![Page 1: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/1.jpg)
1
SunPine Biorefinery Second generation biofuel
![Page 2: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/2.jpg)
2
SunPine AB
• Founded in 2006
• Environmental permission 2008-03
• Owners
KIRAM AB (Lars Stigsson)
Preem AB (from 2008-06)
Sveaskog (from 2008-06)
Södra Skogsägarna (from 2008-06)
• Investment approx. 32 million EUR
• Production start 2010-04
• 20+ employees
![Page 3: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/3.jpg)
3
Location
![Page 4: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/4.jpg)
4
Piteå Harbour
![Page 5: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/5.jpg)
5
Summer 2010
![Page 6: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/6.jpg)
6
SunPine AB …….about Crude Tall Oil (CTO)
CTO is a renewable, non food raw material.
CTO is a rest product from the kraft sulphate process. After the digester (anthraquinone can be used for increased yield), soap is separated from the black liquor and acidulated with sulphuric acid into CTO.
2-3 procent of the wood becomes CTO.
Swedish CTO volume is approx. 200 kton/year.
CTO main components are fatty acids, resin acids and neutral elements.
Sterols are part of the neutral elements and are today recovered and used in functional foods.
![Page 7: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/7.jpg)
7
Pine (Pinus) Spruce (Picea) Birch (Betula)
kg/ton % kg/ton % kg/ton %
Fatty acid 16 73 5 62 13 70
Resin acid 5 22 1,5 21 0 0
Neutral element 1,1 5 1,3 17 5 30
of which Beta-sitosterol
0,8 4 0,5 7 0,7 4
SunPine ……..about wood components
![Page 8: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/8.jpg)
8
SunPine – first phase Production facility for crude tall diesel
Feedstock Crude Tall Oil
Methanol
Products Crude Tall Diesel (55%)
Tall Oil Pitch (45%)
Capacity 100.000 m3/year (that is 2,5% of the swedish diesel volume)
![Page 9: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/9.jpg)
9
![Page 10: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/10.jpg)
10
The SunPine Process
(Catalyst)
CTO
Other non edible
Fatty acids
MEOH
Esterification Vacuum
Distillation
Resin
acid
2. Pitch
Plant
sterols
1. Crude Tall
Diesel
Pulpmills,
Heat plants
Preem
Gothenburg
Chemistry
/Food-
industries
Later
Later
Feedstock Process Products Buyer
![Page 11: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/11.jpg)
11
2006: Process development
![Page 12: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/12.jpg)
12
Steam Boiler 5 MW (3 and 9 bar) Hot oil (300 ºC)
Crude tall diesel tank 25 000 m3
Full scale production unit: 20 meters high at 4’th level 35 meters wide
![Page 13: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/13.jpg)
13
Methanol reactor
Condens tank and coolers
Thin-film evaporator
Vacuum system Spray condenser Steam Ejectors
Fractionation reactor (3mBar, bottom temp 240ºC)
Steam stripper Methanol condensers
Methanol
Turpentine decanter
Reactor flash
Esterification reactor
Turpentine Re-heat Flash tanks
Gas collection
Heat exchangers
![Page 14: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/14.jpg)
14
SunPine crude tall diesel Renewable feedstock for the refinery
at Preem in Gothenburg
ACP
Evolution
Diesel
![Page 15: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/15.jpg)
15
Traditional raw materials for renewable diesel fuels……….
Foto: David Castor, http://commons.wikimedia.org/wiki/File:Rapsf%C3%A4lt-1.jpg
![Page 16: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/16.jpg)
16
SunPine diesel
…and CO2 aspects
![Page 17: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/17.jpg)
17
Nov 2008: Frost protection
![Page 18: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/18.jpg)
18
May 2009: ”Green field”
![Page 19: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/19.jpg)
19
Aug 2009
![Page 20: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/20.jpg)
20
Nov 2009
![Page 21: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/21.jpg)
21
Dec 2009
![Page 22: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/22.jpg)
22
Feb 2010
![Page 23: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/23.jpg)
23
Feb 2010 (-30 ºC)
![Page 24: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/24.jpg)
24
Feb 2010: Boiler start
![Page 25: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/25.jpg)
25
April 2010: “Lysekil oilers”
![Page 26: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/26.jpg)
26
April 2010: Production start
![Page 27: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/27.jpg)
27
May 2010: Opening ceremony
![Page 28: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/28.jpg)
28
October 2010: Vessel to Preem
![Page 29: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/29.jpg)
29
October 2010: Maintenance shut
![Page 30: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/30.jpg)
30
Resin acids
Phytosterols
Valuable components in tall oil pitch
![Page 31: SunPine Biorefinery Second generation biofuel KIRAM AB (Lars Stigsson) Preem AB (from 2008-06) Sveaskog (from 2008-06) Södra Skogsägarna (from 2008-06) • Investment approx. 32](https://reader034.vdocument.in/reader034/viewer/2022042412/5f2b4589be695f668f2020d8/html5/thumbnails/31.jpg)
31
Future
Increase feed
Increase yield
Process optimization
Recovery of resin acids (30-40 % of pitch)
Recovery of anthraquinone
Recovery of phytosterols