8 Aug 1997 ICFA Santa Fe Meeting Network Resource Center H E P Summary of Network Monitoring Working Group Mission of Group: » Obtain as uniform picture as possible of the present performance of the connectivity used by the ICFA community Using ping metrics to make end-to-end performance measurements Have 12 sites in 7 countries collecting data on 400 link pairs, using common documented tools & data format Data being gathered and archived at HEPNRC Have some common tools for analyzing and presenting the data via the Web

Upload: clinton-carlson

Post on 30-Dec-2015

27 views

Category:

Documents


2 download

DESCRIPTION

Summary of Network Monitoring Working Group. Mission of Group: Obtain as uniform picture as possible of the present performance of the connectivity used by the ICFA community Using ping metrics to make end-to-end performance measurements - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Summary of Network Monitoring Working Group

8 Aug 1997 ICFA Santa Fe MeetingNetworkResourceCenter

HE

P

Summary of Network Monitoring Working Group

Mission of Group:» Obtain as uniform picture as possible of the present

performance of the connectivity used by the ICFA community

Using ping metrics to make end-to-end performance measurements

Have 12 sites in 7 countries collecting data on 400 link pairs, using common documented tools & data format

Data being gathered and archived at HEPNRC Have some common tools for analyzing and presenting

the data via the Web

Page 2: Summary of Network Monitoring Working Group

8 Aug 1997 ICFA Santa Fe MeetingNetworkResourceCenter

HE

P

Top Two Major Issues

How Do We Cope With All the Data (collecting 200MBytes/month)» Group By Interest, Experiment, Country, Type, AS ...» Ranking Quality of Links» Categorise Links by Type of Usable Service (mail, FTP,

WWW, etc.)» Weather Maps, Weekly Summary

Need Additional Analysis Effort (to develop tools) and more Collecting Sites» Efforts:

Medium Amount of Effort to Develop Analysis Reports

Small Amount of Error to run a Collection Site

Page 3: Summary of Network Monitoring Working Group

8 Aug 1997 ICFA Santa Fe MeetingNetworkResourceCenter

HE

P

Other Major Issues

Lobbying for Change / Building Relationship with ISPs» Rely on Service Providers to Resolve Problems?» Problem with C in A->B->C->D->E? Should A contact C?» ICFA May Be Able to Help

New Tool Development» Port SLAC Report Generation to Support Multiple Source» Port TracePing to PERL» HTTP, FTP transfers