hall issue Disotal System uency to Tar

The Gr

rnally Int

ties plans oThese plans

be operatedFrequency dwhereby the automatic unParties sharestoring thesist safe separty and theyplement andr party in whther party cng system.

sustained

ncy conditin of any lowchronise Av

serve Capac

istributors ao reduce DeTotal System

stributors;

manual de-eshedding.

ncy conditesponse shaand the CD

ystem is at ect the Ge

ping does noming stable spatch Instruto 50.00 Hz

rget Frequen

rid Code - Ve

terconnec

of action in shall requir

d in Frequeneviation. Internally Innder Frequeall be to me Total Systparation of ty should joind meet the hich case imcannot reach

d abnorm

ons w Frequencvailable CDcity to manag

and Directlymand to ma

m to within th

energisation

tions all not be

DGenset loador above 5

enerating Plot apply.

above 50.50uctions to triz or below ancy.

ersion 2.0

G - SDC3 V

cted

the event oe Generatinncy Sensitiv

terconnecteency relays.maintain thetem. Suitablthe Systems

ntly determincosts of th

mplementatioh agreemen

al

cy conditionsGensets ange Frequenc

y Connecteatch Availablhe normal se

of Deman

de-energiseding is abov

51.50 Hz, thlant and th

0 Hz, after ap appropriatnd follow th

Version 2.0

of ng ve

ed

eir le s.

ne he on nt,

s. nd cy

ed le et

nd

ed ve he he

all te is

Page 259: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman El

Page 5 of5

SDC3.9OETC sh10 seconDispatchScheduleOETC sh

ectricity Tra

5

9 Electrichall endeavonds of Oma Instruction

e and forecahall be respo

nsmission C

c time our (in so faran official timns, taking iast Generatinonsible for m

Company

r as it is ableme by specnto accounng Plant/Dem

monitoring an

e) to control cifying changnt the Genemand marginnd recording

The Gr

Electric Timges to Targeration Schns. Electric Tim

rid Code - Ve

me to within pet Frequenc

hedule and

me error.

ersion 2.0

G - SDC3 V

plus or minucy as part oDesalinatio

Version 2.0

us of on

Page 260: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page

ASASASAS

ASASASAS

n Electricity

1 of 7

SC 1 IntroSC 2 ObjeSC 3 ScoSC 4 Req

ASCASCASC

SC 5 AncSC 6 AncSC 7 AncSC 8 OET

Transmissio

An

oduction ......ectives ........pe ..............

quirement foC4.1 ReguC4.2 ReacC4.3 Systecillary Servicecillary Servicecillary ServiceTC instructio

on Company

ncillary

CO

...................

...................

...................r Ancillary S

ulation of Sysctive Power aem restoratioe contractuaes provided es provided

ons to Users

y

Service

ONTENTS

...................

...................

...................Services ......stem Frequeand voltage on ...............al arrangemeby Power Pby Users ... ..................

The G

H - Ancill

es Code

S

...................

...................

...................

...................ency ............control ...........................ents ............

Producers ..........................................

Grid Code - V

ary Services C

Issue

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

Version 2.0

Code Version 2

ed April 201

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

.0

0

2 2 3 3 3 4 4 4 5 5 6

Page 261: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 2

Anc

ASC

Ancilrequi

OETC

OaS

Ocoth

This contrAncilsets requi

ASC

The o

toin

tofr

toA

n Electricity

2 of 7

cillary S

C 1 Intro

lary Serviceres to opera

C has a num

OETC is requhead when

SCD1); and

OETC is reqooperate withe PWP from

Ancillary Seractual arranlary Servicedown the rements for

C 2 Obje

objectives of

o list the Ancn accordance

o clarify the rom Power P

o clarify the Ancillary Serv

Transmissio

Services

oduction

es are serviate the Trans

mber of spec

uired to enspreparing t

quired by tth PWP in d

m Production

ervices Codengements goes to be prov

form of insAncillary Se

ectives

f the ASC ar

cillary Service with statut

contractual Producers an

process forvices.

on Company

Code

ices ancillarsmission Sys

cific obligatio

ure sufficienthe Generat

the terms odetermining n Facilities.

e (ASC) listoverning thevided by Postruction thervices.

re as follows

ces that OETtory requirem

arrangemennd Users; an

r scheduling

y

ry to the trastem in acco

ons regarding

nt Ancillary Stion Schedu

of the Tranwhich Ancil

s the Ancillae provision wer Producat will be

s;

TC requires ments;

nts governinnd

and instruc

The G

H - Ancill

ansmission ordance with

g Ancillary S

Services wilule and Des

smission anlary Service

ary Servicesof such serers and otheused by O

to operate t

g the purch

cting the req

Grid Code - V

ary Services C

of electricityh its statutory

Services;

l be availabsalination Sc

nd Dispatches should be

s required brvices and der Users. Th

OETC to im

the Transmis

ase of Ancil

quirements f

Version 2.0

Code Version 2

y that OETCy obligations

le on the dachedule (se

h Licence te procured b

by OETC, thdetails of thhis code als

mplement th

ssion System

llary Service

for the use o

.0

C s.

ay ee

to by

he he so he

m

es

of

Page 262: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 3

ASCIn ad

P

P

L

L

D

In

In

R

ASCThe r

R

R

B

ASC

OETC

DurinSyste50.05excee

Undeto 48

The Demaall timSysteFrequ

The GcontrautomGensOETC

Frequarranpurpo

n Electricity

3 of 7

C 3 Scopdition to OE

PWP (as the

Power Produ

icensed Dist

icensed Sup

Directly Conn

nternational

nternally Inte

RAEC if Conn

C 4 Requrequirements

Regulation of

Reactive Pow

Black Start ca

C4.1 Regu

C is required

ng normal opem shall be5Hz. Duringed 49.90Hz

er disturbed .0 Hz.

Frequency oand and totames sufficienem to respouency chang

Grid Code rerol. Synchronmatic governsets throughC.

uency contngements woses of Activ

Transmissio

pe TC, ASC ap

purchaser o

cers;

tributors;

ppliers;

nected Cons

Interconnec

erconnected

nected to the

uirements for Ancillar

f System Fre

wer and volta

apability for

ulation of S

d to maintain

perating cone 50.00 Hzg exceptionato 50.10Hz

conditions,

of the Total al Available nt Generatio

ond automatge.

equires all Cnised Gensening systemh changes

trol can alwith Users th

ve Power ba

on Company

pplies to;

of Ancillary S

sumers;

cted Parties;

Parties; and

e Total Syst

t for Anciry Services c

equency;

age control;

System Res

System Fr

n Frequency

nditions, the z and will bal steady sunless distu

System Fre

System is Generation

on Capacity ically to Act

CDGensets tets can provs. Frequenin output in

lso be prohat allow dealance and F

y

Services from

d

em.

llary Servcan be categ

and

storation.

equency

y within the fo

nominal Sysbe controlletate conditi

urbed circum

equency cou

responsive n Capacity. O

and Demantive Power i

to have the vide continucy control w

n response

ovided throemand to beFrequency c

The G

H - Ancill

m Power Pro

vices gorised as fo

ollowing limi

stem Frequeed normally ons, Freque

mstances pre

ld rise trans

to changes OETC must nd is Availabmbalances

capability toous Freque

will also be ato Dispatch

ough Demae adjusted fcontrol.

Grid Code - V

ary Services C

oducers);

ollows;

its.

ency of the Tbetween 4

ency deviatevail.

siently to 51

in the balatherefore e

ble and Conand correct

o contribute ncy control

assisted by h Instruction

and Side for short pe

Version 2.0

Code Version 2

Transmissio49.95Hz antions will no

.50 Hz or fa

nce betweeensure that anected to thany credibl

to Frequencthrough thesynchronisens issued b

Managemeneriods for th

.0

on nd ot

all

en at

he le

cy eir ed by

nt he

Page 263: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 4

ASC

OETC220kVwill re+10%

The vSitesabno

Durincollap

VoltaTransof thePowediffersourc

UnlikvoltagsourcReacinterc

The mby comp

ASC

BlackShutdproceGrid

BlackProdhave

ASC

The agreePWP

OETCproviPWP

n Electricity

4 of 7

C4.2 Reac

C is requireV and 132kVemain within

%. voltage on t with Users rmal conditio

ng some Syspse transien

age regulatismission Sye Transmisser. Reactiverences and ices of Capac

ke Frequencyges at diffeces of demactive Power connected S

managemenCDGensets

pensators/re

C4.3 Syst

k Start is an down or Totedures to beCode.

k Start capaucers in accBlack Start

C 5 Anci

Sector Lawement betwe

P or (ii) an ag

C can enteded the fac

PA with PWP

Transmissio

ctive Powe

ed to maintaV parts of thn the limits

the 33kV anwill normallyons prevail.

stem Disturbntly to zero a

ion requiresstem to be c

sion System e Power flow

t is thereforcity and dem

y, which is rent points and and Ca

flows acroSystem thus

nt of voltage , Autogen

eactors.

tem restora

Ancillary Setal Shutdowe followed in

ability woulcordance wi capability.

illary Ser

w requires een a Licensgreement es

er Ancillary cilities proviP.

on Company

er and volt

ain voltage ce Transmissof a minimu

nd 11kV sidy remain wit

bances suchat the point o

s both Actcarefully conalso give ris

ws across thre necessarymand on a “z

consistent aon an interc

apacity, by toss the netform a “volta

requires conerators, or

ation

ervice requirewn of the Syn Black Star

d normally th the terms

rvice cont

that Ancillased Generattablished un

Service Ading the An

y

age contro

control withision Systemum voltage

es of Transthin the limit

h as where sof fault until t

tive and Rntrolled. These to the Gehe System y to maintainzonal” basis.

across an inconnected Sthe prevailintwork. The age profile’.

ntrol of Reacr by mea

ed to restoreystem. Systert situations

be Availabs of a PPA o

tractual a

ary Servicestor or a Lice

nder the Grid

Agreements ncillary Serv

The G

H - Ancill

ol

in certain lim at each Coof -10% and

smission trants +/-6% of t

short circuitshe fault is cl

Reactive Poe physical cheneration ancan give risn Reactive P

nterconnecteSystem are ng network c

voltages a

ctive Power ans of s

e the Total Sem Restoratare dealt w

le as requior PWPA. A

arrangem

s are providensed Gened Code or th

with Usersvices are n

Grid Code - V

ary Services C

mits. The vonnection Sitd a maximu

nsformers athe nominal

s occur, theleared.

ower flows haracteristicnd absorptionse to substaPower balan

ed Transmisdetermined

configurationat different

and this cansynchronous

System followtion Procedith in section

red from ceAutogenerat

ments

ded for in rator/Desaline Distributio

s for Ancillaot party to

Version 2.0

Code Version 2

oltage on thte with a Useum voltage o

at Connectiovalue unles

voltage ma

across ths of the Plann of Reactivantial voltagnces betwee

sion System by the locan and by thpoints on

n be provides or stati

wing a Partiaures and thn OC7 of th

ertain Powetors may als

either (i) anator and th

on Code.

ary Servicea PPA or

.0

he er of

on ss

ay

he nt ve ge en

m, al

he a

ed ic

al he he

er so

an he

es a

Page 264: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 5

OETCrequiacco

The Licenand c

All AAgreerequi

ASCThe PPowecapaActiveSysteRespPowe

The Tmust CDGan ov

OETCin its Powelimit lrotor-D of O

Eachover Automis Sy

It is ewill bmust

ASCOETCConnof AnBlack

LicenPWPof De

n Electricity

5 of 7

C is resporements bordance with

Transmissionce require contracting f

Ancillary Serement sharements of t

C 6 AnciPPA or PWPer ranges foble of contre Power anem in whichponse, Secoer response

Turbine Specontrol the enset. The verall speed

C may instruGenerator P

er capability ine (leading -heating limitOC2.

CDGenset the entire opmatic Voltagnchronised u

essential thabe provided

be declared

C 7 AnciC may havnected Consncillary Servik Start capab

nsed SuppliePA may makeemand.

Transmissio

nsible for th in the shthe System

on and DisOETC and for Ancillary

rvices whethall be utilisthe Grid Co

illary SerPA for each or each CDributing to Fnd Reactive h it is Embeondary Respfrom Power

eed ControlleActive Powespeed gove droop of be

uct a CDGenPerformanceand registeReactive Po

t. The React

should be cperating ran

ge Regulatorunless other

at OETC hasin accordan

d in the Daily

illary Serve Ancillarysumers and/oces such asbility.

ers, Directly e arrangeme

on Company

identifying hort term, whm expansions

spatch Licethe PWP toServices.

her providesed in accde.

rvices proPower Prod

DGenset. It Frequency a

Power supedded. Thesponse and Tr Producers.

er of a CDGer output wit

ernor shall between 3.0%

nset to operae Chart. Thisred Minimumower) and thtive Power li

capable of pge without ir which shourwise instruc

s Black Startnce with a Py Status For

rvices proy Service Aor other Uses Demand C

Connected ents for the

y

the Transmhen preparis plans of th

nce and tho liaise and

d through acordance w

ovided byducer shall salso shall snd voltage c

pplied to these services Tertiary Res

Genset in co-th stability o

be capable o% and 5.0%.

ate anywheres envelope ism Generatiohe lagging Rmits are sho

providing connstability. Tuld be in sercted by OET

t Capability PPA or PWPm.

ovided byAgreements ers not partyontrol, Reac

Consumers switching ou

The G

H - Ancill

mission Sysng the day

he PWP.

he Power acooperate o

a PPA, PWwith OETC

y Power Pstate the Acstate that eacontrol by c

e Transmisscover the r

serve and th

-ordination wover the entiof being set.

e within the os contained

on and betweactive Powown by way

nstant voltagThis shall bervice at all timTC

Available toPA. Non-ava

y Users with Licen

y to a PPA octive Power

or other Usut of or a re

Grid Code - V

ary Services C

stem Ancillaahead Sche

and Water on the issue

WPA or AnciC instruction

Producerctive Power aach CDGen

continuous msion Systemrequirementshe provision

with other core operatingt so that it o

operating enbetween deeen the pra

wer line deterof illustration

ge control at by a continmes when th

o it. Black Stailability of t

nsed Supplr PWPA for output and r

ers not partyduction in d

Version 2.0

Code Version 2

ary Serviceedule, and i

Procuremene of providin

illary Servicns and th

rs and Reactiv

nset must bmodulation o or the Uses for Primarn of Reactiv

ontrol deviceg range of thoperates wit

velop defineeclared Activctical stabilitrmined by thn in Append

t its terminauously actinhe CDGense

art Capabilitthis capabilit

iers, Directthe provisio

response an

y to a PPA oiscrete leve

.0

es in

nt ng

ce he

ve be of er ry ve

es he th

ed ve ty

he ix

ls ng et

ty ty

ly on nd

or ls

Page 265: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 6

Switc

inn

inD

An AFrequemerbetwe

AdditDistriof Reor sw

OETC

AutogBlackEmerthis pStart

ASC

OETCday aby 1requi

Potenas a g

InstruissueperioDesainstruDema

a

a

a

a

The pBlack

n Electricity

6 of 7

ching out of

nstructions fetworks; and

nstructions fDemand.

Ancillary Seruency relayrgencies. Theen OETC a

tionally, Anbutors and/o

eactive Powewitched static

C will instruc

generators ok Start caprgency Condpurpose. OEcapability at

C 8 OET

C will normaahead Sched6:00 hours rements.

ntial requiremguide to the

uctions to Aned as a list od beginning

alination Schuctions direcand Control.

requiremen

n instruction

n instruction

n instruction

procedure fok Start situa

Transmissio

Demand or

rom OETC d

from OETC

rvice Agreeys to switchhe Frequencand the User

ncillary Seror other Useer capabilityc Plant.

ct the use of

or other Usepabilities to ditions. AppETC would t the approp

TC instruc

ally scheduleduling planson the da

ments are nexpected o

ncillary Servof special acg immediathedule at 1ctly to the Us. Instructions

nt for Deman

n to effect a L

n to switch in

n to switch in

or a Black Station as prov

on Company

reduction of

or a License

to assist

ment may h off Demacy settings r.

rvice Agreeers not partyy and/or resp

f such Ancilla

ers with GenOETC to

propriate comissue the ne

priate time.

ctions to

e the requires provided foay preceding

not firm Instrutput require

vice Providections in resptely after t16:00 hourssers at eachs may includ

nd reduction,

Load transfe

n a Demand

n or out Reac

tart situationvided for in

y

f Demand ma

ed Distributo

in matching

also provideand to assand any tim

ements wity to a PPA oponse. This

ary Services

nsets not ceassist res

mmercial arrecessary ins

Users

ements for uor in Code sg the releva

uctions but ements from

ers relating topect of that Sthe issue s as provid Control Cen

de;

, de-energis

er between C

Intertrip Sch

ctive control

n will be that OC7. User

The G

H - Ancill

ay take plac

or to reduce

g Available

e for automsist System me delays o

th Licenseor PWPA mamay be pro

s at the appr

entrally Dispatoring the rangements structions ca

use of Ancillection SDCant Schedu

are indicativm Ancillary S

o the SchedSchedule Daof the Geed for in Sntre in relati

ation or rest

Connection P

heme; and

l plant.

specified byrs shall abid

Grid Code - V

ary Services C

ce following;

e Load on th

Active Pow

matic operatresponse

of relays w

d Supplieray provide fo

ovided from r

ropriate time

atched may Total Systemay be pu

alling for the

lary Service1. Users wil

ule Day of

ve only, and ervice Provi

dule Day wilay at any timneration ScSDC2. OETon to specia

toration;

Points;

y OETC at thde by OETC

Version 2.0

Code Version 2

he respectiv

wer output t

tion of undein cases o

ill be agree

rs, Licenseor the Supprotating Plan

e.

wish to offeem followin

ut is place fouse of Blac

s within in itl be informethe potentia

are provideders.

l normally bme during thchedule an

TC will issual actions an

he time of thC instruction

.0

ve

to

er of ed

ed ly nt

er ng or ck

ts ed al

ed

be he nd ue nd

he ns

Page 266: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oma

Page 7

durinopera

OETC

a Eco

a re

a ex

n Electricity

7 of 7

g a Black Stational capa

C may issue

Production Embedded ommenceme

Licensed estoration of

Productionxternal Pow

Transmissio

tart situationbility of the P

e instructions

Facility withProduction ent of GeneDistributor

f Demand; an Facility reer Supply is

on Company

n provided thPlant.

s to;

h Black StarFacility w

ration outpuor to a D

nd elating to co made availa

y

he instructio

rt Capability with Black

t; Directly Con

ommencemeable to it.

The G

H - Ancill

ns are to op

or to a LiceStart Cap

nnected Co

ent of Gene

Grid Code - V

ary Services C

perate within

ensed Distripability rela

onsumer rel

eration outp

Version 2.0

Code Version 2

the declare

butor with aating to th

ating to th

put when a

.0

ed

an he

he

an

Page 267: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Mete

MDMDMDMD

MD

MD

MD

MD

Electricity Tra

Meter

ring and Dat

DEC.1 IntDEC.2 ObDEC.3 ScDEC.4 Ge

MDEC.5 El

MMMM

DEC.6 WMMMM

DEC.7 DaMMMMM

DEC.8 MMM

nsmission Com

P 1 f 38

ring And

ta Exchange

troduction bjectives cope eneral DEC.4.1 Mectricity MetDEC.5.1 GDEC.5.2 MDEC.5.3 MDEC.5.4 M

Water Meters DEC.6.1 GDEC.6.2 WDEC.6.3 WDEC.6.4 Wata ExchangDEC.7.1 GDEC.7.2 DDEC.7.3 MDEC.7.4 MDEC.7.5 Deter and DaDEC.8.1 EDEC.8.2 W

mpany

d Data E

CO

e Code

Meter and MtersGeneralMeter, CT anMetering SysMeter and da

GeneralWater Meter Water MeterWater Meter geGeneralData exchanMeter data vMeter data cData display ta Exchange

Electricity MeWater Meter

The

Exchang

ONTENTS

etering Syst

nd VT requirstem Calibraata security

requiremening System and data se

ge requiremalidation andommunicatioand storage

e Code Revieter and DatSystem rev

e Grid Code - V

I MDEC V

ge Code

S

tem ownersh

rementsation and tesand registra

tsCalibration a

ecurity and r

ments and flod quality cheons systemeiewta Exchange

view

Version 2.0

i 2 0

Issued J

hip

stingation

and testing registration

owsecks

e Code Revi

January 200

2

2 3 3 3 4 5 5 5 8

10 12 12 12 13 15 16 16 17 18 18 20 22

ew 22 24

08

Page 268: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDEAll ADistriMete

Similausing

The includ

The rto thewhom

ReferPerso

Electricity Tra

METE

EC.1 IntroActive and bution Systring System

arly all Watg one or mor

metering ofding;

i) foexLic

ii) foCo

iii) foPr

iv) fobe

v) foap

vi) fomomta

vii) foPe

viii) sucoGr

requirementse metering

m this code a

rences in Mons under an

nsmission Com

P 2 f 38

ERING A

oductionReactive Ptems of Lic

ms. Electricit

ter exiting Pre Water Me

f all such q

r the purposxiting the sycensed Distr the purpoonsumer prer the purposroduction Far calculating

etween Persr certain co

pplies; r the provisionitoring anatters, incluriffs and the r the purposersons who uch other puonnection wirid Code. s of this Metand data eapplies.

MDEC to Meny agreeme

mpany

AND DAT

Power entercensed Opey delivered t

Production Feters or Wate

quantities an

se of establisystems of aribution Syst

ose of estabemises; se of establiacilities; g amounts

sons to whomontractual p

on of data tond enforcemuding the ca

monitoring se of establare bound brposes as mth matters c

tering and Dxchange req

eter Owner nt with a thir

The

TA EXC

ring or exiterators shato Consume

Facilities’ siter Metering S

nd flows is

shing a recoa Licensed Ttem Operato

blishing the

ishing a rec

to be paim this code aurposes be

o the Regulament of Licealculation aof the electrlishing compby it; and may be expecontemplated

Data Exchanquirements

include Metrd party.

e Grid Code - V

I MDEC V

HANGE

ting the Trall be meter

er premises s

tes must beSystems.

required fo

ord of electriTransmissioors; quantities o

cord of the q

d in accorapplies;

etween Pers

atory Authorences, the and establisricity supply pliance with

edient or reqd by the Sec

nge Code (Mof agreeme

ters and Me

Version 2.0

i 2 0

CODE

ansmission red using oshall also be

e metered a

or a variety

ical quantitieon System O

of electricity

quantities of

rdance with

sons to who

rity in conneSector Lawhment of cmarket; the Grid C

uisite from tctor Law and

MDEC) are cents betwee

etering Syst

System anone or more metered.

and recorde

of purpose

es entering oOperator an

y delivered t

water exitin

agreemen

om this cod

ection with thw and relatecost reflectiv

ode by thos

ime to time d/or under th

omplimentan Persons t

ems used b

nd re

ed

s,

or nd

to

ng

ts

de

he ed ve

se

in his

ry to

by

Page 269: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDEThe o

Tm

Ta

Tmd

Td

It is invoicto thethe ti

MDEThe M

P

P

P

L

L

In

In

D

R

MDEassocOper

MDEMetedata and tcalcuapproaccur

Metewith requilong a

At eainstal

Electricity Tra

EC.2 Objeobjectives of

The standardmaintenance

The standardssociated w

The responsmanagement

ata; and

The responsiata.

important thces betweenem all necesmes at whic

EC.3 ScoMetering and

PWP;

PAEW;

Power Produ

icensed Dist

icensed Sup

nternational

nternally Inte

Directly Conn

RAEC if Conn

C is conceciated with rators, Distrib

EC.4 Genring Systemshall be recthen stored

ulate, assessopriate, charate basis.

r data shall other provisrements for as they do n

ach Electricalled, operat

nsmission Com

P 3 f 38

ectives f the Meterin

ds to be mof Metering

ds to be mith Metering

ibilities of et of Metering

bilities of all

hat all relevn such Persssary Meter

ch they requi

ope d Data Exch

cers;

tributors;

ppliers;

Interconnec

erconnected

nected Cons

nected to the

rned with thProduction

bution Syste

neral ms and Metecorded, chec, sufficient s and valid

allenge, invo

be permanesions of MD

Metering Synot prevent c

al and Wateed and ma

mpany

ng and Data

met in the Systems;

met by thos Systems;

each Persong Systems a

Persons bo

vant Personons with a v

r data of relire the same

hange Code

cted Parties;

Parties;

sumers; and

e Total Syst

he MeteringFacilities, t

em Operator

rs shall be ecked and exto ensure tate and, keoices as lis

ently recordeDEC. If a co

ystems or incompliance w

er Delivery Paintained an

The

Exchange C

provision, l

se bound b

n bound by and Meters

ound by MDE

s may prepview to theirable quality

e.

applies to O

em.

g Systems ahe Systems

rs, and Mete

established, xchanged bethat all sucheep approprsted below,

ed and storentract betwe

n relation to with MDEC,

Point, Meternd metering

e Grid Code - V

I MDEC V

Code are to

location, ins

by MDEC in

MDEC in reand the pro

EC in relatio

pare, calcular prompt set

and accura

OETC and;

and related s of Licenseers to final Co

metering shetween Persh Persons ariate records

on a prom

ed for theseeen relevanMeters, thosapply in add

rs and/or Meg shall take

Version 2.0

i 2 0

establish;

stallation, o

n relation to

elation to owovision and

on to the sto

ate, assess ttlement, havacy for those

Meters anded Transmisonsumers.

hall take plasons boundare able to s concernin

mpt, compre

e purposes int Persons hse requiremdition to MD

etering Syste place suff

operation an

o all matte

wnership anuse of Mete

rage of Mete

and validatving availabe purposes a

d Meter datssion Syste

ace and Mete by this codprepare an

g and wherehensive an

n accordanchas addition

ments shall, sEC.

tems shall bficient for a

nd

rs

nd er

er

te le at

ta m

er de nd re nd

ce al

so

be all

Page 270: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

purpobe se

OETCall reis reawherein MD

The aThis ConnDelivso tha

EachProduCapa

MDEThe tunde

The maint

Mete

Pe

PbPb

Pw

Osi

Wn

Electricity Tra

oses of this et out in each

C, Licensed asonable steasonably pre Metering S

DEC.

actual locatimay be dif

nection Agreery Point, coat the overa

CDGenset uction Facili

acity and Ou

EC.4.1 Mterm, Meter r any agreem

Meter Owntenance, cal

r ownership

Power Produntry/exit to/f

Power Produetween the

Production Fusbars;

Power Produwhere the Pro

OETC shall oingle Licens

Where ownerot possible,

− VTsCon

− CTs

− CabMeathe sub

− Metby t

− Thespeon t

nsmission Com

P 4 f 38

code. The Dh Connectio

Distributorseps to ensurracticable toSystems are

ion of a Mefferent fromeement. Whompensationll accuracy r

shall have ity that prodtput of wate

Meter and MOwner, also

ment with a

ner shall blibration and

shall be det

ucers shall orom OETC b

ucers shall Production

Facility site

ucers shall oduction Fac

own and be ed Distributo

rship by a siownership s

s shall be ownnected;

s shall be ow

bling assocasurement Tcabling sha

bstation site o

ters and thethe substatio

e substationecification, mthe site;

mpany

Delivery Poinon Agreemen

s, Licensed Sre that each

o the Delivee required fo

tering System the Delivehere the Acn shall be prequirement

a Metering duces waterr production

Metering So relates to third party.

be responsid testing unle

termined as

own and be busbars;

own and b Facility anwhether or

own and becility is conn

responsibleor;

ingle party oshall be as fo

wned by the

wned by the

ciated with Transformerall be part oowner;

Meter cubicon site owne

n site ownmaintenance,

The

nts shall be nt.

Suppliers an relevant Me

ery Point at or settlemen

em is referreery Point esctual Meterinrovided for at the Deliv

System to mr shall have n units at the

System owMeters and

ible for all ess stated o

follows;

responsible

be responsibnd Licensed r not there

e responsibnected to PA

e for the Met

of a completollows;

owner of th

owner of the

the VTs ar owners upof the gener

cles on whicer;

ner shall h, calibration

e Grid Code - V

I MDEC V

at the owne

nd Users shaetering Systeeach Conn

t purposes o

ed to as thestablished png Point is power trans

very Point is

measure Caa Metering

e Production

wnership Metering S

aspects otherwise in M

e for electric

ble for elecDistributor is another

ble for the WAEW’s system

tering System

te Metering S

e busbar or

e circuit of w

and CTs s to the locaral substatio

ch Meters ar

have overaland testing

Version 2.0

i 2 0

ership bound

all each respem is locate

nection Poinor other pur

e “Actual Mepursuant to

not coincidsformer and/met.

apacity and System to Facility.

Systems use

of ownershiMDEC.

city Metering

ctricity Metebusbars loUser conn

Water Metem;

ms at a sub

System at a

circuit to wh

which the CT

shall be owal junction bon cabling o

re located sh

ll responsibof the Mete

dary and sha

pectively taked as close ant, particularposes set o

etering Pointthe releva

dent with th/or line losse

Output. Eacmeasure th

d by Person

p, purchas

g Systems fo

ring Systemcated on th

nected to th

ring System

bstation with

a substation

hich the VT

T is installed;

wned by thox, thereafteowned by th

hall be owne

bility for thering System

all

ke as rly ut

t”. nt

he es

ch he

ns

e,

or

ms he he

ms

a

is

is

;

he er he

ed

he ms

Page 271: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

FowM

TDot

MDE

MDEAll Mpurpostandrecor

EachincludMete

All dapart oInterntransas the

MDE

MDE

MDEFor Cand c

Main compAppeFor CB. For eto me

The meascondconfigAll Maccor

Electricity Tra

or Metering wner of the

Measuremen

The ownershDistributors a

ther agreem

EC.5 Elec

EC.5.1 GMeters and Moses of thisdards to be mrding and ex

Meter andding those ring System

ata communof or associnational Telemission ovee Metering a

EC.5.2 M

EC.5.2.1. Eq

EC.5.2.1.1 Connections check Meter

Meters andply at all reendix A. Connections

each Delivereasure the fo

i) Enii) En

Meter Ownsuring elemuctors. Tgurations en

Meters shall rdance with

nsmission Com

P 5 f 38

Systems the Metering S

t Transform

hip and respand Consum

ment between

ctricity M

eneral Metering Syss code shallmet in relatio

xchange of M

d Metering Sas to the s

ms.

nications equiated with aecommunicaer telecommand Data Ex

Meter, CT a

quipment re

Meters greater thaequipment

d check Meelevant time

to consume

ry Point, a Mollowing parantry and exitntry and exitner shall coents is equ

These includnable the flowbe labelled Appendix C

mpany

hat meter eleSystem shalers are loca

onsibility formers shall be

n the parties

Meters

stems procul be sufficieon to those

Meter data se

System shastandards o

uipment reqny Meter or

ations Unionmunication syxchange Cod

and VT req

equired

n or equal tboth having

eters shall bes with the

ers, Metering

Metering Sysameters; t Active Enert Reactive Eonfigure actual to or ode the new of energy by the Met

C.

The

ectricity flowl be the owted; and

r Metering Se as determis.

ured, installeent for all pMeters and et out in this

all comply wof accuracy

quired for ther Metering Sn (ITU) standystems, or sde Review P

quirement

o 20 MVA, the same le

be installed,standards

g Systems s

stem shall b

rgy; and nergy tive Energyone less thutral and/oin such con

ter Owner o

e Grid Code - V

I MDEC V

ws between Lwner of the s

Systems betned in the C

ed, operatedpurposes of

Metering Sys code are m

with the all and calibr

e purposes System shaldards and resuch other

Panel may sp

ts

Metering Syevels of accu

operated aand accura

shall be in a

e installed,

y Meters suan the num

or earth coductors.

or otherwise

Version 2.0

i 2 0

Licensed Dissite or site

tween OETCConnection A

d and maintthis code s

ystems, metmet.

provisions ation to be

of this codell perform toecommendacommunicatpecify.

ystems shall uracy and fu

and maintaiacy classes

ccordance w

operated an

uch that thember of prionductor w

be readily

stributors, thon which th

C or LicenseAgreement o

tained for thsuch that thtering and th

of this codee achieved

e and formino the relevaations for dattion protoco

include manctionality.

ned so as t indicated

with Append

nd maintaine

e number omary systehere syste

identifiable

he he

ed or

he he he

e, in

ng nt ta

ols

in

to in

dix

ed

of m m

in

Page 272: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

The Mshall throuWhershall data over

Whershall

The facilitbe cinjectoutag

MDEThe and a

Whersets currebe deseale

The providimpos

The partieinspeexcee

CurreBurdeavaila

MDEThe Paccur

Whervoltag

The purpo

The votherevideby the

The partie

Electricity Tra

Metering Sybe displayegh zero morre main Meprovide twoto be interrocommunicat

re Meters prprovide two

Meter Ownetate on-site tapable of pting test quage.

EC.5.2.1.2 Plant Owneaccuracy cla

re main Metof current

ent transformedicated for

ed.

current tranded that ovesed by such

additional Bes and evideection by reled the rated

ent transformens which able by the P

EC.5.2.1.3 Plant Owneracy classes

re main Metge transform

voltage tranose and suc

voltage tranr purposes ence of the ae relevant p

additional Bes and evid

nsmission Com

P 6 f 38

ystems shall ed on a non-re than onceters and cho outputs pogated localtions channe

rovide Mete outputs per

er shall protests. Theseproviding suantities, con

Current traer shall provasses indicat

ters and chetransformers

mer windingsr such purp

nsformers serall accurac

h purposes s

Burden shaence of the vevant partie Burden of s

mer test cerallow the ePlant Owner

Voltage trar shall prov

s indicated in

ters and chemers or one v

nsformer wh windings a

nsformer secprovided theadditional Barties.

Burden shalldence of th

mpany

meter quan-volatile Mete within the nheck Meters er measurely and at a lels.

er data to Our measured q

ovide Test tee terminals suitable meannecting test

ansformersvide current ted in Appen

eck Meters s. The cus and cablesposes and s

supplying chcy requirem

shall be mad

ll not be mvalue of the es. The totasuch current

rtificates shoerror at worr for inspecti

ansformerside voltage n Appendix A

eck Meters voltage trans

inding suppand connect

condary wine overall Buurden impos

not be moe value of

The

ntities on a cter Registernormal mete are provided quantity. later date fo

utstations exquantity.

erminals forshall be in clns for accet Meters, an

s transformer

ndix A – A3.

are requiredrrent transfos connectingsuch cables

heck Metersents are mee available f

modified withmodified ad

al Burden ot transformer

owing errorsrking Burdeon by the re

s transformer

A – A3.

are requiredsformer with

plying main tions shall be

nding supplyurden and ased by such

odified withosuch additi

e Grid Code - V

I MDEC V

continuous b. The Meter

er reading cyed with OutThe Outstar Meter data

xternal to th

r main Metelose proximiessing currend replacing

rs in accord

d, the Plant ormers supg such windi and conne

s may be uet. Evidencefor inspectio

hout prior additional Burn each currr.

s at the overen to be caelevant partie

rs in accord

d the Plant h two or mor

Meters shae securely s

ying check accuracy reh purposes i

out prior argional Burde

Version 2.0

i 2 0

basis and thr Registers sycle. tstations, the

ations shall ea to be prov

he Meter, th

ers and chety to the Meent and volg Meters wit

dance with t

Owner shaplying mainings to mainections shal

used for othe of the addion by relevan

agreement frden shall berent transfor

rall working alculated shes.

ance with s

Owner shale secondary

all be dedicealed.

Meters mayquirements s available f

gument fromen shall be

he informatioshall not pas

e Outstationenable Meteided remote

e Outstation

eck Meters tters and shaltage signalthout a circu

the standard

ll provide twn Meters, thn Meters shal be secure

her purposetional Burdent parties.

from relevae available former shall no

Burden or ahall be mad

tandards an

ll provide twy windings.

cated to tha

y be used foare met an

for inspectio

m the relevaavailable fo

on ss

ns er

ely

ns

to all s,

uit

ds

wo he all ely

es en

nt or ot

at de

nd

wo

at

or nd on

nt or

Page 273: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

inspenot e

VoltaBurdebe av

Sepathe mas clo

MDE

MDEThe Metethe UAppeAccuin MVcircuicontinanticiWherCodeAutho

MDEWhershall requiwithinshall the M

MDEErrorthat arequitest crecorreleva

MDEMeteCodeavailaapprowith G

The GOwne

Electricity Tra

ection by thexceed the ra

age transformens that allovailable by th

arately fusedmain Meter, tose to the vo

EC.5.2.2. Ac

EC.5.2.2.1 accuracy ofring System

User’s Conneendix A – A1racy requireVA. Circuit Cit (i.e. transnuous ratingipate future re relevant se Review Pority the exte

EC.5.2.2.2 re the Actuabe providedrement at tn the Meterbe establish

Meter Registr

EC.5.2.2.3 rs arising froaffect the orement is mcertificates rded in the ant parties.

EC.5.2.3. Mers used in

e Review Paable on requoval of MeteGood Indust

Grid Code Rer and the

nsmission Com

P 7 f 38

e relevant pated Burden

mer test cerow the error he Plant Ow

d voltage trathe check Moltage transf

ccuracy req

Overall acf the variou

ms shall conection Agree and A2.

ements for thCapacity sh

sformer, linegs. The ratiuprating of tstandards c

Panel will reent to which

Compensaal Metering Pd for power he Delivery

ring System hed in accorration Syste

Compensaom the Measoverall accurmet. Values

shall be esMeter Reg

eter approvaccordance anel shall muest. The G

ers to ensuretry Practice.

Review PanRegulatory

mpany

arties. The of such volt

rtificates shoat working B

wner for inspe

ansformer suMeter, and anformer as po

quirements

ccuracy us items of form to the

ement is sign

he purpose ohall be deter, etc) and ming and accthe primary phange from eview such any such ch

ation for poPoint is not ctransformer

y Point is mor remotely

rdance with m.

ation for Mesurement Trracy shall bof the comp

stablished ingistration Sy

val and certwith this c

maintain a lisGrid Code Re complianc

nel will issueAuthority i

The

e total Burdetage transfo

owing errorsBurden to beection by rel

upplies shallny additionaossible.

measuring relevant IE

ned. Standa

of this code rmined by thmust be bacuracy requplant. time to timchanges a

hanges shou

ower transfocoincident wr and/or line

met. The coy. CompenGood Indus

easurementransformers

be compenspensation fan accordancystem and s

tification code shall bst of approvReview Pance with the p

e Meter Cerin accordan

e Grid Code - V

I MDEC V

en on each rmer.

s at the overe calculated evant partie

l be providel Burden. T

equipment C standards

ards relevant

are defined he lowest ra

ased on the irements of

e, the Meteand recommuld be imple

ormer or Linwith the Delive losses so ompensationnsation factostry Practice

t Transform and associated such t

actors and thce with Gooshall be ava

e approvedved Meter tyel shall also

provisions of

rtificates to Pnce with Go

Version 2.0

i 2 0

voltage tran

rall working shall, where

es.

d by the PlaThe fuses sh

comprisings current at t to this code

by circuit Cated primary

primary plaMetering S

ering and Damend to thmented.

ne losses very Point, cthat the ove

n may be aors and theand must b

mer error iated leads tthat the oveheir justificaod Industry ailable for i

Meter typeypes that sho be responf this code in

PWP, the reood Industry

nsformer sha

Burden or ever possible

ant Owner foall be locate

g Meters anthe time th

e are listed

apacity, ratey plant of thant maximuSystems sha

ata Exchange Regulato

compensatioerall accuracapplied localir justificatio

be recorded

to the Meteerall accuraction includinPractice an

inspection b

es. The Grhall be madsible for typn accordanc

elevant Metey Practice t

all

at e,

or ed

nd at in

ed he m all

ge ry

on cy ly

on in

rs cy ng nd by

rid de pe ce

er to

Page 274: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

confirMeteCoderespomay d

MDEMetemanucomp

The providCons

MDE

MDEAll nIndus

All inany MrelevaApperecog

The OwnePersoMetecomp

Metecode

New on sinclusclass

MDECommdata CommMeterecon

Followpartiecode

All MrespecommAppecomm

Electricity Tra

rm that Metr Owners sh

e Review Ponsibility. Mediffer for diff

EC.5.2.4. Opring System

ufacturer’s rply with its ob

Consumer ding Consu

sumer Meter

EC.5.3 M

EC.5.3.1. Inew Meters

stry Practice

itial calibratMeter manufant IEC stan

endix A – Agnised test fa

Meter Owneer must maion bound byr Owner is

pliance with t

rs removed .

voltage tranite. Meter sion in the

ses.

EC.5.3.2. Comissioning tbefore the Cmissioning tring System

nnection sha

wing commes may requ.

Meters, currective Ownemissioning bendix D setsmissioning p

nsmission Com

P 8 f 38

ters and Mehall provide cPanel to eeter Certificaferent Meter

peration anms shall brecommendabligations un

representatiumers suppring Systems

Metering Sy

itial Calibrashall unde

.

ion of Meterfacturer’s wondards and s

A2. A uniquacility before

er will applyntain this se

y this code ss responsiblthe provision

from service

nsformers anOwners shMeter Reg

ommissiontests shall bConnection itests shall a

m is fitted aall be permitt

issioning, thuire to confi

rent transfoer for accurbefore the s out the terogramme.

mpany

etering Systecertification nable the

ates shall betypes.

nd maintenabe operateations or asnder this cod

ves of eachplied at LVs.

ystem Ca

ation ergo relevan

rs shall be porks). Theseshall confirmuely identifiae the Conne

y a certificateal intact in shall break te for ensuns of this co

e must be re

nd current trahall providegistration Sy

ing be carried ouis made livelso be carries part of ated unless th

he Meter Owrm that a M

rmers and racy in accConnection

ests and che

The

ems complyand other dGrid Code

e issued for s

ance d and ma

s otherwise de.

h Licensed V with the

libration a

nt certificatio

performed ine tests shall

m that Meter able calibratction is mad

tion seal folorder for thhe seal unlering that Mde.

e-certified be

ansformers se manufactuystem to sh

ut on all newe and in accoed out beforn existing Mhe tests are

wner shall pMetering Sys

voltage tracordance witn is made ecks that as

e Grid Code - V

I MDEC V

y with the reocumentatio Review Pspecified tim

aintained innecessary

Distributor Meter req

and testin

on tests in

n a recognisbe performeaccuracy is ion record s

de live.

lowing initiae Meter to r

ess properly Meter certific

efore reconn

shall be caliurers’ test chow compli

w Metering ordance withre reconnectMetering Sypassed.

provide sucstem meets

ansformers th Good Inlive, as in

s a minimum

Version 2.0

i 2 0

equirements on as requirePanel to ca

me spans and

n accordanfor the Me

shall be reuirements a

ng

accordanc

sed test facied in accord within the lishall be pro

al calibrationretain certifieauthorised

cation is ca

nection for u

brated prior certificates ance with

Systems proh Good Indution where aystem. No C

h evidence the require

shall be tedustry Pracdicated in m shall be

of this coded to the Grarry out thd the duratio

ce with thter Owner t

esponsible foapplicable t

e with Goo

ility (includindance with thimits stated ovided by th

n. The Meteed status. Nto do so. Th

arried out fo

use under th

to installatioto OETC fothe accurac

oviding Meteustry Practica replacemeConnection o

that relevaments of th

ested by thctice at initiAppendix Dincluded in

e. rid his on

he to

or to

od

ng he in

he

er No he or

his

on or cy

er e. nt or

nt is

he al D. a

Page 275: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDE

MDEPerioensu

Perioany certifwith tstatedsafe authoSyste

Perioon sigiven

Periothe e(inclu

Metebelowpresc

Compconfirshall Syste

MDEElectnot e

Activeat inte

On-s

For eAt lecalibrcircuiyear

WhermanuAccuMete

Whermanu

Whershall

Wherperfo

Electricity Tra

EC.5.3.3. Pe

EC.5.3.3.1 odic Calibratre that the re

odic calibratiMeter manuied by a rethe relevant d in Appendplace and t

orised testinem.

odic Calibratte provided

n in Appendix

odic Calibraterror limits auding any Me

rs shall alsow if the macribed limit o

plete and acrm successfbe kept by

em where ap

EC.5.3.3.2 romechanicxceeding ten

e Energy Meervals not ex

ite Accuracy

electronic Meast one of rated in any it with a Metperiod.

re the mainufacture andracy Tests srs and interv

re the mainufacture or ty

re only a mabe performe

re only a maormed at inte

nsmission Com

P 9 f 38

eriodic Cali

General tion of Meteequirements

on of Meterufacturer’s cognised auIEC standa

dix A. The che significan

ng persons

ion of all Methat the pe

x A are met.

tion of classas describeeter manufa

o be tested ain Meters of error asso

ccurate recoful testing/cay the Meter ppropriate.

Frequencyal Meters shn years.

eters of accuxceeding 5 y

y Tests are n

eters; each type o5-year perio

ter Owner sh

n Meters and type (and ashall be perfvals not exce

n Meters anype, no on-s

ain Active Ened at interva

ain Reactiveervals not ex

mpany

bration and

ering Systems of this code

rs shall be pworks) or buthority. Acc

ards and shacalibration rent details (Idand accura

eters other thercentage er.

s 0.2S Actived above, scturer’s wor

outside of tand check ciated with t

rds of Accuralibration in Owner and

y of testinghall be Calib

uracy class years.

not required

of electronicod. A minimhall be calibr

nd check Mare thus likeformed at ineeding ten y

nd check Msite Accuracy

nergy Meter als not excee

e Energy Mexceeding ten

The

d testing

ms shall be e are met at

performed inby competecuracy Testsall confirm thecord shall bdentification acy results)

han Active Error limits as

e Energy Mshall be perks).

the prescribMeters div

the accuracy

racy Tests, waccordance

d promptly r

brated and r

0.5 shall ha

for all other

c Meter ownmum of 20% rated in an e

Meters emploely to have sntervals not years for Rea

eters employ Tests are

is employededing five ye

eter is emplo years.

e Grid Code - V

I MDEC V

undertaken all relevant

n a recognisent persons s shall be p

hat Meter acbe uniquely Number, darecorded in

Energy classssociated w

Meters and orformed in a

bed intervalsverge by my classes giv

work carriede with the reregistered in

refurbished a

ve on-site A

types of ele

ned by eacof the total o

evenly phase

oyed on a similar failureexceeding 5active Energ

oyed on a required.

d on a circuears.

oyed, on-site

Version 2.0

i 2 0

by the Mettimes.

sed test faciusing stan

performed inccuracy is wi

identifiable,ate, names n the Meter

s 0.2S may with the accu

other Metersa recognise

s stated in Mmore than 1ven in Appen

out and perequirementsn the Meter

as necessar

Accuracy Tes

ectromechan

ch Meter Owof each typeed programm

circuit are e characteri5 years for Agy Meters.

circuit are o

it, on-site Ac

e Accuracy T

er Owners t

ility (includinndard Meten accordancithin the limi retained in and status or Registratio

be performeuracy classe

s not meetind test facili

MDEC.5.3.3.5 times th

ndix A.

rtinent data ts of this codr Registratio

ry at interva

sts performe

nical Meters.

wner shall be of Meter onme over a 10

of the samstics), on-sit

Active Energ

of a differe

ccuracy Tes

Tests shall b

to

ng rs ce ts a

of on

ed es

ng ty

.2 he

to de on

als

ed

be n-0-

me te gy

nt

ts

be

Page 276: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Perio

The tPane

MDEIf anypartyGoodshall the rprescMeteinvitein wri

Certifinternneces

Wherthe aadjusdefecaccor

The MprescexamMete

MDE

MDEAll Msecurobstreffectvibratlocka

MeteSystetelepaffectbreakwhenNeithany winterf

(a

(b

Electricity Tra

odic testing o

testing intervel.

EC.5.3.3.3 y item of a may reque

d Industry Pcarry out aneasonable ccribed limits r Owner. A

ed to witnessiting to the a

fied test equnational stanssary, an ap

re a Accuracaccuracy classting, repairctive compordance with

Metering Sycribed limits

mination, maring System

EC.5.4 M

EC.5.4.1. MeMetering Sysre meteringructions andtive protectiotion. Approp

able and cap

r Owners aem that shahone links. ted parties king of sealsn the breakinher party shaway. Wherefered with, th

a) the quother

b) if thertampe

nsmission Com

P 10 f 3

of Measurem

vals may be

SuspectedMetering S

est the MetePractice to cny test so recosts of sucof error, oth

All affected ps the tests. affected part

uipment andndards) shapproved inde

cy Test indicsses given i

ring or reneonents. In PWP’s/Lice

ystem shall bof accuracyintenance, r

m, the Meterin

Meter and d

eter accessstems and ag cabinets ld well lit byon from moipriate tempepable of bein

nd the relevall include Only the Mshall be giv

s on any parng of a seal iall tamper ore it is estabhen until suc

uantity measrelevant inst

re is no otheered or inter

mpany

8

ment Transfo

modified by

d Metering eSystem is suer Owner toconfirm correquested. Tch testing ifherwise the parties shallAccuracy Ties.

reference sll be used in

ependent lab

cates that anin Appendix

ewing the Msuch case

nsed Distrib

be restored y as soon as repair, recaling System s

data secu

s and sealinassociated located in

y artificial ligisture and derature contg sealed to

vant partiesdata collec

Meter Owneven at leasrt of the Metis necessitatr otherwise blished that

ch tampering

sured or recotalled Meter

er relevant Mrfered with, t

The

ormers is not

y the Meterin

errors uspected of o carry out rect operatiohe party reqf the Meter cost of the be given 2est results s

standards (an such testsboratory may

n error exceex A, the erroMetering Syes substitutebutors’/Licen

to service ais reasonab

ibration or reshall be seal

urity and re

ng communicatan area th

ght. The caust ingress trols shall bprevent una

s, as appropction equipmr’s personne

st forty-eighttering Systeted by the ocinterfere witt the Meterg or interfere

orded shall bring System;

Metering Systhe quantity

e Grid Code - V

I MDEC V

t required.

ng and Data

performing Accuracy T

on and accuquesting the

is found toAccuracy Te

24 hours notshall be mad

all traceable s and if, by y be employ

eds the limitrs shall be r

ystem (or pae Meter dased Supplie

and proved tbly practicabeplacement ed.

egistratio

tions equipmat is readilbinets shalland from ph

be provided.authorised ac

priate, shall ment and ael shall bret (48) hours

em. No suchccurrence ofh any part oing System

ence has bee

be that mea or

stem or it is eshall be agr

Version 2.0

i 2 0

a Exchange

incorrectly, Tests in accuracy. The Accuracy T

o be operatiest shall be tice of such de available

to recogniseagreement,

yed.

ts of error asrecorded beart thereof)

ata shall bers’ procedur

to be operatble. Upon th

of any com

on

ment shall bly accessib include as

hysical dama The cabinccess.

jointly seal associated mak such ses' advance h notice will f an Emerge

of the Meterihas been

en rectified e

sured or rec

established reed by the

Code Revie

any affectecordance witMeter Owneest shall beang within thborne by thtests and bpromptly an

ed national oit is deeme

ssociated witefore prompt

or replacine provided res.

ting within the completio

mponent in th

be located le, free fro

s a minimumage, includinnets must b

the Meterinmodems an

eals. All othenotice of thbe necessa

ency. ing System tampered o

either;

corded by an

to have beeparties, or,

ew

ed th er ar he he be nd

or ed

th tly ng in

he n, he

in m

m, ng be

ng nd er he ry

in or

ny

en in

Page 277: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

If theor MeOwnesufficcalibrSyste

WherMeteby thrights

The partyshall codeEachand/oGood

MDEThe maintEachthe calimiteout abeinginspe

MeteOETCTheypartie

MDEMeteSysteInduscompauditashall indicaAll UsSystede-enRegisreaso

Electricity Tra

the amatte

e Meter Ownetering Syster and all ocient rights ration, operem.

re any Persoring Systeme Person wis shall be se

right of acc’s property be reasona. party shal

or revised frod Industry Pr

EC.5.4.2. MeMeter Ownetained by OE Meter Ownalibration an

ed to the datand the dateg broken andections or se

r Owners shC for entry i shall also

es.

EC.5.4.3. Mering System

em, which isstry Practiceplete, accuraable trail to contain, as

ated in Appesers are resems includinnergisations stration Sysonably requi

nsmission Com

P 11 f 3

bsence of sr to an Expe

ner is not theem is situateother Persoof access

ation and m

on requires m for the purp

th the poweet down in th

cess provideany vehiclebly necessa

l ensure thom time to tractice to fac

eter recorder shall labeETC. ner shall ensnd operationtes and resu

es on which d the Perso

ealings shall

hall ensure tnto the Meteprovide any

eter registrms shall be s to be opee. The puate and up tdemonstrates a minimuendix E. ponsible for

ng any chanor disconn

tem. Any ored by the in

mpany

8

such agreemert for determe Person whed, that Per

ons who reqfor meterin

maintenance

right of acceposes of thiser to grant the relevant C

ed for in this, plant, ma

ary for the pu

at all reasotime as and cilitate the sa

s el all Meters

sure that co of Metering

ults of any teany seal wans, and theibe recorded

that the perter Registratiy other Mete

ration registered

erated and mrpose of thto date cente compliancm, specific

r ensuring thges to the tnections arother informnvolved part

The

ment, eithermination. ho owns or crson (if bounquire the sang purposese and repla

ess or to des code, all suem if that P

Connection A

s code incluachinery andurposes of p

onable arranwhen necesafe exercise

s with a un

omplete andg System. Tests, readingas applied oir affiliationsd.

tinent data (ion System. ering System

in a centramaintained he Meter Rtral databasece with this c

information

at data relatypes of data

re promptly ation regardies.

e Grid Code - V

I MDEC V

r party shall

controls the nd by this coame for thes and for tcement of

al in some ouch necessaerson is bou

Agreement w

udes the rigd maintenanperformance

ngements assary or dese of any right

ique identifi

accurate reThese recordgs, adjustmeor broken. T, attending a

(Appendix E Such data

m data requ

al databaseby OETC in

Registration e of all Metecode. The Mn at each A

ting to all cha set out in

reported iding each m

Version 2.0

i 2 0

l be entitled

land on whode) shall gre purposes the purposethe Meter a

other way wary rights shaund by this cwhere this is

ght to bring nce or othere of obligatio

nd provisionsirable in acct of access.

cation numb

ecords are mds shall incluents or inspeThe reasonsany such te

E) is provideshall be ke

uested by o

, the Metern accordancSystem is er data and

Meter RegistrActual Meter

anges to UsAppendix En writing, t

metering poin

d to refer th

hich the Meterant the Mete

of this codes of testinand Meterin

ith a Meter oall be grantecode. All sucpracticable.

onto such r materials aons under th

ns are madcordance wit

ber from lis

maintained oude but not bection carries for any sests, reading

ed promptly tpt up to dat

other involve

r Registratioce with Gooto provide to ensure a

ration Systering Point a

sers’ MeterinE and any sitto the Metent as may b

he

er er de ng ng

or ed ch .

a as his

de th

ts

of be ed al s,

to e.

ed

on od

a an m as

ng te er be

Page 278: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

The MsevenAny dOETC T

T

O

P

Any USyste

MDE

MDEAll Wmaintsuch Systeare m

EachcodeMete

All dapart oInterntrans

The requicomp

MDEWateMeteoperaaccur

WatereadioperaAll WrequiWateinformshall The shall

Electricity Tra

Meter Regisn years afterdata held inC and (b) ma

The Meter Ow

The Regulato

OETC; and

PWP.

User but witem of that U

EC.6 Wat

EC.6.1 Water Metertained for ththat the sta

ems, meterinmet.

Water Mete, including tring System

ata communof or associnational Telemission ove

relevant Corements in a

ply with the r

EC.6.2 Wer Metering r equipmentation of the racy and fun

er Meters shngs and shation. Water Meterrements spe

er Metering mation shallnot pass thrWater Meteprovide two

nsmission Com

P 12 f 3

stration Syster the replace

n the Meter ay be freely wner;

ory Authority

h access limser.

ter Meters

Geners and Wa

he purposesandards to bng and the

er and Watehose as to t

ms.

nications equiated with aecommunica

er telecommu

onnection Aaccordance requirements

Water MeteSystems sht in series wother. Both

nctionality.

hall include ahall be equ

rs and/or Wecified in ApSystems s be displayerough to zeroer Owner sho outputs pe

mpany

8

em shall maement or disRegistrationaccessed b

y;

mited to that

s

eral ater Meterin of this codee met in relarecording a

er Metering Sthe standard

uipment reqny Meter or

ations Unionunication sys

Agreement mwith establiss of any tele

er requiremhall include with a meanh Meters sh

a pulsed outipped with

Water Meterpendix F. hall meter ed on a nono more thanhall provide er measure

The

aintain the spconnection o

n System (ay;

equipment

g Systems e shall be sation to thosnd exchang

System shallds of accura

quired for ther Metering Sn (ITU) standstems.

may provideshed Good

ecommunica

ments main Water

ns of removiall have at a

tput providinbattery bac

ring System

the quantitin-volatile M

n once withinWater Mete

d quantity.

e Grid Code - V

I MDEC V

pecified infoof a Meter.) shall be th

directly asso

procured, ufficient for se Water Mege of Meter

l comply withacy and cali

e purposes System shaldards and re

e for site-spIndustry Prations service

r Meter equing each Meall relevant

ng instantanck up powe

ms shall co

es on a coeter Registe

n the normal ering SystemThe Outstat

Version 2.0

i 2 0

rmation for a

he intellectua

ociated with

installed, oall purposes

eters and Wdata set ou

h the all provbration to be

of this codell perform toecommenda

pecific isolaactice and ine providers.

ipment and eter withouttimes the sa

eous and iner supplies

omply with

ontinuous ber. The Mereading cyc

ms with Outions shall e

a minimum o

al property o

the Meterin

operated ans of this cod

Water Meterint in this cod

visions of the achieved

e and formino the relevaations for dat

ation or othen particular, t

check Wate affecting thame levels o

ntegrated flofor 24 hou

the technic

asis and theter Registecle. utstations thenable Wate

of

of

ng

nd de ng de

his in

ng nt ta

er to

er he of

ow rs

cal

he rs

at er

Page 279: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Meteprovid

MDEThe Mscale

MDEWateThe Gshall respoof this

The Gthe RMeteMeteCoderespodurat

MDEWatemanuto co

MDE

MDEThe WWatestatusdo socarrie

All newith G

All in(incluaccorshall

The WWatestatusdo socarrie

Wateunde

Electricity Tra

r data to beded remotel

EC.6.2.1. AcMeter accurae reading.

EC.6.2.2. Meer Meters usGrid Code Rbe made

onsible for tys code in ac

Grid Code RRegulatory Ars and Water Owners sh

e Review Ponsibility. Mtion may diff

EC.6.2.3. Oper Metering ufacturer’s remply with its

EC.6.3 W

EC.6.3.1. InWater Mete

er Meter Owns. No Persoo. The Wated out for co

ew Water MGood Indust

nitial calibratuding any Mrdance with be provided

Water Meteer Meter Owns. No Persoo. The Wated out for co

er Meters rer this code.

nsmission Com

P 13 f 3

e interrogaty over comm

ccuracy reqacy over the

eter approvsed in accorReview Panavailable onype approvaccordance w

Review PaneAuthority in aer Metering hall provide cPanel to eMeter Certiffer for differe

peration anSystem sh

ecommendas obligations

Water Mete

itial Calibraer Owner wilner must ma

on bound by er Meter Ow

ompliance wi

etering Systtry Practice.

tion of WatMeter manuthe relevan

d by the reco

er Owner winer must ma

on bound by er Meter Ow

ompliance wi

emoved from

mpany

8

ed locally amunications

quirementsnormal oper

val and certdance with el shall main request. al of Water Mith Good Ind

el will issue Mccordance wSystem com

certification nable the ficates shalent Water Me

nd maintenahall be opeations or as s under this c

ering Syst

ation ll apply a ceaintain this sthis code s

wner is resith the provis

tems shall u

er Meters sufacturer’s nt IEC standognised test

ill apply a caintain this sthis code s

wner is resith the provis

m service m

The

and at a latechannels.

rating range

tification this code shintain a list The Grid Meters to endustry Practi

Meter Certifiwith Good Inmply with thand other dGrid Codel be issuedeter types.

ance rated and otherwise ncode.

tem Calibr

ertification sseal intact inhall break thponsible forsions of this

undergo rele

shall be perworks). T

dards. A unfacility befor

certification seal intact inhall break thponsible forsions of this

must be re-c

e Grid Code - V

I MDEC V

er date for

shall not be

hall be approf approvedCode Revi

nsure complce.

icates to thendustry Prache requiremeocumentatio Review P

d for specifi

maintained ecessary fo

ration and

seal followin order for thhe seal unler ensuring tcode.

evant certifica

rformed in aThese tests niquely idenre the Meter

seal followin order for thhe seal unler ensuring tcode.

certified befo

Version 2.0

i 2 0

Water Mete

more than ±

roved Waterd Water Metew Panel sliance with t

e Water Metectice to confirents of this on as requirePanel to caied time sp

in accordar the Water

d testing

ng initial calie Meter to r

ess properly that Meter c

ation tests in

a recogniseshall be

ntifiable calibr enters serv

ng initial cae Meter to r

ess properly that Meter c

ore reconne

er data to b

±0.20% of fu

r Meter typeter types thashall also bthe provision

er Owner anrm that Watecode. Wateed to the Grarry out thpans and th

nce with thMeter Owne

ibration. Thretain certifieauthorised t

certification

n accordanc

ed test faciliperformed

bration recorvice.

libration. Thretain certifieauthorised t

certification

ection for us

be

ll-

s. at be ns

nd er er rid his he

he er

he ed to is

ce

ty in rd

he ed to is

se

Page 280: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDECommMeteaccorbeforexistiunles

Followrelevarequi

MDE

MDEPerioensuMetemanuISO MDEplaceauthoSyste

Metespecigiven

The WateWate1.5 ti

Compsuccekept Syste

MDEAll W

MDEIf anyaffectaccorMeteAccuto bebornesuch availa

Certifinternneces

Electricity Tra

EC.6.3.2. Comissioning tr data can rdance with re reconnectng Water M

ss the tests a

wing commiant parties rements of t

EC.6.3.3. Pe

EC.6.3.3.1 odic Calibratre that the rers shall b

ufacturer’s wstandards aC.6.2.1. Th

e and the sorised testinem.

r Owners shified interva

n in MDEC.6

testing interer Metering er Meter andmes the limi

plete and acessful testinby the Wateem where ap

EC.6.3.3.2 Water Meters

EC.6.3.3.3 y item of ated party mrdance with r Owner sharacy Test sh operating we by the Wa

tests and bable promptl

fied test equnational stanssary, an ap

nsmission Com

P 14 f 3

ommissiontests shall b

be provideGood Indus

tion where aMetering Syare passed.

issioning, thmay requir

this code.

eriodic Cali

General tion of all Wequirementse performe

works). Theand shall che calibratiosignificant dng persons

hall test in als for accur

6.2.1.

rvals are shSystem Rev

d check Watit of error as

ccurate recog/calibration

er Meter Owppropriate in

Timing of shall be re-

Suspecteda Water Memay request

Good Indusall carry out hall bear thewithin the preater Meter Obe invited toly and in wri

uipment andndards) shapproved inde

mpany

8

ing e carried oued before tstry Practicea replacemeystem. No

he Water Mere to confirm

bration and

Water Meterss of this coded in a ree tests shallconfirm that on record shdetails (Idenand accura

accordance acy to verify

hown in MDview Panel.ter Meter in sociated wit

ords of testsn in accorda

wner and pron accordance

Water Metecalibrated at

d metering etering Systet the Water stry Practiceany Accura

e reasonableescribed lim

Owner. All ao witness thting to the a

reference sll be used in

ependent lab

The

ut on all newthe Connec

e. Commissent Water MeConnection

eter Owner sm that the

d testing

s shall be ue are met atecognised l be perform

Meter acchall be uniq

ntification Nacy results)

with Good Iy that opera

DEC.6.3.3.2 Water Meta Water Me

th the accura

s, work carriance with theomptly registe with Good

er tests t intervals no

errors em is suspe

Meter Owne to confirm cy Test so r

e costs of suits of error, o

affected parthe tests. Affected parti

standards (an such testsboratory may

e Grid Code - V

I MDEC V

w Water Metction is placsioning testsetering Systor reconne

shall provideWater Mete

undertaken t all relevanttest facility

med in accouracy is wi

quely identifumber, daterecorded in

ndustry Praation is with

below but ters shall aletering Systeacy given in

ed out and e requiremetered in the Industry Pra

ot exceeding

ected of pener to carrycorrect ope

requested. ch testing if otherwise thies shall be

Accuracy Teses.

all traceable s and if, by y be employ

Version 2.0

i 2 0

tering Systeced into se shall also btem is fitted ection shall

e such evidering Syste

by the Metet times. The y (includingordance withithin the limfiable, retaine, names an the Meter

actice all Wahin the limits

may be moso be testeem diverge MDEC.6.2.1

pertinent daents of this CWater Meteactice.

g 2 years.

erforming incy out Accurration and aThe party rethe Water Me cost of thegiven 24 ho

st results sh

to recogniseagreement,

yed.

ems to ensurervice and be carried oas part of abe permitte

ence that thm meets th

er Owners tcalibration o

g any Meteh the relevamits stated ned in a safand status or Registratio

ater Meters as of accurac

odified by thd if the maby more tha1.

ata to confirCode shall br Registratio

correctly, anracy Tests accuracy. Thequesting th

Meter is foune test shall bours notice hall be mad

ed national oit is deeme

re in ut an ed

he he

to of er nt in fe of

on

at cy

he in

an

m be on

ny in

he he nd be of

de

or ed

Page 281: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Wherthe aadjusdefecaccorPane

The WwithincompcompWate

MDE

MDEAll Win a obstreffectvibratmust

WateSystelinks.partiesealsthe bNeithSystetampeithe

(a)

(b)

If theWateshall purpoand fof the

WherMeteshall this cwhere

Electricity Tra

re a Accuracaccuracy givsting, repairictive compordance with

el.

Water Meten the prescrpletion, exaponent in theer Metering S

EC.6.4 W

EC.6.4.1. WWater Meterin

secure metructions andtive protectiotion. Appropbe lockable

er Meter Owem including Only the W

es shall be gs on any parreaking of a

her party shem in any wered or inter;

the quantother releif there isbeen tamin the absto an Exp

e Water Meteer Meter or W

grant the Woses of this for the purpoe Water Met

re any Persr or Water Mbe granted

code. All suce this is prac

nsmission Com

P 15 f 3

cy Test indicven in this cng or renew

onents. In procedures

ering Systemribed limits omination, m

e Water MetSystem shal

Water Mete

Water Meter ang Systems tering cabined well lit byon from moi

priate tempee and capabl

wners and Pg data colle

Water Meter Ogiven at leart of the Wat seal is neceall tamper o

way. Where rfered with,

tity measureevant installes no other re

mpered or intsence of sucpert for deterer Owner is Water Meter

Water Meter code suffic

oses of testiner and Wate

on requires Metering Sys

by the Persch rights shacticable.

mpany

8

cates that ancode, then t

wing the Watsuch case

s agreed by

m shall be rof accuracy maintenanceering Systeml be sealed.

er and dat

access andand associaet located i

y artificial ligisture and drature and he of being s

PAEW as apection equipOwner’s per

ast forty-eighter Metering essitated by or otherwiseit is establisthen until s

ed or recorded Water Meelevant Watterfered withch agreemenrmination. not the Per

ring SystemOwner and

cient rights ong calibratioer Metering S

right of accstem for the son with theall be set do

The

n error exceethese errorser Metering

es substitutethe Meterin

restored to as soon as

e, repair, rem in accorda

ta security

d sealing ated commun an area t

ght. The caust ingress

humidity conealed to pre

ppropriate spment and rsonnel shalht (48) hoursSystem. Nothe occurre

e interfere wshed that thuch tamperi

ded shall beetering Systeter Meteringh, the quantint, either par

rson who owm is situated,

all other Peof access fo

on, operationSystem.

cess or to dpurposes o

e power to gown in the re

e Grid Code - V

I MDEC V

eds the limits shall be rSystem (or

e Meter dag and Data

service and is reasonab

ecalibration ance with Go

y and regi

unications eqthat is readbinets shalland from phtrols shall be

event unauth

shall jointlyassociated ll break suchs' advanceo such noticeence of an Emwith any pahe Water Meng or interfe

e that measem; or g System or ty shall be arty shall be e

wns or contro, that Persoersons who or Water Men and mainte

eal in someof this code, rant them if

elevant Wate

Version 2.0

i 2 0

ts of error asecorded befpart thereof

ata shall beExchange C

d proved to bly practicabor replace

ood Industry

istration

quipment shdily accessib include as

hysical damae provided.

horised acce

seal the Wamodems a

h seals. All onotice of the will be necmergency. rt of the Waetering Systerence has b

ured or reco

it is establiagreed by thentitled to re

ols the land n (if bound require the

etering Systenance, repl

e other way all such nec

f that Personer Connectio

ssociated witfore promptf) or replacine provided Code Revie

be operatinble. Upon thment of an

y Practice, th

all be locateble, free fros a minimumage, includinThe cabine

ess.

ater Meterinnd telephonother affectee breaking ocessary whe

ater Meterinem has beebeen rectifie

orded by an

shed to havhe parties, oefer the matte

on which thby this codesame for th

tem purposeacement, et

with a Watecessary righn is bound bon Agreeme

th tly ng in

ew

ng he ny he

ed m

m, ng ts

ng ne ed of

en

ng en ed

ny

ve or, er

he e) he es tc.

er ts by nt

Page 282: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Eachand/oGood

MDEWatefrom Eachmaintshall adjusbrokeatten

Watepromkept reque

MDEWateRegisGoodprovidto enRegisDelivAll UMeteotherPAEWThe minimAny prope

MDE

MDEMeteand trequi

Electricity Tra

party shalor revised frod Industry Pr

EC.6.4.2. Wer Meter Owlists maintai Water Metained of theinclude bu

stments or inen. The reading any suc

er Meter Owptly to PWPup to date

ested by PA

EC.6.4.3. Wer Metering stration Systd Industry Pde a comple

nsure an audstration Sysery Point as

Users are rering Systemr informationW and PWPWater Mete

mum of sevedata held i

erty of PWP i) Thii) Thiii) PAiv) PW

EC.7 Data

EC.7.1 Gr data coverto assess, vred for acco

nsmission Com

P 16 f 3

l ensure thom time to tractice to fac

Water Meter wners shall ined by PWPeter Owner e calibrationut not be lnspection caasons for anch tests, rea

wners shall P for entry ine. They shaEW or PWP

Water Meter Systems sh

tem, which isPractice. Thete accurate ditable trail tstem shall cs indicated inesponsible f

m including an regarding e shall be rec

er Registraten years aften the Wateand (b) may

he Water Mehe RegulatoAEW; and WP.

a Exchan

eneral red by this coverify and w

ounting and r

mpany

8

at all reasotime as and cilitate the sa

records label all WaP.

shall ensun and operaimited to tharried out any seal beinadings, inspe

ensure thato the Wateall also pro

P.

registrationhall be regiss to be operhe purpose and up to d

to demonstrcontain, as an Appendix Efor ensuring

any changeseach Water corded in theion System

er the replacer Meter Rey be freely aeter Owner;ry Authority;

nge

ode is requiwhere approrecord keepi

The

onable arranwhen necesafe exercise

ater Meters

ure that coation of Watehe dates and the dateg broken anections or se

at the pertinr Meter Reg

ovide any o

n stered in a rated and ma

of the Watdate central date compliaa minimum,E. g that data to the typesDelivery Poie Water Met

shall mainement or disegistration Saccessed by;

red by Persoopriate, chaling purposes

e Grid Code - V

I MDEC V

ngements assary or dese of any right

with a uniq

omplete ander Metering

and results es on which nd the Persoealings shall

nent data (Agistration Sysother Water

central dataintained byter Meter Rdatabase of nce with this specific inf

relating to s of data seint as may ber Registrattain the sp

sconnection System (a) ;

ons to prepallenge invoics.

Version 2.0

i 2 0

nd provisionsirable in acct of access.

que identific

d accurate System. Tof any tesany seal w

ons, and thebe recorded

Appendix Estem. Such r Metering

tabase, the y PWP in accRegistration

all Water Ms code. Theformation at

all changest out in App

be reasonabion System.ecified inforof a Water Mshall be th

are and calcuces. Meter

ns are madcordance wit

ation numbe

records arThese recordsts, reading

was applied oeir affiliationd.

) is providedata shall bSystem dat

Water Metecordance witSystem is t

Meter data ane Water Metet each Wate

s to a Wateendix E. Anly required b rmation for Meter.

he intellectu

ulate invoicer data is als

de th

er

re ds s, or s,

ed be ta

er th to nd er er

er ny by

a

al

es so

Page 283: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MetemeteDelivThe DConnMetesuch accurthis c

Wherpass readitake requiMete

Wherto in relevareadirequi

MDEThe pthis c

a) PCP

b) Ptr

c) PS

d) PA

e) P(d

f) PIn

g) P(S

h) PA

i) PL

j) PL

Electricity Tra

rs and/or Mring shall taery Point anDelivery Poinection Agrer Owners shmetering o

rate Meter dcode in acco

re this codebetween th

ng at the timplace, Metered in relatior data shall

re Meter datthis code,

ant Meter ngs and surements of t

EC.7.2 Dprincipal trancode apply a

Payments byCapacity andPWPAs);

Payments beransfers acro

Payments bySupply Agree

Payments byAgreement);

Payments bydemineralise

Payments bynterconnecte

Payments bySupply Cont

Payments bAgreements)

Payments byicensed Dist

Payments byicensed Dist

nsmission Com

P 17 f 3

Metering Syake place s

nd Water Dents shall be ement.

hall in good foperations adata. Meter Ordance with

e requires dahem suppormes requireer reading son to the reinclude the t

ta is requirethe Meter dor Meters, upplying thathis code

ata exchansactions an

are listed bel

y PWP to Pd Output o

etween PWPoss an Intern

y Licensed Sement);

y PAEW to P

y relevant ed water con

y Licenseded Parties fo

y Directly Coracts);

by OETC ;

y Power Protributor for C

y Licensed Stributor for U

mpany

8

ystems shasufficient folivery Point. at the owne

faith, and in s may be nOwners shathe followin

ata to be exrted by Met

ed by this coshall take p

elevant invoitime or times

ed for the pudata shall be

accurately at Meter da

ange reqund agreemeow;

Power Prodf Productio

P and Internnational Inte

Suppliers to

PWP for bu

Persons tontracts);

Suppliers or Active Ene

nnected Co

to provide

oducers to Connection t

Suppliers toUse of Syste

The

ll be instalr all purpos

ership bound

accordancenecessary toall provide Mg provisions

xchanged bter data, Mode. If no tiplace as cloce or Meters at which M

urpose of thie provided recording t

ata to othe

irements ents to which

ucers and In Facilities

ational Intererconnection

PWP for bu

lk purchase

o PWP for

acting as ergy (Agency

nsumers to

ers of Anc

a Licensedo its System

o a Licensedem (Use of S

e Grid Code - V

I MDEC V

led, operateses of this

dary and sha

e with Good o produce a

Meter data tos of this code

etween suceter Ownerme is speci

ose in time r data flow s

Meter reading

s code or reby making athe Meter d

er Persons

and flowsh the data e

Internally Inand Ancilla

rconnected P (Import/Exp

ulk purchase

s of Desalin

purchases

agent for y Contracts)

Licensed Su

cillary Serv

d Transmissm (Connectio

d TransmissSystem Agre

Version 2.0

i 2 0

ed and macode at ea

all be set out

Industry Praand record co other Persoe.

h Persons ors shall undfied for Metas possible

specified in g took place

elevant contaccurate readata arisingin accorda

s exchange req

nterconnecteary Service

Parties for Aport Contrac

es of Active

nated water

of demine

the PWP );

uppliers for A

vices (Ancil

sion Systemon Agreeme

sion Systemements).

aintained anach Electric

t in a releva

actice conducomplete anons bound b

or invoices tdertake Meteter reading te to the timthis code. A

e.

racts referreadings of thg from thosnce with th

quirements

ed Parties foes (PPAs

Active Energcts);

Energy (Bu

(Bulk Supp

ralised wate

to Internal

Active Energ

llary Servic

m Operator oents); and

m Operator o

nd cal

nt

ct nd by

to er to

me All

ed he se he

of

or &

gy

ulk

ply

er

lly

gy

ce

or

or

Page 284: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

This cthe sdata

The dof thethe E

The t

In

Ind

In

In

MDEMetefunct

In caassocthe mthe M

In casused

MDELocaconfo

MeteOutstInstatRemo

Any Mdata new cbeencommsubstMete

The Meach Mete

MDEAny Lenabprovidinterr

Electricity Tra

code also costorage of thexchange re

data that mue agreement

English langu

table shows;

n column A -

n column B -ata;

n column C -

n column D -

EC.7.3 Mr data shalioning of inv

ases where ciated equip

main Meter hMeter data ob

ses where cas required

EC.7.4 Ml or remote

orm to the re

rs may be tations mustions at a cote Instation

Meter Commsystems in communicat installed ov

munication rtations and r data.

Meter CommLDC Remo

r Outstation

EC.7.4.1. LoLocal Outstale Meter daded to Remrogations wh

nsmission Com

P 18 f 3

overs the teche associateequirements

ust be exchats listed abouage.

;

- The data ite

- The perso

- The Person

- The recipie

Meter data l be collect

voicing in acc

Meter data pment such has been probtained from

check Meters in accordan

Meter data communicat

equirements

provided wist be capabcentral locatns would rea

munications order to av

tion routes uver all mainoutes have Production

munication Sote Instation s over eithe

ocal Outstaation that is ata to be inmote Instatiherever poss

mpany

8

chnical requed Meter das of such me

anged betweove are show

em;

n who is ob

n who is obl

ent of the da

validationted, validatecordance wi

is not avaias CT, VT, oven to hav

m the check M

s are not pronce with proc

communitions provideof this secti

th either intble of beinion, such a

ad the Meter

System wouvoid potentiausing fibre opn transmissioadequate cafacilities an

System woushall be ab

r of two com

tions installed (wh

nterrogated ons. Separasible.

The

uirements of ata, althoughtering are ou

een the variown in Appen

liged to con

iged to send

ta.

n and quaed and aggth the releva

ilable due tocabling or pe operated oMeter shall b

ovided, estimcedures agr

ications sed in connecon, MDEC.7

tegral or seg connectes the OETCdata at the

uld be indepal conflicts optic cables aon routes toapacity and d would be

uld be a dupble to interrommunication

hether internlocally and ate ports s

e Grid Code - V

I MDEC V

metering at h the contrautside the sc

ous Personsndix H. All da

duct meterin

d the data to

ality checkgregated as ant parties.

o a failure protection deoutside the be admissib

mated or subreed betwee

system ction with an

7.4.

parate Locaed to and C Load Dispspecified tim

pendent fromof interfacingand digital Po serve the

provide dupused also f

plex systemgate both throutes.

nal or externfor the req

hall be use

Version 2.0

i 2 0

Consumer actual arrancope of this

s to satisfy tata exchang

ng as the pr

the recipien

ks required fo

of the mainevices, or in prescribed lle.

bstitute Meten the releva

ny Metering

al Outstationinterrogatedpatch Centreme and frequ

m the operatg and protocLC communSCADA sys

plicate routefor the comm

, wherever he main Met

nal) shall havquired Meteed for local

premises angements ancode.

the conditiones shall be

roducer of th

nt of the data

or the prope

n Meter or icases wherimits of erro

er data will bnt parties.

System sha

ns. Any Locd by Remote (LDC). Thuency.

tional SCADcol. Howevenications havstem. Thesees to all majomunication o

possible, i.eter and chec

ve facilities ter data to b and remot

nd nd

ns in

he

a;

er

ts re

or,

be

all

cal te he

DA er, ve es or of

e., ck

to be te

Page 285: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

The StandReviemaintalarmautho

Loca

The Lpartie

Facilivaluehour.

A secfusing

Wherwith types

The event

Metecapa

In thewith associnterr

LocaOutstneces

MDERemoMete

The Outstlocal commlevelsautho

RemootherMeteOne all Locompwithin

Electricity Tra

interrogationdard 61107 ew Panel. Ttenance and

ms. A seriesorised Perso

l Outstations

Local Outstaes.

ities shall bees; 60, 30, 1

cure power g for each L

re a Local Oa secure su

s may be use

Local Outstt of a supply

r data togetble of being

e event of aan Local Ociated with rogation can

l interrogatiotations for tssary the ret

EC.7.4.2. Reote Instationr data on a r

broad spectations outlinand remote

missioning, s and codingorised Perso

ote Instationr time intervar data at anypair of Remocal Outstatputers to enn LDC.

nsmission Com

P 19 f 3

n ports shalor equivale

The local intd fault findins of securityons limit acce

s may perfor

ation data s

e provided to5, and 10 m

supply shallocal Outstat

Outstation syupply, separed.

tations shally failure.

ther with alatransferred

an Local OutOutstation su

an Local O identify the

on units mathe purposetrieval of sto

emote Instans if provideroutine basis

ification for ned above. Te interrogatiomaintenancg facilities w

ons only.

ns shall be cal to be specy time throug

mote Instationtions. Such able require

mpany

8

ll be opto-coent as agreterrogation png, time setty levels and ess to data a

rm some pro

shall conform

o select a reminutes with,

be providedtion.

ystem uses arately fused.

provide an

arm indicatioon request d

tstation failuupply failure

Outstation sum.

ay be usedes of commored Meter d

ations ed, shall be s from Local

the RemoteThe Remoteons. The loce and fault

will be provid

capable of ccified. It shoghout the Lons shall be Remote Ins

ed calculatio

The

oupler portsed by the M

port shall being, in additcoding fac

and other fe

ocessing of d

m to a forma

elevant demin each cas

d to each Lo

a separate m. Alternativ

n alarm outp

ons, and Locduring the in

ure, any parte and/or resupply failure

d by authorimissioning, mdata.

computer-bl Outstations

e Instationse Instations cal interrogat

finding andded to limit a

collecting allould howeveocal Outstatilocated at th

stations at thons to be ca

e Grid Code - V

I MDEC V

s with a serMetering ane capable ofion to the trilities shall batures.

data.

at and proto

mand period se, one dem

ocal Outstat

modem the mely, line or

put signal a

cal Outstationterrogation

tial Demandstoration, ane, shall be

ised Users maintenance

ased systems.

s shall be sshall be fittetion port wod time settiaccess to da

l Meter datar, be possibon data storhe LDC to che LDC shaarried out a

Version 2.0

i 2 0

rial protocol nd Data Excf use for co

ransfer of Mbe provided

ocol specifie

from one ofand period e

tion system w

modem shabattery pow

at a manned

on time and process.

Values, dand zero Demmarked so

to interrogae/fault findin

ms that colle

imilar to thoed with sepauld be capang. A serieata and othe

a by daily intle to repeat rage period. communicateall interface nd data to

such as IEchange Codommissioningeter data an

d so that on

d by releva

f the followinending on th

with separat

ll be providewered mode

d point in th

date shall b

ta associatemand Valuethat a futur

ate the Locng and whe

ect or receiv

ose for Locarate ports foable of use foes of securier features t

terrogation ocollections o

e directly witwith the LDbe presente

EC de g, nd nly

nt

ng he

te

ed m

he

be

ed es re

cal en

ve

cal or or ty to

or of

th DC ed

Page 286: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDEAll dTelecover

Interrspeci

p

ra

p

m

lo

In adany Mcode

ErrorOutst

MDE

MDEThe Mdata be En

WherOutst

Wherin the

MDEAny Lby th(2) coAll Uscopy be stshall numbOETCall Mrelevadata OETCin acthe p

Electricity Tra

EC.7.4.3. Codata commcommunicatitelecommun

rogation of Lified by relev

ublic switche

adio data ne

rivate netwo

mains signall

ow power rad

ddition the reMeter data p.

r checking fatations and R

EC.7.5 D

EC.7.5.1. ReMetering Syshall be disnglish.

re Meters prtations shall

re a separate Local Outs

EC.7.5.2. StLocal Outstae respectiveomplete calesers responof the data

tored shall binclude th

ber and MeteC shall main

Metering Sysant parties for sales betC and Userscordance weriod or imm

nsmission Com

P 20 f 3

ommunicatunications ions Union (nications sys

Local Outstavant parties;

ed telephone

etworks;

ork of a Licen

ing / power

dio.

elevant partiprovided that

acilities shaRemote Inst

ata displa

egisters ystems shall played on a

rovide Meteprovide two

te Local Outstation that c

torage ations provide Meters incender monthsible for proin electronic

be agreed bye following er readings. ntain a log instems and for at least tween Licens shall ensuith Table 7.

mediately fol

mpany

8

ions equipment

(ITU) standastems.

ations shall b

e networks;

nsed Transm

line carrier c

ies may spet such other

ll be includetations.

ay and sto

Meter the qa non-volatile

r data to Loo outputs per

tstation is uscan be set to

ded shall havluding alarm

hs. oviding Metec format in ay the Meter

essential

n the form ofLocal Outstten (10)] co

nsed Suppliere that back1. All back lowing comp

The

shall confards and rec

be possible

mission Syst

channels/fibr

ecify other mmedia is co

ed in all com

orage

quantities one Meter Reg

ocal Outstatir measured

sed, cumulao match and

ve the capams and other

r data in accaccordance ring and Datparameters;

f electronic stations and omplete opeers and final k-up copies oup copies spletion of the

e Grid Code - V

I MDEC V

form to thecommendatio

using any o

tem Operato

re optic chan

media and thonsistent with

mmunication

n a continuogister. The la

ions externaquantity.

tive registerincrement w

bility to storer functions fo

cordance wiwith Table 7ta Exchange time perio

storage of dithe associa

erational yeaConsumersof data in elehall be mad

e data set.

Version 2.0

i 2 0

e relevant ons for data

of the followi

or;

nnels; and

he format anh the require

n facilities b

us 24 hour anguage of

al to the Me

r values shawith the Mete

e all Meter dor relevant p

th this code 7.1. The forme Code Reviod, Meter I

igital data ofated data rars other th. ectronic form

de promptly

Internationa transmissio

ing media, a

nd protocol oements of th

etween Loc

basis and thdisplays sha

ter, the Loc

ll be provideer Registers

data collecteparties for tw

shall retain mat of data tiew Panel bIndentificatio

f all data froreceived froan the Mete

mat are madat the end o

al on

as

of his

cal

he all

cal

ed .

ed wo

a to ut

on

m m er

de of

Page 287: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Table

Curreworki(1)

Curreworki(1)

Curremontworki(1)

Eachfinalis

One Year’finalis

Notes

(1)

(2)

ProvipapetransAny Uin wrhourschargindiviLicenin acmanube mcomp

Electricity Tra

e 7.1 Da

Data

ent day’s ing data;

ent week’s ing data;

ent h’s ing data;

month of sed data;

Financial ’s set of sed data;

s:

The perioarrangem

Current pnew data

ders of Meter format, asactions by gUser shall beiting with OEs notice to ges for the sdual Users.

nsed Supplieccordance wually. The remade promppletion of the

nsmission Com

P 21 f 3

ata storage

Frequencback u

End of eacworking da

Each Thursat the end working da

Each montthe end of tlast workingday;

First workinday of follomonth;

od of a daments

period, i.e., dand change

er data shalls agreed in giving 24 houe provided pETC, of seleOETC. OE

supply of su

ers shall maiwith Table 7ecords shall ptly at the e data set wh

mpany

8

by OETC a

cy of p

Plac

ch ay;

On s

sday of

ay;

One site; One anot

th at the g

One site; One OET

ng owing

One site; One OET

One OETOne anot

ay, a week

day, etc, mees to existing

l be providedwriting with

urs notice topromptly withected archiv

ETC shall auch data an

intain record7.2. Most obe transcribend of th

hichever is s

The

and Users

ce of storag

site;

copy at Use copy at

ther site;

copy at Use copy at

TC;

copy at Use copy at

TC;

copy at TC;

copy at ther site;

k or a mon

eans all workg data.

d promptly wh OETC, of OETC. h a copy, in ved data relegree with t

nd any limita

ds of Meter dof such Metbed to electre individua

sooner.

e Grid Code - V

I MDEC V

ge Retaine

One comweek;

er One commonth;

er One comyear;

er Five FinYears;

Ten FinaYears;

nth will dep

k undertake

with a copy acurrent wor

electronic orevant to its the Regulato

ations on the

data associater data wilronic formatl periods o

Version 2.0

i 2 0

ed for C

mplete Eacbacsep

mplete Eacbacsep

mplete

ancial Finmesetagr

ancial

pend on lo

n in that pe

at no cost, inrking data r

r paper formtransactionsory Authorite supply of

ated with final be read a. All back upor immediat

Comment

ch day’s ck up storedparately;

ch week’s ck up storedparately;

alised eans all ttlements reed;

ocally agree

riod includin

n electronic orelevant to i

mat, as agrees by giving 2ty a scale osuch data t

al Consumeand recordep copies shately followin

ed

ng

or ts

ed 24 of to

rs ed all ng

Page 288: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Table

Curremontworki

Eachfinalis

One Year’finalis

Notes

(1)

(2)

The pcopy Suppthe LAny Uin wtransshall and a

MDE

MDE

MDEA MepurpothosereviewRevieAuthoand DOETCExch

Electricity Tra

e 7.2 Da

Data

ent h’s ing data;

month of sed data;

Financial ’s set of sed data;

s:

The term

Current pnew data

providers ofat no cost,

plier, of curreicensed SupUser shall be

writing with actions by gagree with

any limitation

EC.8 Met

EC.8.1 E

EC.8.1.1. Eletering andoses of revie parts of thw all recomew Panel suority for appData ExchanC shall haveange Code.

nsmission Com

P 22 f 3

ata storage

Manual Place of storage

On site;

On site;

On site;

site in this ta

period, i.e., dand change

f Meter data in electron

ent working pplier. e provided pthe Licens

giving 24 hothe Regulatns on the su

er and Da

lectricity M

lectricity Med Data Exchewing and u

he MDEC thmmendationsupports the roval. Other

nge Panel we overall re

mpany

8

by License

readings Retained

for

One year;

Two years;

Ten Years;

able means

day, etc, mees to existing

a referred tonic or paper data relevan

promptly withsed Supplieours notice tory Authoritpply of such

ata Excha

Meter and

eter and Dahange Codupdating theat refer to Ws and guida

recommendrwise, the reith commentsponsibility

The

ed Suppliers

Frequencof back u

Daily;

Weekly;

Annually;

the site or o

eans all workg data.

o in Table 7format, as

nt to its tran

h a copy, in er, of selecto the Licensy a scale of

h data to ind

ange Cod

d Data Exc

ata Exchange Review Pe Metering aWater Meterance proposdations, the

ecommendatts for furtherfor the man

e Grid Code - V

I MDEC V

s

Electroniccy up

Placestora

On site;

One cosite; Onat asite;

One cosite; Onat asite;

offices of a L

k undertake

.2 shall be agreed in wsactions by

electronic orcted archivesed Supplief charges foividual User

de Review

change Co

ge Code RevPanel shall and Data Exrs. The Gridsed by this ey will be ptions will ber consideratinagement o

Version 2.0

i 2 0

c record e of age

Re

Oncoyea

opy on e copy

another

FivFinYe

opy on e copy

another

TeFinYe

Licensed Sup

n in that pe

provided prowriting with giving 24 ho

r paper formed data reer. The Licenr the supplys.

w

ode Revie

view managbe establi

xchange Co Code Revipanel. If thassed to th returned toion.

of the Meter

etained for

ne mplete ar;

ve nancial ears;

en nancial ears;

pplier

riod includin

omptly with the Licenseours notice t

mat, as agreelevant to insed Suppliey of such dat

ew

gement shed for th

ode excludinew Panel w

he Grid Codhe Regulatoo the Meterin

ring and Dat

ng

a ed to

ed ts er ta

he ng

will de ry

ng

ta

Page 289: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDEThe funct

MDEThe P

MDEThe MproceThe rRegu

MDERelevMeteExchto beCode

Electricity Tra

EC.8.1.2. ElMetering anions;

i) geCoM

ii) reExMan

iii) disar

iv) pureRe

v) issitspa

EC.8.1.2.1 Panel shall c

i) a ii) 1 iii) 1 iv) 1 v) 1 vi) 1

Prof

vii) 1 Prex

viii) 1 ix) 1

EC.8.1.2.2 Metering anedures relatirules shall bulatory Autho

EC.8.1.2.3 vant parties ring and Daange Code

e materially ae.

nsmission Com

P 23 f 3

lectricity Mend Data Ex

enerally reviode and itsetering and view and dixchange Coetering Systnd Data Excscuss changrising from uublish recomcommendateview Panelsue guidancs implementaarty with Met

Membershconsist of; Chairman aPerson appoPerson reprPerson reprPerson appoPerson (ro

roducers ea100 MW or Person (r

roducers eaxceeding 100Person reprPerson repr

Rules d Data Exchng to the co

be submittedority for appr

Amendmeshall subm

ta ExchangeReview Panaffected by

mpany

8

eter and Daxchange Co

ew, discusss implemenall data exchscuss propode which Otems or Metehange Paneges necessnforeseen c

mmendationstions has o members; a

ce in relationation, perfortering Syste

hip

nd up to 2 mointed by theresenting earesenting eaointed by PW

otated betwech having Pless; otated betwch having P0 MW; resenting Intresenting Co

hange Codeonduct of its d to the Gridroval.

ents to the cit all propose Code to Onel. OETC sproposed am

The

ata Exchangde Review

s and develontation withhange; osals for amETC, the Rers may sub

el from time tary to the M

circumstances and ensurccurred throand n to the Metrmance and ms or Meter

members appe Regulatorych Licensedch Licensed

WP; een Power Power Facilit

ween PowePower Facilit

ernally Connonsumers wi

e Review Pabusiness an

d Code Revi

code sed amendmOETC for conshall also nomendments

e Grid Code - V

I MDEC V

ge Code RevPanel shal

op the Meteh particular

mendments tegulatory Au

bmit for consto time; Metering anes referred tore that Userough Meter

tering and Dinterpretatio

rs

pointed by Oy Authority;

d Distributor;d Supplier;

Producers)ties with a t

er Produceties with a t

nected partieth Demand g

anel shall esnd shall comiew Panel fo

ments and cnsideration botify in writin

to the Mete

Version 2.0

i 2 0

view Panel l carry out

ering and Dareference

to the Meteruthority or asideration by

nd Data Exco it by relevar consultatioing and Da

Data Exchanon when ask

OETC;

representintotal Registe

rs) represetotal Registe

es; and greater than

stablish its oply with themor review an

comments coby the Meterg all Users

ering and Da

the followin

ata Exchangto electrici

ring and Datany party wity the Meterin

change Codant parties;on upon sucata Exchang

nge Code anked to by an

ng all Poweered Capaci

enting Poweered Capaci

n 5 MW.

own rules anm at all timend then to th

oncerning thring and Datthat are likeata Exchang

ng

ge ty

ta th

ng

de

ch ge

nd ny

er ty

er ty

nd s.

he

he ta

ely ge

Page 290: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

All prby thGrid

MDE

MDEA Waand MeteMetePWPparts

MDEA Wabody

MDEThe P

MDEThe Wrelatishall and t

Electricity Tra

roposed ame Metering Code Review

EC.8.2 W

EC.8.2.1. Water Meteringupdating thers. All recomring and Dat

P shall have of the Mete

EC.8.2.2. Water Meterinto carry out

i) reExthco

ii) manM

iii) issExanan

iv) coExar

EC.8.2.2.1 Panel shall c

i) a ii) 1 iii) 1 iv) 2

Pr

EC.8.2.2.2 Water Meterng to the cobe submitte

then to the R

nsmission Com

P 24 f 3

endments toand Data Ew Panel for

Water Mete

Water Meter Sg System Ree parts of t

mmendationsta Exchange the overall

er and Data E

Water Meterig System Rt the followinview proposxchange Coat any part

onsideration ake recommnd Data Exceters; sue guidancxchange Cond their implny party withonsider chanxchange Corising from u

Membershconsist of; Chairman aPerson appoPerson appoPersons (ro

roducers wit

Rules ring System

onduct of its ed to the MRegulatory A

mpany

8

o the Meterixchange Coreview and t

er System

System reveview Panelthe Meterings and guidae Code Revil responsibilExchange C

ng System Review Paneng functions;sals for ameode applicabty with sucby the Pane

mendations fchange Code

ce in relatiode that refelementation,

h Water Metenges propo

ode that refenforeseen c

hip

nd one otheointed by theointed by PAotated betwh Water Pro

m Review Pabusiness anetering and

Authority for a

The

ng and Dataode Review then to the R

review

view manag will be estag and Data nce proposeiew Panel folity for the m

Code.

Review Panel shall be e ndments to

ble to Waterch systems el from time for amendme that refer t

on to thoseer to Water , performancering Systemsed to thoser to Water circumstance

r person appe RegulatoryAEW; and

ween Power oduction cap

anel shall esnd shall com

Data Exchaapproval.

e Grid Code - V

I MDEC V

a ExchangePanel and

Regulatory A

ement ablished for t

Exchange ed by this paor approval. managemen

nel stablished w

those parts r Metering S

may wish to time;

ments to thoto Water Me

e parts of Metering S

ce and interms or Water se parts of Metering S

es referred to

pointed by Py Authority;

Producers)pability.

stablish its omply with theange Code

Version 2.0

i 2 0

e Code mustshall be sub

Authority for

the purposesCode referr

anel will be p

nt of the Wa

which shall b

of the MeteSystems or W

to submit

ose parts of etering Syste

the MeterinSystems or Wrpretation if Meters; andthe Meteri

Systems or Wo it.

PWP;

) representi

wn rules anem at all timeReview Pan

t be reviewebmitted to thapproval.

s of reviewinring to Watepassed to th

ater Meterin

be a standin

ring and DatWater Meteto PWP fo

the Meterinems or Wate

ng and DatWater Meterequested b

d ng and DatWater Mete

ng all Powe

nd procedurees. The rulenel for revie

ed he

ng er he

ng

ng

ta rs or

ng er

ta rs by

ta rs

er

es es ew

Page 291: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

MDERelevthe MMeteshall amenMeteAll prreviewGrid

Electricity Tra

EC.8.2.2.3 vant parties

Metering andrs to PWP falso notify

ndments to tring Systemroposed relewed by the Code Review

nsmission Com

P 25 f 3

Amendmeshall subm

d Data Exchfor considerin writing althose parts o

ms or Water Mevant amendWater Mete

w Panel for

mpany

8

ents mit all proposhange Coderation by thel Users that of the MeterMeters. dments to thering Systemreview and t

The

sed amendm that refer te Water Meare likely to

ring and Dat

he Meteringms Review then to the R

e Grid Code - V

I MDEC V

ments and co Water Metering Systeo be materiaa Exchange

g and Data EPanel and sRegulatory A

Version 2.0

i 2 0

comments thetering Systeems Reviewally affectede Code that r

Exchange Cshall be subAuthority for

hose parts oems or Wate

w Panel. PW by proposerefer to Wate

Code must bbmitted to thapproval.

of er

WP ed er

be he

Page 292: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

APPEAPPEAPPEAPPEAPPEAPPEAPPEAPPE

Electricity Tra

pendices

ENDIX A Ac

ENDIX B M

ENDIX C La

ENDIX D Co

ENDIX E M

ENDIX F W

ENDIX G Lo

ENDIX H Da

nsmission Com

P 26 f 3

ccuracy of M

etering Syst

abelling of M

ommissionin

eter Registra

Water Meter T

ocations of M

ata Flow Tab

mpany

8

Metering Sys

tems for Con

Meters ng Tests ation Data

Technical Re

Metering Sys

bles

The

stem nsumer Con

equirements

stems

e Grid Code - V

I MDEC V

nections

s

Version 2.0

i 2 0

Page 293: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

A.1 The fIEC (class

IEC (class

IEC S

IEC S(class

IEC S

IEC S

IEC S

IEC S

All Mtime tWherCodeAutho

A.2 For tand overaand trace

Electricity Tra

pendix A

Standafollowing staStandard 6ses 0.2 S an

Standard 6ses 1 and 2)

Standard 60

Standard 61ses 2 and 3)

Standard 60

Standard 60

Standard 60

Standard 61

etering Systthat the Usere relevant se Review Pority the exte

Overallthe measureDemand, Mall limits of ethe resistanable to a rec

nsmission Com

P 27 f 3

Accurac

ards andards are a0687 – Altend 0.5 S);

1036 - Alte);

521 – Altern

1268 – Alte);

044 Part 1 –

044 Part 2 –

044 Part 3 –

107 – Data e

tems and Mer’s Connectstandards c

Panel will reent to which

l accuracy ement and M

Metering Syserror set out nce of cablcognised na

mpany

8

cy of Mete

among thosernating cur

ernating cur

nating curren

ernating cur

– Current tra

– Voltage tra

– Combined

exchange fo

eters shall cion Agreemehange from eview such any such ch

requiremeMetering of stem shall bin Table A -ing or circutional or inte

The

ering Sys

e related torrent static

rrent static

nt watt-hour

rent static v

ansformers;

ansformers;

transformer

or meter read

comply with ent is signedtime to timchanges a

hanges shou

ents Active Ene

be tested a-1, after takiuit protectioernational sta

e Grid Code - V

I MDEC V

stem

this code; watt-hour m

watt-hour m

meters (clas

var-hour me

rs;

ding – direct

the relevantd. e, the Meteand recommuld be imple

rgy, Reactivand calibrateing due accon. Calibratandard.

Version 2.0

i 2 0

meters for a

meters for a

sses 0.5, 1 a

eters for rea

t local data e

t standards

ering and Damend to thmented.

ve Energy, Aed to operaount of CT ation equipm

active energ

active energ

and 2);

active energ

exchange;

current at th

ata Exchange Regulato

Active Poweate within thand VT erro

ment shall b

gy

gy

gy

he

ge ry

er he rs

be

Page 294: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Table

Con

Curpercmea

120

Belo

Belo

120

120

Con

Curpercmea

120

120

120

Electricity Tra

e A-1 : Over

ndition

rrent exprescentage of asuring cur

% to 10% in

ow 10% to 5

ow 5% to 1%

% to 10% in

% to 10% in

ndition

rrent exprescentage of asuring cur

% to 10% in

% to 20% in

% to 20% in

nsmission Com

P 28 f 3

rall accurac

ssed as a rated

rrent

nclusive

5%

%

nclusive

nclusive

ssed as a rated rrent

nclusive

nclusive

nclusive

mpany

8

cy of Meteri

Limits of e

Power Factor

1

1

1

0.5 lag

0.8 lead

Limits of er

Power Factor

0

0.866 lag

0.866 lead

The

ng System

rror at stateand Ene

Lim

>100 MVA

±0.5%

±0.7%

±1.5%

±1.0%

±1.0%

rror for ReaP

Lim

>100 MVA

±4.0%

±5.0%

±5.0%

e Grid Code - V

I MDEC V

ed Power Faergy measu

mits of error

>20–100 MVA

±1.0%

±1.5%

±2.5%

±2.0%

±2.0%

active PowePower Facto

mits of error

>20–100MVA

±4.0%

±5.0%

±5.0%

Version 2.0

i 2 0

actor for Acurement

for Connec

>1–20 MVA

% ±1.5%

% ±2.0%

%

% ±2.5%

% ±2.5%

er and Energor

for Connec

>1–20 MVA

% ±4.0%

% ±5.0%

% ±5.0%

ctive Power

ctions

<=1 MVA

% ±1.5%

% ±2.5%

% ±2.5%

% ±2.5%

gy at stated

ctions

<=1 MVA

% ±4.0%

% ±5.0%

% ±5.0%

r

%

%

%

%

d

%

%

%

Page 295: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

A.3 The ashall

Table

Equ

Curr

Volta

Activ

Reac

Note

Note

Note

A.4 Kilowout inshow

Table

Electricity Tra

Meterinaccuracy claas a minimu

e A-2: Equip

ipment type

ent transform

age transform

ve Energy an

ctive Energy

1: Cuirr

2: OE11

3: A msucupe

Servicewatthour Metn the follow

wn in the tabl

e A3: Ki

Type

Single

Three

Direct

Three

With transfo

nsmission Com

P 29 f 3

ng System ass or equivum be as fol

pment accu

e

mers (Note 1

mers (Note 2

nd Power M

y and Power

urrent transrespective of

ES14 specif1kV

Meter accueasured by

uch that the urrent for peeriods of zer

e connectioters for servi

wing Table Ale.

ilowatthour

phase

phase,

Connected

phase,

current ormers

mpany

8

accuracy valent, is baslows;

uracy classe

1)

2)

eters (Note

r Meters

sformers shf CT second

fies Class 1

racy class othe entry/emetered cu

eriods equivro current).

ons ice ConnectA3. Theses

r Meters for

Voltage

240v

415v, phase, 4 w

415v, phase, 4 w

The

classes sed on the M

es

>100MVA

0.2

0.

3) 0.2

hall meet dary ratings.

1 accuracy t

of 0.5 may bexit Meter duurrent will bvalent to 10

ions shall corequiremen

service Co

Curre

20 – 1

3 wire

50A,

3 wire

200A400A

e Grid Code - V

I MDEC V

MVA Capaci

Equipmenfor C

0 A

>20–10MVA

S 0.2

.2 0.

S 0.5S/0.

2

the class

to BS 3941/

be used wheuring normae above 5%% or greate

onform to IEnts are in a

onnections

ent Ac

100A Cl

100A Cl

, 300A, Cl

Version 2.0

i 2 0

ity of the Co

nt accuracyConnections

0 >1–20 MVA

S 0.5

.5 1

.5 1

2 2

accuracy

/IEC186 for

ere energy tral operating % of the rateer per annu

EC Standard accordance

ccuracy

ass 2

ass 2

ass 2

onnection an

y class s

<=1 MVA

5 0.

2

requiremen

VTs used

ransfers to bconditions

ed measurinum (excludin

60521 as sewith OES a

OES Number

22A

22B

22C

nd

5

1

2

2

ts

at

be is

ng ng

et as

Page 296: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

This applieTrans33kVConsThe Conn Table

The excep

The appro

1 The

Electricity Tra

pendix B

Appendix ises to all Cosmission Sy

V, 11kV or Lsumer Dema

Metering Snections are

e B1 Me

Cat. Co

1. >5MW

2. >1MW

3. >500

4. >100

5. # 100

Metering Sypt as determ

i) LoCo

ii) Seinjca

iii) Mins

iv) Mev

v) Thm

Licensed opriate summ

appropriatenes

nsmission Com

P 30 f 3

Metering

s concerned onsumers. D

ystem. OtherV, the Conn

and. Systems tha

given in Tab

etering Sys

nnection sizMW1

W

W to 5MW

0kW to 1MW

0 kW to 500k

0kW

ystems shalmined by the ocal Outstatonnections oeparate tesjecting test

ategories 1 aeters for caspection andeters for cavery ten yeahe requiremeet for all cateDistributor

maries of the

ss of the size c

mpany

8

g System

with the MeDirect Connr Consumersnection volta

at shall be ble B1.

stem require

ze

KWh

Yes

Yes

W Yes

kW Yes

Yes

ll be in accconditions iions (internaonly; st terminals quantities a

and 2 Conneategory 5 Cod certificatioategory 5 Cors; and ents of MDEegories of C

companiese Metering r

categories need

The

ms for Con

etering Systnected Conss will be Conage generall

applied to

ements

Meters requ

KVarh

KYes Y

Yes Y

Yes Y

Yes Y

No N

cordance witn Table C1 al or extern

for accesand connectiections only;onnections n by manufaonnections

EC.6 for acceConnections.s’ Consumequirements

d confirmation

e Grid Code - V

I MDEC V

nsumer C

tem requiremsumers are nnected to tly being a fu

o the differ

uired

Maximum Demand

KW KVarYes Yes

Yes Yes

Yes No

Yes No

No No

th the requiand those thal) shall be

ssing currening test Met

may be accacturers; shall be re-

ess, sealing

mer represes applicable

by MHEW

Version 2.0

i 2 0

Connectio

ments of Cothose Connhe Distributiunction of th

rent sizes o

Check EMeters re

Ye

No

No

No

No

irements of hat follow; provided fo

nt and voltters shall be

cepted base

-Calibrated

and Registr

entatives sto Consume

ons

onsumers annected to thion System ahe size of th

of Consume

Energy equired

s

o

o

o

o

the MDEC

or category

tage signale provided fo

ed on samp

at least onc

ration shall b

shall provider Metering.

nd he at he

er

.5

1

s, or

le

ce

be

de

Page 297: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

C.1 EachOETC

The nunde

The nMete

Test Mete

C.2 The definfollowActivMete

“Entry

“Exit”

ReacWithiEnergthe re

Table

Meteand t

Electricity Tra

pendix C

Genera Meter shallC and record

number shalr all normal

number will r readings.

blocks andring System

Entry afollowing stitions for en

ws. ve Energy rs or Meter

y” for all Act

” for all Activ

ctive Energyn the contegy can be beelationship;

e C.1: Reac

Flow oEn

E

E

E

E

E

E

rs or Meter those for reg

nsmission Com

P 31 f 3

Labelling

al l be allocateded in the M

ll be markedviewing of th

be quoted o

other relatm with which

and exit labtandard mentry and exi

Registers sh

tive Energy F

ve Energy Fl

y ext of this cest establish

ctive Energy

of Active nergy

Entry

Entry

Entry

Exit

Exit

Exit

Registers fogistering exit

mpany

8

g of Mete

ed a unique Meter Registr

d permanenthe Meter.

on all record

ed Meteringthey are ass

belling ethod of labit shall be in

hall be labell

Flows norma

ows normall

code the relhed by mean

y entry/exit

Pow

or registering Reactive En

The

ers

Meter identration System

tly on the Me

ds arising fro

g equipmentsociated.

belling metencorporated

led

ally entering

ly leaving or

ationship bens of the Pow

convention

wer Factor

Lagging

Leading

Unity

Lagging

Leading

Unity

g entry Reacnergy shall b

e Grid Code - V

I MDEC V

ification numm.

eter in a pos

om and relat

t shall be c

ers, test blo. The requi

the Transm

r exiting the T

etween Activwer Factor.

n

Fl

ctive Energybe labelled “

Version 2.0

i 2 0

mber that wi

sition that is

ted to the M

clearly ident

ocks, etc; bred labelling

mission Syste

Transmissio

ve Energy aThe followin

ow of ReacEnergy

Entry

Exit

zero

Exit

Entry

zero

y shall be la“Exit”.

ll be given b

clearly visib

eter includin

tified with th

based on thg shall be a

em, and

on System,

and Reactivng table give

ctive

belled “Entry

by

le

ng

he

he as

ve es

y”

Page 298: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

This Systecarriecond

D.1 For aensu

1. Dr

2. C

3. V

For inthat, must site, obtai

D.2 For a

1. C

2. C

3. Dao

D.3

D.3.1The flabor

1. R

2. CM

3. CC

4. C

5. Cmef

6. Wa

Electricity Tra

pendix D

Appendix sems commised out on eaucted in acc

Measurall installationre that from

Details of thratio(s);

CT ratio and

VT ratio and

nstallations wwherever prconfirm andthe reason ned from an

Measurall installation

Confirm that

Confirm that

Determine aassociated woverall mete

Meterin

1 Generalfollowing maratory, etc).

Record the M

Confirm thaMeasuremen

Confirm corrCT/VT opera

Check that a

Confirm thatmeters whicexit flow direfor normal po

Where sepaallocations a

nsmission Com

P 32 f 3

Commis

sets out thessioning progarthing, insu

cordance wit

rement Trans with new/site tests an

he installed

polarity for

phasing for

with existingractically posd record VT must be re

ny relevant p

rement Trans the Meter

the VT and

the VT and

and record with Meteringring accurac

ng

l tests and cay be perfo

Metering Sys

at the VT/Cnt Transform

rect operatioated meterin

all cabling an

t Meter regch are linkedections. Conolyphase cu

arate Outstaand that the M

mpany

8

ssioning t

e tests and gramme. Mulation, togeh Good Indu

ansformers/replaced Mend inspection

units, inclu

selected tap

r each windin

g Measuremssible, 1, 2 aand CT ratio

ecorded on party.

ansformer r Owner sha

CT connect

CT Burden

the value g Systems ocy.

checks rmed on-site

stem details

CT ratios amer ratios.

on of Meter g).

nd wiring of t

gisters advad to separatnfirm Meter rrent operat

ations are uMeter units p

The

tests

checks thaMetering Systether with alustry Practic

s easurementns the follow

uding serial

p; and

ng.

ment Transfoand 3 aboveos. If it is nothe commis

leads and all wherever

tions are cor

ratings are n

of any Buor Meters) n

e or elsewh

required by

applied to

test termina

the new or m

nce (and thte Outstatiooperation seion.

used confirmper pulse va

e Grid Code - V

I MDEC V

at shall be item shall in ll other tests

ce.

t Transformewing are conf

numbers, r

ormers the Me are implemot possible tssioning rec

burdens practically p

rrect;

not exceede

urdens (inclnecessary to

here (e.g. fa

y the Meter R

the Meter(

al blocks wh

modified inst

hat output pns) for entryeparately for

m the Metealues or equi

Version 2.0

i 2 0

included in addition hav

s that would

ers the Metefirmed and r

rating, accu

Meter Ownermented, but ato confirm thcord and de

possible;

ed; and

uding any o provide ev

actory, mete

Registration

(s) agree w

here these a

tallation is co

pulses are y and wherer each phas

er to Outstaivalent data

the Meterinve basic tesd normally b

er Owner sharecorded;

racy classe

r shall ensuras a minimuhe CT ratio otails must b

Burdens novidence of th

r test statio

System.

with the sit

are fitted (e.g

orrect.

produced foe appropriate current an

ation channare correct.

ng ts

be

all

s,

re m

on be

ot he

n,

te

g.

or te

nd

el

Page 299: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

7. Co

D.3.2The f1. C

D

2. C

3. CM

4. R

5. WPro

6. WrtwhT

7. RmDr

8. Ct

9. C

Electricity Tra

Confirm that operate corre

2 Site tesfollowing tesCheck any sD.1, D.2 and

Confirm that

Check that tMeter termin

Record Mete

Wherever prPrimary injeregistering thoperation of

Where for precorded on est shall be

where applichave been Transformers

Record valuminimum onData Exchanreading) on t

Confirm the ransmitted d

Confirm from

nsmission Com

P 33 f 3

the local intectly.

ts sts shall be psite cabling,d D.3.1 abov

Meter/Outs

the voltage nals are corre

er start readi

ractically posection test) he correct pthe metering

ractical or sthe commis

e performedcable, any M

determines, above;

es of the Mne complete nge Code Rthe commiss

operation odata); and

m Meter Own

mpany

8

terrogation f

performed on wiring, con

ve;

tation is set

and the phect;

ings (includi

ssible, a prishall be p

primary eneg installation

safety reasossioning rec to confirm Meter VT/CTed separat

Meter(s)/Outhalf-hour u

eview Panesioning reco

of Metering

ner that accu

The

facility (Mete

n site; nnections no

to UTC (Om

hase rotation

ng date and

mary prevaierformed w

ergy values n are correct

ons (5) is nocord and a s

that the MeT ratios. Inely as de

station(s) dunless otherl) value withrd;

System ala

uracy certific

e Grid Code - V

I MDEC V

er or Outstat

ot previously

man time) wit

n of the me

time of read

iling load teswhich confirm

and that thet;

ot possible tsecondary preter registran such caseetailed und

isplayed or rwise approvh the associa

arms (not da

cates exist fo

Version 2.0

i 2 0

tion) and loc

y checked u

thin +/- 5 se

asurement

dings);

st (or wherems that thee overall ins

then the rearevailing loaation is corres the VT/Cder D.1, M

stored Metved by the ated date an

ata alarm o

or the Meters

cal display e

under clause

conds;

supply at th

e necessary e Meter(s) stallation an

ason shall bad or injectioect includingT ratios shaMeasureme

er data (at Metering annd time of th

r flags in th

s.

tc

es

he

a is

nd

be on g, all nt

a nd he

he

Page 300: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

The Melectr

Data Mete

Metelimite

(a) (b)

(c)

(d) (e) (f) (g) (h) (i) (j) (k)

Electricity Tra

pendix E

Meter Regisricity and wa

in the Meter data shall

r data to beed to the follo

A unique ConnectioActual Mei) locii) paiii) sitiv) Mv) los

DeMain and vi) sei) mii) Miii) insiv) tes

cev) asvi) ca

anvii) andata regisdata comtelephonecommuniccommunicdata convUser idendata validincluding;i) algii) daiii) priv) ch

nsmission Com

P 34 f 3

Meter Re

stration Systater Metering

r Registratiobe released

e contained owing;

meter idention Point andetering Pointcation and rearticipant dette identificateter Owner; ss compenselivery Pointcheck Mete

erial numberetering instaeter types astrument trast and calib

ertificates forsset managealibration tabnd ny Meter sumster coding dmunication d

e number forcation equipcation protocversion detantifications adation and gorithm; ata comparisrocessing anheck meterin

mpany

8

egistratio

tems are theg System ins

on Systems to the appro

in the Mete

ification numd Metering pt, including;eference details at the Cion nomencand

sation calcut differ. er installationrs; allation identnd models;

ansformer ratbration progr Meters andement plan ables, where

mmation schdetails; details (wher access to d

pment type acol details oils; nd access risubstitution

son techniqund alarms (i.eng compensa

The

on data

e Meter datastallations.

shall be treaopriate party

er Registrati

mber; point referen

tails (i.e. draConnection Plature;

lation detail

n details, inc

tification nam

tios (availabgramme detad Measuremand testing s

applied to

heme values

n communicdata; and serial nur references

ights; n processes

ue; e. voltage soation details

e Grid Code - V

I MDEC V

abase that h

ated as confy.

on Systems

ce details fo

awing numbePoint;

ls where Ac

cluding;

me;

ble and connails; test reent Transfor

schedule; achieve Me

s and multipl

cation system

umbers; s;

s agreed be

ource limits, .

Version 2.0

i 2 0

holds Meter

fidential and

s shall includ

or both Deliv

ers);

ctual Meteri

ected); esults and rrmers;

eter installat

iers.

ms are used

etween affe

phase-angl

data for bot

only releva

de, but is no

very Point an

ng Point an

eference te

ion accurac

d);

ected partie

e limits);

th

nt

ot

nd

nd

st

cy;

s,

Page 301: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

F.1 The sensoconve

The OMeteprovid

Convfacilitthe mboard

The Win a obstreffectvibratlocka

The WMatemateactioninstru

All Wspeci10%

The Mand Ithe flSyste

Instruin da

F.2 Eachsenso

Wherautom

The sfull-sc

Flow housilined extenshall

Electricity Tra

pendix F

GWater Meteors and coerter units. T

Outstations r data to beded remotel

verter units/ties for confimeasured pds shall com

Water Metersecure met

ructions andtive protectiotion. Approp

able and cap

Water Meterrials, which rials shall bns are presumentation d

Water Meterinification oveand 90%.

Meter cabinIP 65 outdolood level it ems shall no

umentation smage to pla

Fl flow Meteror mounted i

re electromamatic zero er

system accucale reading

sensors shaing and termwith an iner

nd from the be no protru

nsmission Com

P 35 f 3

Water M

eneral ering Systemonverter unitThe sensor s

shall providee interrogaty over comm

Outstations guring the in

parameter, pply with BS 6

ring System tering cabined well lit byon from moipriate tempepable of bein

ring Systemsare exposee chosen thsent other devices mou

ng Systemser the tempe

et and any ors as a mishall be ra

ot reduce the

systems shant or result i

low metersring System in the pipelin

agnetic flow rror averagin

uracy over th.

all compriseminations. Wart substance bore of the t

uding parts to

mpany

8

eter tech

ms shall inclts/Outstationhall be sited

e two outputed locally amunications

shall provinstrumentatiprogrammin6221 (IEC 6

and associaet located i

y artificial ligisture and derature contg sealed to

s shall be reed to the Dehat are comthan those

unted close t

s shall functierature range

associated nimum. Wh

ated to IP 68e IP rating of

all be designn the develo

s shall comp

ne and a sep

Meters are ng and low p

he normal o

a Meter tubater Meter tusuitable for tube to fully o restrict the

The

hnical req

lude main Mns. The Ou in or above

ts per measand at a latechannels.

ide, by meaon system. g facilities 0326).

ated commun an area t

ght. The caust ingress trols shall bprevent una

esistant to cesalinated Wpatible and intended.

to water pipe

ion within the -20° to 50

Metering Syhere an inst8 (submersif the device.

ed such thaopment of a

ply with BS parate signal

used, they ower consum

operating ran

be assemblyubes shall bethe mediumcover the raflow.

e Grid Code - V

I MDEC V

quirement

Meters and utstations m

the water be

ured quantiter date for

ans of the It shall proviand fault a

unications eqthat is readbinets shalland from ph

be provided.authorised ac

orrosion for Water, shall

that no cheSupport syses shall be n

he limits of t0°C at a rela

ystems shatrumentationible). Cable

at failure of thhazardous s

EN ISO 68converter.

shall be ofmption.

nge shall no

y containing e made from and flangedaised face o

Version 2.0

i 2 0

ts

check Meteay be integeing measur

ty and shall Water Mete

local interride a local Lannunciation

quipment shdily accessib include as

hysical dama The cabinccess

the lifetime not corrode

emical or elestems and

non-metallic.

their normal ative humidit

ll be rated In device is l

connections

he system ssituation.

817 and com

f the pulsed

ot be more t

all necessam a non-magd. The lining of the tube fl

ers each witgral with thred.

enable Wateer data to b

rogation porLCD display on. The circu

all be locateble, free fros a minimumage, includinnets must b

of the worke. In all caseectrochemichousings fo

performancty of betwee

IP 55 indooocated belos to Meterin

hall not resu

mprise a flo

dc type wi

han ±0.2%

ry electrodegnetic materi

material shalanges. Ther

th he

er be

rt, of uit

ed m

m, ng be

ks. es cal or

ce en

rs ow ng

ult

ow

th

of

es, al all re

Page 302: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

Wateproteany fnot p

The f

• ad

• insu

• m

• fa

• md

Electricity Tra

er Meter tubcted to IP 6flood water. revent disco

flow Meter co

djustment of

ndependent uitable for an

manual adjus

ailure of the f

means of tesesign.

nsmission Com

P 36 f 3

bes installed68 and shall

Where pottonnection of t

onverter sha

f flow range

4 to 20 mA n integration

stment of pul

flow Meter s

sting the con

mpany

8

d in areas sbe suitable

ting compouthe sensor c

all provide the

according to

output prop counter driv

sed and curr

hall cause th

nverter elect

The

susceptible for continua

unds are usecabling.

e following fa

o size of flow

portional to fve

rent output r

he output to

tronics shall

e Grid Code - V

I MDEC V

to flooding al submergee to achieve

acilities;

w sensor

flow rate and

response tim

be driven do

be an integ

Version 2.0

i 2 0

shall be enence at the le this perform

d a 24 V dc

me

own scale

gral part of

nvironmentalikely depth mance it sha

c pulse outp

the converte

lly of all

ut

er

Page 303: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

Meteof the1

2 •

3 The DConnThe aThis Conn

OETCall reis rea

Electricity Tra

pendix G

ring Systeme Systems o

Between

Power Pro

Licensed

Externally

Internal In

Directly C

Between

Embedde

Internatio

Internal In

Consume

Between

Delivery Poinection Agreactual locatimay be dif

nection Agre

C, Licensed asonable ste

asonably pra

nsmission Com

P 37 f 3

Location

ms must be if the variousa Licensed T

oducers;

Distributors

y Interconne

nterconnecte

Connected C

the Systems

ed Power Pro

nal Intercon

nterconnecte

ers.

the Product

ints shall beement or Eleion of a Mefferent fromement.

Distributorseps to ensuracticable to t

mpany

8

ns of Met

nstalled at es parties, as Transmissio

;

ected Parties

ed Parties; a

Consumers.

s of License

oducers and

nected Part

ed Parties, w

ion Facilities

e at the ownectrical Contering Syste

m the Delive

s, Licensed Sre that eachthe Delivery

The

tering Sys

each Deliverfollows.

on System; a

s;

and

d Distributor

d Autogenera

ies where in

where interco

s of Power a

nership bounnection and

em is referreery Point es

Suppliers an relevant MePoint at eac

e Grid Code - V

I MDEC V

stems

ry Point at th

and

rs; and

ators;

nterconnectio

onnections e

and Water Pr

ndary and s Use of Syst

ed to as thestablished p

nd Users shaetering Systech Connectio

Version 2.0

i 2 0

he ownersh

ons exist;

exist; and

roducers an

shall be spectem Agreem

e “Actual Mepursuant to

all each respem is locateon Point.

ip boundarie

d PAEW.

cified in eacment. etering Point

the releva

pectively taked as close a

es

ch

t”. nt

ke as

Page 304: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman

App

See n

Data

Data

MW

MWh

Wate

Data

MWh

Mvar

Wate

Data

MW

MWh

Mvar

Data

MW

MWh

Data

MW

MWh

Data Agre

MW

MWh

Mvar

Notes

1 2 3 4

Electricity Tra

pendix H

notes at foot

Item

A

exchange r

h

er Production

Exchange

h

rh

er Production

Exchange

h

rh

Exchange

h

exchange r

h

exchange eements

h

rh

s

All MeElectroThe freThe fre

nsmission Com

P 38 f 3

Data exc

t of table.

Prov

B

relating to P

Meter

Meter

n Meter

relating Bu

Meter

Meter

n Meter

relating to S

Meter O

Meter O

Meter O

relating to A

Meter Ow

Meter Ow

relating to I

Meter Ow

Meter Ow

relating to

Meter O

Meter O

Meter O

ter data in theonic formats sequency of alequency of se

mpany

8

change ta

vider

B

PWPAs and

Owner Po

Owner Po

Owner Po

lk Supply A

Owner Me

Owner Me

Owner Me

Supply Con

Owner Me

Owner Me

Owner Me

Agency Co

wner M

wner M

Import and

wner M

wner M

Transmiss

Owner Me

Owner Me

Owner Me

e above tableshall be used ll measuremeending all me

The

ables

Data

Sender

C

d PPAs

ower Produc

ower Produc

ower Produc

Agreement

eter Owner

eter Owner

eter Owner

ntracts

eter Owner

eter Owner

eter Owner

ntracts

Meter Owne

Meter Owne

Export Con

Meter Owne

Meter Owne

sion and Dis

eter Owner

eter Owner

eter Owner

e is required fofor data colle

ents will be hoeasurements w

e Grid Code - V

I MDEC V

a

R

cer PWP

cer PWP

cer PWP/P

PWP

PWP

PWP/ P

License

License

License

r License/PWP

r License/PWP

ntracts

r PWP

r PWP

stribution U

OETC/ DistribuOETC/ DistribuOETC/ Distribu

or invoices ection and forourly will be monthl

Version 2.0

i 2 0

Receiver

D

PAEW

PAEW

ed Supplier

ed Supplier

ed Supplier

ed Suppliers

ed Suppliers

Use of Syst

Licensed utor Licensed

utor Licensed

utor

r data transmi

ly

s

s

tem

ission

Page 305: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 1 of

Abbrevia

A AC AVR CCGT CD CT DC DSM ECA/ECU

G GC GWh HP HV Hz IEC ITU k kV LV M MHEW ms MVA Mvar Mvarh MW MWh OC PPA PSS

ctricity Transmis

26

ations

UOSA

ssion Compan

Abb

Ampere AlternatingAutomatic Combined Centrally DCurrent TrDirect CurDemand SConnectioAgreemenGiga or 10General CGiga Watt High PressHigh VoltaHertz InternationInternationKilo or 103

Kilo-Volt Low VoltagMega or 10Ministry of milli seconMega-VoltMega-VoltMega-var- Mega-WatMega-WatOperating Power PurPower Sys

y

Grid

breviations

g current Voltage RegCycle Gas T

Dispatched /ransformer rent

Side Managen Agreement

09 onditions Hour

sure age

nal Electro-tenal Telecomm

ge 06 f Housing Elend -Ampere -Ampere Rehour (Reac

tt (Active Powtt-hour (ActivCode (of the

rchase Agrestem Stabilis

d Code

s and Def

gulation Turbine / Central Dis

ement nt or Electri

echnical Communications

ectricity and

eactive / Megctive Energy)wer) ve Energy) e Grid Codeement

ser

The Grid Code

J - Abbr an

finitions

spatch

ical Connec

mmission Union

Water, Sult

ga-var (Reac)

)

e - Version 2.0

nd Definitions

Issue

ction and Us

tanate of Om

ctive Power)

s Version 2.00

ed April 201

se of Syste

man

)

00

10

em

Page 306: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 2 of

PAEW PWP PWPA PC RAEC SCADA SD1 SDC SPD VA VT WD-MHE

PAEW

ctricity Transmis

26

EW

ssion Compan

Public AutPower andPower andPlanning CRural AreaSupervisorSchedule DSchedulingStandard PVolt-AmpeVoltage TrWater DepSultanate oPubilc Aut

y

hority for Eled Water Procd Water PurcCode as Electricityry Control anDay 1 (or ang and DispatPlanning Daere ransformer partment of of Oman hority for Ele

ectricity and curer chase Agree

y Company nd Data Acqnother day atch Code ta

f the Ministr

ectricity and

The Grid Code

J - Abbr an

Water

ement

quisition s the numbe

ry of Housin

Water

e - Version 2.0

nd Definitions

er indicates)

ng Electricit

s Version 2.00

y and Wate

00

er,

Page 307: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 3 of

DefinitiThe followwords an

Accuracy

A test to d

Active E

The elecstandard have the

Active Po

The prodof watts have the

Actual M

The phys

Alert

A warninSystem;

Ancillary

The servPersons in conneSystem; aSystem OagreemePWP;

Ancillary

An agree

Autogen

A Person

Automat

Frequencpreset FrAvailable

ctricity Transmis

26

ons wing definitiod variations

y Test

determine th

nergy

ctrical energmultiples thsame mean

ower

duct of voltagor multiplessame mean

Metering Poi

sical point at

ng issued b

y Services

vices which Connected

ection with tand (2) are pOperator ornt between

y Services A

ement for the

nerator

n that Genera

tic Under-Fr

cy relays userequencies

e Generation

ssion Compan

ons identify of tense are

he percentag

y produced hereof. Whning;

ge and the i thereof. W

ning;

int

which elect

by OETC to

(1) Licenseto a Transmthe securityprovided for r a Licensed

a Licensed

Agreement

e purchase o

ates electric

requency R

ed for the auto assist st

n;

y

the meaninge deemed to

ge error of a

during a tiere the term

n-phase comWhen the ter

tricity is mete

o inform Us

ed Generatomission Systey and stabilr in either (i) d Distributiod Generator

(ASA)

of Ancillary S

city primarily

Relays

utomatic de-tabilising the

gs of words o have simila

any item of a

me interval m Energy is

mponent of rm Power is

ered;

sers of pote

ors, Licenseem may be ity of such an agreeme

on System Or or a Licen

Services by O

for the purp

-energising e Active Po

The Grid Code

J - Abbr an

used in the ar meanings

a Metering Sy

measured s used witho

alternating cs used witho

ential Emerg

ed Generatorequired to Transmissi

ent between Operator annsed Gener

OETC or PW

poses of self

of feeders Cower balanc

e - Version 2.0

nd Definitions

Issued J

Grid Code. ;

ystem;

in units of out any mod

current meaout any mod

gency Cond

ors/Desalinaprovide fromion System a Licensed

nd any Persrator/Desalin

WP from a U

f-supply;

Connecting Cce between

s Version 2.00

January 200

Plurals of th

watt-hours difier, this w

asured in unidifier, this w

ditions on th

ators or othm time to tim

or the TotTransmissio

son or (ii) anator and th

User;

Consumers Demand an

00

08

he

or will

its will

he

er me tal on an he

at nd

Page 308: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 4 of

Automat

A continu

Availabil

The MW Producer

Availabil

A notice iGenset to

Back-Up

Protectiocleared b

Black Sta

The procShutdown

Bulk Sup

Bulk Sup(2) Desal

Bulk Sup

The poinMetering

Burden

Burden itransform

Business

A day on

Calibrati

The procdetermine

Capacity

The capastated in

ctricity Transmis

26

tic Voltage R

uously acting

lity

Capacity or and Availa

lity Notice

issued by a o apply for th

p Protection

n equipmenbecause of a

art

edure necesn;

pply

pply means tlinated wate

pply Points

nt at the intis located;

is the elecmers for the p

s Day

which bank

on

cedure whereed and, whe

y

acity of anyMW at an a

ssion Compan

Regulation

g automatic e

of a CDGenable shall be

Power Prodhe following

n

nt or systema failure of th

ssary for the

the Bulk Supr to the Mini

terface betw

trical Load,purposes of

ks in Oman a

eby the releere appropria

y Plant to pssumed or a

y

(AVR)

excitation sy

nset declare construed a

ducer, in the Schedule D

m that is inthe Main Prot

e recovery fro

pply by the Pstry of Hous

ween OETC

measuredMetering, pr

are open for

vant percenate, modified

roduce, deliagreed Powe

ystem to con

ed Available accordingly;

form set ouDay;

tended to otection to op

om a Partial

PWP of (1) esing, Electric

C and Licen

in VA, corotection or

business pu

ntage errors d;

iver or receer Factor or

The Grid Code

J - Abbr an

ntrol Genset

to OETC a

t in SDC1, s

operate wheerate;

System Sh

electricity to city and Wate

sed Distribu

onnected tomeasureme

urposes;

of any item

eive electriciin MVA;

e - Version 2.0

nd Definitions

terminal vol

and/or PWP

stating the A

en a System

utdown or a

any Licenseer;

utors where

o current aent;

of Metering

ty, as the c

s Version 2.00

ltage;

P by a Pow

Availability of

m fault is n

Total Syste

ed Supplier

e Bulk Supp

nd/or voltag

g Systems a

case may b

00

wer

f a

not

em

or

ply

ge

re

be,

Page 309: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 5 of

Caution

A notice adequateaccordan

CCGT Mo

A group engine sewaste hesets withare regist

CDGense

A Connethe proce

Central D

The proce

Check M

A devicemeasurinEnergy o

Code No

A notice s

Cold

A situatioGenset isis in open

Committ

The data a Connec

Complet

Has the mdefinitionOETC’s T

Complex

One or msubstatioConnect

ctricity Transmis

26

Notice

issued in ace physical nce with Safe

odule

of Gensetset) and one

eat from the in the CCGTtered as a C

et (Centrally

cted Gensetedure of Cen

Dispatch (C

ess of Sche

Meter

e where reqng and recorr other elect

otices

served unde

on in which as in combinen cycle confi

ted Project

relating to tction Agreem

tion Date

meaning set, it shall mTransmissio

x

more Connecn and/or Dis

tion

ssion Compan

ccordance wseparation ety Rules to

s, comprisinge or more St

gas turbineT Module ar

CCGT Modul

y Dispatche

t with a Regntral Dispatc

CD)

duling and is

quired, that rding units otrical quantit

er or for the p

a Genset haed cycle conguration;

Planning D

the proposedment and the

t out in the Cean the dan System;

ction Sites tostribution sub

y

with Safety Rwhich musallow safe w

g one or mteam Turbin

es, is used tre designed e under this

ed Genset)

gistered Capch;

ssuing Dispa

duplicates of Active Powties;

purposes of

as been shufiguration an

ata

d User devee subsequen

Connection Ate when a

ogether with bstation and

Rules approvst be in acworking;

more Gas Tune Gensets to drive the to Operate

s Code;

pacity in exc

atch Instruct

and providwer, Active

the Grid Co

t down for mnd more than

elopment at nt data requi

Agreement wUser is exp

the associad/or associat

The Grid Code

J - Abbr an

ved by OETCccordance w

urbine Genswhere, undsteam turbintogether for

cess of 5 MW

tions by OET

es back upEnergy, Re

ode;

more than fon twenty-fou

the time of aired by OET

with each Uspected to C

ated Productted Plant, as

e - Version 2.0

nd Definitions

C and placedwith, and m

sets (or otheer normal One(s) and thr increased e

W and which

TC;

p to the Maactive Powe

orty-eight (48ur (24) hours

acceptance C;

ser, or in theConnect to o

tion Facility, s appropriate

s Version 2.00

d at a point maintained

er gas baseOperation, thhe componeefficiency an

h is subject

ain Meter fer or Reactiv

8) hours if ths if the Gens

of an offer f

e absence ofor start usin

Transmissioe;

00

of in

ed he

ent nd

to

for ve

he set

for

f a ng

on

Page 310: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 6 of

In relatioconnectioLicensedthan a SyConnect

Connect

The estimreplaced

Connect

The termthe Tranaccordan

Connect

The poinTransmis

Connect

The phys

Constrai

A Generalimits on Dispatch

Consum

A Person

Continge

The margperiod froAvailabilit

Control C

The centcontrol rofitted con

Control P

The phasahead (D

Daily Sta

The form

ctricity Transmis

26

on to any Pon between Transmissystem ownedted shall be

ted Planning

mated valueby validated

tion Offer

ms and condnsmission Snce with OET

tion Point

nt on the Tssion System

tion Site

sical site belo

ned Sched

ation Scheduthe Total SCode SDC1

er

n who is Sup

ency Reserv

gin of Availaom 24 hourty and again

Centre

re from wheooms or Platrol centre, a

Phase

se from the iD-1) to real ti

atus Form

used by Po

ssion Compan

Premises, Pthose Prem

ion System d or Operateconstrued a

g Data

es assumed d actual valu

itions offereSystem as aTC’s Licence

Transmissionm;

onging to OE

ule

ule and DesSystem and 1.4.9;

pplied with el

ve

able Generars ahead donst Demand

ere Schedulint operatorsan operation

issue of the me Operatio

ower Produce

y

Production Fmises, Prod

Operator oed by the Ruccordingly;

for planningues;

d by OETC a result of e;

n System t

ETC or a Us

salination Scthat is dev

lectricity at P

ation Capacown to realforecast err

ng, Dispatchs. The term nal room or a

Generation on;

ers for subm

Facility or Suction Facil

or Licensed ural Areas E

g purposes

to a User fapplication

to which a

ser where a

chedule prodveloped in a

Premises for

ity over forel time to corors;

h and Operais used to aa Person de

Schedule a

mission of da

The Grid Code

J - Abbr an

System, the lity or Syste

DistributionElectricity Co

by OETC if

for Connecti for Conne

User Conn

Connection

duced by OEaccordance

r consumptio

ecast Demaover against

ational Instruany such censignated wit

and Desalina

ata to OETC

e - Version 2.0

nd Definitions

presence em and the n System Oompany and

f and when

on of a Useection of P

nects its Sy

Point is loca

ETC that takwith the Sc

on at those P

nd that is ret uncertainti

uctions are gntre which mth such resp

ation Schedu

and PWP u

s Version 2.00

of a physicSystem of

Operator othConnect an

confirmed

er’s System lant made

ystem to th

ated;

kes account cheduling an

Premises;

equired in thes in Gens

given to othmay be a fuponsibilities;

ule on the da

under SDC1;

00

cal a

er nd

or

to in

he

of nd

he set

er lly

ay

;

Page 311: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 7 of

Daily Sta

The formconnectiothe Daily

Electrica

The poinFacility Caccordanmeasured

Deloaded

The condSystem to

Demand

The dema

Demand

Any meth

Demand

A warningwhich wilFacilities

Demand

Automaticfollowing

Demand

The contrDesalinaThe prodconstrued

Desalina

A unit forwater;

Designat

The opeprocedure

ctricity Transmis

26

atus Form –

m used by Oon with ScheStatus Form

al Delivery P

t on the HigConnects to nce with PPd.

d

dition under o which it is

and for Activ

Control

hod of achiev

Control Im

g that may bl be issued and to Direc

Intertrip Sc

cally initiateinstructions

Side Mana

rolled reductation duction of ded accordingl

ation Unit

rming part o

ted Operato

rator approes in agreed

ssion Compan

– OETC Ass

OETC to infoeduling and

m;

Point

gh Voltage tthe Transm

PAs and PW

which a CDSynchronise

ve Power or

ving a reduc

minent War

be issued wiby OETC to ctly Connect

cheme

ed circuit bs from OETC

gement

tion in Dema

emineralisedy;

of the Produc

or

ved in writd Operationa

y

sumed Data

orm Power Dispatch fo

terminals ofission Syste

WPAs and

DGenset hased;

Reactive Po

ction or incre

rning

thin the folloLicensed D

ted Consum

reaker trippC or a Licens

and achieve

d or potable

ction Facility

ing by the al Instruction

a

Producers ollowing failu

f the Producem and at wby referenc

s reduced or

ower;

ease in Dem

owing 30 minDistributors amers;

ping sequensed Distribut

d in real time

water by de

y and which

relevant Uns;

The Grid Code

J - Abbr an

of the data ure by the P

ction Facilitywhich electricce to which

r is not deliv

mand;

nutes, relatinand to Power

nces that ator;

e by a User;

esalination a

is capable

ser as com

e - Version 2.0

nd Definitions

to be usedPower Produ

y at which thcal Energy i

the electric

ering Active

ng to a Demr Producers

re switched

;

and Desalin

of producing

mpetent to c

s Version 2.00

d by OETC ucer to subm

he Productios delivered cal Energy

e Power to th

and reductioat Productio

d into servic

nated shall b

g Desalinate

carry out th

00

in mit

on in is

he

on on

ce

be

ed

he

Page 312: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 8 of

Desynch

The act oconnectin

Detailed

The additstudies to

Directly

A ConsuTransmis

Dispatch

The geninstructioOperationwhose fa

Distribut

Means, inand Distr

Distribut

A Systemconsists Electric Por mainly

Disturba

Any suddthe interr

Earthing

A meansbeing adeon the ToEconomThe purcquantity, future sec

Electric L

Any line, purpose a

(a)

ctricity Transmis

26

hronise

of taking a Gng circuit bre

Planning D

tional data ro be carried

Connected

umer or Ussion System

h

neral procesns, to (1) Ln or cessatcilities are C

tion

n relation to ribute shall

tion System

m which; (i) (wholly or

Plant with voy for the tran

ance

den significauption of De

g Device

s of providinequate to alotal System ic Purchase

chase on thethe nature ocurity, reliab

Lines

whether undand includes

any suppopylon or o

ssion Compan

Genset off aeaker;

Data

required by Oout;

User which m and Direct

ss by whicLicensed Gtion of OpeConnected a

electricity, tbe construe

m

is not a Trmainly) Ele

oltage levelssport of elec

ant change toemand, or th

ng a conneclow the flowand Earthine e best econoof the things

bility and dive

derground os, unless theort for any suother thing in

y

a System to

OETC as pa

imports at Connected

h instructioenerator anration of thnd Dispatch

the transpored according

ransmission ctric Lines of less thanctricity to Pre

o the Total Se failure of P

ction betwee of the maxi

ng shall be c

omic terms s to be purcersity of sup

or overgroune context othuch line, inc

n, on, by or f

which it has

art of the Pla

and/or expod shall be co

ns are detnd/or Licenseir Productih Instructio

rt of electricily;

System; (iiand Electric

n a nominal emises;

System causPlant;

en a conducmum prospe

construed ac

reasonably chased, the pply of the th

d, which is uherwise requluding, withorom which a

The Grid Code

J - Abbr an

s been Sync

anning Code

orts electriconstrued acc

termined ansed Generaton Facilities

ons shall be

ty by means

) is used toc Plant (na132kV) and

sed by a sud

ctor and theective earth ccordingly;

obtainable, available mings to be p

used for carruires; out limitationany such line

e - Version 2.0

nd Definitions

chronised by

e to allow de

city directly cordingly;

nd the issutor/Desalinas and (2) oconstrued a

s of a Distrib

o transport emely, Elect

d (iv) which i

dden loss of

e general mfault curren

having regaanner of deurchased;

rying electric

n, any structue is or may b

s Version 2.00

y opening an

etailed stabili

from/to th

uing of thostor as to th

other Personaccordingly;

bution Syste

electricity; (iric Lines ans used who

f a Genset,

mass of eartt, at that poi

ard to qualitlivery and th

city for any

ure, pole, be supported

00

ny

ity

he

se he ns

em

iii) nd lly

or

th, int

ty, he

d,

Page 313: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 9 of

(b) (c)

Electric P

Any plantGeneratio

(a) (b)

(c) and Plan

Electric T

The time

Electrica

An agreeTransmis

Electrica

An agreeof Systemthe TranConnectio

Embedde

Gensets Connectiobut with n

Larget

Smao

Embedde

A User O

Emergen

Abnormaloss of Tadversely

ctricity Transmis

26

carried or any Plant any wire, coating) winstalled inassociatio

Plant

t, apparatuson, Transmis

an Electrica Meter usand an electric

nt shall be co

Time

shown on a

al Connectio

ement betwession System

al Connectio

ement betwem User’s Plasmission Syon Fees;

ed Genset

that are Coon being eitno Direct Coe Embeddedthan 5MW; all Embeddedor equal to 5

ed Power P

Operating an

ncy Conditio

al System coTransmissioy affect the r

ssion Compan

suspendedConnected cable, tube,

which surroun close prox

on with, any

, equipmentssion, Dispac Line; sed for asce

cal applianceonstrued acc

an electric clo

on Agreeme

een a User m;

on and Use

een OETC anant to the Trystem; and

nnected to ather a Directonnection to d Gensets aand d Gensets a5MW;

Producer

Embedded

ons

onditions thaon facilities, reliability of t

y

; to any suchpipe or othends or supp

ximity to, or isuch line;

t or appliancatch, Distribu

ertaining the

e under the cordingly;

ock connect

ent

and OETC

of System

nd a Systemransmission

(iii) to reco

a Distributiot Connectionthe Transm

are deemed t

re deemed t

Genset;

at require auDistribution

the Transmis

line for the er similar thi

ports, or is sus supported

e used for, oution or Supp

quantity of e

control of a

ted to the To

for the Con

Agreement

m User to proSystem; (ii)

ord the mec

n System orn or a Conneission Systeto be those

to be those w

tomatic or ran facilities ssion System

The Grid Code

J - Abbr an

purpose of cng (includingurrounded o, carried or s

or for purposply of electri

electricity su

Consumer;

otal System;

nnection of t

t

ovide princip) the calculachanism rel

r the Systemection via th

em, where with a Regis

with Registe

apid manuaor Generatm;

e - Version 2.0

nd Definitions

carrying elecg its casing, r supported suspended,

ses connectecity, other th

upplied to an

the User’s S

pally for (i) thtion of charglating to the

m of any othhe busbar of

stered Capa

ered Capacit

l action to ption Capacit

s Version 2.00

ctricity; andinsulator or by, or is in

ed with, the han;

ny Premises

System to th

he Connectioges for use e payment

er User, sucanother Us

city of great

ty of less tha

revent or limty that cou

00

r

;

he

on of of

ch er

ter

an

mit uld

Page 314: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 10 o

Emergen

A Dispatcthe limitsOETC to

Emergen

The manEmergenGeneratio

Expert

A Personthe subje

Exported

In relationOman an

Final Sta

The Outaeach CD and Winte

Final Sys

The Outaprovisionthe propo

Five-Yea

A statemshowing fDemands

Flexible

A Planne

Flicker SA value d

two hour

individua

ctricity Transmis

of 26

ncy Instruct

ch Instructio implied by prevent or l

ncy Manual

nual de-enecy Conditioon Capacity

n with approect in questio

d

n to electricind Export sh

ation Outag

age schedulGenset and

er Downtime

stem Outag

age schedus of OC 2, s

osed timing f

ar Statemen

ent, preparefor each of ts and Power

Outage

ed Outage th

Severity (Loderived from

period and a

l measurem

ssion Compan

tions

n issued by a Daily Statimit abnorm

Demand Sh

ergisation oons to assis

and Deman

priate educaon and who s

ty, electricityhall be const

e Schedule

le submittedd Desalinatioe;

ge Schedule

le for Operaspecifying fofor Outages

nt

ed by OETCthe 5 succeer flows on th

hat, at the re

ng Term) 12 success

a calculation

ents.

y

OETC that tus Form sual System c

hedding

of Consumst regaining nd;

ational and pshould have

y which is Gtrued accord

e

d by a Useron Unit owne

e

ational Yearor each CD G

and Winter

C, in accordaeding Operae Transmiss

quest of OE

sive measure

n of the cube

may requirebmitted by aonditions;

ers or Elethe Active

practical expe no direct in

Generated in dingly;

r to OETC fed by that U

r 1 produceGenset and Downtime;

ance with thtional Years

sion System

TC, can be

ements of Fl

e root of the

The Grid Code

J - Abbr an

e an action oa CDGenset

ctric Lines e Power ba

perience to pvolvement w

Oman and

for OperatioUser, the pro

ed by OETCDesalination

e terms of ts, amongst o;

deferred or

licker Severi

mean sum o

e - Version 2.0

nd Definitions

or response tt or instructio

feeding Clance betwe

provide relevwith any of th

which is tran

nal Year 1 oposed timin

C in accordan Unit in the

the Transmiother matters

advanced by

ity (Short Te

of the cubes

s Version 2.00

that is outsidons issued b

Consumers een Availab

vant advice he parties;

nsported fro

specifying fg for Outage

ance with thTotal Syste

ssion Licencs, the foreca

y a period;

erm) over a

s of 12

00

de by

in ble

to

om

for es

he em

ce ast

Page 315: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 11 o

Flicker SMeasure

over a 10

complain

Forced O

An Outag

Frequen

The numSystem is

Frequen

The OperPower ou

Fuel

Natural g

Gas Turb

A Genset

Gas (SF6

A single Plant motogether Operation

Genset (

Any Planmover, w

Genset D

The rateGeneratiodetailed i

Genset L

The rateGeneratio

Genset R

The time opening o

ctricity Transmis

of 26

Severity (Shof the visua

0 minute per

ts.

Outage

ge for which

cy

mber of alterns running;

cy Sensitiv

ration of a Cutput changin

gas or fuel oi

bine Gense

t with a gas

6) Zone Diag

line diagramodules which

with the an of the Tran

Generating

nt which prowithin a CCG

De-loading

e at which on to Minimun the Opera

Loading Rat

e at which on to Maxim

Run-Down T

taken for a of the Gense

ssion Compan

hort Term) al severity of

riod and as s

no timely no

nating curre

e Mode

CDGenset (wng automati

l;

t

turbine as it

gram

m showing bh comprise

associated snsmission Sy

g Set)

oduces electT Module);

Rate

a Genset cum Generat

ating Parame

te

a Genset mum Generat

Time

gas turbineet circuit bre

y

flicker deriv

such provide

otice can be

ent cycles pe

which can becally in resp

ts prime mov

oundaries opart, or the

stop valves ystem or the

tricity (includ

can decreasion. The Geeters;

can increastion;

e or steam tueaker followin

ved from the

es an indicat

provided by

er second (e

e part of a Conse to cha

ver;

of, and interfe whole, of

and SF6 ge User Syste

ding a (sing

se its outpenset De-loa

se its outp

urbine rotor ng initiation

The Grid Code

J - Abbr an

time series

tion of the ris

y the User to

expressed in

CGT Modulenges in Tota

faces betwea substatio

gas monitorem;

gle) Genset

ut of Activeading Rate fo

ut of Active

to come to of a normal

e - Version 2.0

nd Definitions

output of a f

sk of custom

o OETC;

n Hertz) at w

e) that will real System Fr

en, SF6 gason at a Conrs required

and its asso

e Power froor each Gen

e Power fr

a complete stop signal

s Version 2.00

flicker meter

mer

which a Tot

esult in Activrequency;

s-insulated Hnnection Sit

for the sa

ociated prim

om Maximunset will be a

rom Minimu

stop after thinitiation;

00

r

tal

ve

HV te,

afe

me

um as

um

he

Page 316: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 12 o

Genset R

The timeinitiation Operating

Generati

Means thconstrued

Generato

A diagramexpected

Generati

A statemrequired integrity appropria

Generati

The stanAvailabilit

Good Ind

Acting in Law and

Governm

The Gove

Grid Cod

Means th

Grid Cod

The pane

High Fre

An automincrease SDC3;

High Vol

A nomina

ctricity Transmis

of 26

Run-Up Tim

e taken for aof a start sig Parameter

on

he productiond accordingl

or Performa

m which sh to Operate

on Schedu

ment prepareto meet the of the Tran

ate margin o

on Security

ndards by wty and qualit

dustry Prac

good faith tinternationa

ment

ernment of t

de

he Grid Code

de Review P

el with the fu

equency Res

matic reductin Total Sy

tage (HV)

al alternating

ssion Compan

me

a gas turbingnal. The Grs;

n of electriciy;

ance Chart

ows the MWunder stead

le and Desa

ed by OETCTotal Syste

nsmission Sf reserve;

y Planning S

which PWP’sty of the Tot

ctice

to perform oal good pract

he Sultanate

e prepared p

Panel

unctions set o

sponse

tion in the Aystem Frequ

g voltage equ

y

e or steam Genset Run

ity by any m

W and Mvady state cond

alination Sc

C of the Cem Demand System and

Standard

s performanal System m

obligations intice in the el

e of Oman;

pursuant to C

out in GC.4

Active Poweency above

ual to or exc

turbine to rUp Time fo

means and "G

r capability ditions;

chedule

DGensets aat all times

d the secur

nce in maintmay be meas

n accordanceectricity and

Condition 3 o

of the Gene

er output fre the Target

ceeding one

The Grid Code

J - Abbr an

reach full spr each Gens

Generate" a

limits within

and Desalins, and ensurrity and qu

taining Gensured, as pre

e with the red Desalinatio

of OETC's T

eral Conditio

rom a CDGt Frequency

kilovolt;

e - Version 2.0

nd Definitions

peed at no set will be d

and "Genera

n which a G

ation Units re (as far asality of Sup

eration secuescribed in it

equirementson industries

Transmission

ns;

enset in resnotified by

s Version 2.00

load from thdetailed in th

ated" shall b

Genset will b

that may b possible) thpply, with a

urity, and thts Licence;

s of the Sects;

n Licence;

sponse to aOETC und

00

he he

be

be

be he an

he

tor

an er

Page 317: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 13 o

Hot

When ref(8) hourssuch Gen

Import/E

A contracExport of

Imported

In relationinto Oma

Incident

An unschGensets)experienc

Inflexible

A Planneunder OC

Instation

EquipmeOutstatio

Intercon

An agreeto the SuEnergy aInterconA facility

Interface

An agreeconsequeand/or foSite;

Internal I

A ConneSystem, another Scircuits O

ctricity Transmis

of 26

ferring to a s if the Gensnset has bee

Export Contr

ct entered inf electricity;

d

n to electrican and Impo

heduled or u) including, ced;

e Outage

ed Outage thC2;

n

nt located wns;

nection Agr

ement made ultanate of Ond or Ancillanector that Connec

e Agreemen

ement betwences of a or the sharin

Interconnec

ection that fthe Distribu

System locatOperating in p

ssion Compan

Genset, it mset is in comen shut down

ract

nto in accord

ity, electricitort shall be c

unplanned ofaults, even

hat cannot b

within OETC

reement

between OOman, relatiary Services

cts two Syste

nt

ween a UseUser owning

ng of facilitie

ction

facilitates thtion Systemted within Oparallel;

y

means a Genmbined cyclen if the Gens

dance with A

ty that is Geconstrued ac

ccurrence onts and brea

be deferred o

C Premises

ETC, a Liceing to the tr

s across an I

ems;

er and OETg or Operates and/or th

he transfer m of a LicenOman. A sing

nset that hae configuratiset is in ope

Article [(85)(2

enerated outccordingly;

on, or relatinakdowns an

or advanced

s that receiv

ensed Distribransfer of Pnterconnect

TC containiting Plant we provision

of electricitnsed Distribugle Internal In

The Grid Code

J - Abbr an

s been shution and lessn cycle conf

2)] of the Se

tside Oman

ng to, a Systd adverse w

d by a period

ves and sto

butor or RAEPower and otor;

ing provisiowhich is sited

of services

ty to or fromutor or a Usnterconnect

e - Version 2.0

nd Definitions

t down for les than two (figuration;

ector Law for

and which

tem (includinweather con

d at the requ

ores Meterin

EC and a Peor Active En

ons for dead on anotheat or near

m OETC’s ser System ion may com

s Version 2.00

ess than eig2) hours aft

r the Import

is transporte

ng Embeddenditions bein

uest of OETC

ng Data fro

erson externergy/Reactiv

aling with ther User's lana Connectio

Transmissiointo or out

mprise sever

00

ght ter

or

ed

ed ng

C,

om

nal ve

he nd on

on of

ral

Page 318: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 14 o

Internally

A LicenseLicensedAncillary

Internatio

A PersonSystem oOman;

Internatio

An Intercoutside O

Islanded

FollowingConnecte

Isolating

A device

Isolation

The discosituated i

Licence

An authopursuant

Licensed

A Personconstrued

Licensed

A Person

Licensed

A Person

Licensed

A Person

Licensed

OETC an

ctricity Transmis

of 26

y Interconn

ed Person l DistributionServices to

onal Interco

n responsibloutside the

onal Interco

connector thaOman and In

d

g a Total Sed Productio

g Device

used for ach

n

onnection ofn accordanc

orisation to to the Secto

d Distributio

n who is thed accordingl

d Generator

n who is the

d Generator

n who is the

d Supplier

n who is the

d Transmiss

nd each othe

ssion Compan

nected Party

ocated in On System aother Users

onnected P

e for the opSultanate o

onnection

at Connectsnternational

ystem Distuon Facilities

hieving elect

f HV Plant fce with OC8

undertake or Law;

on System

e holder of y;

r

holder of a G

r/Desalinato

holder of a G

holder of a S

sion System

er Person wh

y

y

Oman that owand/or Plans and/or OET

arty

peration of aof Oman tha

s a System t Interconne

urbance, a become det

trical isolatio

from the rem;

a Regulate

Operator

a Distributi

Generation L

or

Generation a

Supply Licen

m Operator

ho is the hol

wns and/or t for the p

TC;

an electrical at is Conne

that exists wection shall

situation in ached from

on;

mainder of t

ed Activity

on Licence

Licence;

and Desalina

nce;

der of a Tra

The Grid Code

J - Abbr an

Operates apurpose of

Transmissioected to a S

within Oman be construe

which partsthe rest of th

he System

issued by t

and Licens

ation Licenc

nsmission L

e - Version 2.0

nd Definitions

Transmissiproviding E

on System oSystem that

with a Systeed according

s of the Syhe Total Sys

in which tha

the Regulat

sed Distrib

ce;

Licence;

s Version 2.00

on System, Energy and/

or Distributiot exists with

em that exisly;

ystem with istem;

at HV Plant

tory Authori

butor shall b

00

a /or

on hin

sts

its

is

ity

be

Page 319: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 15 o

Load

The ActiDistribute

Local Int

Portable Outstatio

Local Sa

Instructiosetting ouRules ap

Low Volt

An altern

Main Met

The prima

Main Pro

Protectioaction to

Maximum

The maxEmergen

Maximum

The maxi

Measure

Voltage a

Member

A Person

Merit Ord

An order System eOETC aTransmis

Meter

A device or Reacti

ctricity Transmis

of 26

ive or Reaed;

terrogation

or fixed eqn;

afety Instruc

ons on eachut the methply;

tage or LV

ating voltage

ter

ary Meter fo

otection

n equipmenalleviate an

m Generatio

ximum stablecy Condition

m Water Pro

imum water

ement Trans

and/or curren

n who is a m

der

for rankingeconomy, send each ot

ssion Licence

for measurive Energy o

ssion Compan

active Powe

Unit

quipment ca

ctions

h User site ods to achie

e less than o

or measuring

nt or systemabnormal co

on (Max Ge

e electrical ns;

oduction

production a

sformers

nt transform

ember of the

Available Pecurity, stabther Licensee;

ing and recoor other elect

y

er, as the

apable of i

and OETC eve safety f

one kilovolt;

g and record

m expected tondition on t

en)

output that

achievable i

ers or comb

e Grid Code

Production Fbility and reed Transmis

ording units trical and wa

context re

nterrogating

site approvfor those wo

ing electrica

to have priothe Total Sy

a Productio

n one hour o

binations the

Review Pan

Facilities whliability; andssion Syste

of Active Poater quantitie

The Grid Code

J - Abbr an

equires, Ge

g, updating

ved by OETorking on Pl

al quantities;

rity in initiatystem;

on Facility ca

on the Sche

reof used in

nel;

ich order shd shall otheem Operator

ower, Activees;

e - Version 2.0

nd Definitions

nerated, Tr

and/or prog

TC or the rlant to whic

ting fault cle

an make Av

dule Day;

Metering Sy

hall aim to oerwise be dr in accord

e Energy, Re

s Version 2.00

ransmitted

gramming a

relevant Useh their Safe

earance or a

vailable und

ystems;

optimise Totdetermined bance with i

eactive Pow

00

or

an

er, ety

an

er

tal by its

wer

Page 320: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 16 o

Meter Ce

The stateSystem c

Meter Ow

The Persand oper

Meter Re

A device quantities

Meter Re

A systempertinent

Meter Se

A Persocommiss

Metering

The activPower ora Meter;

Metering

The syste

Metering

The groumetering storage aEnergy a

Minimum

The minimCode and

Minimum

The minimSynchron

Notice to

The amoenable it

ctricity Transmis

of 26

ertificate

ement issuecomplies with

wner

son responsation and m

egister

associated s that have p

egistration S

m that uniquedata relating

ervice Provi

n that provioning, oper

g

vity of measr Reactive E

g Communic

em of comm

g System

up of equipprotection

and data cond Demand

m Generatio

mum stable d/or the Sch

m Shutdown

mum amounnise again;

o Synchron

ount of time to be Synch

ssion Compan

ed by the Grh the require

sible for ensaintenance o

with a Metepassed the M

System

ely identifies g to the Met

ider

vides to a ation, mainte

suring and nergy or oth

cation Syst

munications b

pment incluand isolatio

ommunicatiomeasuring

on (Min Gen

output Poweduling and

n Time

nt of time be

ise

(in minuteshronised follo

y

rid Code Reements of th

suring the pof Meters;

er, from whicMeter;

the Meter ater as require

Meter Owenance, and

recording uher electrical

em

between Met

uding Meteron equipme

ons equipmeequipment a

n)

wer which is Dispatch Co

etween a CD

s) that is decowing receip

eview Panel e Metering a

procurement

ch it is poss

and Users ased by the Me

wner Meter d general se

units of Act and water q

ters, Local O

s, time swent includingent that are at or relating

registered fode, with OE

DGenset be

clared by a pt of a Dispa

The Grid Code

J - Abbr an

confirming and Data Ex

t, installation

sible to obta

ssociated wieter and Dat

services srvicing of Me

ive Power, quantities us

Outstations a

itches, Meag alarms, cpart of the

g to a Conne

for a CDGenETC;

ing Desychr

Power Prodatch Instructi

e - Version 2.0

nd Definitions

that a Metexchange Cod

n, testing, c

ain a visual r

th the Meterta Exchange

such as theetering Syst

Active Enesing a Meter

and Remote

asurement Tcircuitry, ass

Active Eneection Site;

nset through

ronised and

ducer for a on from OET

s Version 2.00

er or Meterinde;

ommissionin

reading of th

r and containe Code;

e installatioems;

rgy, Reactivring System

Instations;

Transformersociated da

ergy, Reactiv

h the Plannin

being able

CDGenset TC;

00

ng

ng

he

ns

on,

ve or

rs, ata ve

ng

to

to

Page 321: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 17 o

Numberi

The policnumberin

Oman El

Standardprocedureissued byStandardpursuant reviewed

Operatin

The comb

Operatin

The techchanges under theaccordan

Operatin

The additime Opeacceptab

Operatio

A planneSystem a

Operatio

A diagramexternal labelling;

Operatio

Any effecUser’s Syway in wh

Operatio

Instructio

Operatio

A chronocoordinat

ctricity Transmis

of 26

ng and Nom

cy documentng and nome

ectrical Sta

ds and regues associatey the Minis

ds. Such stato the Sect

or modified

ng Margin

bination of C

ng Paramete

hnical capadue to Site

e Schedulinnce with thes

ng Reserve

tional outpueration to c

ble level follo

on

ed, scheduleand Operate

on Diagram

m that is a circuits and

onal Effect

ct on the Opystem to Ophich they wo

onal Instruc

ons and proc

onal Log

ological rection sent and

ssion Compan

menclature

t of OETC oenclature sys

andards (O

lations in reed with the try of Housandards mator Law and from time to

Contingency

ers

bilities, flexRating, reg

ng and Dispse Codes;

t from Genscontribute t

owing a sudd

ed or errone will be cons

schematic d a Connec

peration of aperate (or beould or may

tions

cedures issu

cord of med received b

y

Policy

or a Licensestem of HV

ES)

elation to saspecificatio

sing Electricay from timd including ao time pursu

Reserve an

ibilities andgistered in thatch Code

sets or the rto containinden change

eous actionstrued accor

representatction Site, i

another Syste materially have norma

ed in Conne

essages reby each oper

d DistributorPlant;

afety of equn and Oper

city and Wame to time any such neuant to the S

nd Operating

d limitations he Operationthrough the

reduction in g or correcin Demand o

n relating tordingly;

ion of the Hincorporating

tem that cauat increaselly Operated

ection with th

lating to Orator and Sa

The Grid Code

J - Abbr an

r setting out

uipment andration of eleater, and kn

be reviewew standards

Sector Law;

g Reserve;

of a Gennal Planning

e Daily Statu

Demand thcting a Freor Generatio

o the Opera

HV Plant ang its numbe

uses the Trad risk of Op

d in the abse

he actual Op

Operational afety Coordin

e - Version 2.0

nd Definitions

t a consisten

d electrical ectrical Systenown as Omed, modifieds as may be

set, taking g Code, OC2us Form, as

at can be reequency devon;

ation of part

nd the Connering, nome

ansmission Sperating) diffence of that e

peration of P

Instructionsnator under O

s Version 2.00

nt and distin

Systems anems, former

man Electricd or replacee establishe

into accou2 and notifies amended

ealised in reviation to a

t of the Tot

nections to aenclature an

System or thferently to theffect;

Plant;

s and safeOC8;

00

nct

nd rly cal ed

ed,

unt ed in

eal an

tal

all nd

he he

ety

Page 322: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 18 o

Operatio

The perioPlanning

Operatio

A test caSystem c

Operatio

The yeaOperation

Outage

In relatioability to removal oas a resu

Outstatio

On-site eprocessindownloadWhen usperform separate

Overall S

The percgovernor

Partial S

As for a TSystem telectricityStart proc

Partially

A Generalimits on 1.4.9;

Person

An indivibody, aut

ctricity Transmis

of 26

onal Plannin

od from 8 wg shall be co

onal Test

arried out inconditions;

onal Year

r running 1nal Year, Op

on to a Genmake Cap

of any part oult of failure o

on

equipment wng of data ding to a Locsed with Metsome proceunits or may

Speed Droo

entage dropaction, to al

ystem Shut

Total Systemthat has becy Supply frocedures;

Constraine

ation Scheduthe Total S

dual, partnethority, eman

ssion Compan

ng Phase

weeks to theonstrued acc

order to ac

1 April to 3perational Ye

nset or Desapacity Availaof the Transmor breakdow

which receibefore tran

cal Interrogatering Systeessing of dy be integra

op

p in the Totalter its outpu

tdown

m Shutdowncome detac

om other pa

ed Schedule

ule and Desystem impo

ership, compnation, agen

y

e end of thecordingly;

cquire inform

31 March wear 1 means

alination Unable. In remission or D

wn;

ives data fnsmitting thation Unit on ems the Outata. Thesel with the Me

l System Freut from zero

n except thatched from orts of the T

e

salination Scosed by the

pany, firm, ncy, instrume

e 2nd Opera

mation in re

where Opers the followin

nit, an eventlation to OE

Distribution S

from local ee data to request.

tstation will e functions eter;

equency thato its full Ca

t all Generatother parts ootal System

chedule prodTransmissio

trust, body entality, unin

The Grid Code

J - Abbr an

ational Year

spect of Pla

rational Yeang Operation

t, which affeETC, or a Systems for

equipment aan Instation

store data fmay be fa

at would causapacity;

tion has ceaof the Total

m, so it is ne

duced by OEon System a

corporate, ncorporated

e - Version 2.0

nd Definitions

ahead and

ant under pr

ar 0 meansnal Year, etc

ects a PowLicensed Drepair or ma

and may pn or SCAD

from a Meteacilitated in

se the Gens

ased in a paSystem an

ecessary to

ETC that takand as desc

governmentbody or an a

s Version 2.00

d Operation

re-determine

s the currec.;

er ProducerDistributor, thaintenance,

perform somDA system

er(s) and maone or mo

set, under fre

art of the Totd there is ninvoke Blac

kes account cribed in SD

t, governmeassociation;

00

nal

ed

ent

r’s he or

me or

ay re

ee

tal no ck

of DC

ent

Page 323: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 19 o

Planned

An Outag

Planned

The manElectric Lbalance b

Planning

The margplanning

Plant Ow

The Persand Oper

Point of

That poinmore tha

Power Fa

The cosin

Power P

Any PersConnect with that a Desalin

Power P

An agreeagrees, awith the r

Power an

An agreethe PWPassociate

Power an

The Pers

Prelimina

Means thConnectio

ctricity Transmis

of 26

Outage

ge planned a

Rota Dema

ual de-energLines feedinbetween Ava

g Margin

gin by whichyears to ens

wner

son responsration and m

Common C

nt of the Tran one User

actor

ne of the pha

roducer

son that Gento the TranTransmissio

nation Unit;

urchase Ag

ement entereamongst othrelevant Prod

nd Water Pu

ement entereP agrees, amed with the re

nd Water Pu

son of this na

ary Project

he data relaton Agreeme

ssion Compan

at least seve

and Sheddin

gisation andng Consumeailable Gene

h electricity sure that the

sible for ensmaintenance

Coupling

ansmission Sis Connecte

ase angle be

nerates elecnsmission Son System o

greement (P

ed into by Pher things, toduction Faci

urchase Ag

ed into by PWmongst otheelevant Prod

urchaser (P

ame perform

Planning D

ting to the pent but befor

y

en days in ad

ng

d re-energisaers in Emereration and D

Generatione Generation

suring the pof Plant;

System elecd;

etween the V

ctricity and/oSystem, or Dor Distributio

PPA)

PWP and a o purchase ilities;

greement (P

WP and a Ler things, toduction Faci

PWP)

ming the func

Data

proposed Usre an offer is

dvance of th

ation accordgency CondDemand;

Capacity mn Security Pl

procurement

ctrically nea

Volt-Ampere

or which OpeDistribution Son System. T

Licensed Gethe Product

PWPA)

icensed Geno purchase tlities;

ctions assign

ser developms made and a

The Grid Code

J - Abbr an

e event;

ing to planneditions to m

must exceedlanning Stan

t, installation

rest to the U

es and the A

erates one oSystem andThis include

enerator pution Capacit

nerator/Desathe Product

ned to it und

ment at the accepted by

e - Version 2.0

nd Definitions

ed rotas of Caintain the

d forecast Dndard is met

n, testing, c

User installa

Active Power

or more Gend Operate Ss a Person

rsuant to whty and Outp

alinator purstion Capacit

er the Secto

time a Usery the applica

s Version 2.00

Consumers Active Pow

emand in th;

ommissionin

ation at whic

r component

nset(s), whicSynchronousthat Operate

hich the PWput associate

suant to whicty and Outp

or Law;

r applies for nt User;

00

or wer

he

ng

ch

t;

ch sly es

WP ed

ch put

r a

Page 324: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 20 o

Premises

Any land,

Primary

A CDGena changeoperatingthe diffespeed/Fre

Primary

The autofor Activewill be ful

Producti

The elecDesalinat

Producti

Plant whiand DesaPlant and

Program

The perioSchedule

Propose

The propspecifyingowned by

Propose

The Outaprovisionthe propo

Protectio

The provmanual iand data

Provisio

A statemindicates

ctricity Transmis

of 26

s

, building or

Control

nset operatine in Frequeng so as to perence betequency val

Response

matic increae Power in rlly Available

on Capacity

ctricity Genetion Capacit

on Facility

ich is used falination of wd water equi

mming Phas

od from 8 we on the day

d Station O

posed Outag for each y that User,

d System O

age schedus of OC 2, s

osed timing f

on

vision for thenitiation of flogging;

nal Running

ent preparedfor each C

ssion Compan

structure oc

ng mode whncy in a direcprovide Primtween the lue;

ase in Activeresponse to within 5 sec

y

eration Capy of a Produ

for the Genewater and inpment;

e

weeks downahead (D-1

Outage Sche

ge scheduleCD Gensetthe propose

Outage Sche

le for Operaspecifying fofor Outages

e detection ofault clearan

g Order

d and issuedCDGenset a

y

ccupied or us

ich will resuction which

mary Responspeed/Fre

e Power outpa fall in the

conds from t

pacity or thuction Facility

eration of elencludes, as

to the issu);

edule

e submittedt and Desa

ed timing for

edule

ational Yearor each CD G

and Winter

of fault condnce action,

d by OETC and Desalin

sed by a Pe

lt in Active Passists to stnse and/or Sequency T

put of a CDGe Frequencythe time of th

he combiney, as the con

ectricity or thapplicable,

ue of the Ge

d by a Uselination UnitOutages an

r 2 produceGenset and Downtime;

ditions on thincluding au

to the Powenation Unit

The Grid Code

J - Abbr an

rson;

Power outputabilise the FSecondary Rarget valu

Genset or a y of the Totahe Frequenc

d electricityntext so requ

he combinedall associate

eneration Sc

er to OETCt installed in

nd Winter Do

ed by OETCDesalination

e Total Systudible and v

er Producer owned or c

e - Version 2.0

nd Definitions

ut changing iFrequency aResponse pe and th

decrease inal System. Tcy fall;

y Generatiouires;

d Generationed Electric L

chedule and

for Operatn the Produ

owntime;

C in accordan Unit in the

tem and thevisual alarm

pursuant to controlled b

s Version 2.00

n response at any level bproportional e measure

n the DemanThe respons

on and wat

n of electriciLines, Electr

d Desalinatio

tional Year uction Facili

ance with thTotal Syste

e automatic ms, indication

SDC1, whicby the Pow

00

to by to

ed

nd se

ter

ity ric

on

2 ity

he em

or ns

ch wer

Page 325: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 21 o

Producertimes for

Reactive

ReactorsReactive

Reactive

The integ(Varh) an

Reactive

The prodmeasuredReactive lagging Rthe Syste

Red WarA warningDistributoinstructio

Referenc

ReferencGenset P

Register

In relationthe ProdregisteredIn the caaccount ctime to tim

Register

Data subincluding and whicdocumen

Regulato

The body

ctricity Transmis

of 26

r, the expectthe following

e Compensa

and capacPower;

e Energy

gral with resnd standard

e Power

uct of alternd in units of Power Gen

Reactive Powem and is ref

rning g that will beors and Direcns under the

ce Conditio

ce ambient cPower Facto

red Capacity

n to a Genseuction Capad with OETC

ase of a CCchanges dueme in accord

red Data

bmitted to Othe Operat

ch is maintantation;

ory Authorit

y established

ssion Compan

ted output pg day;

ation Plant

citors Conne

pect to Reamultiples the

nating voltagvoltampereseration or ouwer or lagginferred to as

e issued by Octly Connecte Operating

ns

conditions, tr as specifie

y

et and/or a Dacity of that C and, as am

CGT Modulee to site ratdance with th

OETC by Usting Parame

ained by OE

ty

d pursuant to

y

pattern and t

ected to the

ctive Powerereof;

e and currens reactive (vutput is an eng Mvar, andleading Rea

OETC by 16ted CustomeCode OC4;

the lower heed in the PPA

DesalinationGenset tak

mended frome, the Produing, as declhe Grid Cod

sers describeters of GenETC as a co

o Article [(38

the required

System to

r, measured

nt and the svars) and staexport onto d Reactive Pactive Power

6:00 hours oers who will

eating valueA and PWPA

n Unit that doking into acm time to timction Capacared by the

de;

ing the paransets and Sontinuing rec

8)] of the Se

The Grid Code

J - Abbr an

d Synchronis

compensate

in units of v

ine of the phandard multip

the SystemPower absorr or leading M

n the day ahor may subs

e of natural A;

oes not formcount chang

me in accordcity of the CPower Prod

ameters of tandard andcord that ca

ctor Law;

e - Version 2.0

nd Definitions

sing and De

e in part for

voltampere r

hase angle bples thereof. and is referption is an imMvar;

head to thossequently re

gas, and Fr

m part of a Cges due to dance with thCCGT Moduducer and a

their Plant ad Detailed Pan be chang

s Version 2.00

synchronisin

r excesses

reactive hou

between the. rred to as mport from

e Licensed eceive

requency an

CCGT Modulsite rating a

he Grid Codule taking inamended fro

and SystemPlanning Daged by form

00

ng

of

urs

em

nd

le, as

de. nto om

ms, ata mal

Page 326: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 22 o

Remote

Computeroutine ba

Risk of T

The Operesult in t

Rural Are

The Com

Safety C

A Persona Conneccarried oand Safe

Safety Ea

The connaccordan

Safety Fr

The conddangers t

Safety Pe

Safety doPlant;

Safety P

The Isolaand other

Safety R

The rules

Schedule

The 24 hdesignate

Scheduli

The procwith SDC

ctricity Transmis

of 26

Instations

er-based sysasis from Ou

Trip

ration of a Gthe loss of th

eas Electric

mpany of that

oordinator

n nominated ction Point ut on a Syst

ety Coordina

arthing

nection to thnce with OC8

rom The Sy

dition that sathat are inhe

ermits

ocuments is

recautions

ation and orr measures

Rules

s of OETC o

e Day

our period sed SD0, SD1

ing

cess of compC1 and Sche

ssion Compan

stems operatutstations;

Genset whenhe Genset’s

city Compa

t name estab

by a User toand/or a Butem which nation shall b

he general 8;

ystem

afeguards Peerent in the S

ssued under

r Earthing ofto ensure sa

r a User tha

starting at 001, SD2 etc, w

piling a Genedule will be

y

ted by OETC

n the failureActive Powe

ny (RAEC)

blished purs

o be responsulk Supply Pnecessitates be construed

mass of ea

ersons whenSystem;

the Safety

f HV Plant, afety;

t establish a

000 hrs (midwhere SD0 i

neration Sche construed a

C that may

of any singer and/or Re

suant to Artic

sible for the Point when

the provisiod accordingly

arth of HV c

n work is to

Rules relati

posting of s

a safe system

dnight) of theis today in re

hedule and Daccordingly;

The Grid Code

J - Abbr an

collect or re

gle piece of aeactive Powe

cle (6) of the

coordinationwork which

on of Safety y;

conductors b

be carried o

ing to safe c

safety tags,

m of working

e day conceeal time;

Desalination

e - Version 2.0

nd Definitions

eceive Meter

auxiliary equer output;

e Sector Law

n of Safety Pincludes tePrecautions

by an Earth

out on a Sys

conditions fo

use of safe

g on HV Plan

erned. Sched

n Schedule i

s Version 2.00

ring data on

uipment cou

w;

Precautions esting is to bs on HV Pla

ing Device

stem from th

or working o

ety equipme

nt;

dule Days a

n accordanc

00

a

uld

at be ant

in

he

on

ent

re

ce

Page 327: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 23 o

Seconda

The autofor Active

Sector L

The Law No. [ /200

Short No

An Outagof which w

Significa

An Incidereporting

Site Com

Drawingscommon ConnectioSite InveTests conUser sites

Site Res

A schedprepared

Speed G

The mecrotor acco

Spill

Energy s

Spill Con

A contracwith Articby the Po

Spinning

Those GeSystem;

ctricity Transmis

of 26

ary Respons

matic increae Power in re

aw

Governing t03];

otice Outage

ge for maintewill be at the

ant Incident

ent that OEin OC5;

mmon Draw

s that incorprotection/c

on Site; estigations nducted in rs or to moni

ponsibility

ule forming in accordan

Governor (Sp

hanical and/ording to a s

upplied to th

ntract

ct between cle (35)(7) oower and Wa

g Reserve

ensets, whic

ssion Compan

se

ase in Activeesponse to a

the Privatisa

e

enance perfoe sole discre

t

ETC has de

ings

rporate Concontrol draw

relation to Ptor and asse

Schedule

part of thnce with the

peed Contro

/or electricalspeed droop

he Total Sys

a Licensed f the Sectorater Procure

ch form part

y

e Power outpa fall in the F

ation and Re

ormed at noetion of OET

etermined sh

nnection Sitwings and c

lant and opeess the char

he ConnectiConnection

ol)

l equipment p characteris

tem after so

Supplier anr Law and Cer of Product

of the Opera

put of a CDGFrequency o

egulation of

less than 4TC;

hall be defi

te layout dcommon se

erational proracteristics o

on AgreemConditions;

used to constic;

ome captive

nd an AutogCondition 3 otion Capacity

ating Reserv

The Grid Code

J - Abbr an

Genset or a f the Total S

the Electrici

8 hours noti

ned as sign

rawings, eleervices draw

ocedures at of Plant;

ment contain

ntrol the rota

on-site Dem

enerator, enof the PWP y and/or Out

ve, that are S

e - Version 2.0

nd Definitions

decrease inSystem;

ity Sector, S

ce to OETC

nificant in th

ectrical layowings prepa

Production

ning the info

ational spee

mand has bee

ntered into iLicence for tput;

Synchronise

s Version 2.00

n the Deman

Sultani Decre

, the approv

he context

out drawingared for eac

Facilities an

ormation an

d of a Gens

en met;

n accordancthe purchas

ed to the Tot

00

nd

ee

val

of

gs, ch

nd

nd

set

ce se

tal

Page 328: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 24 o

Standard

The gene

Steam Tu

A Genset

Summer

The perioon 30 Se

Supply

In relationshall be c

Synchro

The condor Total Sare identiSynchroSystem A Distribu

System N

The procShutdown

System S

A situatiosynchron

Target F

That Freqnormally determine

Tertiary

The comInstructio

Total Sys

The entirFacilities developewith any

ctricity Transmis

of 26

d Planning

eral data req

urbine Gen

t with a stea

r Period

od commencptember in t

n to electriciconstrued ac

nised

dition where System, so ical (within onise and Sy

ution System

Normalisati

cedures necen;

Separation

on where fism with eac

requency

quency detebe 50.00

ed by OETC

Reserve

ponent of thons to Synch

stem

re interconneand all Tra

ed or modifieSystem whic

ssion Compan

Data

quired by OE

set

m turbine as

cing 00:00 othe same Gr

ty, the Suppccordingly;

a Genset, othat the Fre

operational tynchronisat

m or a Trans

ion Procedu

essary for a

following anch other;

ermined by OHz plus or

C;

he Operatinghronise and D

ected electriansmission ed from timech is outside

y

ETC under th

s its prime m

on 1 April in regorian Cal

ply of electric

or a Systemequencies antolerances) ttion will be c

mission Sys

ures

a recovery fr

n Incident p

OETC as ther minus 0.0

g Reserve thDispatch oth

city SystemSystems an

e to time ande Oman;

he Planning

mover;

a Gregorianendar Year;

city to any P

, is Connectnd phase reto those of thconstrued ac

stem, as the

rom a Partia

parts of the

e desired Fre05Hz excep

hat would beher CDGens

s of Licensend Distributd includes a

The Grid Code

J - Abbr an

Code;

n Calendar Y

Premises and

ted to the buelationships ohe other Sysccordingly;

context requ

al System S

e Transmiss

equency of tpt in excep

e Available ets;

ees in Omantion Systemany such Sys

e - Version 2.0

nd Definitions

Year and en

d Supplied

usbars of anof that Gensstem or Tota

uires;

hutdown or

sion System

he Total Sysptional circu

as a result o

n, including s, as the sstem which

s Version 2.00

nding at 24:0

and Supplie

nother Systeset or Systeal System an

Total Syste

m are out

stem. This wumstances a

of Emergenc

all Productiosame may binterconnec

00

00

es

em em nd

em

of

will as

cy

on be cts

Page 329: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 25 o

Total Sys

The situaSystem h

OETC

The Omathe Secto

Transmis

Means, iSystem, a

Transmis

A Licence

Transmis

The standTransmis

Transmis

A SystemVoltage Enominal vfrom a Prsub-statioany Elect

Transmis

The OutaprovisionSystem;

Transmis

Charges with the T

Turbine S

Any cont(speed co

Unconst

A Generaaccount described

ctricity Transmis

of 26

stem Shutd

ation when ahas ceased t

an Electricityor Law; (Refe

ssion

n relation tand Transm

ssion Licen

e to Transm

ssion Secu

dards as setssion System

ssion Syste

m for the traElectric Linevoltage equaroduction Faon to anothetric Plant use

ssion Syste

age scheduls of OC 2

ssion Use o

made by OTransmission

Speed Cont

trol device tontrol, powe

trained Sche

ation Schedof any limitd in SDC 1.4

ssion Compan

down

all Generatioto function;

y Transmissferred as Tra

to electricitymit shall be c

nce

it electricity;

rity Standa

t down in them will be dev

em

ansport of ees and Elecal to or greaacility to a suer or to or froed for the pu

em Outage

le for the Oregarding o

of System C

ETC for then Licence;

troller

that is prover control, ex

edule

dule and Des on the To

4.9;

y

on Connecte

sion Compaansco in som

y, the transpconstrued ac

rd

e Condition veloped, Ope

lectricity, whctric Plant (nater than 132ub-station, fom any Interurposes of D

Plan

perational Youtages of P

Charges

use of the

vided to govxtraction flow

salination Sotal System

ed to the Tot

ny SAOC eme documen

port of elecccordingly;

28 of the Trerated and m

hich Systemnamely, Ele2kV) and whfrom one Prorconnector,

Dispatch;

Year producPlant and/or

Transmissio

vern the turw control, tem

Schedule prom imposed b

The Grid Code

J - Abbr an

tal System h

established pnts)

ctricity by m

ransmission maintained;

m consists (wctric Lines a

hich is used oduction FacPremises, o

ed by OETCr Electric Li

on System d

bine output mperature lim

oduced by Oby the Trans

e - Version 2.0

nd Definitions

has ceased

pursuant to

means of a

Licence and

wholly or mand Electricfor transporcility to anot

or Distributio

C in accordines of the

determined i

according mitation con

OETC that dsmission Sy

s Version 2.00

and the Tot

Article (6),

Transmissio

d to which th

ainly) of Higc Plant with rting electricither, from onn System an

ance with thTransmissio

n accordanc

to set valuetrol, etc.);

does not takystem and a

00

tal

of

on

he

gh a

ity ne nd

he on

ce

es

ke as

Page 330: SULTANATE OF OMAN Code v2.0 April 2010.pdf · 2016-10-13 · some case & Incidents ure of HV P vestigations lination Sch ... report such onable effo able. Non-c Plant Conn of a revisio

Oman Elec

Page 26 o

User

A term ProducerInterconnDirectly Cthe Grid C

Voltage C

The proce

Warm

When ref(8) hoursconfigurasuch GenWater DeThe pointaccordan

Water Me

A device

Water Me

The centrWater Me

Water Me

The grouisolation communirelating to

Winter D

In respecavailabilitfor which

Winter P

The perio24:00 on

ctricity Transmis

of 26

used to refrs having Cnected PartieConnected CCode applie

Control

ess of regula

ferring to a Gs but not mation and monset has beeelivery Point at the boun

nce with PW

eter

for measurin

eter Registr

ral databaseetering Syste

etering Sys

up of equipmequipment

ications equo a Connect

Downtime

ct of a CDGty of the res no Dispatch

Period

od commen31 March in

ssion Compan

fer to PersCDGensets,es ConnecteConsumers. s;

ation of Syst

Genset, it mmore than fore than twoen shut downnt ndary of the PAs and by

ng and reco

ration Syste

e operated aems

stem

ment includit including uipment thattion Site;

enset or Depective CD h Instruction

cing 00:00 n the followin

y

ons using , all Interned to the Tra

In some in

tem voltages

means a Genforty-eight (4o (2) hours n if the Gens

Production reference to

rding water

em

and maintain

ng Meters, alarms, c

t are part of

esalination UGenset or D will be give

on 1 Octobng Gregorian

the Transmnally Intercoansmission Snstances, th

s to maintain

nset that has48) hours ibut not mo

set is in ope

Facility at wo which the D

quantities;

ned by the P

time switchcircuitry, asf the water

Unit, those hDesalination

n nor Capac

ber in a Gren calendar y

The Grid Code

J - Abbr an

mission Systonnected PSystem, Lice

his term mea

n them withi

s been shut f the Gens

ore than twen cycle conf

hich DesalinDesalinated

WP for the p

es, initiatingssociated dquantity me

hours of the Unit is not a

city payment

egorian caleyear;

e - Version 2.0

nd Definitions

tem includinParties and ensed Distrians any Per

n specified l

down for moset is in coenty four (24figuration;

nated water water flow i

purposes of

g devices, pdata storageasuring eq

Winter Periaffected by ats will be ma

endar year a

s Version 2.00

ng all PowInternation

butors and arson to who

limits;

ore than eigmbined cyc4) hours aft

is delivered s measured

registering a

protection ange and dauipment at

iod where than outage anade; and

and ending

00

wer nal all

om

ght cle ter

in ;

all

nd ata or

he nd

at