Supported by Bioplin u hrvatskom zakonodavstvu: Bioplin u hrvatskom zakonodavstvu: Administrativna procedura stjecanja statusa Administrativna procedura stjecanja statusa povlaštenog proizvođača povlaštenog proizvođača Contract N Contract N o. o. IEE/09/848 SI2.558364 IEE/09/848 SI2.558364 | P P roject duration 01/05/2010 – roject duration 01/05/2010 – 31/10/2012 31/10/2012 Sustainable Biogas Market Sustainable Biogas Market Development in Central and Eastern Development in Central and Eastern Europe Europe

Upload: tulia

Post on 11-Jan-2016

38 views

Category:

Documents


2 download

DESCRIPTION

Sustainable Biogas Market Development in Central and Eastern Europe. Bioplin u hrvatskom zakonodavstvu: Administrativna procedura stjecanja statusa povlaštenog proizvođača. Contract N o. IEE/09/848 SI2.558364 | P roject duration 01/05/2010 – 31/10/2012. Supported by. Sadržaj. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Supported by

Supported by

Bioplin u hrvatskom zakonodavstvu:Bioplin u hrvatskom zakonodavstvu:Administrativna procedura stjecanja statusa povlaštenog Administrativna procedura stjecanja statusa povlaštenog

proizvođačaproizvođača

Contract NContract No. o. IEE/09/848 SI2.558364IEE/09/848 SI2.558364 || P Project duration 01/05/2010 – 31/10/2012 roject duration 01/05/2010 – 31/10/2012

Sustainable Biogas Market Development in Sustainable Biogas Market Development in Central and Eastern EuropeCentral and Eastern Europe

Page 2: Supported by

Sadržaj

Zakonski okvir za razvoj projekata:

- Energetika

- Prostorno planiranje i gradnja

- Zaštita okoliša i prirode

- Zaštita i upravljanje vodama

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

Page 3: Supported by

Zakoni – energetika i OIE

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Zakon o tržištu električne energije (NN 177/04, 76/07, 152/08, 14/11)

-Zakon o energiji (NN 68/01, 117/04, 76/07, 152/08, 127/10)

-Zakon o regulaciji energetskih djelatnosti (NN 177/04, 76/07)

PODZAKONSKI AKTI ZA OIE I KOGENERACIJUPODZAKONSKI AKTI ZA OIE I KOGENERACIJU

-Pravilnik o korištenju obnovljivih izvora i kogeneracije (NN 67/07)

-Pravilnik o stjecanju statusa povlaštenog proizvođača električne energije (NN 67/07, 35/11)

-Tarifni sustav za proizvodnju električne energije iz OIE i kogeneracije

(NN 33/07)

-Uredba o minimalnom udjelu električne energije proizvedene iz OIEiK čija se proizvodnja potiče (NN 33/07, 08/11)

-Uredba o naknadama za poticanje proizvodnje električne energije iz obnovljivih izvora energije i kogeneracije (NN 33/07, 155/08, 155/09, 08/11)

Page 4: Supported by

Zakoni – energetika i OIE

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

TARIFNI SUSTAV ZA OIETARIFNI SUSTAV ZA OIE

P ≤ 1 MWP ≤ 1 MW

Page 5: Supported by

Zakoni – energetika i OIE

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

TARIFNI SUSTAV ZA OIETARIFNI SUSTAV ZA OIE

P > 1 MWP > 1 MW

Page 6: Supported by

Zakoni – priključak na mrežu

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Opći uvjeti za opskrbu električnom energijom (NN 14/06)

-Mrežna pravila elektroenergetskog sustava (NN 36/06)

-Pravilnik o naknadi za priključenje na elektroenergetsku mrežu i za povećanje priključne snage (NN 28/06)

-Dodatni tehnički uvjeti za priključak i pogon vjetroelektrana na prijenosnoj mreži (interni akt HEP-OPSa)

-Odluka o iznosu naknade za priključenje na elektroenergetsku mrežu i za povećanje priključne snage (NN 52/06)

-Pravilnik o naknadi za priključenje na elektroenergetsku mrežu i za povećanje priključne snage (NN 28/06)

Page 7: Supported by

Zakoni – gradnja i prostorno planiranje

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Zakon o prostornom uređenju i gradnji (NN 76/07, 38/09, 55/11)

-Pravilnik o jednostavnim građevinama i radovima (NN 21/09, 51/10, 126/10, 48/11)

-Uredba o određivanju zahvata u prostoru i građevina za koje MZOPUG izdaje lokacijsku i/ili građevinsku dozvolu (NN 116/07, 56/11)

Page 8: Supported by

Zakoni – zaštita okoliša i prirode

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Zakon o zaštiti okoliša (NN 110/07)

-Uredba o procjeni utjecaja zahvata na okoliš (NN 64/08, 67/09)

-Uredba o postupku utvrđivanja objedinjenih uvjeta zaštite okoliša (NN 114/08)

-Zakon o zaštiti prirode (NN 70/05, 139/08)

-Pravilnik o ocjeni prihvatljivosti zahvata za prirodu (NN 89/07)

-Uredba o proglašenju ekološke mreže (NN 109/07)

-Pravilnik o ocjeni prihvatljivosti plana, programa i zahvata za ekološku mrežu (NN 118/09)

-Zakon o zaštiti i očuvanju kulturnih dobara (NN 69/99, 151/03, 157/03, 87/09, 88/10)

Page 9: Supported by

Zakoni – zaštita i upravljanje vodama

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Zakon o vodama (NN 153/09)

-Uredba o uvjetima davanja koncesija za gospodarsko korištenje voda (NN 89/10)

-Pravilnik o izdavanju vodopravnih akata (NN 78/10)

-Zakon o koncesijama (NN 125/08)

Page 10: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

DETALJNIJE NA: DETALJNIJE NA: http://oie.mingorp.hr/default.aspx?id=43http://oie.mingorp.hr/default.aspx?id=43

Page 11: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

ENERGETSKI CILJEVI ZA OIE - HRVATSKAENERGETSKI CILJEVI ZA OIE - HRVATSKA

Prethodno energetsko odobrenje za izgradnju postrojenja (PEO)Prethodno energetsko odobrenje za izgradnju postrojenja (PEO)

Izdaje: MINGORP

Svrha: registracija projekta OIEosiguranje privremenog isključivog prava na ispitivanjepravo rješavanja imovinsko pravnih pitanja na zemljištu RH

Uvjeti: preliminarna analiza opravdanosti izgradnjeregistriranost za energetske djelatnosti (sudski / obrtni

registar ili prijava u registar poreznih obveznika za fizičke osobe)

Ostalo: nije potrebno za snage ≤ 30 kWprvi korak u proceduri vezanoj za zakone u energeticiu tri godine potrebno zatražiti lokacijsku dozvolu

Page 12: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Rješenje o prihvatljivosti zahvata za ekološku mrežuRješenje o prihvatljivosti zahvata za ekološku mrežu

Izdaje: Ministarstvo kulture (Zavod za zaštitu prirode) ili županijska nadležna tijela

Svrha: očuvanje ekološke mreže

Uvjeti: obavezno za zahvate koji mogu utjecati na cjelovitost i očuvanje ekološke mreže

ako se provodi postupak prema ZzO – postupci se objedinjuju (samo Go)podloge: idejno rješenje i elaborati

Ostalo: postupak se provodi u dva koraka: Prethodna ocjena i Glavna ocjena

nije određen rok za provedbu Prethodne ocjene

Glavna ocjena se donosi u 4+2 mjeseca

Page 13: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Rješenje o prihvatljivosti zahvata za okoliš /Rješenje o prihvatljivosti zahvata za okoliš /Rješenje o potrebi procjene utjecaja zahvata za okolišRješenje o potrebi procjene utjecaja zahvata za okoliš

Izdaje: MZOPUG

Svrha: usklađivanje s načelima zaštite okolišanužno za ishođenje lokacijske dozvole

Uvjeti: potvrda o usklađenost s prostornim planovimaizrada studije utjecaja na okolišP>100 MWel, i PVE>20 MW – procjena utjecaja ZzOP>10 MW i PmHE>5 MW – ocjena potrebi procjene

utjecaja

Ostalo: za VE izrada elaborata traje minimalno 1 godinupotrebno točno lociranje objekata u prostoru

Page 14: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

ENERGETSKI CILJEVI ZA OIE - HRVATSKAENERGETSKI CILJEVI ZA OIE - HRVATSKA

Prethodna elektroenergetska suglasnost Prethodna elektroenergetska suglasnost (PEES)(PEES)

Izdaje: OPS ili ODS

Svrha: određivanje načina priključka na el.ene. mrežu

- mjesto priključka- snaga priključkanužno za ishođenje lokacijske

dozvole

Uvjeti: razrađen priključak u idejnom projektu (Opći uvjeti)

izrada Elaborata optimalnog tehničkog rješenja priključka

izrada Preliminarne analize mogućnosti priključenja (OPS)

Ostalo: formalni zahtjev za PEES daje (ured) MZOPUGmože sadržavati uvjete ispitivanja

postrojenjaizdaje se na najviše 2+2 godine

Page 15: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Vodopravni uvjetiVodopravni uvjeti

Izdaje: Hrvatske vode

Svrha: osiguranje zaštite od voda (poplava)osiguranje zaštite voda od onečišćenjaosiguranje racionalnog korištenja vodanužno za ishođenje lokacijske dozvole

Uvjeti: tehničko rješenje uređenja vodnog režima u idejnom projektu

Ostalo: Ako se izdaje rješenje o objedinjenim uvjetima zaštite okoliša, umjesto

vodopravnih uvjeta izdaje se obvezujuće vodopravno mišljenje

Page 16: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Lokacijska dozvola (LD) / Rješenje o uvjetima građenja Lokacijska dozvola (LD) / Rješenje o uvjetima građenja (RUG)(RUG)

Izdaje: MZOPUG za P>20 MW ili U≥220 kVuredi županija i velikih gradova

Svrha: određivanje lokacijskih uvjetausklađenje s prostornim planovima

Uvjeti: do 400 m2 (600 m2 u poljoprivredne namjene) – RUGidejni projektza LD dokaz pravnog interesa (PEO, potvrda AUDIO)za RUG potrebno imati dokaz prava građenja (IPO)

Ostalo: RUG je ujedno i dozvola za građenjeRUG ili LD potrebni su i za rekonstrukcije (promjena namjene građevine)

Page 17: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Energetsko odobrenje za izgradnju postrojenja (EO)Energetsko odobrenje za izgradnju postrojenja (EO)

Izdaje: MINGORP

Svrha: dozvola za gradnju energetskog objektanužno za građevinsku dozvolu / potvrdu glavnog

projekta

Uvjeti: ishođena LD ili RUGanaliza opravdanosti izgradnje

Ostalo: u roku 1 godina potrebno predati zahtjev za GD ili PGP

Page 18: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Ugovor o priključenjuUgovor o priključenju

Izdaje: OPS/ODS

Svrha: reguliranje rokova, obaveza i plaćanja naknada kod izgradnje priključka

Uvjeti: PEES

Ostalo: mogućnost prethodnog ugovora o priključenju

ugovara nositelj projekta

određivanje uvjeta za stavljanje priključka u funkciju

OPS/ODS je investitor priključka (kasnije vlasnik)

Page 19: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Vodopravna potvrdaVodopravna potvrda

Izdaje: Hrvatske Vode

Svrha: provjera usklađenosti glavnog projekta s uvjetima propisanim u vodopravnim uvjetima ili obvezujućim vodopravnim mišljenjem izdanim s lokacijskom

dozvolom

Uvjeti: LD

glavni projekt, elaborati, nostrifikacije

Ostalo: dovoljno je usmeno očitovanje predstavnika Hrvatskih voda

vrijedi koliko i akt kojim se odobrava građenje ILI 2 godine ako se radi o posebnim radovima

Page 20: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Građevinska dozvola (GD) / Potvrda glavnog projekta (PGP)Građevinska dozvola (GD) / Potvrda glavnog projekta (PGP)

Izdaje: MZOPUG za P>20 MW ili U≥220 kV - GDuredi županija i velikih gradova - PGPMINGORP za rudarske objekte i postrojenja

Svrha: provjera ispunjenja uvjeta iz etape LD

provjera sukladnosti s građevinskim propisima

Uvjeti: LD, EO

glavni projekt, elaborati, nostrifikacije

dokazano pravo građenja (vlasništvo, ortakluk, koncesija, služnost…)

Ostalo: između GD/PGP i građenja potrebno izraditi elaborat iskolčenja i prijaviti početak građenja

građenje mora početi u roku dvije godine

Page 21: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Prethodno rješenje o stjecanju statusa povlaštenog proizvođačaPrethodno rješenje o stjecanju statusa povlaštenog proizvođača

Izdaje: HERA

Svrha: stvaranje uvjeta za sklapanje ugovora o (zajamčenom) otkupu električne energije

Uvjeti: GD/PGP i EO

Ostalo: u roku 2+1 godine potrebno je izgraditi postrojenje i zatražiti konačno rješenje o stjecanju statusa povlaštenog

proizvođača

Page 22: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Ugovor o otkupu električne energijeUgovor o otkupu električne energije

Izdaje: HROTE

Svrha: osiguranje ulaska u poticanu kvotu projekata OIE (13,4% do 2020.)

Uvjeti: Prethodno rješenje o SPP

Ugovor o priključenju

Ostalo: ugovor stupa na snagu stjecanjem rješenja o SPP

Page 23: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Koncesije / vodopravna dozvolaKoncesije / vodopravna dozvola

Izdaje: MRRŠVG - koncesija za mHEMINGORP - koncesija za geotermalne bušotineHrvatske vode - vodopravna dozvola za mHE i ispuštanje otpadnih

voda

Svrha: reguliranje obaveza, naknada i uvjeta korištenja javnih dobara (vode, energetske mineralne sirovine)

reguliranje ispuštanja otpadnih voda (vodopravna dozvola)reguliranje ispuštanja otpadnih voda (vodopravna dozvola)

Uvjeti: pobjeda na nadmetanju za koncesiju

tehnički pregled (za ispuštanje otpadnih voda)

Page 24: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Uporabna dozvolaUporabna dozvola

Izdaje: MZOPUG za P>20 MW ili U≥220 kV - GDuredi županija i velikih gradova - PGPMINGORP za rudarske objekte i postrojenja

Svrha: provjera ispunjenja uvjeta iz etape GD i LD

provjera sukladnosti s građevinskim propisima

Uvjeti: uredna dokumentacija s gradilišta

pozitivna ocjena na tehničkom pregledu

Ostalo: za gradnju na temelju RUG nije potrebna uporabna dozvola

Page 25: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Elektroenergetska suglasnost (EES)Elektroenergetska suglasnost (EES)

Izdaje: OPS ili ODS

Svrha: potvrda uredno ispunjenih obaveza izgradnje priključka

nužno za sklapanje ugovora o korištenju mreže

određeni tehnički uvjeti rada na mreži

Uvjeti: GD / PGP / RUGplaćene naknade za izgradnju priključkauspješno obavljeno ispitivanje prema

uvjetima propisanima u PEES

Page 26: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Ugovor o korištenju mrežeUgovor o korištenju mreže

Izdaje: OPS ili ODS

Svrha: reguliranje odnosa između operatora i elektrane (obračuni, prava, obaveze, sporovi…)

određivanje eventualnih dodatnih obaveza

Uvjeti: EESplaćene sve naknade

Ostalo: priključak se stavlja u trajni pogon tek nakon što su ispunjeni svi uvjeti iz ugovora o korištenju mreže

Page 27: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽUDozvola za obavljanje energetske djelatnostiDozvola za obavljanje energetske djelatnosti

Izdaje: HERA - potrebno samo za P>1 MW

Svrha: stjecanje svojstva “energetski subjekt”

Uvjeti: uporabna dozvola

tehnička i financijska kvalificiranost (može se ispitivati)

stručna osposobljenost (može se ispitivati)

dokazati sposobnost obavljanja energetske djelatnosti

Ostalo: rješenja se izdaju na određeni broj godina i mogu se produžiti

Page 28: Supported by

RJEŠENJE O PRIHVATLJIVOSTI

ZAHVATA ZA OKOLIŠ

LOKACIJSKA DOZVOLA

-----------------------RJEŠENJE O

UVJETIMA GRAĐENJA

PRETHODNA ELEKTROENERGETSKA

SUGLASNOST

PRETHODNO ENERGETSKO ODOBRENJE

ENERGETSKO ODOBRENJE

UPORABNA DOZVOLA

PRETHODNO RJEŠENJE O STJECANJU STATUSA

POVLAŠTENOG PROIZVOĐAČA

DOZVOLA ZA OBAVLJANJE ENERGETSKE DJELATNOSTI

UGOVOR O OTKUPU ELEKTRIČNE ENERGIJE

UGOVOR O PRIKLJUČENJU

ODLUKA I/ILI UGOVOR O KONCESIJI

VODOPRAVNA DOZVOLA

VODOPRAVNI UVJETI

ELEKTROENERGETSKA SUGLASNOST

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

UGOVOR O KORIŠTENJU MREŽE

RJEŠENJE O STJECANJU STATUSA POVLAŠTENOG

PROIZVOĐAČA

ENERGETSKO ODOBRENJE

GRAĐEVINSKA DOZVOLA-------------------------------POTVRDA GLAVNOG

PROJEKTA

VODOPRAVNA POTVRDARJEŠENJE O

PRIHVATLJIVOSTI ZAHVATA ZA

EKOLOŠKU MREŽU

Rješenje o stjecanju statusa povlaštenog proizvođačaRješenje o stjecanju statusa povlaštenog proizvođača

Izdaje: HERA

Svrha: stjecanje prava na zajamčeni otkup električne energije

aktiviranje ugovora o otkupu električne energije

Uvjeti: uporabna dozvola

dozvola za obavljanje energetskih djelatnosti

ugovor o korištenju mreže

Ostalo: rješenje se izdaje na rok od 12 godina

Page 29: Supported by

Zakoni – što nas očekuje

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

-Najava zakona o obnovljivim izvorima energije – do kraja 2011.

-Najava izmjena i dopuna podzakonskih akata (tarife) – sredina 2011. (?)

-U tijeku donošenje 4 nova zakona u području energetike (energija, tržište, regulacija, plin)

-Moguće izmjene podzakonskih akata vezanih za priključak i rad privatnih elektrana

-NAJUČESTALIJI PRIGOVORI

-Presložena procedura za male elektrane (fotonapon) za fizičke osobe

-Ograničenje sunčanih elektrana na 1 MW ukupno u cijeloj RH

-Izgradnja priključka na prijenosni sustav

-Trajanje probnog pogona / ne-naplata energije u probnom pogonu

-Nakon početka građenja PEES je “beskonačan”, a kapacitet zauzet.

Page 30: Supported by

09/06/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

Fraunhofer-Institute for Wind Energy and Energy System TechnologyDivision Bioenergy System TechnologyM.Sc. Henning HahnPhone: +49/(0)561/[email protected]

WIP - Renewable EnergiesDipl. Ing. Dominik Rutz M.Sc.Phone: +49/(0)89/[email protected]

European Biogas AssociationIng. Franz KirchmayrVice PresidentMobile: +43/[email protected]

Partneri i kontaktiPartneri i kontakti

Page 31: Supported by

07/12/2010 | Contract No. IEE/09/848 SI2.558364 | Project duration 01/05/2010 – 31/10/2012

KoordinatorKoordinator::

Energetski institut Hrvoje PožarSavska cesta 163Zagreb, Hrvatskawww.eihp.hrFax: +385 1 6040 599

KontaktKontakt:: Ana Kojaković [email protected]: +385 1 6326 135

Biljana Kulišić[email protected]: +385 1 6326 169

Web stranica projektaWeb stranica projekta::www.biogasin.org

Partneri na projektuPartneri na projektu::

• WIP Renewable Energies (WIP), Germany

• European Biogas Association (EBA),

Belgium

• Fraunhofer (IWES), Germany

• Centre for Renewable Energy Sources

and Savings (CRES), Greece

• Czech Biogas Association (CzBA),

Czech Republic

• EKODOMA, Latvia

• Energoproekt, JSC (ENPRO), Bulgaria

• Razvojna agencija Sinergija, Slovenia

• Trinergy Grup (TG), Romania

Partneri i kontaktiPartneri i kontakti