Tunnelling Summer Placement ReviewAlice Jackson

10th August- 2nd October 2015

16 September 2015

Page 2: Summer Placement Review

216 September 2015

About Me

• Studying Civil and Environmental Engineering at Imperial College London

• ICE QUEST Scholar

• Previous work placement in 2012 with Atkins Oil & Gas

Page 3: Summer Placement Review

316 September 2015

The Problem• Culvert base designed to be

constructed over an existing brick sewer

• Atkins asked to calculate strain resulting from unloading above the sewer

• This will determine whether design is compliant with Thames Water guidelines

Lewisham GatewayRiver Quaggy Culvert base design over existing brick sewer

Page 4: Summer Placement Review

4

Lewisham GatewayLearning to use Oasys Pdisp software

16 September 2015

Input• Ground conditions below level of sewer using

information extracted from nearby boreholes and trial pits

• Uniformly distributed load to represent the ground above

• Unloading of ground for culvert• Analysis line to represent sewer

Output• Soil displacements

Page 5: Summer Placement Review

516 September 2015

Lewisham GatewayCalculation Cover Sheet

Page 6: Summer Placement Review

616 September 2015

Lewisham GatewayTechnical Note

Page 7: Summer Placement Review

716 September 2015

Seanet ProUsing Seanet, I was able to simultaneously watch sonar and video footage of the Riber Tunnel for Severn Trent Water.• Looking for any major problems

that would need immediate action

Riber TunnelLooking through ROV footage

Page 8: Summer Placement Review

816 September 2015

Riber Tunnel

Page 9: Summer Placement Review

9

Calculating reinforcement densities• Converting reinforcement into kg/m from mm2/m for top and

bottom tensile and shear for each section of the tunnel (invert, roof slap, side walls and central wall)

16 September 2015

HS2 Green Tunnels

Page 10: Summer Placement Review

10

HS2 Amersham Shaft• Given plan and section views of the shaft,

I was asked to create a 3D model using SketchUp software

• Then able to convert these back into 2D by taking section cuts, and accurately dimension the drawings

• My first experience using 3D modelling software.

16 September 2015

SketchUp3D Modelling

Page 11: Summer Placement Review

1116 September 2015

SketchUp3D Modelling

Page 12: Summer Placement Review

1216 September 2015

SketchUp3D Modelling

Page 13: Summer Placement Review

13

DLR Woolwich Arsenal Tunnel Inspection

16 September 2015

Inspection Report• Typing up the report• Compiling and captioning the relevant

photos

Page 14: Summer Placement Review

14

Victoria Station Upgrade

Comparison of technical drawings• Locating most recent and previous

drawings to compare them and identify changes

Changes to reinforcement densities• Comparing drawings to identify changes to

the reinforcement bars

16 September 2015

Page 15: Summer Placement Review

15

East/West Link UnderpassPossibility of Atkins involvement in the design and construction of a tunnel underneath a rail line to link the new Imperial campus to Latimer Road.

I was involved in the• Cover letter• Organisation chart• Delivery of tender to Imperial College

London

16 September 2015

Imperial West Tender

Page 16: Summer Placement Review

16

We were taken down to the tunnels via the main shaft and shown• precast concrete running tunnels• 1st stage concrete (part of the track slab which is

constructed in the invert of the running tunnels) • cross passage which connects the running tunnels

16 September 2015

Site Visit: CrossrailLimmo Peninsula Site

Page 17: Summer Placement Review

17

Technical SkillsLearnt to use various new pieces of software including• Oasys Pdisp• Seanet• SketchUp

And have also improved my Microsoft Excel skills.

• Insight into what a career in civil engineering will be like

• Better time management

• Understanding of the importance of teamwork + communication

• Different stages of a project- tender (Imperial West); design (HS2; VSU); construction (Crossrail); maintenance (DLR)

Knowledge Gained

16 September 2015

Page 18: Summer Placement Review

18

Thank you