Page 1: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface TreatmentSurface Treatment

Multi Agencies CollaborationMulti Agencies Collaboration

Page 2: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Participating AgenciesParticipating Agencies

Oregon Department of Transportation Ona Beach Maintenance Section

Rose Lodge Maintenance Section

Benton County Department of Transportation

Private Contractors

Page 3: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

2010 Surface Treatment Projects2010 Surface Treatment Projects

Highway 34 From Milepost 7.0- Milepost 14.0

Highway 226 From Milepost 13.5-Milepost 16.0

Page 4: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Oregon Department of Oregon Department of Transportation Responsibilities Transportation Responsibilities

• Materials Contracts

• Iron Mountain Chip Seal Rock 3/8-1/4,

• Liquid Asphalt-HFRS-1P

• Testing of Materials

Page 5: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• Stockpile Site Preparation

• Stockpile Chip Seal Rock

• Monitor Stockpile Moisture Content

• Stockpile Location Cleanup

Page 6: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• Front End Loader and Operator

• Three Roller Operators

• One Pneumatic Roller (Rental/within ODOT)

• Six Ten Yard Trucks and Drivers

• 2000 gal. Water Truck

• Open Air Broom and Operator

• Broom Shadow Vehicle and Operator

Page 7: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• VMS Boards placed for advanced warning

• Stick and Stomps and Setter Prior to start of Project

• Work Zone Signage and Set up

• Pilot Cars and Operators

• Stick and Stomp Tab Cover Removal

Page 8: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Benton County Department of Benton County Department of Transportation Responsibilities Transportation Responsibilities

• Materials Contract (Freight/Distributors)

• Daily Ordering of Materials

• Material Samples for Testing

Page 9: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Benton County Department of Benton County Department of Transportation ResponsibilitiesTransportation Responsibilities

• 2000 Gallon Liquid Asphalt Distributor and Operator ( as needed for chip seal and fog seal)

• Chip Spreader with Operator and Dump Boss/Belt Operator

• Pneumatic Roller and Steel Wheel Single Drum• Ten Yard Dump Trucks( as needed)• Open Air Broom ( as needed)• Specialty Signs ( Loose Rock, Fresh Oil)

Page 10: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Contractor ResponsibilitiesContractor Responsibilities

• 4400 Gallon Liquid Asphalt Distributor (Chip Seal and Fog Seal, Albania)

• Traffic Control Flaggers ( St Vincent's )

Page 11: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• Benton County Chip Spreader

• ODOT Ten Yard Truck

Page 12: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

Contractor 4400 Gallon Liquid Asphalt Distributor

Page 13: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• Benton County Rollers

• ODOT Roller

• ODOT Operators

Page 14: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• ODOT Pilot Vehicle

Page 15: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• ODOT Pilot Vehicle controlling traffic speeds through the work zone.

Page 16: Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance

Estimated Costs for Hwy 34Estimated Costs for Hwy 34

• Cost per mile $37,200

• Cost per sq yd $2.65