Sunset AcresNeighbourhood Area Structure Plan
RECEWED NOV 2 0 2q15
DRAFT - November 2015
Submitted by:
parloplan
I
Submitted to:
![Page 2: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/2.jpg)
![Page 3: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/3.jpg)
Sunset Acres Area Structure Plan
Prepared for
Doug Sprague
By
#605 Empire Building, 10080 Jasper Ave.
Edmonton, Alberta T5J 1V9
Phone: (780) 423-6824 Fax: (780) 423-6850
Email: [email protected]
www.parioplan.com
DRAFT - November 2015
![Page 4: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/4.jpg)
![Page 5: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/5.jpg)
TABLE OF CONTENTS 1.0 INTRODUCTION 1
1.1 Background
1.2 Plan Area
1.3 Enabling Legislation
1.4 Planning Process
1.5 Community Consultation
1.6 Plan Organization
2.0 STATUTORY PLAN AND POLICY CONTEXT 5
2.1 Alberta Land Use Framework
2.2 Intermunicipal Development Plan, Bylaw 779-11 2.3 Brazeau County Municipal Development Plan, Bylaw 770-11 2.4 South Rocky Rapids Area Structure Plan 3.0 SITE CONTEXT AND DEVELOPMENT CONSIDERATIONS 9
3.1 Topography and Natural Features
3.2 Existing and Adjacent Land Uses
3.3 Man Made Constraints
3.4 Schools, Recreation and Community Facilities
3.5 Protective and Emergency Services
3.6 Historical Resources
4.0 DEVELOPMENT CONCEPT 13
4.1 Overview
4.2 Land Use Policies
4.3 Parks, Open Spaces and Reserves
i
5.0 TRANSPORTATION 17
5.1 Overview
5.2 Roadway Construction Standards
6.0 MUNICIPAL SERVICES 19
6.1 Overview
6.2 Sanitary Servicing 6.3 Water Distribution 6.4 Stormwater Management 6.5 Franchise Utilities 6.6 Solid Waste
7.0 IMPLEMENTATION 23
7.1 Overview
7.2 Phasing 7.3 Land Use Bylaw Amendments 7.4 Subdivision Approval 7.5 Development Agreement 7.6 Amending the Plan
![Page 6: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/6.jpg)
ii
10.0 MAPS 25
Map 1 Location Map
Map 2 Existing Land Use
Map 3 Natural Features and Drainage
Map 4 Constraints
Map 5 Development Concept
Map 6 Conceptual Utility Servicing
LIST OF TABLES
Table 1 — Land Use Statistics 15
Table 2 — Population Projection 15
APPENDICES Appendix A — Water, Sanitary and Drainage Study (MPE Siemens)
Appendix B — Historic Resource Clearance
Appendix C — Restrictive Covenant
![Page 7: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/7.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
INTR
OD
UC
TIO
N
1.0
1
INTRODUCTION 1.0
1.1 Background
Located within Brazeau County approximately 150 km southwest of Edmonton, the Sunset Acres Neighbourhood Area Structure Plan (NASP) abuts the north boundary of Drayton Valley. The region’s economic base is primarily focused on agriculture, forestry and oil/gas activities. These industries further support residential growth and development causing a steady rise in the County’s population. The plan is governed by existing statutory plans which set the planning framework for future development. The Brazeau County and Town of Drayton Valley Intermunicipal Development Plan (IDP), Bylaw 779-11, Figure 6 Future Land Use Concept designates the plan area for Country Residential use, while the Municipal Development Plan (MDP), Bylaw No. 770-11, Figure 4 - Future Land Use Strategy identifies that plan area within a Growth Centre. The IDP also requires the preparation of a Neighbourhood Area Structure Plan (NASP) to comply with the residential land use. The Sunset Acres NASP proposes Country Residential (CR) and Compact Country residential (CCR) uses that support the policy direction. Upon plan adoption, the approved districting as regulated through the Land Use Bylaw (LUB) 782-12 shall apply. This NASP will be guided by the South Rocky Rapids Area Structure Plan (ASP) which will be amended to allow for Compact Country Residential, as per Section 5.4, Policy 14.
![Page 8: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/8.jpg)
2 Sunset Acres Neighbourhood Area Structure Plan - November 2015
1.2 Plan Area
The plan area is comprised of approximately 42.5 ha and is currently part of one titled parcel, legally described as SW 27-49-7-W5M. The entire quarter section, with the exception of four lots in the south western portion, is currently owned by Mr. Doug Sprague. The lands are bounded by Range Road 73 and Town Road 494 with access from the west and south to the parcel, respectively. The proposed development includes 37 residential lots.
1.3 Enabling Legislation
This Area Structure Plan has been prepared in accordance with Sections 633 of the Municipal Government Act (MGA) (Revised Statutes of Alberta, 2000, Chapter M-26). The MGA allows municipalities to adopt area structure plans to provide a framework for the development of an area and future subdivisions. The MGA stipulates the following:
633 (2) An area structure plan:
a) must describe
i. the sequence of development proposed for the area,
ii. the land uses proposed for the area, either generally or with respect to specific parts of the area,
iii. the density of population proposed for the area either generally or with respect to specific parts of the area, and
iv. the general location of major transportation routes and public utilities, and
b) may contain any other matters the council considers necessary.
1.4 Planning Process
This ASP was prepared in four phases over a 8 month period between September 2014 and November 2015.
1.5 Community Consultation
Prior to undertaking a community consultation with respect to the plan, a thorough review of governing policy documents (Land Use Framework, Municipal Development Plan, Intermunicipal Development Plan), South Rocky Rapids ASP, Land Use Bylaw and various technical background studies was carried out.
Public Open House
On September 14, 2015, the draft Sunset Acres NASP was presented to at a public open house held at the Rocky Rapids Community Hall. The open house was attended by six (6) people, including the adjacent landowners and members of the general public. A representative of Brazeau County was
PHASE I
PROJECT INITIATION/SCOPING
PHASE II
PREPARE/SUBMIT DRAFT ASP TO COUNTY
PHASE III
RESOLVE PLANNING/COMMUNITY ISSUES
PHASE IV
FINAL ASP/PUBLIC HEARING, ADOPTION
![Page 9: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/9.jpg)
INTR
OD
UC
TIO
N
1.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015 3
Section 1.0 – Introduction: Provides an overview of the ASP by documenting the background, purpose, vision, and public consultation activities undertaken during the ASP pro-cess.
Section 2.0 – Statutory Plan and Policy Context: This section provides an overview of the high level planning policy documents and the influence on the development of this ASP.
Section 3.0 – Site Context and Development Considerations: Profiles existing site conditions in-cluding the physical environment and existing land uses.
Section 4.0 – Development Concept: Presents the overall development concept based upon the planning principles, opportunities and constraints and public input.
Section 5.0 – Transportation: Describes the external and internal roadway network and road de-velopment standards for the ASP area.
Section 6.0 – Municipal Services: Provides information regarding the proposed sewer servicing, water servicing, stormwater system, franchise utilities and solid waste services with-in the ASP.
Section 7.0 – Implementation: Summarizes the implementation actions required, including stag-ing, subdivision and rezoning requirements, and provisions for amending the plan.
present. The open house format provided through a series of presentation boards the key highlights, goals and objectives of the plan along with details of the development concept. Attendees were encouraged to ask questions directly of the developer and the Consultant during informal conversations. Attendees were provided with an exit survey to provide additional feedback to the project team. No feedback or comments were received through the exit survey.
One concern expressed by a land owner related to traffic increases and speed of traffic as a result of new roads being constructed through the quarter section that will connect existing roads. Questions about design and the County’s servicing standards applicable to the development were answered to the satisfaction of the participants based on the content of the NASP, as well as referring questions to the County’ s planning and development representative. There was also interest in the approximate timeline for developing the new lots from potential buyers which the developer addressed. Overall, the NASP was well received by those that attended.
Public Hearing
In accordance with the Municipal Government Act, a public hearing was held on XX, 2015 at _____ .
1.6 Plan Organization
This ASP is organized as follows:
![Page 10: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/10.jpg)
4 Sunset Acres Neighbourhood Area Structure Plan - November 2015
![Page 11: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/11.jpg)
5
STA
TUTO
RY
PLA
N
AN
D P
OLI
CY
CO
NTE
XT
2
.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015
2.1 Alberta Land-use Framework
The purpose of the Alberta Land-use Framework is to manage growth and to sustain the province’s growing economy, but balance it with Alberta’s social and environmental goals. The Alberta Land-use Framework sets out an approach to manage public and private lands and natural resources to achieve long-term economic, environmental and social goals. It provides a blueprint for land-use management and decision-making that addresses Alberta’s growth pressures. The Alberta Land-use Framework is about Smart Growth. Future land-use decisions will need to be consistent with regional plans. The Land-use Framework consists of seven basic strategies to improve land-use decision-making in Alberta:
Strategy 1: Develop seven regional land-use plans based on seven new land-use regions.
Strategy 2: Create a Land-use Secretariat and establish a Regional Advisory Council for each region.
Strategy 3: Cumulative effects management will be used at the regional level to manage the impacts of development on land, water and air.
Strategy 4: Develop a strategy for conservation and stewardship on private and public lands.
STATUTORY PLAN AND
POLICY CONTEXT 2.0
businessinbrazeau.com
![Page 12: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/12.jpg)
6 Sunset Acres Neighbourhood Area Structure Plan - November 2015
Strategy 5: Promote efficient use of land to reduce the footprint of human activities on Alberta’s landscape.
Strategy 6: Establish an information, monitoring and knowledge system to contribute to continuous improvement of land-use planning and decision-making.
Strategy 7: Inclusion of aboriginal people in land-use planning.
The Brazeau County is part of the North Saskatchewan Regional Plan. This plan has begun and has just completed the consultation phase.
2.2 Intermunicipal Development Plan, Bylaw 779-11
Brazeau County and the Town of Drayton Valley Intermunicipal Development Plan (IDP), Bylaw 779-11, adopted on January 17th, 2012 governs the plan area and designates these lands as Country Residential as illustrated in IDP Figure 6 – Future Land Use Concept. IDP Policy 4.2.4 Country Residential District Amendment states that 0.81 ha is minimum lot size for Country Residential use. The proposed plan is generally consistent with IDP residential land use policies, however, it proposes 0.4 ha lots sizes on lands located in the northeast portion to advance Brazeau County’s Municipal Development Plan policies for a variety of housing and lots sizes that are municipally serviced to accommodate increased development.
2.2 Brazeau County Municipal Development Plan, Bylaw 770-11
The Brazeau County Municipal Development Plan (MDP), Bylaw No. 770-11 was adopted in 2011. Since the Municipal Government Act requires that all statutory plans be consistent with one another, it is important for the Sunset Acres NASP comply with the policy direction outlined in the MDP.
Figure 4 - Future Land Use Strategy in the MDP designates the subject lands as ‘Growth Centres”. The following table summarizes policies in the MDP that support the development of the NASP for residential use:
Policies in the MDP Compliance
4.2.3. Large multi-lot subdivisions should be con-centrated close to existing or future residential areas so that Brazeau County can effectively and efficiently deliver high quality municipal and com-munity services
Located midway between the Town of Drayton Valley and the Hamlet of Rocky Rapids, the site is ideal for a new development that concen-trates residences within the area identified as part of ‘Growth Centres’ (Figure 4)
Policy 31 Brazeau County shall consider the de-velopment of higher density residential develop-ments in the IDP area; and in areas where suffi-cient transportation network is available, and where municipal or community water and sani-tary servicing capabilities exist or can be made available in the future at the expense of the de-veloper.
With direct access to Range Road 73 and Town-ship Road 494, and approximately 1.5km from Highway 22 to the west, the site is ideal for a residential development on a variety of lot siz-es.
![Page 13: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/13.jpg)
STA
TUTO
RY
PLA
N
AN
D P
OLI
CY
CO
NTE
XT
2
.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015 7
2.3 South Rocky Rapids Area Structure Plan
The Sunset Acres NASP is consistent with the overall planning framework established in the South Rocky Rapids ASP (SRRASP) for the plan area and the surrounding lands. The ASP designates the site entirely for Country Residential use in the Future Land Use Concept (Figure 4). Section 5.4, Policy 14, requires that the ASP be amended to allow for country residential suburban estate to be developed.
This Plan affirms the Recreation Policies of Section 5.8. The ASP recommends that lands dedicated for municipal reserve be located and configured to enhance and link into the existing Range Road 73 trail system and connect to Eagle Point Provincial Park as the area develops. In support of this goal, this Plan closely aligns with the Future Trail Concept (Figure 5).
Policies in the MDP Compliance
The Range Road 73 trail system means that ac-tive transportation options are also available, and will be improved with the future develop-ment of the planned trail network as per the South Rocky Rapids ASP, Figure 5.
The lots on this site will be fully serviced, by connecting to municipal water and sanitary sys-tems.
6.3 Objective Promote and encourage the devel-opment of a variety of land uses within the IDP area
This development advances this objective by introducing a variety of residential lot sizes to allow for a range of housing options.
5.1. Natural Environment Sustainability Goals A majority of the existing treed areas and natu-ral drainage courses have been preserved.
6.6. Policy 80. Brazeau County shall require that all new multi-lot subdivisions demonstrate a mu-nicipal reserve dedication strategy, including how proposed municipal reserve sites may link to ad-jacent lands for linear parks and trails
The locations for Municipal Reserves link the subdivision with a proposed trail that traverses the site from the north going in a southeast direction and connecting to lands to the east. The plan integrates the recommended trail alignment in the South Rocky Rapids ASP which aims to provide direct access to the Eagle Point Provincial Park in the future.
Section 6.8. Policy 123 Brazeau County supports engineered stormwater management systems that incorporate the use of wetlands and bios-wales as stormwater retention and/or hydrologi-cal recharge areas in the design of subdivisions.
Existing natural drainage patterns are retained for the plan area’s storm water management system. The ASP includes a preliminary Storm Water Management Plan with detailed plans provided at the time of subdivision.
7. All new area structure plans [...] must include at least one forum for public engagement, in ad-dition to a public hearing.
An Open House was held inviting adjacent land-owners through a mailed letter and notice in the paper for the general public. Feedback was gathered and considered in the final draft of the NASP as described under section 1.5 above.
![Page 14: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/14.jpg)
8 Sunset Acres Neighbourhood Area Structure Plan - November 2015
The Plan also complies with all other sections of the ASP including transportation network requirements, water and sanitary services and stormwater management. These provisions are in detail in the subsequent sections of the ASP. The NASP delineates the provision of water and sanitary services and access by means of internal subdivision roads.
![Page 15: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/15.jpg)
SITE
CO
NTE
XT
AN
D
DEV
ELO
PM
ENT
CO
NSI
DER
ATI
ON
S 3
.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015 9
3.1 Topography and Natural Features
As shown in Map 3 – Natural Features and Drainage, the NASP area has a relatively flat terrain with an elevation height of 836 m above sea level at the south-east corner. Elevation range by 13 m. Water generally drains from the west to the east. A majority of the plan area is currently undeveloped and cultivated for agricultural use, with a small portion along the south and west boundaries developed for country residential use.
There are no significant natural features, but the area does include two tree stands that cover approximately 2.7 ha; and two minor drainage courses that run from the north boundary and the west boundary that join and flow into the lands to the east, and eventually drain into the North Saskatchewan River. These are relatively dry during most of the year but carry seasonal run-off during periods of thawing and/or heavy precipitation. Development has been avoided in these areas, to be retained as environmental reserve at the time of subdivision.
3.2 Existing and Adjacent Land Uses
A portion of the plan area is developed for country residential use while the remaining areas are
SITE CONTEXT AND DEVELOPMENT CONSIDERATIONS 3.0
![Page 16: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/16.jpg)
10 Sunset Acres Neighbourhood Area Structure Plan - November 2015
actively cultivated for agricultural purposes. Existing districting applied to the plan area include: 12.4 ha proposed as Country Residential district and the remaining 7.3 ha as Compact Country Residential district.
Land uses adjacent to the plan area are as follows:
The quarter section to the north is districted Country Residential with one Direct Control parcel.
The quarter section to the east is districted entirely Country Residential.
Lands to the immediate west are districted Airport Vicinity District with the remaining quarter section on the west side districted as Country Residential.
The Town of Drayton Valley forms the southern boundary of the ASP, and is characterized by agricultural land uses immediately adjacent to the plan area. The entire plan area is governed by the Airport Vicinity Protection Overlay as illustrated in Figure 49-7 of the Land Use Bylaw. As required by the SRRASP all land use and development applications for lands adjacent to the Drayton Valley Municipal Airport shall be referred to the Transportation Canada and Nav Canada prior to approval. The proposed Sunset Acres NASP is consistent with existing and surrounding land uses.
3.3 Man Made Constraints
An Evergreen Gas Co-op High Pressure Pipeline right-of-way runs north-south bisecting the plan area. There are spur lines servicing the rest of the plan area with locations illustrated in Map 4 – Constraints. An existing pipeline that is located within a 10.00 m Exoro Energy Inc. right-of-way runs along the north boundary of the site. Also identified within the plan area, as illustrated on Map 4 – Constraints, is an abandoned pipeline (R/W Plan 239 MC) which cuts across four residential lots. The pipeline has been removed off title, and any requirements for its discharge have been met. Referral to Alberta Energy Regulator will be required at the time of subdivision as part of the standard referral process. All existing man-made constraints within the plan area have been considered in the design of the development.
3.4 Schools, Recreation and Community Facilities
The nearest schools to the plan area are: H.W Pickup Junior High School, located in Drayton Valley approximately 3.0 km to the southwest at 3505-58 Avenue; and Aurora Elementary School 2.0 km to the south at 3901-55 Avenue.
The Town of Drayton Valley`s north boundary abuts the site, offering a range of facilities including a pool at the Rotary Park and numerous other recreational facilities at the Lions West Valley Park, including a skate park, a dog park, the Drayton Valley Omniplex, as well as a local museum, a municipal library and the Mackenzie Conference Centre. The hospital is just over 5.0 km away from the plan area in the southern portion of the Town of Drayton Valley.
The Hamlet of Rocky Rapids, located 2.0 km to the north, is a stable community with the following services: a community hall, post office, store, an outdoor skating rink, ball diamonds, along with a local downhill and cross-country ski hill in close proximity.
Eagle Point Provincial Park and Blue Rapids Recreation Area, with over 120 km of managed trails, is located less than 1.0 km away from the site, with the MDP anticipating a future trail concept that will provide easy access from adjacent lands.
![Page 17: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/17.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
11
SITE
CO
NTE
XT
AN
D
DEV
ELO
PM
ENT
CO
NSI
DER
ATI
ON
S 3
.0
Drayton Valley Municipal Airport is located approximately 1.5 km to the north of the site.
3.5 Protective and Emergency Services
Brazeau County is currently policed and patrolled by the RCMP from their detachment in Drayton Valley and working closely with the RCMP are also the Community Peace Officers who take care of enforcement of the Alberta Traffic Safety Act and municipal bylaw enforcement. The plan area is located closest to Fire Station 3, one of the three fire stations in Brazeau County, at 5120 52 Street, approximately 5 km away. The fire department has expressed potential interest in retention pond activities and to work with the developers to install a dry hydrant system for fire suppression purposes. This will be discussed further at the development approval stage, in line with the Minimum Serving Standards, and will be detailed in the development agreement.
The Drayton Valley Hospital and Care Centre is located at 4550 Madsen Avenue and the County is serviced by 911 for all emergency response.
3.6 Historical Resources
Based on a referral to Alberta Culture and Tourism Historical Resources Management Branch, the site has low potential for archaeological or paleontological resources. It has been confirmed that no known historical resources have been identified for the entire plan area and approval to proceed under the Historical Resources Act is provided in a letter dated 01 December 2014, Appendix A. The standard approval provides terms and conditions under the provisions of the Act for developers to report and further comply should any historic resources be discovered during any land disturbance in Alberta.
![Page 18: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/18.jpg)
12 Sunset Acres Neighbourhood Area Structure Plan - November 2015
![Page 19: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/19.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
13
DEV
ELO
PM
ENT
CO
NC
EPT
4.0
DEVELOPMENT CONCEPT 4.0
4.1 Overview
The future development concept for the Sunset Acres NASP is illustrated on Map 5 – Development Concept. This detailed development concept provides a specific land use framework to assist with future decisions on redistricting and subdivision applications. Table 1 – Land Use Statistics provides a breakdown of land use areas, unit densities and projected population for the proposed residential land uses.
Goal: To develop a well planned and serviced country residential community with a rural character that fosters a sense of place with a well-connected linear park system.
Objectives:
Create a variety of 1.0 acre (0.4 hectare) plus residential lots
Create a well-connected parks and open space system that links to the future regional trail network
Preserve existing environmental assets
Design based on cost-effectiveness and the County’s infrastructure standards
![Page 20: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/20.jpg)
14 Sunset Acres Neighbourhood Area Structure Plan - November 2015
4.2 Land Use Policies
The development consists of single detached housing in a country residential setting that covers 42.5 ha with approximately 2.75 ha of land dedicated for parks and open space. The proposed land use concept conforms to Brazeau County’s MDP and the South Rocky Rapids ASP. Future districting that will be applied is Country Residential and Compact Country Residential , as regulated through the LUB. Specific development regulations for CR and CCS districts in the Brazeau County LUB 782-12 include yard, floor area, height, landscaping, parking, home occupations and sign requirements.
4.2.1 Country Residential
Forming the larger portion of the residential development, approximately 10.5 ha, this land use is consistent with adjacent areas and allows for lots up to 1.6 ha.
4.2.2 Compact Country Residential
Approximately 8.1 ha of the net developable area (NDA) are designated in the northern portions of the NASP for Compact Country Residential a maximum lot size of 0.4 ha. This will serve to moder-ately increase density while still retaining the character of a rural setting and providing the market with an alternative to the larger Country Residential lots.
4.2.3 Design Controls
An existing Restrictive Covenant (Appendix C) placed on all lots will be applied to all new lots in the NASP to ensure quality design and aesthetics are applied consistently across the subdivision. As per the Restrictive Covenant, before obtaining a building permit from the municipality, owners of lots within the subdivision are required to obtain approval from the developer of all building plans, site locations, house style, exterior finishes and colours, and finished grade. The siting of all buildings will be determined in coordination with the Developer.
4.2.4 Fire Smart
At the time of development approval, additional considerations should assess the interface of resi-dential development with fire risk and mitigation such as adjacent land uses; density; access (right-of-way width, travel surface, emergency access); and public utilities (water available for fire sup-pression). It is encouraged that residential lots sizes and widths conform to the Fire Smart guide-lines to mitigate risk from the spread of wildfire.
4.2.5 Airport Vicinity Overlay
As seen in Map 2 – Existing Land Use, the entire NASP area is covered by the Airport Vicinity Over-lay. Therefore, all development within the NASP area will conform to the requirements of Section 4.4 of the Brazeau County LUB 782-12 at the time of subdivision and development approval.
4.3 Parks, Open Spaces and Reserves
Currently, lands within the NASP contain no developed parks, open spaces or trail systems. The South Rocky Rapids ASP, however, contains a Future Trail Concept (Figure 5) that seeks to create a well-connected trail system that will link the plan area to the Range Road 73 trail system to the west, and the Eagle Point Provincial Park to the east. As required by the Municipal Government Act (MGA), a maximum of 10% of Municipal Reserve (MR) dedication is required for the entire NASP area; according to the Policy 79 of the MDP, this can be dedicated in the form of land, cash-in-lieu of land, or a combination of both. As per the MGA, MR is only required for the undeveloped por-tions of the plan area, unless caveated on title.
![Page 21: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/21.jpg)
DEV
ELO
PM
ENT
CO
NC
EPT
4.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015 15
The NASP includes developed and undeveloped lands. Cash-in-lieu has already been provided to Brazeau County for the areas (approximately 14.5 hectares) that include eight previously subdivid-ed lots. The maximum MR, approximately 2.75 ha has been provided for the undeveloped portions of the plan area for parks and open space traversing the site. Locations have been selected that are accessible to all proposed residences, create a walkable community, protect existing tree stands and provide numerous connection points to link to a future County trail system. A conceptual walk-ing trail has been illustrated in the development concept. Details for its construction shall be deter-mined at the time of development approval.
4.3.1 Environmental Reserves
As per section 664 (1)(a) of the MGA, a natural drainage course has been identified and protected as Environmental Reserve (ER). This ephemeral drainage way is estimated to include approximately 0.5 ha of land for (ER) dedication. The ER will enhance the community’s aesthetic value and retain existing land patterns for managing stormwater. The final area and configuration of the ER will be confirmed at the subdivision approval stage.
The School Boards responsible for this area have been contacted and they have verified that there are no required school reserves on site. As such, the proposed land uses and their respective areas, including all required reserves, are summarized in the following table (Table 1). The Population Projection table (Table 2) provides an estimate of the expected population when the NASP area is fully developed.
Table 1: Land Use Statistics
Table 2: Population Projection
![Page 22: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/22.jpg)
16 Sunset Acres Neighbourhood Area Structure Plan - November 2015
![Page 23: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/23.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
17
Tran
spo
rtati
on
5.0
TRANSPORTATION 5.0
5.1 Overview
Map 5 — Development Concept illustrates the proposed local roadway network within the NASP area and access locations. Access to Sunset Acres is available from Range Road 73 and Township Road 494 which connect to the existing local roads Township Road 494A and Range Road 72A, respectively. These local roads will be extended in order to service the entire plan area following a curvilinear design similar to other country residential developments in the County. Highway 22 is 1.6 km to the west of the Sunset Acres, running in a north-south direction connecting to the Town of Drayton Valley and the Hamlet of Rocky Rapids, as well as to the rest of the region.
A Transportation Impact Assessment was not required in preparation of the Plan, since the site is more than 800 m from a provincial highway; and the regional network can sustain the additional future traffic flow resulting from the addition of 37 residential lots.
The roadway layout and access has been developed in accordance to the policies outlined in the South Rocky Rapids ASP as well as the MDP. As required by the South Rocky Rapids ASP, a roadway is proposed to extend to the east onto the adjacent quarter section to create a more cohesive transportation network that connects new roads to existing ones. Where applicable, County design standards have been considered in the conceptual design with further details required at the subdivision and development approval stage.
![Page 24: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/24.jpg)
18 Sunset Acres Neighbourhood Area Structure Plan - November 2015
5.2 Roadway Construction Standards
All roads will be constructed in compliance with the County’s Minimum Design Standards. The ex-isting roadways will be extended to allow seamless access into the new development. The new roads will be designed based on the specifications for Country Residential, which includes a paved cross-section with an 8.0 m surface width and a 30.0 m right of way.
![Page 25: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/25.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
19
MU
NIC
IPA
L
SER
VIC
ES
6.0
6.1 Overview
An analysis of the sanitary sewer, water and stormwater servicing requirements for the NASP was conducted in accordance with best engineering practices and County standards in place at the time of the Plan’s adoption. They are subject to alteration should Brazeau County’s development stand-ards change for the area. Much of the design is conceptual, with more detailed engineering being required as part of any development review and approval process. This may involve more detailed pipe sizing for specific site locations. The conceptual servicing plans are identified in Map 6 – Con-ceptual Utility Serving, which sets the framework for infrastructure utilities that are needed to pro-vide reasonable fire service and demand capacity throughout the ASP area. The design of the stormwater management system was done in accordance with the Alberta Water Act, the Alberta Stormwater Management Guidelines and general direction provided by the County.
6.2 Sanitary Servicing
Wastewater collection for the site is proposed by means of a low pressure sewer collection system through a septic tank effluent pumping (STEP) system. In this system, wastewater from a house-hold is first collected into a two compartment septic tank, partially treated where solids settle to
MUNICIPAL SERVICES 6.0
Lifeasahuman.com
![Page 26: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/26.jpg)
20 Sunset Acres Neighbourhood Area Structure Plan - November 2015
the bottom of the septic tank and the effluent rises and moves into the second (pumping) cham-ber. The pump then moves the effluent at low pressure through pipes to a wastewater conveyance or treatment facility. The NASP area will be serviced by the Rocky Rapids sanitary sewer system. A 75mm diameter pipeline is proposed as the minimum size of the low pressure sewer mainline.
Pipelines are laid out as indicated in Map 6 – Conceptual Utility Serving Plan along , 3 m below ground and 3 m from the water distribution main. Additionally, each resident will be required to extend the sanitary service pipeline located at the front property line to their individual STEP tank. Settled solids from the tanks will need to be periodically pumped out of the tank by a vacuum truck and transported to a waste landfill. The Plan also notes sanitary clean outs at two points, on the land to the east and to the south, since the expected flow velocity through the mainline is less than that required for self-cleaning of settled material within the pipeline.
6.3 Water Distribution
A trickle-fill water distribution system is proposed for the Sunset Acres development that will ser-vice the 37 lots with potable water for domestic and consumptive use. Potable water will be sup-plied by the newly constructed water treatment plant (WTP) in Rocky Rapids and the water trans-mission pipeline located along Range Road 73 and extended east in to the plan area. The system comprises a distribution pipe network within the road allowance, a service pipeline along the prop-erty line and a trickle-fill system on private property. The distribution main is proposed to be 75 mm diameter pipe while the service line to property line is proposed to be 50 mm diameter.
On private property, each lot will be required to install the typical trickle-fill components (detailed in the Water, Sanitary and Drainage Study – Appendix B) and extend the service pipeline from the property line to the trickle-fill system. Map 6 – Conceptual Utility Serving Plan shows the proposed location of the water distribution mainline in relation to the property line and sanitary sewer.
6.4 Stormwater Management
Alberta Environment requires stormwater discharge from new development to be restricted to predevelopment flows. This is usually achieved by designing stormwater management ponds and other similar retention facilities into area structure plans and plans of subdivision.
Based on preliminary assessment and calculation in preparation of the Sunset Acres NASP will rely on a drainage ditch system. The natural gradation of the site slopes from west to east at a 2.5 to 3% slope with natural drainage paths existing on site and flowing to the east. As such, these will remain largely intact and the drainage system will be built based on these flows. The development will require the construction of one stormwater retention pond on the quarter section to the east, SE 27-49-7-W5M, and the entire plan area will drain into this facility.
Detailed storm water management plan will be required at the time of subdivision. The construc-tion of any facilities will be required as phasing proceeds. In this case, stormwater management is primarily concerned with managing the runoff from new roadways, mitigating erosion and the po-tential for flooding. The drainage system will also handle significant runoff from lands to the west and north which drain into the site. For the purposes of preliminary modeling, ditches are divided into two categories. Minor trapezoidal ditches provide flow for immediate runoff from the devel-opment, and follow County standards with a bottom width and depth of 3 m and 1 m respectively. Major ditches convey flow from two upstream catchments through the development and have a depth varying from 1 to 1.5 m with a bottom width of at least 5 m.
The storm facility will be designed to contribute to the overall visual quality of the park and open space system. This can be accomplished through plantings and features to provide passive recrea-
![Page 27: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/27.jpg)
MU
NIC
IPA
L
SE
RV
ICES
6
.0
Sunset Acres Neighbourhood Area Structure Plan - November 2015 21
tional amenities. This can be detailed at the time of development approval.
6.5 Franchise Utilities
Natural gas, telephone, cable, and power servicing for the proposed development will be installed within the proposed road rights-of-way. Arrangements for franchise services will be provided at the time of subdivision registration and upon entering into a Development Agreement with Brazeau County. The proposed shallow utilities will be extended from existing utilities adjacent to the plan area and accommodated for during each phase of development through a Utility Right-of-Way agreement. A 5 m right-of-way shall be required within the front of each property lot line for the installation of franchised services to be designed by each franchise.
6.6 Solid Waste
Curbside waste and recyclable pick-up is not a service that Brazeau County offers its residents at this time. Instead, residents are provided with a Transfer Station Identification Card that allows them to drop off regular household waste and recyclables at charge at any of the eight transfer stations. The closest transfer stations to Sunset Acres are in the Hamlet of Rocky Rapids and close to the north boundary of Drayton Valley. The Drayton Valley transfer station is not County operat-ed and fees will apply.
Transfer stations do not accept tires, liquid, concrete, demolition, animal carcasses or hazardous waste. These must be dropped off at the Drayton Valley land fill where fees are charged according to the weight of the waste.
![Page 28: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/28.jpg)
22 Sunset Acres Neighbourhood Area Structure Plan - November 2015
![Page 29: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/29.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
23
IMP
LEM
ENTA
TIO
N
7.0
7.1 Overview
The Sunset Acres NASP will help guide future decisions with respect to planning approvals con-tained in the plan area. The NASP will be implemented through a number of statutory and non-statutory planning tools available to the County consistent with the provisions of the Municipal Government Act. Stakeholder and adjacent land owner involvement is and will continue to be part of the planning and development process as specific lands are redistricted and development per-mits are issued.
7.2 Phasing
The development concept consists of 37 residential and five MR lots that will be developed in two (2) phases. The south portion of the new development containing 18 residential lots (plus) 2 MR lots, districted as Country Residential, will be part of Phase 1. Commencing with these lands will allow for the efficient extension of existing roads from the west and south of the ASP area to en-sure that two accesses are provided for the first phase of the development. Phase 2 will constitute 19 lots (plus 3 MR lots), mostly Compact Country Residential . In this phase a road will be devel-oped connecting to the quarter section on the east that will accommodate future development.
IMPLEMENTATION 7.0
![Page 30: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/30.jpg)
24 Sunset Acres Neighbourhood Area Structure Plan - November 2015
There should be an attempt to minimize non-contiguous development, notwithstanding specific market conditions. It is important to note that the proposed staging is only conceptual in nature and timing may change due to market demand or servicing requirements. The phasing plan is illus-trated in Map 5 – Development Concept.
7.3 Land Use Amendments
Redistricting and subdivision applications that conform to this ASP will be undertaken as required to the satisfaction of Brazeau County in conformance with the County’s LUB and MDP.
7.4 Subdivision Approval
Subsequently following the adoption of the Sunset Acres NASP and redistricting, the County will require the submission and approval of subdivision applications for the development phases.
7.5 Development Agreements
As required by Brazeau County Land Use Bylaw 782-12, the development proponent shall be re-quired to enter into a Development Agreement to address such items as to:
Construct a road for access to the development;
Construct a pedestrian walkway system to serve the development and/or connect such a walk-way system with those serving adjacent development;
Install on-site and/or off-site public utilities or works and landscaping, other than telecommu-nication systems or works; and
Construct parking facilities, and loading and unloading facilities.
7.6 Amending the Plan
An amendment to this NASP is required for any changes to the Development Concept, including but limited to:
Changes in general land uses;
Changes to access, road or infrastructure design or layout;
Amendments to other documents which impact the land use for these lands will also require an amendment to this ASP; and
Changes in park or community facility locations.
Amends to this plan shall be according to the Municipal Government Act and the Municipal Devel-opment Plan.
![Page 31: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/31.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
25
MA
PS
10
.0
MAPS
10.0 List of Maps
Map 1 — Location Plan
Map 2 — Existing Land Use
Map 3 — Natural Features and Drainage
Map 4 — Constraints
Map 5 — Development Concept
Map 6 — Conceptual Utility Servicing
![Page 32: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/32.jpg)
![Page 33: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/33.jpg)
Hw
y 22
Ran
ge R
oad
73
Township Road 494
Airport
Hamlet ofRocky Rapids
Town ofDrayton Valley
NASP Area
N
N.T.S.
Legend
Map 1
Location Plan
Sunset Acres Area Structure Plan
Area Structure Plan Boundary
Town of Drayton Valley Boundary
14-066November 2015
![Page 34: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/34.jpg)
![Page 35: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/35.jpg)
Plan 952 4158
N.W. 1/4 Sec. 27-49-7-5
Ran
ge R
oad
73
S.E. 1/4 Sec. 28-49-7-5
Lot 2
Lot 1
Plan 952 4158
Block 1
Lot 4
Plan 042 6649
Block 1
Plan 022 7603
Lot 1
N.W. 1/4 Sec. 22-49-7-5
Township Road 494
S.E. 1/4 Sec. 27-49-7-5
Lot 1 Block 1 Plan 082 2154
Lot 6
Block 1
Plan 102 0683
Lot 5
Block 1
Pan 102 0683
Lot 2
Block 3
Plan 102 0683
Lot 1
Block 3
Plan 102 0683
Lot 1
Block 2
Lot 2
Plan 102 0683
Block 2
Plan 102 0683
Lot 7
Block 1
Plan 102 0683
Lot 8
Block 1
Plan 102 0683
N.E. 1/4 Sec. 28-49-7-5
Lot 4 Block 1 Plan 082 2154
Town of Drayton Valley
Block 2
Lot 1
Plan 062 3216
Lot 1
N.E. 1/4 Sec. 22-49-7-5
Block 1
Plan 112 3331
Township Road 494 A
Ran
ge R
oad
72 A
N
N.T.S.
Legend
Map 2
Existing Land Use
Sunset Acres Area Structure Plan
Area Structure Plan Boundary
Compact Country Residential
Country Residential
Direct Control
Airport Vicinity
Town of Drayton Valley
Airport Vicinity Overlay
14-066November 2015
![Page 36: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/36.jpg)
![Page 37: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/37.jpg)
Ran
ge R
oad
73
Township Road 494
8
3
5
.
0
8
3
7
.
0
8
3
6
.
0
8
3
4
.
0
8
3
3
.
0
8
3
1
.
0
8
3
0
.0
829.0
828.0
825.0
8
2
6
.
0
8
3
7
.
0
8
3
6
.
0
8
3
5
.
0
8
3
4
.
0
8
3
3
.
0
8
3
2
.
0
8
3
1
.
0
8
2
7
.
0
8
2
6
.
0
8
2
6
.
0
8
2
2
.
0
8
2
3
.
0
8
2
4
.
0
8
2
5
.
0
8
2
6
.
0
8
2
7
.
0
8
2
7
.
08
3
2
.
0
8
3
5
.
0
8
3
7
.
0
8
3
8
.
0
8
2
8
.
0
8
2
9
.
0
8
3
0
.
0
Township Road 494 A
Ran
ge R
oad
72 A
N.W. 1/4 Sec. 22-49-7-5
S.E
. 1
/4 S
ec. 28
-49
-7
-5
N.W. 1/4 Sec. 27-49-7-5
Lot 1 B
lo
ck 1
P
lan 08
2 2
154
S.E
. 1
/4
S
ec. 2
7-49
-7
-5
N
Legend
Existing Treed Areas
Map 3
Natural Features & Drainage
Sunset Acres Area Structure Plan
Contours (5m)
Drainage Course
Contours (1m)
Area Structure Plan Boundary
0 1005025
Scale:14-066November 2015
![Page 38: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/38.jpg)
![Page 39: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/39.jpg)
Ran
ge R
oad
73
Township Road 494
Township Road 494 A
Ran
ge R
oad
72 A
N.W. 1/4 Sec. 22-49-7-5
S.E
. 1
/4 S
ec. 28
-4
9-7-5
N.W. 1/4 Sec. 27-49-7-5
Lot 1 B
lo
ck 1
P
la
n 0
82
2
15
4
S.E
. 1/4 S
ec. 27-49-7-5
N
Area Structure Plan Boundary
Legend
Existing Treed Areas
Map 4
Constraints
Sunset Acres Area Structure PlanGas Line
High Pressure Gas Line
Drainage Course
Right of Way
0 100m5025
Scale:
14-066November 2015
![Page 40: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/40.jpg)
![Page 41: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/41.jpg)
Township Road 494 A
Lot 1
Lot 8
Block 1
Plan 102 0683
Lot 7
Block 1
Plan 102 0683
Plan 952 4158
Plan 952 4158
Lot 2
Block 1
Lot 4
Plan 042 6649
Lot 5
N.W. 1/4 Sec. 22-49-7-5
Block 1
Pan 102 0683
Lot 1
Block 3
Plan 102 0683
Lot 2
Block 3
Plan 102 0683
Lot 6
Block 1
Plan 102 0683
S.E
. 1/4 S
ec. 27-49-7-5
Block 1
Plan 022 7603
Lot 1
Lot 1
Block 2
Plan 102 0683
Lot 2
Block 2
Plan 102 0683
Lot 1 B
lock 1
N.W. 1/4 Sec. 27-49-7-5R
ange
Roa
d 73
Township Road 494
S.E
. 1/4 S
ec. 28-49-7-5
FutureRoadConnection
Phase II
Phase I
Ran
ge R
oad
72 A
Plan 082 2154
Future Connectionto Eagle PointProvincial Park
ROW PLAN 132 0105
N
Map 5
Development Concept
Sunset Acres Area Structure Plan
Legend
Existing Country Residential
Compact Country Residential
Proposed Country Residential
Area Structure Plan Boundary
Municipal Reserve
Phasing Boundary
Environmental Reserve/Ephermeral Drainage
Future Trail System
0 100m5025
Scale:Existing Trail System
14-066November 2015
Uitility ROW
![Page 42: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/42.jpg)
![Page 43: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/43.jpg)
TIE INTO EXISTING WATERTRANSMISSION LINE ANDEXISTING PRESSURESANITARY LINE
TO PROPOSEDSTORMRETENTIONPOND
N.W. 1/4 Sec. 27-49-7-5
S.E
. 1/4
S
ec. 2
8-49
-7
-5
N.W. 1/4 Sec. 22-49-7-5
S.E
. 1/4 S
ec. 27-49-7-5
Lo
t 1
B
lo
ck 1
Plan 952 4158
Lot 1
Lot 2
Plan 952 4158
Block 1
Lot 4
Plan 042 6649
Block 1
Plan 022 7603
Lot 1
Lot 6
Block 1
Plan 102 0683
Lot 5
Block 1
Pan 102 0683
Lot 1
Block 3
Plan 102 0683
Lot 2
Block 3
Plan 102 0683
Lot 1
Block 2
Plan 102 0683
Lot 2
Block 2
Plan 102 0683
Lot 8
Block 1
Plan 102 0683
Lot 7
Block 1
Plan 102 0683
P
la
n 0
82
2
15
4
Township Road 494
Ran
ge R
oad
73
N
Area Structure Plan Boundary
Legend
Map 6
Conceptual Utility Servicing
Sunset Acres Area Structure Plan
Water Servicing
Sanitary Servicing
Sanitary Clean Out
Water Blow Off Valve
Minor Ditches
Major Ditches
Ditch Flow
Culvert
0 100m5025
Scale:14-066November 2015
![Page 44: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/44.jpg)
![Page 45: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/45.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
APPENDIX A Water, Sanitary and Drainage Study (MPE Siemens)
![Page 46: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/46.jpg)
#101, 10630-172 Street Edmonton, AB T5S 1H8 Phone: 780-486-2000 Fax: 780-486-9090
ParioPlan June 17, 2015 #605 Empire Building File: N:\5967\081\00\R01-1.0 10080 Jasper Avenue Edmonton, Alberta T5J 1V9 Attention: Karolina Drabik, MPA, RPP, MCIP Senior Planner Dear Karolina: Re: Sunset Acres Development Water, Sanitary and Drainage Study We are pleased to submit a second copy of our report entitled “Sunset Acres Development – Water, Sanitary and Drainage Study” detailing the infrastructure requirements and cost estimates for the Sunset Acres Development. Should you have any questions, please do not hesitate to contact the undersigned at 780-486-2000 or at [email protected]. Yours truly, MPE SIEMENS
Ivan Kagoro, E.I.T. Project Engineer IK:ik Enclosure
![Page 47: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/47.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
i
CORPORATE AUTHORIZATION
This report has been prepared by MPE Engineering Ltd. under authorization of ParioPlan. The material
in this report represents the best judgment of MPE Engineering Ltd. given the available information.
Any use that a third party makes of this report, or reliance on or decisions made based upon it is the
responsibility of the third party. MPE Engineering Ltd. accepts no responsibility for damages, if any,
suffered by a third party as a result of decisions made or actions taken based upon this report.
Should any questions arise regarding content of this report, please contact the undersigned.
MPE ENGINEERING LTD.
Professional Stamp
Drew Fellers, P. Tech (Eng.)
Professional Seal Corporate Permit
![Page 48: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/48.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
ii
EXECUTIVE SUMMARY
ParioPlan has authorized MPE Engineering to complete an assessment and provide a report detailing the
water, sanitary and drainage infrastructure requirements for the Sunset Acres Development. The
development is located south of the Hamlet of Rocky Rapids within the Brazeau County. It encompasses
a total area of approximately 106.23 acres and contains 47 residential lots that will be serviced with
treated water distribution mains and sanitary wastewater collection system.
Potable water will be drawn from the newly constructed water treatment plant located in the Hamlet of
Rocky Rapids. The proposed water distribution system is proposed to be by trickle which generally
comprises of a distribution pipe network within road allowance, a service pipeline through property line
and a trickle fill system on private property. The distribution main is proposed to be 75 mm diameter
HDPE DR 11 pipe while the service line to property line is proposed to be 50 mm diameter HDPE DR 11.
Wastewater collection for the Sunset Acres is proposed to be by low pressure through a septic tank
effluent pumping (STEP) system. In this system, wastewater from a household is first collected in a two
compartment septic tank, where primary treatment occurs, and is then pumped through smaller
diameter pipes to a wastewater conveyance or treatment facility. A 75mm diameter pipeline is
proposed as the minimum size of the low pressure sewer mainline.
A preliminary evaluation of the drainage requirements of Sunset Acres was modeled using XPSWMM, an
XP Solutions software primarily used for storm water system management and design. The new
development was modeled with ditch drainage for a 1 in 5 year and 1 in 100 year design storms as
outlined in the Brazeau County Design and Construction Standards. Roadside ditches were assumed to
follow the standard cross section outlined in the County standards with a bottom width of 3 m, and side
slopes of 4:1. Parts of the main drainage channel require a bottom width of 5m to reduce flow velocities
to safe levels. The minimum diameter of driveway culverts is recommended to be 400mm. Culverts
passing the main roads on the development were sized at 600 or 800 mm.
![Page 49: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/49.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
iii
Alberta Environment may require ParioPlan to install some form of retention facility on the subdivision
in order to better protect receiving waters from excess water flow and particulate loads from new
development. Based on a 100 year storm and a preliminary estimate of one inch of water over the
entirety of the catchment area, the estimated retention pond capacity is established 7600m3.
The Class D cost estimate for the proposed water, sanitary and drainage infrastructure proposed in this
report is $2.24 million including contingency and engineering services. For the storm water retention
pond, an additional $74,000 to capital costs is would be required. Together with associated
contingencies, and engineering services, the estimated total cost including a storm retention pond is
$2.34 million.
![Page 50: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/50.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
iv
TABLE OF CONTENTS
LETTER OF TRANSMITTAL
CORPORATE AUTHORIZATION ............................................................................................................ I
EXECUTIVE SUMMARY ...................................................................................................................... II
1.0 INTRODUCTION .........................................................................................................................1
1.1 OVERVIEW .......................................................................................................................................... 1
1.2 STUDY SCOPE....................................................................................................................................... 1
1.3 OBJECTIVE ........................................................................................................................................... 1
2.0 WATER DISTRIBUTION SYSTEM ..................................................................................................2
2.1 OVERVIEW .......................................................................................................................................... 2
2.2 PROPOSED TRICKLE FILL WATER DISTRIBUTION SYSTEM .............................................................................. 2
2.2.1 Distribution Pipe Network and Service Pipeline ...................................................................... 2
2.2.2 Trickle-Fill System .................................................................................................................... 3
3.0 SANITARY SEWER COLLECTION SYSTEM ......................................................................................5
3.1 OVERVIEW .......................................................................................................................................... 5
3.2 LOW PRESSURE SEWER SYSTEM .............................................................................................................. 5
3.3 SEPTIC TANK EFFLUENT PUMPING SYSTEM ............................................................................................... 6
4.0 DRAINAGE SYSTEM ....................................................................................................................8
4.1 OVERVIEW .......................................................................................................................................... 8
4.2 SITE CONDITIONS ................................................................................................................................. 8
4.3 MODELING .......................................................................................................................................... 8
4.4 PRELIMINARY DESIGN ............................................................................................................................ 9
4.5 STORM WATER MANAGEMENT PONDS. ................................................................................................. 10
5.0 COST ESTIMATES ...................................................................................................................... 11
![Page 51: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/51.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
v
TABLES
Table 1: Potential Storm Water Pond ......................................................................................................... 11
Table 2: Class D Cost Estimates Excluding SWWP....................................................................................... 11
Table 3: Class D Cost Estimates Including SWWP ....................................................................................... 12
CLASS D COST ESTIMATE
DRAWINGS
Figure 1.0: Location Plan and Catchments
Figure 2.0: Water and Sewer Servicing Plan and Section
Figure 3.0: Water and Sewer Servicing Details
Figure 4.0: Drainage Plan
![Page 52: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/52.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
1
1.0 INTRODUCTION
1.1 Overview
ParioPlan has authorized MPE Engineering Ltd to complete an assessment of municipal infrastructure
required to provide potable water, sanitary, and drainage services to Phase 3 and 4 of the Sunset Acres
Development. Figure 1, in drawings section, shows an overall location plan of the proposed Sunset Acres
Development
The following sections provide discussion and recommendations for servicing the subdivision within the
road right of way and private properties, however, the cost estimate is limited to the proposed services
within the municipal property.
1.2 Study Scope
The scope of this study includes the following tasks:
• Review all existing information pertaining to all subdivision assets.
• Overview meetings with Pario Plan staff.
• Review future household requirements to determine sanitary wastewater production volumes
and water consumption demands.
• Propose water and sanitary servicing alternatives and recommend the most suitable and cost
effective alternative.
• Complete a storm water management analysis to determine the most suitable management
practices applicable.
• Provide preliminary cost estimates for the proposed infrastructure installations.
1.3 Objective
The objective of this project is to provide a report detailing the water sanitary and drainage
infrastructure requirements for the Sunset Acres Development. This report will provide a basis for the
development of the subdivision’s infrastructure.
![Page 53: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/53.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
2
2.0 WATER DISTRIBUTION SYSTEM
2.1 Overview
ParioPlan is proposing a trickle-fill water distribution system for the Sunset Acres development that will
service approximately 47 lots with potable water for domestic and consumptive use. Potable water will
be supplied by the newly constructed water treatment plant (WTP) in Rocky Rapids and the water
transmission pipeline located along Range Road (RR) 73.
2.2 Proposed Trickle Fill Water Distribution system
The proposed trickle fill water distribution system for the Sunset Acres development will generally
comprise of a distribution pipe network within road allowance, a service pipeline through property line
and a trickle fill system on private property.
2.2.1 Distribution Pipe Network and Service Pipeline
The distribution pipe network is proposed to be a 75mm diameter pipeline made of High density
polyethylene (HDPE DR 11) and installed approximately 3 meters from property line within the road
right of way. HDPE DR 11 pipe has a pressure rating of 150psi which is adequate to withstand the high
pressures expected from the WTP.
Figure 2 (in the drawings section) shows the proposed location of the water distribution mainline in
relation to property line and to the sanitary sewer. Alberta Environment guidelines recommend a
separation of 3 meters between potable water and sanitary sewer pipelines. Furthermore, the
guidelines also state that the portable water be installed below the ground frost line; we recommend an
installation depth of 3.0 meters below ground level from top of pipe.
The service pipeline is proposed to be 50mm diameter HDPE municipal tubing and installed to property
line with a shutoff valve, a remote meter reader, and a flow restrictor. Pario Plan advised that the flow
rate to each lot will be restricted to 1.9 liters per minute (L/min) or 0.5 gallons per minute (gpm) which is
adequate to provide for domestic and consumptive use.
![Page 54: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/54.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
3
2.2.2 Trickle-Fill System
On the private property, the resident owner will be required to extend the service pipeline from the
property line to the trickle-fill system. The trickle-fill system would comprise of the following
components.
• A potable water storage holding tank (cistern) with at least 2 days of storage capacity.
• A float valve switch connected to the fill end of the service pipe in the cistern that is used to
control filling. When the water level in the cistern drops, the float drops to open the fill valve to
start filling the tank; as the level rises, the float rises to shut the fill valve off and stop filling.
• An alarm system to detect low and high water levels with the use of mercury float switches.
• A distribution pump downstream of the cistern to provide water pressure to the in-house water
plumbing system.
• A backflow preventer in form of a double check valve to prevent cross contamination of the
water in the cistern by the in-house plumbing system.
• A pressure tank to maintain reasonable in-house water supply pressures.
Note that each resident will be required to install the above typical trickle-fill components and these
items must be certified to NSF/ANSI Standard 61 for potable water use.
Cisterns
Cisterns are available in fabricated standard sizes made of reinforced concrete, fiber glass, polyethylene
or concrete and steel; and they can be installed underground or above ground (indoors) depending on
the resident’s situation. Polyethylene plastic and fiberglass are the most common materials used for
cisterns because they are water proof and resistant to corrosion. The recommended minimum standard
cistern size for a 3 resident lot is 750 gallons (gal) for domestic and consumptive use.
When acquiring a cistern for potable water storage, residents should take note of the following
considerations and requirements.
1. Cisterns should be sized for the number of residents in the household. Note that over sizing a
cistern will affect the quality of the water such that over time, the chlorine residual which
controls bacterial growth will dissipate. Addition of chlorine to water that has been sitting for a
long time may be required to help maintain the chlorine residual levels.
![Page 55: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/55.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
4
2. The pipe intake from the cistern should be installed 4 to 6 inches above the bottom of the
cistern to avoid sediments that collect at the bottom of the cistern from entering into the in-
house plumbing system.
3. Install cisterns at locations that will allow for easy access for maintenance, inspection and
cleaning.
4. An air vent to allow air flow. Install at least 1200mm above the ground level for underground
cisterns and equip with an insect screen.
5. Underground cisterns should be located below the frost line approximately 3.0 meters or it
should be adequately insulated. Adequate insulation should also be provided for above ground
cisterns that are not located in a heated enclosure.
6. Underground cisterns should be installed a minimum of 3 meters away from septic tanks.
7. Above ground cisterns installed in basements or crawl spaces must be installed in such a way as
to allow easy access for routine cleaning and disinfecting. A minimum of 1 meter of space
should be maintained between the access hatch of a tank and any overhead building fixtures. A
minimum access hatch size of 600mm in diameter is proposed.
8. Cisterns should be periodically cleaned and disinfected. Over time, loss of chlorine residual can
lead to microbial growth, sediments and sludge can accumulate, or insects and debris.
9. Cisterns must be inspected regularly to ensure the integrity of the cistern, the piping and any
other related components.
10. Regular bacteriological sampling should also be performed to verify that bacteria are not
present. Such testing should be done once a year.
![Page 56: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/56.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
5
3.0 SANITARY SEWER COLLECTION SYSTEM
3.1 Overview
A sanitary sewer collection system is proposed to service the Sunset Acres development with a current
lot number of 47 lots. ParioPlan intends to install a low pressure sewer collection system of the septic
tank effluent pumping (STEP) type. The proposed system will collect the resident’s sewage, partially
treat it, and discharge the effluent through pipelines to the Rocky Rapids sanitary sewer system.
3.2 Low Pressure Sewer System
In a low pressure sewer system, wastewater from a household is first collected in a septic tank, where
primary treatment occurs, and is then pumped through smaller diameter pipes to a wastewater
conveyance or treatment facility. Figure 3 (in drawings section) shows a typical low pressure sewer
system of the STEP type.
Low pressure sewer systems are designed based on the anticipated peak design sewage flows for the
ultimate development. Peak design sewage flows are estimated based on the number of dwellings in a
community or Equivalent Dwelling Units (EDU) being serviced using the US Environmental Protection
Agency’s simplified equation below for low pressure systems (see attached excerpt from USEPA 625/1-
91/025 in Appendix F).
𝑃𝑃𝑃𝑃 𝐷𝑃𝐷𝐷𝐷𝐷 𝐹𝐹𝐹𝐹 (𝐿 𝐷⁄ ) = 0.032 ∗ 𝐸𝐸𝐸𝐷𝐸𝑃𝐹𝑃𝐷𝐸 𝐷𝐹𝑃𝐹𝐹𝐷𝐷𝐷 𝑈𝐷𝐷𝐸𝐷 + 0.63
or
𝑃𝑃𝑃𝑃 𝐷𝑃𝐷𝐷𝐷𝐷 𝐹𝐹𝐹𝐹 (𝐷𝑔𝑔) = 0.5 ∗ 𝐸𝐸𝐸𝐷𝐸𝑃𝐹𝑃𝐷𝐸 𝐷𝐹𝑃𝐹𝐹𝐷𝐷𝐷 𝑈𝐷𝐷𝐸𝐷 + 10
The following pressure pipe standards and assumptions were adopted for this report:
• As the expected flow velocity us below the minimum recommended value of 0.6 m/s (2 ft/s)
required to allow for removal of settled material within the pipeline, installation of cleanouts
will be required.
• There will be no extraneous flows into the system (groundwater) since the pipe network
connections would be seamless.
![Page 57: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/57.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
6
• Assume that all foundation weeping tiles and roof leaders shall not be connected to septic
tanks.
• Assume the per capita wastewater loading is 50 gpcd for each dwellings (typical)
• Assume the population density is 3 people/dwelling
Based on the above assumptions, the peak design flow is therefore calculated at 126.8 L/min, and the
proposed minimum pipe size shall be 75 mm diameter (HDPE DR17 with a pressure rating of 100psi).
The expected velocity through mainline is less than the required 2ft/s to provide self-cleaning of the
pipe. We therefore recommend cleanouts be installed at pipe ends and low elevation points.
The mainline is proposed to be installed 3 meters below ground and 3 meters away from the water
distribution main as shown in Figure 3. The service pipeline to property line is proposed to be 40mm
schedule 40 municipal tubing with a shutoff valve at the property line.
3.3 Septic Tank Effluent Pumping System
Similarily with a STEP system, each resident owner will be required to extend the sanitary service
pipeline from the property line to the STEP tank. Wastewater in a STEP systems flows from the house
hold into the septic chamber of a two-stage septic tank where primary treatment occurs. Solids settle to
the bottom of the septic tank and effluent rises and flows into the second (pumping) chamber where
pumps move the effluent at low pressures through the pipes to a wastewater conveyance or treatment
facility. Settled solids are periodically pumped out of the tank by a vacuum truck and transported to a
waste landfill.
The Alberta Private Sewage Systems Standards of Practice (2009) states that a septic tank shall have a
minimum working capacity for a single family dwelling as follows:
• 400 gallons for a 3 bedroom home or less
• 600 gallons for a 4 bedroom home
• 750 gallons for a 5 bedroom home
• 900 gallons for a 6 bedroom home
![Page 58: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/58.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
7
Note that the working capacity does not include the effluent or pumping chamber. Therefore, for the
proposed two-compartment STEP tanks, a manufacturer’s 750 gallon tank would have approximately
420 gallons of working capacity.
STEP systems typically comprise of the following components:
• A two compartments concrete or fiberglass septic tank. Concrete tanks are prone to
deterioration from the gases and chemicals in the sewage and to leaking. Fiberglass tanks need
special attention during installation to ensure the tank is anchored to the ground securely and
that it is protected from damage by large rocks or boulders.
• An effluent pump together with a control box and a piggy-back float switch. Caution should be
taken to ensure that all residents install the same size pump so that no one resident is over
loading the system and dead heading the other effluent pumps.
• Backflow preventer to prevent effluent from flowing in the upstream direction when the pump
is offline.
• Pump operating control float switches to initiate pump start when the tank fills and pump stop
when the tank is empty.
• High tank level alarm mercury float switch.
Similar to cisterns, STEP tanks should be installed to allow for easy maintenance, inspection, and
cleaning by providing a minimum access hatch and manhole diameter of 1200mm. Septic tanks are
installed underground at a depth of 3 meters below ground to prevent freezing and at close proximity to
an access road to facilitate cleaning by vacuum trucks. Cleaning of a typical 750 US gallon tanks should
be exercised not less once in three years.
![Page 59: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/59.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
8
4.0 DRAINAGE SYSTEM
4.1 Overview
At the request of ParioPlan, MPE Siemens has undertaken a preliminary evaluation of the drainage
requirements of Sunset Acres in the Southwest Quarter of Section 27-49-7W5M. The proposed system
was modeled using XPSWMM by XP Solutions. This program provides holistic modeling and visualization
of hydraulic flows. The new development was modeled with ditch drainage and with curb and gutter
drainage for the following storms as outlined in the Brazeau County Standards:
• 10 minute, 1:5 year design storm (67.8 mm/hr)
• 1 hour, 1:100 year design storm (42.5 mm/hr)
• 24 hour, 1:100 year design storm (5.29 mm/hr)
4.2 Site Conditions
The natural gradation of the Sunset acres development slopes to the east at 2.5 to 3.0 percent slope.
This topography generally runs from west to east across the development, and Parioplan has made
allowances for existing drainage paths to remain largely intact. An existing natural drainage path exists
just east of the development, and is an ideal location for drainage outfall for the remaining phases of
development. An existing 800mm culvert west of the development diverts runoff from an estimated 30
hectare plot onto the development, and an 80 hectare catchment diverts flows onto the development
from the north. These additional areas will significantly affect the sizing of the Drainage system culverts
along the main drainage pathways. Lot drainage is assumed to typically follow the topography, which
generally slopes towards the main drainage channel in the middle of the development. The overall
situation of the proposed development with respect to nearby catchment areas is shown in Figure 1.
4.3 Modeling
The average rainfall intensities and duration were used to scale the design hyetographs provided in the
Brazeau County Standards for the 1:100 year storm calculations, while the average intensity was used
for the 1:5 year storm modelling. Residential lots in the development were assumed to have a percent
imperviousness of 40% for the 1:5 year calculations, and 60% for the 1:100 year storm. Roads were
modeled to be 90% and 95% impervious to runoff for the 1:5 and 1:100 year events respectively.
![Page 60: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/60.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
9
4.4 Preliminary Design
Modeling of the design storm for the Sunset Acres development demonstrated that drainage ditch
system will be able to adequately transmit design storm drainage to an outfall located on the east end
of the development. The major drainage ditch through the development, which is separate from the
road drainage ditches, should have an approximate bottom width of 5 m to maintain flow velocity and
depth within County Standards.
Preliminary pipe sizes between 300 and 1000 mm were selected using an iterative modeling process,
and an overall layout of the system is shown in Figure 4 (drawings section). A peak flow of 2.53 m3/s was
observed during modeling, which passed through the outflow at a speed of 1.2 m/s. This Velocity came
at a flow depth of 0.27 m.
For the purposes of preliminary modeling, ditches were divided into two categories. Minor trapezoidal
ditches provide flow for immediate runoff from the development, and follow County standards with a
bottom width and depth of 3 m and 1 m respectively. Major ditches convey flow from two upstream
catchments through the development and have a depth varying from 1 to 1.5 m with a bottom width of
at least 5 m. The results of the modeling and preliminary arrangement for the storm water conveyance
system is shown in Figure 4.
The minimum size of driveway culverts should be 300 mm in order to prevent lot flooding during storm
events; however, 400mm culverts are preferable due to their increased capacity and the tendency of
culverts in rural subdivisions to be crushed or filled with sediment. Culverts passing the main roads on
the development were sized at 800 or 1000 mm as shown in Figure 4, which allowed extreme flows to
pass under the road without causing significant damage MPE Siemens recommends a regular
maintenance program to maintain the culverts, as even moderate amounts of sediment and snow in the
culverts will severely hamper the ability of the system to prevent flooding, particularly during the spring
melt.
![Page 61: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/61.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
10
4.5 Storm Water Management Ponds.
Alberta Environment may require Parioplan to install some form of storm water retention facility on the
subdivision in order to better protect receiving waters from excess water flow and particulate loads
from new development. Storm water ponds must be considered at this preliminary design phase as they
may come up during regulatory applications.
Storm water retention facilities typically restrict flow to pre-development levels, and are designed for a
1:100 year storm. Modelling of a 1:100 year 24 hour design storm for pre and post development flows
showed that retention of drainage from the development would require approximately 7000 m3 of
storage. Estimates for physical storm pond sizes are laid out in Table 1. The preliminary dimensions
supplied for retention ponds are at the top of bank, and assume a square pond with an interior side
slope of 7:1.
There is the possibility of reducing the size of the proposed outflow culvert on the east side of the
development and using the existing drainage channel as a retention facility, but this may cause
additional risk to adjacent homes. The owner of the proposed development has identified land just east
of the outflow which would be appropriate for a retention pond. This area has been marked
approximately on Figure 1.
The handling of water from upstream catchments, and diversion of the appropriate amount of water
from the drainage channel are obstacles to the development of a storm water retention pond that
should be addressed in a preliminary design report should it be required. Viable alternatives to a storm
water pond, which can be further considered during preliminary design, include be a biofiltration strip,
grassed swale, or infiltration trenches, which all act to reduce the sediment loading of the runoff.
However, due to the scale of the upstream catchments, a storm water retention facility may be a more
efficient use of development capital.
![Page 62: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/62.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
11
Table 1: Potential Storm Water Pond
Proposed Subdivision
Area 22.9 ha
Upstream catchment 102.7 ha
Modelled peak pre-development flow 2.36 m3/s
Modeled peak ditch outfflow 2.53 m3/s
Potential retention requirements 7000 m3
Wet pond dimensions 110m x 110m
Storage zone 2m
Dry pond dimensions 60m x 60m
Storage zone 3m
5.0 Cost Estimates
MPE Siemens has prepared a Class D estimate for the works outlined in this Study. As stated earlier, the
estimates are limited to works within the municipal right of way; no costs are provided for private
property water and sanitary system installations. Furthermore, the estimates are based on the option
for open ditch drainage for a storm conveyance system in the subdivision as ditch drainage represents a
significant savings over installation of dedicated storm sewer. These cost estimates are summarizes in
Table 2 and includes 15 percent contingency and 12 percent engineering and exclude the addition of a
storm water pond.
Table 2: Class D Cost Estimates Excluding SWWP
Option Drainage Ditch
Capital Cost $1,739,550.00
Contingency (15%) $260,932.50
Engineering (12%) $240,057.90
Total $2,240,540.40
![Page 63: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/63.jpg)
Pario Plan Sunset Acres – Water, Sewer and Drainage Study
12
Should it be required, the addition of a storm water pond to service the current development
necessitates an additional $74,000 in capital costs, along with associated contingencies, and services.
The Table below shows the total project costs with this option.
Table 3: Class D Cost Estimates Including SWWP
Option Drainage Ditch
Capital Cost $1,813,550.00
Contingency (15%) $272,032.50
Engineering (12%) $254,441.07
Total $2,340,023.57
![Page 64: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/64.jpg)
Pario Plan Sunset Acres Area Structure Plan
CLASS “D” COST ESTIMATES
![Page 65: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/65.jpg)
KEY PLAN
SCALE 1:750,000
ROCKY RAPIDS, BRAZEAU COUNTYSUNSET ACRES DEVELOPMENT
PROJECT NO. 5967-081-00
LIST OF DRAWINGS
FIG. 01 UPSTREAM CATCHMENTS 1 & 2FIG. 02 PROPOSED DITCH DRAINAGE PLANFIG. 03 LOT SERVICINGFIG. 04 SERVICING DETAILS
PROJECTLOCATION
SUNSET ACRES STORM MANAGEMENT AND SERVICING PLAN
PRELIMINARY - 2014-11-28
![Page 66: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/66.jpg)
ISSUENo. DATE DESCRIPTION BY APP'D
2
4
5
REVISIONNo. DATE DESCRIPTION BY
2
5
LEGEND
LOCATION PLAN AND CATCHMENTS
ROCKY RAPIDS-BRAZEAU COUNTY
SUNSET ACRES DRAINAGE STUDY
PERMIT TO PRACTICE
MPE ENGINEERING LTD.
PERMIT NUMBER: 3680P
OVERLAND FLOW DIRECTION
FIG. - 01
![Page 67: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/67.jpg)
ISSUENo. DATE DESCRIPTION BY APP'D
2
4
5
FIG. - 02REVISIONNo. DATE DESCRIPTION BY
2
5
LEGEND
WATER AND SEWER SERVICING PLAN
AND SECTION
ROCKY RAPIDS-BRAZEAU COUNTY
SUNSET ACRES DRAINAGE STUDY
WATER SERVICING:
SANITARY SERVICING:
SANITARY CLEAN OUT:
WATER BLOW OFF VALVE:
PERMIT TO PRACTICE
MPE ENGINEERING LTD.
PERMIT NUMBER: 3680P
cc
cc
cc
cc
![Page 68: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/68.jpg)
ISSUENo. DATE DESCRIPTION BY APP'D
2
4
5
FIG. - 03REVISIONNo. DATE DESCRIPTION BY
2
5
LEGEND
WATER AND SEWER SERVICING DETAILS
ROCKY RAPIDS-BRAZEAU COUNTY
SUNSET ACRES DRAINAGE STUDY
PERMIT TO PRACTICE
MPE ENGINEERING LTD.
PERMIT NUMBER: 3680P
![Page 69: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/69.jpg)
ISSUENo. DATE DESCRIPTION BY APP'D
2
4
5
FIG. - 04REVISIONNo. DATE DESCRIPTION BY
2
5
LEGEND
DRAINAGE PLAN
ROCKY RAPIDS-BRAZEAU COUNTY
SUNSET ACRES DRAINAGE STUDY
PERMIT TO PRACTICE
MPE ENGINEERING LTD.
PERMIT NUMBER: 3680P
OVERLAND FLOW DIRECTION
MINOR DITCHES:
MAJOR DITCHES:
![Page 70: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/70.jpg)
![Page 71: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/71.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
APPENDIX B Historic Resource Clearance
![Page 72: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/72.jpg)
![Page 73: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/73.jpg)
Historic Resources Application
Activity Administration
Date Received: November 25,2014 HRA Number: 4835-14-0146-001
Project Category: Subdivisions (4835)
Application Purpose:
Lands Affected
Project Type:
Project Name: Sunset AcresAdditional Name(s):
Key Contact: Mr. Armin A Preiksaitis Affiliation: ParioPlan Inc.Address: 605, 10080 Jasper Ave City / Province: Edmonton, ABPostal Code: T5J 1V9 Phone: (780) 423-6824E-mail: [email protected] Fax: () -
Your File Number:
Proponent: Doug Sprague Contact Name: Doug SpragueAddress: Box149 City / Province: Rocky Rapids, ABPostal Code: T0E 1ZE Phone: (780) 542-1705E-mail: [email protected] Fax: () -
Proposed Development Area Land OwnershipMER RGE TWP SEC LSD List FRH SA CU CT
5 7 49 27 3,5,6
HRA Number: 4835-14-0146-001 Page 1 of 2
Requesting HRA Approval /Requirements
Residential SubdivisionArea Structure Plan /Outline Plan
Approximate Project Area (ha) 42.5
All New Lands
![Page 74: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/74.jpg)
Historical Resources Impact Assessment:For archaeological resources:Has a HRIA been conducted? Yes No Permit Number (if applicable):For palaeontological resource:Has a HRIA been conducted? Yes No Permit Number (if applicable):
Historical Resources Act clearance is granted subject to Section 31 of the Resources Act, "a person who discovers an historicresource in the course of making an excavation for a purpose other than for the purpose of seeking historic resources shall forthwithnotify the minister of the discovery". The chance discovery of historical resources is to be reported to the contacts identified withinthe listing.
HRA Number: 4835-14-0146-001 Page 2 of 2
DateDecember 01, 2014
![Page 75: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/75.jpg)
Sunset Acres Neighbourhood Area Structure Plan - November 2015
APPENDIX C Restrictive Covenant
![Page 76: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/76.jpg)
![Page 77: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/77.jpg)
![Page 78: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/78.jpg)
![Page 79: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/79.jpg)
![Page 80: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/80.jpg)
![Page 81: Sunset Acres Neighbourhood Area Structure Plan...4.0 DEVELOPMENT ON EPT 13 4.1 Overview 4.2 Land Use Policies 4.3 Parks, Open Spaces and Reserves ... The open house format provided](https://reader033.vdocument.in/reader033/viewer/2022051814/6039e550c2abfd3cfc43d1da/html5/thumbnails/81.jpg)